Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Arreglo Final de Terminacin Simple Tubera 3.1/2" K. Fox; Form. Robore Ar. RBR-III
31/05/2007 a 08/08/2007
M.R.G.
X Coordenadas
Y Coord.
356483.5
8082970
CAERIAS
O.D.
I.D
PESO
[pulg.]
[lbs/pie]
13.5/8; 13.3/8
12.415
9.5/8
8.535
6.375/ 6.094
4.276
O.D.
I.D
Drift
PESO
[pulg]
[pulg.]
OD (IN)
[lbrs/pie]
3.5
2.750
2.625
12.7
Salinidad (ppm )
53.5 Q-125
47.1-32
P-110; Q-125
18.0 P-110
Densidad (gr/cc)
Formiato de Na (Formix)
4482-4510 m
4519-4532 m
19
25
41
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
55
RBR III @ 4763m ->Presin =9050 psi
TCP'1999
Rebaleo TCP'2007
4763-77 m
4763-4775 m
4797-4810 m
4818-4830 m
4797-4830 m
4836-4840 m
4845-4850 m
4855-4860 m
4836-64 m
4873-79 m
67
68
69
70
Boca liner
5163 m MD
Tope Ventana:5272 m
CSG: 7" EN :
5442.0 m
SARA 5516 m
Presin= 15600 psi
Tapon en:5620 m
LINER: 5" EN :5649.0 m
Preparado por: M. Robles
Elevation MR
Hanger
Tubo Corto Pin x Pin
Tubing 3 1/2" KFOX 12.7#/'
Pup Joint 3 1.2" KFOX 12.7#/'
Pup Joint 3 1.2" KFOX 12.7#/'
Pup Joint 3 1.2" KFOX 12.7#/'
Tubing 3 1/2" KFOX 12.7#/'
Pup joint 3 1/2" K- FOX
Flow Coupling 3 1/2" K- FOX.
X- Over de 3 1/2" K-FOX x 3 1/2" VAN TOP.
Valvula TRSV "NE".
X- Over de 3 1/2" VAN TOP X 3 1/2" K-FOX.
Flow Coupling 3 1/2" K- FOX.
Pup joint 3 1/2" K- FOX
Tubing de 3 1/2" K- FOX (desde pieza No 3-475)
pzas.
1
1
1
1
1
1
7
1
1
1
1
1
1
1
473
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Prof. Zapato
[mbbp]
BOSS
7.5/8; 7
K- Fox
Fluido en E. Anular (E.A )
ROSCA
psi
129.0 X-56
PRODUCCIN
TUBERIAS
GRADO Colapso
INTERMEDIA
LINER
5221 -4947.8
20
SUPERFICIAL
TVD (mt)
5650.00
[pulg.]
CAO GUA
12
Prof. F (MD)
12/09/2013
Agujero
O.D.
[mbbp]
98.5
26"
100.0
2658.0
17.1/2"
2660.0
9037.0 MJO-SLX
4607.0
12.1/4"
4608.0
5442.0
8.1/2"
5650.0
6"
13472.0 MJO
GRADO
Colapse
Burst
psi
psi
13 Cr
18180.0
Densidad (ppg)
17810.0
ROSCA
12.5
O.D..
[IN]
I.D
[IN]
11.000
3.500
3.500
3.500
3.500
3.500
3.500
2.750
2.750
2.750
2.750
2.750
2.750
2.750
3.890
2.750
4.060
2.650
4.060
2.670
5.610
2.562
4.060
2.670
4.060
2.650
4.060
2.750
3.500
2.750
4.060
2.750
4.060
2.680
4.800
2.562
4.060
2.680
4.060
2.750
3.500
2.750
4.060
2.750
4.060
2.640
7.27
0.31
0.49
9.58
1.84
2.38
1.78
66.01
1.24
1.65
0.26
1.24
0.31
1.63
0.64
4476.98
1.74
1.75
1.23
1.75
0.65
9.06
1.54
1.75
4.060
2.562
4.060
2.640
4.060
2.750
3.500
2.750
3.884
2.750
4.450
2.970
3.850
2.950
3.850
2.950
3.850
2.950
3.850
2.950
3.850
2.950
3.850
2.950
3.850
2.950
3.850
2.950
3.850
2.950
3.850
3.091
10.5
Long.
Mtrs.
TOPE
MBBP
BASE
TOPE
MBBP
TVDSS
-7.27
0.00
0.00
0.31
0.31
0.80
0.80
10.38
10.38
12.22
12.22
14.60
14.60
16.38
16.38
82.39
82.39
83.63
83.63
85.28
85.28
85.54
85.54
86.78
86.78
87.09
87.09
88.72
88.72
89.36
89.36
4566.34
4566.34
4568.08
4568.08
4569.83
4569.83
4571.06
4571.06
4572.81
4572.81
4573.46
4573.46
4582.52
4582.52
4584.06
4584.06
4585.81
0.39
4585.81
4586.20
1.75
0.65
9.58
1.23
0.29
0.51
0.61
0.61
0.51
0.51
0.51
0.51
0.51
0.49
0.91
4586.20
4587.95
4587.95
4588.60
4588.60
4598.18
4598.18
4599.41
4599.41
4599.70
4599.70
4600.21
4600.21
4600.82
4600.82
4601.43
4601.43
4601.94
4601.94
4602.45
4602.45
4602.96
4602.96
4603.47
4603.47
4603.98
4603.98
4604.47
4604.47
4605.38
5.875
3.880
1.35
4599.70
4601.05
5.250
3.880
2.89
4601.05
4603.94
5.570
3.966
0.20
4603.94
4604.14
4.754
3.890
1.70
4604.14
4605.83
5.500
2.747
0.23
4605.83
4606.06
4.080
2.750
0.66
4606.06
4606.72
3.500
2.750
9.45
4606.72
4616.17
4.070
2.750
1.75
4616.17
4617.92
4.060
2.665
1.75
4617.92
4619.67
Nipple R 2.562"
4.070
2.562
0.39
4619.67
4620.06
4.070
2.665
1.75
4620.06
4621.81
4.070
2.750
0.63
4621.81
4622.44
4.080
2.875
0.56
4622.44
4623.00
54
55
56
57
58
59
60
61
62
63
64
65
66
2.875
2.441
10.35
4623.00
4633.35
3.688
2.313
0.59
4633.35
4633.94
2.875
2.441
93.10
4633.94
4727.04
Flow Sub
3.690
2.441
0.20
4727.04
4727.24
2.875
2.441
31.01
4727.24
4758.25
3.625
1.875
0.36
4758.25
4758.61
3.125
1.310
0.50
4758.61
4759.11
4.500
0.000
0.10
4759.11
4759.21
Safety Spacer
4.500
0.000
3.79
4759.21
4763.00
11
4.500
0.000
97.00
4763.00
4860.00
4.500
0.000
0.39
4860.00
4860.39
484.0
PH
1.49
Bull Plug
5650.0
Pzas.
K FOX
41
42
43
44
45
46
47
48
49
50
51
52
53
5442.0
4989.82
4607.55
-4334.54
5139.82
4729.19
-4456.18
5139.82
4736.22
-4463.21
5141.00
4737.40
-4464.39
1er.- Intervencin del pozo se realizo desde el 18/11/2003 hasta el 11/02/2004 con el equipo PRIDE-318
tiempo de duracin 85 dias.
2da.- Intervencin 31/5/2007-08/08/2007, Ampliacin y rebaleo de tramos Reservorio RBR-III, Equipo Pride-379, tiempo de interv. 70 dias, sin DTM