LISTA DE ACTIVIDADES Y MATERIALES

DESCRIPCION DEL ACABADO

1
2
3
4
5
6
7
#REF!
10

CANTIDAD

TRAZO
BODEGA
MOVIMIENTO DE TIERRA
CONEXIN ELECTRICA PROVISIONAL
CONEXIN MECANICA PROVISIONAL
MESAS DE TRABAJO, BURRAS ETC.
ZANJEO PARA CIMIENTOS
RELLENO PRODUCTO DEL ZANJEO A NIVEL DE TERRENO
CIMIENTOS

150.00
1.00
270.00
1.00
1.00
175.00
174.40

11 PAREDES PRIMER NIVEL

759.50

12 COLUMNAS PRIMER NIVEL

56.00

13 VIGAS PRIMER NIVEL


14 ENTREPISO
15 PAREDES SEGUNDO NIVEL

16 COLUMNAS SEGUNDO NIVEL


17 VIGAS SEGUNDO NIVEL
18
19
20
21

TECHOS
EN TERRAZA 5 PIEZAS MADERA 10,00x15,00x250 cm. ANCLADA A ESTRUCTURA DE TECHO
EN TERRAZA CLAVADOR ALMENDRO DE 5x5 cm.
EN TERRAZA PIEZA DE EMPLANTILLADO DE 2,5x5 cm

22 EN ALERO CLAVADOR ALMENDRO DE 5x5 cm.


23 EN ALERO PIEZA DE EMPLANTILLADO DE 2,5x5 cm

14.95
16.87
28.83
52.63
98.56

24 CUBIERTA LAMINA ONDULADA H.G # 26

280.00

25 BOTAGUAS H.G # 26
26 CUMBRERAS H.G # 26
ESCALERA
27
PLUVIAL
TUBO PVC 200 MM
TUBO PVC 150 MM
TUBO PVC 100 MM
TUBO PVC 75 MM
CODO PVC 100 MM
CODO PVC 75 MM
28 TUBO PARA BAJANTE HG 4"
29 TUBO PARA BAJANTE AGUA PLUVIAL HG 3"
CODOS HG 100
30 CODOS HG 75
31 CAJA DE REGISTRO (INCLUIR REJA METALICA)
DIFUSORES HG
32 MANO OBRA
POTABLE
TUBO PRESION PVC 50 mm
TUBO PRESION PVC 38 mm
33 TUBO PRESION PVC 25 mm
34 TUBO PRESION PVC 19 mm
35 TUBO PRESION PVC 12 mm
CODOS PVC 50 MM
36 CODOS PVC 38mm.
37 CODOS PVC 25mm.
38 CODOS PVC 19mm.
39 CODOS PVC 12mm.
TEE PVC 50 MM
TEE PVC 38 MM
40 TEE PVC 25 mm
41 TEE PVC 19 mm
42 TEE PVC 12 mm
VALVULA DE COMPUERTA
VALVULA DE LLAVE BOLLA TANQUE CAPTACION
VALVULA DE BALANCE
VALVULA DE COMPUERTA
LLAVE DE RIEGO
REDUCCIONES DE 50 A38
REDUCCIONES DE 38 A 25
REDUCCIONES DE 25 A 19
REDUCCIONES DE 19 A 12
ADAPTADOR MACHO DE 50 MM

45.00
206.00

25.00
13.00
10.00
10.00
10.00
21.00
30.00
80.00
20.00
45.00
10.00
18.00

25.00
5.00
15.00
10.00
30.00
47.00
25.00
35.00
29.00
45.00
15.00
25.00
25.00
30.00
30.00
1.00
1.00
1.00
5.00
23.00
17.00
7.00
12.00
35.00
5.00

ADAPTADOR MACHO DE 12 MM
PEGAMENTO PVC CUARTOS
43 MEDIDOR 19 mm
44 TANQUE HIDRONEUMATICO PRO-SOURGEPS-220-T52, 85 gls PRECARGADO
45 BOMBA STA-RITE JHE 1 HP, 20 gls

45.00
5.00
1.00
1.00
1.00

46 SALIDAS
NEGRAS
47 TUBO PVC 100 mm DRENASEP
YEE DRENASEP 100
1 TUBO PVC 100 mm
TUBO PVC 75 MM
48 TUBO PVC 50 mm
49 TUBO PVC 38 mm
50 CODOS PVC 100mm.
CODOS PVC 75mm.
51 CODOS PVC 50mm.
52 CODOS PVC 38mm.
CODO PVC 45 X 100 MM
CODO PVC 45 X 50 MM
CODO PVC 45 X 38 MM
CODO PVC 45 X 75 MM
53 YEE PVC 100 mm
YEE PVC 75 mm
54 YEE PVC 50 mm
55 YEE PVC 38 mm
56 REGISTRO DE PISO
57 CENICERO
58 DRENAJE DE PISO
59 CAJA DE REGISTRO
SIFON 50 MM
TUBO HG 75 DRENAJE PARA TANQUE DE AGUA CALIENTE
REGISTRO DE PISO BRONCE
60 REGISTRO SIFONICO 100mm.

6.00
12.00
25.00
12.00
25.00
25.00
6.00
5.00
15.00
24.00
23.00
32.00
25.00
15.00
23.00
22.00
25.00
15.00
14.00
11.00
23.00
12.00
23.00
3.00
11.00
10.00

61 SALIDAS
CALIENTE
62 TUBO CPVC 32 mm
tUBO CPVC 25 mm
TUBO CPVC 19 MM
63 TUBO CPVC 12 mm
CODO CPVC 32 MM
CODO CPVC 25 MM
CODO CPVC 19 MM
CODO CPVC 12 MM
TEE CPVC 32 mm

5.00
17.00
22.00
25.00
13.00
15.00
20.00
25.00
8.00

64 TEE CPVC DE 25 MM
TEE CPVC 19 mm
TEE CPVC DE 12 MM
UNION CPVC 32 MM
UNION CPVC 25 MM
UNION CPVC 19 MM
UNION CPVC 12 MM
PEGAMENTO CPVC
65
66 TANQUE DE AGUA CALIENTE
67 SALIDAS

11.00
15.00
25.00
10.00
12.00
15.00
25.00
3.00
AISLAMIENTO TERMICO

68 TANQUE DE CAPTACION (ancho=1,60 m., largo=3,20m.,hondo=1,80m.) VOL=7680 LTS.


69 TAPA METALICA DE TANQUE 60x60 cm.
PAREDES LIVIANAS
70 ESTRUCTURA PARED LIVIANA (INCLUYE TAPICHELES)
71 1 FORRO TABLICEM DE 1,60 cm.
72 1 FORRO GYPSUM DE 1,25 cm.
73 1 FORRO GYPSUM MR DE 1,25 cm.
74 PRODEX 4 mm. ESPESOR

2.00

1.00

0.00

75 REPELLO FINO

11.20

CIELOS
76 CIELO GYPSUM 12,5 mm., EMPLANTILLADO EN PERFIL SOMBRERO @ 61 cm.
77 CIELO PLANO GYPSUM SUSPENDIDO 12,5 mm., EMPLANTILLADO EN PERFIL SOMBRERO @ 61 cm.

56.00
2.88

78 AISLANTE TERMICO LAMINA DE VIDRIO

58.88

79 ARTESONADO ALERO 18 PIEZAS DE 10x15x200 cm ALMENDRO O SIMILAR


80 ARTESONADO ALERO 4 PIEZAS DE 10x15x455 cm ALMENDRO O SIMILAR

43.06
21.77

81 CIELO DE CANA BRAVA

12.00

82 ALEROS DE CANA BRAVA

31.60

83 PIEZA DE MADERA DE 2,50x5x10 cm @60 cm PARA PRECINTAS


84 PRECINTA DE PIEZA DE MADERA DE 25x150 mm. EN ALERO
85 PRECINTA DE PIEZA DE MADERA DE 25x200 mm. EN ALERO
VENTANAS
86 VENTANA DE EUROMAT SUBCONTRATO

10.17
66.21
28.23

87 CLOSET 60 cm (INCLUIR 4 PUERTAS DE TABLERO DE CEDRO)


88 ESTANTERIA DE CLOSET (APROXIMADO)
89 PERCHERO TUBO HG 19 mm NIQUELADO

0.00
0.00
0.00

88 MUEBLE LAVATORIO 55 cm. ANCHO

0.00

89 MUEBLE DE PILAS CONCRETO

1.00

90 SOBRE DE PIEDRA EN MUEBLE LAVATORIO


PUERTAS Y CERRAJERIA
91 PUERTA TIPO 1, ABATIR 2 HOJAS VIDRIO EN ACCESO. 1,40x2,10 m.
92 PUERTA TIPO 2, ABATIR 1 HOJA VIDRIO EN BAO. 0,90x2,10 m.
93 PUERTA TIPO 3, CORREDIZA 2 HOJAS VIDRIO DORMITORIO. 2,20x2,10 m.
94 PUERTA VIDRIO TEMPERADO 9 mm. BAO

0.58

95
96
97
98
99

1.00
1.00
1.00
9.00
3.00

CERRAJERIA PRINCIPAL MARCA EMTEK FUNCION ENTRADA full dummy MODELO NORMANDY GRIP
CERRAJERIA PUERTA DORMITORIO MARCA EMTEK FUNCION MANUA JALADERA MODELO NORMANDY PULL
CERRAJERIA PUERTA BAO MARCA EMTEK FUNCION PRIVACY MODELO NORMANDY LEVER
BISAGRAS 3,5"x3,5" MARCA EMTEK B12 CK, 3 x PUERTA
TOPE DE PUERTA

100
101
102
103
104
105

BARANDAS 90 cm. ESCALERA COMPUESTO DE 2 PIEZAS DE MADERA DE 7,5x7,5x80 cm.


BARANDAS 90 cm. ESCALERA COMPUESTO DE 2 PIEZAS DE MADERA DE 10x10x80 cm.
PASAMANOS MOLDURADO ESCALERA COMPUESTO DE 2 PIEZAS DE MADERA DE 10x10x150 cm.
BARANDAS 90 cm. TERRAZA COMPUESTO DE 8 PIEZAS DE MADERA DE 7,5x7,5x80 cm.
PASAMANOS MOLDURADO TERRAZA COMPUESTO DE 2 PIEZAS DE MADERA DE 10x10x150 cm.
PASAMANOS MOLDURADO TERRAZA COMPUESTO DE 2 PIEZAS DE MADERA DE 10x10x120 cm.
PISOS
106 PISO DE CERAMICA
107 PISO MADERA TABLONCILLO DE ALMENDRO 12,5 cm. ANCHO 2,54 ESPESOR

9.30

1.00
1.00
1.00
1.00

2.00
2.00
3.59
8.61
3.59
2.87
63.16
32.50

108
109 UMBRAL DE MADERA
ACABADOS PAREDES
110 ENCHAPE PARED BAOS, NIVEL DE CIELO

5.38
1.80
23.80

111 PIEZA DE MADERA DE 25x75x200 mm. A CADA 600 mm. A NIVEL DE ENTREPISO EXTERIOR

73.33

112 TABLON DE MADERA 400x25 mm.

44.00

113 GUARNICION DE CONCRETO TIPO DONINELI EN COLUMNAS DE FACHADAS


114 GUARNICION DE MADERA EN TERRAZA 2,50x17,5 cm.

25.60
38.40

115 GUARNICION DE MADERA EN VIGA CARGADOR TERRAZA 2,50x17,5 cm.

18.80

116
117
118
119

28.00
5.60
5.10
6.40

GUARNICION DE MADERA EN PUERTAS 2,50x10,00 cm.


MARCOS PUERTA TIPO 1
MARCOS PUERTA TIPO 2
MARCOS PUERTA TIPO 3

120 GUARNICION DE MADERA EN VENTANAS 2,50x5,00 cm. EXTERNA


121 GUARNICION DE FIBROCEMENTO EN VENTANAS 1,50x10,00 cm. INTERNA
122

48.80
54.00

123 PINTURA PAREDES


124 PINTURA CIELOGYPSUM
125 PINTURA CANA BRAVA

0.00
0.00
58.88

126 PINTURA LAMINA GALVANIZADA TECHO


127 RODAPIE DE MADERA MOLDURADO DE 2,50x12,50 cm.
128 RODAPIE DE CEMENTO TIPO DONINELLI, 15 cm. ANCHO

280.00
35.00
5.00

129 CORNISA TIPO-A 80x80 mm. DE NOMASTYL (PARA CIELO PLANO)

5.00

130 PILA DOS TANQUES

1.00

131
132
133
134
135
136
137
138
139
140

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TINA
INODORO MARCA INCESA STANDARD MODELO RENAISSANCE ELONGADO 2231564 COLOR BONE
LAVATORIO MARCA INCESA STANDARD MODELO OVALIN 0804000 COLOR BONE
CACHERA LAVATORIO MARCA TEBISA SERIE 22850/99 MODELO BOSTON ACABADO CROMO
CACHERA DUCHA MARCA TEBISA SERIE 22836/99 MODELO BOSTON ACABADO CROMO
ACCESORIO MARCA TEBISA SERIE 6.624 ACABADO CROMO
ACCESORIO MARCA TEBISA SERIE 6.660 ACABADO CROMO
ACCESORIO MARCA TEBISA SERIE 6.625 ACABADO CROMO
ACCESORIO MARCA TEBISA SERIE 6.622 ACABADO CROMO
ESPEJO PARA BAO 6 mm.

EXTERIORES
141
142
143
144
145
146

ACERA
CUNETA
CORDON DE CALLE
CALLE APARTAMENTO (MAS PARQUEOS) CONCRETO PLANCHADO
ACERAS ACABADO CERAMICA (FUERA DEL LOCAL Y APARTAMENTOS)
PARRILLA PLUVIAL 30 cm.

147 LIMPIEZA FINAL

1.00

STA DE ACTIVIDADES Y MATERIALES


UNIDAD

m
global
M3
global
global
global
m
m

m2
m3

vara
vara
vara
vara
vara
UNI
ml.
ml.

UNI
UNI
UNI
UNI
UNI
UNI
ml.
ml.
UNI
unidad
unidad
UNI

unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad

unidad
unidad
unidad
global
global
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad

unidad

unidad

unidad
unidad
unidad
unidad
unidad
m
m
m
m
m
m

m
m
m
vara
vara
m
m
vara
vara
vara
m
ml.
ml.
ml.
ml.
unidad
m
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
m
vara
vara
vara
vara
vara
vara
vara
m
m
ml.
m
unidad

ml.
ml.
ml.
ml.
ml.
ml.
ml.
ml.

ml.
ml.

m
m
m
ml.
ml.
ml.
unidad

unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad
unidad

m
ml.
ml.
m
m
ml.
GLOBAL

CIMIENTOS

peso

0.6
3.5

1.5
CIMIENTO

ANCHO 1

PLACA CORRIDA
PLACA PARED LIVIANA

0.40
0.30
0.00
0.00
0.00

TOTALES
TABLA DE CONCRETOS
PARA UN METRO CUBICO DE CONCRETO
ARENA
PIEDRA
CEMENTO

LARGO

ESPESOR

36.00
4.00
0.00
0.00
0.00

0.20
0.15
0.00
0.00
0.00

CANT.

CONCRETO
1
1
0
0
0

resistencia
210
0.427
0.765
8.5

245

280
0.378
0.730
10.20

#2

#3

2.88
0.18
0.00
0.00
0.00

81.00

3.4

6
#4

9.31
#5

4.50%
ALAM

108
28
0
0
0

0
0

13.5

22.7

0.0

0.0

4.9

20

79

100

280 KGS
0.3
0.6
13

1.44
2.57
28.61
PESO EN KILOS

ARMAD.

100

PAREDES DE BLOQUES

0.00
12.50

PARED NPT
PAREDES DE BLOQUES DE 12X20X40

LARGO

ALTO

22.68

2.60

TOTALES

AREA TOTAL
58.97
-

117.94

CONCRETO
35.73
7.15

3.50

BLOCK

#3

1.50
#2

CONCRETO

707.62
-

196.56
-

1.57
-

714.69

32.76

1.73

210

ARENA
PIEDRA
CEMENTO

245
0.427
0.854
9

0.378
0.756
10.20

0.74
1.48
15.57

PESO EN KILOS
REPEMAX GRUESO
MORTERO

145

ARENA
CAL
CEMENTO

PARED LIVIANA

LARGO

PAREDES DE FIBROCEMENTO

PARED LIVIANA DEL MEZZANINE

4.42

LARGO

ALTO
2.50

ALTO

PAREDES DE GYPSUM

3.57
35.73

AREA TOTAL

TRACK

STUD

11.05

AREA TOTAL

2.90

TRACK

8.84

STUCK

0.00
12.50
LARGO

ALTO

AREA TOTAL

BLOCK

TORNILLOS

8.84

LAMINAS

PAREDES BLOQUES TANQUE SEPTICO


PARED NPT

LAMINAS

#3

265.20

TORNILLOS

3.50

1.50
#2

CONCRETO

PAREDES DE BLOQUES DE 12X20X40

5.40

1.40

7.56
-

TOTALES

15.12

CONCRETO
4.58
0.92

90.72
-

18.90
-

37.80
-

0.60
-

91.63

3.15

6.30

0.67

210

ARENA
PIEDRA
CEMENTO

245
0.427
0.854
9

0.378
0.756
10.20

0.28
0.57
5.99

PESO EN KILOS
REPEMAX GRUESO
MORTERO
ARENA
CAL
CEMENTO

145
0.46
4.58

0.05
ALAMBRE

5.16

114.66
58.97

PASTA
0.88

PASTA
-

0.05
ALAMBRE

0.92

20.48
7.56

COLUMNAS primer nivel


0.125
COLUMNAS CONCRETO

SEC 1

SEC 2

COLUMNA TIPO 1
COLUMNA TIPO 2

0.3
0.1
0
0
0
0
0
0
0

CONCRETO
ARENA
PIEDRA
CEMENTO

TOTALES
210
0.427
0.765
8.5

ALTURA

0.12
0.06
0
0
0
0
0
0
0

245
0.378
0.730
10.20

CANT.
2.6
2.6
0
0
0
0
0
0
0

280

CONCRETO

13.00
9.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

#2
1.5

#3
3.5

1.22
0.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00

127
18

1.49

24

36

#4
6
135.2
46.8
0
0
0
0
0
0

#5
9.31

ALAM
4.50%

0
0
0
0
0
0

0
0

30

106

142

210 KGS/CM2
0.3
0.6
13

0.64
1.14
12.69
PESO EN KILOS

FORMAL.
1 X 10
1X3
M2
tablas
reglas 4 varas
20 24.1429
24.14285714
9 11.1429
11.14285714
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
31

37

37

VIGAS DE CONCRETO
PRIMER NIVEL

0.125
SEC 1

SEC 2

VIGA BANQUINA DE 10x12


VIGA CORONA DE 12x30
VIGA TAPICHEL DE 12x15

CONCRETO
ARENA
PIEDRA
CEMENTO

0.1
0.12
0.12
0
0
0
0
0
210

LONGITUD
0.12
0.3
0.15
0
0
0
0
0

245
0.427
0.765
8.5

6.55
36
7.15
0
0
0
0
0
280

0.378
0.730
10.20

CONCRETO

#2
1.5
0.08
1.30
0.13
0.00
0.00
0.00
0.00
0.00
1.65

#3
3.5
7
36
27

#4
6
13
144
14
0
0
0

#5
9.31

#6
12

ALAM
4.50%

0
0
0
0
0

0
0
12

0
29

17

100

117

210 KGS/CM2
0.3
0.6
13

0.71
1.27
14.06
PESO EN KILOS

FORMAL.
M2
2
22
2
0
0
0
0
0
27

1 X 12
1X3
tablas
reglas 4 varas
1.87
1.87
25.71
25.71
2.55
2.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32

32

MALLA
LOSA DE CONCRETO 15 CM. ESPESOR

HORIZONTAL

VERTICAL

AREA

ESPESOR
LOSA

39.65
0.00

TOTALES
CONCRETO
ARENA
PIEDRA
CEMENTO

210

245
0.427
0.73
8.5

280
0.378
0.730
10.20

CONCRETO
0.1
0.1

#2
3.4

ALAM
5.00%

3.96
0.00

396
0

4.36

69.38

12.38

4.36

69

12

236

236
12

210 KGS/CM2
0.3
0.6
13

1.86
3.18
37.07
PESO KILOS
ALAMBRE N.

FORMAL.
M2
39.65
-

1X12"
TABLA

39.65

1X3"
REGLA 4 VARAS
-

ESTRUCTURA DE TECHO
ELEMENTOS DE ACERO
TUBO DE 3x3 PULG. PARA CERCHA
TUBO DE 1RT 0-16 PARA CLAVADORES

LAMINA HG ONDULADA DE 1.06x2.44


LAMINA HG ONDULADA DE 1.06x1.83

TOTALES

ALES

AREA

62

SECCION

SECCION

LARGO

CANT.

UNIDAD

PINTURA
Galon

0.08

0.75

6.00

4.00

0.50

0.05

0.75

6.00

15.00

1.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

unidad
unidad
unidad

0.00
0.00
0.00
0.00

0.00 unidad

0.00

16.00 LAMINAS
16.00 LAMINAS
ML

0.00
0.00
0.00
0.00
0.00 M2

2.38

SOLDADURA
Kilo

THINNER
Galon

MECHA
Kilo

0.57

0.22

2.14

0.83

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00

0.00

0.00
TORNILLOS
192 UNID.
PINTURA
3.1 GALON

2.71

1.27

1.06

LOSA DE CONCRETO 6 CM. ESPESOR

CONCRETO
ARENA
PIEDRA
CEMENTO

ELEMENTOS DE ACERO

ENTREPISO PC O ESCOSA

TOTALES

HORIZONTAL

VERTICAL
0.00

AREA
0.00

ESPESOR
LOSA

0.00

CONCRETO
0

TOTALES
210

245
0.427
0.854
8.5

280
0.378
0.756
10.20

#2
1.5

0.00

0.00

0.00

0.00

210 KGS/CM2
0.3
0.6
13

0.00
0.00
0.00
PESO KILOS
ALAMBRE N.

SECCION

LARGO

ALTO

CANT.

UNIDAD

LARGO

ANCHO

AREA

PRE/UNI

TOTAL

22.000

9.000

198

13500

2673000.00

PINTURA
Galon

ALAM
5.00%

0.00

0
0

SOLDADURA
Kilo

THINNER
Galon

MECHA
Kilo

ESCALERA
PLACA CONCRETO ARMADO
SEC 1-1 1.20x20x10 MT, MALLA 14 VAR#5 ARO #4@20 cm.

SECCION
1.50

LARGO
6.00

ALTO
0.40

CANT.
1

CONCRETO
3.60

3.60
CONCRETO
ARENA
PIEDRA
CEMENTO

0.43
0.77
8.50

1.54
2.75
30.60

SECCION

LARGO

ALTO

CANT.

PINTURA
Galon

233.33

9.20
#5
250

41.67
210 KGS

PESO EN KILOS

66.67

6.00
#4

210.00

ESCALERA DE CARACOL

ELEMENTOS DE MADERA

3.50
#3
400.00

250.00

0.05
ALAM

ARMAD.

FORMAL.

1X12"

1X3"

27

21.75

483.33

27.00

40.00

40.00

REPEMAX GRUESO 40 kg_INTACO


BLOCK 12x 20 x40 PROGRESO
TABLA FORMALETA SUAVE 1x12
SEMID S/CEP 1 x 3 x 20% CABOS
MALLA ELECTR #2 2.35x6mtx5.3mm
ALAMBRE NEGRO #16=1.58mm_NACIONAL

SAC
UND
VRS
VRS
UND
KLS

3028.45089
508.958
1315.2
349.64804
31009.932
887.4

S
S
P
P
S
S

TRACK GYPS 4x10'=3.05 C25_3.05mt


STUD GYPS 4x10'=3.05_C20
GYPSUM 1.22x2.44x12mm SOFFIT P/EXTER
MASILLA GYPSUM CUBETA_U.S.A
TORN GYPSUM PB 6x 1 7/8

PZA
UND
LAM
CUB
UND

1969.5974
5938.128
9494.1
9635.46449
7.0686

S
S
S
S
S

TUBO HN 75mm=3"x6mt_THN
PERLIN 75x1.58mm=1/16x6mt_RT-016 ROJ
PROT ANTIC MINIO BLANCO_6560 GL
PROT ANTIC CORROTEC BTE ROJO_6615 GL
MECHA COLOR_EXENTO
PROT THINNER CTE 631_631 GL

UND
UND
GLN
GLN
KLS
GLN

28143.8388
11350.0548
14753.25
21146.5584
1573
10865.448

S
S
S
S
N
S

PIEZA 3 VARAS
3945.6
1048.94412

1777.4900

PRESUPUESTO DETALLADO CASA DE HABITACION 42M2


#

ACTIVIDADES / MATERIALES

100
101
102
103
104

OBRAS PRELIMINARES
LIMPIEZA DE TERRENO
INSTALACIONES PROVISIONALES
BODEGA
SUB-TOTAL

200
201
202
203
204

MOVIMIENTOS DE TIERRAS
CORTE
RELLENO
EXCAVACION PARA CIMIENTOS
SUB-TOTAL

300
301
302
303
304
305
306
307

UNIDAD CANT.
glod.
glod.
m2

PREC.
UNITARIO

PRECIO

MANO DE
OBRA

SUB-TOTAL

15 7,000.00

105,000.00
105,000.00

31,500.00
31,500.00

136,500.00
136,500.00

m
m3
m3

8.64 1,500.00

12,960.00
12,960.00

3,888.00
3,888.00

16,848.00
16,848.00

CIMIENTOS
VARILLA #2
VARILLA #3
ARENA
PIEDRA
CEMENTO
ALAMBRE
SUB-TOTAL

unid.
unid.
m3
m3
saco
kg

14
950.44
23 2,740.10
1.44 15,672.29
2.57 16,371.50
29 5,356.50
4.93
887.40

12,830.88
62,108.91
22,525.49
42,156.45
153,254.80
4,374.33
297,250.86

3,849.26
18,632.67
6,757.65
12,646.93
45,976.44
1,312.30
89,175.26

16,680.14
80,741.58
29,283.14
54,803.38
199,231.25
5,686.63
386,426.11

400
401
402
403
404
405
406
407
408

PAREDES (BLOQ DE 12x20x40cm)


BLOQUES
VARILLAS #3
ARENA
PIEDRA
CEMENTO
ALAMBRE
REPELLO QUEMADO
SUB-TOTAL

unid.
unid.
m3
m3
saco
kg
m2

715
508.96
33 2,740.10
4.31 15,672.29
1.48 16,371.50
16 5,356.50
5.16
887.40
58.97 3,028.45

500
501
502
503
504
505
506

PAREDES (FIBROCEMENTO)
TRACK
STUD
LAMINAS
TORNILLOS
PASTA
SUB-TOTAL

600
601
602
603
604
605
606
607
608
609

COLUMNAS (210 kg/cm )


VARILLA #2
VARILLA #3
ARENA
PIEDRA
CEMENTO
ALAMBRE
FORMALETA 1x12 PULG.
REGLA DE 1x3 PULG.
SUB-TOTAL

unid.
unid.
unid.
unid.
cubeta

3
9
9
265
1

1,969.60
5,938.13
9,494.10
7.07
9,635.46

363,748.29 109,124.49 472,872.78


89,765.64 26,929.69 116,695.33
67,579.75 20,273.93
87,853.68
24,183.78
7,255.13
31,438.91
83,387.58 25,016.27 108,403.86
4,578.72
1,373.62
5,952.33
178,581.69 53,574.51 232,156.20
811,825.45 243,547.64 1,055,373.09

5,708.60
52,472.06
83,927.84
1,874.59
8,517.75
152,500.85

1,712.58
15,741.62
25,178.35
562.38
2,555.33
45,750.26

7,421.18
68,213.68
109,106.20
2,436.97
11,073.08
198,251.11

22,857.97
6,857.39
83,116.33 24,934.90
9,990.72
2,997.22
18,697.62
5,609.29
67,973.01 20,391.90
5,680.14
1,704.04
146,184.48 43,855.34
38,863.38 11,659.01
393,363.65 118,009.10

29,715.36
108,051.23
12,987.93
24,306.91
88,364.92
7,384.18
190,039.82
50,522.39
511,372.75

ACTIVIDADES / MATERIALES

unid.
unid.
m3
m3
saco
kg
unid. 3var.
unid. 3var.

24
950.44
30 2,740.10
0.64 15,672.29
1.14 16,371.50
13 5,356.50
6.40
887.40
37 3,945.60
37 1,048.94

UNIDAD CANT.

PREC.
UNITARIO

PRECIO

MANO DE
OBRA

SUB-TOTAL

700
701
702
703
704
705
706
707
708
709

VIGAS (210 kg/cm2)


VARILLA #2
VARILLA #3
ARENA
PIEDRA
CEMENTO
ALAMBRE
FORMALETA 1x12 PULG.
REGLA DE 1x3 PULG.
SUB-TOTAL

800
801
802
803
804
805
900
901
902
903
904
905
906
907
908
909
910
911

unid.
unid.
3
m
m3
saco
kg
unid. 3var.
unid. 3var.

12
950.44
29 2,740.10
0.71 15,672.29
1.27 16,371.50
14.06 5,356.50
5.28
887.40
32 3,945.60
32 1,048.94

10,987.43
3,296.23
78,275.49 23,482.65
11,066.20
3,319.86
20,710.39
6,213.12
75,290.18 22,587.05
4,685.10
1,405.53
124,863.44 37,459.03
33,195.15
9,958.54
359,073.37 107,722.01

14,283.66
101,758.14
14,386.06
26,923.51
97,877.23
6,090.63
162,322.48
43,153.69
466,795.39

CONTRAPISO (210 kg/cm2)


MALLA ELECTROSOLDADA # 2
ARENA
PIEDRA
CEMENTO
SUBTOTAL

unid.
m3
m3
saco

3 31,009.93
1.86 15,672.29
3.18 16,371.50
37 5,356.50

81,959.25 24,587.78
29,183.77
8,755.13
52,118.56 15,635.57
198,555.12 59,566.54
361,816.70 108,545.01

106,547.03
37,938.89
67,754.13
258,121.66
470,361.71

TECHOS
TUBO HN DE 3x3 PULG.
CLAVADOR DE RT 0-16
MINIO BLANCO
PINTURA ANTIC. ROJA
MECHA
THINNER
SOLDADURA
LAMINAS HG OND. 1.06x2.44cm #26
LAMINAS HG OND. 1.06x1.83cm #26
TORNILLOS
SUB-TOTAL

unid.
unid.
galn
galn
kg
galn
kg
unid.
unid.
unid.

4
15
2.38
2.38
1.06
1.27
2.71
16
16
192

28,143.84
11,350.05
14,753.25
21,146.56
1,777.49
10,865.45
2,604.00
12,761.82
9,571.92
42.11

112,575.36 33,772.61
170,250.82 51,075.25
35,038.97 10,511.69
50,223.08 15,066.92
1,876.24
562.87
13,762.90
4,128.87
7,068.00
2,120.40
204,189.08 61,256.73
153,150.73 45,945.22
8,085.50
2,425.65
756,220.67 226,866.20

146,347.96
221,326.07
45,550.66
65,290.00
2,439.11
17,891.77
9,188.40
265,445.81
199,095.94
10,511.15
983,086.87

1000
1001
1002
1003
1004
1005
1006
1007

INSTALACION ELECTRICA
OBRAS DE ACOMETIDA
TUBERIA CONDUIT
CABLEADO
PREVISTA TELEFONICA
CENTRO DE CARGA
ACCESORIOS
SUB-TOTAL

glob.
glob.
glob.
glob.
glob.
glob.

1
1
1
1
1
1

60,000.00
22,906.35
80,539.49
5,000.00
42,734.88
50,946.13

60,000.00
22,906.35
80,539.49
5,000.00
42,734.88
50,946.13
262,126.84

18,000.00
6,871.90
24,161.85
1,500.00
12,820.46
15,283.84
78,638.05

78,000.00
29,778.25
104,701.33
6,500.00
55,555.34
66,229.97
340,764.89

1100
1101
1102
1103

INSTALACION POTABLE
TUBERIA 12mm x 6mts.
ACCESORIOS
SUB-TOTAL

unid.
glob.

4
1

1,346.49
7,984.24

5,385.97
7,984.24
13,370.21

1,615.79
2,395.27
4,011.06

7,001.77
10,379.51
17,381.27

UNIDAD CANT.

PREC.
UNITARIO

ACTIVIDADES / MATERIALES

1200 INSTALACION SANITARIA

PRECIO

MANO DE
OBRA

SUB-TOTAL

unid.
unid.
unid.
unid.
unid.
unid.
glob.
glob.

1
1
2
1
1
1
1
1

36,730.61
19,696.89
4,321.01
5,834.30
3,698.73
50,165.64
14,026.52
3,502.52

36,730.61
19,696.89
8,642.01
5,834.30
3,698.73
50,165.64
14,026.52
3,502.52
142,297.21

11,019.18
5,909.07
2,592.60
1,750.29
1,109.62
15,049.69
4,207.96
1,050.75
42,689.16

47,749.79
25,605.95
11,234.61
7,584.59
4,808.35
65,215.33
18,234.47
4,553.27
184,986.37

TANQUE SEPTICO Y DRENAJES


BLOQUES
VARILLAS #2
VARILLAS #3
ARENA
PIEDRA
CEMENTO
ALAMBRE
REPELLO QUEMADO
TUBO DRENAJE 4''
PIEDRA BRUTA
PIEDRA CUARTA
ARENA
SUB-TOTAL

unid.
unid.
unid.
m3
m3
saco
kg
m2
m
m3
m3
m3

91.63
6.30
3.15
0.28
0.57
6
0.92
7.56
4.00
16.00
0.36
0.36

508.96
950.44
2,740.10
15,672.29
16,371.50
5,356.50
887.40
3,028.45
4,769.15
15,934.00
16,371.50
15,672.29

46,634.40 13,990.32
5,987.74
1,796.32
8,631.31
2,589.39
4,452.10
1,335.63
9,301.45
2,790.44
32,072.15
9,621.64
817.63
245.29
22,895.09
6,868.53
19,076.60
5,722.98
254,944.00 76,483.20
5,893.74
1,768.12
5,642.02
1,692.61
416,348.23 124,904.47

60,624.72
7,784.06
11,220.70
5,787.73
12,091.89
41,693.79
1,062.92
29,763.62
24,799.58
331,427.20
7,661.86
7,334.63
541,252.70

INSTALACION PLUVIAL
CANOAS EN HG # 26
CUMBRERAS EN HG # 26
BOTAGUAS EN HG # 26
BAJANTES EN PVC DE 75mm
TUBO PVC DE 75mm
TUBO PVC DE 100mm
CAJAS DE REGISTRO
SUB-TOTAL

m
unid.
unid.
unid.
unid.
unid.
unid.

14.40 6,200.00
5 4,659.72
5 4,659.72
2 8,056.28
1 11,964.54
2 18,433.15
4 3,698.73

89,280.00
20,968.74
23,024.50
16,112.56
11,964.54
36,866.30
14,794.94
213,011.58

26,784.00
6,290.62
6,907.35
4,833.77
3,589.36
11,059.89
4,438.48
63,903.47

116,064.00
27,259.36
29,931.85
20,946.33
15,553.90
47,926.19
19,233.42
276,915.05

0.00

0.00
0.00

0.00
0.00

180,000.00
180,000.00

11 3,871.62
2 74,778.76
3 24,247.78
2 10,909.80
3 4,276.80

42,587.82
149,557.51
72,743.34
21,819.60
12,830.40
299,538.67

12,776.35
44,867.25
21,823.00
6,545.88
3,849.12
89,861.60

55,364.17
194,424.77
94,566.34
28,365.48
16,679.52
389,400.28

1201
1202
1203
1204
1205
1206
1207
1208
1209

INODORO (CON ACCESORIOS)


LAVAMANOS (CON ACCESORIOS)
TUBO PVC DE 50mm
TUBO PVC DE 75mm
CAJA DE REGISTRO
TRAMPA DE GRASAS
ACCESORIOS (AGUAS NEGRAS)
ACCESORIOS (AGUAS SERVIDAS)
SUB-TOTAL

1500
1501
1502
1503
1504
1505
1506
1507
1508
1509
1510
1511
1512
1513
1400
1401
1402
1403
1404
1405
1406
1407
1408

1500 VENTANERIA
1501 VENTANAS INSTALADAS
1502 SUB-TOTAL
1600
1601
1602
1603
1604
1605
1606

CERRAJERIA Y PUERTAS
MARCOS DE MADERA
PUERTAS EXTERNAS
PUERTAS INTERNAS
LLAVINES EXTERNOS
LLAVINES INTERNOS
SUB-TOTAL

ACTIVIDADES / MATERIALES

1700 ALEROS
1701 EMPLANTILLADO
1702 LAMINA DE FIBROCEMENTO 5mm

glob.

unid. 3var.
unid
unid
unid
unid

UNIDAD CANT.

unid. 3var.
unid.

22
27

PREC.
UNITARIO

1,438.50
1,535.87

PRECIO

MANO DE
OBRA

31,647.00
41,468.38

9,494.10
12,440.51

SUB-TOTAL

41,141.10
53,908.89

1703 PRECINTA (FIBROCEM. 8mm)


1704 SUB-TOTAL
1800
1801
1802
1803
1804
1805

MUEBLES
MUEBLE DE COCINA
FREGADERO
CACHERA
PILA DE LAVAR
SUB-TOTAL

1900
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
1913

ACABADOS
PISOS EN CONCRETO LUJADO
PISOS EN CERAMICA NACIONAL
PEGA DE CERAMICA (BONDEX)
FRAGUA
LAMINA DE FIBROCEMENTO 5mm
EMPLANTILLADO
ENCHAPES
PEGA DE CERAMICA (BONDEX)
FRAGUA
PINTURA DE PAREDES
PINTURA DE CIELOS
PINTURA DE TECHOS
SUB-TOTAL

unid.

3,113.97

18,683.80
91,799.18

5,605.14
27,539.75

24,288.95
119,338.93

glob.
unid.
unid.
unid.

1
1
1
1

30,000.00
26,685.12
10,515.96
13,552.00

30,000.00
26,685.12
10,515.96
13,552.00
80,753.08

9,000.00
8,005.54
3,154.79
4,065.60
24,225.92

39,000.00
34,690.66
13,670.75
17,617.60
104,979.00

39.65
39.65
11
2
54
60
7.50
2.00
1.00
3.50
2.98
3.10

800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

31,720.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,720.00

9,516.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,516.00

41,236.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41,236.00

m2
m2
unid.
unid.
unid.
unid. 3var.
m2
unid.
unid.
galn
galn
galn

COSTO DIRECTO 4,800,976.56


SUB-CONTRATO

180,000.00

MANO DE OBRA 30% 1,440,292.97


SUB- TOTAL 6,421,269.53
IMPREVISTOS DE OBRA 3%
TOTAL

192,638.09
6,613,907.61

PRESUPUESTO DETALLADO CASA DE HABITACION 42M2


#

ACTIVIDADES / MATERIALES

UNIDAD CANT.

PREC.
UNITARIO

PRECIO

MANO DE
OBRA

SUB-TOTAL

100
101
102
103
104

OBRAS PRELIMINARES
LIMPIEZA DE TERRENO
INSTALACIONES PROVISIONALES
BODEGA
SUB-TOTAL

200
201
202
203
204

MOVIMIENTOS DE TIERRAS
CORTE
RELLENO
EXCAVACION PARA CIMIENTOS
SUB-TOTAL

300
301
302
303

PREFABRICADO (subcontrato)
CASA PREFABRICADA
INSTALACION
SUB-TOTAL

glob.
glob.

400
401
402
403
404
405

CONTRAPISO (210 kg/cm2)


MALLA ELECTROSOLDADA # 2
ARENA
PIEDRA
CEMENTO
SUBTOTAL

unid.
m3
m3
saco

3 31,009.93
1.86 15,672.29
3.18 16,371.50
37 5,356.50

81,959.25 24,587.78
29,183.77
8,755.13
52,118.56 15,635.57
198,555.12 59,566.54
361,816.70 108,545.01

106,547.03
37,938.89
67,754.13
258,121.66
470,361.71

500
501
502
503
504
505
506
507
508
509
510
511

TECHOS
TUBO HN DE 3x3 PULG.
CLAVADOR DE RT 0-16
MINIO BLANCO
PINTURA ANTIC. ROJA
MECHA
THINNER
SOLDADURA
LAMINAS HG OND. 1.06x2.44cm #26
LAMINAS HG OND. 1.06x1.83cm #26
TORNILLOS
SUB-TOTAL

unid.
unid.
galn
galn
kg
galn
kg
unid.
unid.
unid.

4
15
2.38
2.38
1.06
1.27
2.71
16
16
192

28,143.84
11,350.05
14,753.25
21,146.56
1,777.49
10,865.45
2,604.00
12,761.82
9,571.92
42.11

112,575.36 33,772.61
170,250.82 51,075.25
35,038.97 10,511.69
50,223.08 15,066.92
1,876.24
562.87
13,762.90
4,128.87
7,068.00
2,120.40
204,189.08 61,256.73
153,150.73 45,945.22
8,085.50
2,425.65
756,220.67 226,866.20

146,347.96
221,326.07
45,550.66
65,290.00
2,439.11
17,891.77
9,188.40
265,445.81
199,095.94
10,511.15
983,086.87

600
601
602
603
604
605
606
607

INSTALACION ELECTRICA
OBRAS DE ACOMETIDA
TUBERIA CONDUIT
CABLEADO
PREVISTA TELEFONICA
CENTRO DE CARGA
ACCESORIOS
SUB-TOTAL

glob.
glob.
glob.
glob.
glob.
glob.

1
1
1
1
1
1

60,000.00
22,906.35
80,539.49
5,000.00
42,734.88
50,946.13

60,000.00
22,906.35
80,539.49
5,000.00
42,734.88
50,946.13
262,126.84

18,000.00
6,871.90
24,161.85
1,500.00
12,820.46
15,283.84
78,638.05

78,000.00
29,778.25
104,701.33
6,500.00
55,555.34
66,229.97
340,764.89

700
701
702
703

INSTALACION POTABLE
TUBERIA 12mm x 6mts.
ACCESORIOS
SUB-TOTAL

unid.
glob.

4
1

1,346.49
7,984.24

5,385.97
7,984.24
13,370.21

1,615.79
2,395.27
4,011.06

7,001.77
10,379.51
17,381.27

UNIDAD CANT.

PREC.
UNITARIO

ACTIVIDADES / MATERIALES

glod.
glod.
m2

m
m3
m3

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

1
1

xxx
xxx

xxx
xxx

PRECIO

xxx
xxx

MANO DE
OBRA

950,000.00
546,000.00
1,496,000.00

SUB-TOTAL

ACTIVIDADES / MATERIALES

UNIDAD CANT.

PREC.
UNITARIO

PRECIO

MANO DE
OBRA

SUB-TOTAL

800
801
802
803
804
805
806
807
808
809

INSTALACION SANITARIA
INODORO (CON ACCESORIOS)
LAVAMANOS (CON ACCESORIOS)
TUBO PVC DE 50mm
TUBO PVC DE 75mm
CAJA DE REGISTRO
TRAMPA DE GRASAS
ACCESORIOS (AGUAS NEGRAS)
ACCESORIOS (AGUAS SERVIDAS)
SUB-TOTAL

unid.
unid.
unid.
unid.
unid.
unid.
glob.
glob.

1
1
2
1
1
1
1
1

36,730.61
19,696.89
4,321.01
5,834.30
3,698.73
50,165.64
14,026.52
3,502.52

36,730.61
19,696.89
8,642.01
5,834.30
3,698.73
50,165.64
14,026.52
3,502.52
142,297.21

11,019.18
5,909.07
2,592.60
1,750.29
1,109.62
15,049.69
4,207.96
1,050.75
42,689.16

47,749.79
25,605.95
11,234.61
7,584.59
4,808.35
65,215.33
18,234.47
4,553.27
184,986.37

900
901
902
903
904
905
906
907
908
909
910
911
912
913

TANQUE SEPTICO Y DRENAJES


BLOQUES
VARILLAS #2
VARILLAS #3
ARENA
PIEDRA
CEMENTO
ALAMBRE
REPELLO QUEMADO
TUBO DRENAJE 4''
PIEDRA BRUTA
PIEDRA CUARTA
ARENA
SUB-TOTAL

unid.
unid.
unid.
m3
m3
saco
kg
m2
m
3
m
m3
m3

91.63
6.30
3.15
0.28
0.57
6
0.92
7.56
4.00
16.00
0.36
0.36

508.96
950.44
2,740.10
15,672.29
16,371.50
5,356.50
887.40
3,028.45
4,769.15
15,934.00
16,371.50
15,672.29

46,634.40 13,990.32
5,987.74
1,796.32
8,631.31
2,589.39
4,452.10
1,335.63
9,301.45
2,790.44
32,072.15
9,621.64
817.63
245.29
22,895.09
6,868.53
19,076.60
5,722.98
254,944.00 76,483.20
5,893.74
1,768.12
5,642.02
1,692.61
416,348.23 124,904.47

60,624.72
7,784.06
11,220.70
5,787.73
12,091.89
41,693.79
1,062.92
29,763.62
24,799.58
331,427.20
7,661.86
7,334.63
541,252.70

INSTALACION PLUVIAL
CANOAS EN HG # 26
CUMBRERAS EN HG # 26
BOTAGUAS EN HG # 26
BAJANTES EN PVC DE 75mm
TUBO PVC DE 75mm
TUBO PVC DE 100mm
CAJAS DE REGISTRO
SUB-TOTAL

m
unid.
unid.
unid.
unid.
unid.
unid.

14.40 6,200.00
5 4,659.72
5 4,659.72
2 8,056.28
1 11,964.54
2 18,433.15
4 3,698.73

89,280.00
20,968.74
23,024.50
16,112.56
11,964.54
36,866.30
14,794.94
213,011.58

26,784.00
6,290.62
6,907.35
4,833.77
3,589.36
11,059.89
4,438.48
63,903.47

116,064.00
27,259.36
29,931.85
20,946.33
15,553.90
47,926.19
19,233.42
276,915.05

xxx

180,000.00
180,000.00

12,776.35
44,867.25
21,823.00
6,545.88
3,849.12
89,861.60

55,364.17
194,424.77
94,566.34
28,365.48
16,679.52
389,400.28

1000
1001
1002
1003
1004
1005
1006
1007
1008

1100 VENTANERIA (subcontrato)


1101 VENTANAS INSTALADAS
1102 SUB-TOTAL
1200
1201
1202
1203
1204
1205
1206

CERRAJERIA Y PUERTAS
MARCOS DE MADERA
PUERTAS EXTERNAS
PUERTAS INTERNAS
LLAVINES EXTERNOS
LLAVINES INTERNOS
SUB-TOTAL

ACTIVIDADES / MATERIALES

glob.

unid. 3var.
unid
unid
unid
unid

xxx

11 3,871.62
2 74,778.76
3 24,247.78
2 10,909.80
3 4,276.80

UNIDAD CANT.

PREC.
UNITARIO

xxx

42,587.82
149,557.51
72,743.34
21,819.60
12,830.40
299,538.67

PRECIO

MANO DE
OBRA

SUB-TOTAL

1300
1301
1302
1303
1304

ALEROS
EMPLANTILLADO
LAMINA DE FIBROCEMENTO 5mm
PRECINTA (FIBROCEM. 8mm)
SUB-TOTAL

1400
1401
1402
1403
1404
1405

MUEBLES
MUEBLE DE COCINA
FREGADERO
CACHERA
PILA DE LAVAR
SUB-TOTAL

1500
1501
1502
1503
1504
1505
1506
1507
1508
1509
1510
1511
1512
1513

ACABADOS
PISOS EN CONCRETO LUJADO
PISOS EN CERAMICA NACIONAL
PEGA DE CERAMICA (BONDEX)
FRAGUA
LAMINA DE FIBROCEMENTO 5mm
EMPLANTILLADO
ENCHAPES
PEGA DE CERAMICA (BONDEX)
FRAGUA
PINTURA DE PAREDES
PINTURA DE CIELOS
PINTURA DE TECHOS
SUB-TOTAL

unid. 3var.
unid.
unid.

22
27
6

1,438.50
1,535.87
3,113.97

31,647.00
41,468.38
18,683.80
91,799.18

9,494.10
12,440.51
5,605.14
27,539.75

41,141.10
53,908.89
24,288.95
119,338.93

glob.
unid.
unid.
unid.

1
1
1
1

30,000.00
26,685.12
10,515.96
13,552.00

30,000.00
26,685.12
10,515.96
13,552.00
80,753.08

9,000.00
8,005.54
3,154.79
4,065.60
24,225.92

39,000.00
34,690.66
13,670.75
17,617.60
104,979.00

39.65
39.65
11
2
54
60
7.50
2.00
1.00
3.50
2.98
3.10

800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

31,720.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,720.00

9,516.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,516.00

41,236.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41,236.00

m2
m2
unid.
unid.
unid.
unid. 3var.
m2
unid.
unid.
galn
galn
galn

COSTO DIRECTO 2,669,002.37


SUB-CONTRATO 1,676,000.00
MANO DE OBRA 30%

800,700.71

SUB- TOTAL 5,145,703.08


IMPREVISTOS DE OBRA 3%
TOTAL

154,371.09
5,300,074.17