DETALLE DE ARMADO ZAPATAS DE FUNDACION (MODULO 2) Esc.

1:50
ESCALERA GENERAL PLANTA BAJA Y 1º PISO
ZAPATA TIPO 1.80 / 1.80 h=20 cm ZAPATA TIPO 1.60 / 1.60 h=20 cm
COLUMNAS DESCANSO ESCALERA 1.80
Esc. 1:25
1.60
Esc. SECCION 1:25

4 10Ø12 c/12 L = 1.70


2 10Ø12 c/12 L = 1.90
11 12Ø10 c/15 cm
Esc. ALTURA 1:50 L = 1.96m

1.80

1.60
1 10Ø12 c/12 L =1.90 3 10Ø12 c/12 L =1.70

DESCANSO
0.14

3 10Ø12 c/12 L = 1.70

0.30

0.30
Z = 1.88 m 1 10Ø12 c/12 L = 1.90
6 21Ø10 c/20 cm
2 10Ø12 c/12 L = 1.90 4 10Ø12 c/12 L = 1.70 9 12Ø10 c/15 cm L = 1.76 m
L = 3.35 m
ZAPATA TIPO 1.10 / 1.10 h=20 cm
C3 ZAPATA TIPO 1.40 / 1.40 h=20 cm
1.74

6Ø12 L=3.10

9 Ø6 c/20

12 8Ø12 c/20 L = 1.20


1.40

8 9Ø12 c/15 L = 1.50


8 10Ø10 c/20 cm
PLANTA BAJA L = 3.81 m
1.10
0.25

1 6Ø12 10 13Ø10 c/14 cm


Z = 0.00 m 9 7Ø 6 c/10 L =0.15(m) L = 5.16 m
15 Ø6 c/10
0.30 1.20

0.25

1.40
5 9Ø12 c/15 L =1.50 07 8Ø12 c/20 L =1.20

1.10
Z = -1.50 m

0.30
7 9Ø12 c/15 L = 1.50 11 8Ø12 c/20 L = 1.20

0.30
0.30 0.05
0.19
6 9Ø12 c/15 L = 1.50 08 8Ø12 c/12 L = 1.20
0.19

COLUMNAS PLANILLA DE FIERROS-ZAPATAS ESPECIFICACIONES TECNICAS


Esc. SECCION 1:25 POS.
Ø
(mm) CANT.
CANT. LONGITUD LONGITUD PESO POR PESO
Kg ESQUEMA DE DOBLADO
ZAPATAS PARCIAL TOTAL METRO
Esc. ALTURA 1:50 ZAPATA 1) HORMIGON: Resistencia especifica a la compresión del
1 12 10 8 1.9 152.00 0.89 135.28
0,10 0,10 Hormigon a los 28 días f'c = 210 kg/cm2
1,70
1,80/1,80 0,10 0,10 2) ACERO: Resistencia especifica a la fluencia del acero
2 12 10 8 1.9 152.00 0.89 135.28
1,70
0,10 0,10
fy = 4200 kg/cm2
3 12 10 8 1.7 136.00 0.89 121.04
1,60/1,60
1,50 3) CARGA VIVA: Las plantas 350 kg/m2
0,10 0,10
4 12 10 8 1.7 136.00 0.89 121.04
1,50 Escaleras 400 kg/m2
5 12 9 11 1.5 148.50 0.89 132.165
0,10 0,10 4) RECUBRIMIENTO DEL ACERO:
2º PISO 1,40/1,40
1,30
Vigas = 2.5 cm
0,10 0,10
6 12 9 11 1.5 148.50 0.89 132.165
Z = 7.00 m 1,30
Columnas = 3 cm
0,10 0,10
0.40

7 12 8 10 1.2 96.00 0.89 85.44


1,10/1,10
1,00 Escalera = 2 cm
0,10 0,10
8 12 8 10 1.2 96.00 0.89 85.44
1,00 Zapatas de fundacion = 5 cm
9 6 7 11 0.15 69.30 0.222 15.385 5) Profundidad de zapatas de fundación h = 1.50 m
11 Ø6 c/10

0,15
5.1) El peralte de las zapatas arriba del acero de refuerzo
0.95

TOTAL 963.23
inferior, no debe ser menor de 15 cm para zapatas apoyadas GOBIERNO AUTONOMO MUNICIPAL
CANTIDAD 1.00
sobre el terreno ACI 318-95 Capítulo 15.7
6) Las dimensiones deben ser verificadas en obra. DE ENTRE RIOS
C2 7) NOTACION:
6 Ø12 L=6.40

TOTAL DE ACERO = 963.23


6 Ø6 c/20
0.95

43 34Ø6 c/19 cm L = 2.00 m


PLANILLA DE FIERROS-COLUMNAS Longitud del fierro en metros
Separacion en centimetros PROYECTO:
Diametro del fierro en milimetros
0.25

3 6Ø12
CONST. 4 AULAS . U.E.
POS. Ø
(mm) CANT.
CANT. LONGITUD LONGITUD PESO POR PESO
Kg
ESQUEMA
Cantidad de fierro
LITORAL BOLIVIANO UNIDAD DE PROYECTOS
11 Ø6 c/10

COLUMNAS PARCIAL TOTAL METRO DE DOBLADO


COLUMNA
0.95

0.25 Posición en Planilla de Fierros


5.60
1 12 6 36 5.90 1274.40 0.89 1134.22 0,30
PLANTA ALTA C.1
0,05 0,19
2 6 37 36 0.86 1145.52 0.222 254.31 0,19 GESTION: RELACION DE SUPERFICIES.
Z = 3.75 m ESQUEMA
0.05 COLUMNA POS.
Ø
(mm)
CANT.
CANT.
COLUMNAS
LONGITUD
PARCIAL
LONGITUD
TOTAL
PESO POR
METRO
PESO
Kg
Sr. ELMER ROJAS SUP. LOTE S./ ESCRITURA 5.000,00 M2
DE DOBLADO
0.19
C.3 3 12 6 1 3.63 21.78 0.89 19.384 0,30
3.33 PLANILLA DE FIERROS-ESCALERAS SUP. A CONSTRUIR P.B. 207.97 M2
0.19 0,05 0,19 SUP. A CONSTRUIR P.A. 207.97 M2
4 6 22 1 0.86 20.64 0.222 4.5821 0,19 PLANTA BAJA - 1º PISO DETALLE DE LAMINA:
ESQUEMA
COLUMNA Ø
POS. (mm) CANT.
CANT.
COLUMNAS
LONGITUD
PARCIAL
LONGITUD
TOTAL
PESO POR
METRO
PESO
Kg DIAMETRO CANTIDAD LONGITUD (m) PLANO DE ZAPATAS Y GRADAS
DE DOBLADO SUP. TOTAL A CONSTRUIR. 415.94 M2
C.2 3.25
5 12 6 36 3.25 702.00 0.89 624.78 0,30
0,05 0,19
POSICION (mm) Unid. UNITARIA TOTAL
6 6 28 36 0.86 866.88 0.222 192.48 0,19
COLUMNAS TOTAL 2229.76
1 10 12 0,69 8.28
Esc. SECCION 1:25 2 10 3 1,90 5.70 DISEÑO Y CALCULO DE PROYECTO: REVALIDACION.
CANTIDAD 1.00

Esc. ALTURA 1:50 TOTAL DE ACERO = 2229.76 3 10 12 0,70 8,40


8 10Ø10 c/20 cm
L = 3.81 m 4 10 12 1,96 23.52
5 10 13 5,09 66.17
7 17Ø10 c/15 cm 6 10 42 1,76 73.92
L = 3.30 m
ESCALA : LAMINA.
1º PISO 7 10 12 3,30 39.60
Z = 3.75 m
8 10 10 3,81 38.10 INDICADA 6 de 6
0.40

9 10 12 3,35 40.20
CROQUIS DE UBICACION:
11 Ø6 c/10

6
0.12 1 0.12 10 10 13 5,16 67.08
0.95

1.76
0.45
6 21Ø10 c/20 cm
2.03
4 12Ø10 c/15 cm
11 10 12 1,96 23.52
L = 1.76 m
1.

2
17

L = 1.96 m
C1 1.40
7
LONG (m) PESO (kg) DEPARTAMENTO.........COCHABAMBA
6 Ø12 L=6.40

0.10
6 Ø6 c/20

0.3
5
0.95

8
TOTAL UNITARIO TOTAL
3 3.86
0.10
PROVINCIA...................CARRASCO
0.35

5 13Ø10 c/14 cm
3 12Ø10 c/15 cm FIERRO DE 10 mm (Kg) 394.49 0,62 244.58
0.25

1 6Ø12 L = 0.70 m
52

L = 5.09 m
TOTAL 244.58
1.

9
1.73 MUNICIPIO....................ENTRE RIOS
11 Ø6 c/10

0.55
0.95

0.25 0.10
1.25 NOTA:
PLANTA BAJA 4
2 4Ø10 c/15 cm  Módulo de elasticidad del hormigón Ec = 218 820 DISTRITO......................
9
3.7

Z = 0.00 m
0.49

10 L = 1.90 m kgf/cm2.
0.05
0.40

0.19  Módulo de elasticidad del acero Es = 2 040 000 ZONA.............................


0.12
0.19
0.50 0.82 kgf/cm2.
0.55  El tamaño máximo del agregado debe no ser mayor a 2.5
10 Ø6 c/10

4.1 1 13Ø10 c/15 cm


1
cm. CALLE...........................
0.70

5
1 L = 0.60 m
1.3
11  Los materiales para el mezclado del hormigón deberán ser
0.36
0.12
0.10
limpios y libres de toda impureza orgánica e inorgánica.
 Resistencia admisible del suelo (Estudio de suelos) qc = 1.24
0.30

Z = -1.50 m kg/cm2
0.30
SELLO COLEGIO DE ARQUITECTOS FECHA :