Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Obra
Dpto.
Provincia
Distrito
Fecha de Inicio
Fecha de Trmino
PARTIDA
DESCRIPCION
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA 4.80x3.
MOVILIZACION Y DESMOVILIZACION DE MAQUINA
CONSTRUCCION DE CAMPAMENTO PROVISIONAL
MEJORAMIENTO DE TROCHA DE ACCESO
CONSTRUCCION DE TROCHA DE ACCESO A CANA
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
LIMPIEZA Y DESBROCE DE TERRENO MANUAL
BOCATOMA
MOVIMIENTO DE TIERRAS
EXCAVACION EN MATERIAL SUELTO
EXCAVACION EN ROCA SUELTA
RELLENO COMPACTADO CON MATERIAL PROPI
ESCOLLERA DE ROCA GRANITICA d=0.60m Pmin=
OBRAS DE CONCRETO SIMPLE
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
CONCRETO CICLOPEO FC=140KG/CM2+30% PM
CONCRETO CICLOPEO FC=175KG/CM2+25% PM
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C= 210KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4200 KG/CM2
JUNTA DE DILATACION CON WATER STOP 6" e=1
COMPUERTAS Y REJILLAS
COMPUERTA PLANA TIPO ARMCO 1.00x1.20M MO
COMPUERTA PLANA TIPO ARMCO 0.85x0.45M MO
REJILLA METALICA INGRESO VENTANA CAPTACI
VARIOS
ALBAILERA DE PIEDRA EMBOQUILLADA CON
CANAL PRINCIPAL
MOVIMIENTO DE TIERRAS
EXCAVACION EN MATERIAL SUELTO
EXCAVACION EN ROCA SUELTA
EXCAVACION EN ROCA FIJA
FILTROS DE GRAVA HASTA 2" CON TUBERA P
RELLENO COMPACTADO CON MATERIAL PROPI
REFINE Y NIVELACION DE CAJA DE CANAL
CANAL
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
CONCRETO F'C= 175KG/CM2
CONCRETO F'C= 210KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO FY= 4200 KG/CM2
P. UNIT.
TOTAL
UND
CANT
und
glb
m2
Km
Km
1.00
1.00
100.00
1.00
1.00
1,179.36
8,000.00
117.41
5,000.00
8,200.00
1,179.36
8,000.00
11,741.00
5,000.00
8,200.00
100.00%
50.00%
100.00%
100.00%
100.00%
1,179.36
4,000.00
11,741.00
5,000.00
8,200.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
50.00%
0.00%
0.00%
0.00%
Km
Km
12.00
12.00
643.85
190.24
7,726.20
2,282.88
40.00%
50.00%
3,090.48
1,141.44
20.00%
50.00%
1,545.24
1,141.44
10.00%
0.00%
772.62
0.00
10.00%
0.00%
772.62
0.00
10.00%
0.00%
772.62
0.00
10.00%
0.00%
m3
m3
m3
m3
485.60
121.40
100.35
78.00
6.20
22.09
13.41
133.11
3,010.72
2,681.73
1,345.69
10,382.58
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
20.00%
20.00%
20.00%
20.00%
602.14
536.35
269.14
2,076.52
80.00%
80.00%
80.00%
80.00%
2,408.58
2,145.38
1,076.55
8,306.06
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
m2
m3
m3
m2
55.00
40.90
57.10
154.00
13.18
144.45
158.19
23.48
724.90
5,908.01
9,032.65
3,615.92
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
10.00%
10.00%
10.00%
10.00%
72.49
590.80
903.27
361.59
90.00%
90.00%
90.00%
90.00%
652.41
5,317.21
8,129.39
3,254.33
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
m3
m2
kg
m
93.60
255.00
4896.00
15.00
281.02
28.73
3.28
24.07
26,303.47
7,326.15
16,058.88
361.05
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
26,303.47
7,326.15
16,058.88
361.05
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
und
und
und
1.00
1.00
1.00
1,763.52
1,460.31
228.21
1,763.52
1,460.31
228.21
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
1,763.52
1,460.31
228.21
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
m2
55.13
32.01
1,764.71
0.00%
0.00
0.00%
0.00
90.00%
1,588.24
10.00%
176.47
0.00%
0.00
0.00%
m3
m3
m3
m3
m3
m
27009.05
13607.24
13084.05
420.45
1611.87
12000.00
6.20
25.30
39.38
39.15
22.29
0.95
167,456.11
344,263.17
515,249.89
16,460.62
35,928.58
11,400.00
20.00%
20.00%
10.00%
0.00%
0.00%
0.00%
33,491.22
68,852.63
51,524.99
0.00
0.00
0.00
30.00%
30.00%
20.00%
10.00%
20.00%
10.00%
50,236.83
103,278.95
103,049.98
1,646.06
7,185.72
1,140.00
30.00%
30.00%
30.00%
30.00%
40.00%
40.00%
50,236.83
103,278.95
154,574.97
4,938.19
14,371.43
4,560.00
20.00%
20.00%
40.00%
30.00%
30.00%
30.00%
33,491.22
68,852.63
206,099.96
4,938.19
10,778.57
3,420.00
0.00%
0.00%
0.00%
30.00%
10.00%
20.00%
0.00
0.00
0.00
4,938.19
3,592.86
2,280.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
m2
m3
m3
m2
kg
36.40
3453.54
20.69
791.46
642.10
13.18
253.56
271.08
24.69
3.28
479.75
875,679.60
5,608.65
19,541.15
2,106.09
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
50.00%
0.00%
0.00%
0.00%
0.00%
239.88
0.00
0.00
0.00
0.00
50.00%
25.00%
5.00%
25.00%
5.00%
239.88
218,919.90
280.43
4,885.29
105.30
0.00%
30.00%
45.00%
30.00%
45.00%
0.00
262,703.88
2,523.89
5,862.35
947.74
0.00%
30.00%
50.00%
30.00%
50.00%
0.00
262,703.88
2,804.33
5,862.35
1,053.05
0.00%
15.00%
0.00%
15.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
5.00%
15.00%
15.00%
23.59
346.11
1,222.56
50.00%
30.00%
30.00%
235.89
692.23
2,445.12
45.00%
30.00%
30.00%
212.30
692.23
2,445.12
0.00%
25.00%
25.00%
0.00
0.00
0.00
0.00
0.00
10.00%
0.00%
0.00%
0.00%
0.00%
28.67
0.00
0.00
0.00
0.00
30.00%
10.00%
0.00%
10.00%
0.00%
86.00
514.26
0.00
200.41
0.00
60.00%
25.00%
45.00%
40.00%
0.00%
172.00
1,285.64
1,490.39
801.63
0.00
0.00%
65.00%
55.00%
50.00%
100.00%
0.00
3,342.66
1,821.58
1,002.04
1,097.12
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
10.00%
10.00%
10.00%
10.00%
0.00%
159.48
3,450.89
1,431.50
1,026.23
0.00
30.00%
30.00%
30.00%
30.00%
20.00%
478.43
10,352.66
4,294.51
3,078.69
182.69
40.00%
40.00%
40.00%
40.00%
20.00%
637.91
13,803.54
5,726.01
4,104.92
182.69
20.00%
20.00%
20.00%
20.00%
60.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
80.00%
70.00%
70.00%
70.00%
0.00%
0.00%
0.00%
0.00%
152.50
1,515.19
632.18
220.42
0.00
0.00
0.00
0.00
20.00%
30.00%
30.00%
30.00%
0.00%
0.00%
0.00%
85.00%
38.12
649.37
270.94
94.46
0.00
0.00
0.00
85.20
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
15.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.00%
70.00%
70.00%
70.00%
0.00%
0.00%
0.00%
322.91
4,053.38
4,156.04
1,322.50
0.00
0.00
0.00
30.00%
30.00%
30.00%
30.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
50.00%
50.00%
50.00%
50.00%
1,616.20
622.19
697.82
534.56
50.00%
50.00%
50.00%
50.00%
1,616.20
622.19
697.82
534.56
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
40.00%
40.00%
40.00%
14,847.16
9,532.32
5,473.40
60.00%
60.00%
60.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
70.00%
70.00%
70.00%
70.00%
22,129.80
8,456.22
9,517.84
10,699.56
30.00%
30.00%
30.00%
30.00%
0.00
20.00%
5,995.68
20.00%
5,995.68
20.00%
5,995.68
20.00%
5,995.68
20.00%
188,221.13
6,587.74
4,705.53
199,514.40
37,907.74
237,422.13
7.74%
237,422.13
7.74%
280,900.73
9,831.53
7,022.52
297,754.78
56,573.41
354,328.19
11.56%
591,750.32
19.30%
661,470.99
23,151.48
16,536.77
701,159.24
133,220.26
834,379.50
27.22%
1,426,129.82
46.52%
638,064.13
22,332.24
15,951.60
676,347.97
128,506.11
804,854.08
26.25%
2,230,983.90
72.77%
416,720.26
14,585.21
10,418.01
441,723.48
83,927.46
525,650.94
17.15%
2,756,634.84
89.92%
100.00%
1,179.36
100.00%
8,000.00
100.00%
11,741.00
100.00%
5,000.00
100.00%
8,200.00
772.62
0.00
100.00%
7,726.20
100.00%
2,282.88
0.00
0.00
0.00
0.00
100.00%
3,010.72
100.00%
2,681.73
0.00
0.00
0.00
0.00
100.00%
724.90
100.00%
5,908.01
100.00%
9,032.65
100.00%
3,615.92
0.00
0.00
0.00
0.00
100.00%
26,303.47
100.00%
1,345.69
100.00%
10,382.58
100.00%
7,326.15
100.00%
16,058.88
100.00%
361.05
0.00
0.00
0.00
100.00%
1,763.52
100.00%
1,460.31
100.00%
228.21
0.00
100.00%
1,764.71
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
167,456.11
100.00%
344,263.17
100.00%
515,249.89
100.00%
16,460.62
100.00%
35,928.58
100.00%
11,400.00
0.00
131,351.94
0.00
2,931.17
0.00
100.00%
479.75
100.00%
875,679.60
100.00%
5,608.65
100.00%
19,541.15
100.00%
2,106.09
0.00
576.86
2,037.60
100.00%
471.77
100.00%
2,307.42
100.00%
8,150.41
0.00
0.00
0.00
0.00
0.00
100.00%
286.67
100.00%
5,142.55
318.96
6,901.77
2,863.00
2,052.46
548.08
100.00%
1,594.78
100.00%
34,508.86
100.00%
14,315.02
100.00%
10,262.30
100.00%
913.46
0.00
0.00
0.00
0.00
443.07
273.33
299.83
15.03
100.00%
190.62
100.00%
2,164.56
100.00%
903.12
100.00%
314.88
100.00%
443.07
100.00%
273.33
100.00%
299.83
100.00%
100.23
138.39
1,737.16
1,781.16
566.78
9,379.00
2,187.85
1,234.40
100.00%
461.30
100.00%
5,790.54
100.00%
5,937.20
100.00%
1,889.28
100.00%
9,379.00
100.00%
2,187.85
100.00%
1,234.40
0.00
0.00
0.00
0.00
100.00%
3,232.40
100.00%
1,244.38
100.00%
1,395.64
100.00%
1,069.12
22,270.74
14,298.47
8,210.10
100.00%
37,117.90
100.00%
23,830.79
100.00%
13,683.50
9,484.20
3,624.10
4,079.07
4,585.52
100.00%
31,614.00
100.00%
12,080.32
100.00%
13,596.91
100.00%
15,285.08
5,995.68
100.00%
29,978.38
100.00%
3,311.97
100.00%
2,004.08
100.00%
1,097.12
244,958.35
8,573.54
6,123.96
259,655.85
49,334.61
308,990.46
10.08%
3,065,625.31
100.00%
2,430,335.59
VALORIZACION DE OBRA No 02
Mes: 31.Mayo.07
Propietario :
Proyecto :
Licitacin:
Contratista:
Supervisor:
Regin
: Huancavelica
Departamento : Huancavelica
Provincia : Huancavelica
Distrito
: Huando
Localidad : Incaan, Miraflores
Monto de Obra
: 3 065,625.32
Fecha de Inicio de Obra : 16.Abril.07
Plazo de Ejecucin
: 145 das cal.
Fecha de Trmino de Obra : 07.Setiembre.07
PARTIDA
PRESUPUESTO
Descripcin
U.
01
01.01
01.02
01.03
01.04
01.05
02
02.01
02.02
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.03
03.03.01
03.03.02
03.03.03
03.03.04
03.04
03.04.01
03.04.02
03.04.03
03.05
03.05.01
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.02.08
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.04
04.04.01
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA 4.80x3.60M
und
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO
glb
CONSTRUCCION DE CAMPAMENTO PROVISIONAL DE LA OBRA
m2
MEJORAMIENTO DE TROCHA DE ACCESO
Km
CONSTRUCCION DE TROCHA DE ACCESO A CANAL
Km
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
Km
LIMPIEZA Y DESBROCE DE TERRENO MANUAL
Km
BOCATOMA
MOVIMIENTO DE TIERRAS
EXCAVACION EN MATERIAL SUELTO
m3
EXCAVACION EN ROCA SUELTA
m3
RELLENO COMPACTADO CON MATERIAL PROPIO CON PLANCHA VIBRATORIA
m3
ESCOLLERA DE ROCA GRANITICA d=0.60m Pmin= 0.55Tn
m3
OBRAS DE CONCRETO SIMPLE
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
m2
CONCRETO CICLOPEO FC=140KG/CM2+30% PM.
m3
CONCRETO CICLOPEO FC=175KG/CM2+25% PM.
m3
ENCOFRADO Y DESENCOFRADO
m2
OBRAS DE CONCRETO ARMADO
CONCRETO F'C= 210KG/CM2
m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
JUNTA DE DILATACION CON WATER STOP 6" e=1"
m
COMPUERTAS Y REJILLAS
COMPUERTA PLANA TIPO ARMCO 1.00x1.20M MODELO 10.00 CON MECANISMO DE IZAJE MANUAL
und
COMPUERTA PLANA TIPO ARMCO 0.85x0.45M MODELO 10.00 CON MECANISMO DE IZAJE MANUAL
und
REJILLA METALICA INGRESO VENTANA CAPTACION 3.00x0.30M
und
VARIOS
ALBAILERA DE PIEDRA EMBOQUILLADA CON MORTERO 1:3
m2
CANAL PRINCIPAL
MOVIMIENTO DE TIERRAS
EXCAVACION EN MATERIAL SUELTO
m3
EXCAVACION EN ROCA SUELTA
m3
EXCAVACION EN ROCA FIJA
m3
FILTROS DE GRAVA HASTA 2" CON TUBERA PERFORADA DE 200MM
m3
RELLENO COMPACTADO CON MATERIAL PROPIO CON PLANCHA VIBRATORIA
m3
REFINE Y NIVELACION DE CAJA DE CANAL
m
CANAL
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
m2
CONCRETO F'C= 175KG/CM2
m3
CONCRETO F'C= 210KG/CM2
m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
JUNTA DE DILATACION CON WATER STOP 6" e=1"
m
JUNTA DE DILATACION E=1" SELLADO CON MATERIAL BITUMINOSO
m
JUNTA DE CONTRACCIN E=1" SELLADO CON MATERIAL BITUMINOSO
m
DESARENADOR (01 UNIDAD)
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
m2
CONCRETO F'C= 210KG/CM2
m3
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4200 KG/CM2
kg
COMPUERTA PLANA TIPO ARMCO 0.50x0.50M MODELO 10.00 CON MECANISMO DE IZAJE MANUAL
und
RAPIDAS (05 UNIDADES)
CONCRETO SOLADO F'C=100 KG/CM2 e=0.05M
m2
Metrado
P.Unit.
1.00
1.00
100.00
1.00
1.00
1,179.36
8,000.00
117.41
5,000.00
8,200.00
12.00
12.00
643.85
190.24
485.60
121.40
100.35
78.00
6.20
22.09
13.41
133.11
55.00
40.90
57.10
154.00
13.18
144.45
158.19
23.48
93.60
255.00
4,896.00
15.00
281.02
28.73
3.28
24.07
1.00
1.00
1.00
1,763.52
1,460.31
228.21
55.13
32.01
27,009.05
13,607.24
13,084.05
420.45
1,611.87
12,000.00
6.20
25.30
39.38
39.15
22.29
0.95
36.40
3,453.54
20.69
791.46
642.10
19.60
930.41
5,582.47
13.18
253.56
271.08
24.69
3.28
24.07
2.48
1.46
21.75
18.65
128.72
611.00
1.00
13.18
275.74
25.73
3.28
1,097.12
121.00
13.18
Presupuesto
34,120.36
1,179.36
8,000.00
11,741.00
5,000.00
8,200.00
10,009.08
7,726.20
2,282.88
17,420.72
3,010.72
2,681.73
1,345.69
10,382.58
19,281.48
724.90
5,908.01
9,032.65
3,615.92
50,049.55
26,303.47
7,326.15
16,058.88
361.05
3,452.04
1,763.52
1,460.31
228.21
1,764.71
1,764.71
1,090,758.37
167,456.11
344,263.17
515,249.89
16,460.62
35,928.58
11,400.00
914,344.84
479.75
875,679.60
5,608.65
19,541.15
2,106.09
471.77
2,307.42
8,150.41
11,842.39
286.67
5,142.55
3,311.97
2,004.08
1,097.12
61,594.42
1,594.78
Anterior
Metrado
Valorizado
0.00
0.50
20.00
1.00
1.00
9.85
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,453.78
4,316.66
3,585.86
0.00
298.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19,548.20
0.00
4,000.00
2,348.20
5,000.00
8,200.00
8,624.80
6,341.92
2,282.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
315,687.88
58,613.44
109,211.50
141,211.17
0.00
6,651.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AVANCES
Actual
Metrado
Valorizado
0.00
0.25
20.00
0.00
0.00
0.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14,382.19
404.52
2,712.42
0.00
1,140.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,348.20
0.00
2,000.00
2,348.20
0.00
0.00
547.27
547.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
231,635.87
89,169.58
10,234.36
106,815.10
0.00
25,416.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Saldo de Obra
Acumulado
Metrado
Valorizado
0.00
0.75
40.00
1.00
1.00
10.70
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23,835.97
4,721.18
6,298.28
0.00
1,438.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
%
Metrado
23,896.40
0.00
6,000.00
4,696.40
5,000.00
8,200.00
9,172.08
6,889.20
2,282.88
70.04%
0.00%
75.00%
40.00%
100.00%
100.00%
91.64%
89.17%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
547,323.76
147,783.01
119,445.85
248,026.27
0.00
32,068.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.18%
88.25%
34.70%
48.14%
0.00%
89.26%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
0.25
60.00
0.00
0.00
1.30
0.00
485.60
121.40
100.35
78.00
55.00
40.90
57.10
154.00
93.60
255.00
4,896.00
15.00
1.00
1.00
1.00
55.13
3,173.08
8,886.06
6,785.77
420.45
173.17
12,000.00
36.40
3,453.54
20.69
791.46
642.10
19.60
930.41
5,582.47
21.75
18.65
128.72
611.00
1.00
121.00
Monto
10,223.96
1,179.36
2,000.00
7,044.60
0.00
0.00
837.01
837.01
0.00
17,420.72
3,010.72
2,681.73
1,345.69
10,382.58
19,281.47
724.90
5,908.01
9,032.65
3,615.92
50,049.55
26,303.47
7,326.15
16,058.88
361.05
3,452.04
1,763.52
1,460.31
228.21
1,764.71
1,764.71
543,434.61
19,673.10
224,817.32
267,223.62
16,460.62
3,859.96
11,400.00
914,344.83
479.75
875,679.60
5,608.65
19,541.15
2,106.09
471.77
2,307.42
8,150.41
11,842.38
286.67
5,142.55
3,311.97
2,004.08
1,097.12
61,594.41
1,594.78
VALORIZACION DE OBRA No 02
Mes: 31.Mayo.07
Propietario :
Proyecto :
Licitacin:
Contratista:
Supervisor:
Regin
: Huancavelica
Departamento : Huancavelica
Provincia : Huancavelica
Distrito
: Huando
Localidad : Incaan, Miraflores
Monto de Obra
: 3 065,625.32
Fecha de Inicio de Obra : 16.Abril.07
Plazo de Ejecucin
: 145 das cal.
Fecha de Trmino de Obra : 07.Setiembre.07
PARTIDA
PRESUPUESTO
Descripcin
U.
04.04.02
04.04.03
04.04.04
04.04.05
04.05
04.05.01
04.05.02
04.05.03
04.05.04
04.05.05
04.05.06
04.05.07
04.05.08
04.06
04.06.01
04.06.02
04.06.03
04.06.04
04.06.05
04.06.06
04.06.07
04.07
04.07.01
04.07.02
04.07.03
04.07.04
04.08
04.08.01
04.08.02
04.08.03
04.09
04.09.01
04.09.02
04.09.03
04.09.04
05
05.01
Metrado
P.Unit.
125.15
579.79
3,128.75
37.95
275.74
24.69
3.28
24.07
13.50
7.85
35.10
96.00
1.00
1.00
1.00
3.00
14.12
275.74
25.73
3.28
443.07
273.33
299.83
33.41
35.00
21.00
230.75
576.00
10.00
5.00
5.00
13.18
275.74
25.73
3.28
937.90
437.57
246.88
12.11
50.40
425.50
32.00
266.92
24.69
3.28
33.41
139.06
965.20
4,171.80
266.92
24.69
3.28
118.44
489.28
4,145.40
457.50
266.92
24.69
3.28
33.41
1.00
29,978.38
S/.
GASTOS GENERALES 3.5%
UTILIDAD 2.5%
SUB TOTAL
I.G.V. 19%
TOTAL AVANCE MENSUAL AL 100% S/.
% AVANCE
..
Ing. RENEE GERARDO SALAZAR SALCEDO
RESIDENTE DE OBRA
CIP. 69573
3.5%
2.5%
Presupuesto
34,508.86
14,315.02
10,262.30
913.46
4,689.64
190.62
2,164.56
903.12
314.88
443.07
273.33
299.83
100.23
26,879.57
461.30
5,790.54
5,937.20
1,889.28
9,379.00
2,187.85
1,234.40
6,941.54
3,232.40
1,244.38
1,395.64
1,069.12
74,632.19
37,117.90
23,830.79
13,683.50
72,576.31
31,614.00
12,080.32
13,596.91
15,285.08
29,978.38
29,978.38
Anterior
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AVANCES
Actual
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,597.41
3,597.41
Saldo de Obra
Acumulado
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,597.41
3,597.41
%
Metrado
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
12.00%
12.00%
125.15
579.79
3,128.75
37.95
13.50
7.85
35.10
96.00
1.00
1.00
1.00
3.00
35.00
21.00
230.75
576.00
10.00
5.00
5.00
12.11
50.40
425.50
32.00
139.06
965.20
4,171.80
118.44
489.28
4,145.40
457.50
0.88
Monto
34,508.86
14,315.02
10,262.30
913.46
4,689.64
190.62
2,164.56
903.12
314.88
443.07
273.33
299.83
100.23
26,879.57
461.30
5,790.54
5,937.20
1,889.28
9,379.00
2,187.85
1,234.40
6,941.54
3,232.40
1,244.38
1,395.64
1,069.12
74,632.19
37,117.90
23,830.79
13,683.50
72,576.32
31,614.00
12,080.32
13,596.91
15,285.08
26,380.97
26,380.97
2,430,335.59
85,061.75
60,758.39
343,860.89
12,035.13
8,596.52
240,128.75
8,404.51
6,003.22
583,989.64
20,439.64
14,599.74
1,846,345.92
64,622.11
46,158.65
2,576,155.73
489,469.59
3,065,625.32
364,492.54
69,253.58
433,746.12
254,536.48
48,361.93
302,898.41
619,029.02
117,615.51
736,644.53
1,957,126.68
371,854.07
2,328,980.75
14.15%
9.88%
24.03%
75.97%
RESUMEN DE VALORIZACION N 01
( AL 30 DE ABRIL DEL 2007 )
OBRA
PROPIETARIO
SUPERVISOR
CONTRATISTA
RESIDENTE
ITEM
S/. 3,065,625.32
D E S C R I P C I O N
I.
VALORIZACION BRUTA
II.
III.
IV.
V.
VI.
MONTO S/.
254,536.48
2,718.66
50,907.30
206,347.85
39,206.09
245,553.94
SON : TRECIENTOS CINCUENTA Y UN MIL SEICIENTOS VENTINUEVE CON 67/100 NUEVOS SOLES
CONTROL DE VALORIZACIONES
OBRA
ITEM
DESCRIPCION
VALORIZ. ACUM
ANTERIOR
S/.
VALORIZ. N01
ACTUAL
S/.
VALORIZACION
ACUMULADA ACTUAL
S/.
I.
VALORIZACION BRUTA
0.00
254,536.48
254,536.48
II.
REAJUSTE DE VALORIZACION
0.00
2,718.66
2,718.66
III.
0.00
50,907.30
50,907.30
IV.
0.00
206,347.85
206,347.85
V.
0.00
39,206.09
39,206.09
VI.
0.00
245,553.94
245,553.94
..
Ing. RENEE GERARDO SALAZAR SALCEDO
RESIDENTE DE OBRA
CIP. 69573
: 15/02/06
: 26/12/06
Descripcin
HUANCAVELICA
: Gobierno Regional de Huancavelica
: CONSORCIO JS
613 125.06
515 231.15
145.00 Das Calendario
5.00
S/.
S/.
20.00%
3 065 625.32
302 898.41
S/.
S/.
S/.
S/.
ADs/IGV*VB/MC
DESCUENTOS S/IGV
Mensual
SALDO S/.
Acumulado
50 907.30
50 907.30
464 323.85
2 Valorizacin
0.00
0.00
0.00
3 Valorizacin
0.00
0.00
0.00
50 907.30
0.00
464 323.85
IGV 19 %
9 672.39
0.00
88 221.53
TOTAL S/.
60 579.68
0.00
552,545.38
1 Valorizacin (25/04/07)
..
Ing. RENEE GERARDO SALAZAR SALCEDO
RESIDENTE DE OBRA
CIP. 69573
DESCRIPCION
Mano de Obra incluyendo leyes s.
IU
Particip.
47.00
0.198
Factor
Porcentaje
100.00%
Ir (Marzo 2007)
361.290
0.198
02.
21.00
0.202
100.00%
350.430
0.202
03.
AA
2.00
5.00
0.058
0.075
43.61%
56.39%
420.290
293.260
0.133
04.
MF
Flete terrestre
Maquinaria y equipo importado
32.00
49.00
0.053
0.305
14.80%
85.196%
0.109
361.290
361.290
361.100
350.430
350.430
350.430
183.284
165.372
411.340
262.180
348.657
400.040
267.220
0.358
05. GGU Indice General de precios al consumidor 39.00
Io (Agosto 2006)
59.222
227.661
286.883
100.00%
314.640
314.640
1.001
0.198
350.430
350.430
1.000
0.202
1.065
0.142
1.007
0.361
1.004
0.109
179.381
147.846
56.553
228.274
284.827
313.290
0.109
314.640
1.000
361.100
361.100
327.227
382.010
267.940
Ir/Io
313.290
313.290
1.012
Marzo
1.012
REAJUSTE
VB=SUBTOTAL*FR
R = VB*(1 - Kmes)
R =
2,718.66
Abril
Mayo
Junio
Julio
Agosto
..
Ing. RENEE GERARDO SALAZAR SALCEDO
RESIDENTE DE OBRA
CIP. 69573
Obra:
Valorizacin No 02
Fecha: 31.Mayo.07
Contratista:
Supervisor:
CONSORCIO HUANCAVELICA
Sustento de Metrados
Partida 1.00
OBRAS PROVISIONALES
Partida 01.02
Partida 1.03
Partida 2.00
TRABAJOS PRELIMINARES
Partida 2.01
100.00 m2
20.00 m2
20.00 m2
20.00 m2
40.00 m2
80.00% valorizado
7.10%
Metrado total:
A valorizar:
12.00 Km
82.07 % * 12.00 =
0.85 Km.
Actual =
Anterior =
Acumulado =
Partida 4.00
Partida 4.01
Partida 4.01.01
0.85 Km
9.85 Km
10.70 Km
CANAL PRINCIPAL
MOVIMIENTO DE TIERRAS
Excavacin en material suelto (m3)
Del cuadro anexo:
Resumen:
De
Volumen
Km. 5+000
Km. 7+800
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 6+000
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 12+000
Total:
2,433.31
1,474.63
2,867.61
2,296.67
2,860.56
2,449.41
14,382.19 m3
Actual =
Anterior =
Acumulado =
Partida 4.01.02
14382.19 m3
9453.78 m3
23835.97 m3
Volumen
Km. 5+000
Km. 7+800
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 6+000
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 12+000
Total:
Actual
404.52
404.52 m3
404.52 m3
Anterior =
Acumulado =
Partida 4.01.03
4316.66 m3
4721.18 m3
Volumen
Km. 5+000
Km. 7+800
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 6+000
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 12+000
Total:
1,532.94
244.28
795.95
139.25
-
2,712.42 m3
Actual =
Anterior =
Acumulado =
Partida 4.01.05
2712.42 m3
3585.86 m3
6298.28 m3
Volumen
Km. 5+000
Km. 7+800
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 6+000
Km. 8+000
Km. 9+000
Km. 10+000
Km. 11+000
Km. 12+000
Total:
Actual =
Anterior =
Acumulado =
128.05
296.60
271.62
305.90
138.11
1,140.28 m3
1140.28 m3
298.42 m3
1438.70 m3
Partida 5.00
TRANSPORTE DE MATERIALES
Partida 5.01
Flete Terrestre
Se ha transportado materiales como:
MATERIAL
UNIDAD
Alambre # 16
Dinamita 65%
Fulminante
Mecha Lenta
Anfo
Nitrato
papeleria
Pentacort
Pintura
Estacas
Gasolina
Petroleo
Aceites
KILOGRAMOS
CAJA
CAJA
TAMBORA
SACO
SACO
MLL
TAMBORA
GALONES
UNIDAD
GALONES
GALONES
BALDES
CANTIDAD
60.00
28.00
22.00
11.00
35.00
30.00
4.00
10.00
15.00
1,000.00
120.00
8,500.00
45.00
1.00
25.00
0.50
20.00
25.00
50.00
5.00
10.00
8.00
0.25
0.80
0.80
20.00
TOTAL KG
Metrado total:
0.12 Glb
A valorizar:
0.12 Glb
Actual =
Anterior =
Acumulado =
0.12 Glb
0.00 Glb
0.12 Glb
60.00
700.00
11.00
220.00
875.00
1,500.00
20.00
100.00
120.00
250.00
96.00
6,800.00
900.00
11,652.00