CALENDARIO VALORIZADO DE EJECUCION DE OBRA DEL EXPEDIENTE TECNICO

PROYECTO: "CREACION DE LA LOSA DE RECREACION MULTIUSOS EN EL CASERIO DE ANGASH, DISTRITO DE CASCA, PROVINCIA MARISCAL LUZURIAGA, ANCASH"
ENTIDAD: MUNICIPALIDAD DISTRITAL DE CASCA
UBICACIÓN: ANGASH - CASCA - MARISCAL LUZURIAGA - ANCASH
VALOR REFERENCAL: S/.232,546.64 PLAZO DE EJECUCION 60 DIAS CALENDARIOS

PRECIO
MES 1 MES 2
ITEM PARTIDA UND METRADO UNITARIO PARCIAL S/.
S/. PARCIAL S/. % PARCIAL S/. %
01 GRASS SINTETICO
01.01 OBRAS PROVISIONALES 4989.76 4369.78 87.57% 619.98 12.43%
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA 5.40MX3.60M und 1.00 781.98 781.98 781.98 100.00% 0.00 0.00%
01.01.02 CASETA DE ALMACEN Y GUARDIANIA glb 1.00 2,141.18 2,141.18 2,141.18 100.00% 0.00 0.00%
01.01.03 SEGURIDAD Y SALUD EN EL TRABAJO glb 1.00 2,066.60 2,066.60 1,446.62 70.00% 619.98 30.00%
01.02 TRABAJOS PRELIMINARES 3870.50 3755.63 97.03% 114.87 2.97%
01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 1069.20 0.6 641.52 641.52 100.00% 0.00 0.00%
01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 1069.20 1.36 1,454.11 1454.11 100.00% 0.00 0.00%
01.02.03 TRAZO Y REPLANTEO PRELIMINAR DURANTE EL PROCESO m2 1069.20 1.66 1,774.87 1660.00 93.53% 114.87 6.47%
01.03 MOVIMIENTO DE TIERRAS 25796.48 25432.00 98.59% 364.48 1.41%
01.03.01 CORTE SUPERFICIAL MANUAL m3 820.16 14.43 11,834.91 11690.61 98.78% 144.30 1.22%
01.03.02 RELLENO CON MATERIAL DE PRESTAMO SELECCIONADO m3 213.84 25.8 5,517.07 5517.07 100.00% 0.00 0.00%
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL A 50 MTS DE LA OBRA m3 984.19 6.44 6,338.18 6118.00 96.53% 220.18 3.47%
01.03.04 NIVELADO Y APISONADO C/ MATERIAL AFIRMADO C/EQUIPO LIVIANO m2 1069.20 1.97 2,106.32 2106.32 100.00% 0.00 0.00%
01.04 AREA DEPORTIVA CON GRASS SINTETICO 34629.00 27857.00 80.44% 6772.00 19.56%
01.04.01 TRABAJOS PRELIMINARES 3554.70 3485.00 98.04% 69.70 1.96%
01.04.01.01 BASE ARENA SERNIDA e=0.05 m COMPACTADA C/ EQUIPO LIVIANO m2 510.00 6.97 3,554.70 3485.00 98.04% 69.7 1.96%
01.04.02 GRASS SINTETICO 31,074.30 24,372.00 78.43% 6702.30 21.57%
01.04.02.01 SUMINISTRO E INSTALACION DE GRASS SINTETICO m2 510.00 60.93 31,074.30 24372.00 78.43% 6702.3 21.57%
01.05 EQUIPAMIENTO 6563.53 0.00 0.00% 6563.53 100.00%
01.05.01 SUMINISTRO E INSTALACION DE ARCOS DE METAL und 2.00 450 900.00 0.00 0.00% 900.00 100.00%
01.05.02 SUMINISTRO E INSTALACION DE MALLA DE PROTECCION EN AREA DE JUEGO m2 401.10 14.12 5,663.53 0.00 0.00% 5663.53 100.00%
01.06 TECHADO DE GRASS SINTÉTICO 107974.94 15000.64 13.89% 92974.29 86.11%
01.06.01 MOVIMIENTO DE TIERRAS 518.09 468.84 90.49% 49.25 9.51%
01.06.01.01 EXCAVACION MANUAL PARA ZAPATAS m3 19.01 17.17 326.40 326.40 100.00% 0.00 0.00%
01.06.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.73 7.94 13.74 13.74 100.00% 0.00 0.00%
01.06.01.03 ACARREO DE MATERIAL EXCEDENTE A 30 MTS m3 20.74 8.58 177.95 128.70 72.32% 49.25 27.68%
01.06.02 OBRAS DE CONCRETO SIMPLE 39.76 39.76 100.00% 0.00 0.00%
01.06.02.01 SOLADO PARA ZAPATAS MEZCLA 1:10 (E=4") m2 1.73 22.98 39.76 39.76 100.00% 0.00 0.00%
01.06.03 OBRAS DE CONCRETO ARMADO 14492.05 14492.05 100.00% 0.00 0.00%
01.06.03.01 ZAPATAS 5642.57 5642.57 100.00% 0.00 0.00%
01.06.03.01.01 ACERO F'Y= 4200 KG/CM2 kg 219.48 4.38 961.32 961.32 100.00% 0.00 0.00%
01.06.03.01.02 CONCRETO PARA ZAPATA F'C=210 KG/CM2 m3 13.82 338.73 4,681.25 4681.25 100.00% 0.00 0.00%
01.06.03.02 COLUMNAS 8849.48 8849.48 100.00% 0.00 0.00%
01.06.03.02.01 ACERO F'Y= 4200 KG/CM2 kg 838.48 4.38 3,672.54 3672.54 100.00% 0.00 0.00%
01.06.03.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNA m2 86.40 35.22 3,043.01 3043.01 100.00% 0.00 0.00%
CALENDARIO VALORIZADO DE EJECUCION DE OBRA DEL EXPEDIENTE TECNICO
PROYECTO: "CREACION DE LA LOSA DE RECREACION MULTIUSOS EN EL CASERIO DE ANGASH, DISTRITO DE CASCA, PROVINCIA MARISCAL LUZURIAGA, ANCASH"
ENTIDAD: MUNICIPALIDAD DISTRITAL DE CASCA
UBICACIÓN: ANGASH - CASCA - MARISCAL LUZURIAGA - ANCASH
VALOR REFERENCAL: S/.232,546.64 PLAZO DE EJECUCION 60 DIAS CALENDARIOS

PRECIO
MES 1 MES 2
ITEM PARTIDA UND METRADO UNITARIO PARCIAL S/.
S/. PARCIAL S/. % PARCIAL S/. %
01.06.03.02.03 CONCRETO F'C=210 KG/CM2 EN COLUMNAS m3 6.48 329.31 2,133.93 2133.93 100.00% 0.00 0.00%
01.06.04 REVOQUES, ENLUCIDOS Y MOLDURAS 2333.66 0.00 0.00% 2333.66 100.00%
01.06.04.01 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 1:5 m2 86.40 27.01 2,333.66 0.00 0.00% 2333.664 100.00%
01.06.05 ESTRUCTURA DE TECHO 61395.98 0.00 0.00% 61395.98 100.00%
01.06.05.01 VIGAS PRINCIPALES m 158.40 90 14,256.00 0.00 0.00% 14256.00 100.00%
01.06.05.02 VIGUETA LONGITUDINAL m 1159.40 24.5 28,405.30 0.00 0.00% 28405.30 100.00%
01.06.05.03 VIGA DE AMARRE m 68.20 68.5 4,671.70 0.00 0.00% 4671.70 100.00%
01.06.05.04 TEMPLADOR DE FIERRO LISO 1/2" m 127.20 11.22 1,427.18 0.00 0.00% 1427.18 100.00%
01.06.05.05 TEMPLADOR DE FIERRO LISO 5/8" m 150.00 12.3 1,845.00 0.00 0.00% 1845.00 100.00%
01.06.05.06 APOYO FIJO und 6.00 650 3,900.00 0.00 0.00% 3900.00 100.00%
01.06.05.07 APOYO MOVIL und 6.00 620 3,720.00 0.00 0.00% 3720.00 100.00%
01.06.05.08 FIJACION DE VIGA DE AMARRE und 2.00 302.3 604.60 0.00 0.00% 604.60 100.00%
01.06.05.09 MONTAJE DE VIGA PRINCIPAL und 6.00 427.7 2,566.20 0.00 0.00% 2566.20 100.00%
01.06.06 COBERTURA 29195.40 0.00 0.00% 29195.40 100.00%
01.06.06.01 COBERTURA CALAMINON CURVO CU-6,1.088X4.71 M e=6mm m2 1029.82 28.35 29,195.40 0.00 0.00% 29195.397 100.00%
01.07 CERCO PERIMETRICO 29884.98 18266.00 61.12% 11618.98 38.88%
01.07.01 MOVIMIENTO DE TIERRAS 963.59 809.20 83.98% 154.39 16.02%
01.07.01.01 EXCAVACION PARA CIMIENTOS EN TERRENO NORMAL m3 38.74 14.72 570.25 441.60 77.44% 128.65280 22.56%
01.07.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 2.36 7.94 18.74 18.74 100.00% 0.00000 0.00%
01.07.01.03 ELIMINACION DE MATERIAL EXCEDENTE m3 43.66 8.58 374.60 348.86 93.13% 25.74000 6.87%
01.07.02 CONCRETO SIMPLE 19025.36 17456.80 91.76% 1568.56 8.24%
01.07.02.01 CIMIENTOS CORRIDOS 7128.90 6911.20 96.95% 217.70 3.05%
01.07.02.01.01 CIMIENTO CORRIDO CONCRETO 1:10 + 30% P.G. m3 41.26 172.78 7,128.90 6911.20 96.95% 217.70 3.05%
01.07.02.02 SOBRECIMIENTO 11896.45 10545.60 88.64% 1350.85 11.36%
01.07.02.02.01 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO m2 206.29 32.98 6,803.44 6596.00 96.95% 207.4442 3.05%
01.07.02.02.02 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 + 25% P.M. m3 25.79 197.48 5,093.01 3949.60 77.55% 1143.4092 22.45%
01.07.03 CARPINTERIA METALICA 9896.03 0.00 0.00% 9896.03 100.00%
01.07.03.01 CERCO DE MALLA DE FIJADOS EN TUB. GALV. 3" S/C° DE CIMIENTO m 147.35 67.16 9,896.03 0.00 0.00% 9896.026 100.00%
01.08 INGRESO PRINCIPAL 5,413.43 3,453.61 63.80% 1959.82 36.20%
01.08.01 ESTRUCTURA 4,242.86 3,453.61 81.40% 789.26 18.60%
01.08.01.01 MOVIMIENTO DE TIERRAS 114.00 39.61 34.75% 74.39 65.26%
01.08.01.01.01 EXCAVACION PARA CIMIENTOS EN TERRENO NORMAL m3 4.61 14.72 67.86 29.44 43.38% 38.42 56.62%
01.08.01.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.58 7.94 4.61 1.59 34.53% 3.02 65.47%
01.08.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE m3 4.84 8.58 41.53 8.58 20.66% 32.95 79.34%
01.08.01.02 CONCRETO SIMPLE 132.36 132.36 100.00% 0.00 0.00%
01.08.01.02.01 SOLADO PARA ZAPATAS 132.36 132.36 100.00% 0.00 0.00%
CALENDARIO VALORIZADO DE EJECUCION DE OBRA DEL EXPEDIENTE TECNICO
PROYECTO: "CREACION DE LA LOSA DE RECREACION MULTIUSOS EN EL CASERIO DE ANGASH, DISTRITO DE CASCA, PROVINCIA MARISCAL LUZURIAGA, ANCASH"
ENTIDAD: MUNICIPALIDAD DISTRITAL DE CASCA
UBICACIÓN: ANGASH - CASCA - MARISCAL LUZURIAGA - ANCASH
VALOR REFERENCAL: S/.232,546.64 PLAZO DE EJECUCION 60 DIAS CALENDARIOS

PRECIO
MES 1 MES 2
ITEM PARTIDA UND METRADO UNITARIO PARCIAL S/.
S/. PARCIAL S/. % PARCIAL S/. %
01.08.01.02.01.01 SOLADO PARA ZAPATAS MEZCLA 1:10 (E=4") m2 5.76 22.98 132.36 132.36 100.00% 0.00 0.00%
01.08.01.03 CONCRETO ARMADO 3996.50 3281.63 82.11% 714.86 17.89%
01.08.01.03.01 ZAPATAS 1,881.99 1,573.92 83.63% 308.07 16.37%
01.08.01.03.01.01 ACERO F'Y= 4200 KG/CM2 kg 73.16 4.38 320.44 219.00 68.34% 101.4408 31.66%
01.08.01.03.01.02 CONCRETO PARA ZAPATA F'C=210 KG/CM2 m3 4.61 338.73 1,561.55 1354.92 86.77% 206.6253 13.23%
01.08.01.03.02 COLUMNAS 1,707.71 1,707.71 100.00% 0.00 0.00%
01.08.01.03.02.01 ACERO F'Y= 4200 KG/CM2 kg 198.16 4.38 867.94 867.94 100.00% 0.00 0.00%
01.08.01.03.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNA m2 14.40 35.22 507.17 507.17 100.00% 0.00 0.00%
01.08.01.03.02.03 CONCRETO F'C=210 KG/CM2 EN COLUMNAS m3 1.01 329.31 332.60 332.60 100.00% 0.00 0.00%
01.08.01.03.03 VIGA COLLARIN 406.80 0.00 0.00% 406.80 100.00%
01.08.01.03.03.01 ACERO F'Y= 4200 KG/CM2 kg 41.30 4.38 180.89 0.00 0.00% 180.894 100.00%
01.08.01.03.03.02 ENCOFRADO Y DESENCOFRADO EN VIGA COLLARIN m2 3.60 30.76 110.74 0.00 0.00% 110.736 100.00%
01.08.01.03.03.03 CONCRETO f'c=210 kg/cm2 PARA VIGA COLLARIN m3 0.34 338.73 115.17 0.00 0.00% 115.168 100.00%
01.08.02 ARQUITECTURA 1,170.57 0.00 0.00% 1170.57 100.00%
01.08.02.01 REVOQUES, ENLUCIDOS Y MOLDURAS 336.00 0.00 0.00% 336.00 100.00%
01.08.02.01.01 TARRAJEO EN SUPERFICIE DE COLUMNAS CON C:A m2 13.44 17.17 230.76 0.00 0.00% 230.7648 100.00%
01.08.02.01.02 TARRAJEO EN SUPERFICIE DE VIGAS CON C:A m2 4.95 21.26 105.24 0.00 0.00% 105.2370 100.00%
01.08.02.02 CARPINTERIA METALICA 645.70 0.00 0.00% 645.70 100.00%
01.08.02.02.01 PUERTA 645.70 0.00 0.00% 645.70 100.00%
01.08.02.02.01.01 PUERTA METALICA DE 3.00x3.00 m.DOS HOJAS PIVOTANTE CON TUBO DE 2" Y MALLA ROMBO 2"x2"
und 1.00 347.85 347.85 0.00 0.00% 347.85 100.00%
01.08.02.02.01.02 PUERTA METALICA DE 1.50x3.00 m.DOS HOJAS PIVOTANTE CON TUBO DE 2" Y MALLA ROMBO 2"x2"
und 1.00 297.85 297.85 0.00 0.00% 297.85 100.00%
01.08.02.03 PINTURA 188.87 0.00 0.00% 188.87 100.00%
01.08.02.03.01 PINTURA EN EXTERIORES C/SUPER MATE DOS MANOS m2 18.39 10.27 188.87 0.00 0.00% 188.8653 100.00%
01.09 SISTEMA DE DRENAJE PLUVIAL 1,190.30 0.00 0.00% 1190.30 100.00%
01.09.01 SISTEMA DE BAJADA MONTANTE 1,190.30 0.00 0.00% 1190.30 100.00%
01.09.01.01 CANAL SEMICIRCULAR DE PLANCHA GALV. 6" INCLUYE SOPORTE m 68.20 13.53 922.75 0.00 0.00% 922.746 100.00%
01.09.01.02 MONTAJE PARA EVACUACION DE AGUAS PLUVIALE glb 1.00 267.55 267.55 0.00 0.00% 267.550 100.00%
01.10 INSTALACIONES ELECTRICAS 2,233.73 120.89 5.41% 2112.84 94.59%
01.10.01 SALIDA TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM (3/4") pto 6.00 69.85 419.10 69.85 16.67% 349.25 83.33%
01.10.02 SALIDA PARA INTERRUPTOR CON PVC pto 3.00 27.02 81.06 27.02 33.33% 54.04 66.67%
01.10.03 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 4.00 24.02 96.08 24.02 25.00% 72.06 75.00%
01.10.04 INSTALACION DE TABLERO DISTRIBUCION und 1.00 94.23 94.23 0.00 0.00% 94.23 100.00%
01.10.05 REFLECTOR DE HALOGENURO und 6.00 257.21 1,543.26 0.00 0.00% 1543.26 100.00%
01.11 FLETE TERRESTRE 10,000.00 8,400.00 84.00% 1600.00 16.00%
01.10.01 FLETE TERRESTRE glb 1.00 8000 8,000.00 6400.00 80.00% 1600.00 20.00%
01.10.02 FLETE RURAL glb 1.00 2000 2,000.00 2000.00 100.00% 0.00 0.00%
CALENDARIO VALORIZADO DE EJECUCION DE OBRA DEL EXPEDIENTE TECNICO
PROYECTO: "CREACION DE LA LOSA DE RECREACION MULTIUSOS EN EL CASERIO DE ANGASH, DISTRITO DE CASCA, PROVINCIA MARISCAL LUZURIAGA, ANCASH"
ENTIDAD: MUNICIPALIDAD DISTRITAL DE CASCA
UBICACIÓN: ANGASH - CASCA - MARISCAL LUZURIAGA - ANCASH
VALOR REFERENCAL: S/.232,546.64 PLAZO DE EJECUCION 60 DIAS CALENDARIOS

PRECIO
MES 1 MES 2
ITEM PARTIDA UND METRADO UNITARIO PARCIAL S/.
S/. PARCIAL S/. % PARCIAL S/. %
COSTO DIRECTO 232,546.64 106655.56 125891.10
GASTOS GENERALES 7% 16,278.26 7,465.89 8,812.38
UTILIDAD 3% 6,976.40 3199.67 3776.73
SUB TOTAL 255,801.31 117,321.11 138,480.21
IGV 18% 46044.24 21117.80 24926.44

PRESUPUESTO DE EJECUCION 301845.54 138,438.91 163,406.64

AVANCE PROGRAMADO 46% 54%


AVANCE ACUMULADO 46% 100%