CANTIDAD
TRAZO
BODEGA
MOVIMIENTO DE TIERRA
CONEXIN ELECTRICA PROVISIONAL
CONEXIN MECANICA PROVISIONAL
MESAS DE TRABAJO, BURRAS ETC.
ZANJEO PARA CIMIENTOS
RELLENO PRODUCTO DEL ZANJEO A NIVEL DE TERRENO
CIMIENTOS
150.00
1.00
270.00
1.00
1.00
175.00
174.40
759.50
56.00
TECHOS
EN TERRAZA 5 PIEZAS MADERA 10,00x15,00x250 cm. ANCLADA A ESTRUCTURA DE TECHO
EN TERRAZA CLAVADOR ALMENDRO DE 5x5 cm.
EN TERRAZA PIEZA DE EMPLANTILLADO DE 2,5x5 cm
14.95
16.87
28.83
52.63
98.56
280.00
25 BOTAGUAS H.G # 26
26 CUMBRERAS H.G # 26
ESCALERA
27
PLUVIAL
TUBO PVC 200 MM
TUBO PVC 150 MM
TUBO PVC 100 MM
TUBO PVC 75 MM
CODO PVC 100 MM
CODO PVC 75 MM
28 TUBO PARA BAJANTE HG 4"
29 TUBO PARA BAJANTE AGUA PLUVIAL HG 3"
CODOS HG 100
30 CODOS HG 75
31 CAJA DE REGISTRO (INCLUIR REJA METALICA)
DIFUSORES HG
32 MANO OBRA
POTABLE
TUBO PRESION PVC 50 mm
TUBO PRESION PVC 38 mm
33 TUBO PRESION PVC 25 mm
34 TUBO PRESION PVC 19 mm
35 TUBO PRESION PVC 12 mm
CODOS PVC 50 MM
36 CODOS PVC 38mm.
37 CODOS PVC 25mm.
38 CODOS PVC 19mm.
39 CODOS PVC 12mm.
TEE PVC 50 MM
TEE PVC 38 MM
40 TEE PVC 25 mm
41 TEE PVC 19 mm
42 TEE PVC 12 mm
VALVULA DE COMPUERTA
VALVULA DE LLAVE BOLLA TANQUE CAPTACION
VALVULA DE BALANCE
VALVULA DE COMPUERTA
LLAVE DE RIEGO
REDUCCIONES DE 50 A38
REDUCCIONES DE 38 A 25
REDUCCIONES DE 25 A 19
REDUCCIONES DE 19 A 12
ADAPTADOR MACHO DE 50 MM
45.00
206.00
25.00
13.00
10.00
10.00
10.00
21.00
30.00
80.00
20.00
45.00
10.00
18.00
25.00
5.00
15.00
10.00
30.00
47.00
25.00
35.00
29.00
45.00
15.00
25.00
25.00
30.00
30.00
1.00
1.00
1.00
5.00
23.00
17.00
7.00
12.00
35.00
5.00
ADAPTADOR MACHO DE 12 MM
PEGAMENTO PVC CUARTOS
43 MEDIDOR 19 mm
44 TANQUE HIDRONEUMATICO PRO-SOURGEPS-220-T52, 85 gls PRECARGADO
45 BOMBA STA-RITE JHE 1 HP, 20 gls
45.00
5.00
1.00
1.00
1.00
46 SALIDAS
NEGRAS
47 TUBO PVC 100 mm DRENASEP
YEE DRENASEP 100
1 TUBO PVC 100 mm
TUBO PVC 75 MM
48 TUBO PVC 50 mm
49 TUBO PVC 38 mm
50 CODOS PVC 100mm.
CODOS PVC 75mm.
51 CODOS PVC 50mm.
52 CODOS PVC 38mm.
CODO PVC 45 X 100 MM
CODO PVC 45 X 50 MM
CODO PVC 45 X 38 MM
CODO PVC 45 X 75 MM
53 YEE PVC 100 mm
YEE PVC 75 mm
54 YEE PVC 50 mm
55 YEE PVC 38 mm
56 REGISTRO DE PISO
57 CENICERO
58 DRENAJE DE PISO
59 CAJA DE REGISTRO
SIFON 50 MM
TUBO HG 75 DRENAJE PARA TANQUE DE AGUA CALIENTE
REGISTRO DE PISO BRONCE
60 REGISTRO SIFONICO 100mm.
6.00
12.00
25.00
12.00
25.00
25.00
6.00
5.00
15.00
24.00
23.00
32.00
25.00
15.00
23.00
22.00
25.00
15.00
14.00
11.00
23.00
12.00
23.00
3.00
11.00
10.00
61 SALIDAS
CALIENTE
62 TUBO CPVC 32 mm
tUBO CPVC 25 mm
TUBO CPVC 19 MM
63 TUBO CPVC 12 mm
CODO CPVC 32 MM
CODO CPVC 25 MM
CODO CPVC 19 MM
CODO CPVC 12 MM
TEE CPVC 32 mm
5.00
17.00
22.00
25.00
13.00
15.00
20.00
25.00
8.00
64 TEE CPVC DE 25 MM
TEE CPVC 19 mm
TEE CPVC DE 12 MM
UNION CPVC 32 MM
UNION CPVC 25 MM
UNION CPVC 19 MM
UNION CPVC 12 MM
PEGAMENTO CPVC
65
66 TANQUE DE AGUA CALIENTE
67 SALIDAS
11.00
15.00
25.00
10.00
12.00
15.00
25.00
3.00
AISLAMIENTO TERMICO
2.00
1.00
0.00
75 REPELLO FINO
11.20
CIELOS
76 CIELO GYPSUM 12,5 mm., EMPLANTILLADO EN PERFIL SOMBRERO @ 61 cm.
77 CIELO PLANO GYPSUM SUSPENDIDO 12,5 mm., EMPLANTILLADO EN PERFIL SOMBRERO @ 61 cm.
56.00
2.88
58.88
43.06
21.77
12.00
31.60
10.17
66.21
28.23
0.00
0.00
0.00
0.00
1.00
0.58
95
96
97
98
99
1.00
1.00
1.00
9.00
3.00
CERRAJERIA PRINCIPAL MARCA EMTEK FUNCION ENTRADA full dummy MODELO NORMANDY GRIP
CERRAJERIA PUERTA DORMITORIO MARCA EMTEK FUNCION MANUA JALADERA MODELO NORMANDY PULL
CERRAJERIA PUERTA BAO MARCA EMTEK FUNCION PRIVACY MODELO NORMANDY LEVER
BISAGRAS 3,5"x3,5" MARCA EMTEK B12 CK, 3 x PUERTA
TOPE DE PUERTA
100
101
102
103
104
105
9.30
1.00
1.00
1.00
1.00
2.00
2.00
3.59
8.61
3.59
2.87
63.16
32.50
108
109 UMBRAL DE MADERA
ACABADOS PAREDES
110 ENCHAPE PARED BAOS, NIVEL DE CIELO
5.38
1.80
23.80
111 PIEZA DE MADERA DE 25x75x200 mm. A CADA 600 mm. A NIVEL DE ENTREPISO EXTERIOR
73.33
44.00
25.60
38.40
18.80
116
117
118
119
28.00
5.60
5.10
6.40
48.80
54.00
0.00
0.00
58.88
280.00
35.00
5.00
5.00
1.00
131
132
133
134
135
136
137
138
139
140
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
TINA
INODORO MARCA INCESA STANDARD MODELO RENAISSANCE ELONGADO 2231564 COLOR BONE
LAVATORIO MARCA INCESA STANDARD MODELO OVALIN 0804000 COLOR BONE
CACHERA LAVATORIO MARCA TEBISA SERIE 22850/99 MODELO BOSTON ACABADO CROMO
CACHERA DUCHA MARCA TEBISA SERIE 22836/99 MODELO BOSTON ACABADO CROMO
ACCESORIO MARCA TEBISA SERIE 6.624 ACABADO CROMO
ACCESORIO MARCA TEBISA SERIE 6.660 ACABADO CROMO
ACCESORIO MARCA TEBISA SERIE 6.625 ACABADO CROMO
ACCESORIO MARCA TEBISA SERIE 6.622 ACABADO CROMO
ESPEJO PARA BAO 6 mm.
EXTERIORES
141
142
143
144
145
146
ACERA
CUNETA
CORDON DE CALLE
CALLE APARTAMENTO (MAS PARQUEOS) CONCRETO PLANCHADO
ACERAS ACABADO CERAMICA (FUERA DEL LOCAL Y APARTAMENTOS)
PARRILLA PLUVIAL 30 cm.
1.00
m
global
M3
global
global
global
m
m
m2
m3
vara
vara
vara
vara
vara
UNI
ml.
ml.
UNI
UNI
UNI
UNI
UNI
UNI
ml.
ml.
UNI
unidad
unidad
UNI
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
global
global
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
m
m
m
m
m
m
m
m
m
vara
vara
m
m
vara
vara
vara
m
ml.
ml.
ml.
ml.
unidad
m
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
m
vara
vara
vara
vara
vara
vara
vara
m
m
ml.
m
unidad
ml.
ml.
ml.
ml.
ml.
ml.
ml.
ml.
ml.
ml.
m
m
m
ml.
ml.
ml.
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
m
ml.
ml.
m
m
ml.
GLOBAL
CIMIENTOS
peso
0.6
3.5
1.5
CIMIENTO
ANCHO 1
PLACA CORRIDA
PLACA PARED LIVIANA
0.40
0.30
0.00
0.00
0.00
TOTALES
TABLA DE CONCRETOS
PARA UN METRO CUBICO DE CONCRETO
ARENA
PIEDRA
CEMENTO
LARGO
ESPESOR
36.00
4.00
0.00
0.00
0.00
0.20
0.15
0.00
0.00
0.00
CANT.
CONCRETO
1
1
0
0
0
resistencia
210
0.427
0.765
8.5
245
280
0.378
0.730
10.20
#2
#3
2.88
0.18
0.00
0.00
0.00
81.00
3.4
6
#4
9.31
#5
4.50%
ALAM
108
28
0
0
0
0
0
13.5
22.7
0.0
0.0
4.9
20
79
100
280 KGS
0.3
0.6
13
1.44
2.57
28.61
PESO EN KILOS
ARMAD.
100
PAREDES DE BLOQUES
0.00
12.50
PARED NPT
PAREDES DE BLOQUES DE 12X20X40
LARGO
ALTO
22.68
2.60
TOTALES
AREA TOTAL
58.97
-
117.94
CONCRETO
35.73
7.15
3.50
BLOCK
#3
1.50
#2
CONCRETO
707.62
-
196.56
-
1.57
-
714.69
32.76
1.73
210
ARENA
PIEDRA
CEMENTO
245
0.427
0.854
9
0.378
0.756
10.20
0.74
1.48
15.57
PESO EN KILOS
REPEMAX GRUESO
MORTERO
145
ARENA
CAL
CEMENTO
PARED LIVIANA
LARGO
PAREDES DE FIBROCEMENTO
4.42
LARGO
ALTO
2.50
ALTO
PAREDES DE GYPSUM
3.57
35.73
AREA TOTAL
TRACK
STUD
11.05
AREA TOTAL
2.90
TRACK
8.84
STUCK
0.00
12.50
LARGO
ALTO
AREA TOTAL
BLOCK
TORNILLOS
8.84
LAMINAS
LAMINAS
#3
265.20
TORNILLOS
3.50
1.50
#2
CONCRETO
5.40
1.40
7.56
-
TOTALES
15.12
CONCRETO
4.58
0.92
90.72
-
18.90
-
37.80
-
0.60
-
91.63
3.15
6.30
0.67
210
ARENA
PIEDRA
CEMENTO
245
0.427
0.854
9
0.378
0.756
10.20
0.28
0.57
5.99
PESO EN KILOS
REPEMAX GRUESO
MORTERO
ARENA
CAL
CEMENTO
145
0.46
4.58
0.05
ALAMBRE
5.16
114.66
58.97
PASTA
0.88
PASTA
-
0.05
ALAMBRE
0.92
20.48
7.56
SEC 1
SEC 2
COLUMNA TIPO 1
COLUMNA TIPO 2
0.3
0.1
0
0
0
0
0
0
0
CONCRETO
ARENA
PIEDRA
CEMENTO
TOTALES
210
0.427
0.765
8.5
ALTURA
0.12
0.06
0
0
0
0
0
0
0
245
0.378
0.730
10.20
CANT.
2.6
2.6
0
0
0
0
0
0
0
280
CONCRETO
13.00
9.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#2
1.5
#3
3.5
1.22
0.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
127
18
1.49
24
36
#4
6
135.2
46.8
0
0
0
0
0
0
#5
9.31
ALAM
4.50%
0
0
0
0
0
0
0
0
30
106
142
210 KGS/CM2
0.3
0.6
13
0.64
1.14
12.69
PESO EN KILOS
FORMAL.
1 X 10
1X3
M2
tablas
reglas 4 varas
20 24.1429
24.14285714
9 11.1429
11.14285714
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
31
37
37
VIGAS DE CONCRETO
PRIMER NIVEL
0.125
SEC 1
SEC 2
CONCRETO
ARENA
PIEDRA
CEMENTO
0.1
0.12
0.12
0
0
0
0
0
210
LONGITUD
0.12
0.3
0.15
0
0
0
0
0
245
0.427
0.765
8.5
6.55
36
7.15
0
0
0
0
0
280
0.378
0.730
10.20
CONCRETO
#2
1.5
0.08
1.30
0.13
0.00
0.00
0.00
0.00
0.00
1.65
#3
3.5
7
36
27
#4
6
13
144
14
0
0
0
#5
9.31
#6
12
ALAM
4.50%
0
0
0
0
0
0
0
12
0
29
17
100
117
210 KGS/CM2
0.3
0.6
13
0.71
1.27
14.06
PESO EN KILOS
FORMAL.
M2
2
22
2
0
0
0
0
0
27
1 X 12
1X3
tablas
reglas 4 varas
1.87
1.87
25.71
25.71
2.55
2.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32
32
MALLA
LOSA DE CONCRETO 15 CM. ESPESOR
HORIZONTAL
VERTICAL
AREA
ESPESOR
LOSA
39.65
0.00
TOTALES
CONCRETO
ARENA
PIEDRA
CEMENTO
210
245
0.427
0.73
8.5
280
0.378
0.730
10.20
CONCRETO
0.1
0.1
#2
3.4
ALAM
5.00%
3.96
0.00
396
0
4.36
69.38
12.38
4.36
69
12
236
236
12
210 KGS/CM2
0.3
0.6
13
1.86
3.18
37.07
PESO KILOS
ALAMBRE N.
FORMAL.
M2
39.65
-
1X12"
TABLA
39.65
1X3"
REGLA 4 VARAS
-
ESTRUCTURA DE TECHO
ELEMENTOS DE ACERO
TUBO DE 3x3 PULG. PARA CERCHA
TUBO DE 1RT 0-16 PARA CLAVADORES
TOTALES
ALES
AREA
62
SECCION
SECCION
LARGO
CANT.
UNIDAD
PINTURA
Galon
0.08
0.75
6.00
4.00
0.50
0.05
0.75
6.00
15.00
1.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
unidad
unidad
unidad
0.00
0.00
0.00
0.00
0.00 unidad
0.00
16.00 LAMINAS
16.00 LAMINAS
ML
0.00
0.00
0.00
0.00
0.00 M2
2.38
SOLDADURA
Kilo
THINNER
Galon
MECHA
Kilo
0.57
0.22
2.14
0.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
TORNILLOS
192 UNID.
PINTURA
3.1 GALON
2.71
1.27
1.06
CONCRETO
ARENA
PIEDRA
CEMENTO
ELEMENTOS DE ACERO
ENTREPISO PC O ESCOSA
TOTALES
HORIZONTAL
VERTICAL
0.00
AREA
0.00
ESPESOR
LOSA
0.00
CONCRETO
0
TOTALES
210
245
0.427
0.854
8.5
280
0.378
0.756
10.20
#2
1.5
0.00
0.00
0.00
0.00
210 KGS/CM2
0.3
0.6
13
0.00
0.00
0.00
PESO KILOS
ALAMBRE N.
SECCION
LARGO
ALTO
CANT.
UNIDAD
LARGO
ANCHO
AREA
PRE/UNI
TOTAL
22.000
9.000
198
13500
2673000.00
PINTURA
Galon
ALAM
5.00%
0.00
0
0
SOLDADURA
Kilo
THINNER
Galon
MECHA
Kilo
ESCALERA
PLACA CONCRETO ARMADO
SEC 1-1 1.20x20x10 MT, MALLA 14 VAR#5 ARO #4@20 cm.
SECCION
1.50
LARGO
6.00
ALTO
0.40
CANT.
1
CONCRETO
3.60
3.60
CONCRETO
ARENA
PIEDRA
CEMENTO
0.43
0.77
8.50
1.54
2.75
30.60
SECCION
LARGO
ALTO
CANT.
PINTURA
Galon
233.33
9.20
#5
250
41.67
210 KGS
PESO EN KILOS
66.67
6.00
#4
210.00
ESCALERA DE CARACOL
ELEMENTOS DE MADERA
3.50
#3
400.00
250.00
0.05
ALAM
ARMAD.
FORMAL.
1X12"
1X3"
27
21.75
483.33
27.00
40.00
40.00
SAC
UND
VRS
VRS
UND
KLS
3028.45089
508.958
1315.2
349.64804
31009.932
887.4
S
S
P
P
S
S
PZA
UND
LAM
CUB
UND
1969.5974
5938.128
9494.1
9635.46449
7.0686
S
S
S
S
S
TUBO HN 75mm=3"x6mt_THN
PERLIN 75x1.58mm=1/16x6mt_RT-016 ROJ
PROT ANTIC MINIO BLANCO_6560 GL
PROT ANTIC CORROTEC BTE ROJO_6615 GL
MECHA COLOR_EXENTO
PROT THINNER CTE 631_631 GL
UND
UND
GLN
GLN
KLS
GLN
28143.8388
11350.0548
14753.25
21146.5584
1573
10865.448
S
S
S
S
N
S
PIEZA 3 VARAS
3945.6
1048.94412
1777.4900
ACTIVIDADES / MATERIALES
100
101
102
103
104
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO
INSTALACIONES PROVISIONALES
BODEGA
SUB-TOTAL
200
201
202
203
204
MOVIMIENTOS DE TIERRAS
CORTE
RELLENO
EXCAVACION PARA CIMIENTOS
SUB-TOTAL
300
301
302
303
304
305
306
307
UNIDAD CANT.
glod.
glod.
m2
PREC.
UNITARIO
PRECIO
MANO DE
OBRA
SUB-TOTAL
15 7,000.00
105,000.00
105,000.00
31,500.00
31,500.00
136,500.00
136,500.00
m
m3
m3
8.64 1,500.00
12,960.00
12,960.00
3,888.00
3,888.00
16,848.00
16,848.00
CIMIENTOS
VARILLA #2
VARILLA #3
ARENA
PIEDRA
CEMENTO
ALAMBRE
SUB-TOTAL
unid.
unid.
m3
m3
saco
kg
14
950.44
23 2,740.10
1.44 15,672.29
2.57 16,371.50
29 5,356.50
4.93
887.40
12,830.88
62,108.91
22,525.49
42,156.45
153,254.80
4,374.33
297,250.86
3,849.26
18,632.67
6,757.65
12,646.93
45,976.44
1,312.30
89,175.26
16,680.14
80,741.58
29,283.14
54,803.38
199,231.25
5,686.63
386,426.11
400
401
402
403
404
405
406
407
408
unid.
unid.
m3
m3
saco
kg
m2
715
508.96
33 2,740.10
4.31 15,672.29
1.48 16,371.50
16 5,356.50
5.16
887.40
58.97 3,028.45
500
501
502
503
504
505
506
PAREDES (FIBROCEMENTO)
TRACK
STUD
LAMINAS
TORNILLOS
PASTA
SUB-TOTAL
600
601
602
603
604
605
606
607
608
609
unid.
unid.
unid.
unid.
cubeta
3
9
9
265
1
1,969.60
5,938.13
9,494.10
7.07
9,635.46
5,708.60
52,472.06
83,927.84
1,874.59
8,517.75
152,500.85
1,712.58
15,741.62
25,178.35
562.38
2,555.33
45,750.26
7,421.18
68,213.68
109,106.20
2,436.97
11,073.08
198,251.11
22,857.97
6,857.39
83,116.33 24,934.90
9,990.72
2,997.22
18,697.62
5,609.29
67,973.01 20,391.90
5,680.14
1,704.04
146,184.48 43,855.34
38,863.38 11,659.01
393,363.65 118,009.10
29,715.36
108,051.23
12,987.93
24,306.91
88,364.92
7,384.18
190,039.82
50,522.39
511,372.75
ACTIVIDADES / MATERIALES
unid.
unid.
m3
m3
saco
kg
unid. 3var.
unid. 3var.
24
950.44
30 2,740.10
0.64 15,672.29
1.14 16,371.50
13 5,356.50
6.40
887.40
37 3,945.60
37 1,048.94
UNIDAD CANT.
PREC.
UNITARIO
PRECIO
MANO DE
OBRA
SUB-TOTAL
700
701
702
703
704
705
706
707
708
709
800
801
802
803
804
805
900
901
902
903
904
905
906
907
908
909
910
911
unid.
unid.
3
m
m3
saco
kg
unid. 3var.
unid. 3var.
12
950.44
29 2,740.10
0.71 15,672.29
1.27 16,371.50
14.06 5,356.50
5.28
887.40
32 3,945.60
32 1,048.94
10,987.43
3,296.23
78,275.49 23,482.65
11,066.20
3,319.86
20,710.39
6,213.12
75,290.18 22,587.05
4,685.10
1,405.53
124,863.44 37,459.03
33,195.15
9,958.54
359,073.37 107,722.01
14,283.66
101,758.14
14,386.06
26,923.51
97,877.23
6,090.63
162,322.48
43,153.69
466,795.39
unid.
m3
m3
saco
3 31,009.93
1.86 15,672.29
3.18 16,371.50
37 5,356.50
81,959.25 24,587.78
29,183.77
8,755.13
52,118.56 15,635.57
198,555.12 59,566.54
361,816.70 108,545.01
106,547.03
37,938.89
67,754.13
258,121.66
470,361.71
TECHOS
TUBO HN DE 3x3 PULG.
CLAVADOR DE RT 0-16
MINIO BLANCO
PINTURA ANTIC. ROJA
MECHA
THINNER
SOLDADURA
LAMINAS HG OND. 1.06x2.44cm #26
LAMINAS HG OND. 1.06x1.83cm #26
TORNILLOS
SUB-TOTAL
unid.
unid.
galn
galn
kg
galn
kg
unid.
unid.
unid.
4
15
2.38
2.38
1.06
1.27
2.71
16
16
192
28,143.84
11,350.05
14,753.25
21,146.56
1,777.49
10,865.45
2,604.00
12,761.82
9,571.92
42.11
112,575.36 33,772.61
170,250.82 51,075.25
35,038.97 10,511.69
50,223.08 15,066.92
1,876.24
562.87
13,762.90
4,128.87
7,068.00
2,120.40
204,189.08 61,256.73
153,150.73 45,945.22
8,085.50
2,425.65
756,220.67 226,866.20
146,347.96
221,326.07
45,550.66
65,290.00
2,439.11
17,891.77
9,188.40
265,445.81
199,095.94
10,511.15
983,086.87
1000
1001
1002
1003
1004
1005
1006
1007
INSTALACION ELECTRICA
OBRAS DE ACOMETIDA
TUBERIA CONDUIT
CABLEADO
PREVISTA TELEFONICA
CENTRO DE CARGA
ACCESORIOS
SUB-TOTAL
glob.
glob.
glob.
glob.
glob.
glob.
1
1
1
1
1
1
60,000.00
22,906.35
80,539.49
5,000.00
42,734.88
50,946.13
60,000.00
22,906.35
80,539.49
5,000.00
42,734.88
50,946.13
262,126.84
18,000.00
6,871.90
24,161.85
1,500.00
12,820.46
15,283.84
78,638.05
78,000.00
29,778.25
104,701.33
6,500.00
55,555.34
66,229.97
340,764.89
1100
1101
1102
1103
INSTALACION POTABLE
TUBERIA 12mm x 6mts.
ACCESORIOS
SUB-TOTAL
unid.
glob.
4
1
1,346.49
7,984.24
5,385.97
7,984.24
13,370.21
1,615.79
2,395.27
4,011.06
7,001.77
10,379.51
17,381.27
UNIDAD CANT.
PREC.
UNITARIO
ACTIVIDADES / MATERIALES
PRECIO
MANO DE
OBRA
SUB-TOTAL
unid.
unid.
unid.
unid.
unid.
unid.
glob.
glob.
1
1
2
1
1
1
1
1
36,730.61
19,696.89
4,321.01
5,834.30
3,698.73
50,165.64
14,026.52
3,502.52
36,730.61
19,696.89
8,642.01
5,834.30
3,698.73
50,165.64
14,026.52
3,502.52
142,297.21
11,019.18
5,909.07
2,592.60
1,750.29
1,109.62
15,049.69
4,207.96
1,050.75
42,689.16
47,749.79
25,605.95
11,234.61
7,584.59
4,808.35
65,215.33
18,234.47
4,553.27
184,986.37
unid.
unid.
unid.
m3
m3
saco
kg
m2
m
m3
m3
m3
91.63
6.30
3.15
0.28
0.57
6
0.92
7.56
4.00
16.00
0.36
0.36
508.96
950.44
2,740.10
15,672.29
16,371.50
5,356.50
887.40
3,028.45
4,769.15
15,934.00
16,371.50
15,672.29
46,634.40 13,990.32
5,987.74
1,796.32
8,631.31
2,589.39
4,452.10
1,335.63
9,301.45
2,790.44
32,072.15
9,621.64
817.63
245.29
22,895.09
6,868.53
19,076.60
5,722.98
254,944.00 76,483.20
5,893.74
1,768.12
5,642.02
1,692.61
416,348.23 124,904.47
60,624.72
7,784.06
11,220.70
5,787.73
12,091.89
41,693.79
1,062.92
29,763.62
24,799.58
331,427.20
7,661.86
7,334.63
541,252.70
INSTALACION PLUVIAL
CANOAS EN HG # 26
CUMBRERAS EN HG # 26
BOTAGUAS EN HG # 26
BAJANTES EN PVC DE 75mm
TUBO PVC DE 75mm
TUBO PVC DE 100mm
CAJAS DE REGISTRO
SUB-TOTAL
m
unid.
unid.
unid.
unid.
unid.
unid.
14.40 6,200.00
5 4,659.72
5 4,659.72
2 8,056.28
1 11,964.54
2 18,433.15
4 3,698.73
89,280.00
20,968.74
23,024.50
16,112.56
11,964.54
36,866.30
14,794.94
213,011.58
26,784.00
6,290.62
6,907.35
4,833.77
3,589.36
11,059.89
4,438.48
63,903.47
116,064.00
27,259.36
29,931.85
20,946.33
15,553.90
47,926.19
19,233.42
276,915.05
0.00
0.00
0.00
0.00
0.00
180,000.00
180,000.00
11 3,871.62
2 74,778.76
3 24,247.78
2 10,909.80
3 4,276.80
42,587.82
149,557.51
72,743.34
21,819.60
12,830.40
299,538.67
12,776.35
44,867.25
21,823.00
6,545.88
3,849.12
89,861.60
55,364.17
194,424.77
94,566.34
28,365.48
16,679.52
389,400.28
1201
1202
1203
1204
1205
1206
1207
1208
1209
1500
1501
1502
1503
1504
1505
1506
1507
1508
1509
1510
1511
1512
1513
1400
1401
1402
1403
1404
1405
1406
1407
1408
1500 VENTANERIA
1501 VENTANAS INSTALADAS
1502 SUB-TOTAL
1600
1601
1602
1603
1604
1605
1606
CERRAJERIA Y PUERTAS
MARCOS DE MADERA
PUERTAS EXTERNAS
PUERTAS INTERNAS
LLAVINES EXTERNOS
LLAVINES INTERNOS
SUB-TOTAL
ACTIVIDADES / MATERIALES
1700 ALEROS
1701 EMPLANTILLADO
1702 LAMINA DE FIBROCEMENTO 5mm
glob.
unid. 3var.
unid
unid
unid
unid
UNIDAD CANT.
unid. 3var.
unid.
22
27
PREC.
UNITARIO
1,438.50
1,535.87
PRECIO
MANO DE
OBRA
31,647.00
41,468.38
9,494.10
12,440.51
SUB-TOTAL
41,141.10
53,908.89
MUEBLES
MUEBLE DE COCINA
FREGADERO
CACHERA
PILA DE LAVAR
SUB-TOTAL
1900
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
1913
ACABADOS
PISOS EN CONCRETO LUJADO
PISOS EN CERAMICA NACIONAL
PEGA DE CERAMICA (BONDEX)
FRAGUA
LAMINA DE FIBROCEMENTO 5mm
EMPLANTILLADO
ENCHAPES
PEGA DE CERAMICA (BONDEX)
FRAGUA
PINTURA DE PAREDES
PINTURA DE CIELOS
PINTURA DE TECHOS
SUB-TOTAL
unid.
3,113.97
18,683.80
91,799.18
5,605.14
27,539.75
24,288.95
119,338.93
glob.
unid.
unid.
unid.
1
1
1
1
30,000.00
26,685.12
10,515.96
13,552.00
30,000.00
26,685.12
10,515.96
13,552.00
80,753.08
9,000.00
8,005.54
3,154.79
4,065.60
24,225.92
39,000.00
34,690.66
13,670.75
17,617.60
104,979.00
39.65
39.65
11
2
54
60
7.50
2.00
1.00
3.50
2.98
3.10
800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,720.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,720.00
9,516.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,516.00
41,236.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41,236.00
m2
m2
unid.
unid.
unid.
unid. 3var.
m2
unid.
unid.
galn
galn
galn
180,000.00
192,638.09
6,613,907.61
ACTIVIDADES / MATERIALES
UNIDAD CANT.
PREC.
UNITARIO
PRECIO
MANO DE
OBRA
SUB-TOTAL
100
101
102
103
104
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO
INSTALACIONES PROVISIONALES
BODEGA
SUB-TOTAL
200
201
202
203
204
MOVIMIENTOS DE TIERRAS
CORTE
RELLENO
EXCAVACION PARA CIMIENTOS
SUB-TOTAL
300
301
302
303
PREFABRICADO (subcontrato)
CASA PREFABRICADA
INSTALACION
SUB-TOTAL
glob.
glob.
400
401
402
403
404
405
unid.
m3
m3
saco
3 31,009.93
1.86 15,672.29
3.18 16,371.50
37 5,356.50
81,959.25 24,587.78
29,183.77
8,755.13
52,118.56 15,635.57
198,555.12 59,566.54
361,816.70 108,545.01
106,547.03
37,938.89
67,754.13
258,121.66
470,361.71
500
501
502
503
504
505
506
507
508
509
510
511
TECHOS
TUBO HN DE 3x3 PULG.
CLAVADOR DE RT 0-16
MINIO BLANCO
PINTURA ANTIC. ROJA
MECHA
THINNER
SOLDADURA
LAMINAS HG OND. 1.06x2.44cm #26
LAMINAS HG OND. 1.06x1.83cm #26
TORNILLOS
SUB-TOTAL
unid.
unid.
galn
galn
kg
galn
kg
unid.
unid.
unid.
4
15
2.38
2.38
1.06
1.27
2.71
16
16
192
28,143.84
11,350.05
14,753.25
21,146.56
1,777.49
10,865.45
2,604.00
12,761.82
9,571.92
42.11
112,575.36 33,772.61
170,250.82 51,075.25
35,038.97 10,511.69
50,223.08 15,066.92
1,876.24
562.87
13,762.90
4,128.87
7,068.00
2,120.40
204,189.08 61,256.73
153,150.73 45,945.22
8,085.50
2,425.65
756,220.67 226,866.20
146,347.96
221,326.07
45,550.66
65,290.00
2,439.11
17,891.77
9,188.40
265,445.81
199,095.94
10,511.15
983,086.87
600
601
602
603
604
605
606
607
INSTALACION ELECTRICA
OBRAS DE ACOMETIDA
TUBERIA CONDUIT
CABLEADO
PREVISTA TELEFONICA
CENTRO DE CARGA
ACCESORIOS
SUB-TOTAL
glob.
glob.
glob.
glob.
glob.
glob.
1
1
1
1
1
1
60,000.00
22,906.35
80,539.49
5,000.00
42,734.88
50,946.13
60,000.00
22,906.35
80,539.49
5,000.00
42,734.88
50,946.13
262,126.84
18,000.00
6,871.90
24,161.85
1,500.00
12,820.46
15,283.84
78,638.05
78,000.00
29,778.25
104,701.33
6,500.00
55,555.34
66,229.97
340,764.89
700
701
702
703
INSTALACION POTABLE
TUBERIA 12mm x 6mts.
ACCESORIOS
SUB-TOTAL
unid.
glob.
4
1
1,346.49
7,984.24
5,385.97
7,984.24
13,370.21
1,615.79
2,395.27
4,011.06
7,001.77
10,379.51
17,381.27
UNIDAD CANT.
PREC.
UNITARIO
ACTIVIDADES / MATERIALES
glod.
glod.
m2
m
m3
m3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1
1
xxx
xxx
xxx
xxx
PRECIO
xxx
xxx
MANO DE
OBRA
950,000.00
546,000.00
1,496,000.00
SUB-TOTAL
ACTIVIDADES / MATERIALES
UNIDAD CANT.
PREC.
UNITARIO
PRECIO
MANO DE
OBRA
SUB-TOTAL
800
801
802
803
804
805
806
807
808
809
INSTALACION SANITARIA
INODORO (CON ACCESORIOS)
LAVAMANOS (CON ACCESORIOS)
TUBO PVC DE 50mm
TUBO PVC DE 75mm
CAJA DE REGISTRO
TRAMPA DE GRASAS
ACCESORIOS (AGUAS NEGRAS)
ACCESORIOS (AGUAS SERVIDAS)
SUB-TOTAL
unid.
unid.
unid.
unid.
unid.
unid.
glob.
glob.
1
1
2
1
1
1
1
1
36,730.61
19,696.89
4,321.01
5,834.30
3,698.73
50,165.64
14,026.52
3,502.52
36,730.61
19,696.89
8,642.01
5,834.30
3,698.73
50,165.64
14,026.52
3,502.52
142,297.21
11,019.18
5,909.07
2,592.60
1,750.29
1,109.62
15,049.69
4,207.96
1,050.75
42,689.16
47,749.79
25,605.95
11,234.61
7,584.59
4,808.35
65,215.33
18,234.47
4,553.27
184,986.37
900
901
902
903
904
905
906
907
908
909
910
911
912
913
unid.
unid.
unid.
m3
m3
saco
kg
m2
m
3
m
m3
m3
91.63
6.30
3.15
0.28
0.57
6
0.92
7.56
4.00
16.00
0.36
0.36
508.96
950.44
2,740.10
15,672.29
16,371.50
5,356.50
887.40
3,028.45
4,769.15
15,934.00
16,371.50
15,672.29
46,634.40 13,990.32
5,987.74
1,796.32
8,631.31
2,589.39
4,452.10
1,335.63
9,301.45
2,790.44
32,072.15
9,621.64
817.63
245.29
22,895.09
6,868.53
19,076.60
5,722.98
254,944.00 76,483.20
5,893.74
1,768.12
5,642.02
1,692.61
416,348.23 124,904.47
60,624.72
7,784.06
11,220.70
5,787.73
12,091.89
41,693.79
1,062.92
29,763.62
24,799.58
331,427.20
7,661.86
7,334.63
541,252.70
INSTALACION PLUVIAL
CANOAS EN HG # 26
CUMBRERAS EN HG # 26
BOTAGUAS EN HG # 26
BAJANTES EN PVC DE 75mm
TUBO PVC DE 75mm
TUBO PVC DE 100mm
CAJAS DE REGISTRO
SUB-TOTAL
m
unid.
unid.
unid.
unid.
unid.
unid.
14.40 6,200.00
5 4,659.72
5 4,659.72
2 8,056.28
1 11,964.54
2 18,433.15
4 3,698.73
89,280.00
20,968.74
23,024.50
16,112.56
11,964.54
36,866.30
14,794.94
213,011.58
26,784.00
6,290.62
6,907.35
4,833.77
3,589.36
11,059.89
4,438.48
63,903.47
116,064.00
27,259.36
29,931.85
20,946.33
15,553.90
47,926.19
19,233.42
276,915.05
xxx
180,000.00
180,000.00
12,776.35
44,867.25
21,823.00
6,545.88
3,849.12
89,861.60
55,364.17
194,424.77
94,566.34
28,365.48
16,679.52
389,400.28
1000
1001
1002
1003
1004
1005
1006
1007
1008
CERRAJERIA Y PUERTAS
MARCOS DE MADERA
PUERTAS EXTERNAS
PUERTAS INTERNAS
LLAVINES EXTERNOS
LLAVINES INTERNOS
SUB-TOTAL
ACTIVIDADES / MATERIALES
glob.
unid. 3var.
unid
unid
unid
unid
xxx
11 3,871.62
2 74,778.76
3 24,247.78
2 10,909.80
3 4,276.80
UNIDAD CANT.
PREC.
UNITARIO
xxx
42,587.82
149,557.51
72,743.34
21,819.60
12,830.40
299,538.67
PRECIO
MANO DE
OBRA
SUB-TOTAL
1300
1301
1302
1303
1304
ALEROS
EMPLANTILLADO
LAMINA DE FIBROCEMENTO 5mm
PRECINTA (FIBROCEM. 8mm)
SUB-TOTAL
1400
1401
1402
1403
1404
1405
MUEBLES
MUEBLE DE COCINA
FREGADERO
CACHERA
PILA DE LAVAR
SUB-TOTAL
1500
1501
1502
1503
1504
1505
1506
1507
1508
1509
1510
1511
1512
1513
ACABADOS
PISOS EN CONCRETO LUJADO
PISOS EN CERAMICA NACIONAL
PEGA DE CERAMICA (BONDEX)
FRAGUA
LAMINA DE FIBROCEMENTO 5mm
EMPLANTILLADO
ENCHAPES
PEGA DE CERAMICA (BONDEX)
FRAGUA
PINTURA DE PAREDES
PINTURA DE CIELOS
PINTURA DE TECHOS
SUB-TOTAL
unid. 3var.
unid.
unid.
22
27
6
1,438.50
1,535.87
3,113.97
31,647.00
41,468.38
18,683.80
91,799.18
9,494.10
12,440.51
5,605.14
27,539.75
41,141.10
53,908.89
24,288.95
119,338.93
glob.
unid.
unid.
unid.
1
1
1
1
30,000.00
26,685.12
10,515.96
13,552.00
30,000.00
26,685.12
10,515.96
13,552.00
80,753.08
9,000.00
8,005.54
3,154.79
4,065.60
24,225.92
39,000.00
34,690.66
13,670.75
17,617.60
104,979.00
39.65
39.65
11
2
54
60
7.50
2.00
1.00
3.50
2.98
3.10
800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,720.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,720.00
9,516.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,516.00
41,236.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41,236.00
m2
m2
unid.
unid.
unid.
unid. 3var.
m2
unid.
unid.
galn
galn
galn
800,700.71
154,371.09
5,300,074.17