DATOS MES A MES

MES 0 MES 1 MES 2 MES 3 MES 4


PV 0 $5,000.00 $10,000.00 $7,000.00 $3,000.00
AC $5,000.00 $12,000.00 $4,200.00
EV $5,000.00 $10,000.00 $3,500.00
DATOS ACUMULADOS (calculos valor ganado)
MES 0 MES 1 MES 2 MES 3 MES 4
PV (curva S) $0.00 $5,000.00 $15,000.00 $22,000.00 $25,000.00
AC $0.00 $5,000.00 $17,000.00 $21,200.00
EV $0.00 $5,000.00 $15,000.00 $18,500.00
Resultado
KPI Formula Mes 2 mes 3
BAC $25,000.00 $25,000.00 presupuesto a termino
CV EV- AC $0.00 -$2,700.00
CPI EV/AC 0.88 0.87 rendimiento actual por $1.00
SV EV- PV $0.00 -$3,500.00 retrasados
SPI EV/PV 1.00 0.84 % de avance a la fecha de lo planeado
EAC BAC/CPI $28,333.33 $28,735.63 la proy. del costo total del proyecto
VAC BAC- EAC -$3,333.33 -$3,735.63 El sobrecosto que se tendrá
TCPI BAC- EV / BAC - AC 1.71 "esfuerzo" que se debe tener para recuperarnos s
30000

25000 $25,0

$22,000.00
GRAFICAR $21,200.00
GRAFICAR 20000
GRAFICAR $18,500.00
$17,000.00

15000 $15,000.00
$15,000.00

al por $1.00
10000

fecha de lo planeado
total del proyecto
5000 $5,000.00
$5,000.00
e debe tener para recuperarnos según PV

0 $0.00
$0.00 0
MES 0 MES 1 MES 2 MES 3 MES 4
BAC

$25,000.00
AC

$22,000.00
$21,200.00
EV
$18,500.00

Row 9
Row 10
Row 11

0
MES 3 MES 4