manzana
CIMENTACION
CIM-001
M2.
58.10
3.00
174.30
CIM-002
CIM-003
M3.
2.89
125.00
361.25
M2.
88.33
6.50
CIM-004
574.15
INST. SANITARIA
SAL.
5.00
110.00
550.00
CIM-005
SAL.
10.00
85.00
850.00
CIM-006
SAL.
1.00
30.00
30.00
CIM-007
ML.
54.00
33.00
1,782.00
CIM-008
M2.
58.10
28.50
1,655.85
CIM-009
ML.
57.80
23.50
1,358.30
CIM-010
KG.
113.42
10.50
1,190.91
CIM-011
CIMBRA PERIMETRAL
ML.
31.88
11.25
358.65
CIM-012
M3.
8.50
1,235.65
10,503.03
SUBTOTAL
19,388.43
MUROS
M-001
MURO DE BLOCK HUECO 12X20X40 CMS. JUNTEADO CON MEZCLA C-A 1:5
M2.
123.03
129.35
15,913.93
M-002
ML.
44.20
38.70
1,710.54
M-003
ML.
15.60
15.55
242.58
M-004
DALA CERR. 12X20 CMS. CON ARMEX 12X20-4 CONCRETO FC=150 KG/CM2.
ML.
48.57
85.70
4,162.45
M-005
INST. SANITARIA
SAL.
3.00
25.00
75.00
M-006
SAL.
8.00
30.00
240.00
M-007
SAL.
17.00
38.00
646.00
22,990.50
SUBTOTAL
AZOTEA
AZ-001
M2.
66.63 $
67.70
4,510.85
AZ-002
M2.
66.63 $
29.00
1,932.27
AZ-003
KG.
100.08 $
10.50
1,050.84
AZ-004
KG.
18.67 $
10.35
193.23
AZ-005
SAL.
2 $
65.00
130.00
AZ-006
SAL.
23 $
25.00
575.00
AZ-007
ML.
48.57 $
55.65
2,702.92
AZ-008
M3.
7.5 $
1,653.90
12,404.25
23,499.37
SUBTOTAL
ALBAILERIAS
ALB-001
M2.
241.35 $
48.25
11,645.14
ALB-002
PZA.
2 $
550.00
1,100.00
ALB-003
PZA.
1 $
425.00
425.00
ALB-004
PZA.
1 $
450.00
450.00
ALB-005
PZA.
1 $
650.00
650.00
ALB-006
PZA.
10 $
45.00
450.00
ALB-007
6.95 $
75.00
521.25
ALB-008
24.4 $
80.00
1,952.00
ALB-009
ML.
49.65 $
23.00
1141.95
ALB-010
ML.
1.17 $
80.00
93.6
ALB-011
ML.
11.95 $
445.60
5324.92
ALB-012
ML.
28.46 $
25.00
711.5
ALB-013
ML.
28.46 $
12.00
341.52
SUBTOTAL
24,806.88
HERRERIAS
HER-001
PZA.
5.00
287.00
1,435.00
HER-002
PZA.
2.00
1,255.00
2,510.00
HER-003
PZA.
2.00
760.00
1,520.00
HER-004
PZA.
1.00
745.00
745.00
HER-005
PZA.
1.00
1,780.00
1,780.00
HER-006
PZA.
2.00
1,020.00
2,040.00
HER-007
PZA.
1.00
785.00
785.00
HER-008
PZA.
1.00
295.00
295.00
HER-009
FABRIC.Y COLOC. MENSULA PARA BOYLER CON ANGULO Y SOLERA DE 1" X 1/8"
PZA.
1.00
115.00
115.00
HER-010
JGO.
1.00
65.00
65.00
11,290.00
SUBTOTAL
ACABADOS
ACA-001
AFINE EN PLAFOND
M2.
60.8 $
20.00
1,216.00
ACA-002
M2.
7.12 $
137.00
975.44
ACA-003
M2.
3.72 $
140.00
520.80
ACA-004
M2.
54.38 $
150.00
8,157.00
ACA-005
TAPAJUNTA EN COLINDANCIA
ML.
8.87 $
60.00
532.20
ACA-006
IMPERMEABILIZANTE EN AZOTEA
M2.
69.05 $
65.00
4,488.25
ACA-007
M2.
174.77 $
28.75
5,024.64
ACA-008
M2.
60.8 $
29.00
1,763.20
ACA-009
M2.
59.46 $
38.00
2,259.48
ACA-010
M2.
7.17 $
38.25
274.25
SUBTOTAL
25,211.26
SUMIN. E INST. DE SALIDAS PARA GAS CON TUBO DE COBRE TIPO "L"
LOTE
1.00
860.65
860.65
IHS-002
PZA.
1.00
1,730.00
1,730.00
IHS-003
JGO.
1.00
1,750.00
1,750.00
IHS-004
SUMIN. Y COLOC. TARJA DE ALUM. 0.50 X 0.75 MT. INCL. LLAVE DE NARIZ
PZA.
1.00
875.00
875.00
IHS-005
PZA.
1.00
1,760.00
1,760.00
IHS-006
LOTE
1.00
310.00
310.00
IHS-007
CONEX. SAL. SAN. REG. VIV. A REG. BANQUETA PVC PES. 4" INCL. EXCAV.
LOTE
1.00
360.00
360.00
IHS-008
LOTE
1.00
280.00
280.00
SUBTOTAL
7,925.65
LOTE
1.00
2,113.00
2,113.00
PZA.
2.00
70.00
140.00
ELEC-003 CONEX. ACOM. ELECT. MUR. MED. A VIVIENDA INCL. EXCAV. DUCTO Y CABLES
LOTE
1.00
425.00
425.00
LOTE
1.00
1,685.00
1,685.00
4,363.00
SUBTOTAL
OBRAS EXTERIORES
OEX-001
M2.
24.42 $
48.00
SUBTOTAL
1,172.16
1,172.16
1,162.00
1,162.00
ENTREGA FINAL
ENT-001
M2.
58.1 $
20.00
SUBTOTAL
TOTAL
$ 141,809.24
CIMENTACION
lt
$ 19,388.43
1
2
1
1
1
1
4
1
1
1
1
1
# subtotal
7
2
total
$ 135,719.01 $ 38,776.86
5/31/2012
11/16/2010
562
112400
1.8145
76.4 77908.8236