Está en la página 1de 5

ENTIDAD:

MTC-PROVIAS NACIONAL.

OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA-SAN FRANCISCO


TRAMO 2: KM. 78+500-KM.172+420 ( SAN FRANCISCO ).

CONTRATISTA:

CONSORCIO VIAL QUINUA.

SUPERVISOR:

CONSORCIO SUPERVISOR LA QUINUA

CONSORCIO SU

OBRAS DE
REPLANT
PROYECTO

REPLANTEO

BADEN N :
PROG. INICIAL

PROG.

FINAL

PROG.
INICIAL

PROG.
FINAL

LONG.
PROYECTO

78+842.50

78+857.50

78+842.50

78+857.50

15.00

92+955.50

92+970.50

92+955.50

92+970.50

15.00

99+951.00

100+011.00

99+951.00

100+011.00

60.00

103+847.50

103+862.50

103+847.50

103+862.50

15.00

104+757.50

104+772.50

104+757.50

104+772.50

15.00

105+655.00

105+685.00

105+655.00

105+685.00

30.00

118+765.000

118+795.00

118+765.000

118+795.00

30.00

124+507.50

124+522.50

124+507.50

124+522.50

15.00

127+643.50

127+658.50

127+643.50

127+658.50

15.00

10

135+308.00

135+338.00

135+308.00

135+338.00

30.00

11

142+570.00

142+589.00

142+570.00

142+589.00

19.00

12

148+970.00

148+990.00

148+970.00

148+990.00

20.00

13

154+520.00

154+535.00

154+520.50

154+535.50

15.00

14

155+095.00

155+110.00

155+095.00

155+110.00

15.00

15

159+582.452

159+597.50

159+582.50

159+597.50

15.05

16

170+230.00

170+250.00

170+230.00

170+250.00

20.00

17

170+547.00

170+567.00

170+547.00

170+567.00

20.00

CONSORCIO SUPERVISOR LA QUINUA


OBRAS DE ARTE Y DRENAJE
REPLANTEO DE BADENES

LONG.
REPLANTEO
15.00
15.00
60.00
15.00
15.00
30.00
30.00
15.00
15.00
30.00
19.00
20.00
15.00
15.00
15.00
20.00
20.00

AUTORIZACIONES DE TRABAJO

PRESENTA CONTRATISTA

OBSERVACION

Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado
Aprobado

FECHA AUT.

N DE AUT.

10/27/2014

AUT. N 762

2/9/2015
1/6/2014
11/28/2014
11/28/2014

AUT.
AUT.
AUT.
AUT.

N
N
N
N

886
837
817
818

5/29/2015
5/29/2015

AUT. N 1052
AUT. N 1056

11/25/2014
11/25/2014
6/21/2013
6/21/2013
6/30/2015
6/5/2015
7/8/2013

AUT. N 806
AUT. N 807
AUT. N 610
AUT. N 609
AUT. N 1115
AUT. N 1070
AUT. N 633

FECHA

CVQ-0192:
CVQ-0192:
CVQ-0192:
CVQ-0192:
CVQ-0192:
CVQ-0337:
CVQ-0328:
CVQ-0192:
CVQ-0192:
CVQ-0192:
CVQ-0192:
CVQ-0192:
CVQ-0192:
CVQ-0192:
CVQ-0192:
CVQ-0192:
CVQ-0192:

F=03-05-13
F=03-05-13
F=03-05-13
F=03-05-13
F=03-05-13
F=19-07-13
F=16-07-13
F=03-05-13
F=03-05-13
F=03-05-13
F=03-05-13
F=03-05-13
F=03-05-13
F=03-05-13
F=03-05-13
F=03-05-13
F=03-05-13

APROBACION SUPERVISOR
OBSERVACIONES
FECHA

CSQ-0056:
CSQ-0056:
CSQ-0056:
CSQ-0056:
CSQ-0056:
CSQ-0119:
CSQ-0116:
CSQ-0056:
CSQ-0056:
CSQ-0056:
CSQ-0056:
CSQ-0056:
CSQ-0056:
CSQ-0056:
CSQ-0056:
CSQ-0056:
CSQ-0056:

F=09-05-13
F=09-05-13
F=09-05-13
F=09-05-13
F=09-05-13
F=22-07-13
F=18-07-13
F=09-05-13
F=09-05-13
F=09-05-13
F=09-05-13
F=09-05-13
F=09-05-13
F=09-05-13
F=09-05-13
F=09-05-13
F=09-05-13

Cambio x informe 64 ; 25 - 09 - 12

Cambio x informe 56 ; 09 - 05 - 13
Cambio x informe 64 ; 25 - 09 - 12
Cambio x informe 64 ; 25 - 09 - 12

AUT N730, 06.10.14 Emboquillados de E.yS.


AUT N731, 06.10.14 Emboquillados de E.yS.

AUT N732, 06.10.14 Emboquillados de E.yS.

VOLUMEN DE DEMOLICION
( ESTRUCTURA EXISTENTE )

Mejoramiento Nivel SR L=5 ;Ancho=4.00m; H=0.60m

AUT N819

Mejoramiento Nivel SR L=20 ;Ancho=4.80m; H=1.20m

AUT N821

10.51 m3
11.62 m3

12.87 m3
12.45 m3
9.96 m3
29.18 m2
25.30 m3

AUT N622
AUT N623

solado 10 cm = 4.29m3 ; concreto 20 cm= 8.58m3


solado 10 cm = 4.15m3 ; concreto 20 cm= 8.30m3

6/5/2015

AUT. N 1069

AUT N610
AUT N609
AUT N650
AUT N649
AUT N648

11/27/2014

11/28/2014
6/26/2013
6/26/2013

6/21/2013
6/21/2013
7/10/2013
7/10/2013
7/10/2013