Interruptor Principal

• WT = 525+3240 + 400 + 400 + 1200 + 1680 + 2280 = 9725W


• I = 9725 / (220) (.85) = 52.00A
• Ic = 52 x 1.25 = 65 A
• e% = 2(3.6) (65) / (127) (13.3) = 0.22
• Conductor = 3#4 + Tf1#10
• TC = 62.77(3) + 28.19= 216.5 mm = Tabla 4 = La tubería es de 1”
• ITM = QO255
• S = 13.3 mm2
• L = 3.6 m

Derivadas:
Derivada 1:
• WT = 525 + 400 + 400 + 1620 + 1620 + 1200 = 5765 W
• I = 5765 / (220) (.85) = 30.82 A
• e% = 2(.3) (30.82) / (127) (5.26) = 0.027
• Conductor = 3#10 + Tf1#10
• TC = ¾”
• ITM = QO235
• S = 5.26 mm2
• L = 0.3 m

Derivada 2:
• WT = 840 + 840 + 1140 + 1140 = 3960 W
• I = 5765 / (220) (.85) = 21.17 A
• e% = 2(.3) (21.17) / (127) (3.31) = 0.030
• Conductor = 3#12 + Tf1#10
• TC = 3(11.68) + 15.68 = 50.72 = Tabla 4 = La tubería es de ½”
• ITM = QO235
• S = 5.26 mm2
• L = 0.3 m

Tableros de distribución – A
Circuito 1 Luminarias:
• Carga ITM = (15) (.8) (127) (.85) = 1295.4 W
• W = 15(11) + 60(6) = 525 W
• I = 525 / (127) (.85) = 4.86 A
• e% = 4 (63.9) (4.86) / (127) (3.31) = 2.95
• Conductor = 2#12 + Tf1#14
• TC = (2) 11.68+ 8.968= 32.328 mm2 = Tabla 4 = La tubería es de ½”
• ITM = QO115
• S = 3.31 mm2
• L = 63.9 m

Circuito 2 Contactos:
• Carga ITM = (20) (.8) (127) (.85) = 1727.2 W
• W = 9(180) = 1620 W
• I = 1620 / (127) (.85) = 15.006 A
• e% = 4(32.9) (15.006) / (127) (5.26) = 2.94
• Conductor = 2#10 + Tf1#12
• Tc = 2(15.68) + 11.68 = 43.04 mm = Tabla 4 = La tubería es de ½”
• ITM = QO120
• S = 5.26 mm2
• L = 62.9 m

Circuito 3 Contactos:
• Carga ITM = (20) (.8) (127) (.85) = 1727.2 W
• W = 9(180) = 1620 W
• I = 1620 / (127) (.85) = 15.006 A
• e% = 4(33.2) (15.006) / (127) (5.26) = 2.98
• Conductor = 2#10 + Tf1#12
• Tc = 2(15.68) + 11.68 = 43.04 mm = Tabla 4 = La tubería es de ½”
• ITM = QO120
• S = 5.26 mm2
• L = 63.2 m

Circuito 4 Lavadora:
• Carga ITM = (15) (.8) (127) (.85) = 1295.4 W
• W = 400 W
• I = 400 / (127) (.85) = 4.63 A
• e% = 4(8) (4.63) / (127) (2.08) = 0.56
• Conductor = 2#14 + Tf1#14
• TC = ½”
• ITM = QO115
• S = 2.08 mm2
• L=8m

Circuito 5 Microondas:
• Carga ITM = (15) (.8) (127) (.85) = 1295.4 W
• W = 1200 W
• I = 1200 / (127) (.85) = 11.11 A
• e% = 4 (15.6) (11.11) / (127) (2.08) = 2.62
• Conductor = 2#14 + Tf1#14
• TC = ½”
• ITM = QO115
• S = 2.08 mm2
• L = 15.6 m

Circuito 6 Bomba:
• Carga ITM = (15) (.8) (127) (.85) = 1295.4 W
• W = 400 W
• I = 400 / (127) (.85) = 4.63 A
• e% = 4(27.3) (4.63) / (127) (2.08) = 1.91
• Conductor = 2#14 + Tf1#14
• TC = ½”
• ITM = QO115
• S = 2.08 mm2
• L = 27.3 m

Tableros de distribución – B
Circuito 1 Aire Acondicionado 1.5 Toneladas:
• Carga ITM = (15) (.8) (127) (.85) = 1295.4 W
• W = 1680 W
• I = 1680 / (220) (.85) = 11.22 A
• e% = 2(19) (11.22) / (127) (2.08) = 1.61
• Conductor = 3#14 + Tf1#14
• TC = ½”
• ITM = Q0215
• S = 2.08 mm2
• L = 19 m

Circuito 2 Aire Acondicionado 2 Toneladas:


• Carga ITM = (20) (.8) (127) (.85) = 1727.2 W
• W = 2280 W
• I = 2280 / (220) (.85) = 15.24 A
• e% = 2(19.4) (15.24) / (127) (3.31) = 1.40
• Conductor = 3#12 + Tf1#12
• TC = ½”
• ITM = Q0220
• S = 3.31 mm2
• L = 19.4 m

Cálculo de la cedula de cableado:


• Nomenclatura 1: TC = 62.77(3) + 28.19= 216.5 mm = Tabla 4 = La tubería
es de 1”
• Nomenclatura 2: Tubería 1: TC = 2(15.68) + 3(11.68)+2(8.968) = 84.33mm
= Tabla 4 = La tubería es de ¾”. Tubería 2: TC = 2(15.68) + 4(8.968)
+11.68= 82.912mm = Tabla 4 = La tubería es de ¾”
• Nomenclatura 3: TC = 11.68(3) + 2(15.68)= 66.4 mm = Tabla 4 = La tubería
es de 1/2”
• Nomenclatura 4: TC = 11.68(2) = 1/2”
• Nomenclatura 5: TC = 15.68(2)+11.68 =43.04 mm = Tabla 4 = La tubería es
de 1/2”
• Nomenclatura 6: TC = 15.68(2)+11.68+2(8.968) =60.976 mm = Tabla 4 = La
tubería es de 1/2”
• Nomenclatura 7: Tubería 1: TC 3(8.968) =1/2”. Tubería 2: TC = 11.68(2) =
1/2”
• Nomenclatura 8: TC = 11.68(3) = 1/2”
• Nomenclatura 9: Tubería 1: TC 2(15.68)+3(11.68) = 66.4 mm = Tabla 4 = La
tubería es de 1/2”. Tubería 2: TC = 2(15.68)+4(8.968)+11.68 =78.832mm=
Tabla 4 = La tubería es de 3/4”
• Nomenclatura 10: Tubería 1: TC= 2(15.68)+3(11.68) = 66.4 mm = Tabla 4 =
La tubería es de 1/2”. Tubería 2: TC = 3(8.968)= 1/2”
• Nomenclatura 11: Tubería 1: TC=2(15.68)+3(11.68) = 66.4 mm= Tabla 4 =
La tubería es de 1/2”. Tubería 2: TC= 2(15.68)+2(8.968)+11.68=60.976mm=
Tabla 4 = La tubería es de 1/2”.
• Nomenclatura 12: TC= 2(15.68)+3(11.68) = 66.4 mm= Tabla 4 = La tubería
es de 1/2”. Tubería 2: TC= 2(15.68)+11.68=54.72mm= Tabla 4 = La tubería
es de 1/2”.
• Nomenclatura 13: Tubería 1: TC= 2(11.68)+8.968=32.328mm= Tabla 4 = La
tubería es de 1/2”. Tubería 2: TC= 2(15.68)+ 2(8.968) +11.68mm= 60.976 =
Tabla 4 = La tubería es de 1/2”.
• Nomenclatura 14: Tubería 1: TC= 2(11.68)+8.968=32.328mm= Tabla 4 = La
tubería es de 1/2”.
• Nomenclatura 15: TC= 3(8.968)+4(11.68)= 73.624mm= Tabla 4 = La tubería
es de 1/2”.
• Nomenclatura 16: TC= 4(8.968)=35.68mm= La tubería es de 1/2”.
• Nomenclatura 17: TC= 4(11.68)=46.72mm= La tubería es de 1/2”.