SEPTIEMBRE 16
MINA PROVIDENCIA
MINA PROVIDENCIA
CUADRO RESUMEN
RESUMEN AL 14 DE SEPTIEMBRE
TONELAJE AL 14 DE SEPTIEMBRE
PROGRAM PROGRAMADO
TENOR TENOR EJECUTADO EJECUTADO EJECUTADO % DE
FRENTE A MES A LA FECHA ONZAS
PROGRAMADO EJECUTADO SEM. 1 (ton) SEM. 2 (ton) TOTAL (ton) CUMPLIMIENTO
(ton) (ton)
12 CT 3690 W 600 280 5.8 5.5 18.6 105 0 105 38%
12 CT 200 W 750 350 7.8 3.9 66.5 355 175 530 151%
14 CT 370 W 900 420 8.3 6.1 57.9 85 210 295 70%
14 CT 630 W 900 420 7.5 6.6 81.7 170 215 385 92%
14 CT 500 W 600 280 5.0 12.4 167.4 245 175 420 150%
14 CT 395 W 900 420 4.7 4.3 45.6 155 175 330 79%
14 CT 315 W 600 280 13.0 27.2 218.6 95 155 250 89%
14 CT 110 W 600 280 21.5 24.7 297.8 165 210 375 134%
14 CT 400 E 750 350 4.1 12.4 227.2 420 150 570 163%
TONELAJE AL 14 DE SEPTIEMBRE
AVANCES AL 14 DE SEPTIEMBRE
AVANCES GL 14 DE SEPTIEMBRE
PROGRAMA PROGRAMADO EJECUTADO EJECUTADO EJECUTADO % DE
FRENTE
MES (m) A LA FECHA (m) SEM. 1 (m) SEM. 2 (m) TOTAL (m) CUMPLIMIENTO
11 RP 420 W 30.0 14.0 8.1 8.8 16.9 121%
14 CM 530 E 10.0 4.7 0.0 3.4 3.4 73%
14 CM 525 E 10.0 4.7 0.0 5.9 5.9 126%
16 GL 3985 W 40.0 18.7 4.9 5.4 10.3 55%
17 XC 05 E 5.0 2.3 6.7 0.0 6.7 287%
17 XC 30 E 70.0 32.7 0.0 1.9 1.9 6%
TOTAL 185.0 86.3 26.5 29.1 55.6 64%
DISPONIBILIDAD AL 14 DE SEPTIEMBRE
TIEMPO PROMEDIO TIEMPO
PARADAS POR
EQUIPOS UTILIZACION (%) DISPONIBILIDAD (%) ENTRE FALLAS PROMEDIO DE CONFIABILIDAD (%)
CORRECTIVOS (%)
(horas) FALLA (horas)
JUMBO 15% 4% 96% 6.0 1.7 78%
DUMPER T7 #1 65% 9% 91% 12.3 1.9 87%
DUMPER T7 #2 82% 8% 92% 18.6 1.9 91%
DUMPER JOY T7 #8 81% 5% 95% 17.5 1.2 94%
DUMPER JOY T7 #12 78% 1% 99% 75.2 1.3 98%
SCOOP LH #1 81% 7% 93% 20.2 1.9 91%
SCOOP LH #2 75% 6% 94% 19.0 1.6 92%
SCOOP LH #10 54% 5% 95% 12.5 1.3 90%
SCOOP MTI #3 66% 19% 81% 14.3 5.1 73%
RENDIMIENTO DE EQUIPOS
AL 14 DE SEPTIEMBRE
SEPTIEMBRE
EQUIPOS Toneladas
MECANIZADOS Toneladas Horas netas de
extraidas/horas netas
extraidas operación
de operación
DUMPER T7 #1 1865 172.6 10.8
DUMPER T7 #2 1842 222.8 8.3
DUMPER 7TD #8 2225 226.9 9.8
DUMPER 7TD #12 2665 225.5 11.8
SCOOP LH #1 3940 221.7 17.8
SCOOP LH #2 2927 208.7 14.0
SCOOP LH #10 1382 149.4 9.3
SCOOP MTI D #3 1208 156.9 7.7
MINA PROVIDENCIA
INDICADORES
TONELADAS HOMBRE/DÍA
AL 14 DE SEPTIEMBRE
ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE TOTAL
Personal producción 135 142 137 135 144 149 150 145 145 142
Total personal 299 289 286 284 284 293 286 276 281 286
Producción mineral/día 291 310 318 317 332 318 312 335 318 317
Producción esteril/día 228 241 206 213 192 80 62 109 136 163
Producción mineral y esteril/día 519 551 524 529 524 398 374 444 455 480
*Tons hombre/día (producción) 2.2 2.2 2.3 2.3 2.3 2.1 2.1 2.3 2.2 2.2
**Tons hombre/día total 1.0 1.1 1.1 1.1 1.2 1.1 1.1 1.2 1.1 1.1
***Tons hombre/día total (mineral y esteril) 1.7 1.9 1.8 1.9 1.8 1.4 1.3 1.6 1.6 1.7
MINA PROVIDENCIA
INDICADORES
TONELADAS YMC #2 (5 TON) 115 80 140 135 117 90 155 150 119 131
TONELADAS JOY #8 (5 TON) 145 145 195 105 175 165 165 150 156 157
TONELADAS JOY #12 (5
TON)
220 185 170 180 195 220 220 150 199 189
TONELADAS TOTAL/DIA 625 530 635 605 547 600 720 600 609 618
MINA PROVIDENCIA
INDICADORES
PROMEDIO DE UTILIZACIÓN
DUMPERS AL 14 DE SEPTIEMBRE
DUMPER #1 DUMPER #2 DUMPER #8 DUMPER #12
FECHA SERENA DIA TARDE SERENA DIA TARDE SERENA DIA TARDE SERENA DIA TARDE
09/09/2021 6.2 4.7 5.2 6.2 0.5 4.3 5.3 6.0 4.4 5.0 5.9 6.5
10/09/2021 4.9 5.8 5.3 5.4 4.8 6.6 5.5 6.5 5.0 5.7 6.0 5.6
11/09/2021 4.3 2.8 0.0 6.8 5.7 4.8 5.1 5.1 5.6 5.8 6.7 6.4
12/09/2021 3.6 0.0 0.0 6.1 3.0 3.6 4.6 6.8 6.6 5.0 6.5 4.9
13/09/2021 3.9 4.9 1.2 0.9 5.3 5.8 5.9 6.0 5.5 5.4 5.9 5.6
14/09/2021 3.7 3.7 4.0 5.2 6.0 7.1 6.3 5.3 5.0 5.9 5.6 5.2
TOTAL 63.0 56.8 52.8 70.4 73.1 79.3 79.6 74.8 72.5 76.3 73.2 76.0
PROMEDIO
14.2 17.0 16.2 16.9
DIA
PROMEDIO
4.7 5.7 5.4 5.6
TURNO
MINA PROVIDENCIA
INDICADORES
8 9 10 11 12 13 14 PROMEDIO/DÍA (BARRILES)
CUMPLIMIENTO (%)
ELEVADORA EJECUTADO
S D T S D T S D T S D T S D T S D T S D T PROGRAMADO
SEMANAL MENSUAL SEMANAL MENSUAL
BARRIL 3530 (3,5 TON) 115 119 120 111 98 109 105 140 111 109
79% 77%
TONELADAS 3530 (3,5 TON) 403 417 420 389 343 382 368 491 389 380
BARRIL 3660 (5 TON) 1 10 11 19 0 7 47 32 14 10
42% 31%
TONELADAS 3660 (5 TON) 5 50 55 95 0 35 235 161 68 50
MINA PROVIDENCIA
INDICADORES
PROMEDIO DE UTILIZACIÓN
ELEVADORA 3530 AL 14 DE SEPTIEMBRE
APIQUE 3530
10.0
8.0
6.0
4.0
2.0
Horas (Hrs)
0.0
) ) )
rs rs O Q S AS L rs TA
(H (H N AP CA IC NA (H BE
JE IA UR RI N SO
A T TT
O T A R TO
IZ ER DE EC EC PE IE
N
QU O / M EL M N
I BI AS AS S SI IM
AP M PI LL LA EN
A LIM A AL T
C / F F AN
T OS M
N
IE
M
LA
R RI
S CA
DE
MINA PROVIDENCIA
INDICADORES
3.5
50.0
3.0
40.0
2.5
Kg/metro
Metro
30.0 2.0
1.5
20.0
1.0
10.0
0.5
0.0 0.0
6.0
MINA PROVIDENCIA
INDICADORES
3.5
40.0
3.0
30.0 2.5
Kg/metro
Metro
2.0
20.0
1.5
1.0
10.0
0.5
0.0 0.0
7.0 5.0 17 XC 030 E
MINA PROVIDENCIA
INDICADORES
CONSUMO DE ACEROS
AL 14 DE SEPTIEMBRE
ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE TOTAL
DESARROLLOS
Metros perforados con Jackleg 13845.6 17440.8 16489.0 14916.0 14859.6 23396.0 21237.0 20349.0 11545.4 17119.8
Metros perforados GCG N/A N/A N/A N/A N/A 19878.8 17014.8 14731.0 8637.5 15065.5
Metros perforados HD N/A N/A N/A N/A N/A 3517.2 4222.2 5618.0 2907.9 4066.3
Metros perforados con Jumbo 7017.9 9021.0 8562.3 8659.7 7633.0 N/A N/A 574.0 1494.3 6137.5
INDICADORES
M Perf. Jackleg/Broca 38 mm 81.4 87.2 82.4 85.2 86.4 90.0 89.2 88.5 199.1 98.8
M Perf. Jackleg/Broca 38 mm GCG N/A N/A N/A N/A N/A 88.4 88.2 84.2 215.9 119.2
M Perf. Jackleg/Broca 38 mm HD N/A N/A N/A N/A N/A 100.5 93.8 102.1 161.6 114.5
M Perf. Jumbo/Broca 45 mm 389.9 347.0 389.2 393.6 331.9 N/A N/A 287.0 747.1 356.4
M Perf. Jumbo/Barra 1754.5 1503.5 2854.1 962.2 1090.4 N/A N/A 574.0 747.1 1456.4
MINA PROVIDENCIA
INDICADORES
AUSENTISMO
AL 14 DE SEPTIEMBRE
TIPO DE DÍAS NO AUSENTES/
AUSENTES/TURNO
AUSENTISMO TRABAJADOS DÍA
Ausentes sin
24 1.7 0.6
permiso
DÍAS NO TOTAL
MINA % AUSENTISMO
TRABAJADOS DÍAS
PROVIDENCIA
24 3864 0.6%
PLAN SEMANAL DE PRODUCCION
Onzas
PROVIDENCIA tms/d tms/mes Au (gpt)
contenidas
PLAN MES_SEPTIEMBRE 330 9.900 14,71 4.682
PLAN OPERATIVO SEMANAL 330 2.310 14,71 1.093
SEMANAL VS MENSUAL 100% 23% 100% 23%
DIAS HABILES SEMANA 7
EQUIPO
LABOR m/Semana Comentarios
Jackleg
DESARROLLO CAPEX
11 RP 420 W GCG X 9 Rampa exploratoria en el sector W
11 CM 635 W GCG X 6 Stock para almacenamiento de mineral.
14 CM 525 E HD X 15 Cámara de maniobra para cargue de mineral y estéril.
16 GL 3985 W HD X 9 Galería exploratoria en el sector w en el nivel 16
17 XC 30 E GCG X 9 Cruzada para interceptar a veta Marmajito.
Subtotal 48
PREPARACION
14 TB 510 E GCG X 6 Tambor exploratorio en Galería 4045 E
Subtotal 6
MINA PROVIDENCIA
GRACIAS