PRIMERA PARTE

Q (lps)=
Q (m3/s)=
L (m)=

SEGUNDA PARTE

66.61
0.06661
2880

V (m/s)=

1.5

Q (lps)=
Q (m3/s)=

66.61
0.06661

L (m)=

1573.28

V (m/s)=

1.5

3.141592654
D=

3.14159265

(4Q/V)

D=

D=

0.23778209 0.056540324

D=

8
10
12

9.36149975

ZANJAS
ANCHO
PROFUNDIDAD
PLANTILLA
AREA

8
0.7
1.1
0.1

10
0.75
1.15
0.1

12
0.8
1.2
0.1

14
0.85
1.25
0.1

0.0324

0.0507

0.073

VOL EXC
VOL PLANTILLA
VOL TUB
VOL RELLENO

2217.6
201.6
93.312
1922.688

2484
216
146.016
2121.984

2764.8
230.4
210.24
2324.16

(4Q/V)

D=

0.23778209 0.05654032

D=

9.36149975

ZANJAS

8
10
12

8
0.7
1.1
0.1

10
0.75
1.15
0.1

12
0.8
1.2
0.1

0.0993

ANCHO
PROFUNDIDAD
PLANTILLA
AREA

0.0324

0.0507

0.073

3060
244.8
285.984
2529.216

VOL EXC
VOL PLANTILLA
VOL TUB
VOL RELLENO

1211.4256
110.1296
50.974272
1050.32173

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

1356.954
1510.3488
117.996
125.8624
79.765296
114.84944
1159.1927 1269.63696

TABLA DE CALCULODEL DIAMETRO ECONOMICO PARA LA LINEA DE CONDUCCION POR BOMBEO

mm

DIAMETRO
pulg.
200
250
300
350

AREA m2 (A)
8
10
12
14

GASTO m3/s
VELOCIDAD m/s (V) LONGITUD LINEA
(Q)

0.0324
0.0507
0.073
0.0993

0.06661
0.06661
0.06661
0.06661

2.055864198
1.313806706
0.912465753
0.670795569

COEF.FRICCION
MANNING (n)

m (L)

Q2

2880
2880
2880
2880

0.004436892
0.004436892
0.004436892
0.004436892

CONSTANTE
MANNING (k)

0.01
0.01
0.01
0.01

PERDIDAS FRICCION hf =
LQ2K en m

5.057
1.538
0.582
0.256

64.61960645
19.65294734
7.436941062
3.271231807

OTRAS PERDIDAS 10% hf

DESNIVEL (h)

6.461960645
1.965294734
0.743694106
0.327123181

56.6
56.6
56.6
56.6

hf+%hf+h

QH

(Q

76

EN LPS)

127.6815671
78.21824208
64.78063517
60.19835499

=
0.73

8504.869184
5210.117105
4315.038109
4009.812426

55.48
55.48
55.48
55.48

HP

QH/76
153.296128
93.90982525
77.77646194
72.27491755

GOLPE DE ARIETE

mm

DIAMETRO
pulg.

AREA m2 (A)

GASTO m3/s
VELOCIDAD m/s (V)
(Q)

LONGITUD LINEA m (L)

COEF.FRICCION
MANNING (n)

Q2

CONSTANTE
MANNING (k)

PERDIDAS FRICCION hf =
LQ2K en m

OTRAS PERDIDAS 10% hf

DESNIVEL (h)

H hf+%hf+h

QH (Q EN LPS)

76

= 0.73

HP QH/76

COSTO DE LA CONDUCCION
CONCEPTO

Cantidad

Excavacin en material Clase I


Excavacin en material Clase II
Excavacin en material Clase III
Plantilla Apisonada
Instalacin, junteo y prueba de tubera
Relleno Compactado
Relleno a Volteo
Costo de la tubera

2217.6
201.6
2880
1922.668
2880

Dimetro = 200 mm ( 8") Clase = A-14


Unidad
P. U.
Importe $
m3
19.53
m3
m3
m3
72.9
16.26
ml
m3
47.53
m3
344
ml

Costo Total de la Conduccin

Cantidad
43309.73

2484

14696.64
46828.80
91384.41

216
2880
2121.984

990720.00

2880

Dimetro = 250mm ( 10") Clase = A-10


Dimetro = 300mm ( 12") Clase = A-7
Unidad
P. U.
Importe $
Cantidad
Unidad
P. U.
Importe $
m3
m3
19.53
48512.52
2764.8
19.53
53996.54
m3
m3
m3
m3
m3
72.9
15746.40
230.4
m3
72.9
16796.16
19.07
54921.60
2880
20.25
58320.00
ml
ml
m3
47.53
100857.90
2324.16
m3
47.53
110467.32
m3
m3
421
1212480.00
2880
419
1206720.00
ml
ml

1186939.58

1432518.42

1446300.03

RESUMEN
Presin de trabajo de la
tubera en Kg/cm2
14
10
7
7

Costo de: K. W. h. = $0.75

mm

Dimetro nominal
pulg
200
8
250
10
300
12
350
14

HP * 0.7457

H. P.
153.296128
93.90982525
77.77646194
72.27491755

K. W. h.
114.3129227
70.02855669
57.99790767
53.89540602

K. W. h. * $

Costo por hora de bombeo $

Cargo Anual de Bombeo $

Costo total de conduccin $

85.73469201
52.52141752
43.49843075
40.42155451

751035.902
460087.6174
381046.2534
354092.8175

1186939.578
1432518.42
1446300.029
2080189.356

Costo horario bombeo * 8760

copiar arriba $

Cargo anual de amortizacin Conduccin


(15 aos 25% anual)
302906.9803
365578.7007
369095.7673
530864.3238

C. c. * anualidad
Factor de anualidad = 0.2552

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Costo Anual bombeo para operacin 365


das
1053942.882
825666.3181
750142.0207
884957.1413

C. a. b. + C. a. a.

Dimetro = 350 mm ( 14") Clase = A-7


Unidad
P. U.
Importe $
m3
3060
19.53
59761.80
m3
m3
244.8
m3
72.9
17845.92
2880
28.6
82368.00
ml
2529.216
m3
47.53
120213.64
m3
2880
625
1800000.00
ml

Cantidad

2080189.36

TABLA DE CALCULODEL DIAMETRO ECONOMICO PARA LA LINEA DE CONDUCCION POR BOMBEO

mm

DIAMETRO
pulg.
200
250
300

AREA m2 (A)
8
10
12

GASTO m3/s
(Q)

0.0324
0.0507
0.073

0.06661
0.06661
0.06661

VELOCIDAD m/s
(V)

LONGITUD LINEA m
(L)

2.055864198
1.313806706
0.912465753

Q2

COEF.FRICCION MANNING (n)

1573.28 0.004436892
1573.28 0.004436892
1573.28 0.004436892

CONSTANTE MANNING PERDIDAS FRICCION hf = LQ2K


OTRAS PERDIDAS 10% hf
(k)
en m

0.01
0.01
0.01

5.057
1.538
0.582

35.30025501
10.7359684
4.062635637

DESNIVEL (h)

3.530025501
1.07359684
0.406263564

H
86
86
86

hf+%hf+h
124.8302805
97.80956524
90.4688992

QH

(Q

76

EN LPS)

= 0.73

8314.944985
6515.095141
6026.133376

55.48
55.48
55.48

HP

QH/76
149.8728368
117.4314193
108.6181214

GOLPE DE ARIETE

mm

DIAMETRO
pulg.

AREA m2 (A)

GASTO m3/s
(Q)

VELOCIDAD m/s
(V)

LONGITUD LINEA m
(L)

Q2

COEF.FRICCION MANNING (n)

CONSTANTE MANNING PERDIDAS FRICCION hf = LQ2K


OTRAS PERDIDAS 10% hf
(k)
en m

DESNIVEL (h)

H hf+%hf+h

QH (Q EN LPS)

76

= 0.73

HP QH/76

COSTO DE LA CONDUCCION
CONCEPTO

Dimetro = 200 mm ( 8") Clase = A-14


Unidad
P. U.
Importe $
m3
1211.4256
m3
19.53
m3
110.1296
72.9
m3
1573.28
ml
16.26
1050.32173
47.53
m3
m3
1573.28
ml
344

Cantidad

Excavacin en material Clase I


Excavacin en material Clase II
Excavacin en material Clase III
Plantilla Apisonada
Instalacin, junteo y prueba de tubera
Relleno Compactado
Relleno a Volteo
Costo de la tubera
Costo Total de la Conduccin

Cantidad
23659.14197
8028.44784
25581.5328
49921.79183
541208.32

Dimetro = 250mm ( 10") Clase = A-10


Unidad
P. U.
m3
1356.954
m3
m3
117.996
m3
1573.28
ml
1159.1927
m3
m3
1573.28
ml

648399.2344

Importe $

Cantidad

19.53

26501.31162

1510.3488

72.9
19.07
47.53

8601.9084
30002.4496
55096.42903

125.8624
1573.28
1269.63696

421

662350.88

1573.28

782552.9787

Dimetro = 300mm ( 12") Clase = A-10


Unidad
P. U.
Importe $
m3
m3
19.53
29497.11206
m3
72.9
9175.36896
m3
ml
23.09
36327.0352
47.53
60345.84471
m3
m3
ml
576
906209.28
$

1041554.641

RESUMEN
Presin de trabajo de la
Dimetro nominal
tubera en Kg/cm2
mm
pulg
14
200
8
10
250
10
10
300
12
Costo de: K. W. h. = $0.75

HP * 0.7457

H. P.
149.8728368
117.4314193
108.6181214

K. W. h.
111.7601744
87.56860934
80.99653313
K. W. h. * $

Costo por hora de bombeo $

Cargo Anual de Bombeo $

Costo total de conduccin $

83.82013079
65.67645701
60.74739985

734264.3458
575325.7634
532147.2227

648399.2344
782552.9787
1041554.641

Costo horario bombeo * 8760

copiar arriba $

Cargo anual de amortizacin


Conduccin (15 aos 25% anual)
165471.4846
199707.5202
265804.7444
C. c. * anualidad
Factor de anualidad = 0.2552

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Costo Anual bombeo para


operacin 365 das
899735.83
775033.28
797951.97
C. a. b. + C. a. a.