DIRECTORIO UNICO DE FONDOS

F.P.S
LA PAZ-BOLIVIA

PRESUPUESTO GENERAL DEL CONTRATO SISTEMA

Fecha: 19/09/2013
Pgina: 1 de 4

Contrato N: C-FPS-02-003199
Fecha de inicio :
Moneda : BS

CONST. SIST. AGUA POTABLE CAUMA (COLQUIRI)


Plazo de Ejecucin : 180

dias

Nombre del Proyecto : CONST. SIST. AGUA POTABLE CAUMA (COLQUIRI)


Cdigo del Proyecto : FPS-02-00003934
Presupuesto : 1
Componente : 1

INFRAESTRUCTURA
INSTITUCION

REPRESENTANTE

Solicitante :
Beneficiario :
Supervisor :
Ejecutor :
ORDEN DE CAMBIO
ITEM
00
MCHQ091
93DC239
MCHQAS12
93BC206
93BC958
93CB146
MDL020140
01AB001
40IA001
93BC206
93BC216
93BC217
93BC533
93CB042
93DC168
MDL020141
01AB001
40IA001
93BC206
93BC216
93BC217
93BC533
93CB042
93DC168
MDL020143
01AB001
40IA001
93BC206
93BC216
93BC217
93BC533
93DC168
MDL020144
01AB001
40DA082
40IA001
93BC206
93BC216
93BC217
93CB042
93DC168
MLPZ0106
93AD401
93BD253
96DC049
MLPZ0151
02HB014
03AD003
12AC010
20AF003
31BA022

ACTIVIDAD

UNIDAD

CTD

CTD

ELEMENTO UNICO
OBRAS COMPLEMENTARIAS
PLACA DE ENTREGA DE OBRAS

PZA

1.00

0.00

M3
PZA
GLB

1.38
1.00
1.00

0.00
0.00
0.00

25.96
25.96
6.23
4.98
1.24
25.96
1.00
25.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

72.56
72.56
17.41
13.93
3.48
72.56
1.00
72.56

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

57.84
57.84
13.88
11.11
2.76
57.84
57.84

0.00
0.00
0.00
0.00
0.00
0.00
0.00

70.00
70.00
70.00
16.80
13.44
3.36
1.00
70.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.00
1.00
1.00

0.00
0.00
0.00

2.13
0.56
4.32
9.65
2.00

0.00
0.00
0.00
0.00
0.00

CAMARA DE VALVULAS
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
CAMARA DE VALVULAS
PROV Y COLOC ACCESORIOS CAMARA DE VALVULAS

RED DE DISTRIBUCION 5
ML
ML
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
RELLENO Y COMPACTADO CON MATERIAL COMUN
M3
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
M3
PROVISION Y TENDIDO TUBERIA PVC SDR-21 3/4"
ML
ACCESORIOS DE DISTRIBUCION
GLB
DESINFECCION DE TUBERIAS HASTA 4 PULG.
ML
RED DE DISTRIBUCION 6
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
ML
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
ML
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
RELLENO Y COMPACTADO CON MATERIAL COMUN
M3
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
M3
PROVISION Y TENDIDO TUBERIA PVC SDR-21 3/4"
ML
ACCESORIOS DE DISTRIBUCION
GLB
DESINFECCION DE TUBERIAS HASTA 4 PULG.
ML
RED DE DISTRIBUCION 8
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
ML
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
ML
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
RELLENO Y COMPACTADO CON MATERIAL COMUN
M3
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
M3
PROVISION Y TENDIDO TUBERIA PVC SDR-21 3/4"
ML
DESINFECCION DE TUBERIAS HASTA 4 PULG.
ML
RED DE DISTRIBUCION 9
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
ML
PROV. Y TEND. TUB. PVC - SDR 21 - 1 1/2" - E.C.
ML
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
ML
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
RELLENO Y COMPACTADO CON MATERIAL COMUN
M3
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
M3
ACCESORIOS DE DISTRIBUCION
GLB
DESINFECCION DE TUBERIAS HASTA 4 PULG.
ML
ACTIVIDADES PRELIMINARES
ANALISIS FISICO, QUIMICO Y BACTEREOLOGICO DE AGUAS
UND
INSTALACION DE FAENAS
GLB
PROV. Y COLOC. LETRERO DE OBRAS FPS
PZA
OBRA DE TOMA
PROV. Y COLOCADO GRAVA D=1/2" A 1.5"
M3
BASE DE HORMIGON POBRE
M3
REVOQUE DE MORTERO CON ADITIVO IMPERMEABILIZANTE
M2 1
SOLADURA DE PIEDRA
M2
PROV. Y COLOC. TAPA METALICA SEGUN DISE?O
PZA
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.

MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PRECIO

COSTO POR

UNITARIO

ACTIVIDAD

1,160.220
82.240
1,019.860
954.180
1.200
1.770
82.240
52.180
79.840
34.590
679.250
0.180
1.200
0.360
82.240
52.180
79.840
34.590
224.930
0.180
1.200
0.360
82.240
52.180
79.840
34.590
0.180
1.200
20.790
0.360
82.240
52.180
79.840
224.930
0.180
1,604.880
3,364.020
1,210.120
460.580
941.840
103.600
112.080
473.280

379,032.12
1,160.22
1,160.22
2,087.53
113.49
1,019.86
954.18
2,530.20
31.15
45.95
512.36
259.86
99.00
897.96
679.25
4.67
5,297.54
87.07
26.12
1,431.80
726.87
277.84
2,509.85
224.93
13.06
4,042.90
69.41
20.82
1,141.49
579.72
220.36
2,000.69
10.41
4,153.22
84.00
1,455.30
25.20
1,381.63
701.30
268.26
224.93
12.60
7,783.90
3,209.76
3,364.02
1,210.12
28,794.27
981.04
527.43
447.55
1,081.57
946.56

DIRECTORIO UNICO DE FONDOS


F.P.S
LA PAZ-BOLIVIA

PRESUPUESTO GENERAL DEL CONTRATO SISTEMA

Contrato N: C-FPS-02-003199
Fecha de inicio :
Moneda : BS

Fecha: 19/09/2013
Pgina: 2 de 4

CONST. SIST. AGUA POTABLE CAUMA (COLQUIRI)


Plazo de Ejecucin : 180

dias

Nombre del Proyecto : CONST. SIST. AGUA POTABLE CAUMA (COLQUIRI)


Cdigo del Proyecto : FPS-02-00003934
Presupuesto : 1
Componente : 1

INFRAESTRUCTURA
INSTITUCION

REPRESENTANTE

Solicitante :
Beneficiario :
Supervisor :
Ejecutor :
ORDEN DE CAMBIO
ITEM
00
MLPZ0151
41DA001
93AD184
93BC206
93BC674
93BC951
93FC153
MLPZ0218
02AD001
93BC107
93CB094
93CB126
93CB407
MLPZ3003
12AB001
15BA002
17AB002
17DA001
31BA004
93BC427
93EC205
MLPZ5013
41BC026
93AB425
93BC206
93BC7053
MLPZ5900
01AB001
40DA082
40IA001
93BC1004
93BC14009
93BC206
93BC216
93BC217
93DC168
MLPZ5901
01AB001
40DA082
40IA001
93BC1004
93BC206
93BC216
93BC217
93DC168
MLPZ6005
01AB001
40DA082
40IA001
93BC1004
93BC206

ACTIVIDAD

UNIDAD

CTD

CTD

ELEMENTO UNICO
OBRA DE TOMA
PROVISION Y COLOCACION ACCESORIOS OBRA DE TOMA
GLB
REVOQUE EXTERIOR CON CEMENTO
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
HORMIGON CICLOPEO DOSIF: 1:2:4
REPLANTEO DE ESTRUCTURAS
TAPA DE HORMIGON ARMADO

M2
M3
M3
M2
M3

1.00
13.15
6.44
19.27
14.59
0.12

0.00
0.00
0.00
0.00
0.00
0.00

4.79
4.79
14.00
1.00
2.00

0.00
0.00
0.00
0.00
0.00

5.32
2.94
5.32
2.10
1.40
1.00
5.46

0.00
0.00
0.00
0.00
0.00
0.00
0.00

5.00
1.80
3.60
5.00

0.00
0.00
0.00
0.00

972.20
972.20
972.20
1.00
1.00
233.28
200.05
33.27
972.20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

241.38
241.38
241.38
1.00
57.93
46.35
11.59
241.38

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

248.85
248.85
248.85
1.00
252.63

0.00
0.00
0.00
0.00
0.00

PASO DE QUEBRADA
M3
M3
PZA
GLB
PZA
CASETA DE DESINFECCION CON HIPOCLORADOR
REVOQUE FROTACHADO DE CEMENTO SOBRE MUROS DEM2
HORMI
CUBIERTA DE CALAMINA(ESTRUCTURA SIMPLE DE MADERA)
M2
PINTURA EXTERIOR - LATEX
M2
PINTURA ANTICORROSIVA EN CUBIERTAS DE CALAMINAM2
PROV. Y COLOC. PUERTA METALICA(PLANCHA 1/16-ANGULA
M2
HIPOCLORADOR P/GOTEO
PZA
MURO DE LADRILLO 6H (E=18 CM - 1:5) 24*18*12
M2
PILETAS PUBLICAS
PEDESTAL DE H?A? Y BASE PARA PILETA DOMICILIARIA PZA
RELLENO CON GRAVA POZO DE ABSORCION
M3
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
CAMARA DESGRASADORA DOMICILIARIAS
PZA
ADUCCION 1
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
ML
PROV. Y TEND. TUB. PVC - SDR 21 - 1 1/2" - E.C.
ML
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
ML
ACCESORIOS ADUCCION
GLB
PROV. Y COLC DE VALVULAS REGULADORAS DE PRESION
PZA
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
RELLENO Y COMPACTADO CON MATERIAL COMUN
M3
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
M3
DESINFECCION DE TUBERIAS HASTA 4 PULG.
ML
ADUCCION 2
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
ML
PROV. Y TEND. TUB. PVC - SDR 21 - 1 1/2" - E.C.
ML
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
ML
ACCESORIOS ADUCCION
GLB
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
RELLENO Y COMPACTADO CON MATERIAL COMUN
M3
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
M3
DESINFECCION DE TUBERIAS HASTA 4 PULG.
ML
ADUCCION
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
ML
PROV. Y TEND. TUB. PVC - SDR 21 - 1 1/2" - E.C.
ML
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
ML
ACCESORIOS ADUCCION
GLB
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
EXCAVACION DE 0-2 M - SUELO DURO

HORMIGON CICLOPEO 50% PIEDRA DESPLAZADORA


PROV Y COLOC CODO FG D=2"
PROV Y COLOC ACCESORIOS PASO DE QUEBRADA
CONST. TORRE PUENTE COLGANTE

MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PRECIO

COSTO POR

UNITARIO

ACTIVIDAD

2,404.880
132.890
82.240
1,005.980
19.770
3,787.040
118.790
1,160.200
184.610
8,625.160
1,650.990
85.690
418.710
50.410
36.380
495.570
69.530
171.440
555.440
286.900
82.240
549.100
1.200
20.790
0.360
1,186.890
1,066.640
82.240
52.180
79.840
0.180
1.200
20.790
0.360
1,186.890
82.240
52.180
79.840
0.180
1.200
20.790
0.360
1,186.890
82.240

379,032.12
28,794.27
2,404.88
1,747.50
529.63
19,385.23
288.44
454.44
20,638.04
569.00
5,557.36
2,584.54
8,625.16
3,301.98
3,730.85
455.87
1,231.01
268.18
76.40
693.80
69.53
936.06
6,335.18
2,777.20
516.42
296.06
2,745.50
56,437.04
1,166.64
20,212.04
349.99
1,186.89
1,066.64
19,184.95
10,438.61
2,656.28
175.00
14,733.24
289.66
5,018.29
86.90
1,186.89
4,764.16
2,418.54
925.35
43.45
36,635.55
298.62
5,173.59
89.59
1,186.89
20,776.29

DIRECTORIO UNICO DE FONDOS


F.P.S
LA PAZ-BOLIVIA

PRESUPUESTO GENERAL DEL CONTRATO SISTEMA

Contrato N: C-FPS-02-003199
Fecha de inicio :
Moneda : BS

Fecha: 19/09/2013
Pgina: 3 de 4

CONST. SIST. AGUA POTABLE CAUMA (COLQUIRI)


Plazo de Ejecucin : 180

dias

Nombre del Proyecto : CONST. SIST. AGUA POTABLE CAUMA (COLQUIRI)


Cdigo del Proyecto : FPS-02-00003934
Presupuesto : 1
Componente : 1

INFRAESTRUCTURA
INSTITUCION

REPRESENTANTE

Solicitante :
Beneficiario :
Supervisor :
Ejecutor :
ORDEN DE CAMBIO
ITEM
00
MLPZ6005
93BC216
93BC217
93DC168
MLPZ9006
01AB001
40IA001
93BC206
93BC216
93BC217
93BC266
93BC516
93DC168
MORU0003
03AD003
06BA013
12AC011
20AF003
93AB102
93AD184
93BB20346
93BB238
93BC107
93BC206
93BC216
93BC317
93BC963
93CB793
93FB201
93FC153
93GB013
MORU0055
93BD262
93CD133
MSCZ0239
01AB001
40DA082
40IA001
93BC206
93BC216
93BC217
93BC533
93DC168
MTRJ103
09AB002
93BC1234
93BC197
93BD209
93EC017
MTRJ311
01AB001

ACTIVIDAD

UNIDAD

CTD

CTD

ELEMENTO UNICO
ADUCCION
RELLENO Y COMPACTADO CON MATERIAL COMUN

M3

RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO


M3
DESINFECCION DE TUBERIAS HASTA 4 PULG.
ML

127.44
30.26
248.85

0.00
0.00
0.00

155.00
155.00
129.83
103.86
25.97
1.00
155.00
155.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.64
3.92
206.56
20.98
1.00
206.56
2.50
61.02
21.72
13.99
20.98
20.98
1.00
1.00
1.00
2.92
60.48

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.00
1.00

0.00
0.00

72.02
72.02
72.02
18.28
12.85
5.43
72.02
72.02

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3.36
3.00
2.09
46.50
1.26

0.00
0.00
0.00
0.00
0.00

20.00

0.00

RED DE DISTRIBUCION
ML
ML
M3
M3
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
M3
PROV. Y COLC. ACCESORIOS CAMARA ROMPE PRESION AP
GLB
PROVISION Y TENDIDO TUBERIA PVC SDR-21 2"
ML
DESINFECCION DE TUBERIAS HASTA 4 PULG.
ML
TANQUE DE ALMACENAMIENTO
BASE DE HORMIGON POBRE
M3
HORMIGON ARMADO - LOSA DE FONDO E=10 CM
M3
REVOQUE DE MORTERO CON ADITIVO IMPERMEABILIZANTE
M2 1
SOLADURA DE PIEDRA
M2
PROV. Y COLOCACION ACCESORIOS VENTILACION
GLB
REVOQUE EXTERIOR CON CEMENTO
M2
TAPA METALICA S/DISEO
M2
ENLUCIDO DE CEMENTO MORTERO DOSIF 1:3 E=0.5 CM M2
HORMIGON CICLOPEO 50% PIEDRA DESPLAZADORA
M3
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
RELLENO Y COMPACTADO CON MATERIAL COMUN
M3
REPLANTEO Y TRAZADO DE ESTRUCTURAS
M2
ACCESORIOS TANQUE DE ALMACENAMIENTO
GLB
PROVISION ACCESORIOS CAMARA DE LLAVES
GLB
ACCESORIOS DE REBOSE Y LIMPIEZA
GLB
TAPA DE HORMIGON ARMADO
M3
PRUEBA DE ESTANQUEIDAD Y DESINFECCION TANQUES M3
MEDIDAS DE MITIGACION AMBIENTAL
LIMPIEZA GENERAL
GLB
CONTROL. Y SELCCION. DE DESECHOS
GLB
RED DE DISTRIBUCION 3
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
ML
PROV. Y TEND. TUB. PVC - SDR 21 - 1 1/2" - E.C.
ML
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
ML
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
RELLENO Y COMPACTADO CON MATERIAL COMUN
M3
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
M3
PROVISION Y TENDIDO TUBERIA PVC SDR-21 3/4"
ML
DESINFECCION DE TUBERIAS HASTA 4 PULG.
ML
CERRAMIENTO MALLA OLIMPICA
HORMIGON CICLOPEO-CIMIENTOS ESTRUCTURAS (HO 1:2:4M3
EXCAVACION COMUN MANUAL
M3
PUERTA DE MALLA OLIMPICA
M2
PROVISION Y COLOCADO DE MALLA OLIMPICA
M2
SOBRECIMIENTOS DE H? C? 1:2.4 PD50)
M3
RED DE DISTRIBUCION 1
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
ML
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
RELLENO Y COMPACTADO CON MATERIAL COMUN

MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PRECIO

COSTO POR

UNITARIO

ACTIVIDAD

52.180
79.840
0.180
1.200
0.360
82.240
52.180
79.840
226.980
49.000
0.180
941.840
3,397.880
103.600
112.080
338.830
128.080
366.710
142.700
1,093.150
82.240
52.180
19.770
4,658.420
5,225.900
3,815.390
3,787.040
70.180
438.620
1,881.550
1.200
20.790
0.360
82.240
52.180
79.840
34.590
0.180
684.790
100.520
579.050
158.190
1,058.400
1.200

379,032.12
36,635.55
6,649.82
2,415.96
44.79
26,261.75
186.00
55.80
10,677.22
5,419.41
2,073.44
226.98
7,595.00
27.90
129,498.52
602.78
13,319.69
21,399.62
2,351.44
338.83
26,456.20
916.78
8,707.55
23,743.22
1,150.54
1,094.74
414.77
4,658.42
5,225.90
3,815.39
11,058.16
4,244.49
2,320.17
438.62
1,881.55
6,721.17
86.42
1,497.30
25.93
1,503.35
670.51
433.53
2,491.17
12.96
12,502.08
2,300.89
301.56
1,210.21
7,355.84
1,333.58
2,428.89
24.00

DIRECTORIO UNICO DE FONDOS


F.P.S
LA PAZ-BOLIVIA

PRESUPUESTO GENERAL DEL CONTRATO SISTEMA

Fecha: 19/09/2013
Pgina: 4 de 4

Contrato N: C-FPS-02-003199
Fecha de inicio :
Moneda : BS

CONST. SIST. AGUA POTABLE CAUMA (COLQUIRI)


Plazo de Ejecucin : 180

dias

Nombre del Proyecto : CONST. SIST. AGUA POTABLE CAUMA (COLQUIRI)


Cdigo del Proyecto : FPS-02-00003934
Presupuesto : 1
Componente : 1

INFRAESTRUCTURA
INSTITUCION

REPRESENTANTE

Solicitante :
Beneficiario :
Supervisor :
Ejecutor :
ORDEN DE CAMBIO
ITEM
00
MTRJ311
40DA082
40IA001
93BC206
93BC216
93BC217
93CB042
93DC168
MTRJ383
01AB001
40IA001
93BC206
93BC216
93BC217
93BC533
93CB042
93DC168
MTRJ461
01AB001
40DA082
40IA001
93BC216
93BC217
93CB042
93DC168

ACTIVIDAD

UNIDAD

CTD

CTD

ELEMENTO UNICO
RED DE DISTRIBUCION 1

GLB
ML

20.00
20.00
12.55
10.15
2.40
1.00
20.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

REPLANTEO Y CONTROL DE LINEAS DE TUBERIA


ML
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
ML
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
RELLENO Y COMPACTADO CON MATERIAL COMUN
M3
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
M3
PROVISION Y TENDIDO TUBERIA PVC SDR-21 3/4"
ML
ACCESORIOS DE DISTRIBUCION
GLB
DESINFECCION DE TUBERIAS HASTA 4 PULG.
ML

30.63
30.63
8.79
7.03
1.76
30.63
1.00
30.63

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

40.00
40.00
40.00
16.53
4.80
1.00
40.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

PROV. Y TEND. TUB. PVC - SDR 21 - 1 1/2" - E.C.

ML

PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.


ML
EXCAVACION MANUAL, TERRENO SEMIDURO 0-2M
M3
RELLENO Y COMPACTADO CON MATERIAL COMUN
M3
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
M3
ACCESORIOS DE DISTRIBUCION
DESINFECCION DE TUBERIAS HASTA 4 PULG.

RED DE DISTRIBUCION 4

RED DE DISTRIBUCION 2
ML
ML
ML
M3
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
M3
ACCESORIOS DE DISTRIBUCION
GLB
DESINFECCION DE TUBERIAS HASTA 4 PULG.
ML
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
PROV. Y TEND. TUB. PVC - SDR 21 - 1 1/2" - E.C.
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
RELLENO Y COMPACTADO CON MATERIAL COMUN

Total General :

MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PRECIO

COSTO POR

UNITARIO

ACTIVIDAD

20.790
0.360
82.240
52.180
79.840
224.930
0.180
1.200
0.360
82.240
52.180
79.840
34.590
224.930
0.180
1.200
20.790
0.360
52.180
79.840
224.930
0.180

379,032.12
2,428.89
415.80
7.20
1,032.11
529.63
191.62
224.93
3.60
2,567.96
36.76
11.03
722.89
366.83
140.52
1,059.49
224.93
5.51
2,371.90
48.00
831.60
14.40
862.54
383.23
224.93
7.20
379,032.12