CRONOGRAMA VALORIZADO DE OBRA

ENTIDAD:

MUNICIPALIDAD DISTRITAL CORONEL GREGORIO ALBARRACIN LANCHIPA

PLAZO DE EJECUCIN :

120 DC.

PROYECTO:

CREACION DEL CAMPO DEPORTIVO E INSTALACION DE JUEGOS INFANTILES EN LA ASOCIACION DE VIVIENDA BELLA UNION, DISTRITO DE
CORONEL GREGORIO ALBARRACIN LANCHIPA-TACNA-TACNA

OBRA:

CREACION DEL CAMPO DEPORTIVO E INSTALACION DE JUEGOS INFANTILES EN LA ASOCIACION DE VIVIENDA BELLA UNION, DISTRITO DE
CORONEL GREGORIO ALBARRACIN LANCHIPA-TACNA-TACNA

ITEM

DESCRIPCION
01.
00.
01.
01.
02.
00.
02.
01.
02.
02.
03.
02.
04.
02.
05.
03.
00.
03.
01.
03.
02.
03.
03.
03.
03.
03.
04.
03.
05.
03.
06.
03.
07.
03.
08.
04.
00.
04.
01.
04.
02.
04.
03.
04.
03.
04.
03.
04.
03.
04.
04.
05.
04.
06.
04.
07.
05.
00.
05.
01.
05.
02.
05.
03.
05.
04.
05.
05.
06.
00.
06.
01.
06.
02.
06.
03.
07.
00.
07.
01.
07.
02.
07.
03.
07.
03.
07.
03.
07.
03.
07.
03.
07.
03.
07.
03.
07.
04.
07.
05.
07.
06.
07.
07.
08.
07.
09.
07.
10.
07.
11.
07.
12.
07.
13.
08.
00.
08.
01.
08.
02.
08.
03.
08.
04.
09.
00.
10.
00.
10.
01.
10.
02.
11.
00.
11.
01.
11.
02.

OBRAS PROVISIONALES Y SEGURIDAD Y


SALUD OBRAS PROVISIONALES Y TRABAJOS
PRELIMINARES
SEGURIDAD Y SALUD
CAMPO DEPORTIVO
MOVIMIENTO DE TIERRAS
CAMPOS DEPORTIVOS
PISOS Y VEREDAS
BARANDA DE PROTECCION
OTROS
CERCO PERIMETRICO
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTO REFORZADO
COLUMNAS
VIGAS
MUROS Y TABIQUERIA DE
ALBAILERIA
REVOQUES ENLUCIDOS Y MOLDURAS
CARPINTERIA METALICA
PINTURA
VARIOS
GRADERIAS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
ZAPATAS
PLACAS Y COLUMNAS
GRADAS
REVOQUES ENLUCIDOS Y MOLDURAS
CARPINTERIA METALICA Y HERRERIA
PINTURA
OTROS
PARQUE INFANTIL
MOVIMIENTO DE TIERRAS
PISOS Y VEREDAS
JARDINERAS
MODULO DE JUEGO DE MESA DE
CONCRETO
OTROS
VEREDAS Y ESTACIONAMIENTOS
MOVIMIENTO DE TIERRAS
VEREDAS
ESTACIONAMIENTO
SS.HH. Y CAMERINOS
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTO REFORZADO
ZAPATAS
COLUMNAS
ESCALERAS
VIGAS
LOSA ALIGERADA
MUROS Y TABIQUERIA DE
ALBAILERIA
REVOQUES
ENLUCIDOS Y
MOLDURAS
ZOCALOS Y CON TRAZOCALOS
PISOS
CARPINTERIA DE MADERA
CARPINTERIA METALICA
CERRAJERIA
VIDRIOS, CRISTALES Y SIMILARES
PINTURA
OTROS
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
SISTEMA DE AGUA FRIA
DESAGUE Y VENTILACION
PRUEBA HIDRAULICA GENERAL
INSTALACIONES ELECTRICAS
MOBILIARIO URBANO
CAMPO DEPORTIVO
PARQUE INFANTIL
MITIGACION DEL IMPACTO AMBIENTAL
RIEGO EN LA ZONA DE TRABAJO
CONFORMACION DE BOTADERO PARA MATERIAL
DE ELIMINACION
COSTO DIRECTO
GASTOS GENERALES 12%
PRESUPUESTO TOTAL DE OBRA
AVANCE PORCENTUAL

MES 01

MES 02

MES 03

MES 04

S/. 31,082.31
S/. 22,665.00
S/. 28,817.85
S/. 87,201.36
S/. 27,897.63
S/. 18,627.46
S/. 13,389.88

Total

S/. 31,082.31
S/. 22,665.00
S/. 28,817.85
S/. 135,458.43
S/. 27,897.63
S/. 18,627.46
S/. 13,389.88

S/. 48,257.07

S/. 3,697.33
S/. 6,046.68

S/. 3,481.96
S/. 5,073.65

S/. 7,179.29
S/. 11,120.33

S/. 10,046.10
S/. 9,428.78

S/. 12,592.99
S/. 10,421.28
S/. 2,958.26
S/. 1,126.57
S/. 13,645.24
S/. 55,808.31
S/. 3,304.12
S/. 221.26

S/. 22,639.09
S/. 19,850.06
S/. 2,958.26
S/. 5,407.55
S/. 13,645.24
S/. 74,411.08
S/. 4,744.38
S/. 221.26

S/. 4,280.98
S/. 12,789.40

S/. 5,813.37
S/. 1,440.26

S/. 8,918.83
S/. 1,755.43
S/. 7,554.97
S/. 25,071.40
S/. 8,987.06

S/. 108.49

S/. 8,918.83
S/. 1,755.43
S/. 7,554.97
S/. 25,071.40
S/. 9,217.50
S/. 4,573.57
S/. 34,890.62
S/. 2,678.01
S/. 115.72

S/. 230.44
S/. 4,573.57
S/. 34,890.62
S/. 2,678.01
S/. 7.23
S/. 8,318.25
S/. 60,780.25
S/. 5,507.78
S/. 3,892.02
S/. 7,697.50

S/. 6,400.25
S/. 9,621.40

S/. 15,918.57
S/. 51,955.54
S/. 14,999.21

S/. 8,318.25
S/. 60,780.25
S/. 5,507.78
S/. 3,892.02
S/. 7,697.50
S/. 22,318.82
S/. 61,576.94
S/. 14,999.21

S/. 3,582.18
S/. 10,174.74

S/. 3,582.18
S/. 10,174.74

S/. 5,209.87
S/. 3,212.69

S/. 5,209.87
S/. 3,212.69
S/. 14,206.44
S/. 2,563.00
S/. 6,582.53
S/. 11,032.90
S/. 17,105.49
S/. 17,487.53
S/. 10,876.33
S/. 7,004.01
S/. 7,227.43
S/. 42,612.48
S/. 830.40
S/. 303.67
S/. 4,985.38
S/. 110.52

S/. 14,206.44
S/. 2,563.00

S/. 9,835.66

S/. 6,229.89
S/. 11,032.90
S/. 7,269.83

S/. 352.64

S/. 17,487.53
S/. 10,876.33
S/. 7,004.01
S/. 7,227.43
S/. 42,612.48
S/. 830.40
S/. 303.67
S/. 4,050.62

S/. 934.76
S/. 110.52
S/. 9,062.80

S/. 2,779.89
S/. 6,597.31

S/. 1,918.52

S/. 5,502.69

S/. 18,600.63

S/. 736.42

S/. 853.82

S/. 326,165.21
39,139.83
365,305.04
31.59

S/. 285,420.57
34,250.47
319,671.04
27.65

S/. 19,220.65

S/. 174.32
S/. 4,333.26
S/. 246,980.16
29,637.62
276,617.78
23.92

S/. 500.00
S/. 1,553.15

S/. 9,062.80
S/. 4,698.41
S/. 6,597.31
S/. 500.00
S/. 44,877.12

S/. 110.00
S/. 75,300.00

S/. 110.00
S/. 75,300.00

S/. 173,767.03
20,852.04
194,619.07
16.83

S/. 1,764.56
S/. 4,333.26
S/. 1,032,332.97
123,879.96
1,156,212.93
100.00

Flujo de caja el lun 25/06/12


PROGRAMCION BELLA UNION

octubre

noviembre
S/. 11,032.90
S/. 9,835.66

S/. 7,269.83

ZOCALOS Y CON TRAZOCALOS


PISOS
CARPINTERIA DE MADERA
CARPINTERIA METALICA
CERRAJERIA
VIDRIOS, CRISTALES Y SIMILARES
PINTURA
OTROS
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
SISTEMA DE AGUA FRIA

S/. 2,779.89

DESAGUE Y VENTILACION

S/. 6,597.31

S/. 1,918.52

PRUEBA HIDRAULICA GENERAL


INSTALACIONES ELECTRICAS

S/. 5,502.69

S/. 18,600.63

S/. 736.42

S/. 853.82

S/. 326,165.21

S/. 285,420.57

MOBILIARIO URBANO
CAMPO DEPORTIVO
PARQUE INFANTIL
MITIGACION DEL IMPACTO AMBIENTAL
RIEGO EN LA ZONA DE TRABAJO
CONFORMACION DE BOTADERO PARA MATERIAL DE ELIMINACION
Total

Pgina 2

Flujo de caja el lun 25/06/12


PROGRAMCION BELLA UNION

diciembre

enero

febrero

Total
S/. 11,032.90
S/. 17,105.49

S/. 17,487.53

S/. 17,487.53

S/. 10,876.33

S/. 10,876.33

S/. 7,004.01

S/. 7,004.01

S/. 7,227.43

S/. 7,227.43

S/. 42,612.48

S/. 42,612.48

S/. 830.40

S/. 830.40

S/. 303.67
S/. 4,050.62

S/. 303.67
S/. 934.76

S/. 4,985.38

S/. 110.52

S/. 110.52

S/. 9,062.80

S/. 9,062.80
S/. 4,698.41
S/. 6,597.31

S/. 19,220.65

S/. 500.00

S/. 500.00

S/. 1,553.15

S/. 44,877.12

S/. 110.00

S/. 110.00

S/. 75,300.00

S/. 75,300.00

S/. 174.32

S/. 1,764.56

S/. 4,333.26
S/. 246,980.16

S/. 4,333.26
S/. 173,767.03

S/. 1,032,332.97