Documentos de Académico
Documentos de Profesional
Documentos de Cultura
1 1/8"
1 T .44 m. Ø 1 1/8"
TRAMPA DE LIQUIDOS
7/8"
1 T .40 m. Ø 7/8"
UNIDAD CONDENSADORA AC INROW 1
VALVULAS DE
SERVICIO
1 T .42 m. Ø 1 1/8"
1 T .30 m. Ø 1 1/8"
1 /8"
Ø1 7 / 8"
9 m. m .Ø
.9 0
1 T1 2. 4
TRAMPA DE LIQUIDOS 1T
1 1/8"
1 T .89 m. Ø 7/8"
1 T .74 m. Ø 1 1/8"
ISOMETRICO GENERAL AC 1
1 T .59 m. Ø 7/8"
1 T .88 m. Ø 1 1/8"
VALVULAS DE 1
SERVICIO M-001
1 T 1.87 m. Ø 7/8"
1T
5.5
1m
1 T 1.88 m. Ø 1 1/8"
.Ø
1T 7/ 8
"
5. 5 YG YH YJ YK YL
1m
.Ø
11
/8"
VESTIBULE
(VESTÍBULO) CORRIDOR
TRAMPA DE LIQUIDOS C023-325
1 1/8" (CORREDOR)
C023-315
11 11 11
AC6
AC4 AC2 SERVER ROOM
(CUARTO DE
SERVIDORES)
6.6
C023-314
2
M-001
10 10 10
1.5
9 NOTE: 9 9
AC1
SHNEIDER ELECTRIC_INROW_RD_500-AIR_COOLED-
(200-480)V 460-480V ON SITE LOCATION
AC1
SHNEIDER ELECTRIC_INROW_RD_500-AIR_COOLED-
(200-480)V 460-480V UBICACIÓN EN SITE
YG YH YJ YK YL
20042-040500-M-001 ISOMETRIC INSTALLATION OF EQUIPMENT AIR IN ROW AC 1 Rev B
REFERENCES/ REFERENCIAS DESIGN FIRM/ FIRMA DE DISEÑO REVISIONS/ REVISIONES COMPAÑÍA CERVECERA DE OBREGÓN
PLAN/ PLANO NO. NAME/ NOMBRE FASE DISEÑO REVISION FECHA ES.04.05.00 - ROS - YEAST/CIP
IFC 0 12-09-2023 DESIGN FIRM: CODETEC TITULO DEL PLANO:
WORK PACKAGE: ISOMETRIC INSTALLATION OF EQUIPMENT AIR
BUSINESS UNIT: CCO IN ROW AC 1
BUILDING NUMBER: C023 - YEAST BUILDING 4 (ISOMETRICO DE INSTALACION UNIDADES DE
FUNCTIONAL AREA: 04 - COLD BLOCK AIRE IN ROW AC 1)
SUB AREA GROUP: 05 - YEAST COTAS: mm ESCALA: 1 : 100
SUB AREA OR SYSTEM: 00 - GENERAL DIBUJO NO: