Compaa Minera San Simon SA.

CONTROL DE PRODUCCION DIARIA MINA: ENERO 2013

31 ENERO 2013.

31

MES: ENERO 2032.


MINA

TAJO

TM ROCA MES

PROGRAMADO

963,853.00

31,092.03

S.RATIO

Ley (gr/tn)

ONZAS
Au

Dias/mes

5.65

0.862

4,020.7

31

S.R

EJEC
MINERAL
TMS

PRoGRAMA DE PRODUCCION MINA

DICIEMBRE 12.

DIA

DIA

PROG_
PROG DESM TM.
MINERAL TMS

PROG ROCA
TM

% Solubilidad
0%

EJEC_MINERAL

PROG Ley
(gr/Tn)

PROG
Onzas Pad

% CUMPL

Onz_Vend

20

Mineral

0.0

Desmonte

EJEC_DESMONTE
EJC DESM
TM.

% CUMPL

TMS/mes
TM/mes

145,049.00

EJEC_ ROCA TM
EJEC ROCA
TM

% CUMPL

S.R

4,679.00

818,804.00
26,413.03
963,853.00 31,092.03
PRODUCC_ FINOS
DIFER.

EJEC Ley
Gr/TM

EJEC Onzas
Pad

PRODUCCION PLANTA_ ADR


% CUMP

FLUJO
m3/dia

Au desorv.
(Onzas)

Ley Pregm
(gr/m3)

Onzas en
Carbon
(Onzas)

ACUM Au
(bullion)

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

3,954.8

85%

13,205.1

50%

15,021.8

48%

3.34

(16,070.2)

0.250

31.8

0.9

#REF!

#REF!

#REF!

#REF!

#REF!

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

3,668.6

78%

15,727.6

60%

20,107.9

65%

4.29

(10,984.1)

0.242

28.5

0.7

#REF!

#REF!

#REF!

#REF!

#REF!

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

0%

17,308.9

66%

20,088.8

65%

#DIV/0!

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

0%

3,635.7

14%

31,149.4

100%

#DIV/0!

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

0%

25,701.9

97%

37,348.1

120%

#DIV/0!

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

0%

8,067.5

31%

30,141.0

97%

#DIV/0!

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

0%

1,781.7

7%

24,847.1

80%

#DIV/0!

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

0%

16,083.8

61%

31,939.8

103%

#DIV/0!

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

799.3

17%

3,452.1

13%

26,955.6

87%

4.32

(4,136.4)

0.242

6.2

10

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

1,803.6

39%

18,654.4

71%

33,092.7

106%

10.34

2,000.6

0.242

14.0

11

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

0%

13,709.8

52%

27,889.2

90%

#DIV/0!

(3,202.9)

12

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

0%

26,072.2

99%

31,150.6

100%

#DIV/0!

13

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

0%

18,884.2

71%

24,533.6

79%

#DIV/0!

(6,558.5)

14

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

1,816.7

39%

19,270.6

73%

27,959.6

90%

10.61

(3,132.5)

0.301

17.6

15

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

4,380.3

94%

0%

0%

(31,092.0)

0.740

16

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

2,780.0

59%

14,494.9

55%

24,244.7

78%

5.21

(6,847.3)

17

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

27,513.7

588%

26,994.1

102%

35,194.7

113%

0.98

18

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

11,646.2

249%

24,810.4

94%

27,721.7

89%

2.13

19

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

22,073.5

472%

45,659.7

173%

47,474.5

153%

20

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

23,065.5

493%

34,196.1

129%

39,345.8

21

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

15,856.0

339%

23,894.0

90%

22

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

23,503.5

502%

29,693.1

23

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

14,438.2

309%

24

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

14,179.4

25

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

5,078.4

26

4,679.0

26,413.0

31,092.0

0.862

129.7

27

4,679.0

26,413.0

31,092.0

0.862

28

4,679.0

26,413.0

31,092.0

29

4,679.0

26,413.0

30

4,679.0

31

(11,003.2)

#REF!

#REF!

#REF!

#REF!

57.4

#REF!

#REF!

#REF!

#REF!

6,256.1

#REF!

#REF!

#REF!

#REF!

(951.0)

#REF!

#REF!

#REF!

#REF!

(6,244.9)

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

0.0

#REF!

#REF!

#REF!

#REF!

0.2

#REF!

#REF!

#REF!

#REF!

847.7

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

0.2

#REF!

#REF!

#REF!

#REF!

104.3

3.1

#REF!

#REF!

#REF!

#REF!

0.745

66.6

1.3

#REF!

#REF!

#REF!

#REF!

4,102.7

1.097

970.5

183.5

#REF!

#REF!

#REF!

#REF!

(3,370.4)

0.336

125.7

10.1

#REF!

#REF!

#REF!

#REF!

2.068533

16,382.4

1.171

830.8

126.0

#REF!

#REF!

#REF!

#REF!

127%

1.482568

8,253.8

0.548

406.5

64.4

#REF!

#REF!

#REF!

#REF!

37,657.3

121%

1.506937

6,565.2

0.662

337.5

36.8

#REF!

#REF!

#REF!

#REF!

112%

37,104.7

119%

1.26335

6,012.7

0.725

547.9

88.5

#REF!

#REF!

#REF!

#REF!

18,562.4

70%

27,310.4

88%

1.285645

(3,781.7)

0.643

298.4

29.6

#REF!

#REF!

#REF!

#REF!

303%

11,709.5

44%

20,389.3

66%

0.825815

(10,702.8)

0.488

222.5

21.7

#REF!

#REF!

#REF!

#REF!

109%

16,322.0

62%

23,708.5

76%

3.214001

(7,383.5)

0.342

55.8

1.9

#REF!

#REF!

#REF!

#REF!

5.65

0%

14,489.1

55%

28,925.0

93%

#DIV/0!

(2,167.1)

#REF!

#REF!

#REF!

#REF!

129.7

5.65

0%

21,973.2

83%

29,691.3

95%

#DIV/0!

(1,400.7)

#REF!

#REF!

#REF!

#REF!

0.862

129.7

5.65

0%

18,310.7

69%

25,010.1

80%

#DIV/0!

(6,081.9)

#REF!

#REF!

#REF!

#REF!

31,092.0

0.862

129.7

5.65

0%

17,307.5

66%

28,193.5

91%

#DIV/0!

(2,898.5)

#REF!

#REF!

#REF!

#REF!

26,413.0

31,092.0

0.862

129.7

5.65

0%

16,708.4

63%

25,370.1

82%

#DIV/0!

(5,722.0)

#REF!

#REF!

#REF!

#REF!

4,679.0

26,413.0

31,092.0

0.862

129.7

5.65

0%

20,196.0

76%

27,852.5

90%

#DIV/0!

(3,239.6)

#REF!

#REF!

#REF!

#REF!

Acumul. Al Dia

145,049.0

818,804.0

963,853.0

6,232.1

121.7%

556,876.8

68.0%

867,419.2

90.0%

4,064.7

65.2%

Total Al Mes

145,049.0

818,804.0

963,853.0

4,020.7

121.7%

% Al Mes

68.0%

176,557.6
% Al Mes

90.0%

3.15

58.5

(96,433.81)
TM

0.716

% Cumpl. Mensual

101.1%

ACUMULADO DEL AO 2012.

#Dias
PRODUCCION TAJO (TMS)
DESMONTE

TOTAL

S.R

Ley Gr/TM

1,444,414.4
871,943.9

1,633,550.4
1,167,750.6

7.64
2.95

0.749

Febrero 12

189,136.1
295,806.7

Marzo 12

491,112.0

549,759.8

1,040,871.8

1.12

Abril-12

299,525.4

408,745.6

708,271.0

Mayo-12

387,771.4

403,371.9

791,143.3

Junio-12

521,829.2

332,704.7

854,533.8

MINERAL
Enero-12

PRODUCCION ONZAS Au a PAD

PRODUCC. FINOS (Au)

MESES - 2012

Gramos

Onzas PAD

Onzas
Vendibles
1,992.72

% Recup.

0.346

141,732.35
102,349.9

4,556.80
3,290.6

0.263

129,007.2

4,147.7

1,199.94
1,192.45

1.36

0.448

134,217.9

4,315.2

*****

****

1.04

0.452
0.456

175,112.6

5,630.0

*****

****

0.64

238,052.4

7,653.6

1.84

0.421

920,472.26

4,385.1

14.8%

43.7%
36.5%
28.7%

Julio -12
Agosto 12
Setiembre 12
Octubre 12

Noviembre 12
Diciembre 12
TOTAL ACUM 2012.

2,185,180.8

4,010,940.2

6,196,120.9

29,593.9

31
FINOS

PROGRAMA MES (ONZAS)

4,020.7

PROGRAMA A LA FECHA(ONZAS)
EJECUTADO A LA FECHA (ONZAS)
BALANCE PRODUCCION AL MES (ONZAS)
% CUMPLIM. ONZAS ( A LA FECHA)
% CUMPLIM. ONZAS (AL MES)

4,020.7
4,064.7
43.95
101.1%
101.1%

PLAN DE PRODUCCION ENERO


Descripcin

UM

2012.

31

20

SUB PLAN
(SURO)

S_ SUR
FASE2

TOTAL
MENSUAL

Producc/Dia Mes

Prod/dia Planta

Mineral

TMS

145,049

145,049

4,679

7,252

Desmonte

TM

38,352

780,452

818,804

26,413

26,413

26,137.5

Total Roca

TM

183,401

780,452

963,853

31,092

33,665

35,807.5

S.R

D/M

0.26

0.0

5.65

Ley

Gr/TM

0.862

0.9

0.862

Onzas Pad

Onzas

4,021

4,021

% RATIO DE REC
Onza Vendible Onzas

0%

0%

9,670

0.862
130

201

DETALLE DEL PLAN PRODUCCION ENERO 2013


ONZAS
ZONA

BANCOS

MINERAL

(TMS)

LEY (gr/TM)

DESMONTE

(TM.)

S.R

Total Roca

(TM )

0.0

0.00

1,688.00

A PAD

Roca

Onzas

Rat. Rec

Recup.

#DIV/0!

50%

8.2

FASE 1 (STOCK)

3521

1,688.00

0.30

16.39

FASE 1 (STOCK)

3515

6,712.00

1.76

379.37

0.0

0.00

6,712.00

#DIV/0!

50%

189.7

FASE 1 (STOCK)

3509

3,492.00

0.24

27.17

0.0

0.00

3,492.00

#DIV/0!

50%

13.6

FASE 1

3509

50,461.00

0.88

1,425.47

11,232.0

0.22

61,693.00

#DIV/0!

50%

712.7

FASE 1

3503

43,910.00

0.83

1,174.74

15,120.0

0.34

59,030.00

#DIV/0!

50%

587.4

FASE 1

3497

38,786.00

0.80

997.60

12,000.0

0.31

50,786.00

0.00

0.00

0.00

780,452.00

0.0

780,452.00

#DIV/0!

50%

0.0

#DIV/0!

50%

1,511.6

SURO SUR F2
DESBROCE
TOTAL

145,049.0

0.862

4,020.74

818,804.0

5.65

963,853.0

Ca. Minera San Simn S.A


REPORTE DIARIO MINA (MINERAL - DESMONTE)

CONTROL DE EXTRACCION POR ZONAS (ENERO 2012)


ENERO 2013.
FECHA

SUBPLAN (SURO BAJO)


MIN

DES

ROCA

SURO SUR F2 (Este - Oeste)

Ley

onzas

D/M

MIN

DES

ROCA

1/1/2013

1,816.71

13,205.13

15,021.84

0.30

17.61

7.27

1/2/2013

4,380.26

12,790.14

17,170.40

0.74

104.27

2.92

2,937.48

1/3/2013

2,779.98

12,650.85

15,430.83

0.74

66.58

4.55

4,658.00

1/4/2013

27,513.73

3,635.70

31,149.42

1.10

970.51

0.13

1/5/2013

11,646.21

25,701.87

37,348.08

0.34

125.71

2.21

1/6/2013

22,073.48

8,067.55

30,141.03

1.17

830.84

0.37

1/7/2013

23,065.45

1,781.69

24,847.14

0.55

406.52

1/8/2013

15,856.01

16,083.77

31,939.77

0.66

1/9/2013

23,503.47

3,452.12

26,955.59

1/10/2013

14,438.23

16,703.12

1/11/2013

14,179.37

1/12/2013

Total

ARC.

Total

TOTAL MINA
MIN

DES

ROCA

Ley

onzas

D/M

1,816.71

13,205.13

15,021.84

0.301

17.61

7.27

2,937.48

4,380.26

15,727.62

20,107.88

0.74

104.27

3.59

4,658.00

2,779.98

17,308.86

20,088.84

0.74

66.58

6.23

27,513.73

3,635.70

31,149.42

1.10

970.51

0.13

11,646.21

25,701.87

37,348.08

0.34

125.71

2.21

22,073.48

8,067.55

30,141.03

1.17

830.84

0.37

0.08

23,065.45

1,781.69

24,847.14

0.55

406.52

0.08

337.48

1.01

15,856.01

16,083.77

31,939.77

0.66

337.48

1.01

0.73

547.89

0.15

23,503.47

3,452.12

26,955.59

0.73

547.89

0.15

31,141.35

0.64

298.40

1.16

1,951.33

1,951.33

14,438.23

18,654.44

33,092.68

0.64

298.40

1.29

10,478.57

24,657.94

0.49

222.45

0.74

3,231.23

3,231.23

14,179.37

13,709.80

27,889.16

0.49

222.45

0.97

5,078.41

20,532.91

25,611.33

0.34

55.77

4.04

5,539.25

5,539.25

5,078.41

26,072.16

31,150.57

0.34

55.77

5.13

1/13/2013

5,649.42

18,884.15

24,533.57

0.49

88.17

3.34

5,649.42

18,884.15

24,533.57

0.49

88.17

3.34

1/14/2013

8,689.00

19,270.57

27,959.58

0.23

63.64

2.22

8,689.00

19,270.57

27,959.58

0.23

63.64

2.22

3,776.76

9,749.87

14,494.88

24,244.75

0.31

96.27

1.49
3.29

1/16/2013

9,749.87

10,718.12

20,467.99

0.31

96.27

1.10

1/17/2013

8,200.60

26,070.93

34,271.54

0.41

106.95

3.18

923.21

923.21

209.82

209.82

8,200.60

26,994.14

35,194.75

0.41

106.95

1/18/2013

2,911.21

22,523.40

25,434.61

0.45

42.17

7.74

2,287.04

2,287.04

2,911.21

24,810.44

27,721.65

0.45

42.17

8.52

1/19/2013

387.42

41,882.96

42,270.38

0.46

5.78

108.11

1,427.32

3,776.76

5,204.08

0.70

32.17

1,814.74

45,659.72

47,474.46

0.65

37.95

25.16

1/20/2013

1,750.50

25,015.41

26,765.91

0.25

13.84

14.29

3,399.22

9,180.69

12,579.91

0.70

76.61

5,149.72

34,196.10

39,345.82

0.55

90.46

6.64

1/21/2013

5,784.11

21,562.68

27,346.79

0.25

45.75

3.73

7,979.15

2,331.33

10,310.48

0.70

179.83

13,763.26

23,894.00

37,657.27

0.51

225.58

1.74

26,315.00

26,315.00

7,411.63

3,378.10

10,789.73

0.70

167.04

7,411.63

29,693.10

37,104.73

0.70

167.04

4.01

1/22/2013

3,776.76

onzas
-

1/15/2013

Bot Contratas
Cantera almacen

Ley

1/23/2013

6,511.52

6,604.55

13,116.07

0.32

66.08

1.01

2,236.40

11,957.90

14,194.29

0.70

50.40

8,747.92

18,562.45

27,310.36

0.41

116.48

2.12

1/24/2013

6,205.69

2,433.91

8,639.60

0.26

50.95

0.39

2,474.03

9,275.62

11,749.65

0.70

55.76

8,679.72

11,709.53

20,389.25

0.38

106.71

1.35

1/25/2013

4,157.18

2,035.25

6,192.43

0.25

33.82

0.49

3,229.35

14,286.77

17,516.11

0.70

72.78

7,386.53

16,322.02

23,708.55

0.45

106.60

2.21

14,435.82

14,489.13

28,924.96

0.64

298.34

14,435.82

14,489.13

28,924.96

0.64

298.34

1.00

1/26/2013

1/27/2013

121.93

1,237.94

1,359.86

0.21

0.80

10.15

7,596.20

20,735.28

28,331.48

0.46

111.31

7,718.13

21,973.22

29,691.35

0.45

112.12

2.85

1/28/2013

2,255.64

4,478.46

6,734.10

0.67

48.30

1.99

4,443.83

13,832.20

18,276.03

0.48

67.86

6,699.47

18,310.66

25,010.13

0.54

116.16

2.73

1/29/2013

10,886.00

9,455.70

20,341.70

0.40

140.70

0.87

7,851.78

7,851.78

10,886.00

17,307.48

28,193.48

0.40

140.70

1.59

1/30/2013

8,661.61

16,708.45

25,370.06

0.29

81.59

1.93

8,661.61

16,708.45

25,370.06

0.29

81.59

1.93

1/31/2013

7,656.42

20,196.04

27,852.46

0.26

65.00

2.64

7,656.42

20,196.04

27,852.46

0.26

65.00

209.82

209.82

2/1/2013

255,909.4

420,476.9

676,386.4

0.60

4,933.86

1.64

54,632.9

136,399.9

191,032.8

0.63

1,112.12

310,542.4

556,876.8

867,419.2

0.61

6,046.0

310,542.4

556,876.8

867,419.2

6,046.0

310,542.4

556,876.8

867,419.2

6,046.0

2.64
1.79

ORE_CONTROL: REPORTE GERENCIA OPERACIONES


ENERO 2013.
FECHA:

MINERAL PROGRAMADO MES (TM.):


DESMONTE PROGRAMADO MES (TM.):
LEY PROGRAMADA MES (gr/Tn):
ONZAS PROGRAMADAS MES (Oz.):

31 ENERO 2013.

GEOLOGIA - ORE CONTROL


DIARIO

T.M. MIN. SECAS


LEY
ONZAS

ACUMULADO DEL MES ACTUAL(OCTUBRE)

SURO SUR F1

SURO SUR F2

ALUMBRE F1

SURO NORTE BOT

TOTAL

SURO SUR F1

SURO SUR F2

7,656.4
0.264
65.003

0.000
0.000
0.000

0
0.000
0.000

0
0.000
0.000

7,656.4
0.264
65.00

89,578
0.316
910.826

54,633
0.633
1112.117

STOCK DE MATERIAL

ALUMBRE F1 SURO NORTE BOT

0
0.000
0.000

0
0.000
0.000

TOTAL

suro sur (F1)

144,211
0.436
2,022.94

85,662
0.407
1120.2

580

suro sur (f2) ALUMBRE SURO NORTE


3,474
0.701
78

0
0.000
0.00

0
0.000
0.00

TOTAL
89,135
0.418
1,199
OVER
101
2119.182

CONTROL DIARIO DE PRODUCC_MINERAL


CONTROL DIARIO DE PRODUCC_DESMONTE (DEL TOTAL)
SUB PLAN (SURO BAJO)

MINERAL

SURO SUR F2 (ESTE-OESTE)

BOTADERO SURO NORTE

ALUMBRE

TOTAL
TOTAL
VIAJES

DESMONTE

TOTAL TMS Au Total


Gr/tom

SURO SUR (FASE 2)

SURO SUR BAJO (sub plan)

CANTERA ALMACEN (arcilla)

PAD FASE 5 - FASE 1 (LIXIVIADO)

LASTRE COMUNIDADES

TOTAL

OVER - FASE 5

N
VIAJES

0nzas

N VIAJES

TMS

Ley

0nzas

N VIAJES

TMS

Ley

Onzas

N
VIAJES

TMS

Ley

Onzas

01/01/13

26

1,816.71

0.301

17.61

0.0

0.000

0.00

17.61

01/12/12

0.0

67

6,365.0

326

6,840.1

46

965

393.0

13,205.1

0.0

0.000

0.00

0.000
0.000

547.6

0.0
0.0

0.301

104.27

0
0

1,816.71

0.740

0.000
0.000

26

4,380.26

0.0
0.0

0.00

345

0
0

0.00

02/01/13

0.00

345

4,380.26

0.740

3243.1

104.27

02/12/12

140

2,937.5

75

7,125.0

270

5,665.1

39

818

485.0

15,727.6

0.00

73

2,779.98

0.745

2071.0

66.58

03/12/12

222

4,658.0

70

6,650.0

286

6,000.9

84

1,762

39

818

578.0

17,308.9

970.51

FECHA

N VIAJES

TMS

Ley

0.00

FINO Gr

ONZAS Observacion.

FECHA

777F
N VIAJES

FM-12
N VIAJES

TM

777F
N VIAJES

TM

FM-12
N VIAJES

TM

777F
N VIAJES

TM

FM-12
N VIAJES

TM

777F
N VIAJES

TM

FM-12
N VIAJES

TM

777F
N VIAJES

TM

FM-12
N VIAJES

TM

777F
N VIAJES

TM

FM-12
N VIAJES

TM

TM

TM

03/01/13

73

2,779.98

0.745

66.58

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

04/01/13

636

27,513.73

1.097

970.51

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

636

27,513.73

1.097

30186.4

04/12/12

0.0

10

950.0

128

2,685.7

25

525

138.0

3,635.7

05/01/13

523

11,646.21

0.336

125.71

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

523

11,646.21

0.336

3910.2

125.71

05/12/12

0.0

269

25,555.0

146.9

168

101

2,119

276.0

25,701.9

06/01/13

503

22,073.48

1.171

830.84

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

503

22,073.48

1.171

25842.1

830.84

06/12/12

0.0

18

1,710.0

303

6,357.5

25

525

321.0

8,067.5

07/01/13

680

23,065.45

0.548

406.52

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

680

23,065.45

0.548

12644.3

406.52

07/12/12

0.0

15

1,425.0

17

356.7

30

629

32.0

1,781.7

08/01/13

342

15,856.01

0.662

337.48

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

342

15,856.01

0.662

10496.9

337.48

08/12/12

0.0

56

5,320.0

513

10,763.8

141

2,958

569.0

16,083.8

09/01/13

519

23,503.47

0.725

547.89

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

519

23,503.47

0.725

17041.4

547.89

09/12/12

0.0

95.0

160

3,357.1

148

3,105

128

2,686

161.0

3,452.1

10/01/13

478

14,438.23

0.643

298.40

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

478

14,438.23

0.643

9281.3

298.40

10/12/12

93

1,951.3

165

15,675.0

49

1,028.1

37

776

307.0

18,654.4

11/01/13

580

14,179.37

0.488

222.45

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

580

14,179.37

0.488

6919.0

222.45

11/12/12

154

3,231.2

105

9,975.0

24

503.6

21

441

283.0

13,709.8

12/01/13

254

5,078.41

0.342

55.77

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

254

5,078.41

0.342

1734.7

55.77

12/12/12

264

5,539.2

166

15,770.0

227

4,762.9

20

420

101

2,119

657.0

26,072.2

13/01/13

250

5,649.42

0.485

88.17

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

250

5,649.42

0.485

2742.4

88.17

13/12/12

0.0

127

12,065.0

325

6,819.2

75

1,574

452.0

18,884.2

14/01/13

423

8,689.00

0.228

63.64

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

423

8,689.00

0.228

1979.4

63.64

14/12/12

0.0

124

11,780.0

357

7,490.6

30

629

481.0

19,270.6

0.0

0.000

0.00

0.0

0.0

#DIV/0!

0.0

1,028.1

0.000

0.00

0.000

0.00

0.00

#DIV/0!

0.00

15/12/12

0.0

479

9,749.87

0.307

96.27

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

479

9,749.87

0.307

2994.3

96.27

16/12/12

180

3,776.8

102

69

1,448

17/01/13

400

8,200.60

0.406

106.95

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

400

8,200.60

0.406

3326.6

106.95

17/12/12

44

923.2

200

19,000.0

337

7,070.9

10

210

62

1,301

581.0

26,994.1

18/01/13

142

2,911.21

0.451

42.17

0.0

0.000

0.00

0.0

0.000

0.00

0.0

0.000

0.00

142

2,911.21

0.451

1311.5

42.17

18/12/12

109

2,287.0

107

10,165.0

589

12,358.4

30

629

805.0

24,810.4

19/01/13

19

387.42

0.464

5.78

70

1427.3

0.701

32.17

0.0

0.000

0.00

0.0

0.000

0.00

89

1,814.74

0.650

1180.3

37.95

19/12/12

180

3,776.8

330

31,350.0

502

10,533.0

408

8,561

1,012.0

45,659.7

90.46

20/12/12

5,320

255

5,350.4

440

9,232

702.0

34,196.1

377.7

132

2,770

338.0

23,894.0

0.0

469

9,841

438.0

29,693.1

15/01/13
16/01/13

0.000

0.00

0
0
0

20/01/13

86

1,750.50

0.246

13.84

167

3399.2

0.701

76.61

0.0

0.000

0.00

0.0

0.000

0.00

253

5,149.72

0.546

2813.5

21/01/13

283

5,784.11

0.246

45.75

376

7979.1

0.701

179.83

0.0

0.000

0.00

0.0

0.000

0.00

659

13,763.26

0.510

7016.3

225.58

21/12/12

0.00

367

7411.6

0.701

167.04

0.0

0.000

0.00

0.0

0.000

0.00

367

7,411.63

0.701

5195.6

167.04

22/12/12

22/01/13

56
4

0.0
9,690.0

0
49

0
0
0

0.0

0.0

331.0

14,494.9

184

3,860.7

207

19,665.0

380

93

1,951.3

223

21,185.0

161

3,378.1

277

26,315.0

4,845

339

7,112.9

64

6,080.0

25.0

524.6

479.0

18,562.4

440.6

0.0

116.0

2,433.9

230.0

11,709.5

2,601.8

0.0

97.0

2,035.3

124

2,602

344.0

16,322.0

18.0
0.0

23/01/13

323

6,511.52

0.316

66.08

40

2236.4

0.701

50.40

0.0

0.000

0.00

0.0

0.000

0.00

363

8,747.92

0.414

3623.1

116.48

23/12/12

24/01/13

301

6,205.69

0.255

50.95

120

2474.0

0.701

55.76

0.0

0.000

0.00

0.0

0.000

0.00

421

8,679.72

0.382

3319.0

106.71

24/12/12

93

8,835

21

25/01/13

206

4,157.18

0.253

33.82

139

3229.3

0.701

72.78

0.0

0.000

0.00

0.0

0.000

0.00

345

7,386.53

0.449

3315.6

106.60

25/12/12

123

11,685

124

0.00

418

14435.8

0.643

298.34

0.0

0.000

0.00

0.0

0.000

0.00

418

14,435.82

0.643

9279.6

298.34

26/12/12

56

5,320

437

9,169.1

0.0

0.0

0.0

89

1,867

493.0

14,489.1

121.93

0.205

0.80

201

7596.2

0.456

111.31

0.0

0.000

0.00

0.0

0.000

0.00

207

7,718.13

0.452

3487.2

112.12

27/12/12

99

9,405

540

11,330.3

0.0

59.0

1,237.9

472

9,904

698.0

21,973.2

0.666

48.30

128

4443.8

0.475

67.86

0.0

0.000

0.00

0.0

0.000

0.00

230

6,699.47

0.539

3613.1

116.16

28/12/12

99

9,405

211

4,427.2

16

1,520.0

141.0

2,958.5

525

11,016

467.0

0.00

0.0

0.000

0.00

527

10,886.10

0.291

3167.9

101.85

29/12/12

80

7,600

12

251.8

92.0

0.00
0.00
0.0

0.0

0.000

81.48

0.000
#DIV/0!

2021.8

65.00

30/12/12
31/12/12

0.0
0.0

0.293
0.264
0.602

2534.5

0
0.0

421
369
11,322.0

8,661.61

#DIV/0!

6,007.0

TOTAL

26/01/13

27/01/13

28/01/13

102

2,255.64

29/01/13

527

10,886.10

0.291

101.85

0.00

0.0

0.000

30/01/13
31/01/13

421

8,661.61

0.293

81.48

0.00

0.0

0.000

7,656.42
255,909.5

0.264
0.595

65.00
4,894.9

0
2,026.0

0.00
1,112.1

0
0.0

0.0
0.0

0.000
#DIV/0!

369
9,296.0

0.0
54,632.9

0.000
0.6

0.00
0.00
0.0

7,656.42
310,542.5

51

0
661

62,795

3,508

73,605

0.0

0.0

120

11,400.0

0.0

164
3,078

15,580.0
292,410

0.0
253.0
220.0
5,653

5,308.4

4,616.0
118,611

10

210

0
0
0

0
0

104
2,877

18,310.7
7,851.8

373.0

16,708.4

2,182
60,365

384.0
12,900

20,196.0
547,421

815

17,100

330

6,924

11,322.0
24,222

Semforo

PRODUCCION _ MINA: ENERO 2013


31 ENERO 2013.
PRODUCCION MINA.

Mineral
Desmonte
Total Roca
S. Ratio
Ley
Onzas a PAD
PRODUCC_EQUIPOS
CAM 777F
VOLQ_FM_SSE
VOLQ_FM_MINERA
VOLQ_FAW_MINERA
VOLQ_FAW_SSE
TOTAL PROD_EQP

UM

TMS
TM
TM
D/M
gr/Tn
Onzas

TM
TM
TM
TM
TM
TM

80% y 90%

Ejecut. Del Da

31
Ejecut.

Plan

Ejecut. A la Fecha

SUB PLAN
S SUR F2

% Cump

Ejecut.

Plan

% Cump

4,679

164%

176,558

145,049

122%

145,049

122%

20,196

54,587

37%

556,877

1,692,195

33%

818,804

68%

27,852

59,266

47%

1,837,244

40%

963,853

76%

2.6

11.7

3.15

11.67

27%

5.65

56%

0.264

0.862

31%

0.716

0.862

83%

0.862

83%

65

130

50%

4,065

4,021

101%

4,021

101%

15,580

8,003

195%

456,419

248,087

184%

248,087

184%

4,794

0%

113,116

148,614

76%

148,614

76%

2,722

0%

81,830

84,370

97%

84,370

97%

2,728

8,165

33%

125,766

253,109

50%

253,109

50%

7,409

0%

142,699

229,673

62%

229,673

62%

31,092

59%

919,830

963,852

95%

963,852

95%

18,307.7

MINERAL

733,434

DESM

Ley

Onzas

20,196

0.264

LASTRE COMUNIDADES
7,656

MINERAL
65

176,558

LIXIVIADO

DESM
420,477

%Mes

60,365
17,100
65

3.0

Onzas

0.822

4,664
-

6,924

0.264

Ley

136,400

2,182
20,196

Programa

ACUM FECHA

7,656

OVER, ARCILLA

TOTAL ACUM

PROG. MENSUAL

7,656

EJEC DIA
PRODUCCION ZONAS

<80%

90% >= 100%

176,558

556,877

0.822

4,664

PRODUCCION MINA

ENERO 2013.

Descripcin
Mineral TMS
Desmonte TM
Roca TM
Stripping Ratio
Ley Gr_ Au/TM
Onzas Au/Pad

Programado
ENERO
145,049.0
818,804.0
963,853.0
5.65
0.862
4,020.7

OVER_MAT_LIXIVIADO_PD02_FASE 05

PRODUCCIN ZONAS

TOTAL MOV. CARGA

ENERO
2013.

PROD. EQUIPOS

ENERO
2013.

963,853.0

Ejecutado
ENERO
176,557.6
580,901.2
757,458.8
3.29
0.716
4,064.3

%
Cumpl.
121.7%
70.9%
78.6%
58.3%
83.0%
101.1%

60,365
817,824

84.8%

Produccin por Zonas


MINERAL TMS DESMONTE TM TM ROCA
SUB PLAN (F1)
176,557.6
420,476.9
597,034.6
S SUR F2
136,399.9
136,399.9
MAT_LIXIVIADO
60,365.2
60,365.2
Over_Arcilla PD02_Fase05
24,024.4
24,024.4
TOTAL
176,557.6
641,266.4
817,824.0
ZONA

FLOTA
CAM 777F
VOLQ_FM_SSE
VOLQ_FM_MINERA
VOLQ_FAW_MINERA
VOLQ_FAW_SSE
TOTAL PROD_EQP

Produccin Equipos
PROG ( TM )

248,086.8
148,614.0
84,369.6
253,108.8
229,672.8
963,852.0

EJECUT ( TM )

456,419.0
113,115.9
81,829.8
125,766.2
142,698.7
919,829.7

%
Cumpl.

184%
76%
97%
50%
62%
95%

OBSERVAC
EJECUTADO MES ENERO
MIN
LEY
176,557.6

n por Zonas
Ley
0.716
0.716

0.716

APORTE MINERAL / ZONAS


Onzas
% Mineral
% Onzas
4,064.7
100.0%
100.0%
0.0
0.0%
0.0%
0
0.0%
0.0%
0
0.0%
0.0%
4,064.7
100%
100%

OBSERVACIONES
Promedio 04 Camiones
Promedio 02 Volquetes
Promedio 04 Volquetes
Promedio 05 Volquetes
Promedio 04 Volquetes

ONZAS
4,064.7

19
20
21
22
23
24
25
26
27
28
29
30
31

MINERAL DE 21/10 AL 31/10


MIN
3,954.8
3,668.6
799.3
1,803.6
10,226.3

Observac.
M. Oxidado
Desmonte.
Lixiviado
Over

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

MINERAL DE 01/11 AL 20/11


MIN
1,816.7
4,380.3
2,780.0
27,513.7
11,646.2
22,073.5
23,065.5
15,856.0
23,503.5
14,438.2
14,179.4
5,078.4

166,331.31

MINERAL DE 21/10 AL 31/10


LEY
ONZAS
0.250
31.8
0.242
28.5
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.242
6.2
0.242
14.0
#DIV/0!
#DIV/0!
#DIV/0!
0.245
80.64

SUB PLAN
MIN
LEY
ONZAS
3,954.8
0.250
31.8
3,668.6
0.242
28.5
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
799.3
0.242
6.2
1,803.6
0.242
14.0
#DIV/0!
#DIV/0!
#DIV/0!
10,226.3
0.245
80.6

MINERAL DE 01/11 AL 20/11


LEY
ONZAS
0.301
17.6
0.740
104.3
0.745
66.6
1.097
970.5
0.336
125.7
1.171
830.8
0.548
406.5
0.662
337.5
0.725
547.9
0.643
298.4
0.488
222.5
0.342
55.8

SUB PLAN
MIN
LEY
ONZAS
1,816.7
0.301
17.6
4,380.3
0.740
104.3
2,780.0
0.745
66.6
27,513.7
1.097
970.5
11,646.2
0.336
125.7
22,073.5
1.171
830.8
23,065.5
0.548
406.5
15,856.0
0.662
337.5
23,503.5
0.725
547.9
14,438.2
0.643
298.4
14,179.4
0.488
222.5
5,078.4
0.342
55.8

0.745

3,984.05

166,331.31

0.745

3,984.05

FASE 2
MIN

LEY
-

ONZAS
-

Compaa Minera San Simon SA.

MINA

TAJO

CONTROL DE PRODUCCION DIARIA MINA : SEPTIEMBRE 2012

963,853.00

31,092.03

S.RATIO

Ley
(gr/tn)

ONZAS
Au

Dias/mes

5.65

0.862

4,020.7

31

PROG Ley
(gr/Tn)

PROG
Onzas
Pad

PROG Onzas
Pad ACUM

S.R

EJEC
MINERAL
TMS

%REC

PROGRAMA DE PRODUCCION MINA

SEP 12.

DIA

DIA

TM ROCA MES

PROGRAMADO

PROG_
MINERAL TMS

PROG_MINERAL
PROG DESM TM.
PROG DESM TM.
ACUM
ACUM

PROG ROCA
TM

Onz_Vend

EJEC MIN TMS


ACUM

21

0%

0.0

% CUMPL

EJC DESM
TM.

EJEC_MINERAL

PROG ROCA
TM ACUM

31 ENERO 2013.

Mineral
Desmonte

EJEC_DESMONTE
EJC DESM
TM. ACUM

TMS/mes

145,049.00

4,679.00

TM/mes

818,804.00

26,413.03

DIFER.

EJEC Ley
Gr/TM

EJEC Onzas
Pad

EJEC Onzas
Pad ACUM

EJEC_ ROCA TM

% CUMPL

EJEC ROCA EJEC ROCA TM


ACUM
TM

% CUMPL

31

PRODUCC_ FINOS
S.R

PRODUCCION PLANTA_ ADR


% CUMP

FLUJO m3/dia

Au desorv.
(Onzas)

Ley Pregm
(gr/m3)

Onzas en
Carbon
(Onzas)

ACUM Au
(bullion)

4,679

4,679

26,413

26,413

31,092.0

31,092

0.862

129.7

129.7

5.65

3,954.8

3,955

85%

13,205.1

13,205

50%

17,159.9

17,160

55%

3.34

(13,932.1)

0.250

31.8

32

0.9

#REF!

#REF!

#REF!

#REF!

#REF!

4,679

9,358

26,413

52,826

31,092.0

62,184

0.862

129.7

259.4

5.65

3,668.6

7,623

78%

15,727.6

28,933

60%

19,396.3

36,556

62%

4.29

(11,695.8)

0.242

28.5

29

0.7

#REF!

#REF!

#REF!

#REF!

#REF!

4,679

14,037

26,413

79,239

31,092.0

93,276

0.862

129.7

389.1

5.65

7,623

0%

17,308.9

46,242

66%

17,308.9

53,865

56%

#DIV/0!

(13,783.2)

29

#REF!

#REF!

#REF!

#REF!

4,679

18,716

26,413

105,652

31,092.0

124,368

0.862

129.7

518.8

5.65

7,623

0%

3,635.7

49,877

14%

3,635.7

57,501

12%

#DIV/0!

(27,456.3)

29

#REF!

#REF!

#REF!

#REF!

4,679

23,395

26,413

132,065

31,092.0

155,460

0.862

129.7

648.5

5.65

7,623

0%

25,701.9

75,579

97%

25,701.9

83,203

83%

#DIV/0!

(5,390.2)

29

#REF!

#REF!

#REF!

#REF!

4,679

28,074

26,413

158,478

31,092.0

186,552

0.862

129.7

778.2

5.65

7,623

0%

8,067.5

83,647

31%

8,067.5

91,270

26%

#DIV/0!

(23,024.5)

29

#REF!

#REF!

#REF!

#REF!

4,679

32,753

26,413

184,891

31,092.0

217,644

0.862

129.7

907.9

5.65

7,623

0%

1,781.7

85,428

7%

1,781.7

93,052

6%

#DIV/0!

(29,310.3)

29

#REF!

#REF!

#REF!

#REF!

4,679

37,432

26,413

211,304

31,092.0

248,736

0.862

129.7

1,037.6

5.65

7,623

0%

16,083.8

101,512

61%

16,083.8

109,136

52%

#DIV/0!

(15,008.3)

29

#REF!

#REF!

#REF!

#REF!

4,679

42,111

26,413

237,717

31,092.0

279,828

0.862

129.7

1,167.3

5.65

799.3

8,423

17%

3,452.1

104,964

13%

4,251.4

113,387

14%

4.32

(26,840.6)

0.242

6.2

35

0.0

#REF!

#REF!

#REF!

#REF!

10

4,679

46,790

26,413

264,130

31,092.0

310,920

0.862

129.7

1,297.0

5.65

1,803.6

10,226

39%

18,654.4

123,619

71%

20,458.0

133,845

66%

10.34

(10,634.0)

0.242

14.0

49

0.2

#REF!

#REF!

#REF!

#REF!

11

4,679

51,469

26,413

290,543

31,092.0

342,012

0.862

129.7

1,426.7

5.65

10,226

0%

13,709.8

137,329

52%

13,709.8

147,555

44%

#DIV/0!

(17,382.2)

49

#REF!

#REF!

#REF!

#REF!

12

4,679

56,148

26,413

316,956

31,092.0

373,104

0.862

129.7

1,556.4

5.65

10,226

0%

26,072.2

163,401

99%

26,072.2

173,627

84%

#DIV/0!

(5,019.9)

49

#REF!

#REF!

#REF!

#REF!

13

4,679

60,827

26,413

343,369

31,092.0

404,196

0.862

129.7

1,686.1

5.65

10,226

0%

18,884.2

182,285

71%

18,884.2

192,511

61%

#DIV/0!

(12,207.9)

49

#REF!

#REF!

#REF!

#REF!

14

4,679

65,506

26,413

369,782

31,092.0

435,288

0.862

129.7

1,815.8

5.65

1,816.7

12,043

39%

19,270.6

201,555

73%

21,087.3

213,598

68%

10.61

(10,004.8)

0.301

17.6

66

0.2

#REF!

#REF!

#REF!

#REF!

15

4,679

70,185

26,413

396,195

31,092.0

466,380

0.862

129.7

1,945.5

5.65

4,380.3

16,423

94%

201,555

0%

4,380.3

217,979

14%

(26,711.8)

0.740

104.3

171

3.1

#REF!

#REF!

#REF!

#REF!

16

4,679

74,864

26,413

422,609

31,092.0

497,473

0.862

129.7

2,075.2

5.65

2,780.0

19,203

59%

14,494.9

216,050

55%

17,274.9

235,254

56%

5.21

(13,817.2)

0.745

66.6

237

1.3

#REF!

#REF!

#REF!

#REF!

17

4,679

79,543

26,413

449,022

31,092.0

528,565

0.862

129.7

2,204.9

5.65

27,513.7

46,717

588%

26,994.1

243,044

102%

54,507.9

289,761

175%

0.98

23,415.8

1.097

970.5

1,208

183.5

#REF!

#REF!

#REF!

#REF!

18

4,679

84,222

26,413

475,435

31,092.0

559,657

0.862

129.7

2,334.6

5.65

11,646.2

58,363

249%

24,810.4

267,855

94%

36,456.6

326,218

117%

2.13

5,364.6

0.336

125.7

1,333

10.1

#REF!

#REF!

#REF!

#REF!

19

4,679

88,901

26,413

501,848

31,092.0

590,749

0.862

129.7

2,464.3

5.65

22,073.5

80,437

472%

45,659.7

313,515

173%

67,733.2

393,951

218%

2.07

36,641.2

1.171

830.8

2,164

126.0

#REF!

#REF!

#REF!

#REF!

20

4,679

93,580

26,413

528,261

31,092.0

621,841

0.862

129.7

2,594.0

5.65

23,065.5

103,502

493%

34,196.1

347,711

129%

57,261.5

451,213

184%

1.48

26,169.5

0.548

406.5

2,571

64.4

#REF!

#REF!

#REF!

#REF!

21

4,679

98,259

26,413

554,674

31,092.0

652,933

0.862

129.7

2,723.7

5.65

15,856.0

119,358

339%

23,894.0

371,605

90%

39,750.0

490,963

128%

1.51

8,658.0

0.662

337.5

2,908

36.8

#REF!

#REF!

#REF!

#REF!

22

4,679

102,938

26,413

581,087

31,092.0

684,025

0.862

129.7

2,853.4

5.645017

23,503.5

142,862

502%

29,693.1

401,298

112%

53,196.6

544,159

171%

1.26

22,104.5

0.725

547.9

3,456

88.5

#REF!

#REF!

#REF!

#REF!

23

4,679

107,617

26,413

607,500

31,092.0

715,117

0.862

129.7

2,983.1

5.65

14,438.2

157,300

309%

18,562.4

419,860

70%

33,000.7

577,160

106%

1.29

1,908.6

0.643

298.4

3,755

29.6

#REF!

#REF!

#REF!

#REF!

24

4,679

112,296

26,413

633,913

31,092.0

746,209

0.862

129.7

3,112.8

5.65

14,179.4

171,479

303%

11,709.5

431,570

44%

25,888.9

603,049

83%

0.83

(5,203.1)

0.488

222.5

3,977

21.7

#REF!

#REF!

#REF!

#REF!

25

4,679

116,975

26,413

660,326

31,092.0

777,301

0.862

129.7

3,242.5

5.65

5,078.4

176,558

109%

16,322.0

447,892

62%

21,400.4

624,449

69%

(9,691.6)

0.342

55.8

4,033

1.9

#REF!

#REF!

#REF!

#REF!

26

4,679

121,654

26,413

686,739

31,092.0

808,393

0.862

129.7

3,372.2

5.65

176,558

0%

14,489.1

462,381

55%

14,489.1

638,939

47%

#DIV/0!

(16,602.9)

4,033

#REF!

#REF!

#REF!

#REF!

27

4,679

126,333

26,413

713,152

31,092.0

839,485

0.862

129.7

3,501.9

5.65

176,558

0%

21,973.2

484,354

83%

21,973.2

660,912

71%

#DIV/0!

(9,118.8)

4,033

#REF!

#REF!

#REF!

#REF!

28

4,679

131,012

26,413

739,565

31,092.0

870,577

0.862

129.7

3,631.6

5.65

176,558

0%

18,310.7

502,665

69%

18,310.7

679,222

59%

#DIV/0!

(12,781.4)

4,033

#REF!

#REF!

#REF!

#REF!

29

4,679

135,691

26,413

765,978

31,092.0

901,669

0.862

129.7

3,761.3

5.65

176,558

0%

17,307.5

519,972

66%

17,307.5

696,530

56%

#DIV/0!

(13,784.5)

4,033

#REF!

#REF!

#REF!

#REF!

30

4,679

140,370

26,413

792,391

31,092.0

932,761

0.862

129.7

3,891.0

5.65

176,558

0%

16,708.4

536,681

63%

16,708.4

713,238

54%

#DIV/0!

(14,383.6)

4,033

#REF!

#REF!

#REF!

#REF!

4,679

145,049

26,413

818,804

31,092.0

963,853

0.862

129.7

4,020.7

5.65

176,558

0%

20,196.0

76%

20,196.0

733,434

65%

#DIV/0!

(10,896.0)

4,033

#REF!

#REF!

#REF!

#REF!

82.5%

556,876.8

68.0%

733,434.4

% Al Mes

121.7%

% Al Mes

68.0%

Gramos

Acumul. Al Dia

214,120.0

818,804.0

963,853.0

#####

Total Al Mes

145,049.0

818,804.0

963,853.0

#####

176,557.6

76.1%
76.1%

3.21

3.15

(230,418.58)
TM

0.716

4,064.7

% Cumpl. Mensual

101.1%
101.1%

ACUMULADO DEL AO 2012.

#Dias
PRODUCCION TAJO (TMS)
MINERAL

Enero-12
Febrero 12
Marzo 12

4/3/2013

DESMONTE

TOTAL

S.R

Ley Gr/TM

Onzas PAD

Onzas
Vendibles
1,992.72

% Recup.

189,136.1

1,444,414.4

1,633,550.4

7.64

0.749

141,732.35

4,556.80

295,806.7

871,943.9

1,167,750.6

2.95

0.346

102,349.9

3,290.6

556,876.8

733,434.4

3.15

0.716

126,425.9

4,064.7

1,199.94
****

36.5%

176,557.6

661,500.4

2,873,235.1

3,534,735.4

4.34

0.560

11,912.1

3,192.7

26.8%

Abril-12

43.7%
***

Mayo-12
TOTAL ACUM 2012.

PRODUCCION ONZAS Au a PAD

PRODUCC. FINOS (Au)

MESES - 2012

370,508.19

31
FINOS

PROGRAMA MES (ONZAS)

4,020.7

PROGRAMA A LA FECHA(ONZAS)
EJECUTADO A LA FECHA (ONZAS)
BALANCE PRODUCCION AL MES (ONZAS)
% CUMPLIM. ONZAS ( A LA FECHA)
% CUMPLIM. ONZAS (AL MES)

4,020.7
4,064.7
43.95
101.1%
101.1%

PRODUCCION DE ONZAS VENDIBLES


DIFERENTE RECUPERACION
4,500
4,250

@50%

4,000
3,750

@45%

3,500
3,250

@40%

3,000
2,750
2,500
2,250
2,000
1,750
1,500
1,250

1,000
750
500
250
0

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

EQUIPOS DE ACARREO

TURNO A ( NOCHE )
EQUIPOS.

CAMIONES 777F

CONTRATA

Horas

Equipo
T7-01

Minera

T7-02

1.4

Minera

T7-03

12.0

Minera

T7-04

12.0

Minera

T7-06

12.0

Minera

T7-07

12.0

Minera

T7-09

3.2

Minera

T7-10

12.0

SUBTOTAL

DNOPF (hra)

DNOPV (hra)

12.0
3.5

1.0

76.7

1.0

1.7

1.0

S-119

1.7

1.0

S-121

10.6

SSE

S-122

1.2

1.0

0.3

SSE

S-123

1.5

1.0

0.4

SSE

S-127

12.0

SSE

S-128

12.0

SSE

S-134

12.0

SSE

S-139

1.4

1.0

0.2

SSE

S-143

1.4

1.0

0.2

SSE

S-144

2.2

1.0

0.3

SSE

S-145

12.0

SSE

S-148

12.0

SSE

S-152

1.4

1.0

SSE

S-155

1.4

1.0

0.3

SSE

S-156

1.4

1.0

0.4

SSE

S-157

12.0
10.0

2.1

0.0

0.0

1.0

0.2

SSE

S-110

SSE
SSE

SUBTOTAL

97.8

SSE

S-158

12.0

SSE

S-159

12.0

SSE

S-160

12.0

SSE

S-161

12.0

SSE

S-162

12.0

SSE

S-163

12.0

SSE

S-165

12.0

SSE

S-166

12.0

SSE

S-167
SUBTOTAL

VOLQUETES FAW

DFM (hra)

Minera

3.5

12.0
108.0

Minera

S-515

12.0

Minera

S-516

12.0

Minera

S-517

12.0

Minera

S-518

12.0

Minera

S-519

12.0

Minera

S-520

1.7

Minera

S-521

12.0

Minera

S-522

1.3

Minera

S-523

12.0

Minera

S-524

12.0

Minera

S-525

12.0

1.0

VOLQUETES FA

Minera

S-526

12.0

Minera

S-527

12.0

Minera

S-528

12.0

Minera

S-529

SUBTOTAL
SSE

CAMC-01

500

400
400
400
400
400
300

EQ. CARGUIO

700
700
500
500

2.0

0.2

12.0

SUBTOTAL

12.0

0.0

0.0

Total general

468.6

13.0

50.8

DFM (hra)

DNOPF (hra)

DNOPV (hra)

CONTRATA
PALA

12.0
159.1

Equipo

RH90C-2
SUB TOT. PALA

2.33

EXCAV. Hyundai 500-LC01

12.0

2.3

EXCAV. Hyundai 500-LC02

2.0

EXCAV. Hyundai 500-LC

2.00

EXCAV. Hyundai 380-LC-CO


SUB TOT. HYUNDAI

12.00

EXCAV. 9

345-C9

12.0

EXCAV. 10

345-C10

1.5

EXCAV. 3

345-BL-3

12.0

EXCAV. 11
345-DL11
SUB TOT. EXC.

37.50

CF Hyundai

HL-770

12.0

CF Hyundai

HL-760

CF Hyundai

HL-760-CO

12.00

C FRONTAL

CF-966-1

12.0

C FRONTAL

CF-966-2

2.0

C FRONTAL

CF-LONG KING

12.0

C FRONTAL
992-C-2
SUB TOT. C FRONT.
Total general
CONTRATA

Equipo

28.00

0.53
0.00

0.53

0.00

0.00

0.00

0.00

1.00

0.75

12.0

1.6

0.88

12.0
63.53

1.00

1.63

131.4

1.0

2.2

DFM (hra)

DNOPF (hra)

DNOPV (hra)

SSE

DM45-E4

4.0

0.50

3.00

SSE

DM45-E2

12.0

0.00

0.00

SSE

D245E-6

3.00

0.50

3.50

19.0

1.0

6.5

DFM (hra)

DNOPF (hra)

DNOPV (hra)

Total general
EQUIPOS AUXILIARES
CONTRATA

Equipo

Minera

420-E1

12.0

Minera

420-E2

1.6

Minera

824H-01

12.0

Minera

D10T-01

12.0

SSE

D6M-2

2.3

SSE

D8R-1

6.1

SSE

D8R-3

12.0

SSE

D8T-9

1.5

SSE

D8N-1

12.0

SSE

16H-01

SSE

160H-01

1.7

SSE

160H-02

12.0

SSE

160H-05

12.0

SSE

RL-1

12.0

1.00

1.00
1.25

57.92
12.0
1.00

1.33

SSE

RL-4

12.0

SSE

CS56-5

12.0

SSE

CIS. COMBUSTIBLE

Total general

4
5
16
17
18

7,333.1
7,333.1
7,333.1
7,333.1
7,333.1

10,235.0

19
20
21
22
23
24
25
26
27
28
29
30

7,333.1
7,333.1
7,333.1
7,333.1
7,333.1
7,333.1
7,333.1
7,333.1
7,333.1
7,333.1
7,333.1
7,333.1

13,831.0

6.00

1.50

221.1

4.5

2.6

2,624.5
2,624.5
2,624.5
2,624.5
2,624.5

419.6
2,664.7

2,624.5
2,624.5
2,624.5
2,624.5
2,624.5
2,624.5
2,624.5
2,624.5
2,624.5
2,624.5
2,624.5
2,624.5

2,748.6

9,195.0
14,686.0

47,985.0

5,833.0

14,686.0

51,903.0

9,195.0

12,000.0

10,235.0

15,000.0

13,831.0

PRODUCCION CAMIONES 777F - GUARDIA "A" VS. GUARDIA

TM

9,000.0

6,000.0

16

3,000.0

17

18

19
Ejec. "A"

20

21
Ejec. "B"

PRODUCCION VOLQUETES FM - GUARDIA "A" VS. GUARDIA


5,000.0

5,000.0

TM

2,119.2

Prog: 2,624.5 TM

2,748.6

3,000.0

2,664.7
2,412.9

4,000.0

419.6

1,000.0

629.5

2,000.0

16

17

18

19

20

Ejec. "A"

21
Ejec. "B"

PRODUCCION VOLQUETES FAW 12,000.0

4,322.3
5,035.7

3,797.7

3,483.0

4,000.0

2,580.8
2,832.6

6,000.0

3,797.7

2,000.0
-

TM

8,000.0

6,735.2

10,000.0

16

17

18

19
Ejec. "A"

20

21
Ejec. "B"

31 ENERO 2013.
HP/gdia
Horas

12
RENDIMIENTO y DISP.

DOP (hra)

Hras efec.

%DM

%UT (DM)

0.0

0%

100.0%

6.1

88%

58.0%

0.0

0%

0.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

1.1

6.7

73%

82.6%

0.0

0%

100.0%

2.1

12.8

80.6%

0.7

8.6

1.2

8.2

0.5

0.9

TM

TM/Hra

3,230.0

526.6

0.0

0.0
3,610.0

542.9

80.1%

6,840.0

133.7

86%

91.0%

839.3

97.2

86%

85.9%

461.6

56.6

0.9

12%

63.9%

62.9

71.3

1.1

8.4

90%

84.5%

482.6

57.8

0.7

8.4

88%

87.2%

461.3

54.7

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.8

8.6

88%

88.4%

524.6

61.0

0.9

8.5

88%

87.7%

482.6

56.7

0.9

7.7

82%

85.3%

419.6

54.9

0.0

0%

100.0%

0.0

0%

100.0%

1.0

8.6

88%

88.6%

503.6

58.7

1.4

7.92

88%

81.3%

440.6

55.7

0.6

8.6

88%

88.6%

482.6

56.2

0.0

0%

100.0%

84.3

68.1%

90.1%

5,161.3

40.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0%

100.0%

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

8.2

86%

86.8%

0.0

0%

100.0%

8.8

89%

89.8%

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

9.8

0.0

0.9
0.9

0.0

0.0

0.0
0.0

0.0

0.0
0.0

0.0

0.0
671.4

82.2

503.6

57.3

0.0

1.7

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

17.0

87.2%

98.4%

0.0

0%

#DIV/0!

0.0%

#DIV/0!

0.0
1,175.0

9.3
#DIV/0!

0.0

0.0

13.6

114.0

0.0

#DIV/0!

DOP (hra)

Hras efec.

%DM

%UT (DM)

0.50

8.6

81%

89.3%

839.3

97.2

0.50

8.63

0.81

0.89

839.28

97.21

13,176.3
TM

TM/Hra

0.0

0%

100.0%

0.67

9.3

83%

93.3%

5,665.1

607.0

0.73

9.3

83%

92.7%

6,840.0

738.1

0.0

0%

100.0%

18.60

83%

97%

12,505.1

336.3

0.0

0%

100.0%

0.0

9.5

88%

90.5%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

9.50

88%

98%

0.0

0%

100.0%

0.0

8.2

87%

85.5%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

0.0

8.7

84%

86.2%

0.0

0.0

0%

100.0%

0.0

0.0

0%

100.0%

1.00

16.83

86%

96%

0.0

3.9

53.6

84%

95%

13,344.4

DOP (hra)

Hras efec.

%DM

%UT (DM)

Metros/ DIA

2.00

2.5

67%

32.6%

0.0

0.00

0.00

0.0

0%

#DIV/0!

0.0

#DIV/0!

2.00

3.0

75%

34.8%

0.00

0.00

4.0

5.5

47%

#DIV/0!

0.0

#DIV/0!

DOP (hra)

Hras efec.

%DM

%UT (DM)

0.0

0%

100.0%

8.7

87%

90.9%

0.0

0%

100.0%

0.0

0%

100.0%

0.50

9.2

81%

94.8%

0.50

4.4

49%

81.4%

0.0

0%

100.0%

8.8

88%

83.3%

0.0

0%

100.0%

0.0

0%

100.0%

8.0

86%

84.3%

0.0

0%

100.0%

0.0

0%

100.0%

0.0

0%

100.0%

1.40
1.00

1.00
0.50

0.50

0.73

8.7

0.50

22.3

0.0

0.0

0.0
0.0

0.0

0.0
0.0

Metros/ HRA.

0.0

0%

100.0%

0.0

0%

100.0%

1.50

3.0

50%

57.1%

3.7

17.0

59%

94%

7,496.1
7,496.1
7,496.1
7,496.1
7,496.1

6,735.2
2,580.8
4,322.3

3,797.7
2,832.6
3,797.7
5,035.7

7,496.1
7,496.1
7,496.1
7,496.1
7,496.1
7,496.1
7,496.1
7,496.1
7,496.1
7,496.1
7,496.1
7,496.1

3,483.0

92.5

629.5
2,119.2
2,412.9

5,161.6

30,381.9

29,186.0

CAMIONES 777F - GUARDIA "A" VS. GUARDIA "B"

21
Ejec. "B"

22

23

24

25

26

PROG. TM

- GUARDIA "A" VS. GUARDIA "B"

27

28

29

30

21

22

23

Ejec. "B"

24

25

26

27

28

29

30

27

28

29

30

PROG. TM

VOLQUETES FAW - GUARDIA "A" VS. GUARDIA "B"

21
Ejec. "B"

22

23

24
PROG. TM

25

26

ERO 2013.
EQUIPOS DE ACARREO

TURN
EQUIPOS.
CONTRATA

CAMIONES 777F

Minera
Minera
Minera
Minera
Minera
Minera
Minera
Minera
SUBTOTAL
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SUBTOTAL
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SUBTOTAL
Minera
Minera
Minera

VOLQUETES FAW

Minera
Minera
Minera
Minera
Minera
Minera
Minera
Minera

VOLQUETES FA

Minera
Minera
Minera
Minera
SUBTOTAL
En prueba
SUBTOTAL
Total general
CONTRATA
Minera
SUB TOT. PALA

8.21

690.0

2.50

2736

7.50

0.0

700 EXCAV. Hyundai


700 EXCAV. Hyundai
500 EXCAV. Hyundai
500 EXCAV. Hyundai
SUB TOT. HYUNDAI
EXCAV. 9
500 EXCAV. 10
EXCAV. 3

#DIV/0!

EXCAV. 11
SUB TOT. EXC.

0.40

400 CF Hyundai
400 CF Hyundai

#DIV/0!

400 CF Hyundai
400 C FRONTAL

#DIV/0!
#DIV/0!

400 C FRONTAL
300 C FRONTAL
C FRONTAL
SUB TOT. C FRONT.
Total general
CONTRATA
SSE
SSE
SSE
Total general
EQUIPOS DE AUXILARES
CONTRATA
Minera
Minera
Minera
Minera
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE

SSE
SSE
SSE
Total general

EQUIPOS DE ACARREO

TURNO B ( DA )
EQUIPOS.

Horas

Equipo

DFM (hra)

T7-01

12.0

T7-02

1.6

T7-03
T7-04

DNOPF (hra)

DNOPV (hra)

RENDIMIENTO y DISP.
DOP (hra)

Hras efec.

%DM

0.0

0%

8.2

86%

12.0

0.0

0%

12.0

0.0

0%

T7-06

12.0

0.0

0%

T7-07

12.0

0.0

0%

T7-09

1.6

0.4

10.0

87%

T7-10

12.0

0.0

0%

1.3

18.2

86.7%

0.7

9.1

82%

SUBTOTAL

75.2

S-110

2.2

S-119

12.0

S-121

2.1

S-122
S-123
S-127

1.0

1.0

0.2

0.2

0.9

0.0

0%

0.8

9.1

83%

1.9

0.6

9.6

85%

1.8

0.6

9.6

85%

12.0

0.0

0%

S-128

12.0

0.0

0%

S-134

12.0

0.0

0%

S-139

2.6

0.6

8.9

79%

S-143

3.0

0.9

8.1

75%

S-144

1.7

0.8

9.5

86%

S-145

12.0

0.0

0%

S-148

12.0

0.0

0%

S-152

2.3

0.6

9.2

81%

S-155

3.6

1.1

7.3

70%

S-156

5.5

0.9

5.6

54%

S-157

12.0

SUBTOTAL

108.4

0.0

0.0

6.9

0.0

0%

85.9

77.8%

S-158

12.0

0.0

0%

S-159

12.0

0.0

0%

S-160

12.0

0.0

0%

S-161

12.0

0.0

0%

S-162

12.0

0.0

0%

S-163

12.0

0.0

0%

S-165

12.0

0.0

0%

S-166

12.0

0.0

0%

S-167

12.0

0.0

0%

0.0

0.0%

SUBTOTAL

108.0

0.0

0.0

0.0

S-515

12.0

0.0

0%

S-516

12.0

0.0

0%

S-517

12.0

0.0

0%

S-518

12.0

0.0

0%

S-519

12.0

0.0

0%

S-520

1.6

9.7

87%

S-521

12.0

S-522

3.9

S-523
S-524
S-525

0.7

0.0

0%

7.6

68%

12.0

0.0

0%

12.0

0.0

0%

12.0

0.0

0%

0.5

S-526

12.0

0.0

0%

S-527

12.0

0.0

0%

S-528

12.0

0.0

0%

S-529

12.0

0.0

0%

17.3

93.4%

SUBTOTAL

161.5

CAMC-01

0.0

0.0

1.2

0.0

0%

SUBTOTAL

12.0

0.0

0.0

0.0

0.0

0.0%

Total general

480.1

1.0

45.3

9.4

121.4

DFM (hra)

DNOPF (hra)

DNOPV (hra)

DOP (hra)

Hras efec.
0.0

0%

0.00

0.00

0.00

0.00

0.00

Equipo

12.0

RH90C-2
SUB TOT. PALA

12.00

500-LC01

12.0

500-LC02

1.92

500-LC

6.00

380-LC-CO
SUB TOT. HYUNDAI

12.0

0.58

2.25
22.17

345-C9

12.0

345-C10

5.7

345-BL-3
345-DL11
SUB TOT. EXC.

0.58

%DM

0.0

0%

0.33

9.2

84%

1.00

5.0

50%

5.08

0.50

4.2

81%

5.08

1.83

18.33

43%

0.0

0%

6.1

53%

12.0

0.0

0%

12.0

0.0

0%

41.67

0.2

0.00

0.00

0.25

6.08

96%

HL-770

5.9

0.75

0.75

4.6

51%

HL-760

4.3

1.37

0.25

6.1

64%

HL-760-CO

2.42

1.50

0.50

7.6

80%

CF-966-1

12.0

CF-966-2

2.3

CF-LONGKING

0.0

0%

9.5

81%

12.0

0.0

0%

12.0

0.0

0%

0.23

992-C-2
SUB TOT. C FRONT.

50.87

0.00

3.62

1.73

27.78

69%

Total general

126.7

0.6

8.7

3.8

52.2

52%

Equipo

DFM (hra)

DNOPF (hra)

DNOPV (hra)

DOP (hra)

Hras efec.

%DM

DM45-E4

4.50

0.50

3.20

1.90

1.9

63%

DM45-E2

12.0

0.00

0.00

0.00

0.0

0%

D245E-6

4.50

1.00

3.00

3.00

0.5

63%

21.0

1.5

6.2

4.9

2.4

42%

DFM (hra)

DNOPF (hra)

DNOPV (hra)

DOP (hra)

Hras efec.

%DM

Total general
EQUIPOS DE AUXILARES
Equipo
420-E1

12.0

0.0

0%

420-E2

12.0

0.0

0%

0.0

0%
0%

824H-01

12.00

0.0

D10T-01

12.0

0.0

0%

D6M-2

3.9

0.75

0.25

7.1

68%

D8R-1

7.0

0.58

0.25

4.2

42%

D8R-3

12.0

D8T-9

2.3

D8N-1

12.0

16H-01

12.0

160H-01

3.6

160H-02

12.0

160H-05

4.7

RL-1

12.0

0.50

0.50
0.33

0.0

0%

9.2

81%

0.0

0%

20.5

95%

0.0

0%

7.9

70%

0.0

0%

7.0

61%

0.0

0%

RL-4

12.00

0.0

CS56-5

12.0

0.0

0%
0%

CIS. COMBUSTIBLE

3.00

2.00

2.00

2.00

3.0

75%

168.5

2.0

3.3

3.8

17.9

25%

87.6

RENDIMIENTO y DISP.
%UT (DM)

TM

TM/Hra

4,370.0

531.8

100.0%
86.5%

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%
96.0%

0.0
4,370.0

436.3

97.8%

8,740.0

121.0

93.4%

377.7

41.4

91.4%

566.5

62.5

94.3%

692.4

72.4

94.6%

650.4

67.5

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

93.7%

692.4

78.2

90.2%

629.5

77.7

92.2%

629.5

66.4

100.0%

0.0

100.0%

0.0

94.3%

734.4

86.7%

671.4

92.0

86.0%

965.2

171.8

6,609.3

47.6

100.0%
95.1%

80.1

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%
100.0%

0.0
0.0

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

93.3%

1,007.1

103.8

545.5

72.1

100.0%
93.4%

comarsa
FM-127
FM-155
FM-156
FM-157

0.0

100.0%

0.0

100.0%

0.0

100.0%

0.0

minera
FM-142
FM-121
FM-154
FM-139
FM-144
FM-110
FAW-160 sse
FAW-161 FAW-158
FAW-162 FAW-163
FAW-166
FAW-167
FAW-159
FAW-164
FAW-165
FAW-158
FAW-163
FM-119
FM-122
FM-123
CAMC

FAW-516
FAW-521
FAW-523
FAW-525
FAW-527
FAW-519
FAW-524
FAW-528
FAW-515

minera
FAW-515
FAW-517
FAW-518
FAW-520
FAW-522
FAW-526
FAW-529

100.0%

0.0

100.0%

0.0

100.0%

0.0

100.0%
99.1%

0.0
1,552.7

#DIV/0!
#DIV/0!

FAW-517
FAW-518
FAW-520
FAW-522
FAW-526

11.7
#DIV/0!

0.0

#DIV/0!

16,902.0
%UT (DM)

TM

TM/Hra

0.00

0.00

95.6%

7,268.0

792.9

83.3%

8,740.0

1,748.0

16,008.0

635.2

184.0

30.2

100.0%
1.00

0.0

100.0%

0.0

42.7%
80%

0.0

100.0%
96.1%

3.8 1912.632
#DIV/0!
6.5
0

0.0

100.0%

#DIV/0!

0.0

100.0%
99%

184.0

10.1

75.5%

3,128.0

675.1

2.2

78.9%

0.0

79.1%

0.0

100.0%

0.0

97.6%

0.0

100.0%

0.0

100.0%

0.0

HL-760-CO

96.4

RH-90C-2

90%

3,128.0

92%

19,320.0

%UT (DM)

Metros/ DIA

26.4%

102.00

53.68

#DIV/0!

0.00

#DIV/0!

7.3%

46.50

93.00

#DIV/0!

148.5

#DIV/0!

#DIV/0!

500-LC02

#DIV/0!
#DIV/0!

Metros/ HRA.

%UT (DM)
100.0%
100.0%
100%
100.0%
100.0%
87.7%
83.3%
100.0%
94.8%
100.0%
95%
100.0%
94.0%
100.0%
95.5%
100.0%

138.0

500-LC

79.0

380-LC-CO

34.0

HL-760

62.0
6.0
148.0

100.0%
100.0%
40.0%
#DIV/0!

REPORTE DIARIO PRODUCTIVIDAD Y DISPONIBILIDADES


DICIEMBRE 2012.

ENE, 2013

RP.DIA

5:00 AM

4/3/2013

EQUIPOS.

Minera

T7-01

Minera

T7-02

296.3

Minera

T7-03

Minera

T7-04

Minera

T7-06

Minera
Minera

CONTRATA

310.6
0.0
205.4
87.2
0.0
306.9
0.0

CAMIONES 777F

0.0

RENDIMIENTO y DIS
Hras. Mes
(acum)
0.0

Equipo

%DM Mes

Hras efec. Dia

0%

0.0

%DM dia
0%

58%

14.4

87%

0.0

0%

0.0

0%

205.4

48%

0.0

0%

87.2

18%

0.0

0%

T7-07

0.0

0%

0.0

0%

T7-09

290.2

60%

16.7

80%

Minera
T7-10
SUBTOTAL 777F

0.0

0%

0.0

0%

879.1

23%

31.0

21%

SSE

S-110

63.2

83%

17.8

84%

SSE

S-119

302.5

59%

8.2

43%

25.4

SSE

S-121

15.5

43%

10.0

47%

285.6

SSE

S-122

267.7

51%

17.9

87%

365.2

SSE

S-123

347.1

66%

18.1

86%

274.4

SSE

S-127

274.4

55%

0.0

0%

0.0

SSE

S-128

0.0

0%

0.0

0%

SSE

S-134

94.3

18%

0.0

0%

SSE

S-139

54.6

71%

17.5

84%

SSE

S-143

123.2

38%

16.6

82%

SSE

S-144

33.9

43%

17.1

84%

0.0

SSE

S-145

0.0

0%

0.0

0%

0.0

SSE

S-148

0.0

0%

0.0

0%

17.8

SSE

S-152

0.0

0%

17.8

85%

327.9

SSE

S-155

312.7

64%

15.2

79%

315.0

SSE

S-156

300.8

60%

14.2

71%

SSE
S-157
SUBTOTAL FM

43.2

17%

0.0

0%

2,233.2

39%

170.2

49%

94.3
72.1
139.8
51.1

VOLQ. FM

81.0
310.6

43.2

SSE

S-158

241.9

51%

0.0

0%

245.8

SSE

S-159

245.8

47%

0.0

0%

SSE

S-160

245.6

59%

0.0

0%

SSE

S-161

268.3

62%

0.0

0%

SSE

S-162

250.1

59%

0.0

0%

SSE

S-163

39.4

64%

0.0

0%

SSE

S-165

18.0

4%

0.0

0%

296.3

SSE

S-166

296.3

69%

0.0

0%

286.7

SSE
S-167
SUBTOTAL FAW

286.7

65%

0.0

0%

1,892.2

53%

0.0

0%

245.6
268.3
250.1
39.4
18.0

VOLQ. FAW
COMARSA

241.9

Minera

S-515

240.2

50%

0.0

0%

0.0

Minera

S-516

0.0

0%

0.0

0%

152.9

Minera

S-517

152.9

32%

0.0

0%

183.6

Minera

S-518

183.6

34%

0.0

0%

0.0

Minera

S-519

0.0

0%

0.0

0%

Minera

S-520

219.8

47%

17.9

86%

Minera

S-521

5.0

1%

0.0

0%

Minera

S-522

213.9

46%

16.4

78%

Minera

S-523

0.0

0%

0.0

0%

Minera

S-524

0.0

0%

0.0

0%

Minera

S-525

0.0

0%

0.0

0%

237.6
5.0
230.3
0.0
0.0
0.0

VOLQUETES FAW

240.2

VOLQUETES FA

Minera

S-526

227.8

47%

0.0

0%

0.0

Minera

S-527

0.0

0%

0.0

0%

0.0

Minera

S-528

0.0

0%

0.0

0%

127.2

25%

0.0

0%

1,370.3

19%

34.2

11%

0.0

0%

0.0

0.0%

0.0

0%

0.0

0%

227.8

Minera
S-529
SUBTOTAL FAW

127.2

CAMC-01
En prueba
SUBTOTAL CAMC

0.0

TOTAL ACARREO
CONTRATA

Equipo

6,374.7
Hras. Acum
Mes
289.8

235.5
%DM Mes

Hras efec. Dia

%DM dia

59%

8.6

40.3%

289.8

59%

8.6

40%

500-LC01

0.0

0%

0.0

0%

EXCAV. Hyundai

500-LC02

203.9

38%

18.5

84%

393.9

EXCV. COMARSA

500-LC

379.6

79%

14.3

67%

325.8

EXCV. COMARSA
380-LC-CO
SUB TOT. HYUNDAI

321.6

75%

4.2

41%

905.1

48%

36.9

48%

PALA
SUB TOT. PALA

RH90C-2

0.0

EXCAV. Hyundai

222.4

0.0
332.2
0.0
0.0

EQ. CARGUIO

298.5

EXCAV. 9

345-C9

0.0

0%

0.0

0%

EXCAV. 10

345-C10

316.7

64%

15.6

70%

EXCAV. 3

345-BL-3

0.0

0%

0.0

0%

EXCAV. 11
SUB TOT. EXC.

345-DL11

0.0

0%

0.0

0%

316.7

16%

15.6

18%

CF Hyundai

HL-770

0.0

0%

4.6

26%

426.0

CF Hyundai

HL-760

411.8

80%

14.2

75%

337.6

CF Hyundai COMARSAHL-760-COM

330.0

73%

7.6

40%

4.6

0.0

C FRONTAL

CF-966-1

0.0

0%

0.0

0%

445.4

C FRONTAL

CF-966-2

427.2

75%

18.2

83%

327.3

C FRONTAL

Long King

327.3

75%

0.0

0%

0.0

0%

0.0

0%

1496.4

43%

44.6

32%

C FRONTAL
992-C-2
SUB TOT. C FRONT.

0.0

91.6
55.1
30.9

PERFORADORA

TOTAL CARGUIO

0.0

0.0

193.1
256.5
81.4
255.0
0.0
0.0
310.2
0.0
280.1
0.0

EQUIPOS AUXILIARES y SOPORTE MINA

0.0

EQUIPO

Equipo

Perforadora

DM45-E4

Perforadora

DM45-E2

Perforadora
D245E-6
SUB TOTAL PERFOR.

105.8
%DM Mes

Hras efec. Dia

%DM dia

54%

4.4

65%

55.1

39%

0.0

0%

27.4

65%

3.5

69%

169.7

53%

7.9

44%

%DM Mes

Hras efec. Dia

%DM dia

EQUIPOS AUXILIARES

126.4
72.6

3,007.9
Hras. Acum
Mes
87.2

EQUIPO

Equipo

Retro excav.

420-E1

Retro excav.
420-E2
SUBTOTAL R EXC

Hras. Acum
Mes
0.0
117.7

0%

0.0

0%

31%

8.7

43%

117.7

16%

8.7

22%

TRACT. Neum

824H-01

72.6

14%

0.0

0%

TRACT. Orug

D10T-01

0.0

0%

0.0

0%

TRACT. Orug

D6M-2

176.8

48%

16.3

74%

TRACT. Orug

D8R-1

247.9

60%

8.6

45%

TRACT. Orug

D8R-3

81.4

23%

0.0

0%

TRACT. Orug

D8T-9

237.0

72%

17.9

84%

TRACT. Orug
D8N-1
SUBTOTAL TRACT

0.0

0%

0.0

0%

815.6

31%

42.8

29%

Motoniv

16H-01

0.0

0%

0.0

0%

Motoniv

294.3

68%

15.9

78%

Motoniv

160H-01
160H-02

0.0

0%

0.0

0%

Motoniv

160H-05-COM

273.1

70%

7.0

31%

Rodillo PC

RL-1

0.0

0%

0.0

0%

EQUIPOS AUXILIA
75.5

Rodillo Liso

RL-4

75.5

35%

0.0

0.0

Rodillo Liso

CS56-1

0.0

0%

0.0

0%

129.0

63%

6.0

63%

771.9

26%

28.9

19%

Cisterna D2
Combust.
SUB TOT. SOPORTE

135.0

TOTAL AUXILIARES

1705.3

80.3

4,584.2

180.1

0%

FLOTA EQ. ACARREO DISPONIBLES PARA EL DIA.

Item

%DM

%UT

CAM 777F

Equipos

Cant. Mina
8

21%

0%

VOLQ FM MINERA

49%

0%

VOLQ FM COMARSA

10

49%

67%

VOLQ FAW SSE

0%

0%

VOLQ. FAW MINERA

15

11%

0%

VOLQ_CAMC

0%

0%

Perforadoras

44%

0%

Excavadoras

33%

46%

Pala RH90

TOTAL PROMEDIO

Programa

Operativos

40%

0%

31%

57%

HorasP/Dia

12 HP
24

HPE
22

5AM

4/3/2013
RENDIMIENTO y DISP.
%UT (DM) dia

TM/dia

TM/Hra dia

N viajes

0%

0.0

0.0

Viajes /
Hra
0

SITUAC.
MECANICA
Inoperativo

72%

7,600.0

529.6

80

Operativo

0%

0.0

0.0

Inoperativo

Transmision

0%

0.0

0.0

Inoperativo

Neutralizacion de transmision

0%

0.0

0.0

Inoperativo

Filtros de transmision

0%

0.0

0.0

Inoperativo

Diferenciales

91%

7,980.0

478.8

84

Operativo

OBSERVACIONES
Transmision

0%

0.0

0.0

Inoperativo

Transmision

0%

15,580.0

502.3

164

92%

1,217.0

68.5

58

5
3

Operativo

STAND BY

82%

461.6

56.6

22

Operativo

STAND BY

88%

629.5

63.3

30

Operativo

STAND BY

89%

1,175.0

65.6

56

Operativo

91%

1,111.7

61.5

55

Operativo

100%

0.0

0.0

Inoperativo

EVALUACION

0%

0.0

0.0

Inoperativo

Reparacion de equipo

0%

0.0

0.0

Operativo

STAND BY

91%

1,217.0

69.7

58

Operativo

89%

1,112.0

66.9

53

Operativo

89%

1,049.1

61.2

50

Operativo

STAND BY

0%

0.0

0.0

Inoperativo

Neumaticos

0%

0.0

0.0

Inoperativo

Retenes de Cubo y zapatas

0%

1,237.9

0.0

59

Operativo

83%

1,112.0

73.1

Inoperativo

1,447.8

102.0

53
69

87%

Inoperativo

LLANTAS

0%

0.0

0.0

Inoperativo

Por caja

0%

11,770.6

69.2

100%

0.0

0.0

563
0

3
0

Inoperativo

EVALUACION

100%

0.0

0.0

Inoperativo

EVALUACION

0%

0.0

0.0

Inoperativo

se retiro al toro

0%

0.0

0.0

Inoperativo

se retiro al toro

0%

0.0

0.0

Inoperativo

se retiro al toro

100%

0.0

0.0

Inoperativo

EVALUACION

0%

0.0

0.0

Inoperativo

EVALUACION

0%

0.0

0.0

Inoperativo

se retiro al toro

0%

0.0

0.0

Inoperativo

se retiro al toro

0%

0.0

0.0

100%

0.0

0.0

0
0

Inoperativo

0%

0.0

0.0

Inoperativo

100%

0.0

0.0

Inoperativo

100%

0.0

0.0

Inoperativo

0%

0.0

0.0

Inoperativo

90%

1,678.6

93.9

80

Operativo

Bomba de inyeccion

Se neutraliz

0%

0.0

0.0

Inoperativo

0%

1,049.1

64.2

50

Operativo

Caja

0%

0.0

0.0

Inoperativo

Reparacion de motor

0%

0.0

0.0

Inoperativo

Rodaje de la corona

0%

0.0

0.0

Inoperativo

Accidente

0%

0.0

0.0

Inoperativo

Neumatico P6

0%

0.0

0.0

Inoperativo

Neumaticos

0%

0.0

0.0

Inoperativo

Neumaticos

0%

0.0

0.0

Inoperativo

Evaluacion

0%

2,727.7

79.7

130

0.0%

0.0

0.0

4
0

Inoperativo

Rodaje y Boggies

0%

0.0

0.0

30,078.3

857

%UT (DM) dia

TM/dia

TM/Hra dia

N de viajes

89%

839.3

97.2

40

0%

839.3

97.2

40

Viajes /
Hr
5

SITUAC.
MECANICA
Operativo

OBSERVACIONES
STAND BY

0%

0.0

0.0

5
0

94%

12,933.1

1,175.7

422

38

Operativo

89%

15,580.0

0.0

179

Operativo

43%

0.0

0.0

Operativo

STAND BY

0%

28,513.1

1,175.7

601

0
Sensor de la bomba

Inoperativo

Reductores de Giro
STAND BY

0%

0.0

0.0

184.0

14.7

142

0
11

Inoperativo

93%
0%

0.0

0.0

Inoperativo

Motor

0%

0.0

0.0

Inoperativo

Motor

93%

184.0

14.7

11
0

Operativo

NO OPERATIVO PARA NOCHE POR FALTA DE LUCES

Operativo

0%

3,128.0

0.0

142
74

82%

0.0

0.0

Operativo

79%

0.0

0.0

Operativo

0%

0.0

0.0

Inoperativo

92%

0.0

0.0

Operativo

100%

0.0

0.0

Inoperativo

Por radiador

0%

0.0

0.0

Inoperativo

Motor

0%

3,128.0

70.1

74

32,664.4
%UT (DM) dia

Metros/ DIA

30%

102.0

Pines y Bocinas

857
Metros/Hra
dia
23.2

SITUAC.
MECANICA
Operativo

0%

0.0

0.0

Inoperativo

23%

46.5

13.3

Operativo

0%

148.5

18

OBSERVACIONES

Baja presion de aceite de motor

0%

SITUAC.
MECANICA
Inoperativo

0%

Inoperativo

SISTEMA ELECTRICO

0%

0%

Inoperativo

Fuga aceite de transmision

0%

Inoperativo

motor

92%

Inoperativo

82%

Inoperativo

0%

Inoperativo
Operativo

Inyectores

89%
0%

Inoperativo

Bomba de Inyeccion y Motor

0%

Eje de mando final

%UT (DM) dia

0%

Inoperativo

89%

Operativo

OBSERVACIONES
Filtros

0%

Inoperativo

95%

Inoperativo

Reparacin de motor
PERNO FLOJO, INDICA EL OPERADOR

0%

Inoperativo

Sist. Hidraulico

100%

Operativo

0%

Inoperativo

47%

Operativo

0%

TOTAL ACUM. MES US$

TM/Hora

TM/DIA

Observaciones

502

15,580

06 inop

69

11,771

01 imoperativo compo. Varios

02 Fm de SSE) compo varios 01 por falrta de operador

03 inop

80

2,728

08 inop

Rodaje

18

149

595

28,697

97

839

DM-45E-2 Inoperativa
02 Exc inop. Hyundai 500-LC02 Inoperativa

Reparacin de motor

Equipo
T7-01
T7-02
T7-03
T7-04
T7-06
T7-07
T7-09
T7-10
S-110
S-119
S-121
S-122
S-123
S-127
S-128
S-134
S-139
S-143
S-144
S-145
S-148
S-152
S-155
S-156
S-157
S-158
S-159
S-160
S-161
S-162
S-163
S-165
S-166
S-167
S-515
S-516
S-517
S-518
S-519
S-520
S-521
S-522
S-523
S-524
S-525

MINERAL

DESMONTE

S-526
S-527
S-528
S-529
CAMC-01
TOTAL ACARREO
Equipo
RH90C-2
500-LC01
500-LC02
500-LC
380-LC-CO
345-C9
345-C10
345-BL-3
345-DL11

ERATIVO PARA NOCHE POR FALTA


HL-770
DE LUCES
HL-760
HL-760-COM
CF-966-1
CF-966-2
Long King
992-C-2

Equipo
DM45-E4
DM45-E2
D245E-6

Equipo
420-E1
420-E2
824H-01
D10T-01
D6M-2
D8R-1
D8R-3

FLOTA EQ. ACARREO DISPONIBLES PARA EL DIA.

D8T-9
D8N-1

Item

Equipos

CAM 777F

16H-01

VOLQ FM

160H-01
160H-02

VOLQ FAW SSE

VOLQ. FAW MINERA

VOLQ_CAMC

Perforadoras

FLOJO, INDICA EL OPERADOR 160H-05-COM


RL-1

RL-4

Excavadoras

CS56-1

Pala RH90

Combust.

Cant. Mina
8
6
10
8
15
1
2
5
1

TOTAL PROMEDIO

OTA EQ. ACARREO DISPONIBLES PARA EL DIA.


Cant. Mina

Programa Operativos

%DM

%UT TM/Hora TM/Dia

21%

0%

502

15,580

16

11

49%

0%

69

11,771

0%

0%

15

11%

0%

80

2,728

0%

0%

0.0

0.0

44%

0%

18

149

33%

46%

595

28,697

40%

89%

97

839

28%

68%

TOTAL PROMEDIO

Observaciones
06 inop
05 inop, 03 falta operadores turno noche
01 inop, 5 se retiraron al toro, 2 en Stby por operador
11 inop
Rodaje
DM-45E-2 Inoperativa

02 Exc inop.

PRODUCCION POR GUARDIAS


31 ENERO 2013.
PRODUCCION MINA.
Mineral
Desmonte
Total Roca
S. Ratio
Ley
Onzas a PAD

UM
TMS
TM
TM
D/M
gr/Tn
Onzas

Gdia (A) Noche


Ejecut.
Plan
4,805
2,340
8,414
27,293
13,219
29,633
1.75
11.67
0.194
0.862
30
64.9

% Cump
205%
31%
45%
23%
46%

UM
TMS
TM
TM
D/M
gr/Tn
Onzas

Gdia (B)
Ejecut.
2,937
11,782
14,720
4.01
0.379
36

Da
Plan
2,340
27,293
29,633
11.67
0.862
65

0.72113292
20,196

DEL 19 al 25 nov
31 ENERO 2013.
PRODUCCION MINA.
Mineral
Desmonte
Total Roca
S. Ratio
Ley
Onzas a PAD

UM
TMS
TM
TM
D/M
gr/Tn
Onzas

Gdia (A) Noche


Ejecut.
Plan
4,804.9
#REF!
8,413.7
#REF!
13,218.5
#REF!
1.75
#REF!
0.194
0.862
29.97
#REF!

% Cump
#REF!
#REF!
#REF!
23%
#REF!

UM
TMS
TM
TM
D/M
gr/Tn
Onzas

Gdia (B) Da
Ejecut.
Plan
2,937.5
#REF!
11,782.4
#REF!
14,719.9
#REF!
4.01
#REF!
0.379
0.862
35.76
#REF!

Jan-03

Gdia (B) Da
% Cump
126%
43%
50%
44%
55%

Prog. Min

PROGRAMADO POR GUARDIA


Prog. Desm
Prog. Ley

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Gdia (B) Da

44%
#REF!

TMS

% Cump
#REF!
#REF!
#REF!

ADO POR GUARDIA

MINERAL
Min. Ejec. "A"
Min. Ejec. B"

Prog. Onzas
-

DESMONTE
Desm. Ejec. "A"
Desm. Ejec. B"

PRODUCCION MINERAL GUARDIA "A" VS. GUARDIA "B"

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

10

11

12

13

14

Min. Ejec. "A"

15

16

17

18

Min. Ejec. B"

19

20

21

22

23

24

Prog. Min

PRODUCCION
300.0
270.0
240.0
210.0
180.0

150.0
120.0
90.0
60.0
-

10

11

12

Prog: 102.9 Oz
-

30.0

Oz. Ejec. "A"

13

LEY
Ley Ejec. "A"

Ley Ejec. B"

#DIV/0!

ONZAS
Oz. Ejec. "A"
Oz. Ejec. B"

#DIV/0!

TM

PRODUCCION

24

25

26

27

28

29

30

10

24

25

26

27

28

29

30

PRODUCCION ONZAS A PAD GUARDIA "A" VS. GUARDIA "B"

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

Oz. Ejec. B"

Prog. Onzas

10

PRODUCCION DESMONTE GUARDIA "A" VS. GUARDIA "B"

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

10

11

12

13

Desm. Ejec. "A"

14

15

16

17

Desm. Ejec. B"

18

19

20

21

Prog. Desm

22

23

24

25

26

27

28

29

30

Semforo

PRODUCCION_MINA: SURO SUR FASE 02


31 ENERO 2013.

31

SURO SUR F2

UM

Mineral
Desmonte
Total Roca
S. Ratio
Ley
Onzas a PAD

TMS
TM
TM
D/M
gr/Tn
Onzas

80% y 90%

Ejecut. Del Da
Ejecut.
-

Plan
-

90% >= 100%

Ejecut. A la Fecha

% Cump
-

Ejecut.
0

Plan
-

% Cump
-

25,176

0%

136,400

780,452

17%

25,176

0%

136,400

780,452

17%

<80%

PROG. MENSUAL
Plan
-

%Mes
-

780,452

17%

780,452

17%

Sub Plan
F2
Acumulado

TMS

LEY

ONZ

89,578

0.316

911

#DIV/0!

89,578

0.316

911

Dimesionamiento de Equipos_MSS - Plan de Diciembre 2012

####

EQUIPOS DE ACARREO Y CARGUIO


Equipo

31

20

Diciembre 2012.
Cant

Empresa Incid

Hef_Dia

Hef_Mes R /hora % DM % Util

PRO/DIA_EQ TM_Dia_fta

TM_Mes_ft

F_02

TIPO

Horas/dia

ACARREOCamiones 777F
CARGUIO Pala RH90C_2

4
1

MSS
MSS

100%
100%

13
14

391
419

342
1,600

70%
75%

90%
90%

4,309
21,600

17,237
21,600

534,341
669,600

S PLAN

Etapa

Dia/m

Volquetes FAW
ACARREO Volquete SSE
Volquetes CAMC
CARGUIO Excav.Hyundai 500

10
4
1
2

MSS
MSS
MSS
SSE

100%
100%
100%
100%

15
14
15
15

474
446
474
474

66
62
76
900

85%
80%
85%
85%

90%
90%
90%
90%

1,012
900
1,157
13,770

10,121
3,599
1,157
27,540

313,749
111,555
35,857
853,740

EQUIPOS DE PERFORACION
PERFORAC

Tipo Trabajo
ZONA

Equipo

534,341
669,600
461,162
853,740
b

Cant

Incid

Hr/dia

Hef_Mes Ren/hra % DM

% Util Mts/Dia

Mts_Mes

TM/Dia

TM_Mes

HBANC (M)

SUB PLAN PERF. DM45E_02

100

279.0

25.0

50%

90%

225.0

6,975.0

18,195.7

545,869.6

6.0

FASE 2

100

279.0

25.0

50%

90%

225.0

6,975.0

18,195.7

545,869.6

6.0

Incid

Hefect

Hr_Mes

DM

UT

1.0

13

390.6

70%

PERF. DM45E_04

SERVICIOS

PLANTA
(PAD _ PROY)

MINA
(SPLAN _F2_BOTAD)

EQUIPOS AUXILIARES MINA Y OTROS


ETAPA ZONA
Equipo

AUXILIAR

TM MES/Fta

13,950.0

Cant Empresa

1,091,739.1

Observaciones

Motoniveladora

SSE

90% Mantenimiento Vias


90% Empuje Botaderos

C Frontal 966

SSE

1.0

13

390.6

70%

Cfrontal Hyundai 770

SSE

0.65

16

326.4

90%

RetroExcav. 420

MSS

1.0

14

446.4

80%

Tractor D8

SSE

1.0

13

390.6

70%

Tractor 824H

MSS

1.0

13

390.6

70%

Tractor D6

SSE

1.0

13

390.6

70%

Excavadora 380

SSE

1.0

14

418.5

75%

90% Empuje Mineral y Prep. Pads


90% Caguio de Lixiviado

Luminaria

SSE

1.0

217.0

70%

50% Trabajos Noche (Splan,F2,Botadero)

RetroExcav. 420
Cfrontal Hyundai 760
Cfrontal Long King
Tractor D8

1
1
1
0

SSE
SSE
SSE
MSS

1.0
1.0
1.0
1.0

14
14
14
13

446.4
446.4
446.4
390.6

80%
80%
80%
70%

90%
90%
90%
90%

Rodillo Liso
Luminaria

1
2

MSS
SSE

0.5
1.0

7
8

209.3
248.0

75%
80%

90% Preparacion Pads


50% Trabajos Turno Noche (PADs)

Bus
1
Camabaja/Cisterna H2O1
Cisterna D2
1
Cisterna H2O
1

MSS
SSE
SSE
SSE

1.0
1.0
1.0
1.0

14
14
11
13

446.4
446.4
325.5
412.3

90%
80%
70%
70%

80%
90%
75%
95%

90% Empuje Botaderos


90% Mantenimeinto Vias y Cunetas
90% Botaderos y accesos
90% Carriles y Vias SP, F2, Botadero

Alimentacion de Cal y Servicios


Preparacion Over en Pad
Empuje, Preparcion Over y Pads
Preparacion PADs y Accesos

Traslado personal
Traslado equipos / Regado de Vias
Abastecimiento de D2
Regado Vias, perforac y Campamento

También podría gustarte