LINEA DE CONDUCCION
PROYECTO
PROP.
PART
N
TOTAL
DESCRIPCION DE PARTIDA
01.00.00
LINEA DE CONDUCCION
01.01.00
TRABAJOS PRELIMINARES
01.01.01
3740.00
01.01.02
3740.00
01.02.00
01.02.01
TUBERIA Fo Go 1 1/2"
01.02.02
UNION Fo Go 1 1/2"
01.02.03
260.00
44.00
# Veces
3.33
44.00
0.40
0.40
0.40
2.82
1.00
0.80
0.80
0.80
0.51
44.00
0.40
0.40
7.04
1.00
0.80
0.80
0.64
Dado en Captacin
01.02.04
7.68
01.03.00
TUBERIA ENTERRADA
01.03.01
3450.00
01.03.02
3450.00
01.03.03
3450.00
01.03.04
3450.00
01.03.05
3450.00
01.03.06
3450.00
01.03.07
3740.00
01.04.00
ACCESORIOS
01.04.01
02.00.00
03.00.00
6.00
6.00
1.00
1.00
1.00
5.00
UND.
M
M
M
Und.
M3
M2
M
M
M
M
M
M
M
und.
und.
und.
und.
und.
und.
260.00
30.00
3740
290.00
3450
:
:
:
PROP.
DIAM
DIAM.
CIRC.
N
VECES
No.
LONG.
LONG.
PIEZ.
PIEZA
PARC.
W/ML
PARC.
KG
LOSA DE FONDO
Li variable
3/8"
3.6 m a menos
0.24
3.60
3.50
3.50
3.40
3.25
3.00
2.70
2.30
1.75
0.85
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2
4
4
4
4
4
4
4
4
4
4.08
3.98
3.98
3.88
3.73
3.48
3.18
2.78
2.23
1.33
8.16
15.92
15.92
15.52
14.92
13.92
12.72
11.12
8.92
5.32
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
4.73
9.23
9.23
9.00
8.65
8.07
7.38
6.45
5.17
3.09
2.65
1.00
83.00
4.32
358.56
0.58
207.96
ACERO HORIZONTAL
3/8"
0.20
2.65
1.00
10.00
16.65
166.50
0.58
96.57
2.60
1.00
6.00
16.34
98.04
0.58
56.86
3.60
3.50
3.50
3.40
3.25
3.00
2.70
2.30
1.75
0.85
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2
4
4
4
4
4
4
4
4
4
5.74
5.64
5.64
5.54
5.39
5.14
4.84
4.44
3.89
2.99
11.48
22.56
22.56
22.16
21.56
20.56
19.36
17.76
15.56
11.96
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
0.58
6.66
13.08
13.08
12.85
12.50
11.92
11.23
10.30
9.02
6.94
0.24
L= Li +
0.48
MUROS
0.15
0.15
0.55
interior
ACERO VERTICAL
3/8"
0.20
exterior
1.97
L= 4.32
0.55
Interior
0.15
Exterior
3/8"
0.20
0.80
LOSA DE TECHO
variable
0.12
3/8"
4.36 m a menos
0.15
0.8
0.15
0.8 0.12
L= 2.14
CASETA DEVALVULAS
1.20
1.20
0.94
L=
L= 1.05
3/8"
0.20
3.34
1.00
5.00
3.34
16.70
0.58
9.69
3/8"
0.20
1.05
1.00
16.00
1.05
16.80
0.58
9.74
3/8"
0.20
1.30
1.00
5.00
1.30
6.50
0.58
3.77
3/8"
0.20
1.15
1.00
6.00
1.15
6.90
0.58
4.00
0.95
3.34
0.10
0.10
1.20
0.10
L= 1.30
0.95
0.10
L= 1.15
977.96
567.17
108.66 Varillas 3/8"
HOJA DE METRADOS
RESERVORIO CIRCULAR 10 M3
PROYECTO
PROP.
PART
N
01
01.01
01.02
02
02.01
:
:
:
DESCRIPCION
REP.
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO
Reservorio
Caja de Vlvulas
MEDIDAS
RADIO
1.25
TRAZO Y REPLANTEO
Reservorio
Caja de Vlvulas
1.25
1.00
1.50
18.85
1.00
1.25
24.12
24.12 m3
12.29 m2
1.88
1.25
11.04
1.25
1.00
7.37 m3
1.88
1.80
1.73
losa techo
Caja de Vlvulas
0.87
1.58
1.88
UND.
20.10 m3
03
03.01
04.03
1.00
12.57
1.25
2.00
1.25
Muros
TOTAL
13.82 m2
Caja Vvulas:
1.00
12.57
1.25
2.00
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
Reservorio
ENCOFRADO Y DESENCOFRADO
Reservorio :
Muroro Interior
Muro exterior
Techo
PARC.
ALTO
13.82 m2
02.02
04.02
ANCHO
2.00
Caja de vlvulas
04.00
04.01
LARGO
0.15
0.10
2.25
1.66
0.09
3.50
1.66
0.13
0.08
0.25
1.00
1.00
1.25
0.80
1.00
0.10
0.15
0.10
1.00
2.00
1.25
0.10
1.00
55.44 m2
1.58
1.73
9.90
10.84
1.95
1.95
19.31
21.14
11.04
1.25
1.00
1.00
0.80
1.00
0.90
1.00
1.00
1.25
0.90
1.00
0.80
1.88
2.00
2.00
2.00
2.00
567.17 kg
HOJA DE METRADOS
RESERVORIO CIRCULAR 10 M3
PROYECTO
PROP.
:
:
:
PART
No.
MEDIDAS
DESCRIPCION
N
REP. RADIO LARGO ANCHO
05
REVOQUES Y ENLUCIDOS
05.01 TARRAJEO CON IMPERMEAB. MEZCLA 1:1 E=1.5CM
Reservorio :
Fondo y Techo
2.00
1.58
Muros
1.58
9.90
05.02
06
06.01
Muros
07
07.01
HIPOCLORADOR
Suministro y colocacin de Hipoclorador
08
09.01
09
VALVULAS Y ACCESORIOS
9.01
9.02
9.03
9.04
9.05
9.06
9.07
PARC.
UND.
32.92 m2
1.75
15.59
17.33
35.73 m2
10.84
11.78
1.75
0.15
1.25
1.00
1.00
0.80
1.00
0.90
1.00
1.00
18.97
1.77
11.04
1.25
0.90
1.00
0.80
11.78
11.78
1.25
1.00
2.25
0.15
0.90
0.90
26.51
1.77
1.13
0.90
1.88
30.31 m2
1.88
1.88
2.00
1.00
1.00 und.
1.73
9.85
10
CERCO PERIMETRICO
10.01 DADO DE CONCRT. SIMPLE 0.40*0.40*0.60M+COLU MADERA 4"X 8' , C/3M
11
CONTROLES DE CALIDAD DE OBRA
11.01 ENSAYO DE PROBETAS DE CONCRETO
TOTAL
ALTO
10.35 ml.
3.00 und
1.00 und
1.00 und
2.00 und
2.00 und
12.00 mt.
12.00 mts
1.00 Gbl.
2.00 und
1.00 und
3.00 und
2.00 und
1.00 und
4.00 und
7.00
8.00
30.00
30.00 ml.
3.00 und.
HOJA DE METRADOS
LINEA DE ADUCCION Y DISTRIBUCION
PROYECTO
PROP.
PART
N
DESCRIPCION DE PARTIDA
TOTAL
UND.
01.00
01.01
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO DE ZANJAS
988 M
02.00
02.01
02.02
02.03
02.04
02.05
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJAS
REFINE, NIVELACION FONDO DE ZANJAS
CAMA DE APOYO PARA TUBERIAS
RELLENO ZANJAS COMPT. MANUAL , C/MATER. SELECTO H=30 CM.
RELLENO ZANJAS COMPT. MAQUINARIA , C/MATER. PROPIO
988 M
988 M
988 M
988 M
988 M
03.00
03.01
03.02
03.03
03.04
TUBERIAS
TUBERIA =1 1/2" PVC SAP CL-7,5
TUBERIA =1" PVC SAP CL-10
TUBERIA =3/4" PVC SAP CL-10
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA
360 M
348 M
280 M
988 M
04.00
04.01
ACCESORIOS
ACCESORIOS COSTO GLOBAL
TEE PVC SAP 1 1/2"
TEE PVC SAP 1"
CODO PVC SAP 1" X 45
CODO PVC SAP 1" X 90
REDUCCION PVC SAP 1 1/2" X 1"
REDUCCION PVC SAP 1" X 3/4"
1.00 und.
2.00 und.
2.00 und.
2.00 und.
2.00 und.
3.00 und.
VALVULAS DE CONTROL
VALVULAS COPUERTA 1", DE BRONCE
2.00 und.
05.00
05.01
1 1/2"
240
120
360
1"
50
110
5
45
43
95
348
988 OK
3/4"
100
90
90
280
HOJA DE METRADOS
PROYECTO
PROP.
PART.
DESCRIPCION
No
MEDIDAS
CANT.
LARGO
ANCHO
PARCIAL
ALTO
N PASES
UND
1.00
5.00
02
TRABAJOS PRELIMINARES
Trazo y replanteo
1.30
1.30
MOVIMIENTO DE TIERRAS
Excavacin manual
0.50
0.50
1.00
1.69
1.69
8.45
m2
0.50
0.50
2.50
m3
0.56
2.78
m3
0.40
2.00
m3
1.60
8.00
m2
6.00
2.00
2.00
30.00
10.00
10.00
m
Un.
Un.
0.50
0.50
0.80
0.40
0.50
0.50
0.80
1.60
Encofrado y desencofrado
04
TUBERIA,VALV. Y ACCESORIOS
Tubera Fo Go 1 1/2"
Unin Fo Go 1 1/2"
Adaptador Pvc Sap 1 1/2"
HOJA DE METRADOS
CAMARA ROMPE PRESION TIPO -6
PROYECTO
PROP.
PART.
DESCRIPCION
N
1.00
TRABAJOS PRELIMINARES
1.01
1.02
TRAZO Y REPLANTEO
No
REP.
LARGO
MEDIDAS
ANCHO
PARCIAL
ALTO
1.00
1.20
1.20
1.44
1.00
1.10
1.10
1.21
1.00
1.10
1.10
1.00
1.00
1.10
1.10
0.15
0.18
MUROS LONGITUDINALES
2.00
0.90
0.15
1.20
0.32
MUROS TRANSVERSALES
2.00
0.60
0.15
1.20
0.22
MUROS INTERIORES
4.00
0.60
1.20
2.88
MUROS EXTERIORES
4.00
0.90
1.20
4.32
LOSA DE FONDO
1.00
1.00
MUROS
4.00
0.60
1.20
2.88
MUROS
4.00
0.90
1.00
3.60
BORDES SUPERIORES
4.00
0.90
0.05
0.02
1.44
8.64 M2
1.21
7.26 M2
1.21
7.26 M3
1.45
8.71 M3
0.72
4.32 M3
7.20
43.20 M2
35.71
214.26 KG.
3.48
20.88 M2
3.62
21.72 M2
1.00
6.00 UN
1.00
6.00 UN
0.60
UND.
6
1.21
1.07
No CAMARAS
1
1.00 UN
PROP.
DIAM
N
VECES
No.
LONG.
LONG.
PIEZ.
PIEZA
PARC.
W/ML
PARCIAL
KG
LOSA DE FONDO
1.04
3/8"
0.25
1.00
5.00
1.04
5.20
0.58
3.02
1.04
3/8"
0.25
1.00
5.00
1.04
5.20
0.58
3.02
3/8"
0.20
4.00
5.00
1.49
29.80
0.58
17.28
3/8"
0.25
1.00
6.00
3.56
21.36
0.58
12.39
MUROS: LONGITUDINALES
1.29
0.20
MUROS: TRANSVERSALES
0.84
0.2
0.84
0.84
0.84
CAMARA
35.71
CAMARA
214.26
HOJA DE METRADOS
CAMARA ROMPE PRESION TIPO -7
PROYECTO
PROP.
:
:
:
PART. DESCRIPCION
N
1.00
TRABAJOS PRELIMINARES
1.01
1.02
TRAZO Y REPLANTEO
No
REP.
LARGO
MEDIDAS
ANCHO
PARCIAL
ALTO
1.00
2.40
2.00
4.80
1.00
1.40
1.00
1.40
1.00
1.80
1.50
1.00
1.00
1.40
1.00
0.15
0.21
MUROS LONGITUDINALES
2.00
1.20
0.10
0.90
0.22
MUROS TRANSVERSALES
2.00
0.60
0.10
0.90
0.11
LOSA DE TECHO
1.00
1.00
0.60
0.10
0.06
MUROS INTERIORES
1.00
3.20
0.90
2.88
MUROS EXTERIORES
1.00
4.00
0.90
3.60
LOSA DE TECHO
1.00
1.00
0.80
0.80
1.00
1.00
0.60
0.60
MUROS
1.00
3.20
0.90
2.88
MUROS
1.00
4.00
0.90
3.60
BORDES SUPERIORES
1.00
3.60
0.10
0.00
UND.
1
4.80
4.80 M2
1.40
1.40 M2
2.70
2.70 M3
3.24
3.24 M3
0.60
0.60 M3
7.28
7.28 M2
45.28
45.28 KG.
3.48
3.48 M2
3.96
3.96 M2
2.70
1.07
No CAMARAS
1
0.36
1.00
1.00 UN
1.00
1.00 UN
2.00
2.00 UN
1.00
1.00 UN
PROP.
DIAM
N
VECES
No.
LONG.
LONG.
PIEZ.
PIEZA
PARC.
W/ML
PARCIAL
KG
LOSA DE FONDO
1.34
3/8"
0.20
1.00
6.00
1.34
8.04
0.58
4.66
0.94
3/8"
0.20
1.00
8.00
0.94
7.52
0.58
4.36
1.05
3/8"
0.20
1.00
7.00
1.25
8.75
0.58
5.08
0.2
3/8"
0.20
1.00
6.00
1.50
9.00
0.58
5.22
1.05
3/8"
0.20
3.00
5.00
1.25
18.75
0.58
10.88
0.7
0.2
3/8"
0.20
3.00
6.00
1.10
19.80
0.58
11.48
0.1
0.60
0.1
3/8"
0.20
1.00
4.00
0.80
3.20
0.58
1.86
0.1
0.40
0.1
3/8"
0.20
1.00
5.00
0.60
3.00
0.58
1.74
MUROS: LONGITUDINALES
0.20
0.2
1.1
MUROS: TRANSVERSALES
0.20
0.2
LOSA DE TECHO
CAMARA
45.28
CAMARA
45.28
HOJA DE METRADOS
PROYECTO
PROP.
PART.
:
:
No
MEDIDAS
CANT.
LARGO
ANCHO
PARCIAL
ALTO
N VALV.
UND
1.00
2.00
VALVULA CONTROL
01
02
TRABAJOS PRELIMINARES
Limpieza de terreno
Trazo y replanteo
MOVIMIENTO DE TIERRAS
Excavacin manual
0.80
0.80
0.80
0.80
0.80
0.80
0.64
0.64
0.80
0.51
1
2
2
0.80
0.80
0.60
0.80
0.10
0.10
0.10
0.75
0.75
0.06
0.12
0.09
0.60
0.60
1.44
Encofrado y desencofrado
4
04
VALV. Y ACCESORIOS
Vlv. Comp. Bronce 1"
Tapa de Inspeccin metlica
0.64
0.64
1.28 m2
1.28 m2
0.51
1.02 m3
0.57
1.14 m3
0.27
0.55 m3
1.44
2.88 m2
1.00
1.00
2.00 Un.
2.00 Un.
HOJA DE METRADOS
PROYECTO
PROP.
PART.
DESCRIPCION
No
MEDIDAS
CANT.
LARGO
ANCHO
PARCIAL
ALTO
No VALV:
UND
1.00
1.00
VALVULA DE AIRE
01
02
TRABAJOS PRELIMINARES
Limpieza de terreno
Trazo y replanteo
MOVIMIENTO DE TIERRAS
Excavacin manual
1.30
1.30
1.30
1.30
1.30
1.30
1.69
1.69
1.25
2.11
1
1
2
2
1
1
1.30
0.25
1.20
0.90
1.30
0.60
1.30
0.20
0.15
0.15
1.30
0.60
0.15
0.25
1.00
1.00
0.10
0.10
Encofrado y desencofrado
04
0.90
0.90
1.00
0.90
1.69 m2
1.69 m2
2.11
2.11 m3
2.35
2.35 m3
1.03
1.03 m3
5.31
5.31 Kg
4.41
4.41 m2
1.00
1.00
1.00
1.00 Un.
1.00 Un.
1.00 Un.
0.25
0.01
0.36
0.27
0.17
-0.04
Acero
4
1
1.69
1.69
3.60
0.81
VALV. Y ACCESORIOS
Abrazadera Pvc Sap 1 1/2"x 1/2"
Valv. Aire 1/2"
tapa de inspeccion metalica
HOJA DE METRADOS
PROYECTO
PROP.
:
:
PART.
No
MEDIDAS
CANT.
LARGO
ANCHO
PARCIAL
ALTO
N VALV.
1.00
UND
1.00
VALVULA DE PURGA
01
02
TRABAJOS PRELIMINARES
Limpieza de terreno
Trazo y replanteo
MOVIMIENTO DE TIERRAS
Excavacin manual
1.60
1.60
1.60
1.60
1.60
1.60
2.56
2.56
1.30
3.33
1
2
2
2
1
1
1.60
0.25
1.50
1.20
1.50
0.60
1.60
0.30
0.15
0.15
1.50
0.60
0.15
0.25
1.00
1.00
0.10
0.10
Encofrado y desencofrado
04
1.20
1.20
1.00
1.20
2.56
2.56
m2
m2
3.33
3.33
m3
3.70
3.70
m3
1.42
1.42
m3
10.45
10.45
Kg
6.24
6.24
m2
1.00
2.00
2.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
Un.
Un.
Un.
Un.
Un.
0.38
0.04
0.45
0.36
0.23
-0.04
Acero
4
1
2.56
2.56
4.80
1.44
VALV. Y ACCESORIOS
Vlv. Comp. Bronce 1 1/2"
Unin Mixta 1 1/2"
Unin Fo Go Universal 1 1/2"
Tee PVC SAP 1 1/2"
Tapa de Inspeccin Metlica