ANEXO 1e MEMORIA DE CLCULO DISEO DE ESTANQUES DE CIDO SULFRICO ADENDA N 1 DECLARACIN DE IMPACTO AMBIENTAL PROYECTO AMPLIACIN PRODUCTIVA PLANTA

DE PROCESAMIENTO DE MOLIBDENO EN MEJILLONES


Regin de Antofagasta

30 de Octubre 2009

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

MEMORIA DE CLCULO

CLIENTE PROYECTO OBRA REA 000 UBICACIN

: MOLYNOR S. A. : COMPLEJO INDUSTRIAL MOLYNOR : ALMACENAMIENTO Y DESPACHO DE CIDO SULFRICO : 000 : MEJILLONES-ANTOFAGASTA-CHILE

RODRIGO CONCHA P. INGENIERO CIVIL UCH

DOCUMENTO : (RC 1400-ADA) PM 2008-05 MC-001-0

REVISIONES
0 B A 08.09.09 03.09.09 12.03.08 Emitido para Construccin Emitido para Aprobacin Emitido para Informacin Detalle A.C.F. A.C.F. A.C.F. R.C.P. R.C.P. R.C.P.

Rev. Fecha

Calcul Firma Aprob Firma

EDUARDO CASTILLO VELASCO N2819 UOA-SANTIAGO FONO :209 4238 2257714 FAX : 2698835 Email: proyectos@rcpingenieria.cl

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

NDICE GENERAL
Pg. I II NORMAS DE DISEO BASES DE DISEO 1. CARACTERSTICAS DEL ESTANQUE 2. SOLICITACIONES 3. COMBINACIONES DE CARGA 4. SELLO DE FUNDACIN III DISEO DEL ESTANQUE 1. DETERMINACIN GEOMTRICA DEL ESTANQUE 2. DISEO DEL MANTO DEL ESTANQUE 3. DISEO DEL ESPESOR DE PLANCHA DE FONDO 4. CLCULO DEL ESPESPOR DE LA PLANCHA ANULAR 5. DISEO DE ATIESADORES SUPERIOR E INTERMEDIOS 6. DISEO DEL TECHO 7. DISEO SSMICO DEL ESTANQUE 8. DISEO POR VIENTO DEL ESTANQUE 9. DISEO DE LOS ANCLAJES 10. DISEO DE ANILLO DE ANCLAJE Y LLAVES DE CORTE 11. DISEO DE ESTRUCTURA DE ACCESO Y SUPERIOR IV DISEO DE OBRAS CIVILES 1. DISEO DE FUNDACIN ESTANQUE 3 3 3 3 6 6 7 7 8 9 9 10 12 15 23 25 27 31 34 35

Pgina 2 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

I. NORMAS DE DISEO Todos los diseos y detalles se harn en conformidad con las normas y cdigos que se listan a continuacin. 1.1 1.2 Cdigo de Diseo de Hormign Armado, basado en el ACI 318-2002. American Iron and Steel Institute, AISI Specification for the Design of Cold Formed Steel Structural Members. 1.3 Manual of Steel Construction Allowable Stress Design, American Institute of Steel Construction Inc., 9 Edition. 1.4 NACE STANDARD SP0294-2006, Design, Fabrication and Inspection of Storage Tank System for Concentrate Fresh and Process Sulfuric Acid and Oleum Ambient Temperatures. 1.5 API STANDAR 650, Tenth Edition, Nov. 1998, Adendum 1, Jan. 2000, Adendum 2, Nov. 2001

II. BASES DE DISEO

1.

CARACTERISTICAS DEL ESTAMQUE Contenido Densidad Capacidad Sobre-espesor por corrosin Eficiencia de la Soldadura : Acido Sulfrico : 1.90 Tf/m3 : 632 : 3.2 : 0.85 m3 mm (NACE 2.7.1)

2.

SOLICITACIONES

2.1

Peso Propio Plataformas Estructura Plancha de Piso Colaterales (Ductos) : : : PPplat. : 40.0 kgf/m2 50.0 kgf/m2 10.0 kgf/m2 100.0 kgf/m2
Pgina 3 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

2.2

Peso Propio Cubierta Estructura Plancha de Piso : : PPcub. : 20.0 kgf/m2 50.0 kgf/m2 70.0 kgf/m2

2.3

Sobrecarga (SC) De acuerdo a Criterios de Diseo RC 1400 CD-001 / REV. 0, la sobrecarga para plataformas de inspeccin es: SCPLAT = 150 kgf/m2 Para la cubierta, la sobrecarga de diseo corresponde a la dada por la norma chilena NCh 1537 of 86, la que estipula una sobrecarga base de: SC = 100 kgf/m2

Esta sobrecarga podr ser reducida por rea tributaria y por pendiente segn: SCt = CA C 100 30 kgf/m2

Donde: CA CA CA CA C C : Factor de reduccin por rea tributaria. = 1.0 = 1.0 0.008A = 0.6 Para A 20 m2 Para 20 A 50 m2 Para A 50 m2

Factor de reduccin por pendiente = 1.0 2.33 tg tg 0.30

Pgina 4 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

2.4

Viento, V: Segn la Norma Chilena NCh 432 Of.71 y a lo indicado en los Criterios de Diseo RC 1400-CD-001 / REV. 0, para estructuras ubicadas campo abierto o en sitios asimilables a estas condiciones, la distribucin de presin bsica en altura, est dada por: Presin Bsica (kgf/m2) 70 70 95 106 118

Altura (m) 0 4 7 10 15

2.5

Sismo, S: Segn la Norma Chilena NCh 2369 Of 2003 y a lo indicado en los Criterios de Diseo RC 1400-CD-001 / REV. 0, las solicitaciones ssmicas estn dadas por los siguientes parmetros: Corte basal: Donde: C : coeficiente ssmico, calculado de la siguiente forma: Qo = C I P

2.75 Ao T ' 0.05 C= gR T *


n

0.4

Para zona ssmica 3 Ao = 0.40 g Tipo de suelo II n =1.33 ; T= 0.35 seg.

Pgina 5 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Modos Modo Impulsivo Modo Convectivo

R 4 4

0.02 0.005

T*: perodo del modo con mayor masa traslacional equivalente en la direccin del anlisis. I : Coeficiente de Importancia I = 1.2; Edificio categora C1. P : Peso total del edificio sobre el nivel basal. Para el Modo Impulsivo Para el Modo Convectivo C = Cmax = 0.32 C 0.10 Ao / g

3.

COMBINACIONES DE CARGA 3.1 Para diseo por mtodo de tensiones admisibles i) ii) PP + SC PP + 0.5SC Sismo Horizontal Sismo Vertical

iii) PP Sismo Horizontal Sismo Vertical

3.2

Para diseo por mtodo de cargas ltimas: i) ii) 1.4PP + 1.7SC 1.2PP + 0.5SC 1.4Sismo Horizontal 1.4Sismo Vertical

iii) 0.9PP 1.4Sismo Horizontal 1.4Sismo Vertical

4.

SELLO DE FUNDACIN De acuerdo al Estudio de Mecnica de Suelos elaborado por Ruz & Vukasovic Ingenieros

Asociados Ltda., las capacidades admisibles del suelo son:

Esttica Dinmica

= =

2.5 kgf/m2 3.5 kgf/m2


Pgina 6 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Estas capacidades de soporte del sello de fundacin corresponden al horizonte U2, definido como arena, estrato de color caf claro a gris, de compacidad media a alta, aumentado con la profundidad. Suelo natural, no cementado, de humedad baja .

III

DISEO DEL ESTANQUE

1.

DETERMINACIN GEOMTRICA DEL ESTANQUE Sea dimetro del estanque: D = 10.5 m.

Altura de Llenado H1 = V / ( D2 / 4) = 6.93 m

V = 600 m3

1.1

Determinacin de la altura total del Estanque Para determinar la altura total del estanque, se calcula la revancha o altura de ola ssmica segn el cdigo ASCE. f = 0.837 RE (A1 / g) R RE = 5.25 m (Radio del Estanque)

A1 =Aceleracin Espectral para modo convectivo


0 .4

2.75 Ao I T ' 0.05 A1 = T * R


n

Donde Ao = 0.4 g = 1.20 R =4

Zona ssmica 3 Factor de importancia Estanques de acero de eje vertical con manto continuo hasta el suelo.

T = 0.35 seg Suelo Tipo T* = 3.46 seg


Pgina 7 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

= 0.005 n = 1.33 A1 = 0.0394 g Suelo Tipo

fmx = 0.837 x 5.25 x 0.0394 x 4.0 = 0.693 m. Considerar una revancha de 0.570 mm.

USAR

Dimetro de Estanque Altura Total de Estanque Altura de Llenado Estanque

D = 10.50 m (34.45 ft) H1 = 7.50 m (24.61 ft) H = 6.93 m (22.74 ft)

2.

DISEO DEL MANTO DEL ESTANQUE Sean 3 tramos de 8 pies (2.44 m) ms un tramo de 0.61 pies (0.186 m) Los espesores del manto se disearn a partir del mtodo, 1 foot Method. Parmetros de diseo D = 34.45 (ft) H = 24.61 (ft) G = 1.90 G1=1.00 CA= 0.126 (in) Sd = 23200 (psi) St = 24900 (psi) E = 0.85
2.6D(H 1)G + CA SdE

: Dimetro del estanque (10.5 m) : Altura de llenado del estanque prueba hidrosttica (7.70 m) : Densidad especifica del contenido : Densidad especfica para prueba hidrosttica : Sobre-espesor por corrosin (3.2 mm) : Tensin de diseo ASTM A36 : Tensin prueba hidrosttica ASTM A36 : Factor de eficiencia de la soldadura, sin inspeccin

td =

Espesor de diseo 1 foot Method


Pgina 8 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

tt =

2.6D(H 1)G1 S tE

Espesor de prueba hidrosttica 1 foot Method

Tramo 1 2 3

H (ft) 24.61 16.61 8.61

td (in) 0.330 0.261 0.192 (mm) 0.838 0.662 0.487 (in) 0.100 0.066 0.032

tt (mm) 0.254 0.168 0.082 (in) 0.330 0.261 0.192

tdis (mm) 0.838 0.662 0.487

Nota: Por ser D < 50 ft tmn = 3/16 (in) = 5.0 (mm)

(API 3.6.1.1) B

tmax = 0.838 mm, sea t = 0.8 mmm => tmax /t = 0.838 / 0.800 = 1.05 USAR: Tramo 1 2 3 4 Espesor mm 8 6 6 6

3.

DISEO DEL ESPESOR DE PLANCHA DE FONDO De acuerdo con API 650, acpite 3.4.1, todas las planchas de fondo deben tener un espesor de (6.0 mm) excluido el espesor por corrosin (Sobre-espesor API CA1 = 2.0 mm), . T = 6.0 + CA1 = 8.0 mm Esto dado que la mayor corrosin se produce en la interfase lquidoaire, por dilucin del cido que se ubica en la parte alta del estanque.

USAR EN PLANCHA DE FONDO PL8.

4.

CLCULO DEL ESPESOR DE LA PLANCHA ANULAR La tabla 3-1, del cdigo API 650, establece que el espesor mnimo de la plancha anular de fondo como funcin de la tensin en el manto inferior debido a la prueba hidrosttica y su espesor, se usar G =1.9 dado que es mayor que la densidad especfica del agua.
Pgina 9 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Tensin debido a la prueba hidrosttica en el manto inferior


2.6D (H 1)G t

F=

D = 34.45 ft H = 24.61 ft G1= 1.9 t = 0.315 in

12756 psi

t < 0.75

taf = in

Adems, por requerimientos del proceso de soldadura, punto 3.1.5.7, del Cdigo API, en el encuentro del manto inferior con la plancha anular, se debe cumplir que: Si 0.1875 < t 0.75 Filete mnimo de soldadura in (6.0 mm)

Siendo t el espesor del manto inferior, el espesor de la plancha anular de fondo debe ser mayor o igual al filete de soldadura. USAR EN PLANCHA ANULAR PL 12.

5.

DISEO DE ATIESADORES SUPERIOR E INTERMEDIOS La velocidad de viento de diseo es 87.5 mph (140 km/hr, correspondiente a una presin bsica de 95 kgf/m2) menor que 100 mph, por lo cual las expresiones de clculo deben corregirse por el factor (87.5/100)2 = 0.77

5.1

Diseo del Atiesador Superior Segn 3.1.5.9 letra e del cdigo API 650, para estanques con dimetro menor a 11 m y techos soportados se debe disponer un ngulo superior no inferior a L 51 x 51 x 4.8. (A = 15.5 cm2)

USAR

L 100x100x8

Laminado L 10x12.2

Pgina 10 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

5.2 Diseo de Atiesadores Intermedios Determinacin de la altura mxima no atiesada del manto (3.9.7.1 API 650)
3/2

t Ht = 600000 t D

t = 6 mm = 0.236 in

espesor del manto superior

D = 34.45 ft Dimetro del estanque

= 600000 x 0.236

0.236 34.45

3/2

Ht = 80.3 ft

HtDIS

= 80.3 / 0.77 = 104 ft = 31.7 m

Para no requerir atiesadores intermedios, la altura traspuesta del manto debe ser inferior a la altura mxima no atiesada del manto La altura traspuesta del manto, se calcula como la sumatoria de los anchos traspuestos de cada tramo del manto (wtri) (3.9.7.2 del cdigo API 650).

t sup wtri = wi ti
Donde: wtri wi tsup ti = = =

5/2

Ancho traspuesto de tramo i = Ancho real del tramo i

Espesor del tramo superior Espesor del tramo i

Como la altura traspuesta es siempre menor que la altura total del estanque y la altura total del estanque es de 7.50 m, menor que la altura mxima no atiesada del manto, no se requiere de atiesadores intermedios.
Pgina 11 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

6.

DISEO DEL TECHO El diseo del techo se realiza segn lo especificado en los puntos 3.10.2 al 3.10.4 del cdigo API 650. La estructura de techo se define como un techo cnico soportado con pendiente del 26.8% ( =15). Solicitaciones Peso propio : Estructura Plancha de Techo PP Sobrecarga de Uso: Modelo Estructural El modelo de diseo del techo consiste en una estructura cnica apoyada en el manto del estanque, esta estructura est conformada por costaneras radiales y 3 anillos concntricos de vigas maestras, los que forman polgonos de caras iguales. SC : 20 kgf/m2 : 50 kgf/m2 : 70 kgf/m2 (25 lb/ft2 3.10.2.1 API) (Plancha e = 6 mm)

: 122 kgf/m2

6.1

Determinacin de Cargas de Diseo Se tienen 3 tramos de carga sobre las costaneras, siendo el primero el ms extremo y el tercero el ms interior, de esta forma las cargas de diseo son: B1 B2 qPP qSC : Ancho tributario mayor : Ancho tributario menor : Carga por peso propio (qPP = 70 kgf/m2) : Carga por sobrecarga (qSC = 122 kgf/m2)

Pgina 12 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Tramo 1 2 3

B1 [m] 1.650 1.210 1.540

B2 [m] 1.210 0.770 0.315

q1PP [tf/m] 0.116 0.085 0.108

q2PP [tf/m] 0.085 0.054 0.022

q1SC [tf/m] 0.201 0.148 0.188

q2SC [tf/m] 0.148 0.094 0.038

6.2

Diseo de Estructura de Cubierta Diseo de Vigas VT Radiales P = 3.990 Tf V = 0.410 Tf M = 0.320 Tf Sea I 20x12.3 (I200x100x4x4) Pa = 14.9 Pa = 19.1 Ma = 1.44 Va = 8.29 P / Pa = 3.99 / 14.9 = 0.27 > 0.15 kly = klx = klm = 2.00 4.95 2.00 [m] => [m] => [m] => Tf Tf Tfm Tf Pao = Pex = I1 = I2 = 0.39 0.51 24.00 Tf 44.30 Tf < 1.0 < 1.0 B B

Diseo de Vigas VT1 Radiales P = 0.640 Tf V = 0.320 Tf M = 0.170 Tf Sea C 15x3.82 (C150x50x2) kly = klx = klm = 1.50 3.00 1.50 [m] => [m] => [m] => Pa = 3.27 Tf Pa = 4.22 Tf Ma = 0.241 Tfm Va = 2.65 Tf I1 = I2 = Pao = Pex = 4.66 19.1 Tf Tf

P/ Pa = 0.64 / 3.27 = 0.20 > 0.15

0.84 0.93

< 1.0 < 1.0

B B

Diseo de Vigas VT1 de Anillos Concntricos P = 3.170 Tf V = 0.130 Tf MX = 0.100 Tf m MY = 0.100 Tf m


Pgina 13 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Sea C 15x5.66 (C150x50x3) kly = klx = klm = 1.20 2.40 1.20 [m] => [m] => [m] => Pa = 7.26 Tf Pa = 8.75 Tf Max = 0.443 Tfm May = 0.065 Tf m Va = 4.47 Tf I1 = I2 = Pao = Pex = Pey = 9.41 43.6 12.0 Tf Tf Tf

P/ Pa = 3.17 / 7.26 = 0.44 > 0.15

0.72 0.89

< 1.0 < 1.0

B B

Diseo de Anillo Central P= 1.65 Tf

Sea I 20x12.3 (I200x100x4x4) kly = 0.314 klx = 3.14 [m] => [m] => Pa = Pa = 23.6 21.3 Tf > Tf > 1.65 1.65 Tf Tf B B

Verificacin de Angulo de Borde T= 1.37 Tf

Sea L 10 x 12.2 (L100x100x8 Laminado) Ta = 0.6 x 2.53 x 15.5 = 23.5 Tf > 1.37 Tf Considerando el efecto por corrosin y lo estipulado por el Cdigo API en 3.10.3.2 USAR en VT VT1 I 20x10x19.8 C 15x7.44 ( I 200x100x8x5 ) ( C150x50x4) B

6.3

Diseo de Uniones Unin VT a Manto P = 3.99 Tf V = 0.41 Tf Sean 2 pernos 7/8 A235 b = 2 in l = 2 in n=2 C = 1.18 Va = 1.18 x 10.2 = 12.0kips =5.44 > 4.01 Tf B Vd = ( 3.992 +0.412)1/2 = 4.01 Tf

Pgina 14 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Sea Planch de Toma Pl 8x 100

(b/e) = 100 / 8 = 0.80 < (b/e)c =15.6

= 0.75 x 100 / (8 / (12)1/2) =32.5 < Cc = 128


FS = 1.76 Usar Fcp =1.39 Tf/cm2 >3.99 / (0.8 x 17) = 0.293 Tf/cm2 B

2 Pernos f 7/8 A325 Plancha de Toma PL 8

Tomas de VT1 P = 3.17 Tf V = 0.13 Tf Sean 2 pernos 3/4 A235 b = 2 in l = 2 in n=2 C = 1.18 Va = 1.18 x 7.51 = 8.86 kips =4.01 > 3.17 Tf (b/e) = 100 / 8 = 0.80 < (b/e)c =15.6 B Vd = ( 3.172 +0.132)1/2 = 3.17 Tf

Sea Planch de Toma Pl 8x 100

= 0.75 x 100 / (8 / (12)1/2) =32.5 < Cc = 128


FS = 1.76 Usar Fcp =1.39 Tf/cm2 >3.17 / (0.8 x 12) = 0.3.30 Tf/cm2 B

2 Pernos f 3/4 A325 Plancha de Toma PL 8

7.

DISEO SSMICO DEL ESTANQUE (ANEXO E API 650 y NCh 1269 2003)

7.1

Momento Volcante M Donde: Z = 0.4 I = 1.20 Ws Wt W1 : Zona ssmica 4 API / Zona Ssmica 3 NCh 2369-2003 : Factor de importancia : Peso del manto : Peso del techo : Masa Impulsiva
Pgina 15 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

I [Z C, (Ws Xs + Wt Ht + W1 X1) + Z C2 W2 X2 ]

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

W2 X1 X2 Xs Ht = 24.61 ft C1, C2 H1 = 22.73 ft

: Masa Convectiva : Altura desde la base al punto de aplicacin de W1 : Altura desde la base al punto de aplicacin de W2 : Altura desde la base al centro de gravedad del manto : Altura total del estanque : Coeficientes ssmicos : Altura total del lquido

Determinacin de los Pesos Estticos Manto wS =12.92 = 28484 tf lb

xS = ti wi hi / ti wi = 3.50 = 11.48 m ft

Techo

wt = x (5.25)2 x 0.070 = 6.06 = 13360 tf lb

(PPT = 70 kgf/m2)

Contenido

w = 600 x 1.9 =1140 tf = 2.,513,720 lb

Clculo de w1; w2; x1; x2 De figura E-2 masas efectivas, se tiene: D/H = 10.5 / 6.93 = 1.52 w1/w = 0.68 w2/w = 0.34 w1 = 1709025 lb w2 = 854512 lb

Pgina 16 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

De figura E-3 centroide de masas ssmicas D/H = 10.5 / 6.93 = 1.52 X1/H1 =0.38 X2/H1 =0.64 X1 = 8.64 ft X2 = 14.55 ft

Clculo de los coeficientes ssmicos De seccin E-3.3 Coeficientes de Fuerzas Laterales C1 = 0.6 T=kD = 0.59 x
34.45

D/H = 1.52 k = 0.59 (Figura E-4)

= 3.46 seg 0.75 S/T Si T < 4.5 Si T 4.5 S = 1.2Suelo Tipo S2

C2 =

3.375 S T2
C2 = 0.260

De esta forma los coeficientes ssmicos segn el Cdigo API son: Masa Impulsiva : Z C1 = 0.4x0.60 = 0.240 Z C2 = 0.4x0.26 = 0.104

Masa Convectiva = M M

= I [Z C1 (Ws Xs + Wt Ht + W1 X1) + Z C2 W2 X2 ] = 5991862 lb ft

Pgina 17 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Segn la Norma Chilena NCh 2369-2002, los coeficientes ssmicos para estanques son: Masa Impulsiva : = 0.02

Mantos de acero soldados Zona ssmica 3 Cmx= 0.32

Estanques de acero de eje vertical con manto contnuo hasta el suelo R = 4

(Tabla 5.7)

2.75 Ao T ' n 0.05 Masa Convectiva: C = g R T *


Ao = 0.4 g R =4 T = 0.35 n =1.33 = 0.005 T* = 3.46 C = 0.033 < 0.1 Ao /g = 0.04 Masa Impulsiva : C1 = 0.320 C2 = 0.040 Suelo Tipo II Suelo Tipo II Zona ssmica 3

0.4

0.1xAo / g

Masa Convectiva = M M

= I [Z C1 (Ws Xs + Wt Ht + W1 X1) + Z C2 W2 X2 ] = 6517925 lb ft

Controla la norma Chilena 2369-2003 USAR PARA MASA IMPULSIVA

C = 0.320

MASA CONVECTIVA C = 0.040


Pgina 18 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

De esta forma M M M V V V = I [Z C1 (Ws Xs + Wt Ht + W1 X1) + Z C2 W2 X2 ] = 6517925 lb ft = 901.1 Tf m = I [Z C1 (Ws + Wt + W1 ) + Z C2 W2] = 713350 lb = 323.6 Tf

7.2

Verificacin al Volcamiento del Estanque Peso del contenido resistente al volcamiento

WL = 7.9 tb

F yb GH 1.25GHD

tb = 6 mm = 0.236 in

(E 4.2 API 650 2000)

7.9 tb

Fyb GH =
=

2386 lb/ft 1960 lb/ft

Fy = 36000 lb/in2 G = 1.9 H = 22.73 ft D = 34.45 ft

1.25GHD

WL = 1960 lb/ft

Peso del manto y del techo resistente al volcamiento (wt)

wt =

W s + WT x D

Ws = 28484 lb WT = 13360 lb D = 34.45 ft

wt =
= =

28484 + 13360 x 34.45


397 lb/ft 0.575 Tf/m

Pgina 19 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Para que el estanque sea estable al volcamiento, se debe cumplir:

M 1.57 D x( wt + wL )
2

De lo contrario usar anclajes

6517925 = 2.44 > 1.57 34.45 2 (1860 + 397)


El estanque requiere de anclajes.

7.3

Fuerza de Compresin en el Manto b Para estanques anclados, la mxima fuerza de compresin en el manto est dado por:

b = wt +

1.273M = 7338lb / ft D2
t = espesor de plancha del manto inferior excluido el sobre-espesor por corrosin t = 8-2 = 6 mm = 0.236 in
2

fa = b/(12 t) = 7338/ (12 x 0.236) = 2609 lb/in2 =183.4 kgf/cm

Clculo de la tensin de compresin admisible en el manto. G H D2/t = 1.90 x 22.73 x 34.452 / (0.236)2 = 9.203 x 105 ft/in2 < 106 ft / in2

10 6 t Fa = + 600 GH = 31345lb / in 2 < 0.5Fy = 18000lb / in 2 2.5D

Fa = 18000 lb/in2 > fa = 2609 lb/in2

B
Pgina 20 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

7.4

Compresin del Manto sobre el Hormign de la Fundacin La presin de compresin PC sobre el hormign de la fundacin se calcula como:

Pc =

( 6t af

b 0.6 fc' + t ) x 100

Donde: b taf t As : Fuerza de compresin en el manto inferior (kgf/m) : Espesor de la plancha anular de fondo (cm) : Espesor del tramo inferior del manto (cm) b taf t fc = 7388 lb/ft = 12 mm = 8 mm = 200 kgf/cm
2

= 10 kgf/m = 1.2 cm = 0.8 cm

Pc =

10993 = 13.7 kgf / cm 2 < 0.6 fc' = 150kgf / cm 2 (6 x1.2 + 0.8) x100

7.5

Verificacin del Estanque al Deslizamiento

Corte Ssmico V = I [ C1 x (Ws + Wt + W1) + C2 W2] I C1 C2 Ws Wt = 1.20 = 0.24 = 0.03 = 12.92 tf = 6.06 tf
Pgina 21 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

Con :

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

W1 W2

= 1709025 lb = 775.2 tf = 854512 lb = 387.6 tf

V = 1.20 [0.32 x (12.92 + 6.06 + 775.5) + 0.04 x 387.6] = 323.7 tf

Corte Resistente Vr Donde: Ws Wt Wf W Vr = = = 12.92 tf = 6.06 tf = 5.55 tf = 1140 tf Peso del Manto Peso del Techo Peso Plancha de Fondo Peso del Contenido = 0.25 x (Ws + Wt + Wf + W)

0.25 x (12.92+6.06+5.55+1140) 291.1 tf El estanque se desliza por sismo, usar llaves de

Como Vr = 291.1 tf < V = 323.7 tf corte.

Pgina 22 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

DISEO POR VIENTO DEL ESTANQUE

8.1

Clculo de las Solicitaciones por Viento

Momento Volcante Mv Donde: Mv1 Mv2 qm P h Mv1 MV2 D Pv2 PV3 = = = = = qM x H2/2 P (H + h/3) PV2 D 0.25 PV3 D2 tg 0.50 D tg = MV1 + MV2

: Momento volcante debido a la carga de viento proyectado sobre la superficie cilndrica : Momento volcante debido a la carga de viento proyectado sobre la superficie cnica : ngulo del techo (15) : Dimetro del Estanque : Presin de viento sobre superficie proyectada del rea cilndrica (18 lb/ft2 = 88 kgf/m2) : Presin de viento sobre superficie proyectada de rea cnica (15 lb/ft2 = 73 kgf/m2)

Como la velocidad de viento de diseo es mayor que 100 mph, las cargas de viento deben ser corregidas por el factor (87.5/100)2 = 0.765
Pgina 23 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

qM Mv1 P h Mv2

= 0.765 x 88 x 10.5 = 0.707 Tf/m = 0.707 7.702/2 = 20.96 Tf m =0.765 x 0.25 x 73 x 10.52 = 0.412 Tf = 0.5 x 10.5 x tg 15 = 1.407 m =0.412 x (7.70 + 1.407/3) = 3.37 Tf x tg 15

MV

= 20.96 + 3.37 =24.33 Tf m

Fuerza Deslizante FD = qM H + P = 0.707 x 7.7 + 0.412 = 5.86 Tf

8.2

Verificacin al Volcamiento del Estanque El peso resistente al volcamiento corresponde a la sumatoria de los pesos del manto, plancha de fondo y techo, excluidos el sobre-espesor por corrosin y el contenido. Peso del Manto Peso del techo Peso total resistente : : ws = 9.25 Tf wf = 4.79 Tf wT = 2.89 Tf wR = 9.25 + 4.79 + 2.89 = 16.93 lb

Peso de la Plancha de Fondo :

Pgina 24 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Momento resistente

MR = WR D/2 = 16.93 x 10.5 / 2 = 88.88 Tf m

Como MV = 24.33 Tf m < 2/3 MR = 59.25 Tf m. El estanque es estable al volcamiento por viento. 8.3 Verificacin del Estanque al Deslizamiento por Viento Fuerza Resistente FR = 0.25 x (Ws + Wt + Wf) = 0.25x (9.25 + 4.79 + 2.89) = 4.23 Tf Como FR = 5.86 Tf > FD =4.23 Tf El Estanque se desliza, usar llaves de corte.

9.

DISEO DE LOS ANCLAJES

9.1

Definicin de Cantidad de Anclaje La cantidad de pernos de anclajes debe encontrarse entre el siguiente rango: 0.31 D N 1.57 D 11 N 54 D = 34.45 ft

Sean 30 Pernos de Anclajes distribuidos 12 c-c.

9.2

Fuerza en los Anclajes por Traccin La traccin mxima en los pernos de anclajes est dada por:

T=

1.273M wt = 9.830Tf / m D2

Por lo tanto cada perno de anclaje toma


Pgina 25 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Ts = 9.83 ( 10.5 / 30) = 10.8 Tf

9.3

Diseo de los Anclajes Sean Pernos de Anclajes 1 A 42-23 ASTM A 307 At = 6.25 cm2 ft = 10.8 / 6.25 = 1.73 Tf/cm2 < Ft = 0.6Fy = 1.380 Tf/cm2 B

ft / Ft =1.73 / 1.38 = 1.25 < 1.33 9.4 Diseo del Anillo de Fundacin por Falla Dctil

Para asegurar la falla dctil, el perno de anclaje debe fluir antes que se fractura el hormign, para lo cual se debe cumplir: TMAX = 1.25 At Fy < 4 Ac (fc)1/2 TMAX =1.25 x 6.25 x 2.3 = 17.97 Tf = 39620 lb Ac 218.7 in2 = 1411 cm2 Por otro lado, como el perno de anclaje se encuentra a 20 cm del borde, Ac no es una circunferencia completa, donde su radio est dado por R = Ld + /2 (Ld : Longitud de empotramiento del anclaje y es el dimetro del anclaje). De esta forma se tiene: A = R2 R2+R2 cos sen fc = 2840 psi = 0.85

con

cos = 20 / R 2 2 1/2 sen = (R 20 ) / R

Ac = 1411= R2 ( Arccos (20/R)) + 20(R2-202)1/2 R Ld = 21.28 cm 21.28 3.2/2 = 19.68 cm

Usar 30 Pernos de Anclajes 1 A 42-23 ASTM A307 L = 90 + 460 + 400 = 1000 mm

Pgina 26 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 27 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 28 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 29 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 30 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 31 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 32 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 33 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 34 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 35 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 36 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 37 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0

RCP INGENIERIA Y SERVICIOS LTDA.

RC 1400-ADA Complejo Industrial Molynor

Pgina 38 de 38 (RC 1400-ADA) PM 2008-26 MC-001-0