Está en la página 1de 1

BP-17

CT=23.458 BP-29 BP-33 BP-36


BP-18 BP-30 BP-31 BP-32
CF=21.339 CT=23.009 CT=23.275 CT=23.000
BP-19 CT=23.009 CT=23.009 CT=23.000 CT=23.110
BP-20 H=2.12m CF=20.293 CF=21.493 CF=21.123
CT=22.778 CF=20.256 CF=20.542 CF=21.025 CF=21.262
CT=22.500 H=2.72m H=1.78m H=1.88m
BP-21 AV. MORALES DUAREZ CF=19.927 H=2.75m H=2.46m AV. SANTA ROSA H=1.97m H=1.85m
CF=19.536 H=2.85m BP-38
CT=22.000
BP-23 BP-22 H=2.96m CT=23.242
CF=19.096
CT=21.370 CT=21.500 CF=21.305
BP-24 H=2.90m
CF=18.107 CF=18.616 H=1.94m
CT=21.123 H=3.26m H=2.88m
CF=18.061 BP-18
H=3.06m CT=23.009
CF=20.256
H=2.75m

DISTANCIA PARCIAL (m) 5.79 63.56 60.00 55.00 48.91 41.06 34.34 DISTANCIA PARCIAL (m) 4.98 33.25 64.51 31.64 30.80 DISTANCIA PARCIAL (m) 22.69
DISTANCIA ACUMULADA (m) 308.66 302.87 239.31 179.31 124.31 75.40 34.34 DISTANCIA ACUMULADA (m) 165.18 160.20 126.95 62.44 30.80 DISTANCIA ACUMULADA (m) 22.69
PENDIENTE 0.8‰ 0.8‰ 0.8‰ 0.8‰ 0.8‰ 0.8‰ 3.15‰ PENDIENTE 0.75‰ 0.75‰ 0.75‰ 0.75‰ 0.75‰ PENDIENTE 0.80‰
DIÁMETRO/MATERIAL/SERIE 400mm/HDPE/SN4 400mm/HDPE/SN4 400mm/HDPE/SN4 400mm/HDPE/SN4 400mm/HDPE/SN4 350mm/PVC 350mm/PVC DIÁMETRO/MATERIAL/SERIE 350mm/PVC 350mm/PVC 350mm/PVC 350mm/PVC 350mm/PVC DIÁMETRO/MATERIAL/SERIE 200mm/PVC
TIPO DE TERRENO NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL NORMAL TIPO DE TERRENO NORMAL NORMAL NORMAL NORMAL NORMAL TIPO DE TERRENO NORMAL

BP-24 BP-23 BP-22 BP-21 BP-20 BP-19 BP-18 BP-17 BP-29 BP-30 BP-31 BP-32 BP-33 BP-37 BP-39

BP-18

PERFIL LONGITUDINAL ALCANTARILLADO DN350PVC/400mm HDPE PERFIL LONGITUDINAL ALCANTARILLADO DN350 PVC

BP-27 BP-28 BP-37


BP-7 BP-26 CT=23.500 CT=23.445
BP-25 CT=23.390 BP-35 BP-36
CT=23.068 CT=23.216 CF=21.920 BP-19 BP-34 CF=21.316
CT=23.000 CF=21.690 CT=23.000 CT=23.000
CF=20.246 CF=21.412 H=1.58m CT=22.778 CT=22.847 H=2.13m
CF=20.839 H=1.70m CF=20.651 CF=21.123
H=2.82m H=1.80m CF=19.927 CF=20.148
H=2.16m AV. SANTA ROSA H=2.35m AV. SANTA ROSA H=1.88m
H=2.85m H=2.70m

LOSA
ARMADA
BP-2 BP-16
A

CT=26.500 CT=26.571
CF=24.274 CF=24.347
H=2.23m H=2.22m
A

DISTANCIA PARCIAL (m) 79.09 76.41 37.01 29.44 DISTANCIA PARCIAL (m) 35.73 81.21 76.35 31.17 DISTANCIA PARCIAL (m) 9.16
DISTANCIA ACUMULADA (m) 221.95 142.86 66.45 29.44 DISTANCIA ACUMULADA (m) 224.46 188.73 107.52 31.17 DISTANCIA ACUMULADA (m) 9.16
PENDIENTE 0.75‰ 0.75‰ 0.75‰ 0.76‰ PENDIENTE 0.62‰ 0.62‰ 0.62‰ 0.62‰ PENDIENTE 0.8‰
DIÁMETRO/MATERIAL/SERIE 900mm/HDPE/SN4 900mm/HDPE/SN4 900mm/HDPE/SN4 900mm/HDPE/SN4 DIÁMETRO/MATERIAL/SERIE 350mm/PVC 350mm/PVC 350mm/PVC 350mm/PVC DIÁMETRO/MATERIAL/SERIE315mm/PVC
TIPO DE TERRENO NORMAL NORMAL NORMAL NORMAL TIPO DE TERRENO NORMAL NORMAL NORMAL NORMAL TIPO DE TERRENO NORMAL
D:\TRABAJO\EDSON\PROYECTOS\PUENTE SANTA ROSA - CALLAO\03 ENVIOS\ENTREGA 01\DWG\D-06.dwg

BP-7 BP-25 BP-26 BP-27 BP-28 BP-34 BP-35 BP-36 BP-37 BP-38 BP-2 BP-16
A-A

PERFIL LONGITUDINAL ALCANTARILLADO DN900 HDPE PERFIL LONGITUDINAL ALCANTARILLADO DN350PVC

APROBADO : REVISIONES ESCALA :


I CA DE L
JEFE DE PROYECTO : "EXPEDIENTE TECNICO REFERENCIAL PARA LA REUBICACION DE REDES PLANO: Original A1 1/1,000
ESTUDIO : ING. EDSON COAGUILA LUQUE
R
E
P
BL PE
R
Ministerio FECHA
REUBICACIÓN DE REDES
Viceministerio PROVIAS 0 22/05/2020 DE AGUA POTABLE Y ALCANTARILLADO AFECTADOS POR EL DERECHO DE VIA FECHA : JUNIO 2020
de Transportes
de Transportes NACIONAL ESPECIALISTA : --- EXISTENTES DE ALCANTARILLADO
PARA LA EJECUCION DE LA OBRA: CONSTRUCCION DEL PUENTE SANTA ROSA,
y Comunicaciones PERFILES LONGITUDINALES
ASISTENTE : ACCESOS, ROTONDA Y PASO A DESNIVEL REGION CALLAO" DETALLE LOSA ARMADA D-06 02 DE 02

También podría gustarte