BASES Y SOPORTES
AFINADO CUBIERTAS PLANAS (E=0.03)

CANCHA MLTIPLE TENISLEIBO


m 0.04
12,200
10,867
10,548
10,419
MANO DE OBRA AA
hc 0.70
12,007
12,007
12,007
12,007
16,183 16,183 16,183 16,183

ESTRUCTURA DE MADERA P/TEJA DE BARRO

CORREA DE 2X2
ml 6.18
0
0
4,946
0
CUADRO 5 X 5 CM
m 6.18
0
0
0
33,990
m 6.18
21,506
0
0
0
DURMIENTE 3 M
LISTN 2X2X3 M AMARILLO
m 6.18
0
44,496
0
0
hc 1.86
31,905
31,905
31,904
31,904
MANO DE OBRA AA
PUNTILLA CON CABEZA 2
lb 0.30
750
750
853
750
54,161 77,151 37,703 66,644

DETALLADOS
GENERALES

ESTRUCTURA DE MADERA P/TEJA FIBROCEMENTO


CAN COMN 3.5X19X3 M
m 0.75
0
m 1.50
0
CUARTN 2X4X3 MACHARE
LARGUERO DE 2 X 4
m 1.50
0
LISTON ABARCO 2X4X3 M
m 1.50
0
hc 1.00
17,153
MANO DE OBRA AA
PLANCHN ORDINARIO 3 M
m 0.75
9,179
lb 0.20
500
PUNTILLA CON CABEZA 2
REPISA ORDINARIO 3 M
m 1.50
7,050
TABLN DE APOYO
ml 0.75
0
TELERA DE OTOBO 2X8X3 M
m 0.75
0
33,882

ESTRUCTURA METLICA P/TEJA FIBROCEMENTO

m
0
18,000
0
0
17,153
0
500
7,050
0
9,750
52,453

0
7,500
0
0
0
11,850
43,875
0
17,153
17,153
0
0
568
500
7,050
7,050
0
0
0
0
68,646 44,053

BARRA G-60 3/8 6M


m 1.50
9,920
9,920
9,920
9,920
MANO DE OBRA AA
hc 1.00
17,153
17,153
17,153
17,153
PERFIL TIPO PERLIN EN C NEGRO P-10-12N m 0.75
93,407
93,407
18,000
93,407
SOLDADURA ELCTRICA 004KG DE 3/32
kg 0.30
3,075
3,075
3,075
3,075
123,554 123,554 48,148 123,554

196

CONSTRUDATA

CUBIERTAS

ANLISIS

UM CANT.

BOGOT

CALI

B/QUILLA

MEDELLN

ANLISIS

UM CANT.

BOGOT

CALI

B/QUILLA

MEDELLN

IMPERMEABILIZACIN AUTOPROTEGIDA m
MANO DE OBRA AA
hc 0.75
12,865
MANTO MORTER PLAS AL-300 TEXSA
rl 0.11
25,129
SUB-CONTRATO INSTALACIN
% 0.04
12,200
38,014

IMPERMEABILIZACIN CUBIERTAS PLANAS


MANO DE OBRA AA
hc 0.75
12,865
MANTO FIBERGLASS 400X(10M)
rl 0.11
11,912
MORTERO 1:4
m 0.04
12,200
36,977

12,865
25,129
10,867
38,013

12,865
12,865
25,129
25,129
10,548
10,419
38,013 38,013

m
12,865
11,912
10,867
35,643

12,865
12,865
11,912
11,912
10,548
10,419
35,324 35,195

CABALLETE ARTICULADO TEJA FIBROCEMENTO

DETALLADOS
GENERALES

ACABADOS
m

CABALL. ETERNIT ARTI. ONDUL. ALA SUP-INF un 1.00


26,000
26,000
26,000
26,000
MANO DE OBRA AA
hc 0.54
9,263
9,263
9,263
9,263
un 2.00
494
494
494
494
TORNILLO FIJADOR DE ALA
35,757 35,757 35,756 35,756

CABALLETE FIJO TEJA FIBROCEMENTO

CABALLETE FIJO COLOMBIT P7 20


un 1.15
23,360
23,360
23,360
23,360
GANCHO GALVANIZ. PARA MADERA
un 2.00
608
608
608
608
MANO DE OBRA AA
hc 0.54
9,263
9,263
9,263
9,263
33,230 33,230 33,230 33,230

EDICIN 166 MARZO - MAYO 2013

197

CUBIERTAS

ANLISIS

UM CANT.

BOGOT

CALI

CANALETA 43 FIBROCEMENTO (L= 6.00 M)


CANALETA 43 ETERNIT X 600
un 0.38
57,168
IGAS GRIS (30 KG)
kg 0.12
2,074
MANO DE OBRA AA
hc 0.90
15,438
TORNILLO PARA CANALETA 43 METAL
un 0.78
787
75,467

MEDELLN

ANLISIS

UM CANT.

BOGOT

CALI

B/QUILLA

MEDELLN

m
57,168
2,074
15,438
787
75,467

CANALETA 90 FIBROCEMENTO (L= 6.00 M)


CANALETA 90 ETERNIT X 600
un 0.19
33,722
kg 0.17
2,938
IGAS GRIS (30 KG)
MANO DE OBRA AA
hc 0.40
6,861
TORNILLO PARA CANALETA 90
un 0.26
785
44,306

B/QUILLA

57,168
57,168
2,074
2,074
15,438
15,438
787
787
75,467 75,467

m
33,722
2,938
6,861
785
44,306

DETALLADOS
GENERALES

CANALETA 90 LMINA GALVANIZADA (L=6.00 M)

33,722
33,722
2,938
2,938
6,861
6,861
785
785
44,306 44,306

CANAL. ACESCO TZC-090 X 6.00-24 (0.60MM) un 0.19


29,602
29,602
29,602
29,602
MANO DE OBRA AA
hc 0.40
6,861
6,861
6,861
6,861
un 0.26
785
785
785
785
TORNILLO PARA CANALETA 90
37,248 37,248 37,248 37,248

CUBIERTA ARQUITECTNICA CORPACERO


A.C.P.M.
gl 0.21 1,746
BROCHA DE CERDA 4
un 0.02
190
MANO DE OBRA AA
hc 0.20
3,431
5,366

198

m
1,768 1,705 1,751
198
198
198
3,431
3,431
3,431
5,397 5,333 5,380

CONSTRUDATA

CUBIERTAS

ANLISIS

UM CANT.

BOGOT

CUBIERTA CORPATECHO CORPACERO

CALI

B/QUILLA

MEDELLN

ANLISIS

UM CANT.

BOGOT

CALI

B/QUILLA

MEDELLN

CUBIERTA TRAPEZ. CORPATECHO CAL 26


m 1.04
15,349
15,349
23,920
15,349
MANO DE OBRA AA
hc 0.30
5,146
5,146
5,146
5,146
TORN. AUTOPERFOR./SELLO DE NEOPRENO un 1.60
288
288
288
288
20,783 20,783 29,354 20,783

CUBIERTA SNDWICH CON FIBRA DE VIDR. HUNTER DOUGLAS m


CLIP TIPO C SENCILLO
un 2.22
5,599
5,599
5,599
5,599
CUB. HD 333C ALUZINC SEN. CAL.26 PINTADA m 3.00 171,243
171,243
171,243
171,243
MANO DE OBRA AA
hc 0.37
6,347
6,347
6,347
6,347
TORN. AUTOPERFOR./SELLO DE NEOPRENO un 2.22
400
400
400
400
183,588 183,588 183,588 183,588

CLIP TIPO C SENCILLO


un 2.22
5,599
MANO DE OBRA AA
hc 0.37
6,347
TEJA MODULAR TIPO C (5 00 MT)
m 1.00
77,720
TORN. AUTOPERFOR.SELLO DE NEOPRENO
un 2.22
400
90,065

CUBIERTA TEJA CALIFORNIA DINALSA

m
5,599
6,347
77,720
400
90,065

DETALLADOS
GENERALES

CUBIERTA SENCILLA HUNTER DOUGLAS

5,599
5,599
6,347
6,347
77,720
77,720
400
400
90,065 90,065

MANO DE OBRA AA
hc 0.30
5,146
5,146
5,146
5,146
TEJA CALIF. M/L PINT. AMBAS CARAS ESP. 1 ml 0.42
18,708
18,708
18,708
18,708
TORN. AUTOPERFOR./SELLO DE NEOPRENO un 2.12
382
382
382
382
24,236 24,236 24,236 24,236

EDICIN 166 MARZO - MAYO 2013

199

CUBIERTAS

ANLISIS

UM CANT.

BOGOT

CUBIERTA TEJA DURALUM 812 DINALSA

CALI

B/QUILLA

MEDELLN

ANLISIS

UM CANT.

BOGOT

CALI

B/QUILLA

MEDELLN

MANO DE OBRA AA
hc 0.30
5,146
5,146
5,146
5,146
TEJA DURALUM 812 - 6 00 M
m 1.00
29,524
29,524
29,524
29,524
TORN. AUTOPERFOR./SELLO DE NEOPRENO un 2.12
382
382
382
382
35,052 35,052 35,051 35,051

TEJA DE BARRO
ARENA DE REVOQUE
m 0.05
0
ARENA FINA
m 0.05
0
CEMENTO GRIS
kg 9.72
4,918
hc 1.03
17,668
MANO DE OBRA AA
TEJA BARROCA ETERNIT
un 1.20
68,160
90,746

TEJA FIBROCEMENTO NO. 4

m
0
0
957
1,392
0
0
4,918
4,918
4,918
17,668
17,667
17,667
68,160
68,160
84,720
92,138 90,746 108,263

DETALLADOS
GENERALES

GANCHO GALVANIZ. PARA MADERA


un 1.00
304
304
304
304
MANO DE OBRA AA
hc 0.60
10,292
10,292
10,292
10,292
TEJA COLOMBIT P7 NO. 4
un 1.01
36,845
36,845
36,845
36,845
47,441 47,441 47,440 47,440

TEJA FIBROCEMENTO NO. 6

GANCHO TEJA ETERNIT 55 MM


un 1.30
342
342
342
342
MANO DE OBRA AA
hc 0.54
9,263
9,263
9,263
9,263
TEJA PREMIUM PERFIL 7 MARFIL N. 6
un 1.00
32,335
30,521
30,521
30,521
41,940 40,126 40,126 40,126

200

CONSTRUDATA

CUBIERTAS

ANLISIS

UM CANT.

BOGOT

TEJA TECHOLINE BAJO TEJA

CALI

B/QUILLA

MEDELLN

ANLISIS

UM CANT.

BOGOT

CALI

B/QUILLA

MEDELLN

un

FIJACIONES TECHOLINE
un 0.30
87,000
87
87
90
MANO DE OBRA AA
hc 5.50
94,342
94,342
94,341
94,341
TEJA TECHOLINE B.T.
un 0.60
19,140
20,340
20,340
20,340
200,482 114,768 114,768 114,771

CANALES Y BAJANTES
BAJANTE PAVCO m

CANAL PAVCO AMAZONA


CANAL REF. 0350001001
ml 1.03
7,761
hc 0.80
15,094
MANO DE OBRA BB
SOPORTE DE CANAL REF. 2270400211
un 2.74
8,609
TAPA EXTERNA REF. 2270600209
un 0.68
4,796
TORNILLO PARA MADERA 1 NO. 6
un 4.00
0
un 0.34
4,436
UNIN DE CANAL
40,696

CANAL PAVCO RAINGO


CANAL REF. 0350001002
ml 1.03
24,587
MANO DE OBRA BB
hc 0.85
16,038
SOPORTE DE CANAL REF. 2280041009
un 2.74
6,398
TAPA EXTERNA BLANCO
un 0.68
3,373
TORNILLO PARA MADERA 1 NO. 6
un 4.00
0
UNIN DE CANAL
un 0.34
4,436
54,831

EDICIN 166 MARZO - MAYO 2013

20,568
289
15,094
4,943
28
4,436
45,359

20,568
20,568
289
289
15,094
15,094
4,943
4,943
23
0
4,436
4,436
45,354 45,331

un
7,761
15,094
8,609
4,796
112
4,436
40,808

7,761
7,761
15,094
15,094
8,609
8,609
4,796
4,796
92
0
4,436
4,436
40,788 40,696

DETALLADOS
GENERALES

BAJANTE REF. 0350001003


ml 1.05
20,568
CODO BAJANTE 45 BLANCO
un 0.06
289
MANO DE OBRA BB
hc 0.80
15,094
SOPORTE DE BAJANTE REF. 2290400211
un 2.74
4,943
TORNILLO PARA MADERA 1 NO. 6
un 1.00
0
UNIN DE CANAL
un 0.34
4,436
45,331

m
24,587
16,038
6,398
3,373
112
4,436
54,943

24,587
24,587
16,038
16,038
6,398
6,398
3,373
3,373
92
0
4,436
4,436
54,923 54,831

201

DESAGES

ANLISIS

UM CANT.

BOGOT

CALI

B/QUILLA

MEDELLN

un

AGUA
lt 0.76
15
15
15
15
m 0.01
638
0
0
0
ARENA DE PEA
ARENA DE REVOQUE (AMARILLA)
m 0.01
0
0
315
0
m 0.01
0
378
0
0
ARENA FINA 5 M3
ARENA LAVADA DE PEA
m 0.01
0
0
0
290
kg 0.91
460
460
460
460
CEMENTO GRIS
MANO DE OBRA AA
hc 0.60
10,292
10,292
10,292
10,292
SIFN PVC 135 4
un 1.03
17,611
17,611
17,611
17,611
29,016 28,756 28,694 28,668

ACCESORIOS PARA DRENAJE 6


ARENA DE PEA
m 0.01
638
ARENA DE REVOQUE (AMARILLA)
m 0.01
0
m 0.01
0
ARENA FINA 5 M3
ARENA LAVADA DE PEA
m 0.01
0
CEMENTO GRIS
kg 1.87
946
CODO 90 1/4 CXC SANITARIO 6
un 1.59 117,662
hc 0.70
12,007
MANO DE OBRA AA
un 1.03
0
SIFN DE GRES 6
131,253

un
0
0
378
0
946
117,662
12,007
17,510
148,502

CAJAS INSPECCIN 100X100 HMAX=1.00

DETALLADOS
GENERALES

ARENA DE PEA
m 0.27
17,226
ARENA DE REVOQUE
m 0.27
0
m 0.27
0
ARENA FINA
ARENA GRUESA
m 0.27
0
ARENA LAVADA DE RO
m 0.27
27,036
ARENA LAVADA JUAN ACOSTA
m 0.27
0
ARENA LAVADA PARA CONCRETO
m 0.27
0
ARENA TURBACO
m 0.27
0
CEMENTO GRIS
kg 118.00
59,708
GRAVILLA FINA 1/2 B/QUILLA.
m 0.27
0
m 0.27
8,682
GRAVILLA FINA 1/2 BOGOT
GRAVILLA FINA 1/2 CALI
m 0.27
0
GRAVILLA FINA 1/2 MEDELLN
m 0.27
0
LADRILLO RECOCIDO OSCURO
un 260.00
0
LADRILLO RECOCIDO OSCURO B/QUILLA.
un 260.00
0
LADRILLO RECOCIDO OSCURO BOGOT
un 260.00 104,000
LADRILLO RECOCIDO OSCURO CALI
un 260.00
0
hc 5.80
99,487
MANO DE OBRA AA
MARCO Y TAPA 100X100
un 1.00 201,840
517,979

CAJAS INSPECCIN 40 X 40
ARENA DE PEA
ARENA DE REVOQUE
ARENA FINA
ARENA GRUESA
ARENA LAVADA DE RO
ARENA LAVADA JUAN ACOSTA
ARENA LAVADA PARA CONCRETO
ARENA TURBACO
CEMENTO GRIS
GRAVILLA FINA 1/2 B/QUILLA.
GRAVILLA FINA 1/2 BOGOT
GRAVILLA FINA 1/2 CALI
GRAVILLA FINA 1/2 MEDELLN
LADRILLO RECOCIDO OSCURO
LADRILLO RECOCIDO OSCURO B/QUILLA.
LADRILLO RECOCIDO OSCURO BOGOT
LADRILLO RECOCIDO OSCURO CALI

m 0.11
m 0.11
m 0.11
m 0.11
m 0.11
m 0.11
m 0.11
m 0.11
kg 86.40
m 0.11
m 0.11
m 0.11
m 0.11
un 112.32
un 112.32
un 112.32
un 112.32

7,018
0
0
0
11,015
0
0
0
43,718
0
3,537
0
0
0
0
44,928
0

0
0
315
0
0
0
0
290
946
946
117,662
117,662
12,007
12,007
17,510
17,510
148,440 148,415

un
0
0
8,100
8,100
0
0
0
0
59,708
0
0
9,720
0
0
0
0
78,520
99,487
201,840
465,475

0
0
0
5,168
0
0
0
0
0
0
10,962
0
0
7,830
10,993
0
59,708
59,708
21,830
0
0
0
0
0
0
10,206
0
91,000
78,520
0
0
0
0
0
99,487
99,487
201,840
201,840
483,340 475,239

un
0
0
3,300
3,300
0
0
0
0
43,718
0
0
3,960
0
0
0
0
33,921

0
0
0
0
0
4,466
0
4,479
43,718
8,894
0
0
0
0
33,921
0
0

UM CANT.

BOGOT

CALI

B/QUILLA

MEDELLN

MANO DE OBRA AA
hc 5.00
85,765
85,765
85,765
85,765
79,228
79,228
79,228
79,228
MARCO Y TAPA CAJA INSPEC. DE 40X40CM un 1.00
275,209 253,192 260,470 257,476

DESAGES
ACCESORIOS PARA DRENAJE 4

ANLISIS

0
2,105
0
0
0
0
3,190
0
43,718
0
0
0
4,158
39,312
0
0
0

CAJAS INSPECCIN 60 X 60
ARENA DE PEA
m 0.16
10,208
ARENA DE REVOQUE
m 0.16
0
m 0.16
0
ARENA FINA
ARENA GRUESA
m 0.16
0
m 0.16
16,021
ARENA LAVADA DE RO
ARENA LAVADA JUAN ACOSTA
m 0.16
0
ARENA LAVADA PARA CONCRETO
m 0.16
0
m 0.16
0
ARENA TURBACO
CEMENTO GRIS
kg 57.19
28,938
GRAVILLA FINA 1/2 B/QUILLA.
m 0.16
0
m 0.16
5,145
GRAVILLA FINA 1/2 BOGOT
m 0.16
0
GRAVILLA FINA 1/2 CALI
m 0.16
0
GRAVILLA FINA 1/2 MEDELLN
LADRILLO RECOCIDO OSCURO
un 168.48
0
un 168.48
0
LADRILLO RECOCIDO OSCURO B/QUILLA.
un 168.48
67,392
LADRILLO RECOCIDO OSCURO BOGOT
un 168.48
0
LADRILLO RECOCIDO OSCURO CALI
MANO DE OBRA AA
hc 5.13
87,995
MARCO Y TAPA CAJA INSPEC. DE 60X60CM un 1.00
79,228
294,927

CAJAS INSPECCIN 80 X 80
ARENA DE PEA
m 0.27
17,226
ARENA DE REVOQUE
m 0.27
0
ARENA FINA
m 0.27
0
ARENA GRUESA
m 0.27
0
ARENA LAVADA DE RO
m 0.27
27,036
m 0.27
0
ARENA LAVADA JUAN ACOSTA
ARENA LAVADA PARA CONCRETO
m 0.27
0
m 0.27
0
ARENA TURBACO
CEMENTO GRIS
kg 94.38
47,756
GRAVILLA FINA 1/2 B/QUILLA.
m 0.27
0
GRAVILLA FINA 1/2 BOGOT
m 0.27
8,682
GRAVILLA FINA 1/2 CALI
m 0.27
0
GRAVILLA FINA 1/2 MEDELLN
m 0.27
0
LADRILLO RECOCIDO OSCURO
un 224.64
0
LADRILLO RECOCIDO OSCURO B/QUILLA.
un 224.64
0
LADRILLO RECOCIDO OSCURO BOGOT
un 224.64
89,856
LADRILLO RECOCIDO OSCURO CALI
un 224.64
0
hc 5.40
92,626
MANO DE OBRA AA
MARCO Y TAPA CAJA INSPEC. DE 80X80CM un 1.00
79,228
362,410

EXCAVACIN EN CONGLOMERADO

un
0
0
4,800
4,800
0
0
0
0
28,938
0
0
5,760
0
0
0
0
50,881
87,995
79,228
262,402

0
0
0
3,062
0
0
0
0
0
0
6,496
0
0
4,640
6,515
0
28,938
28,938
12,936
0
0
0
0
0
0
6,048
0
58,968
50,881
0
0
0
0
0
87,994
87,994
79,228
79,228
272,988 268,879

un
0
0
8,100
8,100
0
0
0
0
47,756
0
0
9,720
0
0
0
0
67,841
92,626
79,228
313,372

0
0
0
5,168
0
0
0
0
0
0
10,962
0
0
7,830
10,993
0
47,756
47,756
21,830
0
0
0
0
0
0
10,206
0
78,624
67,841
0
0
0
0
0
92,626
92,626
79,228
79,228
331,237 321,438

CUADRILLA OFICIAL+2 AYUDANTES


hc 1.50
35,199
35,199
35,199
35,199
VOLQUETA M3
vj 0.21
11,550
8,400
9,450
8,400
46,749 43,599 44,649 43,599

EXCAVACIN EN ROCA

CUADRILLA OFICIAL+2 AYUDANTES


hc 2.00
46,932
46,932
46,932
46,932
VOLQUETA M3
vj 0.21
11,550
8,400
9,450
8,400
58,482 55,332 56,382 55,332

EXCAVACIN MANUAL m
CUADRILLA OFICIAL+2 AYUDANTES
hc 1.00
23,466
23,466
23,466
23,466
VOLQUETA M3
vj 0.21
11,550
8,400
9,450
8,400
35,016 31,866 32,916 31,866

GEOTEXTIL NO TEJIDO

CUADRILLA OFICIAL+2 AYUDANTES


hc 0.15
3,520
3,520
3,520
3,520
GEOTEXTIL PAVCO NO TEJIDO 2500
m 1.08
5,388
5,388
5,388
5,388
8,908 8,908 8,908 8,908

Material de patio
BOGOT
Gravilla de ro
Arena lavada de ro
Arena de pea
Recebo comn
Piedra media songa

202

CALI
Grava con vj 5m3
Arena gruesa 5m3
Arena fina
Roca muerta
Piedra de cantera

BARRANQUILLA
Gravilla canto rodado
Arena lavada Juan Acosta
Arena turbaco
Zahorra
Piedra media songa

MEDELLN
Gravilla de ro
Arena lavada para concreto
Arena para revoque
Base granular
Piedra media songa

CONSTRUDATA

DESAGES

UM CANT.

BOGOT

POZO SPTICO ETERNIT

CALI

B/QUILLA

MEDELLN

un

ABRAZADERA ACERO 3
m 0.02
0
1,060
0
0
BASE GRANULAR
m 0.02
0
0
0
673
BASE GRANULAR B/QUILLA.
m 0.02
0
0
1,619
0
m 0.02
1,462
0
0
0
BASE GRANULAR BOGOT
BASE GRANULAR CALI
m 0.02
0
740
0
0
BASE GRANULAR MEDELLN
m 0.02
0
0
0
505
hc 1.00
17,153
17,153
17,153
17,153
MANO DE OBRA AA
RECEBO B-200 B/QUILLA.
m 0.02
0
0
1,278
0
RECEBO B-200 BOGOT
m 0.02
667
0
0
0
RECEBO B-200 MEDELLN
m 0.02
0
0
0
700
ROCA MUERTA
m 0.02
0
0
0
0
un 1.00 895,520
895,520
895,520
895,520
TANQUE SPTICO CNICO DE 2000LT.
ZAHORRA
m 0.02
0
0
640
0
914,801 914,473 916,211 914,551

RELLENO EN ARENA DE PEA

ARENA DE PEA
m 1.08
68,904
0
0
0
ARENA DE REVOQUE
m 1.08
0
0
0
20,671
ARENA FINA
m 1.08
0
32,400
0
0
ARENA TURBACO
m 1.08
0
0
43,973
0
hc 0.70
16,426
16,426
16,426
16,426
CUADRILLA OFICIAL+2 AYUDANTES
VIBROCOMPACTADOR A GASOLINA
d 0.04
880
880
880
880
86,210 49,706 61,279 37,977

RELLENO EN RECEBO B-200

ABRAZADERA ACERO 3
m 1.00
0
53,000
0
0
hc 0.70
16,426
16,426
16,426
16,426
CUADRILLA OFICIAL+2 AYUDANTES
RECEBO B-200 B/QUILLA.
m 1.00
0
0
63,916
0
m 1.00
33,333
0
0
0
RECEBO B-200 BOGOT
RECEBO B-200 MEDELLN
m 1.00
0
0
0
35,000
VIBROCOMPACTADOR A GASOLINA
d 0.04
880
880
880
880
50,639 70,306 81,222 52,306

RELLENO EN RECEBO B-200 COMPACTADO

ABRAZADERA ACERO 3
m 1.08
0
57,240
0
0
hc 0.70
16,426
16,426
16,426
16,426
CUADRILLA OFICIAL+2 AYUDANTES
RECEBO B-200 B/QUILLA.
m 1.08
0
0
69,029
0
m 1.08
36,000
0
0
0
RECEBO B-200 BOGOT
RECEBO B-200 MEDELLN
m 1.08
0
0
0
37,800
VIBROCOMPACTADOR A GASOLINA
d 0.04
880
880
880
880
53,306 74,546 86,335 55,106

RELLENO EN RECEBO B-400

CUADRILLA OFICIAL+2 AYUDANTES


hc 0.70
16,426
16,426
16,426
16,426
m 1.08
0
57,240
0
0
RECEBO B-400
RECEBO B-400
m 1.08
0
0
33,032
0
m 1.08
16,286
0
0
0
RECEBO B-400
RECEBO B-400
m 1.08
0
0
0
37,800
VIBROCOMPACTADOR A GASOLINA
d 0.04
880
880
880
880
33,593 74,546 50,338 55,106

RELLENO EN RECEBO B-600

CUADRILLA OFICIAL+2 AYUDANTES


hc 0.70
16,426
16,426
16,426
16,426
m 1.08
0
0
0
37,799
LIMPIADOR FUNDENTE COBRE
RECEBO B-600 B/QUILLA
m 1.08
0
0
49,116
0
RECEBO B-600 BOGOT
m 1.08
31,320
0
0
0
RECEBO B-600 CALI
m 1.08
0
57,240
0
0
VIBROCOMPACTADOR A GASOLINA
d 0.04
880
880
880
880
48,626 74,546 66,422 55,106

RELLENO GRAVILLA DE RO

GRAVA CANTO RODADO 1/2


m 1.00
0
0
78,184
0
GRAVILLA DE RO
m 1.00
0
0
0
37,120
GRAVILLA DE RO
m 1.00
98,600
0
0
0
GRAVILLA FINA 1/2 Y 3/4
m 1.00
0
35,000
0
0
hc 0.60
10,292
10,292
10,292
10,292
MANO DE OBRA AA
d 0.04
880
880
880
880
VIBROCOMPACTADOR A GASOLINA
109,772 46,172 89,356 48,292

RELLENOS GRAVILLA FINA

CUADRILLA OFICIAL+2 AYUDANTES


hc 0.70
16,426
16,426
16,426
16,426
m 1.08
0
0
87,320
0
GRAVILLA FINA 1/2 B/QUILLA.
GRAVILLA FINA 1/2 BOGOT
m 1.08
34,728
0
0
0
GRAVILLA FINA 1/2 CALI
m 1.08
0
38,880
0
0
GRAVILLA FINA 1/2 MEDELLN
m 1.08
0
0
0
40,824
51,154 55,306 103,746 57,250

TUBERA DRENAJE PVC 100MM

CUADRILLA OFICIAL+2 AYUDANTES


hc 0.15
3,520
3,520
3,520
3,520
TUBO DRENAJE 100MM
m 1.00
17,699
17,699
17,699
17,699
21,219 21,219 21,219 21,219

EDICIN 166 MARZO - MAYO 2013

ANLISIS

UM CANT.

BOGOT

TUBERA PARA DRENAJE 4


AGUA
lt 0.76
15
ARENA DE PEA
m 0.01
638
ARENA DE REVOQUE (AMARILLA)
m 0.01
0
ARENA FINA 5 M3
m 0.01
0
ARENA LAVADA DE PEA
m 0.01
0
CEMENTO GRIS
kg 0.91
460
hc 0.60
10,292
MANO DE OBRA AA
TUBO PARA DRENAJE X 5.9M DE 4
un 1.03
18,776
BASE ARENA CEMENTO 1:20
m 0.02
3,550
33,732

TUBERA PARA DRENAJE 6


AGUA
lt 1.59
32
m 0.01
638
ARENA DE PEA
ARENA DE REVOQUE (AMARILLA)
m 0.01
0
ARENA FINA 5 M3
m 0.01
0
ARENA LAVADA DE PEA
m 0.01
0
CEMENTO GRIS
kg 1.87
946
hc 0.70
12,007
MANO DE OBRA AA
TUBO PARA DRENAJE 6
un 1.03
41,288
BASE ARENA CEMENTO 1:20
m 0.02
3,550
58,461

CALI

B/QUILLA

MEDELLN

m
15
0
0
378
0
460
10,292
18,776
2,711
32,632

15
15
0
0
315
0
0
0
0
290
460
460
10,292
10,292
18,776
18,776
2,511
2,430
32,370 32,263

m
32
0
0
378
0
946
12,007
41,288
2,711
57,362

32
32
0
0
315
0
0
0
0
290
946
946
12,007
12,007
41,288
41,288
2,511
2,430
57,099 56,992

DOTACIONES DEPORTIVAS
MALLA GRUESA (VOLEIBOL)

un

MALLA NYLON CABLE TENNIS


un 1.00 215,900
215,900
215,900
215,900
215,900 215,900 215,900 215,900

MALLA NYLON ( VOLEIBOL)

un

MALLA NYLON (VOLEIBOL)


un 1.00
47,900
47,900
47,900
47,900
47,900 47,900 47,900 47,900

MALLA NYLON (PETROLIZADA)

un

MALLA NYLON PETROLIZADA VOLEIBOL


un 1.00
55,900
55,900
55,900
55,900
55,900 55,900 55,900 55,900

PORTERA (CANCHA FTBOL)

un

MALLA PORTERA FTBOL


un 1.00 174,900
174,900
174,900
174,900
PORTERA FTBOL
un 1.00 4,193,900 4,193,900 4,193,900 4,193,900
EXCAVACIN MANUAL
m 1.72
60,227
54,809
56,615
54,809
4,429,027 4,423,609 4,425,415 4,423,609

PRTICO MULTIFUNCIONAL(F) un
MALLA BASKET
un 1.00
10,000
10,000
10,000
10,000
un 1.00
83,900
83,900
83,900
83,900
MALLA MICROFTBOL
PORTERA MULTIFUNCIONAL MOVIBLE
un 1.00 2,314,200 2,314,200 2,314,200 2,314,200
m 1.72
60,227
54,809
56,615
54,809
EXCAVACIN MANUAL
2,468,327 2,462,909 2,464,715 2,462,909

SOPORTE MALLA TUBO 4


CONCRETO CORR. GRAVA COMN 5000 PSI m 0.01
4,024
MANO DE OBRA AA
hc 0.30
5,146
TUBO ESTRUCT. 2 REDONDO 4MM COLMENA m 2.07
41,400
50,570

TUBO SOPORTE MALLA


CONCRETO CORR. GRAVA COMN 2000 PSI m 0.01
3,118
MANO DE OBRA AA
hc 1.00
17,153
TUBO ESTRUCT. 2 REDONDO 4MM COLMENA m 3.00
60,000
80,271

un
3,353
5,146
41,400
49,899

4,024
3,623
5,146
5,146
35,690
35,690
44,860 44,459

un
3,059
17,153
60,000
80,212

3,059
2,166
17,153
17,153
51,724
51,724
71,936 71,043

ENCHAPES Y ACCESORIOS
CERMICA ALFA LISA 20X20
AGUA
lt 3.00
60
CEMENTO BLANCO
kg 1.03
2,524
CERMICA BLANCA 20X20
m 1.03
13,132
FIJAMIX ALFA
kg 0.30
2,791
MANO DE OBRA AA
hc 0.85
14,580
33,086

CERMICA CORONA EGEO 20CM X 20CM


CEMENTO BLANCO
kg 0.60
1,470
MANO DE OBRA AA
hc 1.60
27,445
PEGACOR BLANCO
kg 0.60
610
PISO-PARED EGEO BLANCO
m 0.50
8,650
38,175

m
60
2,523
13,132
2,791
14,580
33,086

60
60
2,523
5,047
13,132
13,132
2,791
2,791
14,580
14,580
33,086 35,610

m
1,470
27,445
610
8,650
38,175

1,470
2,940
27,445
27,445
610
610
8,650
8,650
38,175 39,645

203

DETALLADOS
GENERALES

ANLISIS

ENCHAPES Y ACCESORIOS

ANLISIS

UM CANT.

BOGOT

CERMICA PARED ITALIA 20X20


AGUA
lt 3.00
60
CEMENTO BLANCO
kg 0.70
1,715
MANO DE OBRA AA
hc 0.85
14,580
PEGACOR BLANCO
kg 3.15
3,205
PISO PLANO PIECENZA
m 1.05
17,850
37,410

DUCHAS DE 1.20 CM X 0.90CM ENCHAPE CRISTANAC

CALI

B/QUILLA

m
60
1,715
14,580
3,205
17,850
37,410

ARENA DE PEA
m 0.03
1,914
ARENA DE REVOQUE (AMARILLA)
m 0.03
0
ARENA FINA 5 M3
m 0.03
0
m 0.03
0
ARENA LAVADA DE PEA
CEMENTO GRIS
kg 6.71
3,395
un 60.00
0
LADRILLO 10X10
LADRILLO 10X10
un 60.00
0
LADRILLO 10X10
un 60.00
0
un 60.00
12,360
LADRILLO 10X10
MANO DE OBRA AA
hc 0.80
13,722
SIKA-2 (5.5 KG)
kg 0.19
2,182
33,574

GABINETES BAO PRINCIPAL

60
60
1,715
3,430
14,580
14,580
3,205
3,205
21,945
23,226
41,504 44,501

un

AGUA
lt 2.97
59
59
ARENA FINA
m 0.01
0
278
ARENA LAVADA (ARROYO DE PIEDRA)
m 0.01
0
0
m 0.01
302
0
ARENA LAVADA DE PEA
ARENA LAVADA PARA CONCRETO
m 0.01
0
0
BASE DECORADA SELENE AZUL
m 10.74 160,026
160,026
CEMENTO BLANCO
kg 40.77
99,887
99,883
CEMENTO GRIS
kg 6.12
3,097
3,097
COLOR MINERAL
kg 0.10
1,160
350
MANO DE OBRA AA
hc 15.50 265,872
265,872
530,402 529,565

ENCHAPES FACHADA TABLETA

MEDELLN

59
59
0
0
458
0
0
0
0
404
160,026
160,026
99,883
199,773
3,097
3,097
970
290
265,870
265,870
530,364 629,519

m
0
0
1,133
0
3,395
0
0
0
0
13,722
2,182
20,432

0
0
946
0
0
0
0
870
3,395
3,395
0
0
12,360
0
0
12,360
0
0
13,722
13,722
2,182
2,182
32,605 32,530

un

CEMENTO BLANCO
kg 2.00
4,900
4,900
4,900
9,800
GABINETE BAO PPAL
un 1.00 286,900
146,899
146,899
146,900
hc 1.29
22,127
22,127
22,127
22,127
MANO DE OBRA AA
313,927 173,926 173,926 178,827

GABINETES BAO SERVICIO

un

DETALLADOS
GENERALES

CEMENTO BLANCO
kg 1.00
2,450
2,450
2,450
4,900
GABINETE BAO SERVICIO
un 1.00 227,000
164,604
164,604
141,900
hc 0.94
16,124
16,124
16,124
16,124
MANO DE OBRA AA
245,574 183,178 183,178 162,924

JABONERAS PORCELANA ACUARIO


CEMENTO BLANCO
kg 0.50
1,225
un 1.03
10,197
JABONERA ALLEGRO BLANCA
MANO DE OBRA AA
hc 0.48
8,233
19,655

un
1,225
10,197
8,233
19,655

1,225
2,450
10,197
10,197
8,233
8,233
19,655 20,880

JUEGOS INCRUSTAR un
CEMENTO BLANCO
kg 1.54
3,773
3,773
3,773
7,546
ELITE JUEGO ELITE X 7 UNIDADES
un 1.03
71,997
71,997
71,997
71,997
MANO DE OBRA AA
hc 2.00
34,306
34,306
34,306
34,306
110,076 110,076 110,076 113,849

JUEGOS INCRUSTAR ACUARIO


ACCES.S ASTRO CONSTRUCTOR X 4 UND
un 1.03
35,947
kg 1.54
3,773
CEMENTO BLANCO
MANO DE OBRA AA
hc 2.00
34,306
74,026

JUEGOS INCRUSTAR STILO

un
35,947
3,773
34,306
74,026

35,947
35,947
3,773
7,546
34,306
34,306
74,025 77,799

un

CEMENTO BLANCO
kg 1.54
3,773
3,773
3,773
7,546
ESPACIO PALERMO JUEGO POR 6 CROMO
un 1.03 108,047
108,047
108,047
108,047
MANO DE OBRA AA
hc 2.50
42,883
42,883
42,882
42,882
154,703 154,702 154,702 158,475

Notas
La columna fecha indica la ltima revisin del precio de cada insumo.
No olvide que los precios incluyen IVA.
Si usted es suscriptor del portal www.construdata.com, tambin puede
encontrar esta informacin en lnea.

ANLISIS

UM CANT.

BOGOT

LAVADEROS PORCELANA 20X20


ACERO FIGURADO 60000 PSI 1/4
kg 1.18
2,259
ARENA AMARILLA PUERTO COLOMBIA
m 0.02
0
ARENA DE PEA
m 0.04
2,552
m 0.04
0
ARENA DE REVOQUE (AMARILLA)
ARENA FINA 5 M3
m 0.04
0
ARENA GRUESA 5 M3
m 0.02
0
ARENA LAVADA DE RO
m 0.02
2,003
m 0.04
0
ARENA LAVADA MEISSEN
ARENA LAVADA PARA CONCRETO
m 0.02
0
BLOQUE NO. 4 SANTAF
un 12.36
12,570
un 12.36
0
BLOQUE NO. 4 SANTAF
BLOQUE NO. 4 SANTAF
un 12.36
0
BLOQUE NO. 4 SANTAF
un 12.36
0
CEMENTO BLANCO
kg 2.66
6,517
CEMENTO GRIS
kg 22.30
11,284
GRAVA CANTO RODADO 1/2
m 0.04
0
GRAVILLA DE RO
m 0.04
3,944
m 0.04
0
GRAVILLA DE RO
GRAVILLA FINA 1/2 Y 3/4
m 0.04
0
LARGUERO COMN 3.5X7.5X3 M
m 0.61
0
MANO DE OBRA AA
hc 17.95 307,896
m 7.36
5,951
PERFIL ALUMINIO 1/2 X 1/2
m 2.66
46,018
PISO-PARED EGEO BLANCO
TABLA CHAPA ORDINARIO 0.30
m 0.61
1,866
m 0.61
0
TABLA OTOBO 0.30
TABLN CATIVO 0.30
m 0.61
0
402,859

MRMOL GRIS 30X15

CALI

B/QUILLA

MEDELLN

un
2,259
0
0
0
1,510
994
0
0
0
0
16,328
0
0
6,517
11,284
0
0
0
1,400
0
307,896
5,951
46,018
0
1,525
0
401,681

2,259
2,259
464
0
0
0
1,261
0
0
0
0
0
0
0
0
1,068
0
809
0
0
0
0
18,701
0
0
17,514
6,517
13,034
11,284
11,284
3,127
0
0
0
0
1,485
0
0
0
2,135
307,895
307,895
5,951
5,951
46,018
46,018
0
0
0
0
2,074
0
405,550 409,450

AGUA
lt 6.48 130
130
130
130
ARENA FINA
m 0.04
0
1,114
0
0
ARENA LAVADA (ARROYO DE PIEDRA)
m 0.04
0
0
1,833
0
ARENA LAVADA DE PEA
m 0.04
1,206
0
0
0
m 0.04
0
0
0
1,617
ARENA LAVADA PARA CONCRETO
CEMENTO BLANCO
kg 0.51
1,250
1,249
1,249
2,499
kg 9.41
4,761
4,761
4,761
4,761
CEMENTO GRIS
MANO DE OBRA AA
hc 1.30
22,299
22,299
22,299
22,299
m 1.03 252,103
252,103
252,103
252,103
MRMOL CREMA MARFIL
281,749 281,656 282,375 283,409

MRMOL SPACATTO BLANCO

AGUA
lt 2.85
57
57
57
57
ARENA FINA
m 0.04
0
1,114
0
0
m 0.04
0
0
1,833
0
ARENA LAVADA (ARROYO DE PIEDRA)
ARENA LAVADA DE PEA
m 0.04
1,206
0
0
0
m 0.04
0
0
0
1,617
ARENA LAVADA PARA CONCRETO
CEMENTO GRIS
kg 8.31
4,205
4,205
4,205
4,205
MANO DE OBRA AA
hc 1.60
27,445
27,445
27,445
27,445
m 1.03
96,517
96,517
96,517
96,517
SPACCATO BLANCO BRASIL
129,430 129,337 130,056 129,841

MRMOL SPACATTO TRAVERTINO

AGUA
lt 2.85
57
57
57
57
ARENA FINA
m 0.04
0
1,114
0
0
ARENA LAVADA (ARROYO DE PIEDRA)
m 0.04
0
0
1,833
0
ARENA LAVADA DE PEA
m 0.04
1,206
0
0
0
m 0.04
0
0
0
1,617
ARENA LAVADA PARA CONCRETO
CEMENTO GRIS
kg 8.31
4,205
4,205
4,205
4,205
MANO DE OBRA AA
hc 1.60
27,445
27,445
27,445
27,445
SPACCATO TRAVERTINO BOSCONIA
m 1.03
96,517
96,517
96,517
96,517
129,430 129,337 130,056 129,841

MRMOL TRAVERTINO ROMANO


AGUA
ARENA FINA
ARENA LAVADA (ARROYO DE PIEDRA)
ARENA LAVADA DE PEA

lt 6.48 130
m 0.04
0
m 0.04
0
m 0.04
1,206

m
130
1,114
0
0

130
0
1,833
0

130
0
0
0

Convenciones ms usuales
hh .......................Hora hombre

rl .......................................... Rollo

h ........................................... Hora

un ................................... Unidad

m3 ...................... Metro Cubico

hc...................... Hora cuadrilla

kg.............................. Kilogramo

vj ..........................................Viaje

m2 ................. Metro cuadrado

ms ........................................Mes

gl ........................................Galn

lt ........................................... Litro

d ..............................................Da

m....................................... Metro

bt......................................... Bulto
Contina

204

CONSTRUDATA

ENCHAPES Y ACCESORIOS

UM CANT.

BOGOT

CALI

B/QUILLA

MEDELLN

ARENA LAVADA PARA CONCRETO


m 0.04
0
0
0
1,617
kg 0.51
1,250
1,249
1,249
2,499
CEMENTO BLANCO
CEMENTO GRIS
kg 9.41
4,761
4,761
4,761
4,761
MANO DE OBRA AA
hc 1.30
22,299
22,299
22,299
22,299
MRMOL TRAVERTINO ROMANO
m 1.03 463,941
463,941
463,941
463,941
493,587 493,494 494,213 495,247

OLIMPIA BRILLANTE BASE 20X20


AGUA
lt 3.00
60
ARENA FINA 5 M3
m 0.02
0
ARENA LAVADA (ARROYO DE PIEDRA)
m 0.02
0
ARENA LAVADA DE PEA
m 0.02
603
ARENA LAVADA PARA CONCRETO
m 0.02
0
CEMENTO BLANCO
kg 0.70
1,715
CERMICA PARED CUMARAL BLANCO
m 1.05
31,395
MANO DE OBRA AA
hc 0.85
14,580
PEGACOR BLANCO
kg 3.15
3,205
51,558

PAPEL COLGADURA GISELLE

m
60
755
0
0
0
1,715
31,395
14,580
3,205
51,710

60
60
0
0
916
0
0
0
0
809
1,715
3,430
31,395
31,395
14,580
14,580
3,205
3,205
51,871 53,478

PAPEL MEDICI
rl 0.21
8,610
8,610
8,610
8,610
8,610 8,610 8,610 8,610

PAPEL COLGADURA TIPO 1

VINILO MURAL T/COL


gl 0.21
10,479
10,479
10,479
10,479
10,479 10,479 10,479 10,479

ANLISIS

UM CANT.

BOGOT

CALI

PORCELANA ROSSO ITALIA 20X20


AGUA
lt 3.00
60
CEMENTO BLANCO
kg 0.90
2,205
CERMICA PARED ARTICA BLANCA
m 1.05
41,895
MANO DE OBRA AA
hc 0.85
14,580
kg 3.15
3,205
PEGACOR BLANCO
61,945

m
60
2,205
41,895
14,580
3,205
61,945

REJILLAS PLSTICAS SOSCO 3X2

CEMENTO GRIS
kg 0.60
304
304
304
304
MANO DE OBRA AA
hc 0.30
5,146
5,146
5,146
5,146
REJILLA SIFN CON SOSCO 4.5CMX3.5CM un 1.00
9,200
8,300
8,300
8,300
14,650 13,749 13,749 13,749

REJILLAS SIFN 20X20

un

REJILLAS SOSCO 3X2

AGUA
lt 6.48 130
130
130
130
ARENA FINA
m 0.04
0
1,114
0
0
ARENA LAVADA (ARROYO DE PIEDRA)
m 0.04
0
0
1,833
0
m 0.04
1,206
0
0
0
ARENA LAVADA DE PEA
ARENA LAVADA PARA CONCRETO
m 0.04
0
0
0
1,617
kg 0.51
1,250
1,249
1,249
2,499
CEMENTO BLANCO
CEMENTO GRIS
kg 9.41
4,761
4,761
4,761
4,761
MANO DE OBRA AA
hc 1.30
22,299
22,299
22,299
22,299
m 1.03 107,120
107,120
107,120
107,120
PIEDRA CREMA E= 20 MM
136,766 136,673 137,392 138,426

CEMENTO GRIS
kg 0.20
101
MANO DE OBRA AA
hc 0.30
5,146
REJILLA SOSCO 3X2 ACERO
un 1.00
3,700
8,947

PIEDRA MUECA m

REMATES BOCEL ALUMINIO

AGUA
lt 6.48 130
130
130
130
ARENA FINA
m 0.04
0
1,114
0
0
m 0.04
0
0
1,833
0
ARENA LAVADA (ARROYO DE PIEDRA)
ARENA LAVADA DE PEA
m 0.04
1,206
0
0
0
ARENA LAVADA PARA CONCRETO
m 0.04
0
0
0
1,617
kg 0.51
1,250
1,249
1,249
2,499
CEMENTO BLANCO
CEMENTO GRIS
kg 9.41
4,761
4,761
4,761
4,761
hc 1.30
22,299
22,299
22,299
22,299
MANO DE OBRA AA
PIEDRA MUECA E= 20MM
m 1.03 135,610
227,012
135,610
135,610
165,256 256,565 165,882 166,916

CEMENTO BLANCO
kg 0.20
490
MANO DE OBRA AA
hc 0.29
4,974
NGULO 1/2 X 1/2 X 1/16
m 1.05
767
6,232

AGUA
lt 3.00
60
CEMENTO BLANCO
kg 0.70
1,715
CERMICA PISO ALTEA NEGRO
m 1.03
23,020
MANO DE OBRA AA
hc 0.85
14,580
PEGACOR BLANCO
kg 3.15
3,205
42,580

PORCELANA ESFUMADO BASE 20X20


AGUA
lt 3.00
60
CEMENTO BLANCO
kg 0.90
2,205
CERMICA DELTA BEIGE
m 1.05
17,745
MANO DE OBRA AA
hc 0.85
14,580
kg 3.15
3,205
PEGACOR BLANCO
37,795

m
60
1,715
23,020
14,580
3,205
42,580

60
60
1,715
3,430
23,020
23,020
14,580
14,580
3,205
3,205
42,580 44,295

m
60
2,205
17,745
14,580
3,205
37,795

60
60
2,205
4,410
17,745
17,745
14,580
14,580
3,205
3,205
37,794 40,000

PORCELANA LISA m
AGUA
lt 3.00
60
CEMENTO BLANCO
kg 1.03
2,524
MANO DE OBRA AA
hc 0.85
14,580
PEGACOR BLANCO
kg 3.15
3,205
PISO TUBAI BLANCO
m 1.05
25,095
45,463

PORCELANA PLANO ESTANCIA 11X22


AGUA
CEMENTO BLANCO
CERMICA PICTOR BEIGE

60
2,523
14,580
3,205
25,095
45,463

60
60
2,523
5,047
14,580
14,580
3,205
3,205
25,095
25,095
45,463 47,987

lt 3.00
60
60
60
60
kg 0.90
2,205
2,205
2,205
4,410
m 1.05
17,745
17,745
17,745
17,745

EDICIN 166 MARZO - MAYO 2013

5,146
5,146
5,146
203
203
203
2,550
2,550
2,550
7,899 7,899 7,899

REJILLAS SIFN un

PIEDRA CREMA m

PORCELANA ALTEA NEGRO

60
60
2,205
4,410
41,895
41,895
14,580
14,580
3,205
3,205
61,945 64,150

un

MANO DE OBRA AA
hc 0.30
5,146
kg 0.20
203
PEGACOR BLANCO
REJILLA PLAST. 3X2 SOSCO
un 1.00
2,700
8,049

PAPEL MEDICI
rl 0.21
8,610
8,610
8,610
8,610
8,610 8,610 8,610 8,610

MEDELLN

MANO DE OBRA AA
hc 0.85
14,580
14,580
14,580
14,580
PEGACOR BLANCO
kg 3.15
3,205
3,205
3,205
3,205
37,795 37,795 37,794 40,000

CEMENTO GRIS
kg 1.00
506
MANO DE OBRA AA
hc 0.30
5,146
REJILLA SIFN PLSTICO DE 3X2 PVC
un 1.00
2,900
8,552

PAPEL COLGADURA WOODCREST

B/QUILLA

un

REJILLAS VENTILACIN 20X20

AGUA
lt 0.10
2
CEMENTO BLANCO
kg 0.51
1,250
MANO DE OBRA AA
hc 0.50
8,577
PEGACOR BLANCO
kg 1.05
1,068
10,896

REMATES PORCELANA BISELADOS

101
101
101
5,146
5,146
5,146
3,700
3,700
3,700
8,947 8,947 8,947

un

CEMENTO GRIS
kg 0.20
101
MANO DE OBRA AA
hc 0.30
5,146
REJILLA SIFN PLSTICO DE 3X2 PVC
un 1.00
2,900
8,147

REMATES BOCEL PORCELANA 0.11

506
506
506
5,146
5,146
5,146
3,500
3,500
3,500
9,152 9,152 9,152

101
101
101
5,146
5,146
5,146
3,500
3,500
3,500
8,747 8,747 8,747

m
490
490
980
4,974
4,974
4,974
767
767
767
6,232 6,232 6,722

m
2
1,249
8,577
1,068
10,896

2
2
1,249
2,499
8,576
8,576
1,068
1,068
10,896 12,146

MANO DE OBRA AA
hc 0.58
9,949
9,949
9,949
9,949
9,949 9,949 9,949 9,949

TAPAS REGISTRO 20X20

un

CEMENTO GRIS
kg 0.20
101
101
101
101
MANO DE OBRA AA
hc 0.30
5,146
5,146
5,146
5,146
TAPA REGISTRO 20X20 CORR.
un 1.00
4,859
4,859
4,859
4,859
10,106 10,106 10,106 10,106

TAPAS REGISTRO 6 X 6

un

CEMENTO GRIS
kg 0.20
101
101
101
101
MANO DE OBRA AA
hc 0.30
5,146
5,146
5,146
5,146
TAPA REGISTRO R 6X6
un 1.00
6,900
6,900
6,900
6,900
12,147 12,147 12,147 12,147

TUBO CORTINA DUCHA


ESCUDO GOLPEADOR GATO CERRADURA
un 2.00
10,950
MANO DE OBRA AA
hc 0.30
5,146
TUBO CORTINA DUCHA 3/4
m 1.50
7,170
23,266

VLVULAS LAVADERO 2

un
10,426
5,146
7,049
22,621

10,426
10,426
5,146
5,146
7,198
7,198
22,770 22,770

un

CEMENTO GRIS
kg 0.20
101
101
101
101
MANO DE OBRA AA
hc 0.30
5,146
5,146
5,146
5,146
VLVULA BOLA 1
un 1.00
17,400
17,400
17,400
17,400
22,647 22,647 22,647 22,647