: MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD
DEL VALLE LLACUS - ATAURA
Entidad
: MUNICIPALIDAD PROVINCIAL DE JAUJA
Contratista : CONSORCIO A&E MINEROS CIVILES
Monto Cont. S/. 8,420,486.77
(Sin IGV)
S/. 9,936,174.39
(Con IGV)
ITEM
DESCRIPCION
ACUMULADO
ANTERIOR
VALORIZACION
MES
ACUMULADO
ACTUAL
ACTUAL
SALDO POR
VALORIZAR
Montos Valorizados
2,660,647.78
768,264.86
3,428,912.64
4,991,574.12
1.1
1.2
1.3
759,470.11
1,730,647.36
170,530.31
341,629.43
414,442.88
12,192.55
1,101,099.54
2,145,090.24
182,722.86
1,835,782.80
2,150,312.61
1,005,478.71
31.60%
33.14%
9.12%
10.46%
40.72%
43.59%
59.28%
24,164.19
15,355.39
39,519.58
2.1
2.2
2.3
12,637.17
8,141.94
3,385.08
9,223.99
5,802.20
329.20
21,861.16
13,944.14
3,714.28
2,684,811.97
783,620.25
3,468,432.22
532,129.55
486,060.20
153,652.97
153,652.97
685,782.52
639,713.17
998,314.83
1,044,384.18
Total amortizaciones
1,018,189.75
307,305.94
1,325,495.69
2,042,699.02
1,666,622.22
476,314.31
2,142,936.53
IGV 18%x(VN)
299,991.99
85,736.58
385,728.57
Total Valorizacin
1,966,614.21
562,050.89
2,528,665.10
25,550.00
0.00
25,550.00
1,941,064.21
562,050.89
2,503,115.10
Amortizaciones
3.1
3.2
S/.
DESCRIPCIN
PARCIALES (S/.)
341,629.43
414,442.88
12,192.55
768,264.86
:
:
:
:
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 01 - SISTEMA DE AGUA POTABLE
Descripcin
Und
OBRAS PROVISIONALES
GUARDIANIA
mes
ALMACEN DE OBRA OFICINA (ALQUILER)
mes
TRANSPORTE DE MATERIALES, EQUIPOS, MAQUINARIAS Y HERAM. A OBRA
gbl
CINTA PLASTICA SEALIZADORA P/PROTECCION DE ZANJA
km
CARTEL DE IDENTIFICACION DE LA OBRA DE 4.0x3.60 M
Und.
TRANQUERA DE MADERA 1.20x1.10M P/DESVIO TRANSITO VEHICULAR
Und.
PUENTE DE MADERA P/PASE PEATONAL
Und.
TOMA DE CAPTACION Y CERCO PERIMETRICO DEL MANANTINAL CHALHUAPUQUIO
OBRAS PROVISIONALES
TRAZO Y REPLANTEO
m2
LIMPIEZA DEL TERRENO
m2
MOVIMIENTO DE TIERRAS
m3
EXCAVACION EN TERRENO CALIZA
m3
NIVELACION Y APISONADO MANUAL
m2
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
m3
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO 1:10 E=3"
m2
LOSA DE CONCRETO F'C=100 KG/CM2
m3
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2
m3
ACERO DE REFUERZO F'Y=4,200 KG/CM2
kg
ENCOFRADO Y DESENCOFRADO m2
m2
REVOQUES ENLUCIDOS Y MOLDADURAS
TARRAJEO INTERIORES CON IMPERMEABILIZANTE M 1:5, e=1.5
m2
TARRAJEO EXTERIOR C/MORTERO 1:5, E=1.5 cm
m2
PENDIENTE DE FONDO (MORTERO 1:5) L.EST.
m2
ACCESORIOS Y VALVULAS
CANASTILLA DE BRONCE 2x4"
Und.
CANASTILLA DE BRONCE 10x12"
Und.
UNION SIMPLE DE FG DE 2" DE C/R. HEMBRA Y R/MACHO
Und.
UNION SIMPLE DE FG C/ROSCA HEMBRA Y BRIDA DE 10"
Und.
VALVULA COMPUERTA DE BRONCE 2" DE 105 PSI
Und.
VALVULA DE COMPUERTA FF BB 10" DE 105 PSI
Und.
TRANSICION DE PVC DE 2" DE R/MACHO Y CAMPANA
Und.
TRANSICION DE PVC DE 10" (250MM) BB Y CAMPANA (250)
Und.
MARCO Y TAPA FF DE 125 KGM DE 0.60 M
Und.
SUMINISTRO Y COLOCACION DE GRAVA
SUMINISTRO Y COLOCACION DE GRAVA 1"
m3
SUMINISTRO Y COLOCACION DE GRAVA 1/2 A 3/4"
m3
SUMINISTRO Y COLOCACION DE GRAVA 1/4 A 1/2"
m3
SUMINISTRO Y COLOCACION DE GRAVA 1/8 A 1/4"
m3
SUMINISTRO Y COLOCACION DE ARENA GRUESA
m3
VARIOS
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
Und.
PRUEBA DE COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO)
Und.
CERCO PERIMETRICO DEL MANANTIAL CHALHUAPUQUIO
TUBERIA DE FG 2"
m
ALAMBRE DE PUAS N 10
m
PUERTA METALICA
Und.
LINEA DE CONDUCCION (MOLINOS, HUERTAS, HUALA Y S:P CHUNAN)
OBRAS PROVISIONALES
TRAZO Y REPLANTEO
m
MOVIMIENTO DE TIERRAS
EXCAVACION TERRENO SEMIROCOSO H=1.00x0.60M
m
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 1.3*0.60
m
EXCAVACION EN TERRENO CALIZA
m
REFINE Y NIVELACION DE FONDOS
m
PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO H=0.10M
m
CUBRIMIENTO DE TUBERIA C/MATERIAL DE PRESTAMO H=0.50 M
m
CUBRIMIENTO DE TUBERIA CON MATERIAL ZARANDEADO DEL LUGAR=0.50 M
m
RELLENO Y COMP. ZANJA CAPAS 0.30 M H=0.70 C/MAT. DE CULTIVO
m
RELLENO Y COMPAC.ZANJA CAPA 0.30 M H=1.00 C/MAT.ZARANDEADO,LUGAR
m
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
m3
SUMINISTRO E INST.DE TUBERIA PVC-UF
SUMINISTRO E INST. TUB PVC UF 160 C-7.5 INC ANILLO Y LUB.
m
SUMINISTRO E INST. TUB PVC UF 200 C-7.5 INC ANILLO Y LUB.
m
SUMINISTRO E INST. TUB PVC UF 250 C-7.5 INC ANILLO Y LUB.
m
Metrado
P.U.
Parcial
12.00
12.00
1.00
30.00
2.00
6.00
10.00
1,000.00
800.00
31,712.35
322.64
1,394.86
196.90
137.14
12,000.00
9,600.00
31,712.35
9,679.20
2,789.72
1,181.40
1,371.40
33.33%
33.33%
80.00%
33.33%
#######
#######
50.00%
4.00
4.00
0.80
10.00
2.00
6.00
5.00
4,000.00
3,200.00
25,369.89
3,226.40
2,789.72
1,181.40
685.70
169.00
169.00
1.31
1.25
221.39
211.25
#######
169.00
221.40
115.56
37.54
150.23
65.90
2.20
7.02
47.56
6.50
Avance Actual
Metrado
Costo
8.33%
8.33%
10.00%
16.67%
1.00
1.00
0.10
5.00
1,000.00
800.00
3,171.24
1,613.20
20.00%
2.00
274.28
Avance Acumulado
Metrado
Costo
41.67%
41.67%
90.00%
50.00%
100.00%
100.00%
70.00%
5.00
5.00
0.90
15.00
2.00
6.00
7.00
5,000.00
4,000.00
28,541.13
4,839.60
2,789.72
1,181.40
959.98
100.00%
169.00
221.40
58.33%
58.33%
10.00%
50.00%
7.00
7.00
0.10
15.00
7,000.00
5,600.00
3,171.22
4,839.60
30.00%
3.00
411.42
100.00%
169.00
-0.01
211.25
7,615.40
82.59
1,054.61
100.00%
100.00%
100.00%
115.56
37.54
150.23
7,615.40
82.59
1,054.61
17.39
171.03
827.07
1,111.70
100.00%
100.00%
47.56
6.50
827.07
1,111.70
31.78
1,320.14
187.50
281.64
5.24
23.56
8,950.52
6,917.53
4,417.50
100.00%
100.00%
100.00%
31.78
1,320.14
187.50
8,950.52
6,917.53
4,417.50
54.00
60.00
5.00
21.20
15.54
20.83
1,144.80
932.40
104.15
100.00%
100.00%
100.00%
54.00
60.00
5.00
1,144.80
932.40
104.15
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
352.33
1,500.00
169.77
319.77
133.68
2,013.93
68.93
513.93
333.93
352.33
1,500.00
169.77
319.77
133.68
2,013.93
68.93
513.93
667.86
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
352.33
1,500.00
169.77
319.77
133.68
2,013.93
68.93
513.93
667.86
21.50
17.20
12.90
12.90
12.90
74.70
70.29
74.63
77.29
55.50
1,606.05
1,208.99
962.73
997.04
715.95
100.00%
100.00%
100.00%
100.00%
100.00%
21.50
17.20
12.90
12.90
12.90
1,606.05
1,208.99
962.73
997.04
715.95
2.00
2.00
21.28
50.00
42.56
100.00
100.00%
100.00%
2.00
2.00
42.56
100.00
75.00
600.00
1.00
20.63
0.54
292.27
1,547.25
324.00
292.27
100.00%
100.00%
100.00%
75.00
600.00
1.00
1,547.25
324.00
292.27
7,551.00
0.99
7,475.49
44.50%
3,360.00
3,326.40
28.10%
2,122.00
2,100.78
72.60%
5,482.00
5,427.18
27.40%
2,069.00
2,048.31
5,000.00
2,251.10
300.00
7,551.10
7,551.10
5,300.00
2,251.10
5,300.00
2,251.10
2,778.00
72.43
8.91
65.90
2.00
3.24
9.92
3.62
11.10
5.54
7.02
362,150.00
20,057.30
19,770.00
15,102.20
24,465.56
52,576.00
8,148.98
58,830.00
12,471.09
19,501.56
47.60%
40.87%
20.00%
44.50%
19.33%
12.26%
33.32%
6.60%
13.33%
2,380.00
920.00
60.00
3,360.00
1,460.00
650.00
750.00
350.00
300.00
172,383.40
8,197.20
3,954.00
6,720.00
4,730.40
6,448.00
2,715.00
3,885.00
1,662.00
36.00%
4.44%
1,800.00
100.00
130,374.00
891.00
28.10%
53.26%
76.45%
12.00%
58.49%
31.98%
27.00%
2,122.00
4,022.00
4,052.00
270.10
3,100.00
720.00
750.00
4,244.00
13,031.28
40,195.84
977.76
34,410.00
3,988.80
5,265.00
83.60%
45.31%
20.00%
72.60%
72.60%
84.19%
45.32%
65.09%
45.31%
27.00%
4,180.00
1,020.00
60.00
5,482.00
5,482.00
4,462.00
1,020.10
3,450.00
1,020.00
750.00
302,757.40
9,088.20
3,954.00
10,964.00
17,761.68
46,643.84
3,692.76
38,295.00
5,650.80
5,265.00
16.40%
54.69%
80.00%
27.40%
27.40%
15.81%
54.68%
34.91%
54.69%
73.00%
820.00
1,231.10
240.00
2,069.10
2,069.10
838.00
1,231.00
1,850.00
1,231.10
2,028.00
59,392.60
10,969.10
15,816.00
4,138.20
6,703.88
5,932.16
4,456.22
20,535.00
6,820.29
14,236.56
5,151.10
1,500.00
900.00
20.35
29.36
45.19
104,824.89
44,040.00
40,671.00
51.60%
26.80%
11.11%
2,658.00
402.00
100.00
54,090.30
11,802.72
4,519.00
12.08%
40.00%
44.44%
622.00
600.00
400.00
12,657.70
17,616.00
18,076.00
63.68%
66.80%
55.56%
3,280.00
1,002.00
500.00
66,748.00
29,418.72
22,595.00
36.32%
33.20%
44.44%
1,871.10
498.00
400.00
38,076.89
14,621.28
18,076.00
Pgina 3 de 49
:
:
:
:
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 01 - SISTEMA DE AGUA POTABLE
Descripcin
Und
Metrado
P.U.
Parcial
7,551.00
1.20
9,061.20
22.00
1.00
47.00
17.00
3.00
10.00
10.00
8.00
8.00
162.87
166.41
132.87
96.37
93.37
108.87
108.87
212.87
162.87
3,583.14
166.41
6,244.89
1,638.29
280.11
1,088.70
1,088.70
1,702.96
1,302.96
28.34
28.34
1.31
0.95
51.00
66.30
17.31
7.02
%
19.86%
Avance Actual
Metrado
1,500.00
45.45%
10.00
1,628.70
31.82%
7.00
1,140.09
77.27%
17.00
2,768.79
8.51%
11.76%
4.00
2.00
531.48
192.74
42.55%
41.18%
20.00
7.00
2,657.40
674.59
51.06%
52.94%
24.00
9.00
3,188.88
867.33
37.50%
50.00%
3.00
4.00
638.61
651.48
40.00%
40.00%
25.00%
25.00%
4.00
4.00
2.00
2.00
435.48
435.48
425.74
325.74
40.00%
40.00%
62.50%
75.00%
4.00
4.00
5.00
6.00
435.48
435.48
1,064.35
977.22
Costo
1,800.00
Avance Acumulado
%
Metrado
Costo
61.71%
4,660.00
5,592.00
%
38.29%
22.73%
100.00%
48.94%
47.06%
100.00%
60.00%
60.00%
37.50%
25.00%
5.00
1.00
23.00
8.00
3.00
6.00
6.00
3.00
2.00
814.35
166.41
3,056.01
770.96
280.11
653.22
653.22
638.61
325.74
37.13
26.92
100.00%
100.00%
28.34
28.34
37.13
26.92
882.81
465.43
100.00%
100.00%
51.00
66.30
882.81
465.43
28.30
17.39
492.14
100.00%
28.30
492.14
23.27
300.00
28.30
119.32
302.59
5.24
23.72
26.62
7,041.27
1,572.00
671.28
3,176.30
100.00%
100.00%
100.00%
100.00%
23.27
300.00
28.30
119.32
7,041.27
1,572.00
671.28
3,176.30
8.86
120.70
13.33
15.54
118.10
1,875.68
100.00%
100.00%
8.86
120.70
118.10
1,875.68
0.20
0.20
0.30
17.31
281.64
58.12
3.46
56.33
17.44
100.00%
100.00%
100.00%
0.20
0.20
0.30
3.46
56.33
17.44
10.00
10.00
10.00
10.00
10.00
841.81
413.93
713.93
333.93
410.66
8,418.10
4,139.30
7,139.30
3,339.30
4,106.60
100.00%
100.00%
100.00%
100.00%
100.00%
10.00
10.00
10.00
10.00
10.00
8,418.10
4,139.30
7,139.30
3,339.30
4,106.60
6.00
6.00
21.12
50.00
126.72
300.00
100.00%
100.00%
6.00
6.00
126.72
300.00
28.00
28.00
1.31
0.95
36.68
26.60
100.00%
100.00%
28.00
28.00
36.68
26.60
27.30
35.49
17.31
7.02
472.56
249.14
100.00%
100.00%
27.30
35.49
472.56
249.14
7.00
17.39
121.73
100.00%
7.00
121.73
0.91
1.60
9.80
565.00
63.00
317.91
309.71
327.47
5.24
23.56
289.30
495.54
3,209.21
2,960.60
1,484.28
100.00%
100.00%
100.00%
100.00%
100.00%
0.91
1.60
9.80
565.00
63.00
289.30
495.54
3,209.21
2,960.60
1,484.28
28.00
7.00
13.33
15.54
373.24
108.78
100.00%
100.00%
28.00
7.00
373.24
108.78
7.00
7.00
49.00
7.00
7.00
111.80
62.87
226.38
280.79
79.71
782.60
440.09
11,092.62
1,965.53
557.97
100.00%
100.00%
100.00%
100.00%
100.00%
7.00
7.00
49.00
7.00
7.00
782.60
440.09
11,092.62
1,965.53
557.97
4.00
4.00
21.12
50.00
84.48
200.00
100.00%
100.00%
4.00
4.00
84.48
200.00
Pgina 4 de 49
:
:
:
:
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 01 - SISTEMA DE AGUA POTABLE
Descripcin
Und
Metrado
P.U.
Parcial
Avance Actual
Metrado
Costo
Avance Acumulado
Metrado
Costo
163.40
163.40
1.31
0.95
214.05
155.23
100.00%
100.00%
163.40
163.40
214.05
155.23
171.57
110.00
223.00
17.31
2.20
7.02
2,969.88
242.00
1,565.46
100.00%
100.00%
100.00%
171.57
110.00
223.00
2,969.88
242.00
1,565.46
28.98
17.39
503.96
100.00%
28.98
503.96
4.34
4.34
10.22
2,095.43
148.68
281.64
296.96
306.52
5.24
23.56
1,222.32
1,288.81
3,132.63
10,980.05
3,502.90
100.00%
100.00%
100.00%
100.00%
100.00%
4.34
4.34
10.22
2,095.43
148.68
1,222.32
1,288.81
3,132.63
10,980.05
3,502.90
79.80
86.10
10.50
21.20
15.54
20.83
1,691.76
1,337.99
218.72
100.00%
100.00%
100.00%
79.80
86.10
10.50
1,691.76
1,337.99
218.72
7.00
14.00
7.00
7.00
7.00
7.00
7.00
7.00
332.69
318.31
166.41
345.00
313.93
333.93
410.66
100.61
2,328.83
4,456.34
1,164.87
2,415.00
2,197.51
2,337.51
2,874.62
704.27
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
7.00
14.00
7.00
7.00
7.00
7.00
7.00
7.00
2,328.83
4,456.34
1,164.87
2,415.00
2,197.51
2,337.51
2,874.62
704.27
5.00
5.00
21.28
50.00
106.40
250.00
100.00%
100.00%
5.00
5.00
106.40
250.00
152.65
152.65
1.31
0.95
199.97
145.02
#######
#######
152.65
152.65
199.97
145.02
228.97
297.67
64.10
9.04
14,676.98
2,690.94
#######
85.67%
228.97
255.00
14,676.98
2,305.20
6.72%
20.00
180.80
86.54
17.39
1,504.93
#######
86.54
1,504.93
32.00
19.64
19.80
26.90
8,646.57
493.93
327.47
309.71
317.91
309.71
5.24
23.56
10,479.04
6,082.70
6,294.62
8,331.20
45,308.03
11,636.99
#######
#######
32.00
19.64
10,479.04
6,082.70
284.95
284.95
94.98
20.21
21.20
18.82
5,758.84
6,040.94
1,787.52
100.00%
100.00%
100.00%
284.95
284.95
94.98
5,758.84
6,040.94
1,787.52
284.95
50.00
9.19
35.87
2,618.69
1,793.50
100.00%
284.95
2,618.69
1.00
2.00
27,842.54
500.00
27,842.54
1,000.00
100.00%
100.00%
1.00
2.00
27,842.54
1,000.00
7.62%
100.00%
#######
#######
#######
#######
26.90
8,646.57
493.93
50.00
8,331.20
45,308.03
11,636.99
1,793.50
22.67
19.80
204.94
6,294.62
100.00%
100.00%
152.65
152.65
199.97
145.02
100.00%
93.28%
228.97
277.67
14,676.98
2,510.14
100.00%
86.54
1,504.93
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
32.00
19.64
19.80
26.90
8,646.57
493.93
10,479.04
6,082.70
6,294.62
8,331.20
45,308.03
11,636.99
100.00%
50.00
1,793.50
36.00
1.31
47.16
#######
36.00
47.16
100.00%
36.00
47.16
6.30
8.19
64.10
9.04
403.83
74.04
#######
#######
6.30
8.19
403.83
74.04
100.00%
100.00%
6.30
8.19
403.83
74.04
6.30
0.80
6.30
148.48
210.48
23.56
935.42
168.38
148.43
#######
#######
#######
6.30
0.80
6.30
935.42
168.38
148.43
100.00%
100.00%
100.00%
6.30
0.80
6.30
935.42
168.38
148.43
Pgina 5 de 49
:
:
:
:
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 01 - SISTEMA DE AGUA POTABLE
Descripcin
Und
CONCRETO ARMADO
CONCRETO EN COLUMNAS FC=175 KG/CM2
m3
CONCRETO EN VIGAS FC=175 KG/CM2
m3
CONCRETO EN LOSA DE TECHO FC=175 KG/CM2
m3
ACERO DE REFUERZO F'Y=4,200 KG/CM2
kg
ENCOFRADO Y DESENCOFRADO
m2
MUROS Y TABIQUERIA DE ALBAILERIA
LADRILLO HUECO DE ARCILLA 15x30x30 cm PARA TECHO ALIGERADO
Und.
MUROS DE LADRILLO K.K. DE ARCILLA - CABEZA
m2
REVOQUES ENLUCIDOS Y MOLDADURAS
TARRAJEO EXTERIOR C/MORTERO 1:5, E=1.5 cm
m2
CIELO RASOS
CIELORRASOS CON MEZCLA DE CEMENTO - ARENA
m2
PISOS Y PAVIMENTOS
PISO DE CONCRETO DE 4" F'=140 KG/CM2
m2
VEREDA DE 4"-CONCRETO F'C=140 KG/CM2
m2
PINTURAS
PINTURA EN MUROS EXTERIORES AL LATEX
m2
PINTADO DE PUERTAS Y VENTANAS METALICAS LAC (2 MANOS ANTIC. + 2 ESMALTE)
m2
CARPINTERIA METALICA Y HERRERIA
PUERTA METALICA
m2
VENTANA METALICA
m2
MARCO Y TAPA FF DE 125 KGM DE 0.60 M
Und.
MEJORAMIENTO DE LA RED DE DISTRIBUCION DE QUERO - EXISTENTE
CONSTRUCCION DE UNA CAMARA ROMPE PRESION (1 UNID.)
Und.
SUMINISTRO E INST. VALVULAS Y ACCESORIOS
Und.
LINEA DE ADUCCION (MOLINOS, HUERTAS, HUALA Y S:P CHUNAN)
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
m
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA C/MAQ T.C H=1.20 TUB. 3" Y 4"
m
EXCAVACION DE ZANJA C/MAQ T.C H=1.20 TUB. 6", 8" Y 10"
m
EXCAVACION EN TERRENO SEMIROCOSO H=1.00 x 0.60
m
REFINE Y NIVELACION DE FONDOS
m
PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO H=0.10
m3
PREPARACION DE CAMA DE APOYO C/MAT. ZARANDEADO D/ LUGAR E=10CM
m
CUBRIMIENTO DE TUBERIA C/MATERIAL DE PRESTAMO H=0.50 M
m
CUBRIMIENTO DE TUBERIA CON MATERIAL ZARANDEADO DEL LUGAR=0.30 M
m
RELLENO Y COMPAC.ZANJA CAPA 0.30 M H=0.70 C/MATERIAL ZARANDEADO,LUGARm3
RELLENO Y COMP. ZANJA CAPAS 0.30 M H=0.70 C/MAT. DE CULTIVO
m
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
m3
SUMINISTRO E INST.DE TUBERIA PVC-UF
SUMINISTRO E INST. TUB PVC UF 110 C-7.5 INC ANILLO Y LUB.
m
SUMINISTRO E INST. TUB PVC UF 160 C-7.5 INC ANILLO Y LUB.
m
SUMINISTRO E INST. TUB PVC UF 160 C-10 INC ANILLO Y LUB.
m
SUMINISTRO E INST. TUB PVC UF 160 C-15 INC ANILLO Y LUB.
m
SUMINISTRO E INST. TUB PVC UF 200 C-7.5 INC ANILLO Y LUB.
m
SUMINISTRO E INST. TUB PVC UF 250 C-7.5 INC ANILLO Y LUB.
m
PRUEBA HIDRAULICA TUBERIA DE AGUA
Und.
SUMINISTRO E INST. DE VALVULAS Y ACCESORIOS
CODO PVC UF 110 mm x 90
Und.
CODO PVC UF 110 mm x 45
Und.
CODO PVC UF 110 mm x 22.5
Und.
CODO PVC UF 160 mm x 90
Und.
CODO PVC UF 160 mm x 45
Und.
CODO PVC UF 160 mm x 22.5
Und.
CODO PVC UF 200 mm x 45
Und.
CODO PVC UF 200 mm x 22.5
Und.
CODO PVC UF 250 mm x 45
Und.
CODO PVC UF 250 mm x 22.5
Und.
REDUCCION PVC UF 250 mm A 200mm
Und.
REDUCCION PVC UF 200 mm A 160mm
Und.
REDUCCION PVC UF 160 mm A 110mm
Und.
VALVULA FLOTADORA DE BRONCE 110 mm CON BOLA
Und.
GALERIA FILTRANTE - ATAURA
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
Metrado
P.U.
Parcial
Avance Actual
Metrado
Costo
Avance Acumulado
Metrado
Costo
0.75
1.32
2.23
18.58
15.00
306.52
306.52
296.96
5.24
23.56
229.89
404.61
662.22
97.36
353.40
#######
#######
#######
#######
#######
0.75
1.32
2.23
18.58
15.00
229.89
404.61
662.22
97.36
353.40
100.00%
100.00%
100.00%
100.00%
100.00%
0.75
1.32
2.23
18.58
15.00
229.89
404.61
662.22
97.36
353.40
128.00
31.50
2.26
79.74
289.28
2,511.81
#######
#######
128.00
31.50
289.28
2,511.81
100.00%
100.00%
128.00
31.50
289.28
2,511.81
33.60
15.54
522.14
100.00%
33.60
522.14
16.00
40.51
648.16
100.00%
16.00
648.16
16.00
36.00
29.21
32.50
467.36
1,170.00
100.00%
100.00%
16.00
36.00
467.36
1,170.00
79.00
9.60
9.25
9.65
730.75
92.64
100.00%
100.00%
79.00
9.60
730.75
92.64
1.00
3.00
2.00
292.27
300.00
333.93
292.27
900.00
667.86
100.00%
100.00%
100.00%
1.00
3.00
2.00
292.27
900.00
667.86
1.00
1.00
7,149.81
872.01
7,149.81
872.01
100.00%
100.00%
1.00
1.00
7,149.81
872.01
15,278.35
0.93
14,208.87
38.46%
5,876.00
5,464.68
38.46%
5,876.00
5,464.68
61.54%
9,402.35
8,744.19
4,601.60
9,819.75
857.00
15,278.35
857.00
14,421.35
857.00
14,426.35
14,421.35
857.00
1,833.40
6.01
8.39
72.43
2.00
3.24
2.00
9.92
3.62
5.54
11.10
7.02
27,655.62
82,387.70
62,072.51
30,556.70
2,776.68
28,842.70
8,501.44
52,223.39
79,894.28
9,512.70
12,870.47
25.51%
47.88%
1,174.00
4,702.00
7,055.74
39,449.78
25.51%
47.88%
1,174.00
4,702.00
7,055.74
39,449.78
38.46%
27.59%
3.24%
5,876.00
236.44
467.12
11,752.00
766.07
934.24
38.46%
27.59%
3.24%
5,876.00
236.44
467.12
11,752.00
766.07
934.24
40.73%
17.63%
5,876.00
2,542.92
21,271.12
14,087.77
40.73%
17.63%
5,876.00
2,542.92
21,271.12
14,087.77
10.91%
200.00
1,404.00
10.91%
200.00
1,404.00
74.49%
52.12%
100.00%
61.54%
72.41%
96.76%
100.00%
59.27%
82.37%
100.00%
89.09%
3,427.60
5,117.75
857.00
9,402.35
620.56
13,954.23
857.00
8,550.35
11,878.43
857.00
1,633.40
20,599.88
42,937.92
62,072.51
18,804.70
2,010.61
27,908.46
8,501.44
30,952.27
65,806.51
9,512.70
11,466.47
5,458.60
2,145.25
2,100.00
1,911.50
3,163.00
500.00
15,278.35
15.93
20.35
33.29
41.29
29.36
45.19
1.20
86,955.50
43,655.84
69,909.00
78,925.84
92,865.68
22,595.00
18,334.02
21.51%
66.99%
1,174.00
1,437.00
18,701.82
29,242.95
21.51%
66.99%
1,174.00
1,437.00
18,701.82
29,242.95
18.31%
84.26%
350.00
2,665.00
14,451.50
78,244.40
18.31%
84.26%
350.00
2,665.00
14,451.50
78,244.40
36.81%
5,624.00
6,748.80
36.81%
5,624.00
6,748.80
78.49%
33.01%
100.00%
81.69%
15.74%
100.00%
63.19%
4,284.60
708.25
2,100.00
1,561.50
498.00
500.00
9,654.35
68,253.68
14,412.89
69,909.00
64,474.34
14,621.28
22,595.00
11,585.22
5.00
10.00
26.00
6.00
13.00
16.00
6.00
16.00
1.00
2.00
1.00
2.00
2.00
1.00
62.87
62.87
84.87
166.41
162.87
132.87
93.37
96.37
108.87
108.87
212.87
162.87
132.42
722.91
314.35
628.70
2,206.62
998.46
2,117.31
2,125.92
560.22
1,541.92
108.87
217.74
212.87
325.74
264.84
722.91
3.85%
66.67%
46.15%
75.00%
50.00%
31.25%
#######
1.00
4.00
6.00
12.00
3.00
5.00
1.00
84.87
665.64
977.22
1,594.44
280.11
481.85
108.87
3.85%
66.67%
46.15%
75.00%
50.00%
31.25%
100.00%
1.00
4.00
6.00
12.00
3.00
5.00
1.00
84.87
665.64
977.22
1,594.44
280.11
481.85
108.87
100.00%
100.00%
96.15%
33.33%
53.85%
25.00%
50.00%
68.75%
5.00
10.00
25.00
2.00
7.00
4.00
3.00
11.00
314.35
628.70
2,121.75
332.82
1,140.09
531.48
280.11
1,060.07
100.00%
100.00%
2.00
1.00
217.74
212.87
#######
2.00
325.74
100.00%
2.00
325.74
100.00%
100.00%
2.00
1.00
264.84
722.91
200.00
1.31
262.00
100.00%
200.00
262.00
Pgina 6 de 49
:
:
:
:
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 01 - SISTEMA DE AGUA POTABLE
Descripcin
Und
Metrado
P.U.
Parcial
Avance Actual
Metrado
Costo
Avance Acumulado
Metrado
Costo
200.00
200.00
200.00
80.00
240.00
200.00
19.46
4.17
6.54
3.13
7.02
5.79
3,892.00
834.00
1,308.00
250.40
1,684.80
1,158.00
%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
200.00
200.00
45.19
0.32
9,038.00
64.00
100.00%
100.00%
200.00
200.00
9,038.00
64.00
80.00
80.00
80.00
80.00
80.00
80.00
2.00
74.70
70.29
74.63
77.29
55.50
1.85
1,470.18
5,976.00
5,623.20
5,970.40
6,183.20
4,440.00
148.00
2,940.36
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
80.00
80.00
80.00
80.00
80.00
80.00
2.00
5,976.00
5,623.20
5,970.40
6,183.20
4,440.00
148.00
2,940.36
770.00
0.99
762.30
100.00%
770.00
762.30
548.00
222.00
770.00
770.00
548.00
222.00
548.00
222.00
766.74
64.10
8.91
2.00
3.24
10.01
5.27
11.10
5.54
7.02
35,126.80
1,978.02
1,540.00
2,494.80
5,485.48
1,169.94
6,082.80
1,229.88
5,382.51
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
548.00
222.00
770.00
770.00
548.00
222.00
548.00
222.00
766.74
35,126.80
1,978.02
1,540.00
2,494.80
5,485.48
1,169.94
6,082.80
1,229.88
5,382.51
485.00
285.00
770.00
15.93
14.94
1.20
7,726.05
4,257.90
924.00
100.00%
100.00%
100.00%
485.00
285.00
770.00
7,726.05
4,257.90
924.00
3.00
5.00
4.00
1.00
1.00
50.87
52.87
84.87
7,149.81
5,025.35
152.61
264.35
339.48
7,149.81
5,025.35
100.00%
100.00%
100.00%
100.00%
100.00%
3.00
5.00
4.00
1.00
1.00
152.61
264.35
339.48
7,149.81
5,025.35
9.02
9.02
1.31
0.95
11.82
8.57
100.00%
100.00%
9.02
9.02
11.82
8.57
31.66
9.02
41.16
17.31
2.20
7.02
548.03
19.84
288.94
100.00%
100.00%
100.00%
31.66
9.02
41.16
548.03
19.84
288.94
9.01
17.39
156.68
100.00%
9.01
156.68
9.18
351.36
57.50
281.64
5.24
23.56
2,585.46
1,841.13
1,354.70
100.00%
100.00%
100.00%
9.18
351.36
57.50
2,585.46
1,841.13
1,354.70
15.07
79.74
1,201.68
100.00%
15.07
1,201.68
22.69
30.16
21.20
15.54
481.03
468.69
100.00%
100.00%
22.69
30.16
481.03
468.69
0.91
32.50
29.58
100.00%
0.91
29.58
1.00
1.00
1.00
292.27
300.00
333.93
292.27
300.00
333.93
100.00%
100.00%
100.00%
1.00
1.00
1.00
292.27
300.00
333.93
30.16
9.25
278.98
100.00%
30.16
278.98
Pgina 7 de 49
:
:
:
:
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 01 - SISTEMA DE AGUA POTABLE
Descripcin
Und
Metrado
P.U.
Parcial
Avance Actual
Metrado
Costo
Avance Acumulado
Metrado
Costo
14,202.07
14,202.07
%
100.00%
250,000.00
250,000.00
100.00%
1.00
250,000.00
0.99
3,689.69
100.00%
3,726.96
3,689.69
8.91
1.20
2.00
3.62
5.22
7.02
81.70
33,207.21
4,472.35
7,453.92
13,491.60
19,454.73
3,139.55
5,122.59
8.05%
8.05%
8.05%
8.05%
8.05%
300.00
300.00
300.00
300.00
300.00
2,673.00
360.00
600.00
1,086.00
1,566.00
8.05%
8.05%
8.05%
8.05%
8.05%
300.00
300.00
300.00
300.00
300.00
2,673.00
360.00
600.00
1,086.00
1,566.00
91.95%
91.95%
91.95%
91.95%
91.95%
100.00%
100.00%
3,426.96
3,426.96
3,426.96
3,426.96
3,426.96
447.23
62.70
30,534.21
4,112.35
6,853.92
12,405.60
17,888.73
3,139.55
5,122.59
7.63
1.20
28,436.70
4,472.35
8.05%
8.05%
300.00
300.00
2,289.00
360.00
8.05%
8.05%
300.00
300.00
2,289.00
360.00
91.95%
91.95%
3,426.96
3,426.96
26,147.70
4,112.35
374.38
102.27
62.73
72.64
42.64
5,615.70
1,636.32
250.92
72.64
85.28
100.00%
100.00%
100.00%
100.00%
100.00%
15.00
16.00
4.00
1.00
2.00
5,615.70
1,636.32
250.92
72.64
85.28
2,903.08
5,806.16
100.00%
2.00
5,806.16
3,379.63
2,654.93
6,759.26
15,929.58
100.00%
83.33%
2.00
5.00
6,759.26
13,274.65
27,632.35
29,847.17
12,002.54
27,632.35
29,847.17
12,002.54
2,699,489.26
254,291.89
137,673.95
3,091,455.10
2,936,882.35
100.00%
100.00%
100.00%
1.00
1.00
1.00
27,632.35
29,847.17
12,002.54
1,687,393.43
158,952.46
86,057.06
1,932,402.95
1,835,782.80
9.42%
5.10%
95.00%
16.67%
1.00
25.86%
Pgina 8 de 49
2,654.93
698,080.87
65,759.22
35,602.12
799,442.21
759,470.10
16.67%
11.63%
314,014.96
29,580.21
16,014.76
359,609.93
341,629.43
37.49%
1.00
2,654.93
1,012,095.83
95,339.43
51,616.89
1,159,052.15
1,101,099.54
62.51%
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 02 -SISTEMA DE ALCANTARILLADO
Descripcin
Und
Metrado
P.U.
Parcial
RED COLECTOR DE ALCANTARILLADO DE LOS DISTRITOS DE MOLINO, HUERTA PANCAN, S.P. DE CHUNAN Y YAULI
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
m
45,204.09
0.99
44,752.05
TOPOGRAFIA DURANTE LA EJECUCION DE LA OBRA
m
45,204.09
1.11
50,176.54
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG.1.2*0.60
m
25,128.32
7.48
187,959.83
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG.1.5*0.60
m
5,868.97
8.11
47,597.35
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 2.0*0.60
m
2,825.87
8.84
24,980.69
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 2.50*0.60
m
958.05
9.73
9,321.83
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 3.0*0.60
m
971.40
11.44
11,112.82
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 3.5*0.70
m
520.99
13.89
7,236.55
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 4.00*0.70
m
2,764.45
16.22
44,839.38
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 4.50*0.60
m
1,941.26
21.63
41,989.45
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 5.0*0.60
m
1,198.67
24.34
29,175.63
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 5.5*0.60
m
96.46
32.44
3,129.16
EXCAVACION DE ZANJA EN T.SEMIRROCOSO 1.50*0.60 M
m
1,500.00
68.84
103,260.00
EXCAVACION DE ZANJA EN T.SEMIRROCOSO 2.00 X 0.60 M
m
170.00
77.43
13,163.10
EXCAVACION DE ZANJA EN T.SATURADO 2.50 X 0.60 M
m
390.00
21.69
8,459.10
EXCAVACION DE ZANJA EN T.SATURADO 3.00 X 0.60 M
m
80.00
27.10
2,168.00
EXCAVACION DE ZANJA EN T.SATURADO 3.50 X 0.60 M
m
146.35
36.13
5,287.63
EXCAVACION DE ZANJA EN T. SATURADO 4.00 X 0.60 M
m
349.34
43.36
15,147.38
EXCAVACION DE ZANJA EN T.SATURADO 4.50 X 0.60 M
m
294.24
54.20
15,947.81
ENTIBADO Y DESENTIBADO DE ZANJA
m
8,749.00
17.36
151,882.64
REFINE Y NIVELACION DE FONDOS P/DESAGUE
m
45,204.00
2.10
94,928.40
PREPARACION DE CAMA DE APOYO C/MAT. ZARANDEADO D/ LUGAR E=10CM
m
42,274.15
2.00
84,548.30
PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO H=0.10M
m
1,670.00
3.24
5,410.80
PREPARACION DE CAMA DE APOYO C/MAT. GRAVA 1/2" H=0.10M
m
1,259.23
3.97
4,999.14
CUBRIMIENTO DE TUBERIA CON MATERIAL ZARANDEADO DEL LUGAR=0.30mM 42,274.16
3.62
153,032.46
CUBRIMIENTO DE TUBERIA C/MATERIAL DE PRESTAMO H=0.30 M
m
1,259.93
9.92
12,498.51
CUBRIMIENTO DE TUBERIA C/MATERIAL DE GRAVA 1/2" H=0.30 M
m
1,259.93
12.01
15,131.76
RELLENO Y COMPACTACION CAPAS 0.30mt H=1.20 C/MAT. ZAR.LUGAR
m
23,458.32
5.22
122,452.43
RELLENO Y COMPACTACION CAPAS 0.30mt H=1.50 C/MAT. ZAR.LUGAR
m
5,868.97
6.26
36,739.75
RELLENO Y COMPACTACION CAPAS 0.30mt H=2.00 C/MAT. ZAR.LUGAR
m
2,825.87
7.81
22,070.04
RELLENO Y COMPACTACION CAPAS 0.30mt H=2.50 C/MAT. ZAR.LUGAR
m
958.05
10.40
9,963.72
RELLENO Y COMPACTACION CAPAS 0.30mt H=3.00 C/MAT. ZAR.LUGAR
m
971.40
15.58
15,134.41
RELLENO Y COMPACTACION CAPAS 0.30mt H=3.50 C/MAT. ZAR.LUGAR
m
520.99
18.68
9,732.09
RELLENO Y COMPACTACION CAPAS 0.30mt H=4.00 C/MAT. ZAR.LUGAR
m
2,764.45
20.74
57,334.69
RELLENO Y COMPACTACION CAPAS 0.30mt H=4.50 C/MAT. ZAR.LUGAR
m
1,941.26
27.45
53,287.59
RELLENO Y COMPACTACION CAPAS 0.30mt H=5.00 C/MAT. ZAR.LUGAR
m
1,198.67
31.10
37,278.64
RELLENO Y COMPACTACION CAPAS 0.30mt H=5.50 C/MAT. ZAR.LUGAR
m
96.46
34.54
3,331.73
RELLENO Y COMPACTACION CAPAS 0.30mt H=0.70 C/MAT. DE CULTIVO
m
1,670.00
11.10
18,537.00
CONFORMACION Y COMPACTACION DE DIQUES C/MANT. PRESTAMO AL 50%
m3
2,015.80
16.01
32,272.96
EXCAVACION DE BUZONES H=1.20m prof.T.Cong.
m3
1,238.72
27.02
33,470.21
EXCAVACION DE BUZONES H=1.50m prof.T.Cong.
m3
375.25
28.56
10,717.14
EXCAVACION DE BUZONES H=2.00m prof.T.Cong.
m3
284.04
29.83
8,472.91
EXCAVACION DE BUZONES H=2.50m prof.T.Cong.
m3
98.70
33.32
3,288.68
EXCAVACION DE BUZONES H=3.00m prof.T.Cong.
m3
110.46
37.58
4,151.09
EXCAVACION DE BUZONES H=3.50m prof.T.Cong.
m3
73.68
41.76
3,076.88
EXCAVACION DE BUZONES H=4.00m prof.T.Cong.
m3
568.08
52.20
29,653.78
EXCAVACION DE BUZONES H=4.50m prof.T.Cong.
m3
378.88
58.72
22,247.83
EXCAVACION DE BUZONES H=5.00m prof.T.Cong.
m3
236.70
75.16
17,790.37
EXCAVACION DE BUZONES H=5.50m prof.T.Cong.
m3
28.94
93.95
2,718.91
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
m3
6,780.00
7.02
47,595.60
CONSTRUCCION DE BUZONES
BUZON DE CONCRETO H = 1.20m, D = 1.20m T/FoFo
und
392.00
996.15
390,490.80
BUZON DE CONCRETO H = 1.50m, D = 1.20m T/FoFo
und
95.00
1,101.84
104,674.80
BUZON DE CONCRETO H = 2.00m, D = 1.20m T/FoFo
und
54.00
1,257.13
67,885.02
BUZON DE CONCRETO H = 2.50m, D = 1.20m T/FoFo
und
15.00
1,470.18
22,052.70
BUZON DE CONCRETO H = 3.00m, D = 1.20m T/FoFo
und
14.00
1,883.08
26,363.12
BUZON DE CONCRETO H = 3.50m, D = 1.50m T/FoFo
und
8.00
2,181.35
17,450.80
BUZON DE CONCRETO H = 4.00m, D = 1.50m T/FoFo
und
54.00
2,449.81
132,289.74
BUZON DE CONCRETO H = 4.50m, D = 1.50m T/FoFo
und
32.00
2,642.55
84,561.60
BUZON DE CONCRETO H = 5.00m, D = 1.50m T/FoFo
und
18.00
2,949.33
53,087.94
BUZON DE CONCRETO H = 5.50m, D = 1.20m T/FoFo
und
2.00
3,256.10
6,512.20
SUMINISTRO E INST. DE TUBERIA PVC P/DESAGUE
SUMINISTRO E INST. TUB PVC UF 160 MM PVC UF S-25
m
25,854.74
12.42
321,115.87
SUMINISTRO E INST. TUB PVC UF 200 MM PVC UF S-25
m
14,827.42
17.98
266,597.01
SUMINISTRO E INST. TUB PVC UF 250 MM PVC UF S-20 EN ZANJAS MAYORES
A 4,521.93
H=3.00 METROS 34.90
m
157,815.36
PRUEBA HIDRAULICA TUB.PVC P/DESAGUE
m
45,204.00
1.29
58,313.16
VARIOS
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) /M
und
100.00
25.46
2,546.00
PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD CAMPO)
und
100.00
53.17
5,317.00
ROTURA Y REPOSICION DE PAVIMIENTO
m2
371.40
81.70
30,343.38
DADOS DE CONCRETO P/ANCLAJE TUB.ENTRADA Y SALIDA DE BUZON 0.80X0.60
und
1,368.00
46.66
63,830.88
EMISORES DE LOS DISTRITOS DE MOLINO, HUERTA, PANCAN, S.P DE CHUMAN, YAULI-ATAURA
Avance Actual
Metrado
Costo
Avance Acumulado
Metrado
Costo
100.00%
50.31%
45,204.09
22,741.43
44,752.05
25,242.98
11.88%
5,369.68
5,960.34
100.00%
62.19%
45,204.09
28,111.11
44,752.05
31,203.32
71.67%
94.78%
79.94%
22.99%
13.27%
15.97%
1.31%
18,009.71
5,562.67
2,258.86
220.21
128.91
83.19
36.14
134,712.63
45,113.26
19,968.33
2,142.65
1,474.73
1,155.51
586.19
15.20%
0.95%
12.18%
23.29%
38.09%
43.88%
11.89%
3,818.94
56.00
344.26
223.10
370.00
228.61
328.77
28,565.67
454.16
3,043.26
2,170.76
4,232.80
3,175.39
5,332.65
86.87%
95.74%
92.12%
46.27%
51.36%
59.85%
13.20%
21,828.65
5,618.67
2,603.12
443.31
498.91
311.80
364.91
163,278.30
45,567.42
23,011.59
4,313.41
5,707.53
4,330.90
5,918.84
2.99%
56.98%
43.54%
91.43%
261.36
25,757.69
18,406.89
1,526.87
4,537.21
54,091.15
36,813.78
4,947.06
13.72%
11.88%
12.70%
1,200.00
5,369.68
5,369.68
20,832.00
11,276.33
10,739.36
16.70%
68.86%
56.24%
91.43%
1,461.36
31,127.37
23,776.57
1,526.87
25,369.21
65,367.48
47,553.14
4,947.06
58.29%
88.64%
24,640.89
1,116.80
89,200.02
11,078.66
12.70%
5,369.68
19,438.24
70.99%
88.64%
30,010.57
1,116.80
108,638.26
11,078.66
74.36%
84.75%
79.94%
22.99%
13.27%
15.97%
1.31%
17,443.26
4,973.84
2,258.86
220.21
128.91
83.19
36.14
91,053.82
31,136.24
17,641.69
2,290.19
2,008.42
1,553.99
749.54
16.28%
0.95%
12.18%
23.29%
38.09%
43.88%
11.89%
3,818.94
56.00
344.26
223.10
370.00
228.61
328.77
19,934.87
350.56
2,688.67
2,320.24
5,764.60
4,270.43
6,818.69
90.64%
85.70%
92.12%
46.27%
51.36%
59.85%
13.20%
21,262.20
5,029.84
2,603.12
443.31
498.91
311.80
364.91
110,988.69
31,486.80
20,330.36
4,610.43
7,773.02
5,824.42
7,568.23
79.29%
86.34%
51.52%
16.82%
11.51%
22.61%
1.79%
3.39%
982.18
324.00
146.33
16.60
12.71
16.66
10.16
12.84
26,538.50
9,253.45
4,365.03
553.11
477.66
695.72
530.37
753.96
10.33%
9.21%
15.27%
17.69%
23.01%
33.92%
12.52%
127.92
34.56
43.36
17.46
25.42
24.99
71.12
3,456.40
987.03
1,293.43
581.77
955.28
1,043.58
3,712.46
89.62%
95.55%
66.78%
34.51%
34.52%
56.53%
14.31%
3.39%
1,110.10
358.56
189.69
34.06
38.13
41.65
81.28
12.84
29,994.90
10,240.48
5,658.46
1,134.88
1,432.94
1,739.30
4,242.83
753.96
24.79%
1,680.79
11,799.14
9.71%
658.21
4,620.63
34.50%
2,339.00
16,419.77
78.32%
75.79%
57.41%
20.00%
14.29%
25.00%
3.70%
307.00
72.00
31.00
3.00
2.00
2.00
2.00
305,818.05
79,332.48
38,971.03
4,410.54
3,766.16
4,362.70
4,899.62
10.46%
10.53%
14.81%
20.00%
28.57%
37.50%
12.96%
41.00
10.00
8.00
3.00
4.00
3.00
7.00
40,842.15
11,018.40
10,057.04
4,410.54
7,532.32
6,544.05
17,148.67
88.78%
86.32%
72.22%
40.00%
42.86%
62.50%
16.67%
348.00
82.00
39.00
6.00
6.00
5.00
9.00
72.27%
50.39%
18,685.84
7,471.95
232,078.15
134,345.66
6.88%
24.22%
1,778.48
3,591.20
22,088.72
64,569.78
79.15%
74.61%
55.07%
24,892.43
32,111.24
11.88%
5,369.68
6,926.89
38.00%
38.00%
55.30%
61.40%
38.00
38.00
205.40
840.00
967.48
2,020.46
16,781.18
39,194.40
10.00%
10.00%
5.39%
11.11%
10.00
10.00
20.00
152.00
254.60
531.70
1,634.00
7,092.32
Pgina 9 de 49
37.81%
17,092.98
18,973.22
13.13%
4.26%
7.88%
53.73%
48.64%
40.15%
86.80%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
83.30%
31.14%
43.76%
8.57%
100.00%
29.01%
11.36%
100.00%
9.36%
14.30%
7.88%
53.73%
48.64%
40.15%
86.80%
100.00%
100.00%
100.00%
100.00%
100.00%
10.38%
4.45%
33.22%
65.49%
65.48%
43.47%
85.69%
96.61%
100.00%
100.00%
65.50%
3,299.67
250.30
222.75
514.74
472.49
209.19
2,399.54
1,941.26
1,198.67
96.46
1,500.00
170.00
390.00
80.00
146.35
349.34
294.24
7,287.64
14,076.63
18,497.58
143.13
1,259.23
12,263.59
143.13
1,259.93
2,196.12
839.13
222.75
514.74
472.49
209.19
2,399.54
1,941.26
1,198.67
96.46
1,670.00
2,015.80
128.62
16.69
94.35
64.64
72.33
32.03
486.80
366.04
236.70
28.94
4,441.00
24,681.53
2,029.93
1,969.10
5,008.42
5,405.29
2,905.65
38,920.54
41,989.45
29,175.63
3,129.16
103,260.00
13,163.10
8,459.10
2,168.00
5,287.63
15,147.38
15,947.81
126,513.43
29,560.92
36,995.16
463.74
4,999.14
44,394.20
1,419.85
15,131.76
11,463.74
5,252.95
1,739.68
5,353.29
7,361.39
3,907.67
49,766.46
53,287.59
37,278.64
3,331.73
18,537.00
32,272.96
3,475.31
476.66
2,814.45
2,153.80
2,718.15
1,337.58
25,410.95
21,493.87
17,790.37
2,718.91
31,175.83
346,660.20
90,350.88
49,028.07
8,821.08
11,298.48
10,906.75
22,048.29
11.22%
13.68%
27.78%
60.00%
57.14%
37.50%
83.33%
100.00%
100.00%
100.00%
44.00
13.00
15.00
9.00
8.00
3.00
45.00
32.00
18.00
2.00
43,830.60
14,323.92
18,856.95
13,231.62
15,064.64
6,544.05
110,241.45
84,561.60
53,087.94
6,512.20
20,464.32
11,063.15
254,166.87
198,915.44
66.95%
30,262.11
39,038.13
20.85%
25.39%
100.00%
33.05%
5,390.42
3,764.27
4,521.93
14,941.89
66,949.00
67,681.57
157,815.36
19,275.03
48.00%
48.00%
60.69%
72.51%
48.00
48.00
225.40
992.00
1,222.08
2,552.16
18,415.18
46,286.72
52.00%
52.00%
39.31%
27.49%
52.00
52.00
146.00
376.00
1,323.92
2,764.84
11,928.20
17,544.16
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 02 -SISTEMA DE ALCANTARILLADO
Descripcin
Und
Metrado
P.U.
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
m
2,443.64
0.99
TOPOGRAFIA DURANTE LA EJECUCION DE LA OBRA
m
2,443.64
1.11
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG.1.2*0.60
m
35.00
7.48
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG.1.5*0.60
m
1,028.64
8.11
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 2.0*0.60
m
102.00
8.84
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 3.0*0.60
m
212.44
11.44
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 3.5*0.70
m
518.00
13.89
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 4.00*0.70
m
226.34
16.22
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 4.50*0.70
m
321.25
19.46
ENTIBADO Y DESENTIBADO DE ZANJA
m
1,277.00
17.36
REFINE Y NIVELACION DE FONDOS P/DESAGUE
m
2,443.64
2.10
PREPARACION DE CAMA DE APOYO C/MAT. ZARANDEADO D/ LUGAR E=10CM
m
2,443.64
2.00
CUBRIMIENTO DE TUBERIA CON MATERIAL ZARANDEADO DEL LUGAR=0.30mM
2,443.64
3.62
RELLENO Y COMPACTACION CAPAS 0.30mt H=1.20 C/MAT. ZAR.LUGAR
m
35.00
5.22
RELLENO Y COMPACTACION CAPAS 0.30mt H=1.50 C/MAT. ZAR.LUGAR
m
1,028.64
6.26
RELLENO Y COMPACTACION CAPAS 0.30mt H=2.00 C/MAT. ZAR.LUGAR
m
102.00
7.81
RELLENO Y COMPACTACION CAPAS 0.30mt H=3.00 C/MAT. ZAR.LUGAR
m
212.44
15.58
RELLENO Y COMPACTACION CAPAS 0.30mt H=3.50 C/MAT. ZAR.LUGAR
m
518.00
18.68
RELLENO Y COMPACTACION CAPAS 0.30mt H=4.00 C/MAT. ZAR.LUGAR
m
226.34
20.74
RELLENO Y COMPACTACION CAPAS 0.30mt H=4.50 C/MAT. ZAR.LUGAR
m
321.26
27.45
EXCAVACION DE BUZONES H=1.20m prof.T.Cong.
m3
55.20
27.02
EXCAVACION DE BUZONES H=1.50m prof.T.Cong.
m3
48.30
28.56
EXCAVACION DE BUZONES H=2.00m prof.T.Cong.
m3
13.81
29.83
EXCAVACION DE BUZONES H=2.50m prof.T.Cong.
m3
5.75
33.32
EXCAVACION DE BUZONES H=3.00m prof.T.Cong.
m3
23.00
37.58
EXCAVACION DE BUZONES H=3.50m prof.T.Cong.
m3
27.60
41.76
EXCAVACION DE BUZONES H=4.00m prof.T.Cong.
m3
21.24
52.20
EXCAVACION DE BUZONES H=4.50m prof.T.Cong.
m3
31.86
58.72
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
m3
467.00
7.02
CONSTRUCCION DE BUZONES
BUZON DE CONCRETO H = 1.20m, D = 1.20m T/FoFo
und
20.00
996.15
BUZON DE CONCRETO H = 1.50m, D = 1.20m T/FoFo
und
14.00
1,101.84
BUZON DE CONCRETO H = 2.00m, D = 1.20m T/FoFo
und
3.00
1,257.13
BUZON DE CONCRETO H=4.50 m D=1.50 m T/FoFo
und
1.00
1,470.18
BUZON DE CONCRETO H = 3.00m, D = 1.20m T/FoFo
und
4.00
1,883.08
BUZON DE CONCRETO H = 3.50m, D = 1.50m T/FoFo
und
7.00
2,181.35
BUZON DE CONCRETO H = 4.00m, D = 1.50m T/FoFo
und
3.00
2,449.81
BUZON DE CONCRETO H = 4.50m, D = 1.50m T/FoFo
und
4.00
2,642.55
SUMINISTRO E INST. DE TUBERIA PVC P/DESAGUE
SUMINISTRO E INST. TUB PVC UF 200 MM PVC UF S-25
m
499.81
17.98
SUMINISTRO E INST. TUB PVC UF 250 MM PVC UF S-25
m
804.96
27.45
SUMINISTRO E INST. TUB PVC UF 250 MM PVC UF S-25 EN ZANJAS MAYORES
A 1,138.87
H=3.00 METROS 34.90
m
PRUEBA HIDRAULICA TUB.PVC P/DESAGUE
m
2,443.64
1.29
VARIOS
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) /M
und
100.00
25.46
PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD CAMPO)
und
50.00
53.17
ROTURA Y REPOSICION DE PAVIMIENTO
m2
360.00
81.70
DADOS DE CONCRETO P/ANCLAJE TUB.ENTRADA Y SALIDA DE BUZON 0.80X0.60
und
98.00
46.66
CRUCE DE TUBERIA EN LINEA FERREREA, CARRETERA CENTRAL Y RIOS
CRUCE DE TUBERIAS EN LINEA FERREA
und
1.00
7,467.83
CRUCE DE CARRETERA CENTRAL
und
1.00
1,763.71
CRUCE DE RIO-SUBTERRANEO
m
55.30
122.98
ACUEDUCTOS SOBRE EL RIO JULCAN Y YACUS (PUENTE NEGRO) 2 UNID
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
m2
56.00
1.31
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN T/CONG
m3
16.20
17.31
RELLENO Y COMPAC. C/MATERIAL DEL LUGAR EN ESTRIBOS 85% D.S.
m3
3.00
50.06
PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO H=0.10m3
1.20
3.62
OBRAS DE CONCRETO SIMPLE
CONCRETO CICLOPEO FC=175G/CM2 + 40 % P.G.( 20<=6")
m3
14.56
285.67
ENCOFRADO / DESENCOFRADO
m2
54.34
23.56
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2
m3
8.48
302.59
CONCRETO F'C=175 KG/CM2
m3
0.06
281.64
ENCOFRADO / DESENCOFRADO
m2
91.42
23.56
ACERO DE REFUERZO F'Y=4200 KG/CM2
kg
834.48
5.24
REVOQUES ENLUCIDOS Y MOLDADURAS
TARRAJEO EXTERIOR C/MORTERO 1:5, E=1.5 cm
m2
66.80
15.54
Costo Directo
Gastos Generales
9.42%
Utilidad
5.10%
Sub Total
Parcial
2,419.20
2,712.44
6.18%
6.18%
151.00
151.00
149.49
167.61
261.80
8,342.27
901.68
2,430.31
7,195.02
3,671.23
6,251.53
22,168.72
5,131.64
4,887.28
8,845.98
182.70
6,439.29
796.62
3,309.82
9,676.24
4,694.29
8,818.59
1,491.50
1,379.45
411.95
191.59
864.34
1,152.58
1,108.73
1,870.82
3,278.34
100.00%
7.00%
23.53%
9.41%
35.00
72.00
24.00
20.00
261.80
583.92
212.16
228.80
6.18%
6.18%
6.18%
100.00%
7.00%
23.53%
9.41%
151.00
151.00
151.00
35.00
72.00
24.00
20.00
317.10
302.00
546.62
182.70
450.72
187.44
311.60
5.65%
17.89%
39.21%
100.00%
3.12
8.64
5.42
5.75
84.30
246.76
161.54
191.59
10.81%
50.50
354.51
19,923.00
15,425.76
3,771.39
1,470.18
7,532.32
15,269.45
7,349.43
10,570.20
5.00%
14.29%
33.33%
100.00%
1.00
2.00
1.00
1.00
996.15
2,203.68
1,257.13
1,470.18
8,986.58
22,096.15
39,746.56
3,152.30
30.21%
151.00
2,714.98
6.18%
151.00
2,546.00
2,658.50
29,412.00
4,572.68
3.00%
6.00%
3.00
3.00
10.20%
10.00
Avance Actual
Metrado
Costo
45.54
51.06
4.47%
46.00
373.06
1.88%
1.88%
1.88%
46.00
46.00
46.00
96.60
92.00
166.52
4.47%
46.00
287.96
17.89%
8.64
246.76
88.53%
76.47%
90.59%
100.00%
100.00%
100.00%
100.00%
91.94%
91.94%
91.94%
910.64
78.00
192.44
518.00
226.34
321.25
1,277.00
2,246.64
2,246.64
2,246.64
7,385.29
689.52
2,201.51
7,195.02
3,671.23
6,251.53
22,168.72
4,717.94
4,493.28
8,132.84
88.53%
76.47%
90.59%
100.00%
100.00%
100.00%
94.35%
64.22%
60.79%
910.64
78.00
192.44
518.00
226.34
321.26
52.08
31.02
8.39
5,700.61
609.18
2,998.22
9,676.24
4,694.29
8,818.59
1,407.20
885.93
250.41
100.00%
100.00%
100.00%
100.00%
75.27%
23.00
27.60
21.24
31.86
351.50
864.34
1,152.58
1,108.73
1,870.82
2,467.53
95.00%
71.43%
66.67%
19.00
10.00
2.00
18,926.85
11,018.40
2,514.26
100.00%
100.00%
100.00%
100.00%
4.00
7.00
3.00
4.00
7,532.32
15,269.45
7,349.43
10,570.20
60.59%
100.00%
100.00%
91.94%
302.81
804.96
1,138.87
2,246.64
5,444.52
22,096.15
39,746.56
2,898.17
82.00%
64.00%
100.00%
85.71%
82.00
32.00
360.00
84.00
2,087.72
1,701.44
29,412.00
3,919.44
7,467.83
1,763.71
6,800.79
100.00%
100.00%
100.00%
1.00
1.00
55.30
7,467.83
1,763.71
6,800.79
73.36
100.00%
100.00%
100.00%
100.00%
100.00%
56.00
73.36
280.42
150.18
4.34
16.20
3.00
1.20
280.42
150.18
4.34
4,159.36
1,280.25
100.00%
100.00%
14.56
54.34
4,159.36
1,280.25
2,565.96
16.90
2,153.86
4,372.68
100.00%
100.00%
100.00%
100.00%
8.48
0.06
91.42
834.48
2,565.96
16.90
2,153.86
4,372.68
100.00%
66.80
1,038.07
1,976,499.28
186,186.23
100,801.46
2,263,486.97
65.00
456.30
14.29%
2.00
2,203.68
9.20%
46.00
194.79
1.88%
46.00
76.38
159.51
15.00%
30.00%
15.00
15.00
466.60
4.08%
4.00
186.64
1,590,756.25
149,849.24
81,128.57
1,821,734.06
827.08
197.00
197.00
195.03
218.67
100.00%
11.47%
23.53%
9.41%
35.00
118.00
24.00
20.00
261.80
956.98
212.16
228.80
8.06%
8.06%
8.06%
100.00%
11.47%
23.53%
9.41%
197.00
197.00
197.00
35.00
118.00
24.00
20.00
413.70
394.00
713.14
182.70
738.68
187.44
311.60
5.65%
35.78%
39.21%
100.00%
3.12
17.28
5.42
5.75
84.30
493.52
161.54
191.59
13.92%
8.06%
8.06%
2,246.64
2,246.64
Pgina 10 de 49
46.00
46.00
Avance Acumulado
Metrado
Costo
91.94%
91.94%
1,038.07
3,948,198.30
371,920.28
201,358.11
4,521,476.69
1.88%
1.88%
24.73%
115.50
810.81
5.00%
28.57%
33.33%
100.00%
1.00
4.00
1.00
1.00
996.15
4,407.36
1,257.13
1,470.18
39.41%
197.00
3,542.06
59.34
8.06%
197.00
254.13
381.90
797.55
18.00%
36.00%
18.00
18.00
458.28
957.06
14.29%
14.00
653.24
380,942.77
35,884.81
19,428.08
436,255.66
##########
185,734.05
100,556.65
##########
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 02 -SISTEMA DE ALCANTARILLADO
Item
Descripcin
Factor de Relacin
Und
Metrado
P.U.
95.00%
Parcial
4,295,402.86
Pgina 11 de 49
%
9.65%
Avance Actual
Metrado
Costo
414,442.88
Avance Acumulado
%
Metrado
Costo
49.94%
##########
%
50.06%
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 03 - PLANTA DE TRATAMIENTO
Descripcin
Und
Metrado
P.U.
Parcial
Avance Actual
Metrado
Costo
Avance Acumulado
Metrado
Costo
187.11
100.00%
142.83
187.11
2,472.39
185.77
1,303.47
100.00%
100.00%
100.00%
142.83
84.44
185.68
2,472.39
185.77
1,303.47
711.95
100.00%
40.94
711.95
2,620.15
4,594.40
4,229.41
4,645.33
100.00%
100.00%
100.00%
100.00%
8.46
14.03
807.14
197.17
2,620.15
4,594.40
4,229.41
4,645.33
2,650.64
1,121.06
1,025.04
100.00%
100.00%
100.00%
125.03
72.14
49.21
2,650.64
1,121.06
1,025.04
420.91
1,083.64
80.91
1,128.50
100.00%
100.00%
100.00%
100.00%
1.00
4.00
1.00
1.00
420.91
1,083.64
80.91
1,128.50
106.40
250.00
100.00%
100.00%
5.00
5.00
106.40
250.00
79.23
100.00%
60.48
79.23
1,361.09
133.06
717.51
100.00%
100.00%
100.00%
78.63
60.48
102.21
1,361.09
133.06
717.51
267.11
100.00%
15.36
267.11
486.40
473.86
1,277.13
1,958.24
2,417.26
100.00%
100.00%
100.00%
100.00%
100.00%
1.53
1.53
3.90
373.71
102.60
486.40
473.86
1,277.13
1,958.24
2,417.26
1,338.14
701.16
299.95
100.00%
100.00%
100.00%
63.12
45.12
14.40
1,338.14
701.16
299.95
2,167.28
100.00%
8.00
2,167.28
42.56
100.00
100.00%
100.00%
2.00
2.00
42.56
100.00
212.22
100.00%
162.00
212.22
280.42
356.40
151.63
100.00%
100.00%
100.00%
16.20
162.00
21.60
280.42
356.40
151.63
2,817.18
100.00%
162.00
2,817.18
5,367.95
5,418.16
1,206.27
100.00%
100.00%
100.00%
17.74
1,034.00
51.20
5,367.95
5,418.16
1,206.27
1,798.00
100.00%
100.00
1,798.00
110.04
100.00%
84.00
110.04
2,181.06
92.40
1,149.88
100.00%
100.00%
100.00%
126.00
42.00
163.80
2,181.06
92.40
1,149.88
Pgina 12 de 49
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 03 - PLANTA DE TRATAMIENTO
Descripcin
Und
Metrado
P.U.
Parcial
Avance Actual
Metrado
Costo
Avance Acumulado
Metrado
Costo
17.39
730.38
100.00%
42.00
730.38
302.59
5.24
23.56
4,992.74
3,098.73
2,544.48
100.00%
100.00%
100.00%
16.50
591.36
108.00
4,992.74
3,098.73
2,544.48
15.54
20.83
1,678.32
337.45
100.00%
100.00%
108.00
16.20
1,678.32
337.45
12.00
1,101.84
721.32
6,611.04
100.00%
100.00%
60.11
6.00
721.32
6,611.04
0.99
59.40
100.00%
60.00
59.40
8.11
2.10
2.00
5.54
486.60
126.00
120.00
1,163.40
100.00%
100.00%
100.00%
100.00%
60.00
60.00
60.00
210.00
486.60
126.00
120.00
1,163.40
12.42
745.20
100.00%
60.00
745.20
1.31
1.13
24,266.94
20,932.55
64.04%
90.81%
11,862.19
16,821.94
15,539.47
19,008.79
4.17
7.02
16.01
3,480.79
1.96
5.40
12.52
14.28
18.37
43,936.70
48,076.12
85,376.69
50,784.73
6,514.96
62,654.26
41,615.98
165,685.70
279,224.00
66.13%
59.49%
27.25%
6,968.19
4,074.23
1,453.27
29,057.35
28,601.09
23,266.85
0.99
64.04%
90.81%
11,862.19
16,821.94
15,539.47
19,008.79
35.96%
9.19%
6,662.19
1,702.44
8,727.47
1,923.76
66.13%
59.49%
40.38%
6,968.19
4,074.23
2,153.27
29,057.35
28,601.09
34,473.85
33.87%
40.51%
59.62%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
3,568.19
2,774.22
3,179.44
14.59
3,323.96
11,602.64
3,323.96
11,602.64
15,200.00
14,879.35
19,475.03
50,902.84
50,784.73
6,514.96
62,654.26
41,615.98
165,685.70
279,224.00
539.06
100.00%
544.50
539.06
17.31
281.64
0.55
17.31
55.57
250.65
4,078.15
2,094.40
3,133.11
666.84
100.00%
100.00%
100.00%
100.00%
100.00%
14.48
14.48
3,808.00
181.00
12.00
250.65
4,078.15
2,094.40
3,133.11
666.84
4,041.03
11.22
18.37
50.00
19.98
4,041.03
14,025.00
28,473.50
2,500.00
3,996.00
100.00%
1.00
4,041.03
100.00%
100.00%
100.00%
1,550.00
50.00
200.00
28,473.50
2,500.00
3,996.00
1.31
1.25
128.43
122.55
66.67%
66.67%
65.36
65.36
85.62
81.71
66.67%
66.67%
65.36
65.36
85.62
81.71
33.33%
33.33%
32.68
32.68
42.81
40.84
2.20
7.02
17.31
121.97
1,342.15
2,545.61
66.67%
2.62%
66.67%
36.96
5.00
98.04
81.32
35.10
1,697.06
66.67%
2.62%
66.67%
36.96
5.00
98.04
81.32
35.10
1,697.06
33.33%
97.38%
33.33%
18.48
186.19
49.02
40.65
1,307.05
848.55
100.00%
1,250.00
14,025.00
13.13%
700.00
11,207.00
100.00%
1,250.00
14,025.00
17.39
964.10
66.67%
36.96
642.73
66.67%
36.96
642.73
33.33%
18.48
321.37
317.91
309.71
327.47
5.24
23.56
2,524.21
2,573.69
4,823.63
9,349.00
4,630.95
66.67%
66.67%
66.67%
66.67%
66.67%
5.29
5.54
9.82
1,189.43
131.04
1,682.79
1,715.78
3,215.72
6,232.60
3,087.27
66.67%
66.67%
66.67%
66.67%
66.67%
5.29
5.54
9.82
1,189.43
131.04
1,682.79
1,715.78
3,215.72
6,232.60
3,087.27
33.33%
33.33%
33.33%
33.33%
33.33%
2.65
2.77
4.91
594.73
65.52
841.42
857.91
1,607.91
3,116.40
1,543.68
21.20
15.54
2,083.54
1,577.62
66.67%
66.67%
65.52
67.68
1,389.02
1,051.75
66.67%
66.67%
65.52
67.68
1,389.02
1,051.75
33.33%
33.33%
32.76
33.84
694.52
525.87
8.91
1,069.20
66.67%
80.00
712.80
66.67%
80.00
712.80
33.33%
40.00
356.40
Pgina 13 de 49
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA LOCALIDAD DEL VALLE LLACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
10,459,130.94 con IGV
8,863,670.29 sin IGV
FORMULA POLINOMICA N 03 - PLANTA DE TRATAMIENTO
Descripcin
Und
Metrado
P.U.
Parcial
120.00
120.00
25.20
25.20
25.20
6.00
3.00
6.00
2.10
12.42
58.12
74.70
55.50
86.63
79.19
94.57
252.00
1,490.40
1,464.62
1,882.44
1,398.60
519.78
237.57
567.42
6.00
6.00
21.28
50.00
127.68
300.00
1.00
50,000.00
50,000.00
1.00
20,000.00
20,000.00
1,092,157.26
102,881.21
55,700.02
1,250,738.49
1,188,201.56
9.42%
5.10%
95.00%
14.35%
Pgina 14 de 49
6.00
4.00
Avance Actual
Metrado
Costo
127.68
200.00
156,746.06
14,765.48
7,994.05
179,505.59
170,530.31
Avance Acumulado
%
Metrado
Costo
66.67%
80.00
168.00
66.67%
80.00
993.60
66.67%
16.80
976.42
66.67%
16.80
1,254.96
66.67%
16.80
932.40
66.67%
4.00
346.52
66.67%
2.00
158.38
66.67%
4.00
378.28
100.00%
66.67%
1.03%
11,207.00
1,055.70
571.56
12,834.26
12,192.55
15.38%
6.00
4.00
127.68
200.00
167,953.06
15,821.18
8,565.61
192,339.85
182,722.86
33.33%
2.00
100.00
100.00%
1.00
50,000.00
100.00%
1.00
20,000.00
924,204.20
87,060.04
47,134.41
1,058,398.65
1,005,478.71
84.62%
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALALCION DEL SISTEMA DE ALCANTARILLADO
U. EJECUTORA
SANITARIO DE MUNICIPALIDAD
LA LOCALIDAD DEL
PROVINCIAL
VALLE LLACUS
DE JAUJA
- ATAURA
S/. 10,459,130.94 (con I.G.V.)
S/. 8,863,670.29 (sin I.G.V.)
UBICACION
JUNIN
S/. 9,936,174.39 (con I.G.V.)
S/. 8,420,486.77 (sin I.G.V.)
AVANCE PROGRAMADO
SOLES
PORCENTAJE
MENSUAL
ACUMULADO
MES
ACUMULADO
119,331.48
119,331.48
1.42%
1.42%
PERIODO
01) Junio-12
AVANCE EJECUTADO
SOLES
PORCENTAJE
MENSUAL
ACUMULADO
MES
ACUMULADO
230,346.76
230,346.76
2.74%
2.74%
AVANCE
COMPARADO
(%)
193.03%
RETRASO
MENSUAL
(%)
02) Julio-12
262,322.32
381,653.80
3.12%
4.53%
460,173.46
690,520.22
5.46%
8.20%
180.93%
03) Agosto-12
448,254.13
829,907.93
5.32%
9.86%
656,655.02
1,347,175.23
7.80%
16.00%
162.33%
04) Setiembre-12
932,831.06
1,762,738.99
11.08%
20.93%
681,153.19
2,028,328.42
8.09%
24.09%
115.07%
2.99%
1,027,712.95
2,790,451.94
12.20%
33.14%
632,319.36
2,660,647.78
7.51%
31.60%
95.35%
4.70%
06) Noviembre-12
880,362.04
3,670,813.98
10.46%
43.59%
768,264.86
3,428,912.64
9.12%
40.72%
93.41%
1.33%
07) Diciembre-12
950,468.41
4,621,282.39
11.29%
54.88%
0.00%
08) Enero-13
1,106,692.05
5,727,974.44
13.14%
68.02%
0.00%
09) Febrero-13
1,004,648.99
6,732,623.43
11.93%
79.96%
0.00%
10) Marzo-13
615,819.36
7,348,442.79
7.31%
87.27%
0.00%
11) Abril-13
590,516.29
7,938,959.08
7.01%
94.28%
0.00%
12) Mayo-13
456,654.03
8,395,613.11
5.42%
99.70%
0.00%
13) Junio-13
24,873.67
8,420,486.78
0.30%
100.00%
05) Octubre-12
8,420,486.77
100.00%
3,428,912.64
40.72%
99.70%
100%
94.28%
87.27%
90%
79.96%
80%
68.02%
70%
60%
381,654
1,762,739
829,908
Real Ejecutado
AVANCE PROGRAMADO
REAL EJECUTADO
Avance Programado
Real
12) Mayo-13
690,520
11) Abril-13
230,347
119,331
10) Marzo-13
1,000,000
0%
09) Febrero-13
1,347,175
2,000,000
10%
08) Enero-13
3,000,000
20%
31.60% 40.72%
33.14%
24.09%
16.00%
20.93%
8.20%
9.86%
4.53%
2.74%
1.42%
07) Diciembre-12
3,428,913
3,670,814
2,660,648
2,028,328
2,790,452
4,000,000
4,621,282
30%
06) Noviembre-12
5,727,974
5,000,000
40%
05) Octubre-12
6,000,000
8,420,487
04) Setiembre-12
6,732,623
03) Agosto-12
7,348,443 7,938,959
7,000,000
43.59%
01) Junio-12
8,000,000
54.88%
50%
02) Julio-12
8,395,613
9,000,000
AVANCE FISICO PROGRAMADO vs. AVANCE FISICO EJECUTADO (SISTEMA DE AGUA POTABLE)
PROYECTO
PPTO BASE
PPTO CONT.
PERIODO
01) Junio-12
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO
U. EJECUTORA
SANITARIO
MUNICIPALIDAD
DE LA LOCALIDAD
PROVINCIAL
DEL
DEVALLE
JAUJALLACUS - ATAURA
S/. 10,459,130.94 (con I.G.V.)
S/. 8,863,670.29 (sin I.G.V.)
UBICACION
JUNIN
S/. 9,936,174.39 (con I.G.V.)
S/. 8,420,486.77 (sin I.G.V.)
AVANCE PROGRAMADO
SOLES
PORCENTAJE
MENSUAL
ACUMULADO
MES
ACUMULADO
17,127.29
17,127.29
0.58%
0.58%
AVANCE EJECUTADO
SOLES
PORCENTAJE
MENSUAL
ACUMULADO
MES
ACUMULADO
14,200.48
14,200.48
0.48%
0.48%
AVANCE
COMPARADO
(%)
82.91%
RETRASO
MENSUAL
(%)
0.10%
02) Julio-12
125,013.40
142,140.69
4.26%
4.84%
71,985.14
86,185.62
2.45%
2.93%
60.63%
1.81%
03) Agosto-12
189,790.44
331,931.13
6.46%
11.30%
175,192.73
261,378.35
5.97%
8.90%
78.74%
0.50%
04) Setiembre-12
375,783.01
707,714.14
12.80%
24.10%
274,592.19
535,970.54
9.35%
18.25%
75.73%
3.45%
05) Octubre-12
444,418.30
1,152,132.44
15.13%
39.23%
223,499.57
759,470.11
7.61%
25.86%
65.92%
7.52%
06) Noviembre-12
365,785.79
1,517,918.23
12.45%
51.68%
341,629.43
1,101,099.54
11.63%
37.49%
72.54%
0.82%
07) Diciembre-12
413,103.82
1,931,022.05
14.07%
65.75%
0.00%
08) Enero-13
448,172.35
2,379,194.40
15.26%
81.01%
0.00%
09) Febrero-13
456,896.68
2,836,091.08
15.56%
96.57%
0.00%
10) Marzo-13
59,591.99
2,895,683.07
2.03%
98.60%
0.00%
11) Abril-13
37,691.15
2,933,374.22
1.28%
99.88%
0.00%
12) Mayo-13
2,333.16
2,935,707.38
0.08%
99.96%
0.00%
13) junio-13
1,174.97
2,936,882.35
0.04%
100.00%
2,936,882.35
0.00%
100.00%
1,101,099.54
37.49%
4,000,000
2,935,707
3,000,000
2,836,091
2,379,194
2,000,000
1,931,022
1,517,918
1,101,100
1,152,132
1,000,000
759,470
535,971
707,714
261,378
14,200
17,127
86,186
142,141
331,931
AVANCE PROGRAMADO
REAL EJECUTADO
2,895,683
2,933,374
2,936,882
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALALCION DEL SISTEMA DE ALCANTARILLADO
U. EJECUTORA
SANITARIOMUNICIPALIDAD
DE LA LOCALIDAD
PROVINCIAL
DEL VALLE
DE
LLACUS
JAUJA - ATAURA
S/. 10,459,130.94 (con I.G.V.)
S/. 8,863,670.29 (sin I.G.V.)
UBICACION
JUNIN
S/. 9,936,174.39 (con I.G.V.)
S/. 8,420,486.77 (sin I.G.V.)
AVANCE PROGRAMADO
SOLES
PORCENTAJE
MENSUAL
ACUMULADO
MES
ACUMULADO
102,204.19
102,204.19
2.38%
2.38%
AVANCE EJECUTADO
SOLES
PORCENTAJE
MENSUAL
ACUMULADO
MES
ACUMULADO
216,146.28
216,146.28
5.03%
5.03%
AVANCE
COMPARADO
(%)
211.48%
RETRASO
MENSUAL
(%)
02) Julio-12
137,308.92
239,513.11
3.20%
5.58%
388,188.32
604,334.60
9.04%
14.07%
252.32%
03) Agosto-12
258,463.69
497,976.80
6.02%
11.59%
374,557.31
978,891.91
8.72%
22.79%
196.57%
04) Setiembre-12
557,048.05
1,055,024.85
12.97%
24.56%
367,343.29
1,346,235.20
8.55%
31.34%
127.60%
4.42%
05) Octubre-12
483,315.14
1,538,339.99
11.25%
35.81%
384,412.16
1,730,647.36
8.95%
40.29%
112.50%
2.30%
06) Noviembre-12
388,615.63
1,926,955.62
9.05%
44.86%
414,442.88
2,145,090.24
9.65%
49.94%
111.32%
07) Diciembre-12
414,810.28
2,341,765.90
9.66%
54.52%
0.00%
08) Enero-13
379,857.26
2,721,623.16
8.84%
63.36%
0.00%
09) Febrero-13
377,681.38
3,099,304.54
8.79%
72.15%
0.00%
10) Marzo-13
377,672.18
3,476,976.72
8.79%
80.95%
0.00%
11) Abril-13
409,596.18
3,886,572.90
9.54%
90.48%
0.00%
12) Mayo-13
406,890.05
4,293,462.95
9.47%
99.95%
0.00%
13) Junio-13
1,939.91
4,295,402.86
0.05%
100.00%
4,295,402.86
0.00%
100.00%
2,145,090.24
49.94%
4,293,463
4,000,000
3,886,573
3,476,977
3,099,305
3,000,000
2,721,623
2,145,090
1,730,647
2,000,000
1,346,235
978,892
1,000,000
604,335
216,146
102,204
2,341,766
1,926,956
1,538,340
1,055,025
497,977
239,513
AVANCE PROGRAMADO
REAL EJECUTADO
4,295,403
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALALCION DEL SISTEMA DE ALCANTARILLADO
U. EJECUTORAMUNICIPALIDAD
SANITARIO DE LA LOCALIDAD
PROVINCIAL
DEL VALLE
DE JAUJA
LLACUS - ATAURA
S/. 10,459,130.94 (con I.G.V.)
S/. 8,863,670.29 (sin I.G.V.)
UBICACIN:
JUNIN
S/. 9,936,174.39 (con I.G.V.)
S/. 8,420,486.77 (sin I.G.V.)
AVANCE PROGRAMADO
SOLES
PORCENTAJE
MENSUAL
ACUMULADO
MES
ACUMULADO
0.00
0.00
0.00%
0.00%
AVANCE EJECUTADO
SOLES
PORCENTAJE
MENSUAL
ACUMULADO
MES
ACUMULADO
0.00
1.00
0.00%
0.00%
02) Julio-12
0.00
0.00
0.00%
0.00%
0.00
1.00
0.00%
03) Agosto-12
0.00
0.00
0.00%
0.00%
106,904.98
106,904.98
9.00%
9.00%
04) Setiembre-12
0.00
0.00
0.00%
0.00%
39,217.70
146,122.68
3.30%
12.30%
05) Octubre-12
99,979.51
99,979.51
8.41%
8.41%
24,407.63
170,530.31
2.05%
14.35%
06) Noviembre-12
125,960.62
225,940.13
10.60%
19.02%
0.00
170,530.31
0.00%
14.35%
07) Diciembre-12
122,554.31
348,494.44
10.31%
29.33%
0.00%
08) Enero-13
278,662.44
627,156.88
23.45%
52.78%
0.00%
09) Febrero-13
170,070.92
797,227.80
14.31%
67.10%
0.00%
10) Marzo-13
178,555.19
975,782.99
15.03%
82.12%
0.00%
11) Abril-13
143,228.96
1,119,011.95
12.05%
94.18%
0.00%
12) Mayo-13
47,430.82
1,166,442.77
3.99%
98.17%
0.00%
13) Junio-13
21,758.79
1,188,201.56
1.83%
1,188,201.56
AVANCE
COMPARADO
(%)
0.00%
100.00%
170,530.31
14.35%
2,000,000
1,119,012
1,000,000
975,783
797,228
627,157
0
0
1
0
106,905
146,123
170,530
170,530
225,940
348,494
99,980
AVANCE PROGRAMADO
REAL EJECUTADO
1,166,443 1,188,202
RETRASO
MENSUAL
(%)
VAL. N
FECHA
01
al 30.Jun.2012
230,346.76
1,684,097.35
46,069.35
1,638,028.00
02
al 31.Jul.2012
460,173.46
1,638,028.00
92,034.69
1,545,993.31
03
al 31.Ago.2012
656,655.02
1,545,993.31
131,331.00
1,414,662.31
04
al 30.Set.2012
681,153.19
1,414,662.31
136,230.64
1,278,431.67
05
al 31.Oct. 2012
632,319.36
1,278,431.67
126,463.87
1,151,967.80
06
al 30.Nov.2012
768,264.86
1,151,967.80
153,652.97
998,314.83
685,782.52
998,314.83
TOTALES
3,428,912.64
SALDO POR
AMORTIZAR
VAL. N
FECHA
MONTO BRUTO
VALORIZADO
MVB
MONTO ADELANTO
OTORGADO
A
AMORTIZACION
SALDO POR
AMORTIZAR
MVB x (A/C)
01
al 30.Jun.2012
230,346.76
1,684,097.35
0.00
1,684,097.35
02
al 31.Jul.2012
460,173.46
1,684,097.35
92,034.69
1,592,062.66
03
al 31.Ago.2012
656,655.02
1,592,062.66
131,331.00
1,460,731.66
04
al 30.Set.2012
681,153.19
1,460,731.66
136,230.64
1,324,501.02
05
al 31.Oct.2012
632,319.36
1,324,501.02
126,463.87
1,198,037.15
06
al 30.Nov.2012
768,264.86
1,198,037.15
153,652.97
1,044,384.18
639,713.17
1,044,384.18
TOTALES
3,428,912.64
Pto.Cont.
:
Pto.Base
:
Presupuesto:
Item
01.00.00
04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
04.06.00
04.07.00
02.00.00
02.01.00
02.01.01
02.01.02
02.02.00
02.02.01
02.02.02
02.02.03
02.03.00
02.03.01
02.03.02
02.04.00
02.04.01
02.04.02
02.04.03
02.05.00
02.05.01
02.05.02
02.05.03
02.06.00
02.06.01
02.06.02
02.06.03
02.06.04
02.06.05
02.06.06
02.06.07
02.06.08
02.06.09
02.07.00
02.07.01
02.07.02
02.07.03
02.07.04
02.07.05
02.08.00
02.08.01
02.08.02
03.00.00
03.00.01
03.00.02
03.00.03
04.00.00
04.01.00
04.01.01
04.02.00
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07
04.02.08
04.02.09
04.02.10
04.03.00
04.03.01
04.03.02
04.03.03
04.03.04
04.04.00
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05
04.04.06
04.04.07
04.04.08
04.04.09
05.00.00
05.01.00
05.01.01
05.01.02
05.02.00
05.02.01
05.02.02
05.03.00
05.03.01
05.04.00
05.04.01
05.04.02
05.04.03
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO
DE LA LOCALIDAD DEL VALLE YACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
con IGV
sin IGV
FORMULA POLINOMICA N 01 - SISTEMA DE AGUA POTABLE
Descripcin
Pgina 21 de 49
Avance Anterior
Acumulado
13.75%
61.43%
33.33%
33.33%
80.00%
33.33%
100.00%
100.00%
50.00%
6.25%
50.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
29.54%
44.50%
44.50%
23.78%
47.60%
40.87%
20.00%
44.50%
19.33%
12.26%
33.32%
6.60%
13.33%
0.00%
32.84%
51.60%
26.80%
11.11%
41.85%
17.03%
45.45%
0.00%
8.51%
11.76%
0.00%
0.00%
0.00%
37.50%
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Avance Actual
2.49%
9.05%
8.33%
8.33%
10.00%
16.67%
0.00%
0.00%
20.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
29.31%
28.10%
28.10%
32.77%
36.00%
4.44%
0.00%
28.10%
53.26%
76.45%
12.00%
58.49%
31.98%
27.00%
29.10%
12.08%
40.00%
44.44%
19.86%
27.28%
31.82%
0.00%
42.55%
41.18%
0.00%
40.00%
40.00%
25.00%
25.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Avance
Acumulado
16.23%
70.48%
41.67%
41.67%
90.00%
50.00%
100.00%
100.00%
70.00%
6.25%
50.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
58.85%
72.60%
72.60%
56.55%
83.60%
45.31%
20.00%
72.60%
72.60%
88.72%
45.32%
65.09%
45.31%
27.00%
61.94%
63.68%
66.80%
55.56%
61.71%
44.31%
77.27%
0.00%
51.06%
52.94%
0.00%
40.00%
40.00%
62.50%
75.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Saldo por
Valorizar
83.77%
29.52%
58.33%
58.33%
10.00%
50.00%
0.00%
30.00%
93.75%
50.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
41.15%
27.40%
27.40%
43.45%
16.40%
54.69%
80.00%
27.40%
27.40%
11.28%
54.68%
34.91%
54.69%
73.00%
38.06%
36.32%
33.20%
44.44%
38.29%
55.69%
22.73%
100.00%
48.94%
47.06%
100.00%
60.00%
60.00%
37.50%
25.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Pto.Cont.
:
Pto.Base
:
Presupuesto:
Item
05.04.04
05.05.00
05.05.01
05.05.02
05.06.00
05.06.01
05.06.02
05.06.03
05.07.00
05.07.01
05.07.02
05.07.03
05.07.04
05.07.05
05.08.00
05.08.01
05.08.02
06.00.00
06.01.00
06.01.01
06.01.02
06.02.00
06.02.01
06.02.02
06.03.00
06.03.01
06.04.00
06.04.01
06.04.02
06.04.03
06.04.04
06.04.05
06.05.00
06.05.01
06.05.02
06.06.00
06.06.01
06.06.02
06.06.03
06.06.04
06.06.05
06.07.00
06.07.01
06.07.02
07.00.00
07.01.00
07.01.01
07.01.02
07.02.00
07.02.01
07.02.02
07.02.03
07.03.00
07.03.01
07.04.00
07.04.01
07.04.02
07.04.03
07.04.04
07.04.05
07.05.00
07.05.01
07.05.02
07.05.03
07.06.00
07.06.01
07.06.02
07.06.03
07.06.04
07.06.05
07.06.06
07.06.07
07.06.08
07.07.00
07.07.01
07.07.02
08.00.00
08.01.00
08.01.01
08.01.02
08.02.00
08.02.01
08.02.02
08.03.00
08.03.01
08.04.00
08.04.01
08.04.02
08.04.03
08.04.04
08.04.05
08.04.06
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO
DE LA LOCALIDAD DEL VALLE YACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
con IGV
sin IGV
FORMULA POLINOMICA N 01 - SISTEMA DE AGUA POTABLE
Descripcin
Pgina 22 de 49
Avance Anterior
Acumulado
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
60.88%
100.00%
100.00%
100.00%
92.83%
100.00%
85.67%
100.00%
100.00%
83.33%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
Avance Actual
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.92%
0.00%
0.00%
0.00%
3.81%
0.00%
7.62%
0.00%
0.00%
16.67%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
Avance
Acumulado
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
63.81%
100.00%
100.00%
100.00%
96.64%
100.00%
93.28%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Saldo por
Valorizar
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
36.19%
0.00%
0.00%
0.00%
3.36%
0.00%
6.72%
0.00%
0.00%
Pto.Cont.
:
Pto.Base
:
Presupuesto:
Item
08.05.00
08.05.01
08.05.02
08.05.03
08.06.00
08.06.01
08.06.02
08.07.00
08.07.01
08.07.02
09.00.00
09.01.00
09.01.01
09.02.00
09.02.01
09.02.02
09.03.00
09.03.01
09.03.02
09.03.03
09.04.00
09.04.01
09.04.02
09.04.03
09.04.04
09.04.05
09.05.00
09.05.01
09.05.02
09.06.00
09.06.01
09.07.00
09.07.01
09.08.00
09.08.01
09.08.02
09.09.00
09.09.01
09.09.02
09.10.00
09.10.01
09.10.02
09.10.03
10.00.00
10.01.00
10.02.00
11.00.00
11.01.00
11.01.01
11.02.00
11.02.01
11.02.02
11.02.03
11.02.04
11.02.05
11.02.06
11.02.07
11.02.08
11.02.09
11.02.10
11.02.11
11.03.00
11.03.01
11.03.02
11.03.03
11.03.04
11.03.05
11.03.06
11.03.07
11.04.00
11.04.01
11.04.02
11.04.03
11.04.04
11.04.05
11.04.06
11.04.07
11.04.08
11.04.09
11.04.10
11.04.11
11.04.12
11.04.13
11.04.14
12.00.00
12.01.00
12.01.01
12.02.00
12.02.01
12.02.02
12.02.03
12.02.04
12.02.05
12.02.06
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO
DE LA LOCALIDAD DEL VALLE YACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
con IGV
sin IGV
FORMULA POLINOMICA N 01 - SISTEMA DE AGUA POTABLE
Descripcin
TARRAJEO Y ENLUCIDOS
TARRAJEO EN EXTERIORES CON CEMENTO - ARENA
TARRAJEO INTERIORES CON IMPERMEABILIZANTE M 1:5, e=1.5
PENDIENTE DE FONDO RESERVORIO (MORTERO 1:5) L.EST.
PINTURAS
PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS
WATER STOP DE P.V.C. DE 6". PROVISION Y COLOCADO DE JUNTA
VALVULAS Y ACCESORIOS
VALVULA Y ACCESORIO P/RESERVORIO DE 350 M3
ESCALERA TIPO GATO FG 1
CASETA DE VALVULAS DEL RESERVORIO V=350 M3
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION EN TERRENO SEMIROCOSO
ELIMINACION DE MATERIAL EXCEDENTE DIST=30 m
ONCRETO SIMPLE
CIMIENTOS CORRIDOS-CONCRETO 1:10 + 30% P.G
SOBRECIMIENTOS-CONCRETO 1:8 + 25% P.M
ENCOFRADO Y DESENCOFRADO
CONCRETO ARMADO
CONCRETO EN COLUMNAS FC=175 KG/CM2
CONCRETO EN VIGAS FC=175 KG/CM2
CONCRETO EN LOSA DE TECHO FC=175 KG/CM2
ACERO DE REFUERZO F'Y=4,200 KG/CM2
ENCOFRADO Y DESENCOFRADO
MUROS Y TABIQUERIA DE ALBAILERIA
LADRILLO HUECO DE ARCILLA 15x30x30 cm PARA TECHO ALIGERADO
MUROS DE LADRILLO K.K. DE ARCILLA - CABEZA
REVOQUES ENLUCIDOS Y MOLDADURAS
TARRAJEO EXTERIOR C/MORTERO 1:5, E=1.5 cm
CIELO RASOS
CIELORRASOS CON MEZCLA DE CEMENTO - ARENA
PISOS Y PAVIMENTOS
PISO DE CONCRETO DE 4" F'=140 KG/CM2
VEREDA DE 4"-CONCRETO F'C=140 KG/CM2
PINTURAS
PINTURA EN MUROS EXTERIORES AL LATEX
PINTADO DE PUERTAS Y VENTANAS METALICAS LAC (2 MANOS ANTIC. + 2 ESMALTE)
CARPINTERIA METALICA Y HERRERIA
PUERTA METALICA
VENTANA METALICA
MARCO Y TAPA FF DE 125 KGM DE 0.60 M
MEJORAMIENTO DE LA RED DE DISTRIBUCION DE QUERO - EXISTENTE
CONSTRUCCION DE UNA CAMARA ROMPE PRESION (1 UNID.)
SUMINISTRO E INST. VALVULAS Y ACCESORIOS
LINEA DE ADUCCION (MOLINOS, HUERTAS, HUALA Y S:P CHUNAN)
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA C/MAQ T.C H=1.20 TUB. 3" Y 4"
EXCAVACION DE ZANJA C/MAQ T.C H=1.20 TUB. 6", 8" Y 10"
EXCAVACION EN TERRENO SEMIROCOSO H=1.00 x 0.60
REFINE Y NIVELACION DE FONDOS
PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO H=0.10
PREPARACION DE CAMA DE APOYO C/MAT. ZARANDEADO D/ LUGAR E=10CM
CUBRIMIENTO DE TUBERIA C/MATERIAL DE PRESTAMO H=0.50 M
CUBRIMIENTO DE TUBERIA CON MATERIAL ZARANDEADO DEL LUGAR=0.30 M
RELLENO Y COMPAC.ZANJA CAPA 0.30 M H=0.70 C/MATERIAL ZARANDEADO,LUGAR
RELLENO Y COMP. ZANJA CAPAS 0.30 M H=0.70 C/MAT. DE CULTIVO
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
SUMINISTRO E INST.DE TUBERIA PVC-UF
SUMINISTRO E INST. TUB PVC UF 110 C-7.5 INC ANILLO Y LUB.
SUMINISTRO E INST. TUB PVC UF 160 C-7.5 INC ANILLO Y LUB.
SUMINISTRO E INST. TUB PVC UF 160 C-10 INC ANILLO Y LUB.
SUMINISTRO E INST. TUB PVC UF 160 C-15 INC ANILLO Y LUB.
SUMINISTRO E INST. TUB PVC UF 200 C-7.5 INC ANILLO Y LUB.
SUMINISTRO E INST. TUB PVC UF 250 C-7.5 INC ANILLO Y LUB.
PRUEBA HIDRAULICA TUBERIA DE AGUA
SUMINISTRO E INST. DE VALVULAS Y ACCESORIOS
CODO PVC UF 110 mm x 90
CODO PVC UF 110 mm x 45
CODO PVC UF 110 mm x 22.5
CODO PVC UF 160 mm x 90
CODO PVC UF 160 mm x 45
CODO PVC UF 160 mm x 22.5
CODO PVC UF 200 mm x 45
CODO PVC UF 200 mm x 22.5
CODO PVC UF 250 mm x 45
CODO PVC UF 250 mm x 22.5
REDUCCION PVC UF 250 mm A 200mm
REDUCCION PVC UF 200 mm A 160mm
REDUCCION PVC UF 160 mm A 110mm
VALVULA FLOTADORA DE BRONCE 110 mm CON BOLA
GALERIA FILTRANTE - ATAURA
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 2.0*1.00 M
REFINE Y NIVELACION DE FONDOS T/SATURADO GF
PREPARACION DE CAMA DE APOYO T/SATURADO GF
RELLENO CON MATERIAL ZARANDEADO DEL LUGAR
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
MOTOBOMBA Q=20 LT/SEG
Pgina 23 de 49
Avance Anterior
Acumulado
0.00%
0.00%
0.00%
0.00%
50.00%
0.00%
100.00%
0.00%
0.00%
0.00%
50.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
31.02%
38.46%
38.46%
19.27%
25.51%
47.88%
0.00%
38.46%
27.59%
3.24%
0.00%
40.73%
17.63%
0.00%
10.91%
32.55%
21.51%
66.99%
0.00%
18.31%
84.26%
0.00%
36.81%
33.78%
0.00%
0.00%
3.85%
66.67%
46.15%
75.00%
50.00%
31.25%
100.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Avance Actual
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Avance
Acumulado
0.00%
0.00%
0.00%
0.00%
50.00%
0.00%
100.00%
0.00%
0.00%
0.00%
50.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
31.02%
38.46%
38.46%
19.27%
25.51%
47.88%
0.00%
38.46%
27.59%
3.24%
0.00%
40.73%
17.63%
0.00%
10.91%
32.55%
21.51%
66.99%
0.00%
18.31%
84.26%
0.00%
36.81%
33.78%
0.00%
0.00%
3.85%
66.67%
46.15%
75.00%
50.00%
31.25%
100.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Saldo por
Valorizar
100.00%
100.00%
100.00%
100.00%
50.00%
100.00%
100.00%
100.00%
100.00%
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
68.98%
61.54%
61.54%
80.73%
74.49%
52.12%
100.00%
61.54%
72.41%
96.76%
100.00%
59.27%
82.37%
100.00%
89.09%
67.45%
78.49%
33.01%
100.00%
81.69%
15.74%
100.00%
63.19%
66.22%
100.00%
100.00%
96.15%
33.33%
53.85%
25.00%
50.00%
68.75%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Pto.Cont.
:
Pto.Base
:
Presupuesto:
Item
12.03.00
12.03.01
12.03.02
12.04.00
12.04.01
12.04.02
12.04.03
12.04.04
12.04.05
12.04.06
12.04.07
13.00.00
13.01.00
13.01.01
13.02.00
13.02.01
13.02.02
13.02.03
13.02.04
13.02.05
13.02.06
13.02.07
13.02.08
13.02.09
13.03.00
13.03.01
13.03.02
13.03.03
13.04.00
13.04.01
13.04.02
13.04.03
13.04.04
13.04.05
14.00.00
14.01.00
14.01.01
14.01.02
14.02.00
14.02.01
14.02.02
14.02.03
14.03.00
14.03.01
14.04.00
14.04.01
14.04.02
14.04.03
14.05.00
14.05.01
14.06.00
14.06.01
14.06.02
14.07.00
14.07.01
14.08.00
14.08.01
14.08.02
14.08.03
14.09.00
14.09.01
14.10.00
14.10.01
14.11.00
14.11.01
15.00.00
15.01.00
15.01.01
15.02.00
15.02.01
15.02.02
15.02.03
15.02.04
15.02.05
15.02.06
15.02.07
15.03.00
15.03.01
15.03.02
15.04.00
15.04.01
15.04.02
15.04.03
15.04.04
15.04.05
16.00.00
16.01.00
17.00.00
17.01.00
17.02.00
18.00.00
18.01.00
18.02.00
18.03.00
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO
DE LA LOCALIDAD DEL VALLE YACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
con IGV
sin IGV
FORMULA POLINOMICA N 01 - SISTEMA DE AGUA POTABLE
Avance Anterior
Descripcin
Acumulado
SUMINISTRO E INST.DE TUBERIA PVC-UF
0.00%
SUMINISTRO E INST. TUB PVC UF 250 C-7.5 INC ANILLO Y LUB.
0.00%
PERFORACION DE TUBERIA 250mm DE 1/2 @ 0.20m
0.00%
SUMINISTRO Y COLOCACION DE GRAVA
0.00%
SUMINISTRO Y COLOCACION DE GRAVA 1"
0.00%
SUMINISTRO Y COLOCACION DE GRAVA 1/2 a 3/4"
0.00%
SUMINISTRO Y COLOCACION DE GRAVA 1/4 a 1/2"
0.00%
SUMINISTRO Y COLOCACION DE GRAVA 1/8 a 1/4"
0.00%
SUMINISTRO Y COLOCACION DEARENA GRUESA
0.00%
SUMINISTRO E INST. LAMINA DE 3mm
0.00%
CONSTRUCCION DE BUZON DE INSPECCION CONCRETO H=2.50 mts D=1.20
0.00%
LINEA DE IMPULSION Y CONDUCCION MIRAVALLE - ATAURA
0.00%
OBRAS PRELIMINARES
0.00%
TRAZO Y REPLANTEO
0.00%
MOVIMIENTO DE TIERRAS
0.00%
EXCAVACION DE ZANJA EN T.SEMI ROCOSO H=1M
0.00%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 1.3*0.60
0.00%
REFINE Y NIVELACION DE FONDOS
0.00%
PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO H=0.10
0.00%
CUBRIMIENTO DE TUBERIA C/MATERIAL DE PRESTAMO (MAT. DE CULTIVO) H=1.00
0.00%
CUBRIMIENTO DE TUBERIA CON MATERIAL ZARANDEADO DEL LUGAR=0.50 M
0.00%
RELLENO Y COMPACTACION CAPAS 0.30mt H=0.70 C/MAT. DE CULTIVO
0.00%
RELLENO Y COMPAC.ZANJA CAPA 0.30 M H=0.70 C/MATERIAL ZARANDEADO,LUGAR
0.00%
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
0.00%
SUMINISTRO E INST.DE TUBERIA PVC-UF
0.00%
SUMINISTRO E INST. TUB PVC UF 110 C-7.5 INC ANILLO Y LUB.
0.00%
SUMINISTRO E INST. TUB PVC UF 90 C-7.5 INC ANILLO Y LUB.
0.00%
PRUEBA HIDRAULICA TUBERIA DE AGUA
0.00%
SUMINISTRO E INST. DE VALVULAS Y ACCESORIOS
0.00%
CODO PVC UF 90 mm x 45
0.00%
CODO PVC UF 90 mm x 90
0.00%
CODO PVC UF 110 mm x 22.5
0.00%
CAMA ROMPE PRESION (1 UNID)
0.00%
CONSTRUCCION DE BUZON DERIVACION Y CAJA DE VALVULA
0.00%
CONSTRUCCION DE CISTERNA Y CASETA DE BOMBEO
0.00%
OBRAS PRELIMINARES
0.00%
TRAZO Y REPLANTEO
0.00%
LIMPIEZA DE TERRENO MANUAL
0.00%
MOVIMIENTO DE TIERRAS
0.00%
EXCAVACION MANUAL TN.
0.00%
NIVELACION Y APISONADO MANUAL
0.00%
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
0.00%
OBRAS DE CONCRETO SIMPLE
0.00%
SOLADO DE CONCRETO 1:10 E=3"
0.00%
OBRAS DE CONCRETO ARMADO
0.00%
CONCRETO f'c=175 kg/cm2
0.00%
ACERO DE REFUERZO F'Y=4,200 KG/CM2
0.00%
ENCOFRADO Y DESENCOFRADO
0.00%
MUROS Y TABIQUERIA DE ALBAILERIA
0.00%
MUROS DE LADRILLO K.K. DE ARCILLA - CABEZA
0.00%
REVOQUES ENLUCIDOS Y MOLDADURAS
0.00%
TARRAJEO INTERIORES CON IMPERMEABILIZANTE M 1:5, e=1.5
0.00%
TARRAJEO EXTERIOR C/MORTERO 1:5, E=1.5 cm
0.00%
PISOS Y PAVIMENTOS
0.00%
VEREDA DE 4"-CONCRETO F'C=140 KG/CM2
0.00%
CARPINTERIA METALICA Y HERRERIA
0.00%
PUERTA METALICA
0.00%
VENTANA METALICA
0.00%
MARCO Y TAPA FF DE 125 KGM DE 0.60 M
0.00%
PINTURAS
0.00%
PINTURA EN MUROS EXTERIORES AL LATEX
0.00%
EQUIPAMIENTO E INSTALACION HIDRAULICA DE LA CASETA DE BOMBEO
0.00%
EQUIPAMIENTO E INSTALACION HIDRAULICA DE LA CASETA DE BOMBEO
0.00%
ELECTROMECANICA DE LA LINEA DE IMPULSION
0.00%
SISTEMA DE ELECTRIFICACION PARA EL SISTEMA DE BOMBEO DE LA LINEA DE IMPULSION
0.00%
RED DE DISTRIBUCION - ATAURA
0.00%
OBRAS PRELIMINARES
0.00%
TRAZO Y REPLANTEO
0.00%
MOVIMIENTO DE TIERRAS
0.00%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 1.3*0.60
0.00%
REFINE Y NIVELACION DE FONDOS EN T.N. H=0.10 MTS
0.00%
PREPARACION DE CAMA DE APOYO C/MAT. ZARANDEADO D/ LUGAR E=10CM
0.00%
CUBRIMIENTO DE TUBERIA CON MATERIAL ZARANDEADO DEL LUGAR=0.30 M
0.00%
RELLENO Y COMPACTACION CAPAS 0.30mt H=1.20 C/MAT. ZAR.LUGAR
0.00%
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
0.00%
ROTURA Y REPOSICION DE PAVIMIENTO
0.00%
SUMINISTRO E INST.DE TUBERIA PVC-UF
0.00%
SUMINISTRO E INST. TUB PVC UF 63 mm C-7.5 INC ANILLO Y LUB.
0.00%
PRUEBA HIDRAULICA TUBERIA DE AGUA
0.00%
SUMINISTRO E INST. DE VALVULAS Y ACCESORIOS
0.00%
VALVULA DE COMPUERTA 63mm DE BRONCE
0.00%
TEE PVC UF 63 mm x 63 mm
0.00%
TAPON PVC UF 63 mm
0.00%
CODO PVC UF 63 mm x 90
0.00%
CODO PVC UF 63 mm x 45
0.00%
SISTEMA DE CLORACION VALLE YACUS, MOLINOS,ATAURA (3UND)
0.00%
CASETA Y EQUIPO DE CLORACION RESERVORIO DE MOLINOS Y ATAURA
0.00%
CRUCE DE RIO
8.33%
CRUCE DE RIO C/TUB. FM 6" SCH-40S/C-RIO QUERO - AEREO
0.00%
CRUCE DE RIO SUBTERRANEO C/TUB. PVC 6,8",10"
16.67%
INSTALACIONES HIDRAULICAS DE RESERVORIO
0.00%
INSTALACIONES HIDRAULICAS DE RESERVORIO EXISTENTE DE MOLINOS
0.00%
INSTALACIONES HIDRAULICAS DE RESERVORIO EXISTENTE DE PANCAN
0.00%
INSTALACIONES HIDRAULICAS DE RESERVORIO EXISTENTE DE HUERTA
0.00%
Pgina 24 de 49
Avance Actual
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.45%
0.00%
0.00%
5.75%
8.05%
8.05%
8.05%
8.05%
8.05%
0.00%
0.00%
8.05%
8.05%
8.05%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Avance
Acumulado
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.45%
0.00%
0.00%
5.75%
8.05%
8.05%
8.05%
8.05%
8.05%
0.00%
0.00%
8.05%
8.05%
8.05%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.33%
0.00%
16.67%
0.00%
0.00%
0.00%
0.00%
Saldo por
Valorizar
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
96.55%
100.00%
100.00%
94.25%
91.95%
91.95%
91.95%
91.95%
91.95%
100.00%
100.00%
91.95%
91.95%
91.95%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
91.67%
100.00%
83.33%
100.00%
100.00%
100.00%
100.00%
: MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO
DE LA LOCALIDAD DEL VALLE YACUS - ATAURA
Pto.Cont.
:
9,936,174.39 con IGV
8,420,486.77 sin IGV
Pto.Base
:
con IGV
sin IGV
Presupuesto : FORMULA POLINOMICA N 03 - PLANTA DE TRATAMIENTO
Item
01.00.00
01.01.00
01.01.01
01.02.00
01.02.01
01.02.02
01.02.03
01.03.00
01.03.01
01.04.00
01.04.01
01.04.02
01.04.03
01.04.04
01.05.00
01.05.01
01.05.02
01.05.03
01.06.00
01.06.01
01.06.02
01.06.03
01.06.04
01.07.00
01.07.01
01.07.02
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.02.03
02.03.00
02.03.01
02.04.00
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.05.00
02.05.01
02.05.02
02.05.03
02.06.00
02.06.01
02.07.00
02.07.01
02.07.02
03.00.00
03.01.00
03.01.01
03.02.00
03.02.01
03.02.02
03.02.03
03.03.00
03.03.01
03.04.00
03.04.01
03.04.02
03.04.03
03.05.00
03.05.01
04.00.00
04.01.00
04.01.01
Avance
Anterior
Acumulad
Descripcin
Avance
Actual
PLANTA DE TRATAMIENTO
12.11%
CAMARA DE REJAS Y DESARENADORES
0.00%
OBRAS PRELIMINARES
0.00%
TRAZO Y REPLANTEO
0.00%
MOVIMIENTO DE TIERRAS
0.00%
EXCAVACION MANUAL
0.00%
NIVELACION Y APISONADO MANUAL
0.00%
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
0.00%
OBRAS DE CONCRETO SIMPLE
0.00%
SOLADO DE CONCRETO 1:10 E=3"
0.00%
OBRAS DE CONCRETO ARMADO
0.00%
CONCRETO f'c=210Kg/cm2 LOSA DE FONDO
0.00%
CONCRETO EN MUROS f'c=210 kg/cm2
0.00%
ACERO DE REFUERZO fy=4,200 kg/cm2
0.00%
ENCOFRADO Y DESENCOFRADO
0.00%
REVOQUES ENLUCIDOS Y MOLDADURAS
0.00%
TARRAJEO INTERIORES CON IMPERMEABILIZANTE M 1:5,e=1.5
0.00%
TARRAJEO EXTERIOR C/MORTERO 1:5, e=1.5 cm
0.00%
PENDIENTE DE FONFO (MORTERO 1:5) E=1.5M
0.00%
ACCESORIOS Y VALVULAS
0.00%
COMPUERTA METALICA DE 1/4" 0.80x1.20m
0.00%
COMPUERTA METALICA (VERTEDERO)DE 5/16" 1.50x1.20m
0.00%
REJA DE FIERRO LISO DE 1/2"
0.00%
VALVULA COMPUERTA DE FDH DE 6"
0.00%
VARIOS
0.00%
PRUEBA DE CALIDAD DEL CONCRETO(PRUEBA A LA COMPRESION)/M
0.00%
PRUEBA DE COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO)
0.00%
CAMARA DE DISTRIBUCION DE CAUDALES (3 unid)
0.00%
OBRAS PRELIMINARES
0.00%
TRAZO Y REPLANTEO
0.00%
MOVIMIENTO DE TIERRAS
0.00%
EXCAVACION MANUAL
0.00%
NIVELACION Y APISONADO MANUAL
0.00%
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
0.00%
OBRAS DE CONCRETO SIMPLE
0.00%
SOLADO DE CONCRETO 1:10 E=3"
0.00%
OBRAS DE CONCRETO ARMADO
0.00%
CONCRETO EN LOSA DE TECHO FC=210KG/CM2
0.00%
CONCRETO f'c=210Kg/cm2 LOSA DE FONDO
0.00%
CONCRETO EN MUROS f'c=210 kg/cm2
0.00%
ACERO DE REFUERZO fy=4,200 kg/cm2
0.00%
ENCOFRADO Y DESENCOFRADO
0.00%
REVOQUES ENLUCIDOS Y MOLDADURAS
0.00%
TARRAJEO INTERIORES CON IMPERMEABILIZANTE M 1:5,e=1.5
0.00%
TARRAJEO EXTERIOR C/MORTERO 1:5, e=1.5 cm
0.00%
PENDIENTE DE FONFO (MORTERO 1:5) E=1.5M
0.00%
ACCESORIOS Y VALVULAS
0.00%
COMPUERTA METALICA (VERTEDERO)DE 5/16" 1.50x1.20m
0.00%
VARIOS
0.00%
PRUEBA DE CALIDAD DEL CONCRETO(PRUEBA A LA COMPRESION)/M
0.00%
PRUEBA DE COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO)
0.00%
PLATAFORMA DE INGRESO DE INTERCONEXION DE LAS LAGUNAS PRIMARIA Y SECUNDARIA0.00%
(6 unid)
OBRAS PRELIMINARES
0.00%
TRAZO Y REPLANTEO
0.00%
MOVIMIENTO DE TIERRAS
0.00%
EXCAVACION MANUAL
0.00%
NIVELACION Y APISONADO MANUAL
0.00%
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
0.00%
OBRAS DE CONCRETO SIMPLE
0.00%
SOLADO DE CONCRETO 1:10 E=3"
0.00%
OBRAS DE CONCRETO ARMADO
0.00%
CONCRETO f'c=210Kg/cm2
0.00%
ACERO DE REFUERZO fy=4,200 kg/cm2
0.00%
ENCOFRADO Y DESENCOFRADO
0.00%
SUMINISTRO E INST. DE VALVULAS Y ACCESORIOS
0.00%
SUMINISTRO E INST. TUB DN 200mm PVC UF S-25
0.00%
SISTEMA DE SALIDA DE AGUAS RESIDUALES TRATADAS (6 unid)
0.00%
OBRAS PRELIMINARES
0.00%
TRAZO Y REPLANTEO
0.00%
Pgina 25 de 49
0.07%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Avance
Saldo por
Acumulado Valorizar
12.18%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
87.82%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
: MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO
DE LA LOCALIDAD DEL VALLE YACUS - ATAURA
Pto.Cont.
:
9,936,174.39 con IGV
8,420,486.77 sin IGV
Pto.Base
:
con IGV
sin IGV
Presupuesto : FORMULA POLINOMICA N 03 - PLANTA DE TRATAMIENTO
Item
04.02.00
04.02.01
04.02.02
04.02.03
04.03.00
04.03.01
04.04.00
04.04.01
04.04.02
04.04.03
04.05.00
04.05.01
04.05.02
04.06.00
04.06.01
04.06.02
05.00.00
05.01.00
05.01.01
05.02.00
05.02.01
05.02.02
05.02.03
05.02.04
05.03.00
05.03.01
06.00.00
06.01.00
06.01.01
06.01.02
06.02.00
06.02.01
06.02.02
06.02.03
06.02.04
06.02.05
06.02.06
06.02.07
06.02.08
06.02.09
07.00.00
07.01.00
07.01.01
07.02.00
07.02.01
07.02.02
07.02.03
07.02.04
07.02.05
8.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.05.00
09.00.00
09.01.00
09.01.01
09.01.02
09.02.00
09.02.01
09.02.02
09.02.03
09.03.00
09.03.01
09.04.00
09.04.01
09.04.02
09.04.03
09.04.04
Avance
Anterior
Acumulad
MOVIMIENTO DE TIERRAS
0.00%
EXCAVACION MANUAL
0.00%
NIVELACION Y APISONADO MANUAL
0.00%
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
0.00%
OBRAS DE CONCRETO SIMPLE
0.00%
SOLADO DE CONCRETO 1:10 E=3"
0.00%
OBRAS DE CONCRETO ARMADO
0.00%
CONCRETO f'c=210Kg/cm2
0.00%
ACERO DE REFUERZO fy=4,200 kg/cm2
0.00%
ENCOFRADO Y DESENCOFRADO
0.00%
REVOQUES ENLUCIDOS Y MOLDADURAS
0.00%
TARRAJEO EXTERIOR C/MORTERO 1:5, e=1.5 cm
0.00%
PENDIENTE DE FONFO (MORTERO 1:5) E=1.5M
0.00%
VARIOS
0.00%
BAFLE Y PANTLLA DE MADERA EUCALIPTO TRATADI DE 1"x40"x5" PARA CANAL DE SALIDA
0.00%
BUZON DE CONCRETO H=1.50m, D=1.20m T/FG
0.00%
TUBERIA DE SALIDA A RIO MANTARO
0.00%
OBRAS PRELIMINARES
0.00%
TRAZO Y REPLANTEO A
0.00%
MOVIMIENTO DE TIERRAS
0.00%
EXCAVACION DE ZANJA CON RETROEXCAVDORA EN T. CONG 1.5*0.60
0.00%
REFINE Y NIVELACION DE FONDOS P/DESAGUE
0.00%
PREPARACION DE CAMA DE APOYO C/MAT. ZARANDEADO D/LUGAR
0.00%
RELLENO Y COMPAC. ZANJA CAPA 0.30M H=1.00 C/MAT. ZARANDEADO LUGAR
0.00%
SUMINISTRO E INST. DE TUBERIA PVC-UF
0.00%
SUMINISTRO E INST. TUB DN 160mm PVC UF S-25
0.00%
LAGUNA FACULTATIVA PRIMARIA (MOLINOS,HUERTAS,S.P. DE CHUNAN,PANCAN-ATAURA) 247.20%
unid
OBRAS PRELIMINARES
77.42%
TRAZO Y REPLANTEO
64.04%
LIMPIEZA DEL TERRENO P.T.A RESIDUALES
90.81%
MOVIMIENTO DE TIERRAS
16.99%
EXCAVACION MASIVA CON MAQUINARIA
66.13%
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
59.49%
CONFORMACION Y COMPACTACION DE DIQUES C/MAT PRESTAMO AL 50%
27.25%
NIVELACION Y COMPACTACION DE FONDO DE LAGUNA CAP. 030 C/MAT.DE PRESTAMO AL 50%0.00%
REFINE Y NIVELACION DE TALUD DE LAGUNA (DIQUE)
0.00%
IMPERMEABILIZACION DE FONDO DE LAGUNA C/ARCILLA E=10CM
0.00%
EMPASTADO CON MATERIAL IMPERMEABLE EN TALLUDES DE LAGUNA
0.00%
EMPASTADO CON MATERIAL IMPERMEABLE EN FONDO DE LAGUNA
0.00%
TENDIDO DE GEOMENBRANA PARA LA LAGUNA PRIMARIA N! 1 Y 2
0.00%
CERCO PERIMETRICO
0.00%
OBRAS PRELIMINARES
0.00%
TRAZO Y REPLANTEO
0.00%
MOVIMIENTO DE TIERRAS
0.00%
EXCAVACION MANUAL
0.00%
CONCRETO f'c=175 kg/cm2
0.00%
ALAMBRE DE PUAS N16
0.00%
MADERA EUCALIPTO-ROLLIZO
0.00%
PUERTA METALICA 4.00 x 3.00
0.00%
MEJORAMIENTO DE LA LAGUNA DE OXIDACION EXISTENTE (ATAURA)
20.00%
CANAL DE SALIDA DE AGUAS RESIDUALES TRATADAS
0.00%
LIMPIEZA DE VEGETACION Y EXTRACCION DE LODOS
100.00%
TENDIDO DE GEOMENBRANA PARA LA LAGUNA PRIMARIA N! 1 Y 2
0.00%
SUMINISTRO E INST. DEL EMISOR DE AGUAS RESIDUALES TRATADAS
0.00%
CONSTRUCCION DEL CERCO PERIMETRICO
0.00%
TANQUE SEPTICO Y ZANJA DE PERCOLACION (3 unid)
66.00%
OBRAS PRELIMINARES
66.67%
TRAZO Y REPLANTEO
66.67%
LIMPIEZA DEL TERRENO
66.67%
MOVIMIENTO DE TIERRAS
45.32%
NIVELACION Y APISONADO MANUAL
66.67%
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
2.62%
SOLADO DE CONCRETO 1:10 E=3"
66.67%
REVOQUES ENLUCIDOS Y MOLDADURAS
66.67%
EXCAVACION MANUAL
66.67%
OBRAS DE CONCRETO SIMPLE
66.67%
CONCRETO EN LOSA DE TECHO FC=210KG/CM2
66.67%
CONCRETO f'c=210Kg/cm2 LOSA DE FONDO
66.67%
CONCRETO EN MUROS f'c=210 kg/cm2
66.67%
ACERO DE REFUERZO fy=4,200 kg/cm2
66.67%
Descripcin
Pgina 26 de 49
Avance
Actual
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.73%
0.00%
0.00%
0.00%
1.46%
0.00%
0.00%
13.13%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Avance
Saldo por
Acumulado Valorizar
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
47.93%
77.42%
64.04%
90.81%
18.44%
66.13%
59.49%
40.38%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
20.00%
0.00%
100.00%
0.00%
0.00%
0.00%
66.00%
66.67%
66.67%
66.67%
45.32%
66.67%
2.62%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
52.07%
22.58%
35.96%
9.19%
81.56%
33.87%
40.51%
59.62%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
80.00%
100.00%
0.00%
100.00%
100.00%
100.00%
34.00%
33.33%
33.33%
33.33%
54.68%
33.33%
97.38%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
: MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO
DE LA LOCALIDAD DEL VALLE YACUS - ATAURA
Pto.Cont.
:
9,936,174.39 con IGV
8,420,486.77 sin IGV
Pto.Base
:
con IGV
sin IGV
Presupuesto : FORMULA POLINOMICA N 03 - PLANTA DE TRATAMIENTO
Item
09.04.05
09.05.00
09.05.01
09.05.02
09.06.00
09.06.01
09.06.02
09.06.03
09.06.04
09.06.05
09.06.06
09.06.07
09.06.08
09.06.09
09.07.00
09.07.01
09.07.02
10.00.00
10.01.00
11.00.00
11.01.00
Descripcin
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
TARRAJEO INTERIORES CON IMPERMEABILIZANTE M 1:5,e=1.5
TARRAJEO EXTERIOR C/MORTERO 1:5, e=1.5 cm
INSTALACIONES SANITARIAS
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T. CONG. 1.3X0.60
REFINE Y NIVELACION DE FONDOS P/DESAGUE
SUMINISTRO E INST. TUB DN 160mm PVC UF S-25
SUMINISTRO Y COLOCACION DE GRAVA DIAM 1/2"
SUMINISTRO Y COLOCACION DE GRAVA DIAM 1"
SUMINISTRO Y COLOCACION DE ARENA GRUESA
CODO PVC UF DN 160 mm x 90
TAPON PVC UF 160 mm
TEE PVC UF DN 160mm
VARIOS
PRUEBA DE CALIDAD DEL CONCRETO(PRUEBA A LA COMPRESION)
PRUEBA DE COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO)
LECHO DE SECADO
LECHO DE SECADO
VARIOS
APROBACION DIGESA-PLANTA DE TRATAMIENTO
Pgina 27 de 49
Avance
Anterior
Acumulad
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
83.33%
100.00%
66.67%
0.00%
0.00%
0.00%
0.00%
Avance
Actual
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Avance
Saldo por
Acumulado Valorizar
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
83.33%
100.00%
66.67%
0.00%
0.00%
0.00%
0.00%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
33.33%
16.67%
0.00%
33.33%
100.00%
100.00%
100.00%
100.00%
Pto.Cont.
:
Pto.Base
:
Presupuesto :
Item
01.00.00
01.01.00
01.01.01
01.01.02
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.02.12
01.02.13
01.02.14
01.02.15
01.02.16
01.02.17
01.02.18
01.02.19
01.02.20
01.02.21
01.02.22
01.02.23
01.02.24
01.02.25
01.02.26
01.02.27
01.02.28
01.02.29
01.02.30
01.02.31
01.02.32
01.02.33
01.02.34
01.02.35
01.02.36
01.02.37
01.02.38
01.02.39
01.02.40
01.02.41
01.02.42
01.02.43
01.02.44
01.02.45
01.02.46
01.02.47
01.02.48
01.03.00
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.03.07
01.03.08
01.03.09
01.03.10
01.04.00
01.04.01
01.04.02
01.04.03
01.04.04
01.05.00
01.05.01
01.05.02
01.05.03
01.05.04
02.00.00
02.01.00
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO
DE LA LOCALIDAD DEL VALLE YACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
con IGV
sin IGV
FORMULA POLINOMICA N 02 - SISTEMA DE ALCANTARILLADO
Avance Anterior
Acumulado
Descripcin
Avance Actual
SISTEMA DE ALCANTARILLADO
13.88%
3.48%
RED COLECTOR DE ALCANTARILLADO DE LOS DISTRITOS DE MOLINO, HUERTA PANCAN, S.P. DE
44.18%
CHUNAN Y YAULI 9.84%
OBRAS PRELIMINARES
75.15%
5.94%
TRAZO Y REPLANTEO
100.00%
0.00%
TOPOGRAFIA DURANTE LA EJECUCION DE LA OBRA
50.31%
11.88%
MOVIMIENTO DE TIERRAS
25.68%
9.89%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG.1.2*0.60
71.67%
15.20%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG.1.5*0.60
94.78%
0.95%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 2.0*0.60
79.94%
12.18%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 2.50*0.60
22.99%
23.29%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 3.0*0.60
13.27%
38.09%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 3.5*0.70
15.97%
43.88%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 4.00*0.70
1.31%
11.89%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 4.50*0.60
0.00%
0.00%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 5.0*0.60
0.00%
0.00%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 5.5*0.60
0.00%
0.00%
EXCAVACION DE ZANJA EN T.SEMIRROCOSO 1.50*0.60 M
0.00%
0.00%
EXCAVACION DE ZANJA EN T.SEMIRROCOSO 2.00 X 0.60 M
0.00%
0.00%
EXCAVACION DE ZANJA EN T.SATURADO 2.50 X 0.60 M
0.00%
0.00%
EXCAVACION DE ZANJA EN T.SATURADO 3.00 X 0.60 M
0.00%
0.00%
EXCAVACION DE ZANJA EN T.SATURADO 3.50 X 0.60 M
0.00%
0.00%
EXCAVACION DE ZANJA EN T. SATURADO 4.00 X 0.60 M
0.00%
0.00%
EXCAVACION DE ZANJA EN T.SATURADO 4.50 X 0.60 M
0.00%
0.00%
ENTIBADO Y DESENTIBADO DE ZANJA
2.99%
13.72%
REFINE Y NIVELACION DE FONDOS P/DESAGUE
56.98%
11.88%
PREPARACION DE CAMA DE APOYO C/MAT. ZARANDEADO D/ LUGAR E=10CM
43.54%
12.70%
PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO H=0.10M
91.43%
0.00%
PREPARACION DE CAMA DE APOYO C/MAT. GRAVA 1/2" H=0.10M
0.00%
0.00%
CUBRIMIENTO DE TUBERIA CON MATERIAL ZARANDEADO DEL LUGAR=0.30 M
58.29%
12.70%
CUBRIMIENTO DE TUBERIA C/MATERIAL DE PRESTAMO H=0.30 M
88.64%
0.00%
CUBRIMIENTO DE TUBERIA C/MATERIAL DE GRAVA 1/2" H=0.30 M
0.00%
0.00%
RELLENO Y COMPACTACION CAPAS 0.30mt H=1.20 C/MAT. ZAR.LUGAR
74.36%
16.28%
RELLENO Y COMPACTACION CAPAS 0.30mt H=1.50 C/MAT. ZAR.LUGAR
84.75%
0.95%
RELLENO Y COMPACTACION CAPAS 0.30mt H=2.00 C/MAT. ZAR.LUGAR
79.94%
12.18%
RELLENO Y COMPACTACION CAPAS 0.30mt H=2.50 C/MAT. ZAR.LUGAR
22.99%
23.29%
RELLENO Y COMPACTACION CAPAS 0.30mt H=3.00 C/MAT. ZAR.LUGAR
13.27%
38.09%
RELLENO Y COMPACTACION CAPAS 0.30mt H=3.50 C/MAT. ZAR.LUGAR
15.97%
43.88%
RELLENO Y COMPACTACION CAPAS 0.30mt H=4.00 C/MAT. ZAR.LUGAR
1.31%
11.89%
RELLENO Y COMPACTACION CAPAS 0.30mt H=4.50 C/MAT. ZAR.LUGAR
0.00%
0.00%
RELLENO Y COMPACTACION CAPAS 0.30mt H=5.00 C/MAT. ZAR.LUGAR
0.00%
0.00%
RELLENO Y COMPACTACION CAPAS 0.30mt H=5.50 C/MAT. ZAR.LUGAR
0.00%
0.00%
RELLENO Y COMPACTACION CAPAS 0.30mt H=0.70 C/MAT. DE CULTIVO
0.00%
0.00%
CONFORMACION Y COMPACTACION DE DIQUES C/MANT. PRESTAMO AL 50%
0.00%
0.00%
EXCAVACION DE BUZONES H=1.20m prof.T.Cong.
79.29%
10.33%
EXCAVACION DE BUZONES H=1.50m prof.T.Cong.
86.34%
9.21%
EXCAVACION DE BUZONES H=2.00m prof.T.Cong.
51.52%
15.27%
EXCAVACION DE BUZONES H=2.50m prof.T.Cong.
16.82%
17.69%
EXCAVACION DE BUZONES H=3.00m prof.T.Cong.
11.51%
23.01%
EXCAVACION DE BUZONES H=3.50m prof.T.Cong.
22.61%
33.92%
EXCAVACION DE BUZONES H=4.00m prof.T.Cong.
1.79%
12.52%
EXCAVACION DE BUZONES H=4.50m prof.T.Cong.
3.39%
0.00%
EXCAVACION DE BUZONES H=5.00m prof.T.Cong.
0.00%
0.00%
EXCAVACION DE BUZONES H=5.50m prof.T.Cong.
0.00%
0.00%
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
24.79%
9.71%
CONSTRUCCION DE BUZONES
27.45%
13.48%
BUZON DE CONCRETO H = 1.20m, D = 1.20m T/FoFo
78.32%
10.46%
BUZON DE CONCRETO H = 1.50m, D = 1.20m T/FoFo
75.79%
10.53%
BUZON DE CONCRETO H = 2.00m, D = 1.20m T/FoFo
57.41%
14.81%
BUZON DE CONCRETO H = 2.50m, D = 1.20m T/FoFo
20.00%
20.00%
BUZON DE CONCRETO H = 3.00m, D = 1.20m T/FoFo
14.29%
28.57%
BUZON DE CONCRETO H = 3.50m, D = 1.50m T/FoFo
25.00%
37.50%
BUZON DE CONCRETO H = 4.00m, D = 1.50m T/FoFo
3.70%
12.96%
BUZON DE CONCRETO H = 4.50m, D = 1.50m T/FoFo
0.00%
0.00%
BUZON DE CONCRETO H = 5.00m, D = 1.50m T/FoFo
0.00%
0.00%
BUZON DE CONCRETO H = 5.50m, D = 1.20m T/FoFo
0.00%
0.00%
SUMINISTRO E INST. DE TUBERIA PVC P/DESAGUE
44.43%
10.74%
SUMINISTRO E INST. TUB PVC UF 160 MM PVC UF S-25
72.27%
6.88%
SUMINISTRO E INST. TUB PVC UF 200 MM PVC UF S-25
50.39%
24.22%
SUMINISTRO E INST. TUB PVC UF 250 MM PVC UF S-20 EN ZANJAS MAYORES A H=3.00 METROS 0.00%
0.00%
PRUEBA HIDRAULICA TUB.PVC P/DESAGUE
55.07%
11.88%
VARIOS
48.18%
9.12%
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) /M
38.00%
10.00%
PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD CAMPO)
38.00%
10.00%
ROTURA Y REPOSICION DE PAVIMIENTO
55.30%
5.39%
DADOS DE CONCRETO P/ANCLAJE TUB.ENTRADA Y SALIDA DE BUZON 0.80X0.60
61.40%
11.11%
EMISORES DE LOS DISTRITOS DE MOLINO, HUERTA, PANCAN, S.P DE CHUMAN, YAULI-ATAURA 11.33%
4.09%
OBRAS PRELIMINARES
6.18%
1.88%
Pgina 28 de 49
Avance
Acumulado
17.36%
54.01%
81.09%
100.00%
62.19%
35.56%
86.87%
95.74%
92.12%
46.27%
51.36%
59.85%
13.20%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
16.70%
68.86%
56.24%
91.43%
0.00%
70.99%
88.64%
0.00%
90.64%
85.70%
92.12%
46.27%
51.36%
59.85%
13.20%
0.00%
0.00%
0.00%
0.00%
0.00%
89.62%
95.55%
66.78%
34.51%
34.52%
56.53%
14.31%
3.39%
0.00%
0.00%
34.50%
40.93%
88.78%
86.32%
72.22%
40.00%
42.86%
62.50%
16.67%
0.00%
0.00%
0.00%
55.18%
79.15%
74.61%
0.00%
66.95%
57.30%
48.00%
48.00%
60.69%
72.51%
15.41%
8.06%
Saldo por
Valorizar
82.64%
45.99%
18.91%
0.00%
37.81%
64.44%
13.13%
4.26%
7.88%
53.73%
48.64%
40.15%
86.80%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
83.30%
31.14%
43.76%
8.57%
100.00%
29.01%
11.36%
100.00%
9.36%
14.30%
7.88%
53.73%
48.64%
40.15%
86.80%
100.00%
100.00%
100.00%
100.00%
100.00%
10.38%
4.45%
33.22%
65.49%
65.48%
43.47%
85.69%
96.61%
100.00%
100.00%
65.50%
59.07%
11.22%
13.68%
27.78%
60.00%
57.14%
37.50%
83.33%
100.00%
100.00%
100.00%
44.82%
20.85%
25.39%
100.00%
33.05%
42.70%
52.00%
52.00%
39.31%
27.49%
84.59%
91.94%
Pto.Cont.
:
Pto.Base
:
Presupuesto :
Item
02.01.01
02.01.02
02.02.00
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.02.09
02.02.10
02.02.11
02.02.12
02.02.13
02.02.14
02.02.15
02.02.16
02.02.17
02.02.18
02.02.19
02.02.20
02.02.21
02.02.22
02.02.23
02.02.24
02.02.25
02.02.26
02.02.27
02.03.00
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.03.06
02.03.07
02.03.08
02.04.00
02.04.01
02.04.02
02.04.03
02.04.04
02.05.00
02.05.01
02.05.02
02.05.03
02.05.04
03.00.00
03.01.00
03.02.00
03.03.00
04.00.00
04.01.00
04.01.01
04.02.00
04.02.01
04.02.02
04.02.03
04.03.00
04.03.01
04.03.02
04.04.00
04.04.01
04.04.02
04.04.03
04.04.04
04.05.00
04.05.01
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALACION DEL SISTEMA DE ALCANTARILLADO SANITARIO
DE LA LOCALIDAD DEL VALLE YACUS - ATAURA
9,936,174.39 con IGV
8,420,486.77 sin IGV
con IGV
sin IGV
FORMULA POLINOMICA N 02 - SISTEMA DE ALCANTARILLADO
Avance Anterior
Acumulado
Descripcin
TRAZO Y REPLANTEO
6.18%
TOPOGRAFIA DURANTE LA EJECUCION DE LA OBRA
6.18%
MOVIMIENTO DE TIERRAS
17.48%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG.1.2*0.60
100.00%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG.1.5*0.60
7.00%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 2.0*0.60
23.53%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 3.0*0.60
9.41%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 3.5*0.70
0.00%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 4.00*0.70
0.00%
EXCAVACION DE ZANJA C/RETROEXCAVADORA EN T.CONG. 4.50*0.70
0.00%
ENTIBADO Y DESENTIBADO DE ZANJA
0.00%
REFINE Y NIVELACION DE FONDOS P/DESAGUE
6.18%
PREPARACION DE CAMA DE APOYO C/MAT. ZARANDEADO D/ LUGAR E=10CM
6.18%
CUBRIMIENTO DE TUBERIA CON MATERIAL ZARANDEADO DEL LUGAR=0.30 M
6.18%
RELLENO Y COMPACTACION CAPAS 0.30mt H=1.20 C/MAT. ZAR.LUGAR
100.00%
RELLENO Y COMPACTACION CAPAS 0.30mt H=1.50 C/MAT. ZAR.LUGAR
7.00%
RELLENO Y COMPACTACION CAPAS 0.30mt H=2.00 C/MAT. ZAR.LUGAR
23.53%
RELLENO Y COMPACTACION CAPAS 0.30mt H=3.00 C/MAT. ZAR.LUGAR
9.41%
RELLENO Y COMPACTACION CAPAS 0.30mt H=3.50 C/MAT. ZAR.LUGAR
0.00%
RELLENO Y COMPACTACION CAPAS 0.30mt H=4.00 C/MAT. ZAR.LUGAR
0.00%
RELLENO Y COMPACTACION CAPAS 0.30mt H=4.50 C/MAT. ZAR.LUGAR
0.00%
EXCAVACION DE BUZONES H=1.20m prof.T.Cong.
5.65%
EXCAVACION DE BUZONES H=1.50m prof.T.Cong.
17.89%
EXCAVACION DE BUZONES H=2.00m prof.T.Cong.
39.21%
EXCAVACION DE BUZONES H=2.50m prof.T.Cong.
100.00%
EXCAVACION DE BUZONES H=3.00m prof.T.Cong.
0.00%
EXCAVACION DE BUZONES H=3.50m prof.T.Cong.
0.00%
EXCAVACION DE BUZONES H=4.00m prof.T.Cong.
0.00%
EXCAVACION DE BUZONES H=4.50m prof.T.Cong.
0.00%
ELIMINACION DE MATERIAL EXCAVADO C/MAQUINARIA Y VOLQUETE
10.81%
CONSTRUCCION DE BUZONES
19.08%
BUZON DE CONCRETO H = 1.20m, D = 1.20m T/FoFo
5.00%
BUZON DE CONCRETO H = 1.50m, D = 1.20m T/FoFo
14.29%
BUZON DE CONCRETO H = 2.00m, D = 1.20m T/FoFo
33.33%
BUZON DE CONCRETO H=4.50 m D=1.50 m T/FoFo
100.00%
BUZON DE CONCRETO H = 3.00m, D = 1.20m T/FoFo
0.00%
BUZON DE CONCRETO H = 3.50m, D = 1.50m T/FoFo
0.00%
BUZON DE CONCRETO H = 4.00m, D = 1.50m T/FoFo
0.00%
BUZON DE CONCRETO H = 4.50m, D = 1.50m T/FoFo
0.00%
SUMINISTRO E INST. DE TUBERIA PVC P/DESAGUE
9.10%
SUMINISTRO E INST. TUB PVC UF 200 MM PVC UF S-25
30.21%
SUMINISTRO E INST. TUB PVC UF 250 MM PVC UF S-25
0.00%
SUMINISTRO E INST. TUB PVC UF 250 MM PVC UF S-25 EN ZANJAS MAYORES A H=3.00 METROS 0.00%
PRUEBA HIDRAULICA TUB.PVC P/DESAGUE
6.18%
VARIOS
4.80%
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) /M
3.00%
PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD CAMPO)
6.00%
ROTURA Y REPOSICION DE PAVIMIENTO
0.00%
DADOS DE CONCRETO P/ANCLAJE TUB.ENTRADA Y SALIDA DE BUZON 0.80X0.60
10.20%
CRUCE DE TUBERIA EN LINEA FERREREA, CARRETERA CENTRAL Y RIOS
0.00%
CRUCE DE TUBERIAS EN LINEA FERREA
0.00%
CRUCE DE CARRETERA CENTRAL
0.00%
CRUCE DE RIO-SUBTERRANEO
0.00%
ACUEDUCTOS SOBRE EL RIO JULCAN Y YACUS (PUENTE NEGRO) 2 UNID
0.00%
OBRAS PRELIMINARES
0.00%
TRAZO Y REPLANTEO
0.00%
MOVIMIENTO DE TIERRAS
0.00%
EXCAVACION MANUAL EN T/CONG
0.00%
RELLENO Y COMPAC. C/MATERIAL DEL LUGAR EN ESTRIBOS 85% D.S.
0.00%
PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO H=0.10
0.00%
OBRAS DE CONCRETO SIMPLE
0.00%
CONCRETO CICLOPEO FC=175G/CM2 + 40 % P.G.( 20<=6")
0.00%
ENCOFRADO / DESENCOFRADO
0.00%
OBRAS DE CONCRETO ARMADO
0.00%
CONCRETO F'C=210 KG/CM2
0.00%
CONCRETO F'C=175 KG/CM2
0.00%
ENCOFRADO / DESENCOFRADO
0.00%
ACERO DE REFUERZO F'Y=4200 KG/CM2
0.00%
REVOQUES ENLUCIDOS Y MOLDADURAS
0.00%
TARRAJEO EXTERIOR C/MORTERO 1:5, E=1.5 cm
0.00%
Pgina 29 de 49
Avance Actual
1.88%
1.88%
1.72%
0.00%
4.47%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.88%
1.88%
1.88%
0.00%
4.47%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
17.89%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
13.92%
1.79%
0.00%
14.29%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.77%
9.20%
0.00%
0.00%
1.88%
12.27%
15.00%
30.00%
0.00%
4.08%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Avance
Acumulado
8.06%
8.06%
19.20%
100.00%
11.47%
23.53%
9.41%
0.00%
0.00%
0.00%
0.00%
8.06%
8.06%
8.06%
100.00%
11.47%
23.53%
9.41%
0.00%
0.00%
0.00%
5.65%
35.78%
39.21%
100.00%
0.00%
0.00%
0.00%
0.00%
24.73%
20.86%
5.00%
28.57%
33.33%
100.00%
0.00%
0.00%
0.00%
0.00%
11.87%
39.41%
0.00%
0.00%
8.06%
17.07%
18.00%
36.00%
0.00%
14.29%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Saldo por
Valorizar
91.94%
91.94%
80.80%
0.00%
88.53%
76.47%
90.59%
100.00%
100.00%
100.00%
100.00%
91.94%
91.94%
91.94%
0.00%
88.53%
76.47%
90.59%
100.00%
100.00%
100.00%
94.35%
64.22%
60.79%
0.00%
100.00%
100.00%
100.00%
100.00%
75.27%
79.14%
95.00%
71.43%
66.67%
0.00%
100.00%
100.00%
100.00%
100.00%
88.13%
60.59%
100.00%
100.00%
91.94%
82.93%
82.00%
64.00%
100.00%
85.71%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Entidad
Contratista
Monto Cont.
S/. 8,420,486.77
(Sin I.G.V.)
Monto Adelanto
S/. 1,684,097.35
(Sin I.G.V.)
Fecha Adelanto
AVANCE PROGRAMADO
(1)
17,127.29
14,200.48
17,127.29
14,200.48
125,013.40
71,985.14
142,140.69
86,185.62
189,790.44
175,192.73
331,931.13
261,378.35
375,783.01
274,592.19
707,714.14
535,970.54
444,418.30
223,499.57
1,152,132.44
759,470.11
365,785.79
341,629.43
1,517,918.23
1,101,099.54
413,103.82
1,931,022.05
448,172.35
2,379,194.40
456,896.68
2,836,091.08
59,591.99
2,895,683.07
37,691.15
2,933,374.22
2,333.16
2,935,707.38
AVANCE
EJECUTADO
(2)
1,174.97
2,936,882.35
REAJUSTE
PROGRAMADO
(1) x (3)
K-1
(3)
0.007
0.007
0.008
0.020
0.023
0.027
119.89
REAJUSTE
RECONOCID VALORIZADO
(2) + (4)
O
(4)
99.40
99.40
14,299.88
REAJUSTE
EJECUTADO
(2) x (3)
119.89
99.40
99.40
14,299.88
875.09
503.90
503.90
72,489.04
994.98
603.30
603.30
86,788.92
1,518.32
1,401.54
1,401.54
176,594.27
2,513.30
2,004.84
2,004.84
263,383.19
7,515.66
5,491.84
5,491.84
280,084.03
10,028.96
7,496.68
7,496.68
543,467.22
10,221.62
5,140.49
5,140.49
228,640.06
20,250.58
12,637.17
12,637.17
772,107.28
9,876.22
9,223.99
9,223.99
350,853.42
30,126.80
21,861.16
21,861.16
1,122,960.70
Entidad
Contratista
Monto Cont.
S/. 8,420,486.77
(Sin I.G.V.)
Monto Adelanto
S/. 1,684,097.35
(Sin I.G.V.)
Fecha Adelanto
AVANCE PROGRAMADO
(1)
17,127.29
216,146.28
17,127.29
216,146.28
125,013.40
388,188.32
142,140.69
604,334.60
189,790.44
374,557.31
331,931.13
978,891.91
375,783.01
367,343.29
707,714.14
1,346,235.20
444,418.30
384,412.16
1,152,132.44
1,730,647.36
365,785.79
414,442.88
1,517,918.23
2,145,090.24
413,103.82
1,931,022.05
448,172.35
2,379,194.40
456,896.68
2,836,091.08
59,591.99
2,895,683.07
37,691.15
2,933,374.22
2,333.16
2,935,707.38
AVANCE
EJECUTADO
(2)
1,174.97
2,936,882.35
REAJUSTE
PROGRAMADO
(1) x (3)
K-1
(3)
REAJUSTE
RECONOCID VALORIZADO
(2) + (4)
O
(4)
216.15
216.15
216,362.43
REAJUSTE
EJECUTADO
(2) x (3)
0.001
17.13
17.13
216.15
216.15
216,362.43
0.003
375.04
1,164.56
1,164.56
389,352.88
392.17
1,380.71
1,380.71
605,715.31
-569.37
-1,123.67
-1,123.67
373,433.64
-177.20
257.04
257.04
979,148.95
4,133.61
4,040.78
4,040.78
371,384.07
3,956.41
4,297.82
4,297.82
1,350,533.02
4,444.18
3,844.12
3,844.12
388,256.28
8,400.59
8,141.94
8,141.94
1,738,789.30
-0.003
0.011
0.010
0.014
5,121.00
5,802.20
5,802.20
420,245.08
13,521.59
13,944.14
13,944.14
2,159,034.38
Entidad
Contratista
Monto Cont.
S/. 8,420,486.77
(Sin I.G.V.)
Monto Adelanto
S/. 1,684,097.35
(Sin I.G.V.)
Fecha Adelanto
AVANCE PROGRAMADO
(1)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
106,904.98
0.00
106,904.98
0.00
39,217.70
0.00
146,122.68
99,979.51
24,407.63
99,979.51
170,530.31
125,960.62
12,192.55
225,940.13
182,722.86
122,554.31
348,494.44
278,662.44
627,156.88
170,070.92
797,227.80
178,555.19
975,782.99
143,228.96
1,119,011.95
47,430.82
1,166,442.77
AVANCE
EJECUTADO
(2)
21,758.79
1,188,201.56
0.00
REAJUSTE
RECONOCID VALORIZADO
(2) + (4)
O
(4)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,603.57
1,603.57
108,508.55
0.00
1,603.57
1,603.57
108,508.55
0.00
1,098.10
1,098.10
40,315.80
0.00
2,701.67
2,701.67
148,824.35
REAJUSTE
PROGRAMADO
(1) x (3)
K-1
(3)
0.013
0.014
0.015
0.028
0.028
0.027
REAJUSTE
EJECUTADO
(2) x (3)
2,799.43
683.41
683.41
25,091.04
2,799.43
3,385.08
3,385.08
173,915.39
3,400.94
329.20
329.20
12,521.75
6,200.37
3,714.28
3,714.28
186,437.14
: MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALALCION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA
LOCALIDAD DEL VALLE YACUS - ATAURA
: MUNICIPALIDAD PROVINCIAL DE JAUJA
: CONSORCIO A&E MINEROS CIVILES
: NOVIEMBRE 2012
: JUNIN (Zona Geogrfica 03)
Frmula Polinmica N 01 - SISTEMA DE AGUA POTABLE
K = 0.082 HCr/HCo + 0.093 AAr/AAo + 0.302 IFr/IFo + 0.202 Tr/To + 0.211 Mr/Mo + 0.110 MTr/MTo
Ind.
38
04
39
72
47
48
DESCRIPCIN
Hormigon
Agregado fino
Indice general de precios al cons.
Tuberia de PVC
Mano de obra inc. Leyes sociales
maquinaria y equipo nacional
Abrev
Incid
HC
AA
IF
T
M
MT
100.000%
100.000%
100.000%
100.000%
100.000%
100.000%
Nov.2011
IUo
K
757.70 0.082
878.93 0.093
368.88 0.302
351.77 0.202
448.29 0.211
330.64 0.110
1.000
Jun.2012
IUr
K
770.07 0.083
896.37 0.095
377.30 0.309
346.99 0.199
448.25 0.211
329.22 0.110
1.007
Jul.2012
IUr
K
766.91 0.083
890.71 0.094
377.16 0.309
350.65 0.201
448.25 0.211
328.79 0.109
1.007
Ago.2012
IUr
K
775.72 0.084
898.59 0.095
377.50 0.309
348.79 0.200
448.25 0.211
327.55 0.109
1.008
Set.2012
IUr
K
776.21 0.084
902.72 0.096
379.42 0.311
346.50 0.199
470.75 0.222
325.98 0.108
1.020
Oct.2012
IUr
K
782.23 0.085
903.38 0.096
381.48 0.312
347.79 0.200
470.79 0.222
325.11 0.108
1.023
Nov.2012
IUr
K
785.44 0.085
904.39 0.096
380.86 0.312
354.66 0.204
470.79 0.222
324.30 0.108
1.027
: MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE E INTALALCION DEL SISTEMA DE ALCANTARILLADO SANITARIO DE LA
LOCALIDAD DEL VALLE YACUS - ATAURA
Entidad
Contratista
Fecha
Ubicacin
Ind.
DESCRIPCIN
Abrev
Incid
65
38
48
72
39
47
TAH
HM
MC
T
I
M
100.000%
100.000%
100.000%
100.000%
100.000%
100.000%
Nov.2011
IUo
K
263.19 0.090
757.70 0.058
330.54 0.175
351.77 0.187
368.88 0.207
448.29 0.283
1.000
Jun.2012
IUr
K
260.47 0.089
770.07 0.059
329.22 0.174
346.99 0.184
377.30 0.212
448.25 0.283
1.001
Jul.2012
IUr
K
258.98 0.089
766.91 0.059
328.79 0.174
350.65 0.186
377.16 0.212
448.25 0.283
1.003
Ago.2012
IUr
K
249.56 0.085
775.72 0.059
327.55 0.173
348.79 0.185
377.50 0.212
448.25 0.283
0.997
Set.2012
IUr
K
249.37 0.085
776.21 0.059
325.98 0.173
346.50 0.184
379.42 0.213
470.75 0.297
1.011
Oct.2012
IUr
K
239.44 0.082
782.23 0.060
325.11 0.172
347.79 0.185
381.48 0.214
470.79 0.297
1.010
Nov.2012
IUr
K
241.06 0.082
785.44 0.060
324.30 0.172
354.66 0.189
380.86 0.214
470.79 0.297
1.014
DESCRIPCIN
Maquinaria y equipo nacional
Agregado grueso
Mano de obra inc. Leyes sociales
Indice general de precios al consumidor
Abrev
Incid
MT
ACA
M
I
100.000%
100.000%
100.000%
100.000%
Nov.2011
IUo
K
330.64 0.102
352.77 0.356
448.29 0.195
368.88 0.347
1.000
Jun.2012
IUr
K
329.22 0.102
357.34 0.361
448.25 0.195
377.30 0.355
1.013
Jul.2012
IUr
K
328.79 0.101
359.70 0.363
448.25 0.195
377.16 0.355
1.014
Ago.2012
IUr
K
327.55 0.101
360.73 0.364
448.25 0.195
377.50 0.355
1.015
Set.2012
IUr
K
325.98 0.101
361.97 0.365
470.75 0.205
379.42 0.357
1.028
Oct.2012
IUr
K
325.11 0.100
360.26 0.364
470.79 0.205
381.48 0.359
1.028
Nov.2012
IUr
K
324.30 0.100
360.51 0.364
470.79 0.205
380.86 0.358
1.027
CLCULO DE VALORIZACIN N 02
RESUMEN DE LA VALORIZACIN N 02
CONSOLIDADO DE PLANILLAS
RESUMEN DE PLANILLAS
SUSTENTO DE VALORIZACIN
ANEXOS
DOCUMENTACIN RECIBIDA
DOCUMENTACIN REMITIDA
PANEL FOTOGRFICO
DOCUMENTACIN COMPLEMENTARIA
CONTRATO DE OBRA
PLANILLA DE METRADOS