Documentos de Académico
Documentos de Profesional
Documentos de Cultura
1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
CONCEPTO
BONIFIC. VACACIONES
HORAS EXTRAS SUBSIDIO GRATIFICACIONES
POR ACUERDO GRATIF. TRUNCAS
REM LIC BONO PARTICIPACION BASE
INDEMNIZACIO TRABAJO EN CANASTA DE
APELLIDO APELLIDO FECHA. CARGO O REM REM BÁSICA S ASIG. PRODUCTI. DE UTILIDADES BASE
Nº NOMBRES DNI FEC NAC. FECHA CESE CON GOCE DE CON N RESOLUCION DIA FERIADO O NAVIDAD O CTS DE
PATERNO MATERNO INGRESO OCUPACIÓN BASICA DIAS LAB. N FAMILIAR BONIF.
DE CONTRATO
ANTES DJ
DIA DESCANSO SIMILARES MATE SUBSIDIO IMPONIBLE
HABER REGULARES ANUAL RENTA CALCULO
TRABAJADORE 0.25 0.35 RNIDA INCAPACIDAD POR G. TRUNCAS G. NORMAL B. NORMAL B. TRUNCAS V. NORMAL V. TRUNCAS
D ENFERMEDAD
S
| ACUÑA PAISIG JESUS ORLANDO 42865176 2/18/1985 12/1/2021 SUPERVISOR DE IZAJE 8,000.00 8,000.00 N 0.00 0.00 8,828.06 0.00 16,828.06 8,000.00
2 AGUILAR HERAS RAUL 26680427 3/31/2022 3/31/2022 0.00 0.00 0.00 0.00 0.00 556.52 556.52 0.00
3 ALAYO DE LA CRUZ EDWARD GERALD 40872283 3/31/2022 3/31/2022 0.00 0.00 0.00 0.00 0.00 9,613.17 9,613.17 0.00
4 ALAYO DE LA CRUZ MENAGHEM LEONID 41786297 11/27/1982 1/1/2022 TOPOGRAFO 4,300.00 4,300.00 S 93.00 0.00 6,608.65 0.00 11,001.65 4,393.00
5 ALCANTARA SANCHEZ EDWIN ALBERTO 43034518 3/31/2022 3/31/2022 0.00 0.00 0.00 0.00 0.00 648.83 648.83 0.00
6 ALVAREZ RODRIGUEZ DENIS ALEX 40854211 3/15/1981 11/2/2021 SUPERVISOR EHS 6,600.00 6,600.00 S 93.00 0.00 1,899.32 0.00 8,592.32 6,693.00
7 AMBROSIO NARVAEZ LUIS ALBERTO 18066946 3/31/2022 3/31/2022 0.00 0.00 0.00 0.00 5,143.29 5,143.29 0.00
8 AREVALO BURGA FERNANDO NORVIL 47242775 3/31/2022 3/31/2022 0.00 0.00 0.00 0.00 2,311.97 2,311.97 0.00
9 ARRISBAPLATA BERMEO FREDDY MICHEL 63259963 3/31/2022 3/31/2022 0.00 0.00 0.00 0.00 2,300.61 2,300.61 0.00
10 AVILA DURAND ANTHONY YOVANY 47467306 5/2/1992 1/1/2022 JEFE LABORATORIO MECANICA DE SUELOS 4,200.00 4,200.00 S 93.00 0.00 6,407.88 0.00 10,700.88 4,293.00
11 BALAREZO VERASTEGUI CHRISTIAN ALBERTO 26731939 3/31/2022 3/31/2022 0.00 0.00 0.00 0.00 3,242.40 3,242.40 0.00
12 BANDA BURGA JESUS MARINO 09444952 12/27/1968 1/6/2022 3/9/2022 CAPATAZ MOV. TIERRAS 5,000.00 1,500.00 S 93.00 0.00 3,019.74 0.00 1,839.14 165.52 919.57 919.57 8,456.54 2,512.57
13 BARDALES CORREA WILDER ORLANDO 26601676 6/11/1960 2/10/2022 3/31/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 0.00 0.00 784.54 70.88 393.77 393.77 4,535.96 3,286.77
14 BECERRA GAONA ROBERTO CARLOS 41838185 4/30/1983 1/1/2022 MECANICO 3,300.00 3,300.00 S 93.00 0.00 4,825.34 0.00 8,218.34 3,393.00
15 BELTRAN ROMERO MARLLURY GISELL 44195907 11/21/1986 1/6/2022 SUPERVISOR EHS 5,500.00 5,500.00 N 0.00 0.00 3,261.43 0.00 0.00 8,761.43 5,500.00
16 BRINGAS ARANA ALCIDES OMAR 45479103 9/10/1987 1/3/2022 JEFE OFICINA TECNICA 9,000.00 9,000.00 N 0.00 0.00 11,672.61 0.00 0.00 20,672.61 9,000.00
17 CABANILLAS CUEVA ALFREDO 46916489 3/31/2022 3/31/2022 0.00 0.00 0.00 3,129.70 3,129.70 0.00
18 CABRERA CACEDA WALTER ULISES 26693020 3/31/2022 3/31/2022 0.00 0.00 0.00 2,515.71 2,515.71 0.00
19 CAMACHO TORRES INOCENTE 26677098 9/4/1958 1/1/2022 3/31/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 N 0.00 0.00 3,472.61 0.00 1,400.00 126.00 700.00 0.00 700.00 9,198.61 3,500.00
20 CAMPOS LLATAS ELVER IVAN 72654123 3/31/2022 3/31/2022 0.00 0.00 0.00 2,272.42 2,272.42 0.00
21 CARAHUATAY RODRIGUEZ ELMER 47638319 1/10/1993 1/1/2022 CONDUCTOR SPRINTER 2,600.00 2,600.00 S 93.00 0.00 4,046.74 0.00 0.00 6,739.74 2,693.00
22 CARDENAS QUILICHE SEGUNDO RAFAEL 40120284 3/31/2022 3/31/2022 0.00 0.00 0.00 1,995.49 1,995.49 0.00
23 CARRERA CRUZ CLEIDER 70391441 3/31/2022 3/31/2022 0.00 0.00 0.00 2,633.69 2,633.69 0.00
24 CASTREJON CARRASCO WALTER 45104647 3/31/2022 3/31/2022 0.00 0.00 0.00 3,044.44 3,044.44 0.00
25 CASTREJON DURAN JOSE ROBERTO 42991773 3/31/2022 3/31/2022 0.00 0.00 0.00 1,068.24 1,068.24 0.00
26 CASTREJON YOPLA CANDELARIO 42106820 2/2/1977 2/1/2022 CAPATAZ MOV. TIERRAS 5,000.00 5,000.00 S 93.00 0.00 0.00 0.00 5,093.00 5,093.00
27 CERQUIN COLORADO ANA MARIA 46543060 7/22/1990 1/1/2022 SUPERVISOR EHS 5,500.00 5,500.00 S 93.00 0.00 6,048.57 0.00 0.00 11,641.57 5,593.00
28 CHAVEZ BANDA LORENZO 70367175 12/8/1996 2/10/2022 AYUDANTE MECANICO 2,350.00 2,350.00 N 0.00 0.00 2,810.81 0.00 0.00 5,160.81 2,350.00
29 CHAVEZ MARTOS WILSON 41462922 3/31/2022 3/31/2022 0.00 0.00 0.00 3,166.00 3,166.00 0.00
30 CHAVEZ VASQUEZ MANUEL ARNALDO 43412580 3/31/2022 3/31/2022 0.00 0.00 0.00 3,715.91 3,715.91 0.00
31 CHAVEZ VILLANUEVA SANTOS 43752101 3/31/2022 3/31/2022 0.00 0.00 0.00 3,075.81 3,075.81 0.00
32 CHEGNE CHAVEZ JESUS ANDRES 70856576 11/12/1991 1/3/2022 JEFE AREA DE SISTEMAS 2,420.00 2,420.00 N 0.00 0.00 7,062.19 0.00 0.00 9,482.19 2,420.00
33 CHICOMA OCAS ELIAS 26700494 3/31/2022 3/31/2022 0.00 0.00 0.00 2,475.78 2,475.78 0.00
34 CHILON AYAY ALEX RAMIRO 45077945 3/31/2022 3/31/2022 0.00 0.00 0.00 1,955.12 1,955.12 0.00
35 CHILON CALUA JOSE PAULINO 41965137 3/31/2022 3/31/2022 0.00 0.00 0.00 1,409.46 1,409.46 0.00
36 CHILON CASTREJON RAFAEL 26684548 11/2/1971 1/1/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 4,596.94 0.00 0.00 7,489.94 2,893.00
37 CHILON CASTREJON VICTOR 41050768 3/31/2022 3/31/2022 0.00 0.00 0.00 1,479.53 1,479.53 0.00
38 CHILON HUARIPATA SEGUNDO VICTORIANO 44952184 3/31/2022 3/31/2022 0.00 0.00 0.00 1,749.32 1,749.32 0.00
39 CHILON INFANTE NEMER BILARDO 44352594 4/30/1987 1/1/2022 CONTROLADOR DE EQUIPOS 3,200.00 3,200.00 S 93.00 0.00 4,864.88 0.00 0.00 8,157.88 3,293.00
40 CHUNQUI LLANOS JOSE LICANOR 26712001 6/22/1970 12/23/2021 AYUDANTE CISTERNA DE AGUA 2,350.00 2,350.00 S 93.00 0.00 3,890.64 0.00 0.00 6,333.64 2,443.00
41 CHUNQUI NOVOA ALEJANDRO 41415879 7/12/1980 1/1/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 3,841.74 0.00 0.00 6,734.74 2,893.00
42 CHUQUIMANGO ISHPILCO WILDER 73511487 3/31/2022 3/31/2022 0.00 0.00 0.00 728.39 728.39 0.00
43 CHUQUIRUNA MENDOZA SEGUNDO 26705060 3/31/2022 3/31/2022 0.00 0.00 0.00 1,778.39 1,778.39 0.00
44 CONDO CHUMBIRAYCO AMADO 45996150 3/31/2022 3/31/2022 0.00 0.00 0.00 3,180.13 3,180.13 0.00
45 CORDOVA GUTIERREZ CARMEN GENARO 42933554 7/16/1981 1/1/2022 SUPERVISOR MOVIMIENTO DE TIERRAS 8,000.00 8,000.00 S 93.00 0.00 5,734.27 0.00 0.00 13,827.27 8,093.00
46 CORONADO CALDERON VICTOR 26711659 3/31/2022 3/31/2022 0.00 0.00 0.00 1,487.57 1,487.57 0.00
47 CORONADO CHAVEZ ELMER 71963890 3/31/2022 3/31/2022 0.00 0.00 0.00 953.42 953.42 0.00
48 CORONADO TASILLA EDILFONSO 46307743 2/8/1990 11/25/2021 CONDUCTOR CAMIONETA 2,500.00 2,500.00 S 93.00 0.00 4,335.40 0.00 0.00 6,928.40 2,593.00
49 CORTEZ CORONADO CESAR OSWALDO 43686980 6/8/1986 1/1/2022 CONDUCTOR CAMIONETA 2,500.00 2,500.00 S 93.00 0.00 5,187.04 0.00 0.00 7,780.04 2,593.00
50 CUEVA CHILON JOSE EDUARDO 41656067 3/31/2022 3/31/2022 0.00 0.00 0.00 1,644.69 1,644.69 0.00
51 CUEVA LLAMOCTANTA CARLOS 42263405 3/31/2022 3/31/2022 0.00 0.00 0.00 2,537.66 2,537.66 0.00
52 CUEVA QUIJANO JORGE LUIS 41656054 3/31/2022 3/31/2022 0.00 0.00 0.00 3,103.17 3,103.17 0.00
53 CULQUI JULCA JOSE JULIO 26680863 8/24/1971 2/3/2022 3/31/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 3,052.59 0.00 900.04 81.00 450.02 0.00 450.02 7,826.67 3,343.02
54 DIAZ PORTAL KEVIN 41141298 3/31/2022 3/31/2022 0.00 0.00 0.00 2,217.58 2,217.58 0.00
55 DUCOS ZAMBRANO CASIMIRO 41506350 4/26/1981 1/6/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 N 0.00 0.00 4,935.21 0.00 0.00 7,735.21 2,800.00
56 ESCOBEDO SERRANO MANUEL RAMON 46548628 3/31/2022 3/31/2022 0.00 0.00 0.00 1,961.53 1,961.53 0.00
57 FERNANDEZ GAONA JHAMIS 43360038 11/15/1985 1/1/2022 MECANICO 3,300.00 3,300.00 S 93.00 0.00 5,332.56 0.00 0.00 8,725.56 3,393.00
58 FLORES HERNANDEZ VICTOR ANIBAL 06774954 3/31/2022 3/31/2022 0.00 0.00 0.00 4,115.05 4,115.05 0.00
59 FLORES SANCHEZ ELMER 47063922 7/30/1991 12/29/2021 ASISTENTE DE SUPERVISION 2,500.00 2,500.00 S 93.00 0.00 3,756.77 0.00 0.00 6,349.77 2,593.00
60 FUENTES LLANOS SALATIEL 46029419 3/31/2022 3/31/2022 0.00 0.00 0.00 215.32 215.32 0.00
61 GAITAN GODOY GHINO PAUL 72485258 3/31/2022 3/31/2022 0.00 0.00 0.00 2,189.40 2,189.40 0.00
62 GALAN PANTA DAVID ANTONY 46681593 10/1/1990 1/1/2022 TECNICO DE LABORATORIO MECANICA DE SU 3,500.00 3,500.00 S 93.00 0.00 1,239.85 0.00 0.00 4,832.85 3,593.00
63 GALLARDO VASQUEZ SEGUNDO GABRIEL 26697752 9/23/1973 1/1/2022 CAPATAZ MOV. TIERRAS 5,000.00 5,000.00 S 93.00 0.00 7,655.93 0.00 0.00 12,748.93 5,093.00
64 GAONA RODRIGUEZ DEYNER EDUAR 42131647 9/20/1983 1/3/2022 JEFE MANTENIMIENTO DE EQUIPOS 7,750.00 7,750.00 S 93.00 0.00 8,505.56 0.00 0.00 16,348.56 7,843.00
65 GONZALES CABRERA JOHAN EMILIO 70659891 3/31/2022 3/31/2022 0.00 0.00 0.00 3,913.23 3,913.23 0.00
66 GUTIERREZ CABRERA DAVID 41044213 3/31/2022 3/31/2022 0.00 0.00 0.00 5,643.68 5,643.68 0.00
67 GUTIERREZ LLANOS CESAR WILFREDO 71963874 3/31/2022 3/31/2022 0.00 0.00 0.00 2,029.09 2,029.09 0.00
68 GUTIERREZ MURRUGARRA ANDER YOHEL 72071958 1/12/1994 1/1/2022 MECANICO 2,900.00 2,900.00 S 93.00 0.00 3,780.42 0.00 0.00 6,773.42 2,993.00
69 GUZMAN MONTALVAN JUAN CARLOS 16716087 3/31/2022 3/31/2022 0.00 0.00 0.00 7,057.93 7,057.93 0.00
70 HERNANDEZ HERNANDEZ JOSE LEONCIO 27991987 5/2/1974 1/1/2022 CAPATAZ MOV. TIERRAS 5,000.00 5,000.00 S 93.00 0.00 5,582.49 0.00 0.00 10,675.49 5,093.00
71 HERRERA CASTREJON WALTER 47170068 9/29/1991 1/1/2022 CONDUCTOR CAMIONETA 2,500.00 2,500.00 S 93.00 0.00 1,816.36 0.00 0.00 4,409.36 2,593.00
72 HERRERA MALCA EDSON 45375279 10/8/1988 1/1/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 4,298.09 0.00 0.00 7,191.09 2,893.00
73 HUAMAN AGUILAR HUALDON OMAR 42300175 3/31/2022 3/31/2022 0.00 0.00 0.00 3,495.39 3,495.39 0.00
74 HUAMAN VASQUEZ PERCY 73126170 2/5/1999 1/3/2022 ASISTENTE DE LOGISTICA 1,210.00 1,210.00 N 0.00 0.00 440.36 0.00 0.00 1,650.36 1,210.00
75 HUARIPATA INFANTE WILI RUSBET 46694298 3/31/2022 3/31/2022 0.00 0.00 0.00 2,877.33 2,877.33 0.00
76 HUARIPATA QUISPE DENIS OMAR 75563522 4/24/1998 1/1/2022 AYUDANTE MECANICO 2,350.00 2,350.00 N 0.00 0.00 1,627.59 0.00 0.00 3,977.59 2,350.00
77 HUATAY HUAMAN ALBERTO 42369353 3/31/2022 3/31/2022 0.00 0.00 0.00 2,738.87 2,738.87 0.00
78 HUATAY HUAMAN ROSARIO 26723508 12/1/1975 2/3/2022 3/31/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 0.00 900.04 81.00 450.02 0.00 450.02 4,774.08 3,343.02
79 INFANTE AYAY JESUS 40546383 1/29/1979 1/1/2022 ALMACENERO 2,500.00 2,500.00 S 93.00 0.00 5,050.19 0.00 0.00 7,643.19 2,593.00
80 INFANTE CHUQUIMANGO RAMON 26716950 3/31/2022 3/31/2022 0.00 0.00 0.00 2,330.71 2,330.71 0.00
81 INFANTE VALDEZ DANIT SOLIZ 48504535 3/7/1995 12/2/2021 ASISTENTE DE ALMACEN 1,800.00 1,800.00 N 0.00 0.00 3,643.37 0.00 0.00 5,443.37 1,800.00
82 INTOR GUEVARA YOHDAN STEMARS 47639264 10/11/1992 1/1/2022 ASISTENTE CONTROL DE CALIDAD 2,500.00 2,500.00 N 0.00 0.00 3,277.14 0.00 0.00 5,777.14 2,500.00
83 INTOR RIOS FLAVIO 26718557 9/5/1976 1/1/2022 JEFE CONTROL DE CALIDAD 14,000.00 14,000.00 S 93.00 0.00 14,192.99 0.00 0.00 28,285.99 14,093.00
84 INTOR VASQUEZ CARLOS ENRIQUE 42284466 3/31/2022 3/31/2022 0.00 0.00 0.00 760.95 760.95 0.00
85 JAVE BARRANTES NANCY MARIBEL 26706637 11/25/1973 11/20/2017 CONTADOR 3,740.00 3,740.00 N 0.00 0.00 7,337.81 0.00 0.00 11,077.81 3,740.00
86 LEAL CALUA JUAN CARLOS 26704696 3/18/1975 1/13/2022 3/31/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 3,060.00 0.00 1,269.71 114.27 634.86 0.00 634.85 8,606.69 3,527.85
87 LEIVA MENDOZA YDELSO 26717621 3/31/2022 3/31/2022 0.00 0.00 0.00 2,697.81 2,697.81 0.00
88 LIMAY VASQUEZ SAMUEL 47338435 3/31/2022 3/31/2022 0.00 0.00 0.00 2,287.87 2,287.87 0.00
89 LINARES PAREDES MAYRA FATIMA DEL CARMEN 72909087 7/7/1994 1/3/2022 ASISTENTE OFICINA TECNICA 3,190.00 3,190.00 N 0.00 0.00 7,615.62 0.00 0.00 10,805.62 3,190.00
90 LLAMOCTANTA HUARIPATA FILADELFIO 47832174 3/31/2022 3/31/2022 0.00 0.00 0.00 2,192.51 2,192.51 0.00
91 LLANOS CALDERON ELMER 43383277 3/31/2022 3/31/2022 0.00 0.00 0.00 375.89 375.89 0.00
92 LLANOS CALDERON WILDER 72197214 8/15/1994 12/2/2021 ASISTENTE MEDIO AMBIENTE 2,500.00 2,500.00 S 93.00 0.00 4,126.69 0.00 0.00 6,719.69 2,593.00
93 LLANOS CHUNQUE MANUEL 73197876 12/21/1992 1/1/2022 CONDUCTOR CAMIONETA 2,500.00 2,500.00 S 93.00 0.00 3,919.77 0.00 0.00 6,512.77 2,593.00
94 LLANOS CONDOR JUAN 42121084 11/5/1983 1/20/2022 CAPATAZ MOV. TIERRAS 5,000.00 5,000.00 S 93.00 0.00 5,020.25 0.00 0.00 10,113.25 5,093.00
95 LLANOS JUAREZ WALTER JAIME 44384131 8/3/1985 1/1/2022 AYUDANTE DE ZARANDA 2,350.00 2,350.00 S 93.00 0.00 672.57 0.00 0.00 3,115.57 2,443.00
96 LLANOS JULCA HUMBERTO 70367144 3/31/2022 3/31/2022 0.00 0.00 0.00 2,303.57 2,303.57 0.00
97 LLANOS RAMIREZ PASCUAL 42347555 4/15/1980 1/1/2022 TOPOGRAFO 4,300.00 4,300.00 S 93.00 0.00 6,635.10 0.00 0.00 11,028.10 4,393.00
98 LLANOS RODRIGUEZ DJIMI DJERSY 71973729 3/11/1998 2/8/2022 TOPOGRAFO 3,000.00 3,000.00 S 93.00 0.00 2,978.37 0.00 0.00 6,071.37 3,093.00
99 LLANOS SANGAY ANDRES 42679622 3/31/2022 3/31/2022 0.00 0.00 0.00 3,358.53 3,358.53 0.00
100 LLANOS TANTA WILMER 47055242 3/31/2022 3/31/2022 0.00 0.00 0.00 3,079.17 3,079.17 0.00
101 LLANOS TOCAS ANGELES 42977399 1/27/1985 1/1/2022 CONDUCTOR CAMIONETA 2,500.00 2,500.00 S 93.00 0.00 4,480.52 0.00 0.00 7,073.52 2,593.00
102 LLICO ESPILCO LUIS ALBERTO 71011058 1/7/2000 1/1/2022 3/1/2022 AYUDANTE CISTERNA DE AGUA 2,350.00 78.33 S 93.00 0.00 1,518.29 0.00 827.91 74.51 413.96 0.00 413.95 3,419.95 585.28
103 LUCANO MALUQUISH ELIAS 40990474 7/1/1981 1/1/2022 CONDUCTOR CAMIONETA 2,500.00 2,500.00 S 93.00 0.00 4,527.25 0.00 0.00 7,120.25 2,593.00
104 LUZON PAREDES OSCAR PAUL SANTIAGO 73066048 11/5/1997 1/2/2022 SUPERVISOR DE MOVIMIENTO DE TIERRAS 4,000.00 4,000.00 N 0.00 0.00 5,973.53 0.00 0.00 9,973.53 4,000.00
105 MACHUCA ROMERO MIRIAM MARIBEL 26733694 3/31/2022 3/31/2022 0.00 0.00 0.00 3,825.13 3,825.13 0.00
106 MARIN SALAZAR JOSE LUIS 76215569 3/31/2022 3/31/2022 0.00 0.00 0.00 970.25 970.25 0.00
107 MEDINA CARRANZA MARCO ANTONIO 09933751 3/31/2022 3/31/2022 0.00 0.00 0.00 4,509.19 4,509.19 0.00
108 MEMBRILLO MARRUFO HECTOR EDUARDO 26710405 8/5/1974 1/3/2022 ASISTENTE RRHH 3,300.00 3,300.00 S 93.00 0.00 6,498.60 0.00 0.00 9,891.60 3,393.00
109 MENDOZA VEGA RENAN VIDAL 43351446 8/4/1985 1/1/2022 SUPERVISOR CONTROL DE CALIDAD 7,700.00 7,700.00 S 93.00 0.00 8,127.43 0.00 0.00 15,920.43 7,793.00
110 MONTOYA CIEZA RONAL HERBERTH 43224167 3/31/2022 3/31/2022 0.00 0.00 0.00 3,978.12 3,978.12 0.00
111 MONZÓN CARUAJULCA WILSON KENNY 70205970 2/26/1993 1/1/2022 ASISTENTE EHS 2,000.00 2,000.00 S 93.00 0.00 1,287.70 0.00 3,380.70 2,093.00
112 MORALES BAUTISTA ALEXANDER 45909009 7/25/1989 1/1/2022 CONDUCTOR SPRINTER 2,600.00 2,600.00 S 93.00 0.00 5,592.42 0.00 8,285.42 2,693.00
113 MORALES LLANOS NICOLAS 26705771 3/31/2022 3/31/2022 0.00 0.00 0.00 1,479.53 1,479.53 0.00
114 MORENO BRIONES JOSUE 46685241 3/31/2022 3/31/2022 0.00 0.00 0.00 1,096.26 1,096.26 0.00
115 MUÑOZ VAQUEZ ALBERTO 80629397 3/31/2022 3/31/2022 0.00 0.00 0.00 3,071.88 3,071.88 0.00
116 NARRO MARTINEZ EBER MALAVER 71230921 2/15/1994 2/4/2022 MECANICO 2,900.00 2,900.00 S 93.00 0.00 4,206.42 0.00 7,199.42 2,993.00
117 NOVOA HUAMAN SEGUNDO MANUEL 41007600 1/15/1980 2/14/2022 SUPERVISOR EHS 5,500.00 5,500.00 S 93.00 733.33 7,135.80 0.00 13,462.13 6,326.33
118 OBLITAS LEIVA JOSE MERCEDES NORBERTO 27410833 3/31/2022 3/31/2022 0.00 0.00 0.00 3,280.14 3,280.14 0.00
119 OCON CASTREJON WILDER 71997833 10/11/1995 1/3/2022 MECANICO 2,900.00 2,900.00 S 93.00 0.00 6,137.35 0.00 9,130.35 2,993.00
120 OCON CHILON CRUZ 26735046 5/3/1977 11/10/2017 GERENTE 15,840.00 15,840.00 S 93.00 0.00 16,601.79 0.00 32,534.79 15,933.00
121 OCON CHILON MODESTO 44314362 6/20/1987 4/1/2020 LOGISTICA 3,204.00 3,204.00 S 93.00 0.00 7,647.80 0.00 10,944.80 3,297.00
122 OCON CHILON NESTOR 46159365 2/8/1990 1/1/2022 AYUDANTE CISTERNA DE COMBUSTIBLE 2,350.00 2,350.00 S 93.00 0.00 4,535.72 0.00 6,978.72 2,443.00
123 OCON VALLEJOS SANTIAGO 26614245 12/23/1950 1/4/2021 SUB GERENTE 2,400.00 2,400.00 S 93.00 0.00 6,180.16 0.00 8,673.16 2,493.00
124 OCON VILLANUEVA CARLOS 71977209 5/28/1997 1/3/2022 ASISTENTE ADMINISTRATIVO 2,200.00 2,200.00 N 0.00 0.00 4,089.51 0.00 6,289.51 2,200.00
125 ORDOÑEZ MALAVER EDMIR SIMON 71251400 1/22/1997 12/1/2021 3/15/2022 SUPERVISOR MOVIMIENTO DE TIERRAS 3,000.00 1,500.00 N 0.00 0.00 4,716.59 0.00 1,250.00 112.50 1,020.83 875.00 9,474.92 2,375.00
126 ORDOÑEZ MALAVER EDMIR SIMON 71251400 1/22/1997 3/18/2022 ASISTENTE DE RESIDENTE DE OBRA 2,500.00 1,166.67 N 0.00 0.00 0.00 1,166.67 1,166.67
127 ORDOÑEZ SANCHEZ DIONICIO ROBERTO 26953572 10/9/1969 2/1/2012 GERENTE FINANCIERO 19,680.00 19,680.00 S 93.00 0.00 19,576.44 0.00 39,349.44 19,773.00
128 PADILLA DE LA CRUZ HAROLD ABSALON 72567321 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 1,035.65 1,035.65 0.00
129 PADILLA DE LA CRUZ LUIS ALBERTO 80511191 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 4,500.91 4,500.91 0.00
130 PAJARES DE LA CRUZ JAIME 26722154 2/19/1972 2/10/2022 MECANICO 2,900.00 2,900.00 S 93.00 0.00 3,180.13 0.00 6,173.13 2,993.00
131 PIZAN MENDOZA CRISTHIAN OMAR 44721293 9/19/1986 1/3/2022 INGENIERO DE COSTOS 7,100.00 7,100.00 N 0.00 0.00 9,097.58 0.00 16,197.58 7,100.00
132 POLANCO DURAN HENRY MANUEL 26716638 4/23/1976 2/10/2022 3/31/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 0.00 0.00 787.54 70.88 393.77 393.77 4,538.96 3,286.77
133 POMPA CUEVA ROSARIO 43049211 5/25/1985 1/27/2022 3/31/2022 CAPATAZ MOV. TIERRAS 5,000.00 5,000.00 N 0.00 0.00 0.00 0.00 1,666.67 150.00 833.33 833.33 8,483.33 5,833.33
134 PORTAL DELGADO ANGEL 45597550 3/31/2022 3/31/2022 0.00 2,750.65 2,750.65 0.00
135 PORTAL VARGAS IRVIN MANUEL JESUS 72542028 8/1/1992 1/1/2022 ASISTENTE RRHH EN CAMPO 1,700.00 1,700.00 N 0.00 0.00 1,245.06 0.00 2,945.06 1,700.00
136 PORTAL VASQUEZ LUIS ENRIQUE 26683614 7/27/1969 1/1/2022 JEFE DE EHS 10,000.00 10,000.00 S 93.00 0.00 12,037.45 0.00 22,130.45 10,093.00
137 PRUDENCIO RISHING EDUARDO 80662347 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 3,124.81 3,124.81 0.00
138 QUILICHE CHINGAY JUAN FERNANDO 46680999 8/16/1990 1/3/2022 CADISTA 3,300.00 3,300.00 N 0.00 0.00 5,590.27 0.00 8,890.27 3,300.00
139 QUIROZ RAMOS JOSE ANGEL 10312818 10/16/1966 11/25/2021 RESIDENTE DE OBRA 14,000.00 14,000.00 S 93.00 0.00 11,303.52 0.00 25,396.52 14,093.00
140 QUISPE ESTACIO JOSE BENITO 26708465 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 960.32 960.32 0.00
141 RAFAEL MANYA MILTON 45567476 12/1/1988 1/3/2022 3/31/2022 GERENTE OPERACIONES 14,000.00 14,000.00 N 0.00 0.00 19,118.16 0.00 6,922.22 623.00 3,461.11 3,461.11 47,585.60 17,461.11
142 RAICO CONDOR TEODORO 26688140 8/22/1972 1/21/2022 3/31/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 3,103.20 0.00 1,141.13 102.70 570.57 570.56 8,381.16 3,463.56
143 RAMOS CHAVEZ JUAN CARLOS 26704174 1/1/1975 12/1/2021 JEFE DE ABASTECIMIENTO 4,847.70 4,847.70 S 93.00 0.00 8,003.15 0.00 12,943.85 4,940.70
144 REYES VILLEGAS ADLER 26689628 7/24/1969 1/1/2022 CAPATAZ MOV. TIERRAS 5,000.00 5,000.00 S 93.00 0.00 7,600.57 0.00 12,693.57 5,093.00
145 ROBLES GALLARDO SANTOS GONZALO 16762517 4/14/2021 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 8,025.00 8,025.00 0.00
146 RODRIGUEZ BOBADILLA JOSE LUIS 40730120 5/12/2021 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 966.04 966.04 0.00
147 RODRIGUEZ MONCADA FREDY ANDRES 42245523 12/24/1983 12/27/2021 ENFERMERO EN SALUD OCUPACIONAL 3,025.00 3,025.00 S 93.00 0.00 127.27 0.00 3,245.27 3,118.00
148 ROJAS FERNANDEZ JOSE EDGAR 26690332 3/31/2022 12/31/2021 0.00 0.00 N 0.00 0.00 9,451.61 9,451.61 0.00
149 ROJAS HURTADO JORGE LUIS 40069670 4/11/1978 1/27/2022 SUPERVISOR MOVIMIENTO DE TIERRAS 8,000.00 8,000.00 N 0.00 0.00 0.00 0.00 8,000.00 8,000.00
150 ROJAS MURRUGARRA MARCO ANTONIO 42395119 5/11/1984 1/3/2022 ASISTENTE ADMINISTRATIVO 2,174.70 2,174.70 S 93.00 0.00 7,156.70 0.00 9,424.40 2,267.70
151 ROJAS YGNACIO WILSON 27992094 12/12/1973 1/1/2022 3/23/2022 CAPATAZ MOV. TIERRAS 5,000.00 3,833.33 S 93.00 0.00 5,503.61 0.00 2,263.57 203.73 1,131.77 1,131.77 14,160.77 5,058.10
152 ROMERO CABALLERO LUIS ALBERTO 45512745 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 2,145.06 2,145.06 0.00
153 RUCABADO DELGADO ANGEL ROMAIN 41748896 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 2,637.32 2,637.32 0.00
154 SAAVEDRA MURRUGARRA MIRNA ELISA 77379873 10/23/1995 1/3/2022 ASISTENTE DE SUPERVISION 3,600.00 3,600.00 N 0.00 0.00 6,353.74 0.00 9,953.74 3,600.00
155 SAAVEDRA MURRUGARRA RONALD ADEMIR 43608394 2/11/1985 3/31/2022 3/31/2022 ASISTENTE SUPERVISION MANTENIMIENTO 2,000.00 0.00 0.00 N 0.00 0.00 3,846.20 3,846.20 0.00
156 SALDAÑA QUISPE JOSE RAMIRO 41340353 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 4,016.95 4,016.95 0.00
157 SALIRROSAS ROMERO CESAR MANUEL 70408024 12/6/1996 1/3/2022 CONTADOR COSTOS 2,750.00 2,750.00 N 0.00 0.00 7,204.12 0.00 9,954.12 2,750.00
158 SANCHEZ BARRANTES JHON ANTONY 70206094 11/27/1993 1/1/2022 ASISTENTE RRHH EN CAMPO 2,000.00 2,000.00 S 93.00 0.00 3,793.20 0.00 5,886.20 2,093.00
159 SANCHEZ CABOS JUAN PABLO 26696547 5/19/1973 1/1/2022 RESIDENTE DE OBRA 14,000.00 14,000.00 S 93.00 0.00 10,084.28 0.00 24,177.28 14,093.00
160 SANCHEZ DURAN WALTER 26663470 12/22/1970 2/17/2022 3/31/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 0.00 0.00 675.03 60.75 337.51 337.52 4,303.81 3,230.52
161 SANCHEZ MILLA LUIS FERNANDO 09521646 3/31/2022 3/31/2022 0.00 0.00 0.00 N 0.00 0.00 3,904.82 3,904.82 0.00
162 SANCHEZ MUÑOZ VICTOR MANUEL 42449010 6/4/1982 1/1/2022 3/31/2022 AYUDANTE MECANICO 2,350.00 2,350.00 S 93.00 0.00 3,230.60 0.00 1,221.50 109.94 610.75 610.75 8,226.54 3,053.75
163 SANCHEZ QUIROZ MIGUEL ANGEL 40730551 8/23/1980 11/18/2021 SUPERVISOR DE IZAJE 7,000.00 7,000.00 S 93.00 0.00 1,248.26 0.00 8,341.26 7,093.00
164 SANCHEZ RUDAS PEDRO PABLO 41440726 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 2,820.21 2,820.21 0.00
165 SANGAY TASILLA HUMBERTO 44798729 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 3,294.37 3,294.37 0.00
166 SANTA CRUZ BOBADILLA WILSON 42868268 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 657.87 657.87 0.00
167 SAUCEDO CHUQUILIN CESAR 26698943 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 4,478.56 4,478.56 0.00
168 SAUCEDO GABRIEL HERVIN OMAR 45602735 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 1,030.51 1,030.51 0.00
169 SEMINARIO CADENILLAS JUAN CARLOS 43487835 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 1,325.41 1,325.41 0.00
170 SERRATO GUTIERREZ CESAR JHONCARLOS 43739927 9/12/1986 1/1/2022 SUPERVISOR CONTROL DE CALIDAD 7,000.00 7,000.00 S 93.00 0.00 7,448.72 0.00 14,541.72 7,093.00
171 TACILLA CAJA CONCEPCION 26641861 3/7/2022 MAESTRO DE OBRA 5,000.00 4,166.67 S 93.00 0.00 0.00 4,259.67 4,259.67
172 TACILLA IZQUIERDO MARCO ANTONIO 73068003 2/25/1999 1/3/2022 GUARDIAN 1,492.70 1,492.70 S 93.00 0.00 4,388.54 0.00 5,974.24 1,585.70
173 TANTALEAN CARRASCO JOSE MANUEL 26706447 6/23/2021 1/1/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 2,446.84 0.00 5,339.84 2,893.00
174 TAPIA BURGA GLADYS NELY 26686777 9/21/1971 3/5/2015 JEFE DE RECURSOS HUMANOS 7,200.00 7,200.00 S 93.00 0.00 9,947.47 0.00 17,240.47 7,293.00
175 TAPIA RUIZ MARIA JESUS 26709963 4/15/1976 1/3/2022 CONTADOR RECURSOS HUMANOS 3,520.00 3,520.00 S 93.00 0.00 8,149.38 0.00 11,762.38 3,613.00
176 TEATINO ALAYA AURELIO 43979547 10/8/1985 1/20/2022 CAPATAZ MOV. TIERRAS 5,000.00 5,000.00 S 93.00 0.00 0.00 5,093.00 5,093.00
177 TELLO CORTEGANA ESTEBAN 46380383 9/5/1987 12/9/2021 MECANICO 2,900.00 2,900.00 N 0.00 0.00 5,923.35 0.00 8,823.35 2,900.00
178 TERRONES SOTO JOSE CATALINO 41974807 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 119.37 119.37 0.00
179 TRUJILLO VASQUEZ LUIS FRANCISCO 26684115 10/18/1971 1/1/2022 GUARDIAN 1,430.00 1,430.00 S 93.00 0.00 2,046.65 0.00 3,569.65 1,523.00
180 VALDIVIA CASTREJON ROSMERY 75052784 10/3/1998 1/3/2022 ASISTENTE ADMINISTRATIVO 2,114.20 2,114.20 N 0.00 0.00 7,019.41 0.00 9,133.61 2,114.20
181 VALDIVIA HUARIPATA ROGER 40995672 7/3/1981 1/1/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 4,177.38 0.00 7,070.38 2,893.00
182 VALENCIA CERNA CESAR 41464434 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 2,721.03 2,721.03 0.00
183 VARGAS HERAS CATALINO 70167843 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 1,843.73 1,843.73 0.00
184 VARGAS SANCHEZ JHONY 72842257 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 1,411.54 1,411.54 0.00
185 VASQUEZ CAMPOS JULIO CESAR 70009055 5/16/1987 12/1/2021 SUPERVISOR MANTENIMIENTO 4,800.00 4,800.00 S 93.00 0.00 6,622.28 0.00 11,515.28 4,893.00
186 VASQUEZ PRINCIPE DONNY 42846648 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 3,199.10 3,199.10 0.00
187 VENTURA VECORENA PERCY LUIS 72842262 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 4,341.55 4,341.55 0.00
188 VIGO BARRIOS KARLA MARÍA 76261432 8/4/1994 1/3/2022 ASISTENTE ADMINISTRATIVO 2,000.00 2,000.00 N 0.00 0.00 2,308.98 0.00 4,308.98 2,000.00
189 VIGO INTOR PETER ESROM 77670192 6/30/1997 1/1/2022 ASISTENTE CONTROL DE CALIDAD 2,500.00 2,500.00 N 0.00 0.00 3,817.95 0.00 6,317.95 2,500.00
190 VILLANUEVA DELGADO NIXON 45463304 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 3,182.29 3,182.29 0.00
191 YOPLA CUEVA JOSE NOLBERTO 41939425 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 2,574.40 2,574.40 0.00
192 YOPLA SOTO JORGE LUIS 72972889 9/15/1994 1/1/2022 3/27/2022 AYUDANTE DE ZARANDA 2,350.00 2,115.00 N 0.00 0.00 3,006.78 0.00 1,135.83 102.23 567.92 567.92 7,495.68 2,682.92
193 ZAMBRANO INFANTE PAULINO 26703611 3/25/1974 1/1/2022 3/31/2022 CONDUCTOR DE BUS 2,800.00 2,800.00 S 93.00 0.00 4,190.94 0.00 1,446.50 130.19 723.25 723.25 10,107.13 3,616.25
194 ZAMORA CORONADO MACSIMILA 70367179 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 1,056.18 1,056.18 0.00
195 ZAMORA OCON FELIX 26684237 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 3,205.96 3,205.96 0.00
196 ZAPATA TORRES MABEL GODOFREDO 41913445 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 4,224.52 4,224.52 0.00
197 ZAVALETA ALVARADO ARTIDORO JULIO 18092214 3/31/2022 3/31/2022 0.00 0.00 N 0.00 0.00 1,698.87 1,698.87 0.00
198 ZELADA FAICHIN CESAR 43863466 8/15/1986 12/1/2022 3/31/2022 SUPERVISOR MANTENIMIENTO 4,800.00 4,800.00 N 0.00 0.00 5,939.50 2,400.00 216.00 1,866.67 1,600.00 16,822.17 6,400.00
468,988.30 456,148.30 0.00 - 7,161.00 733.33 0.00 0.00 788,736.42 0.00 0.00 0.00 0.00 0.00 0.00 28,831.37 0.00 0.00 2,595.10 15,479.68 0.00 15,067.16 1,314,752.35 479,109.79
RÉGIMEN GENERAL RCC
1.50 APORTES RG RC
148,931.49 9,994.09 158,925.58 446,135.82 605,061.41
547,132.46 34,313.73 581,446.19 581,446.19 HABITAT D
696,063.95 44,307.83 740,371.78 1,186,507.60 INTEGRA D
PRIMA D
PROFUTURO D
RZO 2022 REGIMEN GENERAL CONSORCIO CHAQUICOCHA SRL
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 57 58 59 60 61 62 63 64
DESCUENTOS
APORTES DEL EMPLEADOR DEPOSITO EN CUENTA PARA VACACIONES
REMUN. NETA PARA AFP
AL TRABAJADOR
DIAS POR DIAS
DIAS DIAS DIAS
NETO A DIAS ACUERDO POR H.E.
SUBSIDI VACACIO INASISTEN CENTRO DE COSTOS
PRIMA DE PAGAR LAB.
ADOS NES
CON PATERN 35% CIAS
AFP APOR. COMIS. RTA. 5TA. SUB TOTAL TOTAL TRABAJ
SEGURO ONP ESSALUD VIDA LEY IDADA BANCO CUENTA CORRIENTE VACACIONES TOTAL41 AFP PCGE IMPORTE
ONP OBLIG. PORCENT CATEG. TOTAL DESCTO APORTES
AFP
PROFUTURO MIXTA 800.00 139.20 22.40 0.00 2,056.26 3,017.86 3,017.86 13,810.20 720.00 19.32 8,000.00 739.32 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 556.52 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,613.17 0.00 0.00 0.00 0.00 0
PROFUTURO MIXTA 439.30 76.44 12.30 0.00 1,161.29 1,689.33 1,689.33 9,312.32 395.37 10.61 4,393.00 405.98 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 648.83 0.00 0.00 0.00 0.00 0
PRIMA 669.30 116.46 107.09 0.00 851.65 1,744.50 1,744.50 6,847.82 602.37 16.16 6,693.00 618.53 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,143.29 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,311.97 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,300.61 0.00 0.00 0.00 0.00 0
HABITAT MIXTA 429.30 74.70 9.87 0.00 1,116.68 1,630.55 1,630.55 9,070.33 386.37 10.37 4,293.00 396.74 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,242.40 0.00 0.00 0.00 0.00 0
PROFUTURO 251.26 43.72 42.46 0.00 0.00 337.44 337.44 8,119.10 226.13 6.07 2,512.57 232.20 9 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA 328.68 57.19 50.94 0.00 0.00 436.81 436.81 4,099.15 295.81 7.94 3,286.77 303.75 30
PROFUTURO 339.30 59.04 57.34 0.00 492.11 947.79 947.79 7,270.55 305.37 8.19 3,393.00 313.56 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
HABITAT MIXTA 550.00 95.70 12.65 0.00 865.68 1,524.03 1,524.03 7,237.40 495.00 13.28 5,500.00 508.28 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PROFUTURO MIXTA 900.00 156.60 25.20 0.00 2,573.69 3,655.49 3,655.49 17,017.12 810.00 21.73 9,000.00 831.73 30 OFICINA CAJAMARCA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,129.70 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,515.71 0.00 0.00 0.00 0.00 0
PRIMA 350.00 60.90 56.00 0.00 0.00 466.90 466.90 8,731.71 315.00 8.45 3,500.00 323.45 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,272.42 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 269.30 46.86 0.00 0.00 363.66 679.82 679.82 6,059.92 242.37 6.50 2,693.00 248.87 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,995.49 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,633.69 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,044.44 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,068.24 0.00 0.00 0.00 0.00 0
INTEGRA 509.30 88.62 78.94 0.00 348.74 1,025.60 1,025.60 4,067.40 458.37 12.30 5,093.00 470.67 30
HABITAT MIXTA 559.30 97.32 12.86 0.00 1,281.38 1,950.86 1,950.86 9,690.71 503.37 13.51 5,593.00 516.88 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
ONP 0.00 0.00 0.00 305.50 28.11 333.61 333.61 4,827.20 211.50 5.67 2,350.00 217.17 30
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,166.00 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,715.91 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,075.81 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 242.00 42.11 0.00 0.00 577.68 861.79 861.79 8,620.40 217.80 5.84 2,420.00 223.64 30 OFICINA CAJAMARCA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,475.78 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,955.12 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,409.46 0.00 0.00 0.00 0.00 0
INTEGRA 289.30 50.34 44.84 0.00 426.59 811.07 811.07 6,678.87 260.37 6.99 2,893.00 267.36 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,479.53 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,749.32 0.00 0.00 0.00 0.00 0
PROFUTURO 329.30 57.30 55.65 0.00 483.69 925.94 925.94 7,231.94 296.37 7.95 3,293.00 304.32 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA 244.30 42.51 37.87 0.00 326.50 651.18 651.18 5,682.46 219.87 5.90 2,443.00 225.77 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA 289.30 50.34 44.84 0.00 367.54 752.02 752.02 5,982.72 260.37 6.99 2,893.00 267.36 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 728.39 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,778.39 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,180.13 0.00 0.00 0.00 0.00 0
PROFUTURO 809.30 140.82 136.77 0.00 1,620.42 2,707.31 2,707.31 11,119.96 728.37 19.54 8,093.00 747.91 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,487.57 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 953.42 0.00 0.00 0.00 0.00 0
PROFUTURO MIXTA 259.30 45.12 7.26 0.00 377.33 689.01 689.01 6,239.39 233.37 6.26 2,593.00 239.63 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA 259.30 45.12 40.19 0.00 445.46 790.07 790.07 6,989.97 233.37 6.26 2,593.00 239.63 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,644.69 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,537.66 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,103.17 0.00 0.00 0.00 0.00 0
INTEGRA 334.30 58.17 51.82 0.00 0.00 444.29 444.29 7,382.38 300.87 8.07 3,343.02 308.94 30
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,217.58 0.00 0.00 0.00 0.00 0
PROFUTURO 280.00 48.72 47.32 0.00 441.90 817.94 817.94 6,917.27 252.00 6.76 2,800.00 258.76 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,961.53 0.00 0.00 0.00 0.00 0
INTEGRA 339.30 59.04 52.59 0.00 529.77 980.70 980.70 7,744.86 305.37 8.19 3,393.00 313.56 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,115.05 0.00 0.00 0.00 0.00 0
PRIMA MIXTA 259.30 45.12 4.67 0.00 334.37 643.46 643.46 5,706.31 233.37 6.26 2,593.00 239.63 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 215.32 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,189.40 0.00 0.00 0.00 0.00 0
HABITAT MIXTA 359.30 62.52 8.26 0.00 224.19 654.27 654.27 4,178.58 323.37 8.68 3,593.00 332.05 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA 509.30 88.62 78.94 0.00 1,423.75 2,100.61 2,100.61 10,648.32 458.37 12.30 5,093.00 470.67 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PRIMA 784.30 136.47 125.49 0.00 1,994.03 3,040.29 3,040.29 13,308.27 705.87 18.94 7,843.00 724.81 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,913.23 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,643.68 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,029.09 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 299.30 52.08 0.00 0.00 370.68 722.06 722.06 6,051.36 269.37 7.23 2,993.00 276.60 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,057.93 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 509.30 88.62 0.00 0.00 1,122.83 1,720.75 1,720.75 8,954.74 458.37 12.30 5,093.00 470.67 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA MIXTA 259.30 45.12 0.00 0.00 175.81 480.23 480.23 3,929.13 233.37 6.26 2,593.00 239.63 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PRIMA 289.30 50.34 46.29 0.00 402.68 788.61 788.61 6,402.48 260.37 6.99 2,893.00 267.36 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,495.39 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 121.00 21.05 0.00 0.00 0.00 142.05 142.05 1,508.31 108.90 2.92 1,210.00 111.82 30 OFICINA CAJAMARCA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,877.33 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 235.00 40.89 0.00 0.00 132.96 408.85 408.85 3,568.74 211.50 5.67 2,350.00 217.17 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,738.87 0.00 0.00 0.00 0.00 0
INTEGRA 334.30 58.17 51.82 0.00 0.00 444.29 444.29 4,329.79 300.87 8.07 3,343.02 308.94 30
PROFUTURO 259.30 45.12 43.82 0.00 434.52 782.76 782.76 6,860.43 233.37 6.26 2,593.00 239.63 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,330.71 0.00 0.00 0.00 0.00 0
HABITAT MIXTA 180.00 31.32 4.14 0.00 0.00 215.46 215.46 5,227.91 162.00 4.35 1,800.00 166.35 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PRIMA MIXTA 250.00 43.50 4.50 0.00 283.84 581.84 581.84 5,195.30 225.00 6.04 2,500.00 231.04 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA 1,409.30 183.31 218.44 0.00 4,885.10 6,696.15 6,696.15 21,589.84 1,268.37 34.03 14,093.00 1,302.40 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 760.95 0.00 0.00 0.00 0.00 0
INTEGRA 374.00 65.08 57.97 0.00 718.70 1,215.75 1,215.75 9,862.06 336.60 9.03 3,740.00 345.63 30 OFICINA CAJAMARCA
INTEGRA 352.79 61.38 54.68 0.00 0.00 468.85 468.85 8,137.84 317.51 8.52 3,527.85 326.03 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,697.81 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,287.87 0.00 0.00 0.00 0.00 0
PRIMA MIXTA 319.00 55.51 5.74 0.00 696.20 1,076.45 1,076.45 9,729.17 287.10 7.70 3,190.00 294.80 30 OFICINA CAJAMARCA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,192.51 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 375.89 0.00 0.00 0.00 0.00 0
PRIMA MIXTA 259.30 45.12 4.67 0.00 360.64 669.73 669.73 6,049.96 233.37 6.26 2,593.00 239.63 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PRIMA MIXTA 259.30 45.12 4.67 0.00 344.08 653.17 653.17 5,859.60 233.37 6.26 2,593.00 239.63 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PRIMA 509.30 88.62 81.49 0.00 1,013.26 1,692.67 1,692.67 8,420.58 458.37 12.30 5,093.00 470.67 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PROFUTURO MIXTA 244.30 42.51 6.84 0.00 64.02 357.67 357.67 2,757.90 219.87 5.90 2,443.00 225.77 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,303.57 0.00 0.00 0.00 0.00 0
PROFUTURO 439.30 76.44 74.24 0.00 1,164.99 1,754.97 1,754.97 9,273.13 395.37 10.61 4,393.00 405.98 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA MIXTA 309.30 53.82 0.00 0.00 288.73 651.85 651.85 5,419.52 278.37 7.47 3,093.00 285.84 30
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,358.53 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,079.17 0.00 0.00 0.00 0.00 0
PROFUTURO 259.30 45.12 43.82 0.00 388.94 737.18 737.18 6,336.34 233.37 6.26 2,593.00 239.63 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PRIMA MIXTA 58.53 10.18 1.05 0.00 0.00 69.76 69.76 3,350.19 83.70 1.41 585.28 85.11 1 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PROFUTURO 259.30 45.12 43.82 0.00 392.68 740.92 740.92 6,379.33 233.37 6.26 2,593.00 239.63 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PRIMA MIXTA 400.00 69.60 7.20 0.00 500.18 976.98 976.98 8,996.55 360.00 9.66 4,000.00 369.66 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,825.13 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 970.25 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,509.19 0.00 0.00 0.00 0.00 0
INTEGRA 339.30 59.04 52.59 0.00 626.01 1,076.94 1,076.94 8,814.66 305.37 8.19 3,393.00 313.56 30 OFICINA CAJAMARCA
PRIMA 779.30 135.60 124.69 0.00 1,936.42 2,976.01 2,976.01 12,944.42 701.37 18.82 7,793.00 720.19 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,978.12 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 209.30 36.42 0.00 0.00 103.02 348.74 348.74 3,031.96 188.37 5.05 2,093.00 193.42 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PROFUTURO 269.30 46.86 45.51 0.00 487.31 848.98 848.98 7,436.44 242.37 6.50 2,693.00 248.87 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,479.53 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,096.26 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,071.88 0.00 0.00 0.00 0.00 0
PRIMA MIXTA 299.30 52.08 5.39 0.00 381.06 737.83 737.83 6,461.59 269.37 7.23 2,993.00 276.60 30
PROFUTURO MIXTA 632.63 110.08 17.71 0.00 1,357.86 2,118.28 2,118.28 11,343.85 569.37 15.28 6,326.33 584.65 30 4
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,280.14 0.00 0.00 0.00 0.00 0
PRIMA MIXTA 299.30 52.08 5.39 0.00 552.07 908.84 908.84 8,221.51 269.37 7.23 2,993.00 276.60 30 OFICINA CAJAMARCA
PRIMA 1,593.30 183.31 254.93 0.00 5,742.99 7,774.53 7,774.53 24,760.26 1,433.97 38.47 15,933.00 1,472.44 30 OFICINA CAJAMARCA
INTEGRA 329.70 57.37 51.10 0.00 703.22 1,141.39 1,141.39 9,803.41 296.73 7.96 3,297.00 304.69 30 OFICINA CAJAMARCA
PROFUTURO MIXTA 244.30 42.51 6.84 0.00 379.11 672.76 672.76 6,305.96 219.87 5.90 2,443.00 225.77 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PROFUTURO 249.30 0.00 42.13 0.00 513.21 804.64 804.64 7,868.52 224.37 6.02 2,493.00 230.39 30 OFICINA CAJAMARCA
HABITAT MIXTA 220.00 38.28 5.06 0.00 327.16 590.50 590.50 5,699.01 198.00 5.31 2,200.00 203.31 30 OFICINA CAJAMARCA
INTEGRA MIXTA 237.50 41.33 0.00 0.00 377.33 656.16 656.16 8,818.76 213.75 5.73 2,375.00 219.48 15 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA MIXTA 116.67 20.30 0.00 0.00 39.42 176.39 176.39 990.28 105.00 2.82 1,166.67 107.82 14 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PRIMA 1,977.30 183.31 316.37 0.00 9,631.80 12,108.78 12,108.78 27,240.66 1,779.57 47.75 19,773.00 1,827.32 30 OFICINA CAJAMARCA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,035.65 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,500.91 0.00 0.00 0.00 0.00 0
INTEGRA 299.30 52.08 46.39 0.00 293.96 691.73 691.73 5,481.40 269.37 7.23 2,993.00 276.60 30
PROFUTURO 710.00 123.54 119.99 0.00 1,942.18 2,895.71 2,895.71 13,301.87 639.00 17.14 7,100.00 656.14 30 OFICINA CAJAMARCA
PRIMA 328.68 57.19 52.59 0.00 0.00 438.46 438.46 4,100.50 295.81 7.94 3,286.77 303.75 30
INTEGRA 583.33 101.50 90.42 0.00 0.00 775.25 775.25 7,708.08 525.00 14.09 5,833.33 539.09 30
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,750.65 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 170.00 29.58 0.00 0.00 0.00 199.58 199.58 2,745.48 153.00 4.10 1,700.00 157.10 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PRIMA 1,009.30 175.62 161.49 0.00 3,272.70 4,619.11 4,619.11 17,511.34 908.37 24.37 10,093.00 932.74 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,124.81 0.00 0.00 0.00 0.00 0
PRIMA MIXTA 330.00 57.42 5.94 0.00 543.64 937.00 937.00 7,953.27 297.00 7.97 3,300.00 304.97 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA 1,409.30 183.31 218.44 0.00 4,307.20 6,118.25 6,118.25 19,278.27 1,268.37 34.03 14,093.00 1,302.40 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 960.32 0.00 0.00 0.00 0.00 0
HABITAT MIXTA 1,746.11 183.31 40.16 0.00 5,838.96 7,808.54 7,808.54 39,777.06 1,571.50 42.16 17,461.11 1,613.66 30 OFICINA CAJAMARCA
PRIMA MIXTA 346.36 60.27 6.23 0.00 0.00 412.86 412.86 7,968.30 311.72 8.36 3,463.56 320.08 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA 494.07 85.97 76.58 0.00 1,430.65 2,087.27 2,087.27 10,856.58 444.66 11.93 4,940.70 456.59 30 OFICINA CAJAMARCA
INTEGRA 509.30 88.62 78.94 0.00 1,416.00 2,092.86 2,092.86 10,600.71 458.37 12.30 5,093.00 470.67 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,025.00 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 966.04 0.00 0.00 0.00 0.00 0
PRIMA MIXTA 311.80 54.25 5.61 0.00 91.06 462.72 462.72 2,782.55 280.62 7.53 3,118.00 288.15 30 OFICINA CAJAMARCA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,451.61 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 800.00 139.20 0.00 0.00 791.30 1,730.50 1,730.50 6,269.50 720.00 19.32 8,000.00 739.32 30
INTEGRA 226.77 39.46 35.15 0.00 572.54 873.92 873.92 8,550.48 204.09 5.48 2,267.70 209.57 30 OFICINA CAJAMARCA
PRIMA 505.81 88.01 80.93 0.00 0.00 674.75 674.75 13,486.02 455.23 12.21 5,058.10 467.44 23 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,145.06 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,637.32 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 360.00 62.64 0.00 0.00 619.94 1,042.58 1,042.58 8,911.16 324.00 8.69 3,600.00 332.69 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA MIXTA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,846.20 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,016.95 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 275.00 47.85 0.00 0.00 621.73 944.58 944.58 9,009.54 247.50 6.64 2,750.00 254.14 30 OFICINA CAJAMARCA
PRIMA MIXTA 209.30 36.42 3.77 0.00 303.46 552.95 552.95 5,333.25 188.37 5.05 2,093.00 193.42 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PRIMA 1,409.30 183.31 225.49 0.00 4,063.36 5,881.46 5,881.46 18,295.82 1,268.37 34.03 14,093.00 1,302.40 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PROFUTURO 323.05 56.21 54.60 0.00 0.00 433.86 433.86 3,869.95 290.75 7.80 3,230.52 298.55 30
PROFUTURO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,904.82 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 305.38 53.14 0.00 0.00 0.00 358.52 358.52 7,868.02 274.84 7.37 3,053.75 282.21 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA 709.30 123.42 109.94 0.00 857.51 1,800.17 1,800.17 6,541.09 638.37 17.13 7,093.00 655.50 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,820.21 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,294.37 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 657.87 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,478.56 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,030.51 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,325.41 0.00 0.00 0.00 0.00 0
PRIMA 709.30 123.42 113.49 0.00 1,725.57 2,671.78 2,671.78 11,869.94 638.37 17.13 7,093.00 655.50 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PROFUTURO 425.97 74.12 71.99 0.00 239.90 811.98 811.98 3,447.69 383.37 10.29 4,259.67 393.66 25
INTEGRA MIXTA 158.57 27.59 0.00 0.00 0.00 186.16 186.16 5,788.08 142.71 3.83 1,585.70 146.54 30 OFICINA CAJAMARCA
INTEGRA 289.30 50.34 44.84 0.00 249.42 633.90 633.90 4,705.94 260.37 6.99 2,893.00 267.36 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
INTEGRA 729.30 126.90 113.04 0.00 2,114.58 3,083.82 3,083.82 14,156.65 656.37 17.61 7,293.00 673.98 30 OFICINA CAJAMARCA
INTEGRA 361.30 62.87 56.00 0.00 778.90 1,259.07 1,259.07 10,503.31 325.17 8.72 3,613.00 333.89 30 OFICINA CAJAMARCA
PROFUTURO 509.30 88.62 86.07 0.00 310.42 994.41 994.41 4,098.59 458.37 12.30 5,093.00 470.67 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PROFUTURO MIXTA 290.00 50.46 8.12 0.00 526.29 874.87 874.87 7,948.48 261.00 7.00 2,900.00 268.00 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 119.37 0.00 0.00 0.00 0.00 0
PRIMA MIXTA 152.30 26.50 2.74 0.00 0.00 181.54 181.54 3,388.11 137.07 3.68 1,523.00 140.75 30 OFICINA CAJAMARCA
PRIMA MIXTA 211.42 36.79 3.81 0.00 350.97 602.99 602.99 8,530.62 190.28 5.11 2,114.20 195.39 30 OFICINA CAJAMARCA
INTEGRA 289.30 50.34 44.84 0.00 394.33 778.81 778.81 6,291.57 260.37 6.99 2,893.00 267.36 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,721.03 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,843.73 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,411.54 0.00 0.00 0.00 0.00 0
INTEGRA MIXTA 489.30 85.14 0.00 0.00 1,245.95 1,820.39 1,820.39 9,694.89 440.37 11.82 4,893.00 452.19 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,199.10 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,341.55 0.00 0.00 0.00 0.00 0
PRIMA MIXTA 200.00 34.80 3.60 0.00 0.00 238.40 238.40 4,070.58 180.00 4.83 2,000.00 184.83 30 OFICINA CAJAMARCA
INTEGRA MIXTA 250.00 43.50 0.00 0.00 327.11 620.61 620.61 5,697.34 225.00 6.04 2,500.00 231.04 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,182.29 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,574.40 0.00 0.00 0.00 0.00 0
PRIMA 268.29 46.68 42.93 0.00 0.00 357.90 357.90 7,137.78 241.46 6.48 2,682.92 247.94 27 BECHTEL - Estabilizacion de Terreno Campamento Km 52
PROFUTURO 361.63 62.92 61.11 0.00 0.00 485.66 485.66 9,621.47 325.46 8.73 3,616.25 334.19 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,056.18 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 64.12 64.12 64.12 3,141.84 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,224.52 0.00 0.00 0.00 0.00 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,698.87 0.00 0.00 0.00 0.00 0
HABITAT MIXTA 640.00 111.36 14.72 0.00 0.00 766.08 766.08 16,056.09 576.00 15.45 6,400.00 591.45 30 BECHTEL - Estabilizacion de Terreno Campamento Km 52
- 47,676.00 7,691.45 4,987.46 305.50 92,905.05 153,565.46 153,565.46 1,161,186.89 43,150.91 1,156.92 479,109.79 44,307.83 3,144 0 0 4 0 0 0 0 0 0 0 0 0 0 0
3,163
(43,150.91) 8,872.20 -52,023.11
60,354.91 -60,354.91
PAGOS
28,929.78
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PLANILLA TOTAL CONSORCIO CHAQUICOCHA SRL MES DE ENERO 2022
1 2 3 4
Apellido Apellido
Cod. DNI
Paterno Materno
6211094
6213090
6213090
6213090
6213091
6213091
6313094
6214090
6214090
6214091
6214090
6214091
6214094
6215090
6215091
6215090
6215094
6220090
6220090
6220091
6220094
6230090
6230090
6230091
6230094
6271090
6271091
6271090
6271091
6271090
6271094
6272090
6272091
6272090
6272091
6272090
6272094
6291090
6291091
6291090
6291091
6291094
62941090
62941191
62941090
62941191
62941090
62941191
62941494
1422
40173
4031
4032
4035
4036
41711
41712
41713
41714
4111
CLASIFICACIÓN DE
OBRA
COSTO
CI
CI
CI
CD
CD
CI
CI
CI
CD
CD
CD
CI
CI
CI
CD
CI
CD
CD
CI
CI
CI
CD
CD
CI
CI
CI
CD
CI
CI
CD
CI
CD
CI
CI
CD
CI
CI
CI
CI
CI
CD
CI
CI
CI
CD
CD
CI
CI
CI
CD
CI
CI
CI
CI
CI
CD
CI
CI
CI
CI
CI
CD
CI
CI
CI
CI
CI
CI
CI
CD
CD
CI
CI
CI
CI
CI
CD
CI
CD
CI
CI
CI
CD
CI
CI
CI
CI
CI
CD
CI
CI
CI
CI
CI
CD
CI
CI
CD
CI
CI
CI
CD
CI
CI
CI
CD
CD
CI
INDEMNIZACIÓN AL PERSONAL INDIRECTO
CUENTAS POR COBRAR
SUELDOS Y SALARIOS - PROD - DIRECTO - Remuneraciones - CargasBMPS
SUELDOS Y SALARIOS - PROD - INDIRECTO - Remuneraciones - Car BMPS
SUELDOS Y SALARIOS - PROD - DIRECTO - Remuneraciones - CargasPADCAR1421
SUELDOS Y SALARIOS - PROD - INDIRECTO - Remuneraciones - Car PADCAR1421
SUELDOS Y SALARIOS - PROD - DIRECTO - Remuneraciones - Carga TOPREH21
SUELDOS Y SALARIOS - PROD - INDIRECTO - Remuneraciones - Car TOPREH21
SUELDOS Y SALARIOS - PROD - DIRECTO - Remuneraciones - Carga CAM52BEC21
SUELDOS Y SALARIOS - PROD - INDIRECTO - Remuneraciones - Car CAM52BEC21
SUELDOS Y SALARIOS - ADM - Remuneraciones - Cargas de Personal,
ADM
REM EN ESPECIE - PROD - DIRECTO - Remuneraciones - Cargas dePAD
REM EN ESPECIE - PROD - DIRECTO - Remuneraciones - Cargas deREH
REM EN ESPECIE - PROD - DIRECTO - Remuneraciones - Cargas deBMPS
REM EN ESPECIE - PROD - INDIRECTO - Remuneraciones - Cargas PAD
d
REM EN ESPECIE - PROD - INDIRECTO - Remuneraciones - Cargas TOPREH21
d
REM EN ESPECIE - PROD - INDIRECTO - Remuneraciones - Cargas BMPS
d
REM EN ESPECIE - ADM - Remuneraciones - Cargas de Personal, Di
ADM
GRATIFICACIONES - PROD - DIRECTO - Remuneraciones - CargasBMPS
d
GRATIFICACIONES - PROD - INDIRECTO - Remuneraciones - CargasBMPS
GRATIFICACIONES - PROD - DIRECTO - Remuneraciones - CargasCAM52BEC21
d
GRATIFICACIONES - PROD - INDIRECTO - Remuneraciones - CargasCAM52BEC21
GRATIFICACIONES - PROD - DIRECTO - Remuneraciones - CargasPADCAR1421
d
GRATIFICACIONES - PROD INDIRECTAS - Remuneraciones - Cargas PADCAR1421
GRATIFICACIONES - PROD - DIRECTO - Remuneraciones - CargasTOPREH21
d
GRATIFICACIONES - PROD INDIRECTAS - Remuneraciones - Cargas TOPREH21
GRATIFICACIONES - ADM - Remuneraciones - Cargas de Personal,ADM
Direc
VACACIONES - PROD - Remuneraciones - Cargas de Personal, Directore
BMPS
VACACIONES - PROD INDIRECTOS - Remuneraciones - Cargas de BMPS Pers
VACACIONES - PROD - Remuneraciones - Cargas de Personal, Directore
CAM52BEC21
VACACIONES - PROD INDIRECTOS - Remuneraciones - Cargas de CAM52BEC21
Pers
VACACIONES - PROD - Remuneraciones - Cargas de Personal, Directore
PADCAR1421
VACACIONES - PROD INDIRECTOS - Remuneraciones - Cargas de PADCAR1421
Pers
VACACIONES - PROD - Remuneraciones - Cargas de Personal, Directore
TOPREH21
VACACIONES - PROD INDIRECTOS - Remuneraciones - Cargas de TOPREH21
Pers
VACACIONES - ADM - Remuneraciones - Cargas de Personal, Directores
ADM
OTRAS REMUNERACIONES - PROD - Cargas de Personal, Directores BMPS
y Gerent
OTRAS REMUNE INDIRECTAS - Cargas de Personal, Directores y Gerentes
BMPS
OTRAS REMUNERACIONES - PROD - Cargas de Personal, Directores CAM52BEC21
y Gerent
OTRAS REMUNE INDIRECTAS - Cargas de Personal, Directores y Gerentes
CAM52BEC21
OTRAS REMUNERACIONES - PROD - Cargas de Personal, Directores PADCAR1421
y Gerent
OTRAS REMUNE INDIRECTAS - Cargas de Personal, Directores y Gerentes
PADCAR1421
OTRAS REMUNERACIONES - PROD - Cargas de Personal, Directores TOPREH21
y Gerent
OTRAS REMUNE INDIRECTAS - Cargas de Personal, Directores y Gerentes
TOPREH21
OTRAS REMUNERACIONES - ADM - Cargas de Personal, DirectoresADM y Gerente
INDEMNIZACIONES AL PERSONAL - PROD - Cargas de Personal, Directore
BMPS
INDEMNIZACIONES AL PERSONAL - PROD - INDIRECTOS - Cargas de BMPS
Pe
INDEMNIZACIONES AL PERSONAL - PROD - Cargas de Personal, Directore
CAM52BEC21
INDEMNIZACIONES AL PERSONAL - PROD - INDIRECTOS - Cargas de CAM52BEC21
Pe
INDEMNIZACIONES AL PERSONAL - PROD - Cargas de Personal, Directore
PADCAR1421
INDEMNIZACIONES AL PERSONAL - PROD - INDIRECTOS - Cargas de PADCAR1421
Pe
INDEMNIZACIONES AL PERSONAL - PROD - Cargas de Personal, Directore
TOPREH21
INDEMNIZACIONES AL PERSONAL - PROD - INDIRECTOS - Cargas de TOPREH21
Pe
INDEMNIZACIONES AL PERSONAL - ADM - Cargas de Personal, Directores
ADM
REGIMEN DE PRESTACIONES DE SALUD - PROD - DIRECTO - Seguridad BMPSy P
REGIMEN DE PRESTACIONES DE SALUD - PROD - INDIRECTO - SeguridadBMPS
REGIMEN DE PRESTACIONES DE SALUD - PROD - DIRECTO - Seguridad CAM52BEC21
yP
REGIMEN DE PRESTACIONES DE SALUD - PROD - INDIRECTO - SeguridadCAM52BEC21
REGIMEN DE PRESTACIONES DE SALUD - PROD - DIRECTO - Seguridad PADCAR1421
yP
REGIMEN DE PRESTACIONES DE SALUD - PROD - INDIRECTO - SeguridadPADCAR1421
REGIMEN DE PRESTACIONES DE SALUD - PROD - DIRECTO - Seguridad TOPREH21
yP
REGIMEN DE PRESTACIONES DE SALUD - PROD - INDIRECTO - SeguridadTOPREH21
REGIMEN DE PRESTACIONES DE SALUD - ADM - Seguridad y Previsión ADM Social
REGIMEN DE PENSIONES - PROD - Seguridad y Previsión Social BMPS
REGIMEN DE PENSIONES - PROD - INDIRECTO - Seguridad y PrevisiónBMPSSocial
REGIMEN DE PENSIONES - PROD - Seguridad y Previsión Social CAM52BEC21
REGIMEN DE PENSIONES - PROD - INDIRECTO - Seguridad y PrevisiónCAM52BEC21
Social
REGIMEN DE PENSIONES - PROD - Seguridad y Previsión Social PADCAR1421
REGIMEN DE PENSIONES - PROD - INDIRECTO - Seguridad y PrevisiónPADCAR1421
Social
REGIMEN DE PENSIONES - PROD - Seguridad y Previsión Social TOPREH21
REGIMEN DE PENSIONES - PROD - INDIRECTO - Seguridad y PrevisiónTOPREH21
Social
REGIMEN DE PENSIONES - ADM - Seguridad y Previsión Social ADM
CTS - PROD - DIRECTO - Beneficios Social de los Trabajadores BMPS
CTS - PROD - INDIRECTO - Beneficios Social de los Trabajadores BMPS
CTS - PROD - DIRECTO - Beneficios Social de los Trabajadores CAM52BEC21
CTS - PROD - INDIRECTO - Beneficios Social de los Trabajadores CAM52BEC21
CTS - PROD - DIRECTO - Beneficios Social de los Trabajadores PADCAR1421
CTS - PROD - INDIRECTO - Beneficios Social de los Trabajadores PADCAR1421
CTS - PROD - DIRECTO - Beneficios Social de los Trabajadores TOPREH21
CTS - PROD - INDIRECTO - Beneficios Social de los Trabajadores TOPREH21
CTS - ADM - Beneficios Social de los Trabajadores ADM
PARTICIPACION DE LOS TRABAJADORES - PROD - DIRECTO - UTILIDADESBMPS
PARTICIPACION DE LOS TRABAJADORES - PROD - INDIRECTO - UTILIDADES
BMPS
PARTICIPACION DE LOS TRABAJADORES - PROD - DIRECTO - UTILIDADESCAM52BEC21
PARTICIPACION DE LOS TRABAJADORES - PROD - INDIRECTO - UTILIDADES
CAM52BEC21
PARTICIPACION DE LOS TRABAJADORES - PROD - DIRECTO - UTILIDADESPADCAR1421
PARTICIPACION DE LOS TRABAJADORES - PROD - INDIRECTO - UTILIDADES
PADCAR1421
PARTICIPACION DE LOS TRABAJADORES - PROD - DIRECTO - UTILIDADESTOPREH21
PARTICIPACION DE LOS TRABAJADORES - PROD - INDIRECTO - UTILIDADES
TOPREH21
PARTICIPACION DE LOS TRABAJADORES - ADM - UTILIDADES ADM
ADELANTO DE REMUNERACIONES - Personal - Cuentas por Cobrar
RTA. DE 5TA CAT
ESSALUD
ONP - SNP
ESSALUD +VIDA
CONAFOVISER
PROFUTURO AFP
AFP INTEGRA
PRIMA AFP
AFP HABITAD
SUELDOS Y SALARIOS POR PAGAR
8 9 0
-
-
53,282.61
11,793.72
-
-
-
-
-
-
27,550.90
6,546.86
-
-
-
-
-
-
84,937.11
1,061.44
-
-
-
-
-
-
38,548.04
33,282.16
-
-
-
-
-
-
3,108.04
-
-
-
-
-
-
-
31,357.13
6,959.36
-
-
-
-
-
-
104,534.58
448,241.78
-
-
-
-
97,787.14
71,830.20
1,198.61
615.00
4,440.34
105,783.07
1,520,347.92
1,560,329.35 1,802,002.29
1,803,556.98
241,672.94
11 12 13 14
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD ONP
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Habitat
CAM52BEC21 CD Prima
CAM52BEC21 CD Integra
CAM52BEC21 CD Habitat
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Profuturo
CAM52BEC21 CD ONP
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Habitat
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Prima
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Prima
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Prima
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Habitat
CAM52BEC21 CD Integra
CAM52BEC21 CD Habitat
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Integra
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Prima
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD ONP
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Profuturo
CAM52BEC21 CD Integra
CAM52BEC21 CD Integra
CAM52BEC21 CD Prima
CAM52BEC21 CI PROFUTURO MIXTA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI PROFUTURO MIXTA
CAM52BEC21
CAM52BEC21 CI PRIMA
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI HABITAT MIXTA
CAM52BEC21
CAM52BEC21 CD PROFUTURO
CAM52BEC21 CD INTEGRA
CAM52BEC21 CI PROFUTURO
CAM52BEC21 CI HABITAT MIXTA
CAM52BEC21 CI PROFUTURO MIXTA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CD PRIMA
CAM52BEC21
CAM52BEC21 CD INTEGRA MIXTA
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CD INTEGRA
CAM52BEC21 CI HABITAT MIXTA
CAM52BEC21 CI ONP
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CD INTEGRA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI PROFUTURO
CAM52BEC21 CD INTEGRA
CAM52BEC21 CD INTEGRA
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI PROFUTURO
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI PROFUTURO MIXTA
CAM52BEC21 CI INTEGRA
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CD INTEGRA
CAM52BEC21
CAM52BEC21 CD PROFUTURO
CAM52BEC21
CAM52BEC21 CI INTEGRA
CAM52BEC21
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI HABITAT MIXTA
CAM52BEC21 CD INTEGRA
CAM52BEC21 CI PRIMA
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21
CAM52BEC21 CD INTEGRA MIXTA
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21 CD PRIMA
CAM52BEC21
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21
CAM52BEC21 CD INTEGRA
CAM52BEC21 CI PROFUTURO
CAM52BEC21
CAM52BEC21 CI HABITAT MIXTA
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21 CI INTEGRA
CAM52BEC21
CAM52BEC21 CI INTEGRA
CAM52BEC21 CD INTEGRA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21 CD PRIMA
CAM52BEC21 CD PROFUTURO MIXTA
CAM52BEC21
CAM52BEC21 CI PROFUTURO
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI PROFUTURO
CAM52BEC21 CD PRIMA MIXTA
CAM52BEC21 CI PROFUTURO
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI INTEGRA
CAM52BEC21 CI PRIMA
CAM52BEC21
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21 CD PROFUTURO
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21 CI PROFUTURO MIXTA
CAM52BEC21
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21 CI PRIMA
CAM52BEC21 CI INTEGRA
CAM52BEC21 CD PROFUTURO MIXTA
CAM52BEC21 CI PROFUTURO
CAM52BEC21 CI HABITAT MIXTA
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21 CI PRIMA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI INTEGRA
CAM52BEC21 CI PROFUTURO
CAM52BEC21 CD PRIMA
CAM52BEC21 CD INTEGRA
CAM52BEC21
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21 CI PRIMA
CAM52BEC21
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21 CI INTEGRA
CAM52BEC21
CAM52BEC21 CI HABITAT MIXTA
CAM52BEC21 CD PRIMA MIXTA
CAM52BEC21 CI INTEGRA
CAM52BEC21 CD INTEGRA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21 CI INTEGRA
CAM52BEC21 CD PRIMA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21 CI PRIMA
CAM52BEC21 CD PROFUTURO
CAM52BEC21 PROFUTURO
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21 CI INTEGRA
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI PRIMA
CAM52BEC21 CI PROFUTURO
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21 CD INTEGRA
CAM52BEC21 CI INTEGRA
CAM52BEC21 CI INTEGRA
CAM52BEC21 CD PROFUTURO
CAM52BEC21 CI PROFUTURO MIXTA
CAM52BEC21
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21 CD INTEGRA
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI PRIMA MIXTA
CAM52BEC21 CI INTEGRA MIXTA
CAM52BEC21
CAM52BEC21
CAM52BEC21 CD PRIMA
CAM52BEC21 CD PROFUTURO
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21
CAM52BEC21 CI HABITAT MIXTA
105,783.07
15 16 17 18 19 20
Com.Mixta/Saldo 638381WAPÑS1
Comision/Flujo 619511RAHYM3
Com.Mixta/Saldo 675590EBTTI2
Com.Mixta/Saldo 567621JBCOQ5
Comision/Flujo 590641RCHDM5
Com.Mixta/Saldo 608761ECJDC4
Comision/Flujo 577631GCLDN1
Com.Mixta/Saldo 341301ACVAD9
Comision/Flujo 625401MCCTT4
Comision/Flujo 568681OCFTR0
Comision/Flujo 603951ACCTT7
Com.Mixta/Saldo 656931RCHTR0
Comision/Flujo 625591RCTTA4
Com.Mixta/Saldo 596101GCVTL0
Comision/Flujo 611901JCVCL9
Comision/Flujo 589701JCVLI0
Comision/Flujo 630371GCCVL7
Com.Mixta/Saldo 646971JCCVG2
Comision/Flujo 566961SCCVG2
Com.Mixta/Saldo 615691JCCVZ2
Com.Mixta/Saldo 621881CCTVI8
Com.Mixta/Saldo 346581JCYVL5
Comision/Flujo 268921VCCCQ9
Comision/Flujo 612321RCCLL3
Com.Mixta/Saldo 633581RCCLV7
Com.Mixta/Saldo 596991CCFLR5
Com.Mixta/Saldo 618990FCOLN0
Comision/Flujo 609001DCPLP8
Comision/Flujo 572240CCSLI3
Comision/Flujo 585291ECTLI0
Comision/Flujo 593671GCVLG1
Comision/Flujo 325441ECZLB9
Com.Mixta/Saldo 565451MCMNT0
Comision/Flujo 629961ECCQU0
Com.Mixta/Saldo 634951HCGQZ3
Comision/Flujo 592541GCIQI8
Comision/Flujo 632851DCPQP0
Com.Mixta/Saldo 668321CCBQD0
Comision/Flujo 613421RCBQD1
Com.Mixta/Saldo 630491GCHQM8
Com.Mixta/Saldo 666441ECCOV0
Comision/Flujo 577641RCMOC0
Comision/Flujo 604231JCLTV2
Com.Mixta/Saldo 619171FCMTA6
Com.Mixta/Saldo 619791RCCZU3
Comision/Flujo 559781MCLZN2
Com.Mixta/Saldo 616851HCLVM2
Comision/Flujo 619121NCCZL0
Com.Mixta/Saldo 609981AFCRV1
Comision/Flujo 635191EGVCL3
Com.Mixta/Saldo 566821AHBAD2
Comision/Flujo 608711SHHAM4
Comision/Flujo 613851NHTRA5
Com.Mixta/Saldo 587421CHVOO6
Com.Mixta/Saldo 616521WHJIB0
Comision/Flujo 544331JHCMT5
Com.Mixta/Saldo 660881AHCMO6
Comision/Flujo 589501JHHMM9
Comision/Flujo 582271PHTMC8
Comision/Flujo 603671CHVMG1
Com.Mixta/Saldo 661541SHVYD0
Comision/Flujo 591621GIIAA5
Comision/Flujo 603101JIAIY7
Comision/Flujo 629161SIAIY6
Com.Mixta/Saldo 655291FJTBI9
Com.Mixta/Saldo 633731EJSCA4
Com.Mixta/Saldo 644811WJHOM8
Com.Mixta/Saldo 595681JLFMR6
Comision/Flujo 586641CLCND0
Comision/Flujo 641141ELCNL7
Com.Mixta/Saldo 621031JLCND5
Com.Mixta/Saldo 607771JLJNR2
Com.Mixta/Saldo 650160CLLNN0
Comision/Flujo 584981GLLNN0
Comision/Flujo 612511SLVND4
Com.Mixta/Saldo 613471CLVNG7
Comision/Flujo 575791AMCCV9
Comision/Flujo 609731CMCCO6
Com.Mixta/Saldo 340081IMCDD5
Comision/Flujo 623451GMMDC0
Com.Mixta/Saldo 338871EMCOG9
Com.Mixta/Saldo 600001DMMOD6
Comision/Flujo 593981JMSOC1
Com.Mixta/Saldo 630691FMCQT6
Com.Mixta/Saldo 601461EMVGL0
Com.Mixta/Saldo 615100AOCNL0
Comision/Flujo 564891AOCNL4
Com.Mixta/Saldo 613310MOCNL3
Comision/Flujo 573341MOCNL3
Com.Mixta/Saldo 671370NOMNA0
Comision/Flujo 523801JPCEG0
Comision/Flujo 596451DPCPL0
Com.Mixta/Saldo 347301JQRSO6
Com.Mixta/Saldo 296081ERHIM6
Com.Mixta/Saldo 573161VRTOT7
Comision/Flujo 570561TRLRN0
Com.Mixta/Saldo 606101MRMRD1
Comision/Flujo 555551JRMAT0
Comision/Flujo 609461WRSAO1
Com.Mixta/Saldo 586841SSAMÑ0
Com.Mixta/Saldo 607661RTCIA7
Comision/Flujo 614251GTCIL1
Com.Mixta/Saldo 621911CTSIC3
Com.Mixta/Saldo 329551ETSIC3
Com.Mixta/Saldo 635331NTHLC4
Com.Mixta/Saldo 610560HTLRN8
Com.Mixta/Saldo 605181LVCDL7
Comision/Flujo 582041JVCDZ4
Com.Mixta/Saldo 674641RVHIM9
Com.Mixta/Saldo 563051SVLGN5
Comision/Flujo 617571NVCQL3
Comision/Flujo 581991EVSCG4
Com.Mixta/Saldo 644331RVCLV9
Com.Mixta/Saldo 627251EVJLR5
Comision/Flujo 617581FZHBR1
Com.Mixta/Saldo 636520MZCOO9
Comision/Flujo 531551MZOON0
Comision/Flujo 585031SZOON0
Com.Mixta/Saldo 670640JZSOA4
Comision/Flujo 591431NZVAE3
com.Mixta/Saldo 610560HTLRN8
21 22 23 24 25
N° Hr Hr Reintegro
Jornal Básico
Hijos 60% 100% EsSalud + Vida
1,636.60 5
1,677.69 5
1,138.20 5
2,080.40 5
1,470.00 5
1,470.00 5
1,470.00 5
1,470.00 5
758.63 5
2,080.40 5
2,080.40 5
426.83 5
1,636.60 5
2,080.40 5
2,080.40 5
792.00 5
1,319.80 5
1,470.00 5
1,470.00 5
1,470.00 5
201.35 5
1,470.00 5
426.83 5
2,080.40 5
2,080.40 5
1,003.00 5
2,080.40 5
1,470.00 5
1,543.21 5
134.48 5
2,013.53 5
2,080.40 5
1,543.21 5
1,470.00 5
1,470.00 5
2,080.40 5
2,080.40 5
2,080.40 5
2,080.40 5
1,470.00 5
2,080.40 5
1,470.00 5
1,470.00 5
1,374.98 5
1,879.05 5
2,080.40 5
1,470.00 5
1,043.18 5
1,636.60 5
2,080.40 5
1,470.00 5
1,470.00 5
1,470.00 5
426.83 5
2,080.40 5
2,080.40 5
426.83 5
711.38 5
900.90 5
1,470.00 5
1,470.00 5
2,080.40 5
1,470.00 5
2,080.40 5
2,080.40 5
2,080.40 5
1,470.00 5
2,080.40 5
426.83 5
900.90 5
1,043.18 5
1,470.00 5
2,080.40 5
1,470.00 5
1,470.00 5
2,080.40 5
900.90 5
1,470.00 5
2,080.40 5
2,080.40 5
711.38 5
2,080.40 5
1,636.60 5
2,080.40 5
2,080.40 5
900.90 5
1,470.00 5
1,470.00 5
2,080.40 5
1,470.00 5
1,470.00 5
711.38 5
900.90 5
2,080.40 5
1,470.00 5
2,080.40 5
900.90 5
2,080.40 5
1,470.00 5
2,080.40 5
2,080.40 5
1,470.00 5
1,610.82 5
1,744.56 5
1,043.18 5
1,043.18 5
1,470.00 5
1,138.20 5
2,080.40 5
1,470.00 5
1,470.00 5
1,043.18 5
2,080.40 5
2,013.53 5
2,080.40 5
1,274.99 5
2,080.40 5
1,470.00 5
1,470.00 5
1,470.00 5
1,470.00 5
1,470.00 5
2,080.40 5
142.28
8,000.00
-
-
4,300.00
-
6,600.00
-
-
-
4,200.00
-
1,500.00
2,800.00
3,300.00
5,500.00
9,000.00
-
-
2,800.00
-
2,600.00
-
-
-
-
5,000.00
5,500.00
2,350.00
-
-
-
2,420.00
-
-
-
2,800.00
-
-
3,200.00
2,350.00
2,800.00
-
-
-
8,000.00
-
-
2,500.00
2,500.00
-
-
-
2,800.00
-
2,800.00
-
3,300.00
-
2,500.00
-
-
3,500.00
5,000.00
7,750.00
-
-
-
2,900.00
-
5,000.00
2,500.00
2,800.00
-
1,210.00
-
2,350.00
-
2,800.00
2,500.00
-
1,800.00
2,500.00
14,000.00
-
3,740.00
2,800.00
-
-
3,190.00
-
-
2,500.00
2,500.00
5,000.00
2,350.00
-
4,300.00
3,000.00
-
-
2,500.00
78.33
2,500.00
2,500.00
-
-
-
3,300.00
7,700.00
-
2,000.00
2,600.00
-
-
-
2,900.00
5,500.00
-
2,900.00
15,840.00
3,204.00
2,350.00
2,400.00
2,200.00
1,500.00
1,166.67
19,680.00
-
-
2,900.00
7,100.00
2,800.00
5,000.00
1,700.00
10,000.00
-
3,300.00
14,000.00
-
14,000.00
2,800.00
4,847.70
5,000.00
-
-
3,025.00
-
8,000.00
2,174.70
3,833.33
-
-
3,600.00
-
-
2,750.00
2,000.00
14,000.00
2,800.00
-
2,350.00
7,000.00
-
-
-
-
-
-
7,000.00
4,166.67
1,492.70
2,800.00
7,200.00
3,520.00
5,000.00
2,900.00
-
1,430.00
2,114.20
2,800.00
-
-
-
4,800.00
-
-
2,000.00
2,500.00
-
-
2,115.00
2,800.00
-
-
-
-
4,800.00
644,954.20 615.00
PLANILLA CONTABILIDAD
Operario Maq. Pesada CD
Operario moviento t. CD
PAD Oficial CD
Peón CD
Ayudante CD
Capataz CD
GG CI
PADCAR1421 CD - -
PADCAR1421 CI - -
TOPREH21 CD
TOPREH21 CI
BMP'S CD
BMP'S CI
CAM52BEC21 CD 287,082.56 615.00
CAM52BEC21 CI 357,871.64 -
644,954.20 615.00
- -
BMP'S CD - -
BMP'S CI - -
CAM52BEC21 CD 287,082.56 615.00
CAM52BEC21 CI 357,871.64 -
PADCAR1421 CD - -
PADCAR1421 CI - -
TOPREH21 CD
TOPREH21 CI
644,954.20 615.00
- -
PLANILLLA COSTOS
PAD
APORTES
Capataz - -
Ayudantes - -
Oficial -
Peón -
Operario moviento t. -
Operario Maq. Pesada -
GG - -
BECHTEL APORTES
Capataz 41,077.33 4,062.75
Ayudantes 58,210.33 5,931.34
Oficial 21,694.27
Peón 179,318.61
Operario moviento t. 16,612.81
Operario Maq. Pesada 228,510.13
GG 363,254.97 34,175.11
26 27 28 29
Concepto por
BUC Movilidad Acumulada Dominical Acuerdo con
Trabajadores
490.98 24.00 272.72
536.86 24.00 279.54
341.46 24.00 189.70
665.73 24.00 346.64
441.00 32.00 245.00
441.00 24.00 245.00
441.00 32.00 245.00
441.00 24.00 245.00
227.59 8.00 126.44
665.73 40.00 346.64
665.73 24.00 346.64
128.05 8.00 71.14
490.98 32.00 272.72
665.73 16.00 346.64
665.73 24.00 346.64
237.60 16.00 131.98
395.94 8.00 219.93
441.00 32.00 245.00
441.00 24.00 245.00
441.00 24.00 245.00
64.43 - 33.55
441.00 24.00 245.00
128.05 8.00 71.14
665.73 24.00 346.64
665.73 40.00 346.64
300.90 24.00 167.14
665.73 16.00 346.64
441.00 24.00 245.00
493.83 16.00 257.13
43.03 - 22.41
644.33 16.00 335.50
665.73 24.00 346.64
493.83 16.00 257.13
441.00 24.00 245.00
441.00 32.00 245.00
665.73 32.00 346.64
665.73 32.00 346.64
665.73 32.00 346.64
665.73 24.00 346.64
441.00 24.00 245.00
665.73 24.00 346.64
441.00 24.00 245.00
441.00 24.00 245.00
412.49 24.00 229.16
601.30 24.00 313.09
665.73 24.00 346.64
441.00 24.00 245.00
312.95 24.00 173.86
490.98 32.00 272.72
665.73 32.00 346.64
441.00 24.00 245.00
441.00 24.00 245.00
441.00 24.00 245.00
128.05 8.00 71.14
665.73 16.00 346.64
665.73 32.00 346.64
128.05 8.00 71.14
213.41 16.00 118.56
270.27 24.00 150.15
441.00 24.00 245.00
441.00 24.00 245.00
665.73 16.00 346.64
441.00 24.00 245.00
665.73 16.00 346.64
665.73 32.00 346.64
665.73 24.00 346.64
441.00 24.00 245.00
665.73 24.00 346.64
128.05 8.00 71.14
270.27 24.00 150.15
312.95 24.00 173.86
441.00 24.00 245.00
665.73 24.00 346.64
441.00 24.00 245.00
441.00 32.00 245.00
665.73 24.00 346.64
270.27 24.00 150.15
441.00 24.00 245.00
665.73 32.00 346.64
665.73 24.00 346.64
213.41 16.00 118.56
665.73 16.00 346.64
490.98 24.00 272.72
665.73 32.00 346.64
665.73 24.00 346.64
270.27 24.00 150.15
441.00 24.00 245.00
441.00 24.00 245.00
665.73 16.00 346.64
441.00 24.00 245.00
441.00 24.00 245.00
213.41 16.00 118.56
270.27 24.00 150.15
665.73 24.00 346.64
441.00 24.00 245.00
665.73 24.00 346.64
270.27 24.00 150.15
665.73 24.00 346.64
441.00 24.00 245.00
665.73 32.00 346.64
665.73 32.00 346.64
441.00 32.00 245.00
515.46 8.00 268.40
558.26 24.00 290.68
312.95 24.00 173.86
312.95 24.00 173.86
441.00 32.00 245.00
341.46 32.00 189.70
665.73 32.00 346.64
441.00 32.00 245.00
441.00 32.00 245.00
312.95 24.00 173.86
665.73 24.00 346.64
644.33 24.00 335.50
665.73 24.00 346.64
408.00 24.00 212.44
665.73 16.00 346.64
441.00 32.00 245.00
441.00 24.00 245.00
441.00 32.00 245.00
441.00 24.00 245.00
441.00 24.00 245.00
665.73 40.00 346.64
42.68 23.71
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
733.33
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
59,110.48 2,904.00 31,712.83 733.33
30,086.71 1,160.00 15,665.90 -
2,211.88 72.00 1,151.71 -
2,898.36 160.00 1,609.93 -
23,913.53 1,512.00 13,285.29 -
- - - -
- - - -
- - - 733.33
- - - -
- - - -
- - - -
- - - -
59,110.48 2,904.00 31,712.83 -
- - - 733.33
- - - -
- - - -
- - - -
RESUMEN GENERAL
1.5 PADCAR1421
- S/ - PADCAR1421
- S/ - CAM52BEC21
S/ - CAM52BEC21
S/ -
S/ -
S/ -
S/ -
- S/ -
1.5
61,616.00 S/ 65,678.75
87,315.50 S/ 93,246.84
S/ 21,694.27
S/ 179,318.61
S/ 16,612.81
S/ 228,510.13
S/ 605,061.41
544,882.46 S/ 579,057.57
30 31 32
INDEMNIZACIÓN INDEMNIZACIÓN O
Bonif. Por Altitud 3000 Escolaridad x hijo TRABAJO EN DÍA
BAE POR VACACIONES RESOLUCIÓN DE
msnm (4.01) FERIADO CONTRATO
NO GOZADAS
- 70.00 136.38
134.22 56.45 279.62
- 54.20 -
208.04 70.00 173.37
- 70.00 367.50
- 70.00 122.50
- 70.00 245.00
- 70.00 122.50
- 36.13 126.44
208.04 70.00 173.37
208.04 70.00 520.10
- 20.33 -
- 70.00 136.38
208.04 70.00 346.73
208.04 70.00 346.73
- 33.88 198.00
- 56.45 109.98
- 70.00 122.50
- 70.00 122.50
- 70.00 122.50
20.14 6.78 16.78
- 70.00 122.50
- 20.33 35.57
208.04 70.00 346.73
208.04 70.00 346.73
- 42.90 83.58
208.04 70.00 693.47
- 70.00 122.50
123.46 51.93 385.80
13.45 4.53 11.21
201.35 67.75 503.38
208.04 70.00 346.73
154.32 51.93 128.60
- 70.00 -
- 70.00 -
208.04 70.00 173.37
208.04 70.00 173.37
208.04 70.00 173.37
166.43 70.00 173.37
- 70.00 -
208.04 70.00 -
- 70.00 -
- 70.00 -
- 65.48 229.16
187.90 63.22 469.76
208.04 70.00 173.37
- 70.00 122.50
- 49.68 86.93
- 70.00 136.38
208.04 70.00 -
- 70.00 122.50
- 70.00 245.00
- 70.00 122.50
- 20.33 106.71
208.04 70.00 520.10
208.04 70.00 520.10
- 20.33 71.14
- 33.88 -
- 42.90 -
- 70.00 245.00
- 70.00 245.00
208.04 70.00 346.73
- 70.00 -
208.04 70.00 346.73
208.04 70.00 346.73
208.04 70.00 693.47
- 70.00 -
208.04 70.00 520.10
- 20.33 35.57
- 42.90 225.23
- 49.68 173.86
- 70.00 -
208.04 70.00 346.73
- 70.00 367.50
- 70.00 122.50
208.04 70.00 346.73
- 42.90 75.08
- 70.00 367.50
208.04 70.00 346.73
208.04 70.00 346.73
- 33.88 59.28
208.04 70.00 520.10
- 70.00 136.38
208.04 70.00 520.10
208.04 70.00 346.73
- 42.90 75.08
- 70.00 122.50
- 70.00 367.50
208.04 70.00 346.73
- 70.00 122.50
- 70.00 122.50
- 33.88 -
- 42.90 75.08
208.04 70.00 520.10
- 70.00 122.50
208.04 70.00 346.73
- 42.90 75.08
208.04 70.00 346.73
- 70.00 245.00
208.04 70.00 -
208.04 70.00 520.10
- 70.00 245.00
128.87 54.20 268.47
174.46 58.70 145.38
- 49.68 86.93
- 49.68 173.86
- 70.00 122.50
- 54.20 94.85
208.04 70.00 520.10
- 70.00 122.50
- 70.00 -
- 49.68 -
208.04 70.00 173.37
201.35 67.75 167.79
166.43 70.00 173.37
127.50 42.90 -
208.04 70.00 346.73
- 70.00 -
- 70.00 -
- 70.00 245.00
- 70.00 122.50
- 70.00 -
208.04 70.00 520.10
11.86
-
-
-
93.00
-
93.00
-
-
-
93.00
-
93.00
93.00
93.00
-
-
93.00
93.00
93.00
-
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
-
-
93.00
-
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
-
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
93.00
-
-
-
93.00
-
-
93.00
-
93.00
-
-
93.00
-
-
93.00
-
-
93.00
93.00
93.00
-
-
93.00
-
-
93.00
93.00
-
-
-
-
-
-
93.00
93.00
93.00
-
93.00
93.00
-
-
-
-
-
-
93.00
93.00
93.00
93.00
93.00
93.00
93.00
-
-
93.00
-
93.00
-
-
-
93.00
-
-
-
-
-
-
-
93.00
-
-
-
-
-
9,913.43 7,598.43 31,725.26 - -
9,360.46 3,163.56 15,312.21 - - -
552.97 232.58 1,107.26 - - -
- 413.22 937.08 - - -
- 3,789.06 7,207.71 - - -
- - 1,767.00 - - -
- - 744.00 - - -
- - 4,650.00 - - -
- - - - -
- - - - -
- - - - -
- - - - -
9,913.43 7,598.43 27,075.26 - -
- - 4,650.00 - -
- - - - -
- - - - -
- - - - -
EN GENERAL
CD-03 S/ - $ -
GG-01 S/ - $ -
CD-03 S/ 605,061.41 $ 162,301.88
GG-01 S/ 579,057.57 $ 155,326.60
S/ 1,184,118.98 $ 317,628.48
33 34 35 36
6,048.57
2,810.81
3,166.00
3,715.91
3,075.81
7,062.19
2,475.78
1,955.12
1,409.46
4,596.94
1,479.53
1,749.32
4,864.88
3,890.64
3,841.74
728.39
1,778.39
3,180.13
5,734.27
1,487.57
953.42
4,335.40
5,187.04
1,644.69
2,537.66
3,103.17
450.02 3,052.59 450.02 900.04
2,217.58
4,935.21
1,961.53
5,332.56
4,115.05
3,756.77
215.32
2,189.40
1,239.85
7,655.93
8,505.56
3,913.23
5,643.68
2,029.09
3,780.42
7,057.93
5,582.49
1,816.36
4,298.09
3,495.39
440.36
2,877.33
1,627.59
2,738.87
450.02 450.02 900.04
5,050.19
2,330.71
3,643.37
3,277.14
14,192.99
760.95
7,337.81
634.85 3,060.00 634.86 1,269.71
2,697.81
2,287.87
7,615.62
2,192.51
375.89
4,126.69
3,919.77
5,020.25
672.57
2,303.57
6,635.10
2,978.37
3,358.53
3,079.17
4,480.52
413.95 1,518.29 413.96 827.91
4,527.25
5,973.53
3,825.13
970.25
4,509.19
6,498.60
8,127.43
3,978.12
1,287.70
5,592.42
1,479.53
1,096.26
3,071.88
4,206.42
7,135.80
3,280.14
6,137.35
16,601.79
7,647.80
4,535.72
6,180.16
4,089.51
875.00 4,716.59 1,020.83 1,250.00
19,576.44
1,035.65
4,500.91
3,180.13
9,097.58
393.77 - 393.77 787.54
833.33 - 833.33 1,666.67
2,750.65
1,245.06
12,037.45
3,124.81
5,590.27
11,303.52
960.32
3,461.11 19,118.16 3,461.11 6,922.22
570.56 3,103.20 570.57 1,141.13
8,003.15
7,600.57
8,025.00
966.04
127.27
9,451.61
-
7,156.70
1,131.77 5,503.61 1,131.77 2,263.57
2,145.06
2,637.32
6,353.74
3,846.20
4,016.95
7,204.12
3,793.20
10,084.28
337.52 - 337.51 675.03
3,904.82
610.75 3,230.60 610.75 1,221.50
1,248.26
2,820.21
3,294.37
657.87
4,478.56
1,030.51
1,325.41
7,448.72
4,388.54
2,446.84
9,947.47
8,149.38
5,923.35
119.37
2,046.65
7,019.41
4,177.38
2,721.03
1,843.73
1,411.54
6,622.28
3,199.10
4,341.55
2,308.98
3,817.95
3,182.29
2,574.40
567.92 3,006.78 567.92 1,135.83
723.25 4,190.94 723.25 1,446.50
1,056.18
3,205.96
4,224.52
1,698.87
1,600.00 5,939.50 1,866.67 2,400.00
15,067.16 19,030.60 794,449.71 38,316.49 36,244.96 28,831.36
- 9,402.08 2,821.89 11,282.57 17,905.70 -
- 691.21 207.46 829.46 1,316.38 -
- 966.12 289.26 1,159.34 1,839.68 -
- 7,971.19 2,394.69 9,565.44 15,183.20 -
5,635.63 - 64,438.70 5,635.65 - 11,268.27
2,884.67 - 34,382.59 2,884.67 - 5,769.38
6,546.86 - 448,241.78 6,959.36 - 11,793.72
- - - - - -
- - - - - -
- - - - - -
- - - - - -
8,520.30 19,030.60 104,534.58 31,357.13 36,244.96 17,037.65
6,546.86 - 448,241.78 6,959.36 - 11,793.72
- - - - - -
- - - - - -
- - - - - -
37 38 39 40
28.05 3,384.42
28.76 3,761.09
19.51 2,273.52
35.66 4,525.17
25.20 3,303.34
25.20 3,050.34
25.20 3,180.84
25.20 3,050.34
13.01 1,635.47
35.66 4,541.17
35.66 4,871.90
7.32 854.72
28.05 3,392.42
35.66 4,690.53
35.66 4,698.53
13.57 1,776.79
22.62 2,718.92
25.20 3,058.34
25.20 3,050.34
25.20 3,050.34
3.45 440.17
25.20 3,050.34
7.32 890.29
35.66 4,698.53
35.66 4,714.53
17.19 2,085.39
35.66 5,037.27
25.20 3,050.34
26.45 3,582.54
2.30 295.65
34.51 4,708.22
35.66 4,698.53
26.45 3,356.20
25.20 2,927.84
25.20 2,935.84
35.66 4,533.17
35.66 4,533.17
35.66 4,533.17
35.66 4,483.56
25.20 2,927.84
35.66 4,351.80
25.20 2,927.84
25.20 2,927.84
23.57 2,969.62
32.21 4,403.19
35.66 4,525.17
25.20 3,050.34
17.88 2,173.07
28.05 3,392.42
35.66 4,359.80
25.20 3,050.34
25.20 3,172.84
25.20 3,050.34
7.32 961.43
35.66 4,863.90
35.66 4,879.90
7.32 925.86
12.20 1,423.84
15.44 1,805.57
25.20 3,172.84
25.20 3,172.84
35.66 4,690.53
25.20 2,927.84
35.66 4,690.53
35.66 4,706.53
35.66 5,045.27
25.20 2,927.84
35.66 4,871.90
7.32 890.29
15.44 2,030.80
17.88 2,260.00
25.20 2,927.84
35.66 4,698.53
25.20 3,295.34
25.20 3,058.34
35.66 4,698.53
15.44 1,880.65
25.20 3,295.34
35.66 4,706.53
35.66 4,698.53
12.20 1,483.12
35.66 4,863.90
28.05 3,384.42
35.66 4,879.90
35.66 4,698.53
15.44 1,880.65
25.20 3,050.34
25.20 3,295.34
35.66 4,690.53
25.20 3,050.34
25.20 3,050.34
12.20 1,423.84
15.44 1,880.65
35.66 4,871.90
25.20 3,050.34
35.66 4,698.53
15.44 1,880.65
35.66 4,698.53
25.20 3,172.84
35.66 4,359.80
35.66 4,879.90
25.20 3,180.84
27.61 3,596.32
29.90 3,799.35
17.88 2,173.07
17.88 2,260.00
25.20 3,058.34
19.51 2,376.37
35.66 4,879.90
25.20 3,058.34
25.20 2,935.84
17.88 2,086.14
35.66 4,525.17
34.51 4,380.64
35.66 4,483.56
21.85 2,678.26
35.66 4,690.53
25.20 2,935.84
25.20 2,927.84
25.20 3,180.84
25.20 3,050.34
25.20 2,927.84
35.66 4,887.90
2.44 281.37
16,828.06
556.52
9,613.17
11,001.65
648.83
8,592.32
5,143.29
2,311.97
2,300.61
10,700.88
3,242.40
165.52 8,456.54
70.88 4,535.96
8,218.34
8,761.43
20,672.61
3,129.70
2,515.71
126.00 9,198.61
2,272.42
6,739.74
1,995.49
2,633.69
3,044.44
1,068.24
5,093.00
11,641.57
5,160.81
3,166.00
3,715.91
3,075.81
9,482.19
2,475.78
1,955.12
1,409.46
7,489.94
1,479.53
1,749.32
8,157.88
6,333.64
6,734.74
728.39
1,778.39
3,180.13
13,827.27
1,487.57
953.42
6,928.40
7,780.04
1,644.69
2,537.66
3,103.17
81.00 7,826.67
2,217.58
7,735.21
1,961.53
8,725.56
4,115.05
6,349.77
215.32
2,189.40
4,832.85
12,748.93
16,348.56
3,913.23
5,643.68
2,029.09
6,773.42
7,057.93
10,675.49
4,409.36
7,191.09
3,495.39
1,650.36
2,877.33
3,977.59
2,738.87
81.00 4,774.08
7,643.19
2,330.71
5,443.37
5,777.14
28,285.99
760.95
11,077.81
114.27 8,606.69
2,697.81
2,287.87
10,805.62
2,192.51
375.89
6,719.69
6,512.77
10,113.25
3,115.57
2,303.57
11,028.10
6,071.37
3,358.53
3,079.17
7,073.52
74.51 3,419.95
7,120.25
8,473.53
3,825.13
970.25
4,509.19
9,891.60
15,920.43
3,978.12
3,380.70
8,285.42
1,479.53
1,096.26
3,071.88
7,199.42
13,462.13
3,280.14
9,130.35
32,534.79
10,944.80
6,978.72
8,673.16
6,289.51
112.50 9,474.92
1,166.67
39,349.44
1,035.65
4,500.91
6,173.13
16,197.58
70.88 4,538.96
150.00 8,483.33
2,750.65
2,945.06
22,130.45
3,124.81
8,890.27
25,396.52
960.32
623.00 47,585.60
102.70 8,381.16
12,943.85
12,693.57
8,025.00
966.04
3,245.27
9,451.61
8,000.00
9,424.40
203.73 14,160.77
2,145.06
2,637.32
9,953.74
3,846.20
4,016.95
9,954.12
5,886.20
24,177.28
60.75 4,303.81
3,904.82
109.94 8,226.54
8,341.26
2,820.21
3,294.37
657.87
4,478.56
1,030.51
1,325.41
14,541.72
4,259.67
5,974.24
5,339.84
17,240.47
11,762.38
5,093.00
8,823.35
119.37
3,569.65
9,133.61
7,070.38
2,721.03
1,843.73
1,411.54
11,515.28
3,199.10
4,341.55
4,308.98
6,317.95
3,182.29
2,574.40
102.23 7,495.68
130.19 10,107.13
1,056.18
3,205.96
4,224.52
1,698.87
216.00 16,822.17
- - 5,857.21 - - 1,727,064.45
- - 1,611.58 - - 212,033.38
- - 118.48 - - 15,423.51
- - 165.58 - - 20,134.78
- - 1,366.48 - - 166,220.43
- - 1,014.41 - - 146,202.99
- - 519.25 - - 87,517.88
- - 1,061.44 - - 837,858.13
- - - - -
- - - - -
- 4,795.78 - - 647,532.97
- 1,061.44 - - 837,858.13
- 5,857.22 - - 1,485,391.10
0 - - - 241,673.35
- - - - -
- - - - -
- 4,795.78 - - 647,532.97
- 1,061.44 - - 837,858.13
- - - - -
- - - - -
- 5,857.22 - - 1,485,391.10
- - - - -
41 42 43 44 45 46
Aport.
Total Comision Com.Mixt Prima
O.N.P.13% Obligatorio
Afecto /Flujo /Saldo Afp
Afp
2,633.96 - - 0.00 45.83 263.40
2,852.53 - 48.21 - 49.63 285.25
1,837.38 - - 0.00 31.97 183.74
3,578.85 - - 6.44 62.27 357.89
2,373.00 - 36.78 - 41.29 237.30
2,373.00 - - 6.64 41.29 237.30
2,373.00 - 36.78 - 41.29 237.30
2,373.00 - - 4.27 41.29 237.30
1,224.65 - 19.59 - 21.31 122.47
3,578.85 - 55.47 - 62.27 357.89
3,578.85 - 57.26 - 62.27 357.89
689.03 - - 1.24 11.99 68.90
2,633.96 - 44.51 - 45.83 263.40
3,578.85 - - 0.00 62.27 357.89
3,578.85 - 60.48 - 62.27 357.89
1,274.66 - 19.76 - 22.18 127.47
2,124.10 276.13 - - - -
2,373.00 - 40.10 - 41.29 237.30
2,373.00 - - 0.00 41.29 237.30
2,373.00 - 40.10 - 41.29 237.30
346.39 - - 0.97 6.03 34.64
2,373.00 - - 6.64 41.29 237.30
689.03 - - 1.58 11.99 68.90
3,578.85 - 57.26 - 62.27 357.89
3,578.85 - 55.47 - 62.27 357.89
1,614.24 - - 3.71 28.09 161.42
3,578.85 - - 0.00 62.27 357.89
2,373.00 - - 4.27 41.29 237.30
2,623.88 - 44.34 - 45.66 262.39
231.35 - 3.59 - 4.03 23.14
3,463.81 - 53.69 - 60.27 346.38
3,578.85 - 60.48 - 62.27 357.89
2,654.74 - 44.87 - 46.19 265.47
2,373.00 308.49 - - - -
2,373.00 - - 6.64 41.29 237.30
3,578.85 - 55.47 - 62.27 357.89
3,578.85 - - 8.23 62.27 357.89
3,578.85 - 55.47 - 62.27 357.89
3,537.24 - 59.78 - 61.55 353.72
2,373.00 - - 0.00 41.29 237.30
3,578.85 - 55.47 - 62.27 357.89
2,373.00 - - 6.64 41.29 237.30
2,373.00 - - 0.00 41.29 237.30
2,219.61 - 34.40 - 38.62 221.96
3,232.48 - 54.63 - 56.25 323.25
3,578.85 - - 0.00 62.27 357.89
2,373.00 - - 0.00 41.29 237.30
1,683.99 - 26.94 - 29.30 168.40
2,633.96 - - 0.00 45.83 263.40
3,578.85 - 55.47 - 62.27 357.89
2,373.00 - - 6.64 41.29 237.30
2,373.00 - 36.78 - 41.29 237.30
2,373.00 - - 0.00 41.29 237.30
689.03 - 11.64 - 11.99 68.90
3,578.85 - 57.26 - 62.27 357.89
3,578.85 - - 0.00 62.27 357.89
689.03 - - 1.24 11.99 68.90
1,148.37 - 19.41 - 19.98 114.84
1,454.31 - - 0.00 25.30 145.43
2,373.00 - 40.10 - 41.29 237.30
2,373.00 - 36.78 - 41.29 237.30
3,578.85 - 60.48 - 62.27 357.89
2,373.00 - - 4.27 41.29 237.30
3,578.85 - 60.48 - 62.27 357.89
3,578.85 - 57.26 - 62.27 357.89
3,578.85 - 57.26 - 62.27 357.89
2,373.00 - - 4.27 41.29 237.30
3,578.85 - - 6.44 62.27 357.89
689.03 - - 1.24 11.99 68.90
1,454.31 - - 0.00 25.30 145.43
1,683.99 - 28.46 - 29.30 168.40
2,373.00 - 36.78 - 41.29 237.30
3,578.85 - - 10.02 62.27 357.89
2,373.00 - - 4.27 41.29 237.30
2,373.00 - - 0.00 41.29 237.30
3,578.85 - 55.47 - 62.27 357.89
1,454.31 - 22.54 - 25.30 145.43
2,373.00 - - 0.00 41.29 237.30
3,578.85 - 55.47 - 62.27 357.89
3,578.85 - 60.48 - 62.27 357.89
1,148.37 - - 2.64 19.98 114.84
3,578.85 - 55.47 - 62.27 357.89
2,633.96 - - 6.06 45.83 263.40
3,578.85 - - 10.02 62.27 357.89
3,578.85 - 55.47 - 62.27 357.89
1,454.31 - - 4.07 25.30 145.43
2,373.00 - - 0.00 41.29 237.30
2,373.00 - - 4.27 41.29 237.30
3,578.85 - 57.26 - 62.27 357.89
2,373.00 - - 4.27 41.29 237.30
2,373.00 - 40.10 - 41.29 237.30
1,148.37 - - 0.00 19.98 114.84
1,454.31 - 22.54 - 25.30 145.43
3,578.85 - 55.47 - 62.27 357.89
2,373.00 - - 4.27 41.29 237.30
3,578.85 - - 6.44 62.27 357.89
1,454.31 - - 0.00 25.30 145.43
3,578.85 - 57.26 - 62.27 357.89
2,373.00 - - 4.27 41.29 237.30
3,578.85 - 55.47 - 62.27 357.89
3,578.85 - 60.48 - 62.27 357.89
2,373.00 - - 0.00 41.29 237.30
2,738.83 - - 4.93 47.66 273.88
3,001.12 - 50.72 - 52.22 300.11
1,683.99 - - 3.03 29.30 168.40
1,683.99 - - 3.03 29.30 168.40
2,373.00 - - 4.27 41.29 237.30
1,837.38 - - 3.31 31.97 183.74
3,578.85 - - 10.02 62.27 357.89
2,373.00 - 36.78 - 41.29 237.30
2,373.00 - - 0.00 41.29 237.30
1,683.99 - - 0.00 29.30 168.40
3,578.85 - 55.47 - 62.27 357.89
3,463.81 - 55.42 - 60.27 346.38
3,537.24 - - 9.90 61.55 353.72
2,193.33 - - 0.00 38.16 219.33
3,578.85 - 55.47 - 62.27 357.89
2,373.00 - - 0.00 41.29 237.30
2,373.00 308.49 - - - -
2,373.00 - 40.10 - 41.29 237.30
2,373.00 - 40.10 - 41.29 237.30
2,373.00 - - 0.00 41.29 237.30
3,578.85 - 55.47 - 62.27 357.89
222.90 3.88 22.29
8,000.00 - 22.40 139.20 800.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
4,393.00 - 12.30 76.44 439.30
- - 0.00 0.00 0.00
6,693.00 - 107.09 116.46 669.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
4,293.00 - 9.87 74.70 429.30
- - 0.00 0.00 0.00
2,512.57 - 42.46 43.72 251.26
3,286.77 - 50.94 57.19 328.68
3,393.00 - 57.34 59.04 339.30
5,500.00 - 12.65 95.70 550.00
9,000.00 - 25.20 156.60 900.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
3,500.00 - 56.00 60.90 350.00
- - 0.00 0.00 0.00
2,693.00 - 0.00 46.86 269.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
5,093.00 - 78.94 88.62 509.30
5,593.00 - 12.86 97.32 559.30
2,350.00 305.50 - - -
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
2,420.00 - 0.00 42.11 242.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
2,893.00 - 44.84 50.34 289.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
3,293.00 - 55.65 57.30 329.30
2,443.00 - 37.87 42.51 244.30
2,893.00 - 44.84 50.34 289.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
8,093.00 - 136.77 140.82 809.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
2,593.00 - 7.26 45.12 259.30
2,593.00 - 40.19 45.12 259.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
3,343.02 - 51.82 58.17 334.30
- - 0.00 0.00 0.00
2,800.00 - 47.32 48.72 280.00
- - 0.00 0.00 0.00
3,393.00 - 52.59 59.04 339.30
- - 0.00 0.00 0.00
2,593.00 - 4.67 45.12 259.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
3,593.00 - 8.26 62.52 359.30
5,093.00 - 78.94 88.62 509.30
7,843.00 - 125.49 136.47 784.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
2,993.00 - 0.00 52.08 299.30
- - 0.00 0.00 0.00
5,093.00 - 0.00 88.62 509.30
2,593.00 - 0.00 45.12 259.30
2,893.00 - 46.29 50.34 289.30
- - 0.00 0.00 0.00
1,210.00 - 0.00 21.05 121.00
- - 0.00 0.00 0.00
2,350.00 - 0.00 40.89 235.00
- - 0.00 0.00 0.00
3,343.02 - 51.82 58.17 334.30
2,593.00 - 43.82 45.12 259.30
- - 0.00 0.00 0.00
1,800.00 - 4.14 31.32 180.00
2,500.00 - 4.50 43.50 250.00
14,093.00 - 218.44 183.31 1,409.30
- - 0.00 0.00 0.00
3,740.00 - 57.97 65.08 374.00
3,527.85 - 54.68 61.38 352.79
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
3,190.00 - 5.74 55.51 319.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
2,593.00 - 4.67 45.12 259.30
2,593.00 - 4.67 45.12 259.30
5,093.00 - 81.49 88.62 509.30
2,443.00 - 6.84 42.51 244.30
- - 0.00 0.00 0.00
4,393.00 - 74.24 76.44 439.30
3,093.00 - 0.00 53.82 309.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
2,593.00 - 43.82 45.12 259.30
585.28 - 1.05 10.18 58.53
2,593.00 - 43.82 45.12 259.30
2,500.00 - 4.50 43.50 250.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
3,393.00 - 52.59 59.04 339.30
7,793.00 - 124.69 135.60 779.30
- - 0.00 0.00 0.00
2,093.00 - 0.00 36.42 209.30
2,693.00 - 45.51 46.86 269.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
2,993.00 - 5.39 52.08 299.30
6,326.33 - 17.71 110.08 632.63
- - 0.00 0.00 0.00
2,993.00 - 5.39 52.08 299.30
15,933.00 - 254.93 183.31 1,593.30
3,297.00 - 51.10 57.37 329.70
2,443.00 - 6.84 42.51 244.30
2,493.00 - 42.13 - 249.30
2,200.00 - 5.06 38.28 220.00
2,375.00 - 0.00 41.33 237.50
1,166.67 - 0.00 20.30 116.67
19,773.00 - 316.37 183.31 1,977.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
2,993.00 - 46.39 52.08 299.30
7,100.00 - 119.99 123.54 710.00
3,286.77 - 52.59 57.19 328.68
5,833.33 - 90.42 101.50 583.33
- - 0.00 0.00 0.00
1,700.00 - 0.00 29.58 170.00
10,093.00 - 161.49 175.62 1,009.30
- - 0.00 0.00 0.00
3,300.00 - 5.94 57.42 330.00
14,093.00 - 218.44 183.31 1,409.30
- - 0.00 0.00 0.00
17,461.11 - 40.16 183.31 1,746.11
3,463.56 - 6.23 60.27 346.36
4,940.70 - 76.58 85.97 494.07
5,093.00 - 78.94 88.62 509.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
3,118.00 - 5.61 54.25 311.80
- - 0.00 0.00 0.00
8,000.00 - 0.00 139.20 800.00
2,267.70 - 35.15 39.46 226.77
5,058.10 - 80.93 88.01 505.81
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
3,600.00 - 0.00 62.64 360.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
2,750.00 - 0.00 47.85 275.00
2,093.00 - 3.77 36.42 209.30
14,093.00 - 225.49 183.31 1,409.30
3,230.52 - 54.60 56.21 323.05
- - 0.00 0.00 0.00
3,053.75 - 0.00 53.14 305.38
7,093.00 - 109.94 123.42 709.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
7,093.00 - 113.49 123.42 709.30
4,259.67 - 71.99 74.12 425.97
1,585.70 - 0.00 27.59 158.57
2,893.00 - 44.84 50.34 289.30
7,293.00 - 113.04 126.90 729.30
3,613.00 - 56.00 62.87 361.30
5,093.00 - 86.07 88.62 509.30
2,900.00 - 8.12 50.46 290.00
- - 0.00 0.00 0.00
1,523.00 - 2.74 26.50 152.30
2,114.20 - 3.81 36.79 211.42
2,893.00 - 44.84 50.34 289.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
4,893.00 - 0.00 85.14 489.30
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
2,000.00 - 3.60 34.80 200.00
2,500.00 - 0.00 43.50 250.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
2,682.92 - 42.93 46.68 268.29
3,616.25 - 61.11 62.92 361.63
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
- - 0.00 0.00 0.00
6,400.00 - 14.72 111.36 640.00
795,281.52 1,198.61 2,722.17 5,165.27 13,073.19 78,606.36
161,699.42 - 1,858.72 68.49 2,813.50 16,170.13
11,752.48 - 152.33 4.93 204.50 1,175.24
15,548.84 276.13 64.27 9.77 233.59 1,342.49
128,670.99 616.98 646.85 97.32 2,156.25 12,392.50
63,845.96 - - 853.81 1,110.93 6,384.61
43,962.00 - - 618.19 764.95 4,396.20
369,801.83 305.50 - 3,512.76 5,789.47 36,745.19
- - - - - -
- - - - - -
- - - - - -
- - - - - -
425,479.69 893.11 2,722.17 1,652.52 7,283.72 41,861.17
369,801.83 305.50 - 3,512.76 5,789.47 36,745.19
- - - - - -
- - - - - -
- - - - - -
47 48 49 50 51 52
- - - - - -
- - - - - -
- - - - - -
- - - - - -
3,108.04 4,440.34 14,420.15 615.00 - -
- - 83,302.87 - - -
- - - - - -
- - - - - -
- - - - - -
53 54 55 56 57
- - - - -
- - - - -
- - - - -
- - - - -
76,996.62 570,536.35 38,548.04 3,108.04 317,671.67
129,655.79 708,202.34 33,282.16 - -
- - - - -
- - - - -
- - - - -
58
6.62 270.02
7.17 292.43
183.73
357.89
237.30
237.30
237.30
237.30
122.47
357.89
357.89
90.59
263.40
357.89
357.89
3.20 130.67
5.34 196.51
237.30
237.30
237.30
87.16
237.30
90.59
357.89
357.89
4.06 165.48
357.89
237.30
262.39
86.01
346.38
357.89
265.48
213.57
237.30
357.89
357.89
357.89
353.72
237.30
357.89
237.30
237.30
221.96
8.12 331.36
357.89
237.30
4.23 172.63
263.40
357.89
237.30
237.30
237.30
90.59
357.89
357.89
90.59
2.89 117.72
3.65 149.08
237.30
237.30
357.89
237.30
357.89
357.89
357.89
237.30
357.89
90.59
3.65 149.08
4.23 172.63
5.96 243.26
8.99 366.88
5.96 243.26
5.96 243.26
8.76 366.65
3.65 149.08
5.96 243.26
8.99 366.88
8.99 366.88
2.89 117.72
8.99 366.88
6.62 270.02
8.99 366.88
8.99 366.88
3.65 149.08
5.96 243.26
5.96 243.26
8.99 366.88
5.96 243.26
5.96 243.26
2.89 117.72
3.65 149.08
8.99 366.88
5.96 243.26
8.99 366.88
3.65 149.08
8.99 366.88
5.96 243.26
8.99 366.88
8.99 366.88
5.96 243.26
6.88 280.76
7.54 307.65
4.23 172.63
4.23 172.63
5.96 243.26
4.62 188.35
8.99 366.88
5.96 243.26
5.96 243.26
4.23 172.63
8.99 366.88
8.70 355.08
8.89 362.61
5.51 224.84
8.99 366.88
5.96 243.26
5.96 219.53
5.96 243.26
5.96 243.26
5.96 243.26
8.99 366.88
0.56 22.85
19.32 739.32
- -
- -
10.61 405.98
- -
16.16 618.53
- -
- -
- -
10.37 396.74
- -
6.07 232.20
7.94 303.75
8.19 313.56
13.28 508.28
21.73 831.73
- -
- -
8.45 323.45
- -
6.50 248.87
- -
- -
- -
- -
12.30 470.67
13.51 516.88
5.67 217.17
- -
- -
- -
5.84 223.64
- -
- -
- -
6.99 267.36
- -
- -
7.95 304.32
5.90 225.77
6.99 267.36
- -
- -
- -
19.54 747.91
- -
- -
6.26 239.63
6.26 239.63
- -
- -
- -
8.07 308.94
- -
6.76 258.76
- -
8.19 313.56
- -
6.26 239.63
- -
- -
8.68 332.05
12.30 470.67
18.94 724.81
- -
- -
- -
7.23 276.60
- -
12.30 470.67
6.26 239.63
6.99 267.36
- -
2.92 111.82
- -
5.67 217.17
- -
8.07 308.94
6.26 239.63
- -
4.35 166.35
6.04 231.04
34.03 1,302.40
- -
9.03 345.63
8.52 326.03
- -
- -
7.70 294.80
- -
- -
6.26 239.63
6.26 239.63
12.30 470.67
5.90 225.77
- -
10.61 405.98
7.47 285.84
- -
- -
6.26 239.63
1.41 85.11
6.26 239.63
6.04 231.04
- -
- -
- -
8.19 313.56
18.82 720.19
- -
5.05 193.42
6.50 248.87
- -
- -
- -
7.23 276.60
15.28 584.65
- -
7.23 276.60
38.47 1,472.44
7.96 304.69
5.90 225.77
6.02 230.39
5.31 203.31
5.73 219.48
2.82 107.82
47.75 1,827.32
- -
- -
7.23 276.60
17.14 656.14
7.94 303.75
14.09 539.09
- -
4.10 157.10
24.37 932.74
- -
7.97 304.97
34.03 1,302.40
- -
42.16 1,613.66
8.36 320.08
11.93 456.59
12.30 470.67
- -
- -
7.53 288.15
- -
19.32 739.32
5.48 209.57
12.21 467.44
- -
- -
8.69 332.69
- -
- -
6.64 254.14
5.05 193.42
34.03 1,302.40
7.80 298.55
- -
7.37 282.21
17.13 655.50
- -
- -
- -
- -
- -
- -
17.13 655.50
10.29 393.66
3.83 146.54
6.99 267.36
17.61 673.98
8.72 333.89
12.30 470.67
7.00 268.00
- -
3.68 140.75
5.11 195.39
6.99 267.36
- -
- -
- -
11.82 452.19
- -
- -
4.83 184.83
6.04 231.04
- -
- -
6.48 247.94
8.73 334.19
- -
- -
- -
- -
15.45 591.45
1,554.69 76,492.93
191.36 16,476.75
14.05 1,189.30
25.84 1,559.49
170.14 13,098.18
154.18 5,931.34
106.17 4,062.75
892.95 34,175.11
- -
- -
661.74 42,317.82
892.95 34,175.11
1,554.69 76,492.93
- -
- -
- -
661.74 42,317.82
892.95 34,175.11
- -
- -
1,554.69 76,492.93
- -
PLANILLA CONSTRUCCION CIVIL CONSORCIO CHAQUICOCHA SRL MES DE MARZO 2022
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
1 47463306 ACUÑA PAISIG WILSON DAVID ACUÑA PAISIG WILSON DAVID BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Oficial OFICIAL VIENTERO GRUA 11/18/2021 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 638381WAPÑS1 14 X 7 28 28 28 1 1,636.60 5.00 490.98 24.00 272.72 0.00 0.00 70.00 136.38 163.66 49.00 196.39
2 44331240 ALAYA HUAMAN ROGER ESGAR ALAYA HUAMAN ROGER ESGAR BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario moviento t. OPERARIO OBRAS CIVILES 3/7/2022 3/7/2022 3/31/2022 Profuturo Comision/Flujo 619511RAHYM3 14 X 7 23 23 23 2 1,677.69 5.00 536.86 24.00 279.54 0.00 134.22 56.45 279.62 167.77 50.35 201.32
3 71964017 BAUTISTA TACILLA ELIZABETH BAUTISTA TACILLA ELIZABETH BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón VIGIA 3/10/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 675590EBTTI2 14 X 7 22 22 22 0 1,138.20 5.00 341.46 24.00 189.70 0.00 0.00 54.20 0.00 113.82 34.25 136.58
4 26704167 BOÑON CERQUIN JOSE PABLO BOÑON CERQUIN JOSE PABLO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR CISTERNA DE AGUA 5/5/2021 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 567621JBCOQ5 14 X 14 28 28 28 1 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 173.37 208.04 62.44 249.65
5 80429185 CALDERON HUAMAN ROMAN CALDERON HUAMAN ROMAN BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 2/2/2022 3/1/2022 3/31/2022 Integra Comision/Flujo 590641RCHDM5 14 X 7 28 28 28 3 1,470.00 5.00 441.00 32.00 245.00 0.00 0.00 70.00 367.50 147.00 44.24 176.40
6 42455554 CALDERON JULCA ELICEO CALDERON JULCA ELICEO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 12/30/2021 3/1/2022 3/31/2022 Profuturo Com.Mixta/Saldo 608761ECJDC4 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
7 26735245 CALDERON LLANOS GASPAR CALDERON LLANOS GASPAR BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 2/2/2022 3/1/2022 3/31/2022 Integra Comision/Flujo 577631GCLDN1 14 X 7 28 28 28 2 1,470.00 5.00 441.00 32.00 245.00 0.00 0.00 70.00 245.00 147.00 44.24 176.40
8 73333267 CARAHUATAY VALDIVIA ADELMO CARAHUATAY VALDIVIA ADELMO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón VIGIA 1/20/2022 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 341301ACVAD9 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
9 45529956 CASTILLO CORTEZ MARCO CASTILLO CORTEZ MARCO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 2/3/2022 3/1/2022 3/16/2022 Prima Comision/Flujo 625401MCCTT4 14 X 7 14 14 14 2 758.63 5.00 227.59 8.00 126.44 0.00 0.00 36.13 126.44 75.86 22.83 91.04
10 80058480 CASTILLO FLORES OSCAR SANTIAGO CASTILLO FLORES OSCAR SANTIAGO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario Maq. Pesada OPERADOR CARGADOR FRONTAL 2/24/2022 3/1/2022 3/31/2022 Integra Comision/Flujo 568681OCFTR0 14 X 7 28 28 28 1 2,080.40 5.00 665.73 40.00 346.64 0.00 208.04 70.00 173.37 208.04 62.44 249.65
11 41803671 CASTREJON CASTREJON AUGUSTO CASTREJON CASTREJON AUGUSTO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 11/11/2021 3/1/2022 3/31/2022 Prima Comision/Flujo 603951ACCTT7 14 X 7 28 28 28 3 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 520.10 208.04 62.44 249.65
12 71963925 CASTREJON HUARIPATA ROGER CASTREJON HUARIPATA ROGER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 1/27/2022 3/1/2022 3/9/2022 Prima Com.Mixta/Saldo 656931RCHTR0 14 X 7 8 8 8 0 426.83 5.00 128.05 8.00 71.14 0.00 0.00 20.33 0.00 42.68 12.85 51.22
13 45580631 CASTREJON TERAN RAUL CASTREJON TERAN RAUL BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Oficial OFICIAL DE MOVIMIENTO TIERRAS 1/4/2022 3/1/2022 3/31/2022 Profuturo Comision/Flujo 625591RCTTA4 14 X 7 28 28 28 1 1,636.60 5.00 490.98 32.00 272.72 0.00 0.00 70.00 136.38 163.66 49.00 196.39
14 42236722 CASTREJON VILLANUEVA GUMERCINDO CASTREJON VILLANUEVA GUMERCINDO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario Maq. Pesada OPERADOR CAMION GRUA 1/19/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 596101GCVTL0 14 X 14 28 28 28 2 2,080.40 5.00 665.73 16.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
15 42977392 CERCADO VILLANUEVA JUAN CARLOS CERCADO VILLANUEVA JUAN CARLOS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR CISTERNA COMBUSTIBLE 4/6/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 611901JCVCL9 14 X 14 28 28 28 2 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
16 41993792 CHALAN VALIENTE JORGE CHALAN VALIENTE JORGE BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Oficial OFICIAL OBRAS CIVILES 3/17/2022 3/17/2022 3/31/2022 Integra Comision/Flujo 589701JCVLI0 14 X 7 14 14 14 3 792.00 5.00 237.60 16.00 131.98 0.00 33.88 198.00 79.20 23.71 95.04
17 41366762 CHAMAY CABELLOS GILBERTO CHAMAY CABELLOS GILBERTO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Oficial OFICIAL OBRAS CIVILES 3/7/2022 3/7/2022 3/31/2022 ONP 14 X 7 23 23 23 1 1,319.80 5.00 395.94 8.00 219.93 0.00 56.45 109.98 131.98 39.52 158.38
18 46360776 CHAVARRIA CHALAN GILBERTO CHAVARRIA CHALAN GILBERTO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 11/4/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 630371GCCVL7 14 X 7 28 28 28 1 1,470.00 5.00 441.00 32.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
19 71973740 CHAVEZ CHUGNAS JESUS CASIMIRO CHAVEZ CHUGNAS JESUS CASIMIRO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 2/3/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 646971JCCVG2 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
20 26700957 CHAVEZ CHUGNAS SEGUNDO SANTOS CHAVEZ CHUGNAS SEGUNDO SANTOS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 7/14/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 566961SCCVG2 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
21 43580766 CHAVEZ CRUZADO JOSE CARLOS CHAVEZ CRUZADO JOSE CARLOS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 10/28/2021 3/1/2022 3/3/2022 Profuturo Com.Mixta/Saldo 615691JCCVZ2 14 X 7 3 3 3 1 201.35 5.00 64.43 0.00 33.55 0.00 20.14 6.78 16.78 20.14 6.04 24.16
22 45580649 CHAVEZ TASILLA CESAR CHAVEZ TASILLA CESAR BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 2/5/2022 3/1/2022 3/31/2022 Profuturo Com.Mixta/Saldo 621881CCTVI8 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
23 70367173 CHAVEZ YOPLA JORGE LUIS CHAVEZ YOPLA JORGE LUIS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 2/3/2022 3/1/2022 3/9/2022 Habitat Com.Mixta/Saldo 346581JCYVL5 14 X 7 8 8 8 1 426.83 5.00 128.05 8.00 71.14 0.00 0.00 20.33 35.57 42.68 12.85 51.22
24 26717522 CHICLOTE CERQUIN VICTOR RAUL CHICLOTE CERQUIN VICTOR RAUL BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 4/28/2021 3/1/2022 3/31/2022 Prima Comision/Flujo 268921VCCCQ9 14 X 7 28 28 28 2 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
25 43110039 CHILON CHILON ROGER CHILON CHILON ROGER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR CARGADOR FRONTAL 5/5/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 612321RCCLL3 14 X 7 28 28 28 2 2,080.40 5.00 665.73 40.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
26 47046793 CHILON CUEVA RAUL CHILON CUEVA RAUL BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Oficial OFICIAL OBRAS CIVILES 3/12/2022 3/12/2022 3/31/2022 Habitat Com.Mixta/Saldo 633581RCCLV7 14 X 14 17 17 17 1 1,003.00 5.00 300.90 24.00 167.14 0.00 42.90 83.58 100.30 30.03 120.36
27 42455548 CHILON FLORES CASIMIRO CHILON FLORES CASIMIRO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR DE ZARANDA 11/4/2021 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 596991CCFLR5 14 X 14 28 28 28 4 2,080.40 5.00 665.73 16.00 346.64 0.00 208.04 70.00 693.47 208.04 62.44 249.65
28 44219725 CHILON OCON FLOIRA CHILON OCON FLOIRA BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón VIGIA 1/13/2022 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 618990FCOLN0 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
29 42524522 CHILON POMPA DOMINGO CHILON POMPA DOMINGO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario moviento t. OPERARIO RIGGER GEOSINTETICOS 11/25/2021 3/1/2022 3/23/2022 Profuturo Comision/Flujo 609001DCPLP8 14 X 7 21 21 21 3 1,543.21 5.00 493.83 16.00 257.13 0.00 123.46 51.93 385.80 154.32 46.32 185.19
30 26707984 CHILON SORIANO CARMEN CHILON SORIANO CARMEN BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR TRACTOR 12/2/2021 3/1/2022 3/2/2022 Integra Comision/Flujo 572240CCSLI3 14 X 7 2 2 2 1 134.48 5.00 43.03 0.00 22.41 0.00 13.45 4.53 11.21 13.45 4.04 16.14
31 26732181 CHILON TACILLA EDWIN CHILON TACILLA EDWIN BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario Maq. Pesada OPERADOR EXCAVADORA 11/3/2021 3/1/2022 3/30/2022 Integra Comision/Flujo 585291ECTLI0 14 X 14 27 27 27 3 2,013.53 5.00 644.33 16.00 335.50 0.00 201.35 67.75 503.38 201.35 60.43 241.62
32 40956734 CHILON VARGAS GERMAN CHILON VARGAS GERMAN BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 3/29/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 593671GCVLG1 14 X 7 28 28 28 2 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
33 70017160 CHILON ZAMBRANO ELIAS CHILON ZAMBRANO ELIAS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario Maq. Pesada OPERADOR CISTERNA DE AGUA 1/13/2022 3/1/2022 3/23/2022 Profuturo Comision/Flujo 325441ECZLB9 14 X 14 21 21 21 1 1,543.21 5.00 493.83 16.00 257.13 0.00 154.32 51.93 128.60 154.32 46.32 185.19
34 48053554 CHUNQUE LLOVERA JOSE VALENTIN CHUNQUE LLOVERA JOSE VALENTIN BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 1/4/2022 3/1/2022 3/31/2022 ONP 14 X 7 28 28 28 0 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
35 26708084 CHUNQUE MESTANZA MERCEDES CHUNQUE MESTANZA MERCEDES BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 1/4/2022 3/1/2022 3/31/2022 Profuturo Com.Mixta/Saldo 565451MCMNT0 14 X 7 28 28 28 0 1,470.00 5.00 441.00 32.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
36 46325901 CHUQUIMANGO CALUA ELMER CHUQUIMANGO CALUA ELMER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR EXCAVADORA 10/17/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 629961ECCQU0 14 X 7 28 28 28 1 2,080.40 5.00 665.73 32.00 346.64 0.00 208.04 70.00 173.37 208.04 62.44 249.65
37 46993596 CHUQUIMANGO GONZALES HUMBERTO CHUQUIMANGO GONZALES HUMBERTO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 10/21/2021 3/1/2022 3/31/2022 Habitat Com.Mixta/Saldo 634951HCGQZ3 14 X 7 28 28 28 1 2,080.40 5.00 665.73 32.00 346.64 0.00 208.04 70.00 173.37 208.04 62.44 249.65
38 40858576 CHUQUIMANGO ISPILCO GILMER CHUQUIMANGO ISPILCO GILMER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR TRACTOR 10/14/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 592541GCIQI8 14 X 7 28 28 28 1 2,080.40 5.00 665.73 32.00 346.64 0.00 208.04 70.00 173.37 208.04 62.44 249.65
39 46774205 CHUQUIMANGO POMPA DANIEL CHUQUIMANGO POMPA DANIEL BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario moviento t. OPERARIO RIGGER GEOSINTETICOS 11/18/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 632851DCPQP0 14 X 7 28 28 28 1 2,080.40 5.00 665.73 24.00 346.64 0.00 166.43 70.00 173.37 208.04 62.44 249.65
40 76957338 CHUQUIRUNA BANDA CESAR CHUQUIRUNA BANDA CESAR BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 12/30/2021 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 668321CCBQD0 14 X 7 28 28 28 0 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
41 43221736 CHUQUIRUNA BARDALES RAUL CHUQUIRUNA BARDALES RAUL BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 12/2/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 613421RCBQD1 14 X 7 28 28 28 0 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 0.00 208.04 62.44 249.65
42 46379434 CHUQUIRUNA HUAMAN GUILLERMO CHUQUIRUNA HUAMAN GUILLERMO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 1/4/2022 3/1/2022 3/31/2022 Profuturo Com.Mixta/Saldo 630491GCHQM8 14 X 7 28 28 28 0 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
43 71963890 CORONADO CHAVEZ ELMER CORONADO CHAVEZ ELMER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 1/1/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 666441ECCOV0 14 X 7 28 28 28 0 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
44 80566657 CORONADO MARCELO RAYMUNDO CORONADO MARCELO RAYMUNDO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 3/3/2022 3/3/2022 3/31/2022 Integra Comision/Flujo 577641RCMOC0 14 X 7 26 26 26 2 1,374.98 5.00 412.49 24.00 229.16 0.00 0.00 65.48 229.16 137.50 41.38 165.00
45 41813322 CORTEZ LEIVA JOSE ANGHELO CORTEZ LEIVA JOSE ANGHELO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario Maq. Pesada OPERADOR RODILLO 3/4/2022 3/4/2022 3/31/2022 Profuturo Comision/Flujo 604231JCLTV2 14 X 7 25 25 25 3 1,879.05 5.00 601.30 24.00 313.09 187.90 63.22 469.76 187.91 56.40 225.49
46 44279104 CORTEZ MORALES FRANCISCO CORTEZ MORALES FRANCISCO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR RODILLO 1/14/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 619171FCMTA6 14 X 7 28 28 28 1 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 173.37 208.04 62.44 249.65
47 46963128 CRUZ CHAUPE ROBER ANTONI CRUZ CHAUPE ROBER ANTONI BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 2/3/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 619791RCCZU3 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
48 26684172 CRUZADO LLANOS MARIO CRUZADO LLANOS MARIO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/10/2022 3/10/2022 3/31/2022 Prima Comision/Flujo 559781MCLZN2 14 X 7 20 20 20 1 1,043.18 5.00 312.95 24.00 173.86 0.00 49.68 86.93 104.32 31.39 125.18
49 44009851 CUEVA LLAMOCTANTA HIPOLITO CUEVA LLAMOCTANTA HIPOLITO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Oficial OFICIAL VIENTERO GRUA 11/25/2021 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 616851HCLVM2 14 X 7 28 28 28 1 1,636.60 5.00 490.98 32.00 272.72 0.00 0.00 70.00 136.38 163.66 49.00 196.39
50 44271829 DE LA CRUZ CHILON NILVER DE LA CRUZ CHILON NILVER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 10/28/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 619121NCCZL0 14 X 7 28 28 28 0 2,080.40 5.00 665.73 32.00 346.64 0.00 208.04 70.00 0.00 208.04 62.44 249.65
51 42713924 FLORES CUEVA ALADINO FLORES CUEVA ALADINO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 1/13/2022 3/1/2022 3/31/2022 Profuturo Com.Mixta/Saldo 609981AFCRV1 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
52 47254831 GARCIA VILLANUEVA EDUAR EDUARDO GARCIA VILLANUEVA EDUAR EDUARDO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 9/17/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 635191EGVCL3 14 X 7 28 28 28 2 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 245.00 147.00 44.24 176.40
53 26708299 HERAS BANDA ALEJANDRO HERAS BANDA ALEJANDRO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 5/12/2021 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 566821AHBAD2 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
54 44106124 HERAS HUAMAN SAUL HERAS HUAMAN SAUL BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 1/4/2022 3/1/2022 3/9/2022 Profuturo Comision/Flujo 608711SHHAM4 14 X 7 8 8 8 3 426.83 5.00 128.05 8.00 71.14 0.00 0.00 20.33 106.71 42.68 12.85 51.22
55 43312210 HERRERA TERAN NICOLAS HERRERA TERAN NICOLAS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR CAMA BAJA 5/12/2021 3/1/2022 3/31/2022 Prima Comision/Flujo 613851NHTRA5 14 X 14 28 28 28 3 2,080.40 5.00 665.73 16.00 346.64 0.00 208.04 70.00 520.10 208.04 62.44 249.65
56 80469622 HOYOS VIGO CESAR AUGUSTO HOYOS VIGO CESAR AUGUSTO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 5/12/2021 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 587421CHVOO6 14 X 7 28 28 28 3 2,080.40 5.00 665.73 32.00 346.64 0.00 208.04 70.00 520.10 208.04 62.44 249.65
57 44100863 HUAIHUA JAMBO WILDER HUAIHUA JAMBO WILDER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 9/30/2021 3/1/2022 3/9/2022 Prima Com.Mixta/Saldo 616521WHJIB0 14 X 7 8 8 8 2 426.83 5.00 128.05 8.00 71.14 0.00 0.00 20.33 71.14 42.68 12.85 51.22
58 26679685 HUAMAN CASTILLO JUAN HUAMAN CASTILLO JUAN BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/17/2022 3/17/2022 3/31/2022 Profuturo Comision/Flujo 544331JHCMT5 14 X 7 14 14 14 0 711.38 5.00 213.41 16.00 118.56 0.00 33.88 0.00 71.14 21.41 85.37
59 61584120 HUAMAN CORONADO ALEX HUAMAN CORONADO ALEX BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/12/2022 3/12/2022 3/31/2022 Integra Com.Mixta/Saldo 660881AHCMO6 14 X 7 17 17 17 0 900.90 5.00 270.27 24.00 150.15 0.00 42.90 0.00 90.09 27.11 108.11
60 40737217 HUAMAN HUAMAN JUAN HUAMAN HUAMAN JUAN BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 12/2/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 589501JHHMM9 14 X 7 28 28 28 2 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 245.00 147.00 44.24 176.40
61 40127552 HUAMAN TAICA PEDRO HUAMAN TAICA PEDRO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 8/1/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 582271PHTMC8 14 X 7 28 28 28 2 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 245.00 147.00 44.24 176.40
62 41804745 HUAMAN VARGAS CESAR HUAMAN VARGAS CESAR BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR DE ZARANDA 10/21/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 603671CHVMG1 14 X 14 28 28 28 2 2,080.40 5.00 665.73 16.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
63 71456043 HUAYHUA VALDIVIA SEGUNDO ALBERTO HUAYHUA VALDIVIA SEGUNDO ALBERTO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 1/21/2022 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 661541SHVYD0 14 X 7 28 28 28 0 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
64 40340126 INFANTE INFANTE GILMER INFANTE INFANTE GILMER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR CAMA BAJA 12/2/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 591621GIIAA5 14 X 14 28 28 28 2 2,080.40 5.00 665.73 16.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
65 42057490 ISPILCO AYAY JUAN ISPILCO AYAY JUAN BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR EXCAVADORA 5/19/2021 3/1/2022 3/31/2022 Prima Comision/Flujo 603101JIAIY7 14 X 7 28 28 28 2 2,080.40 5.00 665.73 32.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
66 46314186 ISPILCO AYAY SANTOS ISPILCO AYAY SANTOS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR EXCAVADORA 4/14/2021 3/1/2022 3/31/2022 Prima Comision/Flujo 629161SIAIY6 14 X 7 28 28 28 4 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 693.47 208.04 62.44 249.65
67 76032796 JAMBO TASILLA FILADELFIO JAMBO TASILLA FILADELFIO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 9/17/2021 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 655291FJTBI9 14 X 7 28 28 28 0 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
68 46931281 JULCA SAMAN EDILBERTO JULCA SAMAN EDILBERTO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 9/23/2021 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 633731EJSCA4 14 X 7 28 28 28 3 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 520.10 208.04 62.44 249.65
69 72458231 JULON HUAMAN WINY LEYDIS JULON HUAMAN WINY LEYDIS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 8/20/2021 3/1/2022 3/9/2022 Prima Com.Mixta/Saldo 644811WJHOM8 14 X 7 8 8 8 1 426.83 5.00 128.05 8.00 71.14 0.00 0.00 20.33 35.57 42.68 12.85 51.22
70 41143157 LLAMOGTANTA FLORES JUAN LLAMOGTANTA FLORES JUAN BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/12/2022 3/12/2022 3/31/2022 Integra Com.Mixta/Saldo 595681JLFMR6 14 X 7 17 17 17 3 900.90 5.00 270.27 24.00 150.15 0.00 42.90 225.23 90.09 27.11 108.11
71 26735333 LLANOS CALDERON CARLOS LLANOS CALDERON CARLOS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/10/2022 3/10/2022 3/31/2022 Profuturo Comision/Flujo 586641CLCND0 14 X 7 20 20 20 2 1,043.18 5.00 312.95 24.00 173.86 0.00 49.68 173.86 104.32 31.39 125.18
72 70367145 LLANOS CHALAN EDILBERTO LLANOS CHALAN EDILBERTO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 8/18/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 641141ELCNL7 14 X 7 28 28 28 0 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
73 44644768 LLANOS CONDOR JUAN CARLOS LLANOS CONDOR JUAN CARLOS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR MOTONIVELADORA 11/23/2021 3/1/2022 3/31/2022 Profuturo Com.Mixta/Saldo 621031JLCND5 14 X 7 28 28 28 2 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
74 43387022 LLANOS JUAREZ JUAN HERMILDE LLANOS JUAREZ JUAN HERMILDE BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón VIGIA 9/17/2021 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 607771JLJNR2 14 X 7 28 28 28 3 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 367.50 147.00 44.24 176.40
75 71954254 LLANOS LLANOS CARMEN NOEMI LLANOS LLANOS CARMEN NOEMI BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 1/4/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 650160CLLNN0 14 X 7 28 28 28 1 1,470.00 5.00 441.00 32.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
76 26735186 LLANOS LLANOS GONZALO LLANOS LLANOS GONZALO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 11/25/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 584981GLLNN0 14 X 7 28 28 28 2 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
77 43366438 LLANOS VALDIVIA SANTIAGO LLANOS VALDIVIA SANTIAGO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/12/2022 3/12/2022 3/31/2022 Integra Comision/Flujo 612511SLVND4 14 X 7 17 17 17 1 900.90 5.00 270.27 24.00 150.15 0.00 42.90 75.08 90.09 27.11 108.11
78 43237621 LLANOS VARGAS CESAR LLANOS VARGAS CESAR BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 2/2/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 613471CLVNG7 14 X 7 28 28 28 3 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 367.50 147.00 44.24 176.40
79 26715916 MALCA CHAVEZ ALFONSO MALCA CHAVEZ ALFONSO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 11/25/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 575791AMCCV9 14 X 7 28 28 28 2 2,080.40 5.00 665.73 32.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
80 42656101 MARCELO CORONADO CARLOS LUIS MARCELO CORONADO CARLOS LUIS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario Maq. Pesada OPERADOR TRACTOR 1/21/2022 3/1/2022 3/31/2022 Profuturo Comision/Flujo 609731CMCCO6 14 X 7 28 28 28 2 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
81 73544445 MENDOZA CALDERON ISIDRO MENDOZA CALDERON ISIDRO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/17/2022 3/17/2022 3/31/2022 Habitat Com.Mixta/Saldo 340081IMCDD5 14 X 14 14 14 14 1 711.38 5.00 213.41 16.00 118.56 0.00 33.88 59.28 71.14 21.41 85.37
82 45199158 MENDOZA MINCHAN GUMERCINDO MENDOZA MINCHAN GUMERCINDO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR CAMION GRUA 11/25/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 623451GMMDC0 14 X 14 28 28 28 3 2,080.40 5.00 665.73 16.00 346.64 0.00 208.04 70.00 520.10 208.04 62.44 249.65
83 71873747 MOROCHO CHUGNAS EDIS MOROCHO CHUGNAS EDIS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Oficial OFICIAL VIENTERO GRUA 12/2/2021 3/1/2022 3/31/2022 Habitat Com.Mixta/Saldo 338871EMCOG9 14 X 7 28 28 28 1 1,636.60 5.00 490.98 24.00 272.72 0.00 0.00 70.00 136.38 163.66 49.00 196.39
84 42439478 MOROCHO MENDOZA DILBERTO MOROCHO MENDOZA DILBERTO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario Maq. Pesada OPERADOR TRACTOR 12/30/2021 3/1/2022 3/31/2022 Profuturo Com.Mixta/Saldo 600001DMMOD6 14 X 7 28 28 28 3 2,080.40 5.00 665.73 32.00 346.64 0.00 208.04 70.00 520.10 208.04 62.44 249.65
85 40818007 MOROCHO SANCHEZ JUAN UVALDO MOROCHO SANCHEZ JUAN UVALDO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR TRACTOR 2/3/2022 3/1/2022 3/31/2022 Integra Comision/Flujo 593981JMSOC1 14 X 7 28 28 28 2 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
86 46411480 MOSQUEIRA CASTILLO FELIX MOSQUEIRA CASTILLO FELIX BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/12/2022 3/12/2022 3/31/2022 Profuturo Com.Mixta/Saldo 630691FMCQT6 14 X 7 17 17 17 1 900.90 5.00 270.27 24.00 150.15 0.00 42.90 75.08 90.09 27.11 108.11
87 41883860 MURGA VILLANUEVA ELMER MURGA VILLANUEVA ELMER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 1/4/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 601461EMVGL0 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
88 43510895 OCON CHILON AGUSTINA OCON CHILON AGUSTINA BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 12/30/2021 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 615100AOCNL0 14 X 7 28 28 28 3 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 367.50 147.00 44.24 176.40
89 26684223 OCON CHILON ALEJANDRO OCON CHILON ALEJANDRO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR CISTERNA COMBUSTIBLE 3/23/2021 3/1/2022 3/31/2022 Prima Comision/Flujo 564891AOCNL4 14 X 14 28 28 28 2 2,080.40 5.00 665.73 16.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
90 43215082 OCON CHILON MARGARITA OCON CHILON MARGARITA BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón VIGIA 4/14/2021 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 613310MOCNL3 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
91 26708093 OCON CHILON MARTIN OCON CHILON MARTIN BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 3/23/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 573341MOCNL3 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
92 72642844 OCON MORALES NORMA OCON MORALES NORMA BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/17/2022 3/17/2022 3/31/2022 Integra Com.Mixta/Saldo 671370NOMNA0 14 X 7 14 14 14 0 711.38 5.00 213.41 16.00 118.56 0.00 0.00 33.88 0.00 71.14 21.41 85.37
93 26732426 PEREGRINO CHUGNAS JOSE LUIS PEREGRINO CHUGNAS JOSE LUIS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/12/2022 3/12/2022 3/31/2022 Integra Comision/Flujo 523801JPCEG0 14 X 7 17 17 17 1 900.90 5.00 270.27 24.00 150.15 0.00 0.00 42.90 75.08 90.09 27.11 108.11
94 41039218 POMPA CHILON DANIEL POMPA CHILON DANIEL BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR EXCAVADORA 4/6/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 596451DPCPL0 14 X 7 28 28 28 3 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 520.10 208.04 62.44 249.65
95 62224161 QUISPE RAMOS JAIME ROLANDO QUISPE RAMOS JAIME ROLANDO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 1/13/2022 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 347301JQRSO6 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
96 41465317 RAMIREZ HUAMAN ELVIS RAMIREZ HUAMAN ELVIS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 11/18/2021 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 296081ERHIM6 14 X 7 28 28 28 2 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
97 26706578 RAMOS TANTA VICTOR RAMOS TANTA VICTOR BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/12/2022 3/12/2022 3/31/2022 Integra Com.Mixta/Saldo 573161VRTOT7 14 X 7 17 17 17 1 900.90 5.00 270.27 24.00 150.15 0.00 0.00 42.90 75.08 90.09 27.11 108.11
98 26724484 RODRIGUEZ LLANOS TOMAS DAVID RODRIGUEZ LLANOS TOMAS DAVID BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR EXCAVADORA 12/30/2021 3/1/2022 3/31/2022 Prima Comision/Flujo 570561TRLRN0 14 X 7 28 28 28 2 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
99 43755851 RODRIGUEZ MENDOZA MELAÑOS RODRIGUEZ MENDOZA MELAÑOS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 2/2/2022 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 606101MRMRD1 14 X 7 28 28 28 2 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 245.00 147.00 44.24 176.40
100 26680305 RUDAS MANTILLA JORGE LUIS RUDAS MANTILLA JORGE LUIS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 4/14/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 555551JRMAT0 14 X 7 28 28 28 0 2,080.40 5.00 665.73 32.00 346.64 0.00 208.04 70.00 0.00 208.04 62.44 249.65
101 42627213 RUDAS SOTO WILSON RUDAS SOTO WILSON BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR DE RODILLO 12/30/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 609461WRSAO1 14 X 7 28 28 28 3 2,080.40 5.00 665.73 32.00 346.64 0.00 208.04 70.00 520.10 208.04 62.44 249.65
102 80455846 SARMIENTO AZAÑERO SANTIAGO SARMIENTO AZAÑERO SANTIAGO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 1/4/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 586841SSAMÑ0 14 X 7 28 28 28 2 1,470.00 5.00 441.00 32.00 245.00 0.00 0.00 70.00 245.00 147.00 44.24 176.40
103 42312676 TACILLA CAJA ROLANDO ALVARO TACILLA CAJA ROLANDO ALVARO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario moviento t. OPERARIO OBRAS CIVILES 3/7/2022 3/7/2022 3/31/2022 Prima Com.Mixta/Saldo 607661RTCIA7 14 X 7 22 22 22 2 1,610.82 5.00 515.46 8.00 268.40 0.00 128.87 54.20 268.47 161.08 48.35 193.30
104 43544198 TACILLA CHILON GILBERTO TACILLA CHILON GILBERTO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 3/5/2022 3/5/2022 3/31/2022 Profuturo Comision/Flujo 614251GTCIL1 14 X 7 23 23 23 1 1,744.56 5.00 558.26 24.00 290.68 0.00 174.46 58.70 145.38 174.46 52.36 209.35
105 48555018 TASILLA SANCHEZ CLEMENTE TASILLA SANCHEZ CLEMENTE BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/10/2022 3/10/2022 3/31/2022 Prima Com.Mixta/Saldo 621911CTSIC314 X 7 20 20 20 1 1,043.18 5.00 312.95 24.00 173.86 0.00 0.00 49.68 86.93 104.32 31.39 125.18
106 46303568 TASILLA SANCHEZ ELMER TASILLA SANCHEZ ELMER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/10/2022 3/10/2022 3/31/2022 Prima Com.Mixta/Saldo 329551ETSIC314 X 7 20 20 20 2 1,043.18 5.00 312.95 24.00 173.86 0.00 0.00 49.68 173.86 104.32 31.39 125.18
107 48543056 TELLO HUACCHA NICOLAS TELLO HUACCHA NICOLAS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 1/27/2022 3/1/2022 3/31/2022 Prima Com.Mixta/Saldo 635331NTHLC4 14 X 7 28 28 28 1 1,470.00 5.00 441.00 32.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
108 43325256 TERRONES LLANOS HILDA TERRONES LLANOS HILDA BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón VIGIA 12/2/2021 3/4/2022 3/31/2022 Prima Com.Mixta/Saldo 610560HTLRN8 14 X 7 22 22 22 1 1,138.20 5.00 341.46 32.00 189.70 0.00 0.00 54.20 94.85 113.82 34.25 136.58
109 43755849 VALDEZ CHILON LORENZO VALDEZ CHILON LORENZO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR MOTONIVELADORA 10/21/2021 3/1/2022 3/31/2022 Profuturo Com.Mixta/Saldo 605181LVCDL7 14 X 7 28 28 28 3 2,080.40 5.00 665.73 32.00 346.64 0.00 208.04 70.00 520.10 208.04 62.44 249.65
110 26729629 VALDIVIA DE LA CRUZ JULIAN VALDIVIA DE LA CRUZ JULIAN BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 11/25/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 582041JVCDZ4 14 X 7 28 28 28 1 1,470.00 5.00 441.00 32.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
111 72957019 VALIENTE HUAMAN RONALD DEISER VALIENTE HUAMAN RONALD DEISER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 6/30/2021 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 674641RVHIM9 14 X 7 28 28 28 0 1,470.00 5.00 441.00 32.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
112 80005895 VARGAS LLANOS SEGUNDO JULIO VARGAS LLANOS SEGUNDO JULIO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 3/10/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 563051SVLGN5 14 X 7 20 20 20 0 1,043.18 5.00 312.95 24.00 173.86 0.00 0.00 49.68 0.00 104.32 31.39 125.18
113 43924415 VASQUEZ CHILON NOE VASQUEZ CHILON NOE BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR VOLQUETE 10/21/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 617571NVCQL3 14 X 7 28 28 28 1 2,080.40 5.00 665.73 24.00 346.64 0.00 208.04 70.00 173.37 208.04 62.44 249.65
114 26728285 VILCA SANGAY EDWIN CLEMENTE VILCA SANGAY EDWIN CLEMENTE BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR CARGADOR FRONTAL 11/4/2021 3/1/2022 3/30/2022 Prima Comision/Flujo 581991EVSCG4 14 X 7 27 27 27 1 2,013.53 5.00 644.33 24.00 335.50 0.00 201.35 67.75 167.79 201.35 60.43 241.62
115 48377808 VILLANUEVA CUEVA RONALD ZACARIAS VILLANUEVA CUEVA RONALD ZACARIAS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Liviana OPERADOR RETROEXCAVADORA 12/13/2021 3/1/2022 3/31/2022 Profuturo Com.Mixta/Saldo 644331RVCLV9 14 X 7 28 28 28 1 2,080.40 5.00 665.73 24.00 346.64 0.00 166.43 70.00 173.37 208.04 62.44 249.65
116 45856658 VILLANUEVA JUAREZ EULER VILLANUEVA JUAREZ EULER BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Operario Maq. Pesada OPERARIO OBRAS CIVILES 3/12/2022 3/12/2022 3/31/2022 Integra Com.Mixta/Saldo 627251EVJLR514 X 7 17 17 17 0 1,274.99 5.00 408.00 24.00 212.44 0.00 127.50 42.90 0.00 127.50 38.27 153.00
117 44040632 ZAMBRANO HERRERA FAUSTINO ZAMBRANO HERRERA FAUSTINO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR CISTERNA DE AGUA 2/11/2022 3/1/2022 3/31/2022 Integra Comision/Flujo 617581FZHBR1 14 X 7 28 28 28 2 2,080.40 5.00 665.73 16.00 346.64 0.00 208.04 70.00 346.73 208.04 62.44 249.65
118 70367179 ZAMORA CORONADO MACSIMILA ZAMORA CORONADO MACSIMILA BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón VIGIA 1/1/2022 3/1/2022 3/31/2022 Integra Com.Mixta/Saldo 636520MZCOO9 14 X 7 28 28 28 0 1,470.00 5.00 441.00 32.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
119 26684237 ZAMORA OCON FELIX ZAMORA OCON FELIX BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 12/30/2021 3/1/2022 3/31/2022 ONP 14 X 7 28 28 28 0 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
120 26648140 ZAMORA OCON MAXIMO ZAMORA OCON MAXIMO BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 4/28/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 531551MZOON0 14 X 7 28 28 28 2 1,470.00 5.00 441.00 32.00 245.00 0.00 0.00 70.00 245.00 147.00 44.24 176.40
121 26735094 ZAMORA OCON SANTOS ZAMORA OCON SANTOS BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Peón OBRERO 5/4/2021 3/1/2022 3/31/2022 Profuturo Comision/Flujo 585031SZOON0 14 X 7 28 28 28 1 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 122.50 147.00 44.24 176.40
122 77796766 ZAMORA SALAZAR JUANITA ZAMORA SALAZAR JUANITA BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCIN CIVIL Peón OBRERO 1/13/2022 1/13/2022 3/31/2022 Integra Com.Mixta/Saldo 670640JZSOA4 14 X 7 28 28 28 0 1,470.00 5.00 441.00 24.00 245.00 0.00 0.00 70.00 0.00 147.00 44.24 176.40
123 80608109 ZELADA VALERA NORBIL ZELADA VALERA NORBIL BECHTEL - Estabilizacion de Terreno Campamento Km 52 CONSTRUCCION CIVIL Operario Maq. Pesada OPERADOR CARGADOR FRONTAL 10/28/2021 3/1/2022 3/31/2022 Integra Comision/Flujo 591431NZVAE3 14 X 7 28 28 28 3 2,080.40 5.00 665.73 40.00 346.64 0.00 208.04 70.00 520.10 208.04 62.44 249.65
TOTALES 190,163.62 615.00 59,067.80 2,904.00 31,689.12 0.00 9,913.43 7,598.42 24,552.40 19,016.37 5,713.29 22,819.74
109 43325256 TERRONES LLANOS HILDA Peón VIGIA 12/2/2021 3/1/2022 3/3/2022 Prima com.Mixta/Saldo 610560HTLRN8 14 X 7 3 3 3 1 142.28 0.00 42.68 0.00 23.71 0.00 0.00 0.00 11.86 14.23 0.00 17.07 27.10 2.44 0.00 0.00 281.37 222.90 0.00 0.00 0.40 3.88 22.29 2.23 3.32
TOTALES 142.28 0.00 42.68 0.00 23.71 0.00 0.00 0.00 11.86 14.23 0.00 17.07 27.10 2.44 0.00 0.00 281.37 222.90 0.00 0.00 0.40 3.88 22.29 2.23 3.32
3 3 3
#REF!
0
1,350.11 DESCARGAR
PRESENTAR
DESCARTAR EMITIR PAGAR 222.9
20,086.57 DESCARGAR
PRESENTAR
DESCARTAR EMITIR PAGAR 20.061
11,043.82 DESCARGAR
PRESENTAR
DESCARTAR EMITIR PAGAR
13,139.34
45,619.84
31.03
45,588.81
PLANILLA CONSTRUCCION CIVIL CONSORCIO CHAQUICOCH
1 2 3 4 5
Apellido
Apellido
DNI Nombres
Materno
Paterno
FECHA DE
Fecha
REGIMEN Categoria CARGO INGRESO
Ingreso
SUNAT
Días Jornal
Fecha Sistema para es Días N° Jornal
Tipo de Sistema Nº CUSPP Reg.
Cese Pensión escolari Traba Gratif. Hijos Básico
dad jados
5.00 490.98 24.00 272.72 0.00 0.00 70.00 #REF! #REF! 49.00
5.00 536.86 24.00 279.54 0.00 134.22 56.45 #REF! #REF! 50.35
5.00 341.46 24.00 189.70 0.00 0.00 54.20 #REF! #REF! 34.25
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 32.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 32.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 227.59 8.00 126.44 0.00 0.00 36.13 #REF! #REF! 22.83
5.00 665.73 40.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 128.05 8.00 71.14 0.00 0.00 20.33 #REF! #REF! 12.85
5.00 490.98 32.00 272.72 0.00 0.00 70.00 #REF! #REF! 49.00
5.00 665.73 16.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 237.60 16.00 131.98 0.00 33.88 #REF! #REF! 23.71
5.00 395.94 8.00 219.93 0.00 56.45 #REF! #REF! 39.52
5.00 441.00 32.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 64.43 0.00 33.55 0.00 20.14 6.78 #REF! #REF! 6.04
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 128.05 8.00 71.14 0.00 0.00 20.33 #REF! #REF! 12.85
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 40.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 300.90 24.00 167.14 0.00 42.90 #REF! #REF! 30.03
5.00 665.73 16.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 493.83 16.00 257.13 0.00 123.46 51.93 #REF! #REF! 46.32
5.00 43.03 0.00 22.41 0.00 13.45 4.53 #REF! #REF! 4.04
5.00 644.33 16.00 335.50 0.00 201.35 67.75 #REF! #REF! 60.43
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 493.83 16.00 257.13 0.00 154.32 51.93 #REF! #REF! 46.32
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 32.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 32.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 32.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 32.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 24.00 346.64 0.00 166.43 70.00 #REF! #REF! 62.44
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 412.49 24.00 229.16 0.00 0.00 65.48 #REF! #REF! 41.38
5.00 601.30 24.00 313.09 187.90 63.22 #REF! #REF! 56.40
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 312.95 24.00 173.86 0.00 49.68 #REF! #REF! 31.39
5.00 490.98 32.00 272.72 0.00 0.00 70.00 #REF! #REF! 49.00
5.00 665.73 32.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 128.05 8.00 71.14 0.00 0.00 20.33 #REF! #REF! 12.85
5.00 665.73 16.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 32.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 128.05 8.00 71.14 0.00 0.00 20.33 #REF! #REF! 12.85
5.00 213.41 16.00 118.56 0.00 33.88 #REF! #REF! 21.41
5.00 270.27 24.00 150.15 0.00 42.90 #REF! #REF! 27.11
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 16.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 16.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 32.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 128.05 8.00 71.14 0.00 0.00 20.33 #REF! #REF! 12.85
5.00 270.27 24.00 150.15 0.00 42.90 #REF! #REF! 27.11
5.00 312.95 24.00 173.86 0.00 49.68 #REF! #REF! 31.39
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 32.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 270.27 24.00 150.15 0.00 42.90 #REF! #REF! 27.11
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 32.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 213.41 16.00 118.56 0.00 33.88 #REF! #REF! 21.41
5.00 665.73 16.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 490.98 24.00 272.72 0.00 0.00 70.00 #REF! #REF! 49.00
5.00 665.73 32.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 270.27 24.00 150.15 0.00 42.90 #REF! #REF! 27.11
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 16.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 213.41 16.00 118.56 0.00 0.00 33.88 #REF! #REF! 21.41
5.00 270.27 24.00 150.15 0.00 0.00 42.90 #REF! #REF! 27.11
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 270.27 24.00 150.15 0.00 0.00 42.90 #REF! #REF! 27.11
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 32.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 665.73 32.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 32.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 515.46 8.00 268.40 0.00 128.87 54.20 #REF! #REF! 48.35
5.00 558.26 24.00 290.68 0.00 174.46 58.70 #REF! #REF! 52.36
5.00 312.95 24.00 173.86 0.00 0.00 49.68 #REF! #REF! 31.39
5.00 312.95 24.00 173.86 0.00 0.00 49.68 #REF! #REF! 31.39
5.00 441.00 32.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 341.46 32.00 189.70 0.00 0.00 54.20 #REF! #REF! 34.25
0.00 42.68 0.00 23.71 0.00 0.00 0.00 #REF! #REF! 0.00
5.00 665.73 32.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 32.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 32.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 312.95 24.00 173.86 0.00 0.00 49.68 #REF! #REF! 31.39
5.00 665.73 24.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 644.33 24.00 335.50 0.00 201.35 67.75 #REF! #REF! 60.43
5.00 665.73 24.00 346.64 0.00 166.43 70.00 #REF! #REF! 62.44
5.00 408.00 24.00 212.44 0.00 127.50 42.90 #REF! #REF! 38.27
5.00 665.73 16.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
5.00 441.00 32.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 32.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 441.00 24.00 245.00 0.00 0.00 70.00 #REF! #REF! 44.24
5.00 665.73 40.00 346.64 0.00 208.04 70.00 #REF! #REF! 62.44
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
33 34 35 36 37 38 39 40 41 42 43
Bonif.
Gratificacio Com.
CTS. Temp H.E. H.E. Total Total O.N.P. Comision Prima
nes Mixt
12% Ley 60% 100% Ingresos Afecto 13% /Flujo Afp
por navidad /Saldo
30334
196.39 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
201.32 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
136.58 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
91.04 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
51.22 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
196.39 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
95.04 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
158.38 #REF! #REF! 0.00 0.00 #REF! #REF! #REF! 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
24.16 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
51.22 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
120.36 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
185.19 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
16.14 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
241.62 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
185.19 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! #REF! 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
165.00 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
225.49 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
125.18 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
196.39 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
51.22 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
51.22 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
85.37 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
108.11 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
51.22 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
108.11 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
125.18 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
108.11 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
85.37 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
196.39 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
108.11 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
85.37 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
108.11 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
108.11 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
193.30 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
209.35 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
125.18 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
125.18 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
136.58 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
17.07 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
125.18 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
241.62 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
153.00 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! #REF! 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
176.40 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
249.65 #REF! #REF! 0.00 0.00 #REF! #REF! 0.00 0.00 0.00 0.00
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
HABITAT D C
INTEGRA D C
PRIMA D C
PROFUTURO D C
44 45 46 47 48 49 50 51 52 53
Aport. APORT
Conaf Retencion ESSALU Dsct. Total Neto Essalud
Obligatorio COMP Adelanto
2% 5TA D + VIDA Sindical Descuentos a Pagar 9%
Afp AFP
0.00 #REF! #REF! 27.18 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 2.50 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 24.67 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 104.05 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 0.00 #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.23 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 100.72 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 0.00 #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.30 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 107.91 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 8.88 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 36.70 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 108.84 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 27.11 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.18 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.24 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.23 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.12 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.19 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 102.14 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 27.11 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.20 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.16 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.19 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 59.05 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 0.00 0.00 0.00 #REF! #REF! 20.06
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 100.72 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 107.85 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 96.60 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 9.78 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 0.00 #REF! 26.98 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 1.28 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 0.00 5.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! #REF! 111.22 5.00 0.00 0.00 #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 1,159.73 190.38 1,350.11 DESCARGAR
PRESENTAR
DESCARTAR EMITIR PAGAR
52 ### 3,600.78 20,086.57 DESCARGAR
PRESENTAR
DESCARTAR EMITIR PAGAR
30 9,135.10 1,907.77 11,042.87 DESCARGAR
PRESENTAR
DESCARTAR EMITIR PAGAR
33 ### 2,614.35 13,139.34
### 8,313.28 45,618.89
#REF! #REF!
Dias trabajados Movilidad
54 55 56 57 58 59 60 61 62 63 64
Total
APORT
Base para Vida Aportes Colum dias Dias Movilidad
COMP jornales TOTAL
Vida Ley Ley del na1 trabajados Adicionles Costo Zona T
AFP2
Empleador
#REF!
2904
TOTAL PLANILLA MARZO 2022
REGIMEN GENERAL 1,314,752.35 60,354.91 305.50 92,905.05 0.00 0.00 153,565.46 1,161,186.89
REGIMEN CONSTRUCCION CIVIL 413,812.10 42,499.33 893.11 4,882.09 615.00 4,440.34 53,329.87 360,482.23
PLANILLA MARZO 2022 413,530.73 42,470.53 893.11 4,882.09 615.00 4,437.02 53,297.75 360,232.98
PLANILLA COVID 281.37 28.80 0.00 0.00 0.00 3.32 32.12 249.25
1,805,196.00
APORTE TOTAL
ESSALUD VOLUNTARIO VIDA LEY APORTES
AFP
43,150.91 0.00 1,156.92 44,307.83
RUC : 20495847099
Empleador : CONSORCIO CHAQUICOCHA S.R.L.
Periodo : 03/2022
PDT Planilla Electrónica - PLAME Número de Orden :
Retención Aporte
Pension Pensionario
0.00
TAREO - MES DE MARZO 2022 REGIMEN GENERAL
FECHA FECHA DE
CARGO U OCUPACIÓN REGIMEN 1 2 3 4
INGRESO CESE
SUPERVISOR DE IZAJE 01/12/2021 REGIMEN GENERAL 1 1 1 1
TOPOGRAFO 01/01/2022 REGIMEN GENERAL 1 1 1 1
SUPERVISOR EHS 02/11/2021 REGIMEN GENERAL 1 1 1 1
JEFE LABORATORIO MECANICA DE SUELOS 01/01/2022 REGIMEN GENERAL 1 1 1 1
CAPATAZ MOV. TIERRAS 06/01/2022 09/03/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 10/02/2022 31/03/2022 REGIMEN GENERAL 1 1 1 1
MECANICO 01/01/2022 REGIMEN GENERAL 1 1 1 1
SUPERVISOR EHS 06/01/2022 REGIMEN GENERAL 1 1 1 1
JEFE OFICINA TECNICA 03/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 01/01/2022 31/03/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR SPRINTER 01/01/2022 REGIMEN GENERAL 1 1 1 1
CAPATAZ MOV. TIERRAS 21/10/2021 REGIMEN GENERAL 1 1 1 1
SUPERVISOR EHS 01/01/2022 REGIMEN GENERAL 1 1 1 1
AYUDANTE MECANICO 10/02/2022 REGIMEN GENERAL 1 1 1 1
JEFE AREA DE SISTEMAS 03/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 01/01/2022 REGIMEN GENERAL 1 1 1 1
CONTROLADOR DE EQUIPOS 01/01/2022 REGIMEN GENERAL 1 1 1 1
AYUDANTE CISTERNA DE AGUA 23/12/2021 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 01/01/2022 REGIMEN GENERAL 1 1 1 1
SUPERVISOR MOVIMIENTO DE TIERRAS 01/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR CAMIONETA 25/11/2021 REGIMEN GENERAL 1 1 1 1
CONDUCTOR CAMIONETA 01/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 03/02/2022 31/03/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 06/01/2022 REGIMEN GENERAL 1 1 1 1
MECANICO 01/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE DE SUPERVISION 29/12/2021 REGIMEN GENERAL 1 1 1 1
TECNICO DE LABORATORIO MECANICA DE SUELOS 01/01/2022 REGIMEN GENERAL 1 1 1 1
CAPATAZ MOV. TIERRAS 01/01/2022 REGIMEN GENERAL 1 1 1 1
JEFE MANTENIMIENTO DE EQUIPOS 03/01/2022 REGIMEN GENERAL 1 1 1 1
MECANICO 01/01/2022 REGIMEN GENERAL 1 1 1 1
CAPATAZ MOV. TIERRAS 01/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR CAMIONETA 01/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 01/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE DE LOGISTICA 03/01/2022 REGIMEN GENERAL 1 1 1 1
AYUDANTE MECANICO 01/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 03/02/2022 31/03/2022 REGIMEN GENERAL 1 1 1 1
ALMACENERO 01/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE DE ALMACEN 02/12/2021 REGIMEN GENERAL 1 1 1 1
ASISTENTE CONTROL DE CALIDAD 01/01/2022 REGIMEN GENERAL 1 1 1 1
JEFE CONTROL DE CALIDAD 01/01/2022 REGIMEN GENERAL 1 1 1 1
CONTADOR 20/11/2017 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 13/01/2022 31/03/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE OFICINA TECNICA 03/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE MEDIO AMBIENTE 02/12/2021 REGIMEN GENERAL 1 1 1 1
CONDUCTOR CAMIONETA 01/01/2022 REGIMEN GENERAL 1 1 1 1
CAPATAZ MOV. TIERRAS 20/01/2022 REGIMEN GENERAL 1 1 1 1
AYUDANTE DE ZARANDA 01/01/2022 REGIMEN GENERAL 1 0 1 1
TOPOGRAFO 01/01/2022 REGIMEN GENERAL 1 1 1 1
TOPOGRAFO 08/02/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR CAMIONETA 01/01/2022 REGIMEN GENERAL 1 1 1 1
AYUDANTE CISTERNA DE AGUA 01/01/2022 01/03/2022 REGIMEN GENERAL 1 0 0 0
CONDUCTOR CAMIONETA 01/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE DE SUPERVISION 02/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE RRHH 03/01/2022 REGIMEN GENERAL 1 1 1 1
SUPERVISOR CONTROL DE CALIDAD 01/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE EHS 01/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR SPRINTER 01/01/2022 REGIMEN GENERAL 1 1 1 1
MECANICO 04/02/2022 REGIMEN GENERAL 1 1 1 1
SUPERVISOR EHS 14/02/2022 REGIMEN GENERAL 1 1 1 1
MECANICO 03/01/2022 REGIMEN GENERAL 1 1 1 1
GERENTE 10/11/2017 REGIMEN GENERAL 1 1 1 1
LOGISTICA 01/04/2020 REGIMEN GENERAL 1 1 1 1
AYUDANTE CISTERNA DE COMBUSTIBLE 01/01/2022 REGIMEN GENERAL 1 1 1 1
SUB GERENTE 04/01/2021 REGIMEN GENERAL 1 1 1 1
ASISTENTE ADMINISTRATIVO 03/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE DE RESIDENTE DE OBRA 18/03/2022 REGIMEN GENERAL 1 1 1 1
GERENTE FINANCIERO 01/02/2012 REGIMEN GENERAL 1 1 1 1
MECANICO 10/02/2022 REGIMEN GENERAL 1 1 1 1
INGENIERO DE COSTOS 03/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 10/02/2022 31/03/2022 REGIMEN GENERAL 1 1 1 1
CAPATAZ MOV. TIERRAS 27/01/2022 31/03/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE RRHH EN CAMPO 01/01/2022 REGIMEN GENERAL 1 1 1 1
JEFE DE EHS 01/01/2022 REGIMEN GENERAL 1 1 1 1
CADISTA 03/01/2022 REGIMEN GENERAL 1 1 1 1
RESIDENTE DE OBRA 25/11/2021 REGIMEN GENERAL 1 1 1 1
GERENTE OPERACIONES 03/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 21/01/2022 31/03/2022 REGIMEN GENERAL 1 1 1 1
JEFE DE ABASTECIMIENTO 01/12/2021 REGIMEN GENERAL 1 1 1 1
CAPATAZ MOV. TIERRAS 01/01/2022 REGIMEN GENERAL 1 1 1 1
ENFERMERO EN SALUD OCUPACIONAL 27/12/2021 REGIMEN GENERAL 1 1 1 1
SUPERVISOR MOVIMIENTO DE TIERRAS 27/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE ADMINISTRATIVO 03/01/2022 REGIMEN GENERAL 1 1 1 1
CAPATAZ MOV. TIERRAS 01/01/2022 23/03/2022 REGIMEN GENERAL 1 1 1 1
INGENIERO CONTROL DE PROYECTOS 03/01/2022 REGIMEN GENERAL 1 1 1 1
CONTADOR COSTOS 03/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE RRHH EN CAMPO 01/01/2022 REGIMEN GENERAL 1 1 1 1
RESIDENTE DE OBRA 01/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 17/02/2022 31/03/2022 REGIMEN GENERAL 1 1 1 1
AYUDANTE MECANICO 01/01/2022 31/03/2022 REGIMEN GENERAL 1 1 1 1
SUPERVISOR DE IZAJE 18/11/2021 REGIMEN GENERAL 1 1 1 1
SUPERVISOR CONTROL DE CALIDAD 01/01/2022 REGIMEN GENERAL 1 1 1 1
MAESTRO DE OBRA 07/03/2022 REGIMEN GENERAL 0 0 0 0
GUARDIAN 03/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 01/01/2022 REGIMEN GENERAL 1 1 1 1
JEFE DE RECURSOS HUMANOS 05/03/2015 REGIMEN GENERAL 1 1 1 1
CONTADOR RECURSOS HUMANOS 03/01/2022 REGIMEN GENERAL 1 1 1 1
CAPATAZ MOV. TIERRAS 20/01/2022 REGIMEN GENERAL 1 1 1 1
MECANICO 09/12/2021 REGIMEN GENERAL 1 1 1 1
GUARDIAN 01/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE ADMINISTRATIVO 03/01/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 01/01/2022 REGIMEN GENERAL 1 1 1 1
SUPERVISOR MANTENIMIENTO 01/12/2021 REGIMEN GENERAL 1 1 1 1
ASISTENTE ADMINISTRATIVO 03/01/2022 REGIMEN GENERAL 1 1 1 1
ASISTENTE CONTROL DE CALIDAD 01/01/2022 REGIMEN GENERAL 1 1 1 1
AYUDANTE DE ZARANDA 01/01/2022 27/03/2022 REGIMEN GENERAL 1 1 1 1
CONDUCTOR DE BUS 01/01/2022 31/03/2022 REGIMEN GENERAL 1 1 1 1
SUPERVISOR MANTENIMIENTO 01/12/2021 31/03/2022 REGIMEN GENERAL 1 1 1 1
LEYENDA:
VACACIONES 1 MORADO
LICIENCIA POR PATERNIDAD 1 SOMBREADO AMARILLO
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
SAB DOM LUN MAR MIE JUE VIE SAB DOM LUN MAR MIE JUE VIE SAB DOM LUN MAR MIE
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 0 0 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
24 25 26 27 28 29 30 31
LEYENDA:
VACACIONES 1 MORADO
LICIENCIA POR PATERNIDAD 1 SOMBREADO AMARILLO
CONSTRUCCION CIVIL
1 2 3 4 5 6 7
Categoria CARGO FECHA
INGRESO MAR MIE JUE VIE. SAB DOM LUN
MAR MIE JUE VIE. SAB DOM LUN MAR MIE JUE VIE. SAB DOM LUN MAR MIE JUE VIE. SAB
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1
0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1
0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1
0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
27 28 29 30 31
DOM LUN MAR MIE JUE DIAS TRAB. DIAS ADIC. FECHA CESE
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 25 31/03/2022
1 1 1 1 1 24 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
0 0 0 0 0 16 16/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
0 0 0 0 0 9 09/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 15 31/03/2022
1 1 1 1 1 25 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
0 0 0 0 0 3 03/03/2022
1 1 1 1 1 31 31/03/2022
0 0 0 0 0 9 09/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 0 1 19 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
0 0 0 0 0 23 23/03/2022
0 0 0 0 0 2 02/03/2022
1 1 1 1 0 30 30/03/2022
1 1 1 1 1 31 31/03/2022
0 0 0 0 0 23 23/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 29 31/03/2022
1 1 1 1 1 28 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 22 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
0 0 0 0 0 9 09/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
0 0 0 0 0 9 09/03/2022
1 1 1 1 1 15 31/03/2022
1 1 1 0 1 19 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
0 0 0 0 0 9 09/03/2022
1 1 1 0 1 19 31/03/2022
1 1 1 1 1 22 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 0 1 19 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 15 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 0 1 19 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 15 31/03/2022
1 1 1 0 1 19 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 0 1 19 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 24 31/03/2022
1 1 1 1 1 26 31/03/2022
1 1 1 1 1 22 31/03/2022
1 1 1 1 1 22 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 27 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 22 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 0 30 30/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 0 1 19 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022
1 1 1 1 1 31 31/03/2022