Proyecto
CONSTRUCCION DE PAVIMENTO Y VEREDAS EN LAS CALLES DEL CASERIO ANCORACA, DISTRITO DE MATO, PROVINCIA DE HUAY
90 DIAS CALENDARIOS
Tiempo de Ejecucin
Item
01.01.00
DESCRIPCION
OBRAS PROVISIONALES
TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR
CONO DE FIBRA DE VIDRIO FOSFORECENTE
MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL
CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M
CAMPAMENTO PROVISIONAL DE LA OBRA (CALAMINA)
MOVILIZACION Y DESMOVILIZACION DE EQUIPO PARA LA OBRA
01.02.00
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
LIMPIEZA GENERAL DE LA OBRA
DEMOLICION DE PAVIMENTO DE CONCRETO DE 0.10 MTS
01.03.00
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN MATERIAL COMPACTADO A NIVEL DE SUB RASANTE
CONFORMACIONY COMPACTACION ANIVEL DE SUB RASANTE
ELIMINACION DE MATERIAL EXCEDENTE
01.04.00
PAVIMENTOS
SUB BASE GRANULAR E=0.15 M
BASE GRANULAR E=0.15 M
1 MES
0
2 MES
30
31
3
60
61
01.05.00
01.06.00
SEALIZACION DE TRANSITO
PINTADO DE LAS MARCAS RENDIMIENTO 400 ML/DIA
PINTADO DE PAVIMENTO ( SIMBOLOS Y LETRAS)
01.07.00
SARDINELES
CONCRETO F'C=175 KG/CM2 PARA SARDINELES
ENCOFRADO Y DESENCOFRADO DE SARDINELES
ACERO FY=4200KG/CM2 PARA SARDINELES
JUNTAS ASFALTICAS
PINTADO DE SARDINELES
3 MES
90
Proyecto: CONSTRUCCION DE PISTAS Y VEREDAS EN LAS CALLES DEL CASERIO ANCORACA, DISTRITO DE MATO, PROVINCIA DE HUAYLA
60 DIAS CALENDARI
Tiempo de Ejecucin
Item
DESCRIPCION
1 MES
0
2 MES
30
31
3
60
61
PAVIMENTO: EMBOQUILLADO
01.00.00
OBRAS PROVISIONALES
01.01.00
01.02.00
OFICINA Y ALMACEN
01.03.00
01.04.00
GUARDIANIA
01.05.00
FLETE TERRESTRE
02.00.00
TRABAJOS PRELIMINARES
02.01.00
02.02.00
02.03.00
LIMPIEZA DE TERRENO
03.00.00
PAVIMENTOS
03.01.00
MOVIMIENTO DE TIERRAS
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.02.00
PAVIMENTOS
03.02.01
PREPARACION DE PIEDRA
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
04.00.00
JUNTAS
04.01.00
05.00.00
VARIOS
05.01.00
OBRAS PRELIMINARES
3 MES
90
CRONOGRAMA DE EJECUCION
Proyecto:
"CONSTRUCCION Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DEL CASERIO DE HUINO ALTO Y ALCANTARILLADO DE LOS CASERIOS H
PROVINCIA DE HUAYLAS - ANCASH"
Item
DESCRIPCION
RED DE ALCANTARILLADO HUARIPAMPA
01.00.00
OBRAS PROVISIONALES
01.01.00
01.02.00
01.03.00
01.04.00
GUARDIANIA
01.05.00
02.00.00
OBRAS PRELIMINARES
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
03.00.00
MOVIMIENTO DE TIERRAS
03.01.00
EXCAVACION DE ZANJA
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.01.08
03.01.09
EXCAVACION DE ZANJA C/MAQ. PARA CONEXIONES DOMICILIARIAS Ap=0.80M Hmax<=2.50M EN TERRENO CONGLOMERADO
03.02.00
NIVELACION Y REFINE
03.02.01
03.03.00
03.03.01
CAMA DE APOYO P/TUB. HASTA 160MM CON MATERIAL DE PRESTAMO, H=0.10M Aprom=1.00M
03.04.00
03.04.01
RELLENO DE ZANJA CON MATERIAL DE PRESTAMO, C/EQ LIV HASTA 1.50 DE PROF/PROM
03.04.02
03.04.03
03.04.04
03.04.05
03.04.06
03.04.07
03.04.08
03.04.09
RELLENO DE ZANJA, CONEXION DOMICILIARIA C/MAT. DE PRESTAMO INC. COMPACTACION, TERRENO CONGLOMERADO Hmax<=2.50 M.
03.02.00
03.02.01
04.00.00
INSTALACION DE TUBERIAS
04.01.00
05.00.00
CAMARAS DE INSPECCION
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
05.07.00
05.08.00
05.09.00
05.10.00
06.00.00
CONEXIONES DOMICILIARIAS
06.01.00
06.03.00
07.00.00
PRUEBA HIDRAULICA
07.01.00
07.02.00
08.00.00
08.01.00
08.02.00
OBRAS PRELIMINARES
01.01.00
01.02.00
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
02.02.00
03.00.00
03.01.00
03.02.00
03.03.00
04.00.00
04.01.00
05.00.00
CARPINTERIA METALICA
02.02.00
02.02.00
02.02.00
OBRAS PRELIMINARES
01.01.00
01.02.00
01.03.00
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
02.02.00
02.03.00
03.00.00
03.01.00
04.00.00
04.01.00
LOSA DE CIMENTACION
04.01.01
04.01.02
04.02.00
MUROS REFORZADOS
04.02.01
04.02.02
04.02.03
04.03.00
SEDIMENTADOR
04.03.01
04.03.02
04.03.03
04.04.00
04.04.01
04.04.02
04.04.03
05.00.00
05.01.00
06.00.00
JUNTAS
06.01.00
07.00.00
VALVULAS Y ACCESORIOS
07.01.00
07.02.00
07.03.00
07.04.00
08.00.00
CARPINTERIA METALICA
08.01.00
SUBPRESUPUESTO: FILTRO
01.00.00
TRABAJOS PRELIMINARES
01.01.00
01.02.00
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
02.02.00
03.00.00
03.01.00
03.02.00
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
05.00.00
05.01.00
06.00.00
FILTRO
06.01.00
07.00.00
VARIOS
07.01.00
07.02.00
OBRAS PRELIMINARES
01.01.00
01.02.00
01.03.00
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
02.02.00
02.03.00
03.00.00
03.01.00
04.00.00
04.01.00
LOSA DE CIMENTACION
04.01.01
04.01.02
04.02.00
MUROS REFORZADOS
04.02.01
04.02.02
04.02.03
04.03.00
COLUMNAS
04.03.01
04.03.02
05.00.00
05.01.00
06.00.00
VARIOS
06.01.00
06.02.00
06.03.00
06.04.00
06.05.00
06.06.00
06.07.00
06.08.00
06.09.00
06.10.00
COSTO DIRECTO
G. G. (15%)
Utilidades (10%)
SUB -TOTAL
NTARILLADO DE LOS CASERIOS HUACANHUASI, HUICHI, SAN DIEGO, HUANCUP, ACHA Y HUINO DEL DISTRITO DE MATO,
PERFIL
1 MES
0
2 MES
30
31
3 MES
60
61
4 MES
90
91
120
4,000.00
3,600.00
50,000.00
4,000.00
0.00
0.00
0.00
3,600.00
0.00
0.00
0.00
0.00
0.00
0.00
50,000.00
22,060.80
150,000.00
5,515.20
5,515.20
5,515.20
5,515.20
150,000.00
0.00
0.00
0.00
1,052.86
0.00
0.00
0.00
0.00
0.00
10,528.56
9,475.70
1,417.60
1,417.60
112.35
112.35
10,374.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,753.10
0.00
0.00
3,185.58
0.00
0.00
13,208.38
0.00
0.00
11,469.98
0.00
0.00
36,862.48
0.00
0.00
10,374.65
1,532.50
0.00
1,532.50
58,046.04
58,046.04
12,974.78
12,974.78
6,999.82
6,999.82
10,338.00
10,338.00
12,941.65
12,941.65
1,389.48
1,389.48
8,259.30
5,506.20
4,778.36
1,592.79
59,437.69
46,229.31
45,879.92
34,409.94
98,299.96
61,437.47
141,270.22
141,270.22
0.00
0.00
0.00
0.00
0.00
0.00
8,163.14
0.00
0.00
25,446.72
0.00
0.00
53,042.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41,107.00
41,107.00
24,489.43
16,326.28
38,170.08
12,723.36
53,042.25
0.00
5,674.28
0.00
5,674.28
38,895.30
0.00
38,895.30
23,234.92
0.00
23,234.92
106,574.46
35,524.82
71,049.64
226,954.37
68,086.31
158,868.06
140,380.80
81,888.80
58,492.00
80,598.69
80,598.69
10,524.30
10,524.30
13,720.77
13,720.77
0.00
0.00
0.00
0.00
0.00
0.00
6,077.84
0.00
0.00
14,484.32
0.00
0.00
3,877.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,695.44
4,695.44
12,155.68
6,077.84
14,484.32
0.00
3,877.19
0.00
11,631.57
0.00
11,631.57
8,021.00
0.00
12,713.75
8,021.00
5,650.56
7,063.19
37,060.04
15,441.68
3,288.60
21,618.36
1,096.20
2,192.40
13,204.10
6,094.20
5,154.11
7,109.90
1,982.35
3,171.76
201,144.46
95,278.95
105,865.50
8,320.40
3,697.96
4,622.44
0.00
0.00
0.71
0.00
5.60
0.00
1.41
0.00
0.71
5.60
0.00
0.00
45.48
0.00
0.00
45.48
0.00
13.23
0.00
0.00
13.23
0.00
339.25
0.00
0.00
0.00
0.00
0.00
0.00
339.25
0.00
649.38
649.38
0.00
714.62
714.62
0.00
1,147.80
0.00
0.00
1,147.80
0.00
250.56
0.00
0.00
250.56
0.00
200.56
0.00
0.00
200.56
0.00
77.71
0.00
0.00
77.71
0.00
46.73
0.00
0.00
0.00
0.00
0.00
0.00
46.73
0.00
47.79
47.79
0.00
64.37
64.37
0.00
12,634.06
0.00
0.00
12,634.06
0.00
0.00
65.33
0.00
0.00
4,442.47
0.00
65.33
0.00
5,923.30
1,480.82
159.70
0.00
0.00
106.46
53.23
3,568.20
0.00
2,648.90
0.00
1,784.10
1,784.10
0.00
0.00
2,648.90
0.00
15,638.01
0.00
0.00
0.00
0.00
0.00
0.00
15,638.01
5,735.34
5,735.34
15,146.54
0.00
0.00
0.00
15,146.54
3,860.22
0.00
0.00
0.00
3,860.22
2,016.09
0.00
0.00
0.00
0.00
0.00
0.00
2,016.09
2,535.54
2,535.54
1,458.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,458.44
203.46
203.46
257.04
257.04
10,686.07
0.00
0.00
0.00
10,686.07
4,434.02
0.00
0.00
0.00
4,434.02
1,822.48
0.00
0.00
0.00
1,822.48
33.25
0.00
0.00
0.00
33.25
0.00
0.00
0.00
948.27
0.00
0.00
0.00
179.00
948.27
179.00
3,600.00
0.00
0.00
0.00
3,600.00
162.43
0.00
0.00
162.43
0.00
0.00
129.18
0.00
129.18
0.00
11,107.68
0.00
0.00
11,107.68
0.00
2,584.38
0.00
0.00
2,584.38
0.00
1,981.44
0.00
0.00
1,981.44
0.00
1,049.39
0.00
0.00
1,049.39
0.00
9,571.13
0.00
0.00
0.00
0.00
0.00
2,862.79
0.00
0.00
4,532.10
0.00
0.00
0.00
9,571.13
4,294.19
1,431.40
6,798.15
2,266.05
6,310.92
6,310.92
474.82
0.00
0.00
316.55
158.27
953.24
0.00
0.00
0.00
953.24
5,575.80
0.00
0.00
0.00
5,575.80
26,898.55
0.00
0.00
0.00
26,898.55
11,300.31
0.00
0.00
0.00
11,300.31
199.89
0.00
94.16
0.00
199.89
0.00
0.00
0.00
94.16
0.00
0.00
277.72
0.00
277.72
0.00
10,704.61
0.00
0.00
3,568.20
0.00
0.00
0.00
0.00
0.00
0.00
7,136.41
279.49
279.49
5,018.78
5,018.78
164.36
0.00
0.00
0.00
164.36
17,010.09
0.00
0.00
0.00
17,010.09
3,644.26
0.00
0.00
0.00
3,644.26
3,305.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,305.79
3,982.22
3,982.22
1,863.92
1,863.92
331.81
0.00
0.00
0.00
331.81
709.67
0.00
0.00
0.00
709.67
2,892.38
0.00
0.00
0.00
2,892.38
1,762.30
0.00
0.00
0.00
1,762.30
0.00
0.00
0.00
26.14
0.00
0.00
0.00
30.25
0.00
0.00
0.00
52.50
0.00
0.00
0.00
25.26
0.00
0.00
0.00
33.25
26.14
30.25
52.50
25.26
33.25
5,542.71
0.00
0.00
0.00
5,542.71
1,359.61
0.00
0.00
0.00
1,359.61
1,122.84
0.00
0.00
0.00
1,122.84
0.00
0.00
0.00
7,697.95
1,129,679.22
169,451.88
112,967.92
1,412,099.03
712,650.07
106,897.51
71,265.01
890,812.58
59,666.21
8,949.93
5,966.62
74,582.76
205,844.77
30,876.72
20,584.48
257,305.96
7,697.95
###
316,176.05
210,784.03
###
500,612.07
###
268,298.82
1,680,397.85
53.59%
53.59%
169,254.39
1,060,066.97
33.81%
87.40%
14,170.72
88,753.48
2.83%
90.23%
48,888.13
306,194.09
9.77%
100.00%
Presupuesto
Obra
: MEJORAMIENTO Y AMPLIACION DE LOS SISTEMAS DE AGUA Y ALCANTARILLADO DEL C.P. HUARIPAMPA, DISTR
SANTA CRUZ, PROVINCIA DE HUAYLAS- ANCASH
Frmula
Cliente
Departamento
ANCASH
Item
Descripcin
Costo al
Provincia
HUAYLAS
Unidad
Metrado
Precio
Distrito
01.00.00
OBRAS PRELIMINARES
01.01.00
M2
2.77
0.51
01.02.00
M2
2.77
2.02
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
1.20
37.90
02.02.00
M3
1.50
8.82
03.00.00
03.01.0
M3
0.87
389.94
03.01.02
M2
16.19
40.11
03.01.03
KG
141.23
5.06
04.00.00
04.01.00
M2
16.82
68.24
05.00.00
CARPINTERIA METALICA
05.01.00
UND
1.00
250.56
05.02.00
UND
1.00
200.56
05.03.00
UND
1.00
77.71
COSTO DIRECTO
GASTOS GENERALES ( 15% )
UTILIDADES
(10%)
SUBTOTAL
IGV
(19%)
PRESUPUESTO TOTAL
SON :
SANTA CRUZ
Parcial
Total
1.41
5.60
7.01
45.48
13.23
58.71
339.25
649.38
714.62
1,703.25
1,147.80
1,147.80
250.56
200.56
77.71
528.83
3,445.60
516.84
344.56
4,307.00
818.33
-------------------5,125.33
CONSTRUCCION DE PAVIMENTO Y VEREDAS EN LAS CALLES DEL CASERIO ANCORACA, DISTRITO DE MATO, PROVINCIA DE HUAY
90 DIAS CALENDARIO
Tiempo de Ejecucin
Item
DESCRIPCION
01.00.00
OBRAS PRELIMINARES
01.01.00
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
03.00.00
CONCRETO SIMPLE
03.01.01
03.01.02
04.00.00
JUNTAS DE DILATACION
04.01.00
04.02.00
BRUAS DE 1/2"
05.00.00
INSTALACIONES SANITARIAS
05.01.00
05.02.00
SUMINISTRO CAJA CONCRETO SIMPLE + TAPA C.ARMADO .25 X .50M. - PARA AGUA
1 MES
0
2 MES
30
31
3
60
61
3 MES
90