4-Jul-23 COMPRA DE CALAMINAS S/ 400.

00
4-Jul-23 COMPRA DE MATERIALES
UNIDAD
ACERO DE 5/8 68 S/ 4,127.60
ACERO DE 1/2 16 S/ 630.40
ACERO DE 3/8 91 S/ 2,002.00
ACERO DE 1/4 15 S/ 135.00
1 ROLLO DE # 16 4 S/ 400.00
1 ROLLO DE #8 4 S/ 400.00
TRANSPORTE DE MATERIAL S/ 80.00
GASTO TOTAL S/ 7,775.00
1ROLLO DE PLASTICO S/ 360.00
100 BOLSAS CEMENTO S/ 2,500.00
ACERO DE 1/2 15 S/ 600.00
ACERO DE 5/8 15 S/ 930.00
ACERO DE 3/8 80 S/ 1,840.00
ARENA GRUESA 1 S/ 300.00
PIEDRA CHANCADA 1 S/ 720.00
1 TAREO DE PIEDRA 1 S/ 230.00
GASTO TOTAL S/ 7,480.00

100 BOLSAS DE CEMENTO ANSISALITRE S/ 2,900.00

PIEDRA CHANCADA S/ 270.00


ARENA GRUESA S/ 570.00

GASTO TOTAL S/ 840.00

PIEDRA CHANCADA S/ 270.00


ARENA GRUPO S/ 570.00
PIEDRA MACHADA S/ 315.00
GASTO TOTAL S/ 1,155.00

ELMINACION DE MATERIAL 8 S/ 2,560.00

CEMENTO 100 S/ 2,475.00


ACERO 1/2 15 S/ 562.50
ACERO 5/8 8 S/ 488.80
ALAMBRE 16 4.15 S/ 415.00
TRIPLAY 1 S/ 80.00
TRANSPORTE 1 S/ 120.00
GASTO TOTAL S/ 4,141.30

TOTAL GASTO MATERIAL S/ 26,851.30

S/ 16,400.00

S/ 43,251.30
80 640

S/ 55,000.00
S/ 11,748.70
4-Jul-23 S/ 1,000.00 1
7-Jul-23 S/ 1,000.00
8-Jul-23 S/ 4,400.00
10-Jul-23 S/ 1,500.00
14-Jul-23 S/ 1,500.00
15-Jul-23 S/ 4,000.00
18-Jul-23 S/ 3,000.00

TOTAL: S/ 16,400.00
2 3 4 5 7 S/ 35,000.00
S/ 14,000.00
S/ 11,500.00
S/ 7,500.00
105000
95000
85000

l m m
890 890 890

2 2 4
200 200 400

360 360 360


92 350 32200 105000
92 320 29440
92 320 29440
91080 13920

105000 95000

2 2 85000

S/ 80,000.00 5000
6666.6666667

j v s
890 890 890 5340 5900 766.666667

6 6 6
600 600 600 S/ 2,600.00

360 360 360 2160

S/ 4,760.00

S/ 1,140.00