04.01.01 TUBERIAS
04.01.02.01 CODO PVC SAP 1/2" X90 C/R und 25.00 25.00
04.01.02.02 CODO PVC SAP 3/4"X90 C/R und 13.00 13.00
04.01.02.03 CODO PVC SAP 1"X90 C/R und 58.00 58.00
04.01.02.04 CODO PVC SAP 1 1/4"X90 C/R und 134.00 134.00
04.01.02.05 CODO PVC SAP 1 1/2"X90 C/R und 29.00 29.00
04.01.02.06 CODO PVC SAP 2"X90 C/R und 4.00 4.00
04.01.02.07 TEE PVC C-10 DE 1/2" C/R und 1.00 1.00
04.01.02.08 TEE PVC C-10 DE 3/4" C/R und 7.00 7.00
HOJA DE METRADO - REDES INTERIORES
04.01.05 VARIOS
ITEM TUBERIAS CODOS TEE REDUCCION VALV CONTROL VV ACCESORIO AGUA FRIA
1 1 2 2 2 1
3/4" 1/2" 2 1 1 1 1 1
2 1 1 2" x 1/2" 1/4" 1" x 2 1 1 1/2" - 1/2" - 1/2" - 2" - 1 2" - 1 2" - 2" - 1/2" - 1" - 1" - 3/4" - 1 1 2 1 1
2" 1" 3/4" 1/2" x x 2" 1" 3/4" 1/2" 1/2" - 1/2" - 1/2" - 1/4" - 1/4" - 1/4" - 1" 3/4" 1/2" 1/2" 2" 1" 3/4" 1/2"
1/2" 1/2" 1/4" 90° x x 90° 1/2" 1/2" 1/4" 1 1 1 1/2" 1/4" 1" 3/4" 1 3/4" 1/2" 1/2" 1/2" 1/4" 1/2" 1/2" 1/4"
90° 90° 2" 1" 3/4" 1" 3/4" 1/2"
90° 90° 1/2" 1/4" 1/2" 1/4"
AMBIENTES
PRIMER NIVEL
MODULO 3
A-2A 0.29 1
0.29
0.62 1
C-1 0.88 1
2.8
0.8 4
C-2 0.84 1
1.9 1 2
EN ESCALERA
11.8 3 1
MODULO 4
A-2A 0.44 1 1
0.65 1
0.64 1
C-1 3.24 1
2.74 1
1.86 1
C-2
0.75 1
SS-HH
2.7 1 1
2.19 2
3.54 2 1
1.5 1
SUSTENTO DE METRADO DE AGUA
PROYECTO:
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA
UNIVERSIDAD NACIONAL AGRARIA DE LA SELVA”.
FECHA:
ITEM TUBERIAS CODOS TEE REDUCCION VALV CONTROL VV ACCESORIO AGUA FRIA
1 1 2 2 2 1
3/4" 1/2" 2 1 1 1 1 1
2 1 1 2" x 1/2" 1/4" 1" x 2 1 1 1/2" - 1/2" - 1/2" - 2" - 1 2" - 1 2" - 2" - 1/2" - 1" - 1" - 3/4" - 1 1 2 1 1
2" 1" 3/4" 1/2" x x 2" 1" 3/4" 1/2" 1/2" - 1/2" - 1/2" - 1/4" - 1/4" - 1/4" - 1" 3/4" 1/2" 1/2" 2" 1" 3/4" 1/2"
1/2" 1/2" 1/4" 90° x x 90° 1/2" 1/2" 1/4" 1 1 1 1/2" 1/4" 1" 3/4" 1 3/4" 1/2" 1/2" 1/2" 1/4" 1/2" 1/2" 1/4"
90° 90° 2" 1" 3/4" 1" 3/4" 1/2"
90° 90° 1/2" 1/4" 1/2" 1/4"
SECRETARIA
6.89 1
CORREDOR
5.39 3
1.05 1 1
13.1 2 3 1
SALA DE REUNIONES Y DIRECTORIO
5.1 1 1
MODULO 5
A-2 0.21 0.48 1 1 1
0.21 0.48 1 1 1 1
0.21 0.48 1 1 1 1
0.21 0.48 1 1 1 1
0.74 1 1
0.74 1 1
0.74 1 1
3.00 0.51 1 1 1
SSHH MUJERES
2.53 1 4
SSHH MUJERES Y SSHH DISCAPACITADOS
1.96 4.40 1 4 1 1 1 1
SSHH VARONES
5.77 2 6
2.22 1.05 2 2 1 1
1.37 2
2.43 1 1
2.1
A-2A
2.02 1.12 1 1
C-1
0.88 1 1 1
1.52 1 1 1 1 1
0.8 1 1 1 1
0.8 2
2.51 1 1 1
0.83 1 1 1
0.83 1 1 1
0.83 1 1 1
SUSTENTO DE METRADO DE AGUA
PROYECTO:
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA
UNIVERSIDAD NACIONAL AGRARIA DE LA SELVA”.
FECHA:
ITEM TUBERIAS CODOS TEE REDUCCION VALV CONTROL VV ACCESORIO AGUA FRIA
1 1 2 2 2 1
3/4" 1/2" 2 1 1 1 1 1
2 1 1 2" x 1/2" 1/4" 1" x 2 1 1 1/2" - 1/2" - 1/2" - 2" - 1 2" - 1 2" - 2" - 1/2" - 1" - 1" - 3/4" - 1 1 2 1 1
2" 1" 3/4" 1/2" x x 2" 1" 3/4" 1/2" 1/2" - 1/2" - 1/2" - 1/4" - 1/4" - 1/4" - 1" 3/4" 1/2" 1/2" 2" 1" 3/4" 1/2"
1/2" 1/2" 1/4" 90° x x 90° 1/2" 1/2" 1/4" 1 1 1 1/2" 1/4" 1" 3/4" 1 3/4" 1/2" 1/2" 1/2" 1/4" 1/2" 1/2" 1/4"
90° 90° 2" 1" 3/4" 1" 3/4" 1/2"
90° 90° 1/2" 1/4" 1/2" 1/4"
SSHH MUJERES
3.16
C-2
0.76 1 1 1
0.76 1
0.76 1 1 1
0.76 1.75 1 1 1
SSHH- VARONES
1.64
4.52 1 1
2.53 1
1.23 2 1
2.43 1 1
5.79 1
SSHH DISCAPAC.
1.49 2
2.18
ENTRE SSHH- MUJERES Y CORREDOR
13 1 2
CORREDOR
9.34 1 1
7.36 1 1
MODULO 6
A-02 0.85 1
0.85 1
0.69 1
0.69 1
A-2 1.32 1
0.85 1 1
0.85 1 1
SSHH MUJERES
3.13 1
1.25 2 1
1.44
0.75
0.23
0.46
1.44 1 1
SSHH DISCAPACITADOS
SUSTENTO DE METRADO DE AGUA
PROYECTO:
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA
UNIVERSIDAD NACIONAL AGRARIA DE LA SELVA”.
FECHA:
ITEM TUBERIAS CODOS TEE REDUCCION VALV CONTROL VV ACCESORIO AGUA FRIA
1 1 2 2 2 1
3/4" 1/2" 2 1 1 1 1 1
2 1 1 2" x 1/2" 1/4" 1" x 2 1 1 1/2" - 1/2" - 1/2" - 2" - 1 2" - 1 2" - 2" - 1/2" - 1" - 1" - 3/4" - 1 1 2 1 1
2" 1" 3/4" 1/2" x x 2" 1" 3/4" 1/2" 1/2" - 1/2" - 1/2" - 1/4" - 1/4" - 1/4" - 1" 3/4" 1/2" 1/2" 2" 1" 3/4" 1/2"
1/2" 1/2" 1/4" 90° x x 90° 1/2" 1/2" 1/4" 1 1 1 1/2" 1/4" 1" 3/4" 1 3/4" 1/2" 1/2" 1/2" 1/4" 1/2" 1/2" 1/4"
90° 90° 2" 1" 3/4" 1" 3/4" 1/2"
90° 90° 1/2" 1/4" 1/2" 1/4"
0.46 1
1.86 2 1
0.23 1
0.14 1
1.57 1 1
C-1 0.75 2
0.85 1 1
1.03 1
1.61 1 1
0.94 2
0.79 1
SSHH VARONES
0.9 1 1
0.8 1 1
C-2
1.94 1 1
0.85 1 1
ITEM TUBERIAS CODOS TEE REDUCCION VALV CONTROL VV ACCESORIO AGUA FRIA
1 1 2 2 2 1
3/4" 1/2" 2 1 1 1 1 1
2 1 1 2" x 1/2" 1/4" 1" x 2 1 1 1/2" - 1/2" - 1/2" - 2" - 1 2" - 1 2" - 2" - 1/2" - 1" - 1" - 3/4" - 1 1 2 1 1
2" 1" 3/4" 1/2" x x 2" 1" 3/4" 1/2" 1/2" - 1/2" - 1/2" - 1/4" - 1/4" - 1/4" - 1" 3/4" 1/2" 1/2" 2" 1" 3/4" 1/2"
1/2" 1/2" 1/4" 90° x x 90° 1/2" 1/2" 1/4" 1 1 1 1/2" 1/4" 1" 3/4" 1 3/4" 1/2" 1/2" 1/2" 1/4" 1/2" 1/2" 1/4"
90° 90° 2" 1" 3/4" 1" 3/4" 1/2"
90° 90° 1/2" 1/4" 1/2" 1/4"
EN MDULO 6
1.4 2 1
1.5 3 1
21.9 1 2
1.62 2
SEGUNDO NIVEL
MODULO 5
A-2 0.21 0.48 1 1 1
0.21 0.48 1 1 1 1
0.21 0.48 1 1 1 1
0.21 0.48 1 1 1 1
0.74 1 1
0.74 1 1
0.74 1 1
3.00 0.51 1 1 1
SSHH MUJERES
2.53 1 4
SSHH MUJERES Y SSHH DISCAPACITADOS
1.96 4.40 1 4 1 1 1 1
SSHH VARONES
5.77 2 6
2.22 1.05 2 2 1 1
1.37 2
2.43 1 1
2.1
A-2A
2.02 1.12 1 1
C-1
0.88 1 1 1
1.52 1 1 1 1 1
0.8 1 1 1 1
0.8 2
2.51 1 1 1
0.83 1 1 1
0.83 1 1 1
SUSTENTO DE METRADO DE AGUA
PROYECTO:
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA
UNIVERSIDAD NACIONAL AGRARIA DE LA SELVA”.
FECHA:
ITEM TUBERIAS CODOS TEE REDUCCION VALV CONTROL VV ACCESORIO AGUA FRIA
1 1 2 2 2 1
3/4" 1/2" 2 1 1 1 1 1
2 1 1 2" x 1/2" 1/4" 1" x 2 1 1 1/2" - 1/2" - 1/2" - 2" - 1 2" - 1 2" - 2" - 1/2" - 1" - 1" - 3/4" - 1 1 2 1 1
2" 1" 3/4" 1/2" x x 2" 1" 3/4" 1/2" 1/2" - 1/2" - 1/2" - 1/4" - 1/4" - 1/4" - 1" 3/4" 1/2" 1/2" 2" 1" 3/4" 1/2"
1/2" 1/2" 1/4" 90° x x 90° 1/2" 1/2" 1/4" 1 1 1 1/2" 1/4" 1" 3/4" 1 3/4" 1/2" 1/2" 1/2" 1/4" 1/2" 1/2" 1/4"
90° 90° 2" 1" 3/4" 1" 3/4" 1/2"
90° 90° 1/2" 1/4" 1/2" 1/4"
0.83 1 1 1
SSHH MUJERES
3.16
C-2
0.76 1 1 1
0.76 1
0.76 1 1 1
0.76 1.75 1 1 1
SSHH- VARONES
1.64
4.52 1 1
2.53 1
1.23 2 1
2.43 1 1
5.79 1
SSHH DISCAPAC.
1.49 2
2.18
ENTRE SSHH- MUJERES Y CORREDOR
13 1 2
MODULO 6
A-2A
1.1 1 1
A-2
0.22 0.76 1 1
0.22 0.76 1
0.4 0.46 1 1 1
0.4 0.46 1 1 1
SSHH MUJERES
0.72 0.39 1 1 1 1 1
3.26 1 1
C-1
1.05 2 1
1.05 1 1
0.16 2.22 1 1 1 1
SUSTENTO DE METRADO DE AGUA
PROYECTO:
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA
UNIVERSIDAD NACIONAL AGRARIA DE LA SELVA”.
FECHA:
ITEM TUBERIAS CODOS TEE REDUCCION VALV CONTROL VV ACCESORIO AGUA FRIA
1 1 2 2 2 1
3/4" 1/2" 2 1 1 1 1 1
2 1 1 2" x 1/2" 1/4" 1" x 2 1 1 1/2" - 1/2" - 1/2" - 2" - 1 2" - 1 2" - 2" - 1/2" - 1" - 1" - 3/4" - 1 1 2 1 1
2" 1" 3/4" 1/2" x x 2" 1" 3/4" 1/2" 1/2" - 1/2" - 1/2" - 1/4" - 1/4" - 1/4" - 1" 3/4" 1/2" 1/2" 2" 1" 3/4" 1/2"
1/2" 1/2" 1/4" 90° x x 90° 1/2" 1/2" 1/4" 1 1 1 1/2" 1/4" 1" 3/4" 1 3/4" 1/2" 1/2" 1/2" 1/4" 1/2" 1/2" 1/4"
90° 90° 2" 1" 3/4" 1" 3/4" 1/2"
90° 90° 1/2" 1/4" 1/2" 1/4"
1.6 2 1
0.94 2
SSHH DISCAPACITADOS
0.7 3
SSHH VARONES
0.9 1 1
0.8 1 1
0.89 1 1
0.8 1 1 1
C-2
1.94 2 1
0.85 1 1
SSHH VARONES
5.77 2 6
2.22 1.05 2 2 1 1
1.37 2
2.43 1 1
2.1
SUSTENTO DE METRADO DE AGUA
PROYECTO:
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA
UNIVERSIDAD NACIONAL AGRARIA DE LA SELVA”.
FECHA:
ITEM TUBERIAS CODOS TEE REDUCCION VALV CONTROL VV ACCESORIO AGUA FRIA
1 1 2 2 2 1
3/4" 1/2" 2 1 1 1 1 1
2 1 1 2" x 1/2" 1/4" 1" x 2 1 1 1/2" - 1/2" - 1/2" - 2" - 1 2" - 1 2" - 2" - 1/2" - 1" - 1" - 3/4" - 1 1 2 1 1
2" 1" 3/4" 1/2" x x 2" 1" 3/4" 1/2" 1/2" - 1/2" - 1/2" - 1/4" - 1/4" - 1/4" - 1" 3/4" 1/2" 1/2" 2" 1" 3/4" 1/2"
1/2" 1/2" 1/4" 90° x x 90° 1/2" 1/2" 1/4" 1 1 1 1/2" 1/4" 1" 3/4" 1 3/4" 1/2" 1/2" 1/2" 1/4" 1/2" 1/2" 1/4"
90° 90° 2" 1" 3/4" 1" 3/4" 1/2"
90° 90° 1/2" 1/4" 1/2" 1/4"
A-2A
2.02 1.12 1 1
C-1
0.88 1 1 1
1.52 1 1 1 1 1
0.8 1 1 1 1
0.8 2
2.51 1 1 1
0.83 1 1 1
0.83 1 1 1
0.83 1 1 1
SSHH MUJERES
3.16
C-2
0.76 1 1 1
0.76 1
0.76 1 1 1
0.76 1.75 1 1 1
SSHH- VARONES
1.64
4.52 1 1
2.53 1
1.23 2 1
2.43 1 1
5.79 1
SSHH DISCAPAC.
1.49 2
2.18
ENTRE SSHH- MUJERES Y CORREDOR
13 1 2
CUARTO NIVEL
MODULO 5
A-2 0.21 0.48 1 1 1
0.21 0.48 1 1 1 1
0.21 0.48 1 1 1 1
0.21 0.48 1 1 1 1
0.74 1 1
0.74 1 1
0.74 1 1
SUSTENTO DE METRADO DE AGUA
PROYECTO:
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA
UNIVERSIDAD NACIONAL AGRARIA DE LA SELVA”.
FECHA:
ITEM TUBERIAS CODOS TEE REDUCCION VALV CONTROL VV ACCESORIO AGUA FRIA
1 1 2 2 2 1
3/4" 1/2" 2 1 1 1 1 1
2 1 1 2" x 1/2" 1/4" 1" x 2 1 1 1/2" - 1/2" - 1/2" - 2" - 1 2" - 1 2" - 2" - 1/2" - 1" - 1" - 3/4" - 1 1 2 1 1
2" 1" 3/4" 1/2" x x 2" 1" 3/4" 1/2" 1/2" - 1/2" - 1/2" - 1/4" - 1/4" - 1/4" - 1" 3/4" 1/2" 1/2" 2" 1" 3/4" 1/2"
1/2" 1/2" 1/4" 90° x x 90° 1/2" 1/2" 1/4" 1 1 1 1/2" 1/4" 1" 3/4" 1 3/4" 1/2" 1/2" 1/2" 1/4" 1/2" 1/2" 1/4"
90° 90° 2" 1" 3/4" 1" 3/4" 1/2"
90° 90° 1/2" 1/4" 1/2" 1/4"
3.00 0.51 1 1 1
SSHH MUJERES
2.53 1 4
SSHH MUJERES Y SSHH DISCAPACITADOS
1.96 4.40 1 4 1 1 1 1
SSHH VARONES
5.77 2 6
2.22 1.05 2 2 1 1
1.37 2
2.43 1 1
2.1
A-2A
2.02 1.12 1 1
C-1
0.88 1 1 1
1.52 1 1 1 1 1
0.8 1 1 1 1
0.8 2
2.51 1 1 1
0.83 1 1 1
0.83 1 1 1
0.83 1 1 1
SSHH MUJERES
3.16
C-2
0.76 1 1 1
0.76 1
0.76 1 1 1
0.76 1.75 1 1 1
SSHH- VARONES
1.64
4.52 1 1
2.53 1
1.23 2 1
2.43 1 1
5.79 1
SSHH DISCAPAC.
1.49 2
SUSTENTO DE METRADO DE AGUA
PROYECTO:
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA
UNIVERSIDAD NACIONAL AGRARIA DE LA SELVA”.
FECHA:
ITEM TUBERIAS CODOS TEE REDUCCION VALV CONTROL VV ACCESORIO AGUA FRIA
1 1 2 2 2 1
3/4" 1/2" 2 1 1 1 1 1
2 1 1 2" x 1/2" 1/4" 1" x 2 1 1 1/2" - 1/2" - 1/2" - 2" - 1 2" - 1 2" - 2" - 1/2" - 1" - 1" - 3/4" - 1 1 2 1 1
2" 1" 3/4" 1/2" x x 2" 1" 3/4" 1/2" 1/2" - 1/2" - 1/2" - 1/4" - 1/4" - 1/4" - 1" 3/4" 1/2" 1/2" 2" 1" 3/4" 1/2"
1/2" 1/2" 1/4" 90° x x 90° 1/2" 1/2" 1/4" 1 1 1 1/2" 1/4" 1" 3/4" 1 3/4" 1/2" 1/2" 1/2" 1/4" 1/2" 1/2" 1/4"
90° 90° 2" 1" 3/4" 1" 3/4" 1/2"
90° 90° 1/2" 1/4" 1/2" 1/4"
2.18
ENTRE SSHH- MUJERES Y CORREDOR
13 1 2
TECHO GEOMÁTICA
MODULO 5
1.91 1 1
8.1 1 1
5.94 1 1
FECHA
01.02.02.06 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE DE 6 M3, CARGUIO MANUAL M3 4.60
► EXCAVACION DE ZANJA + 15% ESPONJAMIENTO 1.15 76.64 0.40 0.80 28.20
► RELLENO C / MATERIAL PROPIO -1.10 76.64 0.40 0.70 -23.61
PLANILLA DE METRADOS
SUSTENTO DE METRADO DE AGUA
PROYECTO:
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA UNIVERSIDAD
NACIONAL AGRARIA DE LA SELVA”.
FECHA:
LINEA DE ALIMENTACIÓN 01
21 1
21 1
6.74 1 1
1
LINEA DE ALIMENTACIÓN 02
6.68 2
MODULO 6 21.4 1 1
TOTAL 0 28 0 0 49 0 0 0 0 3 0 0 3 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0
SUSTENTO DE METRADO DE APARATOS SANITARIOS
PROYECTO:
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA
UNIVERSIDAD NACIONAL AGRARIA DE LA SELVA”.
FECHA:
acero acero
Urinario acero inoxidable acero Lavamanos
Discapac C/ inoxidable de 1 inoxidable de 2 Barras kit de Dispensador Dispensador Tanque
1" 3/4" 1 1/2" 1 1/4" 1/2" T.Bajo con pico Ovalin de 1 poza inoxidable de 2 acero SIMPLE Jabonera Papelera
itados Pedestal poza de .47 pozas de metalicas (Jgo) Ducha de Jabón de Papel elevado
de loro de .86x.50 C/E pozas S/E inoxidable
x.49 S/E 1.16x0.50 C/E
SANITARIOS
PRIMER NIVEL
MODULO 3
OFICINA DEL PERSONAL TECNICO 1 5 1 1 1 1 1 1
HALL 1 10 1 2 1 2 1 1
MODULO 4
SECRETARIA(SS HH) 7 2 2 1 2 1 1
CORREDOR 1
SALA DE REUNIONES 6 1 1 1 1 1
MODULO 5
SS HH VARONES 1 12 4 3 4 4 1 1 1
SS HH MUJERES 1 7 4 4 4 1 1 1
SS HH DISCAPACITADOS 1 3 1 1 1 1 1 1 1
MODULO 6
SS HH VARONES 7 1 2 2 2 2 1 1
SS HH MUJERES 3 3 2 2 2 1 1 1
SS HH DISCAPACITADOS 2 1 1 1 1 1 1 1
COCINETA 4 2
SEGUNDO NIVEL
MODULO 5
SS HH VARONES 1 12 4 3 4 4 1 1 1
SS HH MUJERES 1 7 4 4 4 1 1 1
SS HH DISCAPACITADOS 1 3 1 1 1 1 1 1
MODULO 6
SS HH VARONES 9 1 2 2 2 2 1 1
SS HH MUJERES 3 2 1 2 2 1 1
SS HH DISCAPACITADOS 1 1 1 1 1 1 1 1
COCINETA
SUSTENTO DE METRADO DE APARATOS SANITARIOS
PROYECTO:
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA
UNIVERSIDAD NACIONAL AGRARIA DE LA SELVA”.
FECHA:
acero acero
Urinario acero inoxidable acero Lavamanos
Discapac C/ inoxidable de 1 inoxidable de 2 Barras kit de Dispensador Dispensador Tanque
1" 3/4" 1 1/2" 1 1/4" 1/2" T.Bajo con pico Ovalin de 1 poza inoxidable de 2 acero SIMPLE Jabonera Papelera
itados Pedestal poza de .47 pozas de metalicas (Jgo) Ducha de Jabón de Papel elevado
de loro de .86x.50 C/E pozas S/E inoxidable
x.49 S/E 1.16x0.50 C/E
TERCER NIVEL
MODULO 5
SS HH VARONES 1 12 4 3 4 4 1 1 1
SS HH MUJERES 1 7 4 4 4 1 1 1
SS HH DISCAPACITADOS 1 3 1 1 1 1 1 1 1
CUARTO NIVEL
MODULO 4
SECRETARIA(SS HH) 1 5 2 2 1 2 1 1
ALMACEN CALIBRACION(SS HH ) 4 1 1 1 1 1
MODULO 5
SS HH VARONES 1 12 4 3 4 4 1 1 1
SS HH MUJERES 1 7 4 4 4 1 1 1
SS HH DISCAPACITADOS 1 3 1 1 1 1 1 1 1
QUINTO NIVEL
MODULO 5
SS HH VARONES 1
SS HH MUJERES 1
SS HH DISCAPACITADOS 1
TANQUE ELEVADO
TANQUE ELEVADO CAP(15 M3) 1
42 28 18 93 54 8 50 24 40 0 0 0 0 0 16 0 0 0 0 24 24 12 1
HOJA DE METRADO - APARATOS SANITARIOS
PROYECTO : “CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA
EN LA UNIVERSIDAD NACIONAL AGRARIA DE LA SELVA”.
FECHA :
ESPECIALIDAD : INSTALACIONES SANITARIAS
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA UNIVERSIDAD
PROYECTO : NACIONAL AGRARIA DE LA SELVA”.
FECHA :
02 SISTEMA DE DESAGUE
02.01 REDES EXTERIORES DE DESAGUE
02.01.01 TRABAJOS PRELIMINARES
02.01.01.01 TRAZO Y REPLANTEO m 109.83 109.83
02.01.02.09
RELLENO COMP. ZANJA TERR. NORMAL "C"-TUB 4"-6" HASTA 1.00 M m 109.83 109.83
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE DE 6M3, CARGUIO A
02.01.02.13 MANO 4.74
EXCAVACION<= 0.60 m3 87.83 1.15 0.60 0.60 36.36
EXCAVACION<=0.61-1.00 m3 22.00 1.15 0.60 0.80 12.14
CAMA H=0.10 M m3 109.83 -0.10 0.60 -6.59
RELLENO H=0.30 M m3 109.83 -0.30 0.60 -19.77
RELLENO<= 0.60 m3 87.83 -1.10 0.60 0.20 -11.59
RELLENO =0.61-1.00 m3 22.00 -1.10 0.60 0.40 -5.81
02.01.03 TUBERIAS
02.01.03.01 TUBERIA PVC D=2" DE 3M. TIPO PESADO PARA DESAGUE m 11.28 1.00 11.28 11.28
02.01.03.02 TUBERIA PVC D=160mm. TIPO PESADO PARA DESAGUE m 98.55 1.00 98.55 98.55
02.01.03.03 DOBLE PRUEBA HIDRAULICA, TUBERIA PVC - DESAGUE m 109.83 1.00 1.066.76 1.066.76
02.01.03.04 EMPALME A BUZON Y/O RED EXISTENTE EN DIAMET. 8-12" und 1.00 1.00 1.00 1.00
HOJA DE METRADO- DESAGUE
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA UNIVERSIDAD
PROYECTO : NACIONAL AGRARIA DE LA SELVA”.
FECHA :
“CREACIÓN DEL CENTRO DE GEOMATICA CON FINES ACADÉMICOS E INVESTIGACIÓN DE LA FACULTAD DE AGRONOMÍA EN LA UNIVERSIDAD
PROYECTO : NACIONAL AGRARIA DE LA SELVA”.
FECHA :
FECHA #REF!
ESPECIALIDAD #REF!
MODULO 4
FECHA #REF!
ESPECIALIDAD #REF!
MD - 7 (4") 2.29 1
0.57 1
MODULO 5
SSHH VARONES 1.91 0.86 1
0.51 0.74
0.65
0.40 0.99
0.51 0.74 1 2
0.65 1 1 1
0.76 1 1
0.7 1 1
0.37 0.97 0.64 1 1 1
1.02 0.64 0.88 1 1 1 1
0.81 1 1 1
1.79 0.62 1 1 1 1
SUSTENTO DE METRADO DE DESAGUE
PROYECTO #REF!
FECHA #REF!
ESPECIALIDAD #REF!
SSHH MUJERES
1.36 1
0.81 0.6 1 1 1
0.46 1
0.93 0.6 1 1 1
0.77 0.37 1
0.93 0.7 1 1 1
0.78 1
0.93 0.7 1 1 1
0.56 0.62 1 1 1
SUSTENTO DE METRADO DE DESAGUE
PROYECTO #REF!
FECHA #REF!
ESPECIALIDAD #REF!
FECHA #REF!
ESPECIALIDAD #REF!
SSHH AUDITORIO
18.4 1
0.86 0.6 1 1
0.43 1
0.44 1
MD - 6 (2")
1.36 1
2.52 1
0.28 1
SEGUNDO NIVEL
MODULO 5
SSHH VARONES 1.91 0.86 1
0.51 0.74
0.65
0.40 0.99
0.51 0.74 1 2
0.65 1 1 1
SUSTENTO DE METRADO DE DESAGUE
PROYECTO #REF!
FECHA #REF!
ESPECIALIDAD #REF!
SSHH MUJERES
1.36 1
0.81 0.6 1 1 1
0.46 1
SUSTENTO DE METRADO DE DESAGUE
PROYECTO #REF!
FECHA #REF!
ESPECIALIDAD #REF!
FECHA #REF!
ESPECIALIDAD #REF!
SSHH AUDITORIO
18.4 1
0.86 0.6 1 1
0.43 1
0.44 1
MD - 6 (2")
1.36 1
2.52 1
0.28 1
TERCER NIVEL
MODULO 5
SUSTENTO DE METRADO DE DESAGUE
PROYECTO #REF!
FECHA #REF!
ESPECIALIDAD #REF!
0.51 0.74 1 2
0.65 1 1 1
0.76 1 1
0.7 1 1
0.37 0.97 0.64 1 1 1
1.02 0.64 0.88 1 1 1 1
0.81 1 1 1
1.79 0.62 1 1 1 1
1.05 0.37 1 1 1 1
1.04 0.4 1 1 1 1
0.95 1 1 1
1.81 0.62 1 1 1 1
1.04 0.37 1 1 1 1
0.88 1 1 1 1
1.04 0.4 1 1 1
0.76 1 1 1
1.08 0.37 1 1 1 1
1.59 0.62 1 1 1 1
1.08 0.36 1 1 1 1
0.41 1 1 1
2.54 1 1 1 1
0.59 0.72 1 1 1 1
0.31 1 1 1 1
0.32 0.72 1.0 1 1
FECHA #REF!
ESPECIALIDAD #REF!
SSHH MUJERES
1.36 1
0.81 0.6 1 1 1
0.46 1
0.93 0.6 1 1 1
0.77 0.37 1
0.93 0.7 1 1 1
0.78 1
0.93 0.7 1 1 1
0.56 0.62 1 1 1
0.33 0.62 1 1 1
1.05 1
0.95 0.62 1 1 1
1.03 1
0.95 0.62 1 1 1
1.04 1
0.95 0.62 1 1 1
0.25 1 1
MD - 1 (4")
3.02 1
CUARTO NIVEL
MODULO 5
SSHH VARONES 1.91 0.86 1
0.51 0.74
0.65
0.40 0.99
0.51 0.74 1 2
SUSTENTO DE METRADO DE DESAGUE
PROYECTO #REF!
FECHA #REF!
ESPECIALIDAD #REF!
SSHH MUJERES
1.36 1
0.81 0.6 1 1 1
SUSTENTO DE METRADO DE DESAGUE
PROYECTO #REF!
FECHA #REF!
ESPECIALIDAD #REF!
ESPECIALIDAINSTALACIONES SANITARIAS
CAJA LONG. PEND. CT CF DIAM. H. CAJA tub 2" tub=3" tub=4" tub=6" tub=8" exc. >=0.60 exc. >=1 exc. >=1.5 exc. >=2.00 exc. >=3.00
ACCESORIOS
TUBERÍA PUNTOS
ITEM TEE CODOS REDUCCIÓN SOMBRERO VENTILACIÓN
2" 4" 2" 4" 2" 4" 2" x 90° 4" x 90° 4" X 2" 2" 4"
AMBIENTES
PRIMER NIVEL
MODULO 3
MV-07(2") 0.57 1 1
0.27 1
0.27 1
0.15 1
1.23 1
MV-08(2") 0.84 1 1
0.26 1
0.4 1
0.1 1
2.08 1
1.6 1
MODULO 4
MV-06(2") 0.54 1 1
0.25 1
0.69 1
1.12 1
0.6 1
0.26 1
0.71 1
0.99 1
0.66 1
MV-05(2")
0.35 1 1
0.25 1
SUSTENTO DE METRADO DE VENTILACION
ACCESORIOS
TUBERÍA PUNTOS
ITEM TEE CODOS REDUCCIÓN SOMBRERO VENTILACIÓN
2" 4" 2" 4" 2" 4" 2" x 90° 4" x 90° 4" X 2" 2" 4"
MODULO 5
MV-02(4")
3.6 1 1 5
0.24 2
0.24 2
0.24 2
3.92 3 1
0.75 1
0.22 1
2.63 1 3
3.05 5
MV-01(4") 3.6 1 2 5
0.28 1
3.35 1
3.25 4
0.24 1
0.24 1
0.24 1
MODULO 6
MV-03(2") 0.37 1 1
0.18 1
0.14 2
0.62 1 2
2.66 1
1.18 1
1.48 2
0.25 1
2.03 2
SUSTENTO DE METRADO DE VENTILACION
ACCESORIOS
TUBERÍA PUNTOS
ITEM TEE CODOS REDUCCIÓN SOMBRERO VENTILACIÓN
2" 4" 2" 4" 2" 4" 2" x 90° 4" x 90° 4" X 2" 2" 4"
MV-04(2") 0.41 1 1
3.15 1
1.22 2
0.25 1
0.28 1
MV-09(2") 0.41 1 1
3.14 1
1.22 2
SEGUNDO NIVEL
MODULO 4
MV-06(2") 0.54 1 1
0.25 1
0.69 1
1.12 1
0.6 1
0.26 1
0.71 1
0.99 1
0.66 1
MV-05(2")
0.35 1 1
0.25 1
MODULO 5
MV-02(4")
3.6 1 1 5
0.24 2
0.24 2
0.24 2
3.82 3 1
SUSTENTO DE METRADO DE VENTILACION
ACCESORIOS
TUBERÍA PUNTOS
ITEM TEE CODOS REDUCCIÓN SOMBRERO VENTILACIÓN
2" 4" 2" 4" 2" 4" 2" x 90° 4" x 90° 4" X 2" 2" 4"
0.75 1
0.22 1
2.66 1 3
3.05 5
MODULO 6
MV-03(2") 0.37 1 1
0.18 1
0.14 2
0.62 1 2
2.66 1
1.18 1
1.48 2
0.25 1
2.03 2
MV-03(2") 0.41 1 1
3.15 1
1.22 2
MV-09(2") 0.41 1 1
3.14 1
1.22 2
TERCER NIVEL
MODULO 5
MV-02(4")
3.6 1 1 5
SUSTENTO DE METRADO DE VENTILACION
ACCESORIOS
TUBERÍA PUNTOS
ITEM TEE CODOS REDUCCIÓN SOMBRERO VENTILACIÓN
2" 4" 2" 4" 2" 4" 2" x 90° 4" x 90° 4" X 2" 2" 4"
0.24 2
0.24 2
0.24 2
3.82 3 1
0.75 1
0.22 1
2.66 1 3
3.05 5
CUARTO NIVEL
MODULO 4
MODULO 4
MV-06(2") 0.54 1 1
0.25 1
0.69 1
1.12 1
0.6 1
0.26 1
0.71 1
0.99 1
0.66 1
MV-05(2")
0.35 1 1
0.25 1
MODULO 5
MV-02(4")
3.6 1 1 5
0.24 2
0.24 2
0.24 2
3.82 3 1
0.75 1
SUSTENTO DE METRADO DE VENTILACION
ACCESORIOS
TUBERÍA PUNTOS
ITEM TEE CODOS REDUCCIÓN SOMBRERO VENTILACIÓN
2" 4" 2" 4" 2" 4" 2" x 90° 4" x 90° 4" X 2" 2" 4"
0.22 1
2.66 1 3
3.05 5
03.02 ACCESORIOS