Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Aire Acond.- Oficinas
Hell Page 2

Zone Detailed Loads (At Zone Peak Times)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 1-Consejo Regional peaks (sensible) in November at 8am, Air Handler 1 (Oficinas Mezanine), Group
0, 2,777.0 x 1.0, Construction Type: 10 (Medium)
UE-M.1 AL UEM-M21
Wall-1-NW-A-D 209 1 10.0 0.340 710 7.310 1,526
Wall-2-SW-B-D 535 1 13.1 0.470 3,302 10.105 5,408
Partition-3-1 712.8 10/15 0.390 2,780 5.850 4,170
Partition-4-1 458.4 10/15 0.390 1,788 5.850 2,682
Partition-5-1 512.4 10/15 0.390 1,998 5.850 2,998
Partition-6-1 32.28 10/15 0.390 126 5.850 189
Gls-P-2-90-Tran 290.5 1.000 -5 0.720 2,092 10.800 3,138
0%S-0-NS-Solar 290.5 0.500 0 0.000 0
Lights-Prof=2 1,389 1.000 4,738
Equipment-Prof=3 350 1.000 1,194 0
People-Prof=1 78.0 1.000 19,500 15,600
Sub-total 38,227 15,600 0
Safety factors: +20% +20% +20%
--------- --------- ---------
Total w/ safety factors: 45,873 18,720 0

Zone 2-Gerencia General Regional peaks (sensible) in November at 10am, Air Handler 2 (Gerencia
General Regional P7), Group 0, 1,184.0 x 1.0, Construction Type: 10 (Medium)
UE-7.1 al UE-7.3
Wall-1-E-B-D 58 1 8.4 0.470 227 10.105 582
Partition-2-1 519.6 10/15 0.390 2,026 5.850 3,040
Partition-3-1 457.2 10/15 0.390 1,783 5.850 2,675
Partition-4-1 626.4 10/15 0.390 2,443 5.850 3,664
Gls-E-1-90-Tran 410.4 1.000 -1 1.030 -528 22.145 9,088
0%S-0-NS-Solar 410.4 0.500 212 0.510 22,186
Lights-Prof=2 592 1.000 2,020
Equipment-Prof=3 350 1.000 1,194 0
People-Prof=1 24.0 1.000 6,000 4,800
Sub-total 37,351 4,800 0
Safety factors: +20% +20% +20%
--------- --------- ---------
Total w/ safety factors: 44,822 5,760 0

Zone 3-Gobernación Regional peaks (sensible) in November at 6pm, Air Handler 3 (Gobernación
Regional P8), Group 0, 2,131.0 x 1.0, Construction Type: 10 (Medium)
UE-8.1 al 8.6
Wall-1-NE-B-D 370 1 14.0 0.470 2,432 10.105 3,735
Wall-2-E-B-D 188 1 19.4 0.470 1,716 10.105 1,904
Partition-3-4 740.4 10/15 0.320 2,369 4.800 3,554
Partition-4-4 543.6 10/15 0.320 1,740 4.800 2,609
Partition-5-4 913.2 10/15 0.320 2,922 4.800 4,383
Partition-6-4 243.6 10/15 0.320 780 4.800 1,169
Lights-Prof=2 1,066 1.000 3,636
Equipment-Prof=3 350 1.000 1,194 0
People-Prof=1 57.0 1.000 14,250 11,400

C:\FIDEL\FIDEL-TRABAJO\@ELITE\ayacucho\Oficinas Ayacucho.CHV martes, 29 de Agosto de 2023, 03:43 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Aire Acond.- Oficinas
Hell Page 3

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Sub-total 31,038 11,400 0
Safety factors: +20% +20% +20%
--------- --------- ---------
Total w/ safety factors: 37,246 13,680 0

Zone 4-Vice Gobernación peaks (sensible) in August at 6pm, Air Handler 4 (Vice Gobernación P8), Group
0, 1,249.0 x 1.0, Construction Type: 10 (Medium)
UE-8.7 al 8.11
Wall-1-NE-B-D 288 1 16.4 0.470 2,217 10.105 2,910
Partition-2-4 417.6 10/15 0.320 1,336 4.800 2,004
Partition-3-4 637.2 10/15 0.320 2,039 4.800 3,059
Partition-4-4 429.6 10/15 0.320 1,375 4.800 2,062
Partition-5-4 354 10/15 0.320 1,133 4.800 1,699
Lights-Prof=2 625 1.000 2,131
Equipment-Prof=3 350 1.000 1,194 0
People-Prof=1 35.0 1.000 8,750 7,000
Sub-total 20,175 7,000 0
Safety factors: +20% +20% +20%
--------- --------- ---------
Total w/ safety factors: 24,209 8,400 0

C:\FIDEL\FIDEL-TRABAJO\@ELITE\ayacucho\Oficinas Ayacucho.CHV martes, 29 de Agosto de 2023, 03:43 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Aire Acond.- Oficinas
Hell Page 4

Air System #1 (Oficinas Mezanine) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 57.899 50.805
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 2,272 1.000 108
Zone Loads 18,720 13.331 45,873 20.194 2,177
Sensible Reserve 0 0.000 0
Zone Condition 18,720 71.230 48,144 71.500 2,285
Return Air Duct 1,136 0.500
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 1,000 CFM 30,857 21.975 5,965 2.407
Blow-Thru Fan 1,903 0.838
Entering Coil Condition 49,577 93.204 57,148 75.745 2,285

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.904 x 1.10 x 2,285 x( 75.745 - 50.805 )= 56,652 Btuh


TLH = 0.904 x 0.68 x 2,285 x( 93.204 - 57.899 )= 49,577 Btuh
----------
SUM = 106,229 Btuh
GTH = 0.904 x 4.50 x 2,285 x( 32.756 - 21.157 )= 107,787 Btuh
Total System Load = 105,865 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 107,787 / ( 10.00 x 500 ) = 21.6 GPM
Heating GPM = 0 /( 20.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 75.74 Dry bulb temperature: 72.00
Wet bulb temperature: 66.51
Relative humidity: 63.15
Enthalpy: 32.76 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 50.81 Dry bulb temperature: 72.00
Wet bulb temperature: 50.01
Relative humidity: 95.00
Enthalpy: 21.16 Btu/lbm

C:\FIDEL\FIDEL-TRABAJO\@ELITE\ayacucho\Oficinas Ayacucho.CHV martes, 29 de Agosto de 2023, 03:43 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Aire Acond.- Oficinas
Hell Page 5

Air System #2 (Gerencia General Regional P7) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 67.929 55.092
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 2,818 1.000 168
Zone Loads 5,760 3.307 44,822 15.908 2,666
Sensible Reserve 0 0.000 0
Zone Condition 5,760 71.236 47,639 71.500 2,834
Return Air Duct 1,409 0.500
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 250 CFM 7,110 4.226 0 -0.044
Blow-Thru Fan 2,360 0.838
Entering Coil Condition 12,870 75.462 51,408 73.294 2,834

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.904 x 1.10 x 2,834 x( 73.294 - 55.092 )= 51,285 Btuh


TLH = 0.904 x 0.68 x 2,834 x( 75.462 - 67.929 )= 13,121 Btuh
----------
SUM = 64,406 Btuh
GTH = 0.904 x 4.50 x 2,834 x( 29.381 - 23.758 )= 64,823 Btuh
Total System Load = 64,278 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 64,823 / ( 10.00 x 500 ) = 13.0 GPM
Heating GPM = 0 /( 20.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 73.29 Dry bulb temperature: 72.00
Wet bulb temperature: 62.32
Relative humidity: 55.71
Enthalpy: 29.38 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.09 Dry bulb temperature: 72.00
Wet bulb temperature: 54.23
Relative humidity: 95.00
Enthalpy: 23.76 Btu/lbm

C:\FIDEL\FIDEL-TRABAJO\@ELITE\ayacucho\Oficinas Ayacucho.CHV martes, 29 de Agosto de 2023, 03:43 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Aire Acond.- Oficinas
Hell Page 6

Air System #3 (Gobernación Regional P8) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 59.721 51.631
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 1,923 1.000 95
Zone Loads 13,680 11.508 37,246 19.368 1,839
Sensible Reserve 0 0.000 0
Zone Condition 13,680 71.229 39,169 71.500 1,934
Return Air Duct 962 0.500
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 500 CFM 15,428 12.979 2,983 1.422
Blow-Thru Fan 1,611 0.838
Entering Coil Condition 29,108 84.208 44,724 74.759 1,934

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.904 x 1.10 x 1,934 x( 74.759 - 51.631 )= 44,476 Btuh


TLH = 0.904 x 0.68 x 1,934 x( 84.208 - 59.721 )= 29,109 Btuh
----------
SUM = 73,585 Btuh
GTH = 0.904 x 4.50 x 1,934 x( 31.107 - 21.641 )= 74,473 Btuh
Total System Load = 73,624 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 74,473 / ( 10.00 x 500 ) = 14.9 GPM
Heating GPM = 0 /( 20.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 74.76 Dry bulb temperature: 72.00
Wet bulb temperature: 64.52
Relative humidity: 59.08
Enthalpy: 31.11 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 51.63 Dry bulb temperature: 72.00
Wet bulb temperature: 50.82
Relative humidity: 95.00
Enthalpy: 21.64 Btu/lbm

C:\FIDEL\FIDEL-TRABAJO\@ELITE\ayacucho\Oficinas Ayacucho.CHV martes, 29 de Agosto de 2023, 03:43 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Aire Acond.- Oficinas
Hell Page 7

Air System #4 (Vice Gobernación P8) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 60.574 52.010
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 1,275 1.000 64
Zone Loads 8,400 10.658 24,209 18.989 1,218
Sensible Reserve 0 0.000 0
Zone Condition 8,400 71.233 25,484 71.500 1,282
Return Air Duct 637 0.500
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 350 CFM 10,800 13.703 2,088 1.501
Blow-Thru Fan 1,068 0.838
Entering Coil Condition 19,200 84.935 29,278 74.839 1,282

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.904 x 1.10 x 1,282 x( 74.839 - 52.010 )= 29,104 Btuh


TLH = 0.904 x 0.68 x 1,282 x( 84.935 - 60.574 )= 19,199 Btuh
----------
SUM = 48,304 Btuh
GTH = 0.904 x 4.50 x 1,282 x( 31.241 - 21.865 )= 48,897 Btuh
Total System Load = 47,929 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 48,897 / ( 10.00 x 500 ) = 9.8 GPM
Heating GPM = 0 /( 20.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 74.84 Dry bulb temperature: 72.00
Wet bulb temperature: 64.68
Relative humidity: 59.43
Enthalpy: 31.24 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 52.01 Dry bulb temperature: 72.00
Wet bulb temperature: 51.19
Relative humidity: 95.00
Enthalpy: 21.87 Btu/lbm

C:\FIDEL\FIDEL-TRABAJO\@ELITE\ayacucho\Oficinas Ayacucho.CHV martes, 29 de Agosto de 2023, 03:43 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Aire Acond.- Oficinas
Hell Page 8

Air System #1 (Oficinas Mezanine) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition HRV Heat Recovery Ventilator Condition

C:\FIDEL\FIDEL-TRABAJO\@ELITE\ayacucho\Oficinas Ayacucho.CHV martes, 29 de Agosto de 2023, 03:43 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Aire Acond.- Oficinas
Hell Page 9

Air System #2 (Gerencia General Regional P7) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition HRV Heat Recovery Ventilator Condition

C:\FIDEL\FIDEL-TRABAJO\@ELITE\ayacucho\Oficinas Ayacucho.CHV martes, 29 de Agosto de 2023, 03:43 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Aire Acond.- Oficinas
Hell Page 10

Air System #3 (Gobernación Regional P8) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition HRV Heat Recovery Ventilator Condition

C:\FIDEL\FIDEL-TRABAJO\@ELITE\ayacucho\Oficinas Ayacucho.CHV martes, 29 de Agosto de 2023, 03:43 p. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Aire Acond.- Oficinas
Hell Page 11

Air System #4 (Vice Gobernación P8) Psychrometric Chart


ZC Zone Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain
PRE Pretreated Air Condition HRV Heat Recovery Ventilator Condition

C:\FIDEL\FIDEL-TRABAJO\@ELITE\ayacucho\Oficinas Ayacucho.CHV martes, 29 de Agosto de 2023, 03:43 p. m.