Documentos de Académico
Documentos de Profesional
Documentos de Cultura
37.492
A
A
4.995
4.995
4,555
Sobrepaso Elevador
NPT+20.40
B B
12,608
3,975
3.975
C
8.050
C
4,075
4.075
D D
1.200 8.092 1.200 4.311 1.200 7.450 1.200 1.850 1.200 3.944 1.200 3.447 1.200 0.762 1.200 3.291
16.001 16.003
1 2 3 4 5 6 7 8 9
AZOTEA
1 2 3 4 5 6 7 8 9
37.492
A
A DUCTO P/
17 16 15es114 13 12 es1
1 11 10 1
A3 A3 A3
es1
1
Ducto
Ducto
A3 H=0.50m SOBRE EL N.P.T. A3
f
ELEVADOR 1
TAB-R.G. sube 1
A1
4.995
4.995
f
1 A3 A3 A3 e
4,555
A1 1 2 es13 4 51 es16 7 81 es1 1
A1
f
e
A1 A1 A1
ACCESO
S S
ACCESO
NPT+17.30
d d d d d 1
5 5 3
1 f
A1 A1
e
Ducto
Ducto
B 1
1 1
Ducto
Ducto
A1
e
B
A1
f Ducto
A2 1
1
f PATIO DE SERVICIO 1
A1
12,608
3,975
1
3.975
f 1
NPT+14.20
VACIO
8.050
Ductos
A2
h=0.70m
A2
A2
h=0.70m
C
A1
4,075
4.075
1
f
1
A1
1 A2 f 1 A1 1 A2 A1
h=0.70m h=0.70m
1
Ducto
D D
1.200 8.092 1.200 4.311 1.200 7.450 1.200 1.850 1.200 3.944 1.200 3.447 1.200 0.762 1.200 3.291
16.001 16.003
1 2 3 4 5 6 7 8 9
ROOF GARDEN
1 2 3 4 5 6 7 8 9
37.492
A
A LK DUCTO P/
17 16 15es114 13 12 es1
1 11 10 1
A3 A3 A3
es1
1
h=0.40m
A2 3
h=0.40m
A2 3 A2
h=0.40m
Ducto
Ducto
c c A3 H=0.50m SOBRE EL N.P.T. A3 3
A1
3
1 b ELEVADOR 1 1 1 BAÑO
TAB-N.4 sube
1 A1
1
4.995
4.995
a b 1 A3 A3 A3 A2 3 BAÑO
4,555
A1 A1
BODEGA
h=1.10m
A1 a 1 2 es13 4 51 es16 7 81 es1 1
h=0.40m A1 g h=1.80m
c 1 f f
1 f g 5
c A1 c 3 1 h A2
A1 1 A1 A1 A1
NPT+14.20 A1 SALA DE LECTURA RECÁMARA 35
h=1.10m eS Área= 36.40m²
S S
d d d d d d 1
5 5 3 3
1 A1 A1 A1 A1 A1
e e 3 e e e
3 1 1
h=0.40m
i Ducto
B A3
1
Ducto
Cto. DE SERVICIO
Ducto
CL
B
1 1
1 Ducto
A4 A4 A1
12,608
i i e
VACÍO 1 1
3,975
BAÑO BAÑO
3.975
1 1 1
RECÁMARA 33
A4 A4 RECÁMARA 34
A1
Área= 26.80m² Área= 29.25m²
i SALA DE CINE i e
1
Ducto Ducto
A3 VACÍO
CL CL
8.050
h=0.40m
1
Ducto
C
Ducto
CL CL
1 1
i i A1
RECÁMARA 32 RECÁMARA 31
Área= 29.26m² Área= 32.80m²
A4 A4 e
1
4,075
4.075
h=0.40m Se
A3
1
1
i i BAÑO BAÑO
1 A4 A4
h=1.20m
i
A3 Ducto
h=0.40m
D D
1.200 8.092 1.200 4.311 1.200 7.450 1.200 1.850 1.200 3.944 1.200 3.447 1.200 0.762 1.200 3.291
16.001 16.003
1 2 3 4 5 6 7 8 9
PLANTA NIVEL 4
1 2 3 4 5 6 7 8 9
37.492
A
A
TUBERIA POR PISO
es1 es1 A2 A2 A2 Ducto
A1 A1 3 A1 A3 3
TUBERIA POR PISO A3 H=0.50m SOBRE EL N.P.T.
f f COCINA e 3
ELEVADOR 1 1 1 BAÑO
TAB-N.3 sube
TUBERIA POR PISO SALON DE ESTETICA
4.995
4.995
1 A3 A3 A3 A2 3 BAÑO
4,555
A1 A1
1
1 2 es13 4 51 es16 7 81 es1 1
h=0.40m A1 g
h h=1.80
g 3 TUBERIA POR PISO f f
A8 A3
e
h=0.40m 1 f g 5
f 3 1 h A2
A1 A1
NPT+11.10 A1 h=1.10m RECÁMARA 30
A1 A1 A1 eS Área= 36.40m²
COMEDOR PRIVADO S S
f f e d d d d d 1
1 3 3 3 3
3 A1 A1 A1 A1 A1
A3 e e 3 e e e
h=0.40m 3 3 3 1 1
A5 3 TUBERIA POR PISO
1 TUBERIA POR PISO
1
TUBERIA POR PISO
h=1.80
g Ducto
B A8
h=0.40m
A5
1
Ducto
Cto. DE SERVICIO
Ducto
CL
B
1
3
Ducto
A1
1
12,608
h=0.70m g 1 e
h=1.80 A1 A1
A8 A8 g h 1
3,975
3.975
A8
3 1
CL
3
1
A5 1 RECÁMARA 29 RECÁMARA 28
A1 Área= 29.25m²
Área= 26.80m²
h=0.40m e
3 A1 A1
VACÍO
CL Ducto
Ducto Ducto
1 CL CL
C C
8.050
h=1.80
TUBERIA POR PISO
g
A8 Contacto en N.P.T.
A6 1
h=0.40m 1
Ducto Ducto
Ducto
3 CL CL
A5 3
Contacto en N.P.T.
A1 A7 A1 A1
RECÁMARA 27 RECÁMARA 26
A6 1 1 Área= 29.26m²
e
Área= 32.80m²
Contacto en N.P.T. 1
h TUBERIA POR PISO
GYM
1
4,075
A7 1 Se
1 3
Contacto en N.P.T. 1
A6 A1 A1 BAÑO BAÑO
A5 A7 CL
TUBERIA POR PISO A8 TUBERIA POR PISO
h=0.40m Contacto en N.P.T.
h
h=0.70m h A8
A8 1
1 A8 1 h=1.80 g Ducto
A8
D D
1.200 8.092 1.200 4.311 1.200 7.450 1.200 1.850 1.200 3.944 1.200 3.447 1.200 0.762 1.200 3.291
16.001 16.003
1 2 3 4 5 6 7 8 9
PLANTA NIVEL 3
1 2 3 4 5 6 7 8 9
37.492
A
A Ducto
A3
h=0.40m
h=0.40m
A3 DUCTO P/
17 16 15es114 13 12
A3
es1
1 11 10 1
A3 A3
es1
1
A2
h=0.40m
h=0.40m
A2
Ducto
1 1
SUBE CIRCUITO BASURA
DE ESCALERAS es1 1 A1 A1
1 S A1
S f f
a es1 1
es1
LA ALTURA DE LAS ARBOTANTES SERA 9 h
Ducto
Área= 36.64m²
h=0.70m 3 3 h=0.40m 3
A1 A1 A1 ELEVADOR 1
SALA DE ARTES BAÑO
TAB-N.2 sube
h=1.20m A2
a b b
4.995
4.995
1 A3 A3 A3 3 BAÑO
4,555
A1 A1
SALA DE ESTAR
1 2 es13 4 51 es16 7 81 es1 1 A2 f
A1 g
f f
h=0.40m
h=0.70m
A3 g 5
3
b h A2
3
A1
NPT+8.00 A1 h=1.10m
eS
RECÁMARA 20
Área= 36.40m²
S S
1 d A1 d d d d 1
A1 1 A1 1 A1 1 1 1 3 3
A1 A1 A1 A1 A1
S c c c
c e e 3 e e e
1 3 1 1
CL
Ducto
B Ducto
Cto. DE SERVICIO
Ducto
CL
B
1
Ducto
A1
c A1
12,608
e
3,975
BAÑO BAÑO
3.975
1
1
C C
8.050
1
Ducto
CL
Ducto
S c Ducto
CL CL
CL
1
RECÁMARA 22
A1 RECÁMARA 21
A1
RECÁMARA 17 RECÁMARA 16
A1 Área= 27.22m² Área= 29.26m² Área= 32.80m²
Área=31.24m² c e
1
4,075
4.075
Se
BAÑO BAÑO
BAÑO BAÑO
Ducto
D D
1.200 8.092 1.200 4.311 1.200 7.450 1.200 1.850 1.200 3.944 1.200 3.447 1.200 0.762 1.200 3.291
16.001 16.003
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
37.492
A
A Ducto
A3 A3
DUCTO P/
17 16 15es114 13 12
A3
es1
1 11 10 1
A3 A3
es1
1
A2
h=0.40m
h=0.40m A2
Ducto
1 A3 1 1 1 1
h=0.40m h=1.20m SUBE CIRCUITO BASURA
DE ESCALERAS es1
A3 h=1.10m A3 1 A1 A1
1 S A1
h=1.40m S f f
b es1 1
1 h=1.10m 1 ESTACIÒN DE ENFERMERIA es1 ESTANCIA
LA ALTURA DE LAS ARBOTANTES SERA 9 h
Ducto
1 A1 a 1 a
TAB-N.1 sube h=1.20m
A2
4.995
4.995
ALMACEN DE MEDICAMENTOS b 3
1 1 A3 A3 A3 BAÑO
4,555
h=0.70m f A1 A1
A4
A4
a 1 2 es13 4 51 es16 7 81 es1 1 A2
A1 g
h=0.40m f f
A1 1 A1 1 h=0.40m
1
A3 3 a a 3 g 5
1 A4 3
h=1.40m
h A2
3
h=0.40m
3 1 A1 A1
NPT+4.90 A1 h=1.10m
RECÁMARA 10
eS Área= 36.40m²
S S
1 d d d d d 1
A1 A1 1 A1 1 1 1 3 3
1 A1 A1 A1 A1 A1
S c c c
c e e 3 e e e
1 3 1 1
CL
Ducto
B Ducto
Cto. DE SERVICIO
Ducto
CL
B
1
Ducto
A1
c A1
12,608
e
3,975
BAÑO BAÑO
3.975
1
1
C C
8.050
1
Ducto
CL
Ducto
S c Ducto
CL CL
CL
1
RECÁMARA 12
A1 RECÁMARA 11 RECÁMARA 7
A1
RECÁMARA 6
A1 Área= 27.22m² Área= 29.26m² Área= 32.80m²
Área=31.24m² c e
1
4,075
4.075
Se
BAÑO BAÑO
BAÑO BAÑO
Ducto
D D
1.200 8.092 1.200 4.311 1.200 7.450 1.200 1.850 1.200 3.944 1.200 3.447 1.200 0.762 1.200 3.291
16.001 16.003
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9 10
37.492 5.057
A
A Ducto
h=0.40m
h=1.20m
DUCTO P/
17 16 15es114 13 12
1 11 10
A3 A3
es1
1
A3
es1
1
A2
h=0.40m
h=0.40m A2
Ducto
h=0.70m 1
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 SUBE CIRCUITO BASURA
DE ESCALERAS 1
es1 1 A1 A1
1 2 3n 4n 5n 6n 7n 8n 9n 10
n n n n n n A1 1 S A1
1 1 1 S f f
es1 1
o es1 LA ALTURA DE LAS ARBOTANTES SERA 9 h
Ducto
CCTV
l l l l RECEPCIÒN
A1
sube h=1.20m h=0.40m
4.995
4.995
1
8 1 A3 A3 A3 3
4,555
A1 A1
1 n 1 A1 1 1 2 es13 4 51 es16 7 81 es1 1 A2
A1 g
m A1 f f
l o
3 o h=0.40m f
A6 5
Proyección losa
VIGILANCIA 3 n A5 3 1
1 1
1 f A2 3 A2 1 A2 m u
h=0.70m 1
a m m m 1 Ducto
B 1
A1 a
1
5
h=0.70m
u
1
A2 u
A2
Ducto
Cto. DE SERVICIO
Ducto
CL
B
A3 A2 1
A3 h=0.70m h=0.70m
3 A3 Ducto
3 h=1.10m
p 1
A1 b 1 1 1 1
1 A1
A1
3 c b LOBBY
12,608
1 BAÑO e
BAÑO STAFF c 1
3,975
BAÑO
3.975
3
A1
14
A2 A2 A2
3 d A1 1 1
Proyección losa
RECÁMARA 8
p m m m
h=1.10m A3
1
A1 RECÁMARA 3
BAÑO STAFF
3 e d
RECÁMARA 4
A1 Área= 29.25m²
e u Área= 26.80m²
A5 e
Proyección losa
h=0.40m 1 A5 1 A5 A2
m A2
Ducto 5 h=0.40m Ducto
Ducto h=0.40m A2
LK
CL CL
h=1.20m VACÍO
C C
8.050
g A4 u
A2 1
1 1 Ducto
h=0.40m 3 Ducto
CL CL
LK
A3 h=2.10m
A4 h=0.70m A2
1 ADMINISTRACIÓN
A2 3 A2 3 A2 3 A2 1 A1
i RECÁMARA 2 RECÁMARA 1
h=1.10m A3 h h 1
g g h
Área= 29.26m²
e
Área= 32.80m²
3 1
1 3
1
1
4,075
1
4.075
1 A2
VACÍO Se
3
COCINA/COMEDOR STAFF 1
i
A4 3 h=0.70m i
BAÑO BAÑO
h=0.70m A3 A2 A2
A3
h=0.40m 3 A4
h=2.10m A4 h=2.10m h=2.10m u
j A4 1
g g 1 A2 1 A4 h=0.70m
3 k h=1.10m 1
CL
h=0.70m A2
h A2 A2
A2 3
1
j k 1
u A2 1 A2 u 1 u A2
BAÑO A2 Ducto
h=0.70m
D D
1.200 8.092 1.200 4.311 1.200 7.450 1.200 1.850 1.200 3.944 1.200 3.447 1.200 0.762 1.200 3.291
16.001 16.003
1 2 3 4 5 6 7 8 9
PLANTA BAJA
1 2 3 4 5 6 7 8 9 10
37.492 5.057
38.510
CONTACTO 220V
3-8 AWG, THHW-LS- 1-12 AWG-d
A
A
h=0.45m C11 1- TUB-21 mm (3/4" in.)
es1 C5 C11
es1 Ducto
17 16 15es114 13 12
1 11 10 1 C4 C2
TAB-COCINA ESP
C10
A3 A3 A3 1 h=0.45m h=0.45m j C5 1 h=0.45m 1 h=1.20m h=1.20m 1 h=0.60m
R
1 1
DUCTO
SUBE CIRCUITO DE ESCALERAS
1
A1 es1 1
Proyección escaleras
1 3
h=0.70m
S S
es1 1 es1 3
A1 LA ALTURA DE LAS ARBOTANTES SERA C1 C1 8 C1 8 C1 8 C1 8 C1
A3 H=0.50m SOBRE EL N.P.T.
9 BAÑO C1 COCINA
1 A3 ALACENA
DUCTO
b 1 j h i i k k
1
sube 1
h=0.70m b ELEVADOR 1
A1
3 1
1 1 A3 A3 A3 8
1
4.995
4.995
1 2 3 4 5 6 7 R
h=0.45m h=1.20m C4 C11
h=1.10m C1 C3 h=0.45m R h=1.20m 1
h=0.70m A1 CL A1 1 1
A1
7
A1 C1 8 C1 C1 C1 8 C1
c c 1
A1 A1 A1
b j h 1 i k k
C1 h=1.20m
d d d
C k C9 k
1 1 1 f
1 C11 i C11 C12 1 i
h 3 h=2.50m h=2.50m h C6 h=0.70m
h=1.20m h=0.35m
S S f C6
3 3 C6 C8 h=1.60m
d 1 g h=1.50m
d
A1 NPT-1.60 A1 A1 C1 C1 C1 1 C1 C1 C1
NPT-2.60
1 d d d f f f f g g g
1 1 1 C1
1 1 3 3 3 1 1
B A1 1 B
10
9
a a A1 A1 Sc
c c l m 1
1 1 1
0
1 1 1
14.36
1 C7 C7
TAB-S1
1
12,608
C7
13.000
CUARTO ELECTRICO 1 1 l l 1 l
1
2
1
3,975
A1 A1 A1
3.975
e e e
1
1
A1 1
11
12
A1 A1
a c c 1
1
C7 C7
C7
l COMEDOR
l l
1 1
1 1 1
C
8.050
C
4
1 1 S A1 A1 1
h=0.50 h=0.50 e e m
Sm A2 A2 h=0.50
m m A2 m S e
1 m
C7 C7 C7
C7
m m m m
1 1 1 1 1
4,075
4.075
NPT-1.60
1
NPT-2.60 Pendiente 12% 1
6
Planta eléctrica
de emergencia A1 A1 A1
e e e C7 C7 C7
C7
m m m m
1 1
1
m m A2 m
A2 h=0.50 1 A2 h=0.50 1 h=0.50
D A8
1
h=1.10m
D
1.200 8.092 1.200 4.311 1.200 7.450 1.200 1.850 1.200 3.944 1.200 3.447 1.200 0.762 1.200 3.291
16.001 16.003
42.650
1 2 3 4 5 6 7 8 9 10
PLANTA SOTANO