RESUMEN DE PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL DISTRITO DE MADEAN,
OBRA
PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OBRA : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBRA : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
E.I.R.L
PROVINCIA : YAUYOS CON ST RUCCIO N Y DESARROLLO EN IN GEN IERIA APLICADA

DISTRITO : MADEAN

ITEM DESCRIPCION PRESUPUESTO BASE PRESUPUESTO EJECUTADO

001 PABELLON A 503,522.07 503,522.07


002 PABELLON B 483,199.34 483,199.34
003 ESCALERA A 61,755.10 61,755.10
004 ESCALERA B 61,755.10 61,755.10
005 OBRAS COMPLEMENTARIAS 691,988.97 691,988.97

COSTO DIRECTO 1,802,220.58 1,802,220.58


GASTOS GENERALES (10.00 %) 180,222.06 180,222.06
UTILIDAD (10.00 %) 180,222.06 180,222.06

SUB TOTAL 2,162,664.70 2,162,664.70


Factor de reajuste 1.00000 2,162,664.70 2,162,664.70
EN I.G.V. (18%*VN) 389,279.65 389,279.65

PRESUPUESTO CONTRATADO 2,551,944.34 2,551,944.34

PRESUPUESTO TOTAL 2,551,944.34 2,551,944.34


PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL


OBRA
DISTRITO DE MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CO N ST RUCCIO N Y DESARRO LLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

PABELLON A
1 TRABAJOS PRELIMINARES
1.01 LIMPIEZA DE TERRENO MANUAL m2 275.55 0.40 110.22 275.55 0.40 110.22
1.02 TRAZO Y REPLANTEO m2 275.55 1.07 294.84 275.55 1.07 294.84
2 MOVIMIENTO DE TIERRAS 0.00 0.00
2.01 EXCAVACIONES 0.00 0.00
02.01.01 EXCAVACION DE ZANJAS PARA ZAPATAS m3 218.13 33.59 7,326.99 218.13 33.59 7,326.99
02.01.02 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 26.92 33.59 904.24 26.92 33.59 904.24
02.01.03 CORTE DE TERRENO m3 37.72 28.79 1,085.96 37.72 28.79 1,085.96
02.01.04 RELLENO CON MATERIAL PROPIO m3 120.83 23.13 2,794.80 120.83 23.13 2,794.80
02.01.05 ELIMINACION MATERIAL EXCEDENTE m3 202.43 8.37 1,694.34 202.43 8.37 1,694.34
02.01.06 NIVELACION, RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m2 228.75 11.36 2,598.60 228.75 11.36 2,598.60
3 CONCRETO SIMPLE 0.00 0.00
3.01 CIMIENTOS CORRIDOS 0.00 0.00
03.01.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 35.37 198.17 7,009.27 35.37 198.17 7,009.27
03.01.02 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON m2 121.63 19.88 2,418.00 121.63 19.88 2,418.00
3.02 SOBRECIMIENTOS 0.00 0.00
03.02.01 SOBRECIMIENTO CONCRETO 1:8+25% P.M. m3 6.90 211.82 1,461.56 6.90 211.82 1,461.56
03.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 130.23 34.9 4,545.03 130.23 34.9 4,545.03
4 CONCRETO ARMADO 0.00 0.00
4.01 ZAPATAS DE CONCRETO 0.00 0.00
04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 68.19 351.00 23,934.69 68.19 351.00 23,934.69
04.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 1,819.72 5.24 9,535.33 1,819.72 5.24 9,535.33
4.02 VIGAS DE CIMENTACION 0.00 0.00
04.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 8.72 351.00 3,060.72 8.72 351.00 3,060.72
04.02.02 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION kg 1,248.61 5.24 6,542.72 1,248.61 5.24 6,542.72
4.03 COLUMNAS Y PLACAS 0.00 0.00
04.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 32.92 510.81 16,815.87 32.92 510.81 16,815.87
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 167.54 43.24 7,244.43 167.54 43.24 7,244.43
04.03.03 ACERO GRADO 60 EN COLUMNAS kg 5,152.91 5.24 27,001.25 5,152.91 5.24 27,001.25
4.04 VIGAS 0.00 0.00
04.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 50.65 497.11 25,178.62 50.65 497.11 25,178.62
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 473.89 54.15 25,661.14 473.89 54.15 25,661.14
04.04.03 ACERO GRADO 60 EN VIGAS kg 4,867.98 5.24 25,508.22 4,867.98 5.24 25,508.22
4.05 COLUMNETAS PARA SOSTENIMIENTO DE BARANDAS 0.00 0.00
04.05.01 CONCRETO PARA COLUMNETAS PARA SOSTENIMIENTO DE BARANDAS F'C=210 KG/CM2 m3 0.27 510.81 137.92 0.27 510.81 137.92
04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS PARA SOSTENIMIENTO DE BARANDAS m2 6.3 43.24 272.41 6.3 43.24 272.41
04.05.03 ACERO GRADO 60 PARA COLUMNETAS PARA SOSTENIMIENTO DE BARANDAS kg 78.68 5.24 412.28 78.68 5.24 412.28
4.06 GARGOLAS DE DESAGUE PLUVIAL 0.00 0.00
04.06.01 CONCRETO PARA GARGOLAS DE DESAGUE PLUVIAL F'C=210 KG/CM2 m3 0.13 510.81 66.41 0.13 510.81 66.41
04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA GARGOLAS DE DESAGUE m2 0.6 43.24 25.94 0.6 43.24 25.94
04.06.03 ACERO GRADO 60 PARA GARGOLAS DE DESAGUE PLUVIAL kg 13.57 5.24 71.11 13.57 5.24 71.11
4.07 LOZA PARA BASE DE MEZA DE LABORATORIO 0.00 0.00
04.07.01 CONCRETO LOZA PARA BASE DE OVALINES F'C=210 KG/CM2 m3 1.47 428.12 629.34 1.47 428.12 629.34
04.07.02 ENCOFRADO Y DESENCOFRADO EN LOSA DE LABORATORIOS Y BAÑOS m2 14.71 44.6 656.07 14.71 44.6 656.07
04.07.03 ACERO GRADO 60 PARA BASE DE LAVADERO OVALIN kg 86.63 5.24 453.94 86.63 5.24 453.94
4.08 LOSA ALIGERADA EN TECHO 0.00 0.00
04.08.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 46.26 425.22 19,670.68 46.26 425.22 19,670.68
04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 462.56 38.85 17,970.46 462.56 38.85 17,970.46
04.08.03 ACERO GRADO 60 EN LOSAS ALIGERADAS kg 2,814.65 5.37 15,114.67 2,814.65 5.37 15,114.67
04.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 4,044.42 3.15 12,739.92 4,044.42 3.15 12,739.92
5 CONTROL DE CALIDAD 0.00 0.00
5.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 8 28.7 229.60 8 28.7 229.60
6 COBERTURA 0.00 0.00
6.01 COBERTURA DE TEJA ANDINA 1.14M x 0.72M m2 275.01 75.84 20,856.76 275.01 75.84 20,856.76
6.02 CUMBRERA DE TEJA ANDINA 0.30M x 0.72M m 26.7 57.53 1,536.05 26.7 57.53 1,536.05
7 MUROS Y TABIQUERIAS DE ALBAÑILERIA 0.00 0.00
7.01 MURO DE LADRILLO KK. DE SOGA 9X15X24 CM. m2 207.15 53.83 11,150.88 207.15 53.83 11,150.88
7.02 MURO DE LADRILLO KK. DE CABEZA 9X15X24 CM. m2 118.94 84.8 10,086.11 118.94 84.8 10,086.11
8 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
8.01 TARRAJEO EN MUROS INTERIORES Y EXTERIORES DE MUROS MEZCLA 1:5 E=1.5 CM m2 652.18 19.86 12,952.29 652.18 19.86 12,952.29
8.02 TARRAJEO DE SUPERFICIE DE COLUMNAS Y PLACAS m2 397.36 22.27 8,849.21 397.36 22.27 8,849.21
8.03 TARRAJEO DE SUPERFICIE DE VIGAS MEZCLA 1:5, E=1.5 CM m2 385.34 23.52 9,063.20 385.34 23.52 9,063.20
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL


OBRA
DISTRITO DE MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CO N ST RUCCIO N Y DESARRO LLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

8.04 TARRAJEO EN CIELO RAZO MEZCLA 1:5, E=1.5 CM m2 462.3 22.27 10,295.42 462.3 22.27 10,295.42
8.05 TARRAJEO PRIMARIO EN DETALLES DE LABORATORIO m2 14.71 22.5 330.98 14.71 22.5 330.98
8.06 TARRAJEO CON IMPERMEABILIZANTES m2 22.7 27.37 621.30 22.7 27.37 621.30
8.07 BRUÑAS MUROS DE 3/4" m 561.44 2.46 1,381.14 561.44 2.46 1,381.14
9 PISOS Y PAVIMENTOS 0.00 0.00
9.01 FALSO PISO DE 4" DE CONCRETO 1:10 M2 229.26 24.82 5,690.23 229.26 24.82 5,690.23
9.02 PISO DE CEMENTO PULIDO Y COLOREADO m2 373.05 39.28 14,653.40 373.05 39.28 14,653.40
9.03 PISO DE CERAMICO COLOR CLARO DE 0.45 x 0.45 CM m2 94.64 67.56 6,393.88 94.64 67.56 6,393.88
10 CONTRAZOCALOS Y ZOCALOS 0.00 0.00
10.01 CONTRAZOCALO DE CERAMICO DE 10X45 CM m 48.2 34.22 1,649.40 48.2 34.22 1,649.40
10.02 ZOCALO DE CERAMICO H = 1.25 m m2 20.34 44.96 914.49 20.34 44.96 914.49
10.03 REVESTIDO CON CERAMICO EN MESA DE TRABAJO DE 36 x 36 CM m2 23.56 65.97 1,554.25 23.56 65.97 1,554.25
11 CARPINTERIA DE MADERA 0.00 0.00
PUERTA APANELADA DE MARCO DE MADERA TORNILLO Y PANEL DE MADERA TORNILLO (VER DETALLE
11.01 M2 25.98 332.75 8,644.85 25.98 332.75 8,644.85
EN PLANO)
12 CARPINTERIA METALICA Y HERRERIA 0.00 0.00
12.01 MAMPARA DE ACCESO PRINCIPAL und 2 2,643.12 5,286.24 2 2,643.12 5,286.24
12.02 VENTANA METALICA DE SISTEMA PROYECTANTE S/DISEÑO m2 73.32 168.42 12,348.55 73.32 168.42 12,348.55

12.03 BARANDA METALICA EN PASADISOS CON TUBO NEGRO SEGUN DISEÑO INC. INSTALACION Y ACABADO m 32.65 104.99 3,427.92 32.65 104.99 3,427.92

13 CERRAJERIA 0.00 0.00


13.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 36 14.06 506.16 36 14.06 506.16
13.02 CERRADURA PARA PUERTA TRES GOLPES pza 12 125.55 1,506.60 12 125.55 1,506.60
13.03 MANIJA DE BRONCE und 12 13.59 163.08 12 13.59 163.08
14 VIDRIOS, CRISTALES Y SIMILARES 0.00 0.00
14.01 VIDRIO LAMINADO DE 6 MM p2 789.66 11.46 9,049.50 789.66 11.46 9,049.50
15 PINTURA 0.00 0.00
15.01 PINTURA LATEX LAVABLE EN MURO INTERIORES Y EXTERIOR 02 MANOS m2 652.18 9.94 6,482.67 652.18 9.94 6,482.67
15.02 PINTURA LATEX EN COLUMNAS Y PLACA 2 MANOS m2 397.36 10.18 4,045.12 397.36 10.18 4,045.12
15.03 PINTURA LATEX LAVABLE EN VIGAS 2 MANOS m2 385.34 10.58 4,076.90 385.34 10.58 4,076.90
15.04 PINTURA LATEX LAVABLE EN CIELO RASO 2 MANOS m2 462.3 9.94 4,595.26 462.3 9.94 4,595.26
16 INSTALACIONES SANITARIAS 0.00 0.00
16.01 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS 0.00 0.00

16.01.01 SUMINISTRO E INSTALACION DE LAVATORIOS TIPO OVALIN GRANDE DE C/BLANCO ESTANDAR und 9.00 243.79 2194.11 9.00 243.79 2194.11

16.01.02 SUMINISTRO E INSTALACION DE INODOROS und 4.00 371.40 1485.60 4.00 371.40 1485.60
16.02 SISTEMA DE AGUA FRIA 0.00 0.00
16.02.01 SALIDA DE AGUA FRIA pto 13.00 16.8 218.40 13.00 16.8 218.40
16.03 REDES DE DISTRIBUCION 0.00 0.00
16.03.01 TUBERIA PVC SAP DE 1/2" C-10 m 28.60 12.19 348.63 28.60 12.19 348.63
16.03.02 TUBERIA PVC SAP DE 3/4" C-10 m 37.40 12.59 470.87 37.40 12.59 470.87
16.03.03 VALVULA COMPUERTA und 15.00 26.37 395.55 15.00 26.37 395.55
16.03.04 CODO PVC SAP 1/2" X 90 und 78.00 11.09 865.02 78.00 11.09 865.02
16.03.05 CODO DE FºGº 1/2" X 90 und 13.00 13.46 174.98 13.00 13.46 174.98
16.03.06 TEE PVC-SAP 1/2"x1/2" und 12.00 26.22 314.64 12.00 26.22 314.64
16.03.07 REDUCCION DE 3/4" A 1/2" und 4.00 7.32 29.28 4.00 7.32 29.28
16.04 DESAGUE Y VENTILACION 0.00 0.00
16.04.01 SALIDA DE DESAGUE pto 13.00 16.8 218.40 13.00 16.8 218.40
16.05 REDES DE DERIVACION 0.00 0.00
16.05.01 TUBERIA PVC SAL DE 2" m 24.15 13.74 331.82 24.15 13.74 331.82
16.05.02 TUBERIA PVC SAL DE 3" m 33.20 17.44 579.01 33.20 17.44 579.01
16.05.03 TUBERIA PVC SAL DE 4" m 20.10 15.34 308.33 20.10 15.34 308.33
16.05.04 TUBERIA PVC SAL DE 6" m 35.24 43.01 1,515.67 35.24 43.01 1,515.67
16.05.05 CODO PVC SAL 2"X90° und 20.00 32.06 641.20 20.00 32.06 641.20
16.05.06 CODO PVC SAL 2"X45° und 11.00 31.86 350.46 11.00 31.86 350.46
16.05.07 CODO PVC SAL 4" X 45° und 13.00 15.34 199.42 13.00 15.34 199.42
16.05.08 CODO PVC SAL 3"X90° und 4.00 25.77 103.08 4.00 25.77 103.08
16.05.09 CODO PVC SAL 4"X90° und 8.00 15.34 122.72 8.00 15.34 122.72
16.05.10 YEE PVC SAL 4" A 3" und 6.00 26.28 157.68 6.00 26.28 157.68
16.05.11 YEE PVC SAL 4" A 2" und 4.00 17.9 71.60 4.00 17.9 71.60
16.05.12 YEE PVC SAL 4" X 4" und 19.00 15.34 291.46 19.00 15.34 291.46
16.05.13 SOMBRERO VENTILACION PVC SAL DE 3" pza 8.00 69.88 559.04 8.00 69.88 559.04
16.05.14 REGISTRO ROSCADO DE BRONCE DE 4" und 5.00 13.58 67.90 5.00 13.58 67.90
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL


OBRA
DISTRITO DE MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CO N ST RUCCIO N Y DESARRO LLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

16.05.15 SUMIDERO DE BRONCE 4" und 4.00 9.24 36.96 4.00 9.24 36.96
16.06 SISTEMA DE DESAGUE Y CAJAS DE REGISTRO 0.00 0.00
16.06.01 CAJA DE REGISTRO DE DESAGUE 30" X 60" und 2.00 89.2 178.40 2.00 89.2 178.40
17 INSTALACIONES ELECTRICAS 0.00 0.00
17.01 CONDUCTORES ELECTRICOS 0.00 0.00
17.01.01 CONDUCTOR 4.00 mm2 LSOH ALUMBRADO m 436.00 2.07 902.52 436.00 2.07 902.52
17.01.02 CONDUCTOR 6.00 mm2 LSOH m 155.00 3.78 585.90 155.00 3.78 585.90
17.02 TUBERIAS Y ACCESORIOS 0.00 0.00
17.02.01 TUBERIA DE PVC 20 mm x 3mts.ALUMBRADO m 436.00 3.93 1,713.48 436.00 3.93 1,713.48
17.02.02 TUBERIA DE PVC 20 mm x 3mts. m 155.00 3.93 609.15 155.00 3.93 609.15
17.02.03 CODOS PVC - SAP 20mm und 426.00 1.79 762.54 426.00 1.79 762.54
17.03 FERRETERIA Y ACCESORIOS ELECTRICOS 0.00 0.00
17.03.01 TOMACORRIENTE DOBLE CON TOMA A TIERRA und 53.00 16.32 864.96 53.00 16.32 864.96
17.03.02 TOMACORRIENTE CON TOMA A TIERRA A PRUEBA DE AGUA und 6.00 22.14 132.84 6.00 22.14 132.84
17.03.03 TOMACORRIENTE SIMPLE PARA LUZ DE EMERGENCIA und 16.00 16.32 261.12 16.00 16.32 261.12
17.03.04 INTERRUPTOR SIMPLE und 16.00 18.79 300.64 16.00 18.79 300.64
17.03.05 INTERRUPTOR DOBLE und 3.00 14.46 43.38 3.00 14.46 43.38
17.03.06 INTERRUPTOR TRIPLE und 2.00 29.46 58.92 2.00 29.46 58.92
17.03.07 CAJA RECTANGULAR 100x55x40mm und 20.00 21.99 439.80 20.00 21.99 439.80
17.04 ARTEFACTOS DE ILUMINACION 0.00 0.00
17.04.01 FLUORESCENTE RECTO ISPE 2 X 36 W INCLUYENDO EQUIPO Y PANTALL und 60.00 75.88 4,552.80 60.00 75.88 4,552.80
17.04.02 LAMPARA AHORRADORA DE 16 W und 4.00 42.83 171.32 4.00 42.83 171.32
17.04.03 CENTRO DE LUZ und 4.00 9.46 37.84 4.00 9.46 37.84
17.05 SISTEMA DE DE DETECTOR DE HUMO Y ALARMAS 0.00 0.00
17.05.01 DETECTOR DE HUMO -CONTRA INCENDIO pto 4.00 125.85 503.40 4.00 125.85 503.40
17.05.02 PANEL DE SISTEMA DE ALARMAS CONTRA INCENDIO und 2.00 126.56 253.12 2.00 126.56 253.12
17.05.03 TUBERIA DE PVC 20 mm x 3mts. m 30.00 3.93 117.90 30.00 3.93 117.90
17.05.04 CABLE PARA SENSORES Y ALARMAS m 30.00 2.22 66.60 30.00 2.22 66.60
17.06 SISTEMA MULTIMEDIA 0.00 0.00
17.06.01 SALIDA PARA TV und 1.00 74.82 74.82 1.00 74.82 74.82
17.06.02 SALIDA PARA PROYECTOR MULTIMEDIA und 1.00 83.3 83.30 1.00 83.3 83.30
17.06.03 TUBERIA DE PVC 20 mm x 3mts. m 28.00 3.93 110.04 28.00 3.93 110.04
17.06.04 CAJA DE INTERCONECCION und 4.00 17.92 71.68 4.00 17.92 71.68
17.07 SISTEMA DE SEGURIDAD Y EMERGENCIA 0.00 0.00
17.07.01 LUZ DE EMERGENCIA und 4.00 167.31 669.24 4.00 167.31 669.24
18 FLETE 0.00 0.00
18.01 FLETE DE MATERIALES DE OBRA glb 1.00 28,615.10 28,615.10 1.00 28,615.10 28,615.10

503,522.07 503,522.07
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL


OBRA
DISTRITO DE MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CO N ST RUCCIO N Y DESARRO LLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

PABELLON B
1.00 TRABAJOS PRELIMINARES
1.01 LIMPIEZA DE TERRENO MANUAL m2 218.50 0.40 87.40 218.50 0.40 87.40
1.02 TRAZO Y REPLANTEO m2 218.50 1.01 220.69 218.50 1.01 220.69
2.00 MOVIMIENTO DE TIERRAS 0.00 0.00
2.01 EXCAVACIONES 0.00 0.00
02.01.01 EXCAVACION DE ZANJAS PARA ZAPATAS m3 212.99 28.79 6131.98 212.99 28.79 6131.98
02.01.02 EXCAVACION DE ZANJAS PARA CIMIENTOS Y VIGAS DE CIMENTACION m3 26.96 28.79 776.18 26.96 28.79 776.18
02.01.03 CORTE DE TERRENO m3 267.66 9.44 2526.71 267.66 9.44 2526.71
02.01.04 RELLENO CON MATERIAL PROPIO m3 127.34 25.68 3270.09 127.34 25.68 3270.09
02.01.05 ELIMINACION MATERIAL EXCEDENTE m3 475.34 8.37 3978.60 475.34 8.37 3978.60

02.01.06 NIVELACION, RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO CAPAS DE 0.15 m2 205.14 10.79 2213.46 205.14 10.79 2213.46

3.00 CONCRETO SIMPLE 0.00 0.00


3.01 CIMIENTOS CORRIDOS 0.00 0.00
03.01.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 37.92 169.56 6429.72 37.92 169.56 6429.72
03.01.02 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON m2 125.00 19.88 2485.00 125.00 19.88 2485.00
3.02 SOBRECIMIENTOS 0.00 0.00
03.02.01 SOBRECIMIENTO CONCRETO 1:8+25% P.M. m3 7.22 198.38 1432.30 7.22 198.38 1432.30
03.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 86.47 17.25 1491.61 86.47 17.25 1491.61
4.00 CONCRETO ARMADO 0.00 0.00
4.01 ZAPATAS DE CONCRETO 0.00 0.00
04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 71.00 351.00 24921.00 71.00 351.00 24921.00
04.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 2067.06 5.24 10831.39 2067.06 5.24 10831.39
4.02 VIGAS DE CIMENTACION 0.00 0.00
04.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 10.36 351.00 3636.36 10.36 351.00 3636.36
04.02.02 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION kg 952.30 5.24 4990.05 952.30 5.24 4990.05
4.03 COLUMNAS Y PLACAS 0.00 0.00
04.03.01 CONCRETO EN COLUMNAS Y PLACAS F'C=210 KG/CM2 m3 36.92 428.12 15806.19 36.92 428.12 15806.19
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 357.08 44.60 15925.77 357.08 44.60 15925.77
04.03.03 ACERO GRADO 60 EN COLUMNAS kg 5572.82 5.24 29201.58 5572.82 5.24 29201.58
4.04 VIGAS 0.00 0.00
04.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 42.89 419.55 17994.50 42.89 419.55 17994.50
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 351.30 35.75 12558.98 351.30 35.75 12558.98
04.04.03 ACERO GRADO 60 EN VIGAS kg 5769.34 5.24 30231.34 5769.34 5.24 30231.34
4.05 COLUMNETAS PARA SOSTENIMIENTO DE BARANDAS 0.00 0.00

04.05.01 CONCRETO PARA COLUMNETAS PARA SOSTENIMIENTO DE BARANDAS F'C=210 KG/CM2 m3 0.18 446.53 80.38 0.18 446.53 80.38

ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS PARA SOSTENIMIENTO DE


04.05.02 m2 4.20 33.74 141.71 4.20 33.74 141.71
BARANDAS
04.05.03 ACERO GRADO 60 PARA COLUMNETAS PARA SOSTENIMIENTO DE BARANDAS kg 48.54 5.24 254.35 48.54 5.24 254.35
4.06 GARGOLAS DE DESAGUE PLUVIAL 0.00 0.00
04.06.01 CONCRETO PARA GARGOLAS DE DESAGUE PLUVIAL F'C=210 KG/CM2 m3 0.20 446.58 89.32 0.20 446.58 89.32
04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA GARGOLAS DE DESAGUE PLUVIAL m2 0.90 33.74 30.37 0.90 33.74 30.37
04.06.03 ACERO GRADO 60 PARA GARGOLAS DE DESAGUE PLUVIAL kg 42.12 5.24 220.71 42.12 5.24 220.71
4.07 LOSA PARA BASE DE LAVADERO OVALIN 0.00 0.00
04.07.01 CONCRETO PARA BASE DE LAVADERO OVALIN F'C=210 KG/CM2 m3 0.88 446.58 392.99 0.88 446.58 392.99
04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA BASE DE LAVADERO OVALIN m2 10.09 33.74 340.44 10.09 33.74 340.44
04.07.03 ACERO GRADO 60 PARA BASE DE LAVADERO OVALIN kg 77.02 5.24 403.58 77.02 5.24 403.58
4.08 LOSA ALIGERADA EN TECHO 0.00 0.00
04.08.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 50.92 384.60 19583.83 50.92 384.60 19583.83
04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 509.24 38.85 19783.97 509.24 38.85 19783.97
04.08.03 ACERO GRADO 60 EN LOSAS ALIGERADAS kg 2769.22 5.37 14870.71 2769.22 5.37 14870.71
04.08.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 4583.34 2.61 11962.52 4583.34 2.61 11962.52
5.00 CONTROL DE CALIDAD 0.00 0.00
5.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 6.00 28.70 172.20 6.00 28.70 172.20
6.00 COBERTURA 0.00 0.00
6.01 COBERTURA DE TEJA ANDINA 1.14M x 0.72M m2 203.50 75.84 15433.44 203.50 75.84 15433.44
6.02 CUMBRERA DE TEJA ANDINA 0.30M x 0.72M m 20.35 57.53 1170.74 20.35 57.53 1170.74
7.00 MUROS Y TABIQUERIAS DE ALBAÑILERIA 0.00 0.00
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL


OBRA
DISTRITO DE MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CO N ST RUCCIO N Y DESARRO LLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

7.01 MURO DE LADRILLO KK. DE SOGA 9X15X24 CM. m2 117.24 51.67 6057.79 117.24 51.67 6057.79
7.02 MURO DE LADRILLO KK. DE CABEZA 9X15X24 CM. m2 121.44 76.08 9239.16 121.44 76.08 9239.16
8.00 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
8.01 TARRAJEO EN EXTERIORES E INTERIORES DE MUROS CON CEMENTO-ARENA m2 497.28 19.86 9875.98 497.28 19.86 9875.98
8.02 TARRAJEO DE SUPERFICIE DE COLUMNAS Y PLACAS m2 339.82 22.27 7567.79 339.82 22.27 7567.79
8.03 TARRAJEO DE SUPERFICIE DE VIGAS MEZCLA 1:5, E=1.5 CM m2 337.64 23.52 7941.29 337.64 23.52 7941.29
8.04 TARRAJEO EN CIELO RAZO MEZCLA 1:5, E=1.5 CM m2 402.17 22.27 8956.33 402.17 22.27 8956.33
8.05 TARRAJEO PRIMARIO RAYADO EN DETALLES DE BAÑOS m2 7.99 15.46 123.53 7.99 15.46 123.53
8.06 TARRAJEO CON IMPERMEABILIZANTES m2 83.93 27.37 2297.16 83.93 27.37 2297.16
8.07 BRUÑAS MUROS DE 3/4" m 322.40 2.46 793.10 322.40 2.46 793.10
9.00 PISOS Y PAVIMENTOS 0.00 0.00
9.01 FALSO PISO DE 4" DE CONCRETO 1:10 M2 341.51 20.16 6884.84 341.51 20.16 6884.84
9.02 PISO DE CEMENTO PULIDO Y COLOREADO m2 282.66 39.28 11102.88 282.66 39.28 11102.88
9.03 PISO DE CERAMICO COLOR CLARO DE 0.45 x 0.45 CM m2 68.24 67.56 4610.29 68.24 67.56 4610.29
10.00 CONTRAZOCALOS Y ZOCALOS 0.00 0.00
10.01 ZOCALO DE CERAMICO H = 1.25 m m2 114.72 48.40 5552.45 114.72 48.40 5552.45
10.02 REVESTIDO CON CERAMICO DE 36 x 36 CM m2 7.99 72.25 577.28 7.99 72.25 577.28
11.00 CARPINTERIA DE MADERA 0.00 0.00
PUERTA APANELADA DE MARCO DE MADERA TORNILLO Y PANEL DE MADERA TORNILLO (VER
11.01 M2 23.76 332.75 7906.14 23.76 332.75 7906.14
DETALLE EN PLANO)
11.02 ESCENARIO DE MADERA GLB 1.00 2486.94 2486.94 1.00 2486.94 2486.94
12.00 CARPINTERIA METALICA 0.00 0.00
12.01 VENTANA METALICA DE SISTEMA PROYECTANTE S/DISEÑO m2 49.96 168.42 8414.26 49.96 168.42 8414.26
12.02 SEPARADOR METALICO P' SS.HH. INCL.PUERTA und 12.00 160.67 1928.04 12.00 160.67 1928.04
BARANDA METALICA EN PASADISOS CON TUBO NEGRO SEGUN DISEÑO INC. INSTALACION Y
12.03 m 29.24 107.53 3144.18 29.24 107.53 3144.18
ACABADO
13.00 CERRAJERIA 0.00 0.00
13.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 24.00 14.06 337.44 24.00 14.06 337.44
13.02 CERRADURA PARA PUERTA TRES GOLPES pza 8.00 125.55 1004.40 8.00 125.55 1004.40
13.03 MANIJA DE BRONCE und 8.00 13.59 108.72 8.00 13.59 108.72
14.00 VIDRIOS, CRISTALES Y SIMILARES 0.00 0.00
14.01 VIDRIO LAMINADO DE 6 MM p2 538.07 11.46 6166.28 538.07 11.46 6166.28
15.00 PINTURA 0.00 0.00
15.01 PINTURA LATEX LAVABLE EN MURO INTERIORES Y EXTERIOR 02 MANOS M2 497.28 9.94 4942.96 497.28 9.94 4942.96
15.02 PINTURA LATEX EN COLUMNAS Y PLACA 2 MANOS m2 339.82 10.18 3459.37 339.82 10.18 3459.37
15.03 PINTURA LATEX LAVABLE EN VIGAS 2 MANOS m2 355.84 10.58 3764.79 355.84 10.58 3764.79
15.04 PINTURA LATEX LAVABLE EN CIELO RASO 2 MANOS M2 412.47 9.94 4099.95 412.47 9.94 4099.95
16.00 INSTALACIONES SANITARIAS 0.00 0.00
16.01 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS 0.00 0.00
16.01.01 SUMINISTRO E INSTALACION DE LAVATORIOS TIPO OVALIN GRANDE DE und 14.00 243.79 3413.06 14.00 243.79 3413.06
16.01.02 SUMINISTRO E INSTALACION DE INODOROS und 12.00 371.40 4456.80 12.00 371.40 4456.80
16.01.03 SUMINISTRO E INSTALACION DE URINARIOS und 6.00 192.64 1155.84 6.00 192.64 1155.84
16.02 SISTEMA DE AGUA FRIA 0.00 0.00
16.02.01 SALIDA DE AGUA FRIA pto 32.00 16.80 537.60 32.00 16.80 537.60
16.03 REDES DE DISTRIBUCION 0.00 0.00
16.03.01 TUBERIA PVC SAP DE 1 1/2" C-10 m 37.74 13.37 504.58 37.74 13.37 504.58
16.03.02 TUBERIA PVC SAP DE 1" C-10 m 43.18 12.69 547.95 43.18 12.69 547.95
16.03.03 TUBERIA PVC SAP DE 3/4" C-10 m 30.10 12.59 378.96 30.10 12.59 378.96
16.03.04 TUBERIA PVC SAP DE 2" C-10 m 44.07 7.86 346.39 44.07 7.86 346.39
16.03.05 VALVULA COMPUERTA und 9.00 26.37 237.33 9.00 26.37 237.33
16.03.06 CODO PVC SAP 1" X 90 und 88.00 9.75 858.00 88.00 9.75 858.00
16.03.07 CODO DE FºGº 1" X 90 und 16.00 10.73 171.68 16.00 10.73 171.68
16.03.08 TEE PVC-SAP 1" X 1" und 36.00 22.31 803.16 36.00 22.31 803.16
16.03.09 TEE PVC-SAP 1 1/2" X 1 1/2" und 8.00 15.72 125.76 8.00 15.72 125.76
16.03.10 REDUCCION DE PVC SAP DE 1 1/2" A 1" und 16.00 15.11 241.76 16.00 15.11 241.76
16.03.11 REDUCCION DE PVC SAP DE 1" A 3/4" und 12.00 15.11 181.32 12.00 15.11 181.32
16.04 DESAGUE Y VENTILACION 0.00 0.00
16.04.01 SALIDA DE DESAGUE pto 32.00 16.80 537.60 32.00 16.80 537.60
16.05 REDES DE DERIVACION 0.00 0.00
16.05.01 TUBERIA PVC SAL DE 2" m 42.18 13.74 579.55 42.18 13.74 579.55
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL


OBRA
DISTRITO DE MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CO N ST RUCCIO N Y DESARRO LLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

16.05.02 TUBERIA PVC SAL DE 3" m 62.24 17.44 1085.47 62.24 17.44 1085.47
16.05.03 TUBERIA PVC SAL DE 4" M 87.16 15.34 1337.03 87.16 15.34 1337.03
16.05.04 TUBERIA PVC SAL DE 6" m 44.85 43.01 1929.00 44.85 43.01 1929.00
16.05.05 CODO PVC SAL 2"X90° und 40.00 32.06 1282.40 40.00 32.06 1282.40
16.05.06 CODO PVC SAL 2"X45° und 16.00 31.86 509.76 16.00 31.86 509.76
16.05.07 CODO PVC SAL 4" X 45° UND 12.00 15.34 184.08 12.00 15.34 184.08
16.05.08 CODO PVC SAL 3"X90° und 72.00 25.77 1855.44 72.00 25.77 1855.44
16.05.09 CODO PVC SAL 4"X90° UND 18.00 15.34 276.12 18.00 15.34 276.12
16.05.10 YEE PVC SAL 4" A 3" und 80.00 26.28 2102.40 80.00 26.28 2102.40
16.05.11 YEE PVC SAL 4" A 2" und 28.00 17.90 501.20 28.00 17.90 501.20
16.05.12 YEE PVC SAL 4" X 4" UND 26.00 15.34 398.84 26.00 15.34 398.84
16.05.13 SOMBRERO VENTILACION PVC SAL DE 3" pza 8.00 69.88 559.04 8.00 69.88 559.04
16.05.14 REGISTRO ROSCADO DE BRONCE DE 4" UND 4.00 15.34 61.36 4.00 15.34 61.36
16.05.15 SUMIDERO DE BRONCE 4" und 8.00 9.24 73.92 8.00 9.24 73.92
16.06 SISTEMA DE DESAGUE Y CAJAS DE REGISTRO 0.00 0.00
16.06.01 CAJA DE REGISTRO DE DESAGUE DE 25" X 25" UND 2.00 53.78 107.56 2.00 53.78 107.56
16.06.02 CAJA DE REGISTRO DE DESAGUE DE 60" X 60" UND 2.00 105.44 210.88 2.00 105.44 210.88
17.00 INSTALACIONES ELECTRICAS 0.00 0.00
17.01 CONDUCTORES ELECTRICOS 0.00 0.00
17.01.01 CONDUCTOR 4.00 mm2 LSOH ALUMBRADO m 295.60 2.07 611.89 295.60 2.07 611.89
17.01.02 CONDUCTOR 6.00 mm2 LSOH m 282.40 4.36 1231.26 282.40 4.36 1231.26
17.02 TUBERIAS Y ACCESORIOS 0.00 0.00
17.02.01 TUBERIA DE PVC 20 mm x 3mts. ALUMBRADO M 295.60 3.93 1161.71 295.60 3.93 1161.71
17.02.02 TUBERIA DE PVC 20 mm x 3mts. M 282.40 3.93 1109.83 282.40 3.93 1109.83
17.02.03 CODOS PVC - SAP 20mm und 226.00 1.79 404.54 226.00 1.79 404.54
17.03 FERRETERIA Y ACCESORIOS ELECTRICOS 0.00 0.00
17.03.01 TOMACORRIENTE DOBLE CON TOMA A TIERRA und 31.00 16.32 505.92 31.00 16.32 505.92
17.03.02 TOMACORRIENTE A PRUEBA DE AGUA und 4.00 22.14 88.56 4.00 22.14 88.56
17.03.03 TOMACORRIENTE SIMPLE PARA LUZ DE EMERGENCIA und 8.00 16.32 130.56 8.00 16.32 130.56
17.03.04 INTERRUPTOR SIMPLE und 7.00 18.79 131.53 7.00 18.79 131.53
17.03.05 INTERRUPTOR DOBLE und 6.00 14.46 86.76 6.00 14.46 86.76
17.03.06 CAJA RECTANGULAR 100x55x40mm und 20.00 21.99 439.80 20.00 21.99 439.80
17.04 ARTEFACTOS DE ILUMINACION 0.00 0.00
17.04.01 FLUORESCENTE RECTO ISPE 2 X 36 W INCLUYENDO EQUIPO Y PANTALL und 44.00 75.88 3338.72 44.00 75.88 3338.72
17.04.02 LAMPARA AHORRADORA DE 16 W UND 12.00 42.83 513.96 12.00 42.83 513.96
17.04.03 CENTRO DE LUZ UND 12.00 6.10 73.20 12.00 6.10 73.20
17.05 SISTEMA DE DE DETECTOR DE HUMO Y ALARMAS 0.00 0.00
17.05.01 DETECTOR DE HUMO -CONTRA INCENDIO PTO 4.00 125.85 503.40 4.00 125.85 503.40
17.05.02 PANEL DE SISTEMA DE ALARMAS CONTRA INCENDIO und 2.00 126.56 253.12 2.00 126.56 253.12
17.05.03 TUBERIA DE PVC 20 mm x 3mts. M 30.00 3.93 117.90 30.00 3.93 117.90
17.05.04 CABLE PARA SENSORES Y ALARMAS m 30.00 2.22 66.60 30.00 2.22 66.60
17.06 SISTEMA DE SEGURIDAD Y EMERGENCIA 0.00 0.00
17.06.01 LUZ DE EMERGENCIA und 4.00 167.31 669.24 4.00 167.31 669.24
18.00 FLETE 0.00 0.00
18.01 FLETE DE MATERIALES GLB 1.00 32793.50 32793.50 1.00 32793.50 32793.50

483,199.34 483,199.34
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL


OBRA
DISTRITO DE MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CO N ST RUCCIO N Y DESARRO LLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

ESCALERA A
1 TRABAJOS PRELIMINARES
1.01 LIMPIEZA DE TERRENO MANUAL m2 37.19 0.40 14.88 37.19 0.40 14.88
1.02 TRAZO Y REPLANTEO m2 37.19 1.01 37.56 37.19 1.01 37.56
2 MOVIMIENTO DE TIERRAS 0.00 0.00
2.01 EXCAVACIONES 0.00 0.00
02.01.01 EXCAVACION DE ZANJAS PARA ZAPATAS m3 13.88 33.59 466.23 13.88 33.59 466.23
02.01.02 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 8.21 33.59 275.77 8.21 33.59 275.77
02.01.03 CORTE DE TERRENO m3 3.72 25.19 93.71 3.72 25.19 93.71
02.01.04 RELLENO CON MATERIAL PROPIO m3 6.37 1.85 11.78 6.37 1.85 11.78
02.01.05 ELIMINACION MATERIAL EXCEDENTE m3 20.80 8.37 174.10 20.80 8.37 174.10
02.01.06 NIVELACION, RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m2 28.21 10.79 304.39 28.21 10.79 304.39
3 CONCRETO SIMPLE 0.00 0.00
3.01 CIMIENTOS CORRIDOS 0.00 0.00
03.01.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 6.35 155.94 990.22 6.35 155.94 990.22
03.01.02 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON m2 8.89 19.88 176.73 8.89 19.88 176.73
3.02 SOBRECIMIENTOS 0.00 0.00
03.02.01 SOBRECIMIENTO CONCRETO 1:8+25% P.M. m3 1.83 177.33 324.51 1.83 177.33 324.51
03.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 16.73 17.25 288.59 16.73 17.25 288.59
4 CONCRETO ARMADO 0.00 0.00
4.01 ZAPATAS DE CONCRETO 0.00 0.00
04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 5.64 351.00 1,979.64 5.64 351.00 1,979.64
04.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 170.25 5.24 892.11 170.25 5.24 892.11
4.02 COLUMNAS DE CONCRETO 0.00 0.00
04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 5.09 428.12 2,179.13 5.09 428.12 2,179.13
04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 48.47 44.60 2,161.76 48.47 44.60 2,161.76
04.02.03 ACERO GRADO 60 EN COLUMNAS kg 812.77 5.24 4,258.91 812.77 5.24 4,258.91
4.03 VIGAS 0.00 0.00
04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 7.66 388.18 2,973.46 7.66 388.18 2,973.46
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 64.74 35.75 2,314.46 64.74 35.75 2,314.46
04.03.03 ACERO GRADO 60 EN VIGAS kg 1171.57 5.24 6,139.03 1171.57 5.24 6,139.03
4.04 GARGOLAS DE DESAGUE PLUVIAL 0.00 0.00
04.04.01 CONCRETO PARA GARGOLAS DE DESAGUE PLUVIAL F'C=210 KG/CM2 m3 0.26 385.52 100.24 0.26 385.52 100.24
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA GARGOLAS DE DESAGUE PLUVIAL m2 0.30 33.74 10.12 0.30 33.74 10.12
04.04.03 ACERO GRADO 60 PARA GARGOLAS DE DESAGUE PLUVIAL kg 4.52 5.24 23.68 4.52 5.24 23.68
4.05 ESCALERA 0.00 0.00
04.05.01 CONCRETO EN ESCALERA F'C=210 KG/CM2 m3 4.36 384.60 1,676.86 4.36 384.60 1,676.86
04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 24.91 70.04 1,744.70 24.91 70.04 1,744.70
04.05.03 ACERO GRADO 60 EN ESCALERAS kg 665.61 5.02 3,341.36 665.61 5.02 3,341.36
4.06 LOSA MACIZA EN TECHO DE ESCALERA 0.00 0.00
04.06.01 CONCRETO EN LOSA MACISA DE ESCALERA F'C=210 KG/CM2 m3 4.15 384.60 1,596.09 4.15 384.60 1,596.09
04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA MACIZA DE ESCALERAS m2 27.64 70.04 1,935.91 27.64 70.04 1,935.91
04.06.03 ACERO GRADO 60 EN LOSA MACISA DE TECHO DE ESCALERAS kg 404.74 5.02 2,031.79 404.74 5.02 2,031.79
4.07 LOSA ALIGERADA EN TECHO 0.00 0.00
04.07.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 1.81 384.60 696.13 1.81 384.60 696.13
04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 18.10 38.85 703.19 18.10 38.85 703.19
04.07.03 ACERO GRADO 60 EN LOSAS ALIGERADAS kg 166.25 5.37 892.76 166.25 5.37 892.76
04.07.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 162.90 2.61 425.17 162.90 2.61 425.17
5 CONTROL DE CALIDAD 0.00 0.00
5.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 7.00 28.70 200.90 7.00 28.70 200.90
6 MUROS Y TABIQUERIAS DE ALBAÑILERIA 0.00 0.00
6.01 MURO DE LADRILLO KK. DE SOGA 9X15X24 CM. m2 11.86 53.83 638.42 11.86 53.83 638.42
6.02 MURO DE LADRILLO KK. DE CABEZA 9X15X24 CM. m2 57.10 84.80 4,842.08 57.10 84.80 4,842.08
7 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
7.01 TARRAJEO EN EXTERIORES E INTERIORES DE MUROS CON CEMENTO-ARENA m2 85.52 19.86 1,698.43 85.52 19.86 1,698.43
7.02 TARRAJEO DE SUPERFICIE DE COLUMNAS m2 49.87 22.27 1,110.60 49.87 22.27 1,110.60
7.03 TARRAJEO EN SUPERFICIE DE VIGAS m2 64.74 23.52 1,522.68 64.74 23.52 1,522.68
7.04 TARRAJEO DE EN CIELO RASO m2 58.49 22.27 1,302.57 58.49 22.27 1,302.57
7.05 TARRAJEO CON IMPERMEABILIZANTES m2 1.20 27.37 32.84 1.20 27.37 32.84
7.06 BRUÑAS MUROS DE 3/4" m 45.00 2.46 110.70 45.00 2.46 110.70
8 PISOS Y PAVIMENTOS 0.00 0.00
8.01 FALSO PISO DE 4" DE CONCRETO 1:10 M2 30.35 20.16 611.86 30.35 20.16 611.86
8.02 PISO DE CEMENTO PULIDO Y COLOREADO m2 27.50 39.28 1,080.20 27.50 39.28 1,080.20
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL


OBRA
DISTRITO DE MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CO N ST RUCCIO N Y DESARRO LLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

8.03 PISO DE CERAMICO COLOR CLARO DE 0.45 x 0.45 CM m2 2.85 67.56 192.55 2.85 67.56 192.55
9 CONTRAZOCALOS Y ZOCALOS 0.00 0.00
9.01 ZOCALO DE CERAMICO H = 1.20 m m2 8.63 34.45 297.30 8.63 34.45 297.30
10 CARPINTERIA DE MADERA 0.00 0.00
PUERTA APANELADA DE MARCO DE MADERA TORNILLO Y PANEL DE MADERA TORNILLO (VER
10.01 M2 2.40 332.75 798.60 2.40 332.75 798.60
DETALLE EN PLANO)
11 CARPINTERIA METALICA 0.00 0.00
11.01 AGARRADOR PARA BAÑO DE MINUSVALIDOS GLB 1.00 86.07 86.07 1.00 86.07 86.07
12 CERRAJERIA 0.00 0.00
12.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 3.00 14.06 42.18 3.00 14.06 42.18
12.02 CERRADURA PARA PUERTA TRES GOLPES pza 1.00 125.55 125.55 1.00 125.55 125.55
12.03 MANIJA DE BRONCE und 1.00 13.59 13.59 1.00 13.59 13.59
13 PINTURA 0.00 0.00
13.01 PINTURA LATEX LAVABLE EN MURO INTERIORES Y EXTERIOR 02 MANOS M2 85.52 9.94 850.07 85.52 9.94 850.07
13.02 PINTURA LATEX EN COLUMNAS m2 49.87 10.18 507.68 49.87 10.18 507.68
13.03 PINTURA LATEX EN VIGAS m2 64.74 10.58 684.95 64.74 10.58 684.95
13.04 PINTURA LATEX LAVABLE EN CIELO RASO M2 58.49 9.94 581.39 58.49 9.94 581.39
14 INSTALACIONES SANITARIAS 0.00 0.00
14.01 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS 0.00 0.00

14.01.01 SUMINISTRO E INSTALACION DE LAVATORIOS TIPO OVALIN GRANDE DE C/BLANCO ESTANDAR und 1.00 302.13 302.13 1.00 302.13 302.13

14.01.02 SUMINISTRO E INSTALACION DE INODOROS und 1.00 371.40 371.40 1.00 371.40 371.40
14.02 SISTEMA DE AGUA FRIA 0.00 0.00
14.02.01 SALIDA DE AGUA FRIA pto 2.00 16.80 33.60 2.00 16.80 33.60
14.03 REDES DE DISTRIBUCION 0.00 0.00
14.03.01 TUBERIA PVC SAP DE 1/2" C-10 m 4.10 21.29 87.29 4.10 21.29 87.29
14.03.02 VALVULA COMPUERTA und 2.00 27.24 54.48 2.00 27.24 54.48
14.03.03 CODO PVC SAP 1/2" X 90 und 14.00 11.09 155.26 14.00 11.09 155.26
14.03.04 TEE PVC-SAP 1/2"x1/2" und 6.00 25.47 152.82 6.00 25.47 152.82
14.04 DESAGUE Y VENTILACION 0.00 0.00
14.04.01 SALIDA DE DESAGUE pto 2.00 33.60 67.20 2.00 33.60 67.20
14.05 REDES DE DERIVACION 0.00 0.00
14.05.01 TUBERIA PVC SAL DE 2" m 1.60 13.74 21.98 1.60 13.74 21.98
14.05.02 TUBERIA PVC SAL DE 3" m 3.70 17.44 64.53 3.70 17.44 64.53
14.05.03 TUBERIA PVC SAL DE 4" M 4.10 37.04 151.86 4.10 37.04 151.86
14.05.04 CODO PVC SAL 2"X90° und 1.00 32.06 32.06 1.00 32.06 32.06
14.05.05 CODO PVC SAL 2"X45° und 2.00 31.86 63.72 2.00 31.86 63.72
14.05.06 CODO PVC SAL 3"X45° und 2.00 33.10 66.20 2.00 33.10 66.20
14.05.07 CODO PVC SAL 3"X90° und 3.00 25.77 77.31 3.00 25.77 77.31
14.05.08 CODO PVC SAL 4"X90° UND 1.00 37.04 37.04 1.00 37.04 37.04
14.05.09 YEE PVC SAL 3" A 3" und 3.00 13.39 40.17 3.00 13.39 40.17
14.05.10 YEE PVC SAL 4" A 3" und 3.00 26.28 78.84 3.00 26.28 78.84
14.05.11 YEE PVC SAL 4" A 2" und 3.00 17.90 53.70 3.00 17.90 53.70
14.05.12 YEE PVC SAL 4" X 4" UND 3.00 37.04 111.12 3.00 37.04 111.12
14.05.13 SOMBRERO VENTILACION PVC SAL DE 3" pza 1.00 69.35 69.35 1.00 69.35 69.35
14.05.14 REGISTRO ROSCADO DE BRONCE DE 4" UND 1.00 20.96 20.96 1.00 20.96 20.96
14.05.15 SUMIDERO DE BRONCE 4" und 1.00 9.16 9.16 1.00 9.16 9.16
14.06 SISTEMA DE DESAGUE Y CAJAS DE REGISTRO 0.00 0.00
14.06.01 CAJA DE REGISTRO DE DESAGUE 30" X 60" und 2.00 41.00 82.00 2.00 41.00 82.00
15 FLETE 0.00 0.00
15.01 FLETE MATERIALES GLB 1.00 984.74 984.74 1.00 984.74 984.74

61,755.10 61,755.10
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL DISTRITO DE
OBRA
MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CO N ST RU CCIO N Y DESARRO LLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

ESCALERA B
1 TRABAJOS PRELIMINARES
1.01 LIMPIEZA DE TERRENO MANUAL m2 37.19 0.40 14.88 37.19 0.40 14.88
1.02 TRAZO Y REPLANTEO m2 37.19 1.01 37.56 37.19 1.01 37.56
2 MOVIMIENTO DE TIERRAS 0.00 0.00
2.01 EXCAVACIONES 0.00 0.00
02.01.01 EXCAVACION DE ZANJAS PARA ZAPATAS m3 13.88 33.59 466.23 13.88 33.59 466.23
02.01.02 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 8.21 33.59 275.77 8.21 33.59 275.77
02.01.03 CORTE DE TERRENO m3 3.72 25.19 93.71 3.72 25.19 93.71
02.01.04 RELLENO CON MATERIAL PROPIO m3 6.37 1.85 11.78 6.37 1.85 11.78
02.01.05 ELIMINACION MATERIAL EXCEDENTE m3 20.80 8.37 174.10 20.80 8.37 174.10
02.01.06 NIVELACION, RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m2 28.21 10.79 304.39 28.21 10.79 304.39
3 CONCRETO SIMPLE 0.00 0.00
3.01 CIMIENTOS CORRIDOS 0.00 0.00
03.01.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 6.35 155.94 990.22 6.35 155.94 990.22
03.01.02 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON m2 8.89 19.88 176.73 8.89 19.88 176.73
3.02 SOBRECIMIENTOS 0.00 0.00
03.02.01 SOBRECIMIENTO CONCRETO 1:8+25% P.M. m3 1.83 177.33 324.51 1.83 177.33 324.51
03.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 16.73 17.25 288.59 16.73 17.25 288.59
4 CONCRETO ARMADO 0.00 0.00
4.01 ZAPATAS DE CONCRETO 0.00 0.00
04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 5.64 351.00 1,979.64 5.64 351.00 1,979.64
04.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 170.25 5.24 892.11 170.25 5.24 892.11
4.02 COLUMNAS DE CONCRETO 0.00 0.00
04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 5.09 428.12 2,179.13 5.09 428.12 2,179.13
04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 48.47 44.60 2,161.76 48.47 44.60 2,161.76
04.02.03 ACERO GRADO 60 EN COLUMNAS kg 812.77 5.24 4,258.91 812.77 5.24 4,258.91
4.03 VIGAS 0.00 0.00
04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 7.66 388.18 2,973.46 7.66 388.18 2,973.46
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 64.74 35.75 2,314.46 64.74 35.75 2,314.46
04.03.03 ACERO GRADO 60 EN VIGAS kg 1171.57 5.24 6,139.03 1171.57 5.24 6,139.03
4.04 GARGOLAS DE DESAGUE PLUVIAL 0.00 0.00
04.04.01 CONCRETO PARA GARGOLAS DE DESAGUE PLUVIAL F'C=210 KG/CM2 m3 0.26 385.52 100.24 0.26 385.52 100.24
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA GARGOLAS DE DESAGUE PLUVIAL m2 0.30 33.74 10.12 0.30 33.74 10.12
04.04.03 ACERO GRADO 60 PARA GARGOLAS DE DESAGUE PLUVIAL kg 4.52 5.24 23.68 4.52 5.24 23.68
4.05 ESCALERA 0.00 0.00
04.05.01 CONCRETO EN ESCALERA F'C=210 KG/CM2 m3 4.36 384.60 1,676.86 4.36 384.60 1,676.86
04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 24.91 70.04 1,744.70 24.91 70.04 1,744.70
04.05.03 ACERO GRADO 60 EN ESCALERAS kg 665.61 5.02 3,341.36 665.61 5.02 3,341.36
4.06 LOSA MACIZA EN TECHO DE ESCALERA 0.00 0.00
04.06.01 CONCRETO EN LOSA MACISA DE ESCALERA F'C=210 KG/CM2 m3 4.15 384.60 1,596.09 4.15 384.60 1,596.09
04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA MACIZA DE ESCALERAS m2 27.64 70.04 1,935.91 27.64 70.04 1,935.91
04.06.03 ACERO GRADO 60 EN LOSA MACISA DE TECHO DE ESCALERAS kg 404.74 5.02 2,031.79 404.74 5.02 2,031.79
4.07 LOSA ALIGERADA EN TECHO 0.00 0.00
04.07.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 1.81 384.60 696.13 1.81 384.60 696.13
04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 18.10 38.85 703.19 18.10 38.85 703.19
04.07.03 ACERO GRADO 60 EN LOSAS ALIGERADAS kg 166.25 5.37 892.76 166.25 5.37 892.76
04.07.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 162.90 2.61 425.17 162.90 2.61 425.17
5 CONTROL DE CALIDAD 0.00 0.00
5.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 7.00 28.70 200.90 7.00 28.70 200.90
6 MUROS Y TABIQUERIAS DE ALBAÑILERIA 0.00 0.00
6.01 MURO DE LADRILLO KK. DE SOGA 9X15X24 CM. m2 11.86 53.83 638.42 11.86 53.83 638.42
6.02 MURO DE LADRILLO KK. DE CABEZA 9X15X24 CM. m2 57.10 84.80 4,842.08 57.10 84.80 4,842.08
7 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
7.01 TARRAJEO EN EXTERIORES E INTERIORES DE MUROS CON CEMENTO-ARENA m2 85.52 19.86 1,698.43 85.52 19.86 1,698.43
7.02 TARRAJEO DE SUPERFICIE DE COLUMNAS m2 49.87 22.27 1,110.60 49.87 22.27 1,110.60
7.03 TARRAJEO EN SUPERFICIE DE VIGAS m2 64.74 23.52 1,522.68 64.74 23.52 1,522.68
7.04 TARRAJEO DE EN CIELO RASO m2 58.49 22.27 1,302.57 58.49 22.27 1,302.57
7.05 TARRAJEO CON IMPERMEABILIZANTES m2 1.20 27.37 32.84 1.20 27.37 32.84
7.06 BRUÑAS MUROS DE 3/4" m 45.00 2.46 110.70 45.00 2.46 110.70
8 PISOS Y PAVIMENTOS 0.00 0.00
8.01 FALSO PISO DE 4" DE CONCRETO 1:10 M2 30.35 20.16 611.86 30.35 20.16 611.86
8.02 PISO DE CEMENTO PULIDO Y COLOREADO m2 27.50 39.28 1,080.20 27.50 39.28 1,080.20
8.03 PISO DE CERAMICO COLOR CLARO DE 0.45 x 0.45 CM m2 2.85 67.56 192.55 2.85 67.56 192.55
9 CONTRAZOCALOS Y ZOCALOS 0.00 0.00
9.01 ZOCALO DE CERAMICO H = 1.20 m m2 8.63 34.45 297.30 8.63 34.45 297.30
10 CARPINTERIA DE MADERA 0.00 0.00

10.01 PUERTA APANELADA DE MARCO DE MADERA TORNILLO Y PANEL DE MADERA TORNILLO (VER DETALLE EN PLANO) M2 2.40 332.75 798.60 2.40 332.75 798.60

11 CARPINTERIA METALICA 0.00 0.00


11.01 AGARRADOR PARA BAÑO DE MINUSVALIDOS GLB 1.00 86.07 86.07 1.00 86.07 86.07
12 CERRAJERIA 0.00 0.00
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL DISTRITO DE
OBRA
MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CO N ST RU CCIO N Y DESARRO LLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

12.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 3.00 14.06 42.18 3.00 14.06 42.18
12.02 CERRADURA PARA PUERTA TRES GOLPES pza 1.00 125.55 125.55 1.00 125.55 125.55
12.03 MANIJA DE BRONCE und 1.00 13.59 13.59 1.00 13.59 13.59
13 PINTURA 0.00 0.00
13.01 PINTURA LATEX LAVABLE EN MURO INTERIORES Y EXTERIOR 02 MANOS M2 85.52 9.94 850.07 85.52 9.94 850.07
13.02 PINTURA LATEX EN COLUMNAS m2 49.87 10.18 507.68 49.87 10.18 507.68
13.03 PINTURA LATEX EN VIGAS m2 64.74 10.58 684.95 64.74 10.58 684.95
13.04 PINTURA LATEX LAVABLE EN CIELO RASO M2 58.49 9.94 581.39 58.49 9.94 581.39
14 INSTALACIONES SANITARIAS 0.00 0.00
14.01 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS 0.00 0.00
14.01.01 SUMINISTRO E INSTALACION DE LAVATORIOS TIPO OVALIN GRANDE DE C/BLANCO ESTANDAR und 1.00 302.13 302.13 1.00 302.13 302.13
14.01.02 SUMINISTRO E INSTALACION DE INODOROS und 1.00 371.40 371.40 1.00 371.40 371.40
14.02 SISTEMA DE AGUA FRIA 0.00 0.00
14.02.01 SALIDA DE AGUA FRIA pto 2.00 16.80 33.60 2.00 16.80 33.60
14.03 REDES DE DISTRIBUCION 0.00 0.00
14.03.01 TUBERIA PVC SAP DE 1/2" C-10 m 4.10 21.29 87.29 4.10 21.29 87.29
14.03.02 VALVULA COMPUERTA und 2.00 27.24 54.48 2.00 27.24 54.48
14.03.03 CODO PVC SAP 1/2" X 90 und 14.00 11.09 155.26 14.00 11.09 155.26
14.03.04 TEE PVC-SAP 1/2"x1/2" und 6.00 25.47 152.82 6.00 25.47 152.82
14.04 DESAGUE Y VENTILACION 0.00 0.00
14.04.01 SALIDA DE DESAGUE pto 2.00 33.60 67.20 2.00 33.60 67.20
14.05 REDES DE DERIVACION 0.00 0.00
14.05.01 TUBERIA PVC SAL DE 2" m 1.60 13.74 21.98 1.60 13.74 21.98
14.05.02 TUBERIA PVC SAL DE 3" m 3.70 17.44 64.53 3.70 17.44 64.53
14.05.03 TUBERIA PVC SAL DE 4" M 4.10 37.04 151.86 4.10 37.04 151.86
14.05.04 CODO PVC SAL 2"X90° und 1.00 32.06 32.06 1.00 32.06 32.06
14.05.05 CODO PVC SAL 2"X45° und 2.00 31.86 63.72 2.00 31.86 63.72
14.05.06 CODO PVC SAL 3"X45° und 2.00 33.10 66.20 2.00 33.10 66.20
14.05.07 CODO PVC SAL 3"X90° und 3.00 25.77 77.31 3.00 25.77 77.31
14.05.08 CODO PVC SAL 4"X90° UND 1.00 37.04 37.04 1.00 37.04 37.04
14.05.09 YEE PVC SAL 3" A 3" und 3.00 13.39 40.17 3.00 13.39 40.17
14.05.10 YEE PVC SAL 4" A 3" und 3.00 26.28 78.84 3.00 26.28 78.84
14.05.11 YEE PVC SAL 4" A 2" und 3.00 17.90 53.70 3.00 17.90 53.70
14.05.12 YEE PVC SAL 4" X 4" UND 3.00 37.04 111.12 3.00 37.04 111.12
14.05.13 SOMBRERO VENTILACION PVC SAL DE 3" pza 1.00 69.35 69.35 1.00 69.35 69.35
14.05.14 REGISTRO ROSCADO DE BRONCE DE 4" UND 1.00 20.96 20.96 1.00 20.96 20.96
14.05.15 SUMIDERO DE BRONCE 4" und 1.00 9.16 9.16 1.00 9.16 9.16
14.06 SISTEMA DE DESAGUE Y CAJAS DE REGISTRO 0.00 0.00
14.06.01 CAJA DE REGISTRO DE DESAGUE 30" X 60" und 2.00 41.00 82.00 2.00 41.00 82.00
15 FLETE 0.00 0.00
15.01 FLETE MATERIALES GLB 1.00 984.74 984.74 1.00 984.74 984.74

61,755.10 61,755.10
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL DISTRITO DE
OBRA
MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CON ST RUCCION Y DESARROLLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

OBRAS PROVICIONALES
1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
1.01 OBRAS PROVISIONALES
01.01.01 MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA GLB 1.00 6,923.26 6,923.26 1.00 6,923.26 6,923.26
01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 x 3.60 M2 und 1.00 1,132.59 1,132.59 1.00 1,132.59 1,132.59
01.01.03 CERCO PERIMETRICO H=2.00 m 181.25 20.08 3,639.50 181.25 20.08 3,639.50
01.01.04 ALMACEN, GUARDIANIA Y OFICINA MES 6.00 1,748.12 10,488.72 6.00 1,748.12 10,488.72
1.02 TRABAJOS PRELIMINARES 0.00 0.00
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 3350.00 0.40 1,340.00 3350.00 0.40 1,340.00
1.03 ELIMINACION DE OBSTRUCCIONES 0.00 0.00
01.03.01 TALA Y RETIRO DE ARBOLES und 56.00 53.98 3,022.88 56.00 53.98 3,022.88
01.03.02 DEMOLICION DE ALBAÑILERIA EXISTENTE M3 431.52 28.64 12,358.73 431.52 28.64 12,358.73
1.04 ELIMINACION DE DEMOLICIONES 0.00 0.00
01.04.01 ACARREO MANUAL DE MATERIAL DEMOLIDO HASTA UNA DISTANCIA PROMEDIO DE 30 MTS. m3 539.40 17.13 9,239.92 539.40 17.13 9,239.92
01.04.02 ELIMINACION DE DEMOLICION DE ALBAÑILERIA EXISTENTE m3 539.40 10.47 5,647.52 539.40 10.47 5,647.52
1.05 DESMONTAJE 0.00 0.00

01.05.01 DESMONTAJE DE COBERTURA DE MADERAS - CALAMINAS, CIELO RASO DE MADERA Y TRIPLAY INC. TRASLADO m2 280.00 7.20 2,016.00 280.00 7.20 2,016.00

01.05.02 DESMONTAJE DE PUERTAS Y VENTANAS INC. TRASLADO und 23.00 20.16 463.68 23.00 20.16 463.68
2 CISTERNA Y TANQUE ELEVADO 0.00 0.00
2.01 TRABAJOS PRELIMINARES 0.00 0.00
02.01.01 LIMPIEZA DEL TERRENO 0.00 0.00
02.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 17.28 0.40 6.91 17.28 0.40 6.91
02.01.02 TRAZO, NIVELES Y REPLANTEO 0.00 0.00
02.01.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR m2 17.28 1.01 17.45 17.28 1.01 17.45
2.02 MOVIMIENTO DE TIERRAS 0.00 0.00
02.02.01 EXCAVACION DE ZANJAS PARA CISTERNA H>=2.00 M DE PROFUNDIDAD m3 27.48 33.59 923.05 27.48 33.59 923.05
02.02.02 NIVELACION, PERFILADO Y APISONADO FINAL DEL TERRENO PREVIO A LA CIMENTACION m2 9.62 2.21 21.26 9.62 2.21 21.26
02.02.03 ELIMINACION MATERIAL EXCEDENTE m3 34.35 10.47 359.64 34.35 10.47 359.64
2.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
02.03.01 SOLADO PARA CIMENTACION MEZCLA 1:12 CEMENTO-HORMIGON E=10 CM m2 9.50 22.61 214.80 9.50 22.61 214.80
2.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
02.04.01 CISTERNA 0.00 0.00
02.04.01.01 CONCRETO PARA CISTERNA F'C=210 KG/CM2 m3 7.64 351.00 2,681.64 7.64 351.00 2,681.64
02.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CISTERNA m2 20.11 40.98 824.11 20.11 40.98 824.11
02.04.01.03 ACERO F'Y= 4200 KG/CM2 EN CISTERNA kg 919.56 5.24 4,818.49 919.56 5.24 4,818.49
02.04.02 COLUMNAS 0.00 0.00
02.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 3.38 428.17 1,447.21 3.38 428.17 1,447.21
02.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 49.30 44.60 2,198.78 49.30 44.60 2,198.78
02.04.02.03 ACERO F'Y= 4200 KG/CM2 EN COLUMNAS kg 770.17 5.24 4,035.69 770.17 5.24 4,035.69
02.04.03 VIGAS 0.00 0.00
02.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 2.08 388.14 807.33 2.08 388.14 807.33
02.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 19.10 35.75 682.83 19.10 35.75 682.83
02.04.03.03 ACERO F'Y= 4200 KG/CM2 EN VIGAS kg 134.78 5.24 706.25 134.78 5.24 706.25
02.04.04 TANQUE ELEVADO 0.00 0.00
02.04.04.01 CONCRETO PARA TANQUE ELEVADO F'C=210 KG/CM2 m3 1.44 388.14 558.92 1.44 388.14 558.92
02.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO m2 8.55 35.75 305.66 8.55 35.75 305.66
02.04.04.03 ACERO F'Y= 4200 KG/CM2 EN TANQUE ELEVADO kg 124.93 5.24 654.63 124.93 5.24 654.63
02.04.05 LOSA MACIZA 0.00 0.00
02.04.05.01 CONCRETO EN LOSA MACIZA F'C=210 KG/CM2 m3 4.09 388.14 1,587.49 4.09 388.14 1,587.49
02.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA MACIZA m2 22.79 38.85 885.39 22.79 38.85 885.39
02.04.05.03 ACERO F'Y= 4200 KG/CM2 EN LOSA MACIZA kg 326.32 5.24 1,709.92 326.32 5.24 1,709.92
2.05 MUROS Y TABIQUERIAS DE ALBAÑILERIA 0.00 0.00
02.05.01 MURO DE SOGA LADRILLO DE ARCILLA DE 25X12X10 m2 10.69 60.03 641.72 10.69 60.03 641.72
2.06 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
02.06.01 TARRAJEO DE MUROS MEZCLA 1:5 E=1.5 CM CON IMPERMEABILIZANTE m2 31.10 27.37 851.21 31.10 27.37 851.21
02.06.02 TARRAJEO EN MUROS INTERIORES Y EXTERIORES MEZCLA 1:5 E=1.5 CM m2 37.38 19.86 742.37 37.38 19.86 742.37
02.06.03 TARRAJEO EN CIELO RAZO MEZCLA 1:5, E=1.5 CM m2 13.31 22.27 296.41 13.31 22.27 296.41
02.06.04 TARRAJEO DE SUPERFICIE DE COLUMNAS MEZCLA 1:5, E=1.5 CM m2 37.92 22.27 844.48 37.92 22.27 844.48
02.06.05 TARRAJEO DE SUPERFICIE DE VIGAS MEZCLA 1:5, E=1.5 CM m2 9.06 23.52 213.09 9.06 23.52 213.09
02.06.06 BRUÑAS DE 3/4" m 36.00 2.46 88.56 36.00 2.46 88.56
2.07 PISOS Y PAVIMENTOS 0.00 0.00
02.07.01 PISO DE CEMENTO PULIDO BRUÑADO DE 4" SIN COLOREAR m2 12.52 51.23 641.40 12.52 51.23 641.40
2.08 CONTRAZOCALOS 0.00 0.00
02.08.01 CONTRAZOCALO CEMENTO S/COLOREAR H =20 CM m 14.12 7.42 104.77 14.12 7.42 104.77
2.09 CUBIERTAS 0.00 0.00
02.09.01 CUBIERTA LADRILLO PASTELERO FRAGUA CON MORTERO 1:5 m2 5.76 31.02 178.68 5.76 31.02 178.68
2.1 CARPINTERIA METALICA 0.00 0.00
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL DISTRITO DE
OBRA
MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CON ST RUCCION Y DESARROLLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

02.10.01 VENTANA METALICA DE FIERRO CON SEGURIDAD INCLUYE COLOCACION m2 0.56 157.40 88.14 0.56 157.40 88.14
02.10.02 PUERTA METALICA S/DISEÑO INCLUYE COLOCACION m2 1.12 1,543.20 1,728.38 1.12 1,543.20 1,728.38
02.10.03 TAPA METALICA S/DISEÑO INCLUYE COLOCACION und 0.72 66.74 48.05 0.72 66.74 48.05
02.10.04 ESCALERA TIPO GATO Ø=1 1/2" SEGUN DISEÑO m 5.20 108.99 566.75 5.20 108.99 566.75
02.10.05 ESCALERA EMPOTRADA EN MURO DE CONCRETO S/DISEÑO m 1.55 82.16 127.35 1.55 82.16 127.35
2.11 CERRAJERIA 0.00 0.00
02.11.01 BISAGRAS 0.00 0.00
02.11.01.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 3.00 14.06 42.18 3.00 14.06 42.18
02.11.02 CERRADURAS 0.00 0.00
02.11.02.01 CERRADURA DE 02 GOLPES PARA PUERTAS pza 1.00 125.55 125.55 1.00 125.55 125.55
02.11.02.02 MANIJA DE BRONCE DE 4" PARA PUERTAS und 1.00 13.59 13.59 1.00 13.59 13.59
2.12 VIDRIOS, CRISTALES Y SIMILARES 0.00 0.00
02.12.01 VIDRIO TEMPLADO DE 6 MM p2 2.02 11.46 23.15 2.02 11.46 23.15
2.13 PINTURA 0.00 0.00
02.13.01 PINTURA EN INTERIORES 0.00 0.00
02.13.01.01 PINTURA LATEX EN MUROS INTERIORES DOS MANOS m2 10.69 6.71 71.73 10.69 6.71 71.73
02.13.01.02 PINTURA LATEX EN COLUMNAS INTERIORES DOS MANOS m2 6.24 7.61 47.49 6.24 7.61 47.49
02.13.01.03 PINTURA LATEX EN VIGAS INTERIORES DOS MANOS m2 6.70 8.95 59.97 6.70 8.95 59.97
02.13.02 PINTURA EN EXTERIORES 0.00 0.00
02.13.02.01 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS m2 26.69 6.25 166.81 26.69 6.25 166.81
02.13.02.02 PINTURA LATEX EN COLUMNAS EXTERIORES DOS MANOS m2 20.83 7.79 162.27 20.83 7.79 162.27
02.13.02.03 PINTURA LATEX EN VIGAS EXTERIORES DOS MANOS m2 4.33 7.79 33.73 4.33 7.79 33.73
02.13.02.04 PINTURA EN CONTRAZOCALO CON ESMALTE H=0.20 M m 1.92 3.80 7.30 1.92 3.80 7.30
02.13.02.05 PINTURA LATEX VINILICO EN CIELO RASO m2 18.63 8.61 160.40 18.63 8.61 160.40
02.13.03 PINTURA EN CARPINTERIA METALICA 0.00 0.00
02.13.03.01 PINTURA EN VENTANAS METALICAS CON ESMALTE Y ANTICORROSIVO m2 0.56 12.15 6.80 0.56 12.15 6.80
02.13.03.02 PINTURA EN PUERTAS METALICAS CON ESMALTE Y ANTICORROSIVO m2 1.12 14.35 16.07 1.12 14.35 16.07

02.13.03.03 PINTURA CON ATICORROSIVO ZINCROMATO ACABADO CON ESMALTE SINTETICO EN ESCALERA TIPO DE GATO m2 5.20 12.81 66.61 5.20 12.81 66.61

02.13.03.04 PINTURA CON ATICORROSIVO ZINCROMATO ACABADO CON ESMALTE SINTETICO EN PELDAÑOS EMPOTRADOS m2 1.55 12.81 19.86 1.55 12.81 19.86

3 MUROS DE CONTENCION 0.00 0.00


3.01 TRABAJOS PRELIMINARES 0.00 0.00
03.01.01 LIMPIEZA DEL TERRENO 0.00 0.00
03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 108.73 0.40 43.49 108.73 0.40 43.49
03.01.02 TRAZO, NIVELES Y REPLANTEO 0.00 0.00
03.01.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR m2 108.73 1.01 109.82 108.73 1.01 109.82
3.02 MOVIMIENTO DE TIERRAS 0.00 0.00
03.02.01 EXCAVACION DE ZANJAS PARA ZAPATAS m3 309.25 28.79 8,903.31 309.25 28.79 8,903.31
03.02.02 NIVELACION INTE. Y APISONADO FINAL DEL TERRENO PREVIO AL MURO DE CONTENCION m2 108.73 2.21 240.29 108.73 2.21 240.29
03.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 300.73 34.59 10,402.25 300.73 34.59 10,402.25
03.02.04 NIVELACION, RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO CAPAS DE 0.15 m2 8.83 10.79 95.28 8.83 10.79 95.28
03.02.05 ELIMINACION MATERIAL EXCEDENTE m3 11.21 10.47 117.37 11.21 10.47 117.37
3.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
03.03.01 SOLADO PARA ZAPATAS E=4" MEZCLA 1:12 CEMENTO-HORMIGÓN CONFITILLADO m2 108.73 19.88 2,161.55 108.73 19.88 2,161.55
3.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
03.04.01 CONCRETO PARA MURO DE CONTENCION F'C=210 KG/CM2 m3 114.43 351.00 40,164.93 114.43 351.00 40,164.93
03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO DE CONTENCION m2 281.78 40.98 11,547.34 281.78 40.98 11,547.34
03.04.03 ACERO F'Y= 4200 KG/CM2 EN MURO DE CONTENCION kg 8127.20 5.24 42,586.53 8127.20 5.24 42,586.53
3.05 JUNTAS 0.00 0.00
03.05.01 JUNTAS CON TECNOPOR EN MUROS DE CONTENCION E=1" m 25.00 4.75 118.75 25.00 4.75 118.75
3.06 DRENAJE 0.00 0.00
03.06.01 MATERIAL FILTRANTE PARA DRENAJE m3 22.28 134.99 3,007.58 22.28 134.99 3,007.58
03.06.02 TUBERIA PVC SAL DE 4" PARA DRENAJE DE AGUA m 25.52 15.21 388.16 25.52 15.21 388.16
03.06.03 TUBERIA DE 2" PARA LLORONES EN MURO m 8.40 6.56 55.10 8.40 6.56 55.10
3.07 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
03.07.01 TARRAJEO DE MURO EXTERIOR MEZCLA 1:5 E=1.5 CM m2 114.83 19.86 2,280.52 114.83 19.86 2,280.52
3.08 CARPINTERIA METALICA 0.00 0.00
03.08.01 CERCO ENREJADO + ARMADURA DE SUJECION und 9.00 91.16 820.44 9.00 91.16 820.44
03.08.02 CERCO PERIMETRICO CON MALLA METALICA m2 70.47 112.46 7,925.06 70.47 112.46 7,925.06
4 DRENAJE PLUVIAL 0.00 0.00
4.01 TRABAJOS PRELIMINARES 0.00 0.00
04.01.01 LIMPIEZA DEL TERRENO 0.00 0.00
04.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 104.80 0.40 41.92 104.80 0.40 41.92
04.01.02 TRAZO, NIVELES Y REPLANTEO 0.00 0.00
04.01.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR m2 104.80 1.01 105.85 104.80 1.01 105.85
4.02 MOVIMIENTO DE TIERRAS 0.00 0.00
04.02.01 EXCAVACION DE ZANJAS m3 16.77 25.19 422.44 16.77 25.19 422.44
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL DISTRITO DE
OBRA
MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CON ST RUCCION Y DESARROLLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

04.02.02 NIVELACION INTE. Y APISONADO PARA DESAGUE PLUVIAL m2 41.92 2.21 92.64 41.92 2.21 92.64
04.02.03 ELIMINACION MATERIAL EXCEDENTE m3 20.96 10.47 219.45 20.96 10.47 219.45
4.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
04.03.01 CONCRETO 1:8+25% PIEDRA MEDIANA PARA CANAL PLUVIAL m3 14.15 177.33 2,509.22 14.15 177.33 2,509.22
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CANAL PLUVIAL m2 25.15 29.01 729.60 25.15 29.01 729.60
4.04 CARPINTERIA METALICA 0.00 0.00
04.04.01 REJILLA DE CUNETA PLUVIAL m 104.80 199.06 20,861.49 104.80 199.06 20,861.49
04.04.02 TAPA DE INSPECCION DE POZOS PLUVIALES und 6.00 95.10 570.60 6.00 95.10 570.60
5 ACCESOS Y RAMPAS 0.00 0.00
5.01 TRABAJOS PRELIMINARES 0.00 0.00
05.01.01 LIMPIEZA DEL TERRENO 0.00 0.00
05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 62.74 0.40 25.10 62.74 0.40 25.10
05.01.02 TRAZO, NIVELES Y REPLANTEO 0.00 0.00
05.01.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR m2 62.74 1.01 63.37 62.74 1.01 63.37
5.02 MOVIMIENTO DE TIERRAS 0.00 0.00
05.02.01 EXCAVACION DE ZANJAS m3 43.95 25.19 1,107.10 43.95 25.19 1,107.10
05.02.02 NIVELACION INTE. Y APISONADO PARA RAMPA m2 62.74 2.21 138.66 62.74 2.21 138.66
05.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 10.77 34.59 372.53 10.77 34.59 372.53
05.02.04 ELIMINACION MATERIAL EXCEDENTE m3 41.48 10.47 434.30 41.48 10.47 434.30
05.02.05 NIVELACION, RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO CAPAS DE 0.15 m2 82.74 24.98 2,066.85 82.74 24.98 2,066.85
5.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
05.03.01 CONCRETO SIMPLE F'C=175 KG/CM2. m2 9.40 411.22 3,865.47 9.40 411.22 3,865.47
05.03.02 SARDINEL PARA RAMPA F'C=175 KG/CM2. m2 3.42 411.22 1,406.37 3.42 411.22 1,406.37
05.03.03 ENCOFRADO Y DESENCOFRADO m2 21.27 44.60 948.64 21.27 44.60 948.64
5.04 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
05.04.01 TARRAJEO DE SUPERFICIE DE SARDINELES MEZCLA 1:5, E=1.5 CM m2 12.97 23.52 305.05 12.97 23.52 305.05
5.05 PISOS Y PAVIMENTOS 0.00 0.00
05.05.01 PISO DE RAMPA DE CONCRETO DE 15 CM m2 91.52 63.18 5,782.23 91.52 63.18 5,782.23
5.06 CARPINTERIA METALICA 0.00 0.00
05.06.01 BARANDA METALICA DE D=3" DE H=0.90 CM m 25.18 121.44 3,057.86 25.18 121.44 3,057.86
5.07 PINTURA 0.00 0.00
05.07.01 PINTURA EN BARANDAS METALICAS CON ESMALTE Y ANTICORROSIVO m 25.18 15.49 390.04 25.18 15.49 390.04
05.07.02 PINTURA EN SARDINELES CON ESMALTE m2 12.97 12.76 165.50 12.97 12.76 165.50
6 BASE DE ASTA DE BANDERA 0.00 0.00
6.01 TRABAJOS PRELIMINARES 0.00 0.00
06.01.01 LIMPIEZA DEL TERRENO 0.00 0.00
06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 2.00 0.40 0.80 2.00 0.40 0.80
06.01.02 TRAZO, NIVELES Y REPLANTEO 0.00 0.00
06.01.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR m2 2.00 1.01 2.02 2.00 1.01 2.02
6.02 MOVIMIENTO DE TIERRAS 0.00 0.00
06.02.01 EXCAVACION DE ZANJAS m3 6.00 25.19 151.14 6.00 25.19 151.14
06.02.02 ELIMINACION MATERIAL EXCEDENTE m3 7.50 10.47 78.53 7.50 10.47 78.53
6.03 OBRAS DE CONCRETO ARMADO 0.00 0.00
06.03.01 CONCRETO EN BASE DE ASTAS DE BANDERA F'C=210 KG/CM2 m3 0.29 428.17 124.17 0.29 428.17 124.17
06.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN BASE DE ASTAS DE BANDERA m2 2.58 44.60 115.07 2.58 44.60 115.07
06.03.03 ACERO F'Y= 4200 KG/CM2 EN BASE DE ASTA DE BANDERA kg 10.26 5.37 55.10 10.26 5.37 55.10
6.04 CARPINTERIA METALICA 0.00 0.00
06.04.01 ASTAS DE BANDERA X 3 UND. jgo 1.00 1,458.36 1,458.36 1.00 1,458.36 1,458.36
7 PATIO CIVICO Y LOSA DEPORTIVA 0.00 0.00
7.01 TRABAJOS PRELIMINARES 0.00 0.00
07.01.01 LIMPIEZA DEL TERRENO 0.00 0.00
07.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 664.61 0.40 265.84 664.61 0.40 265.84
07.01.02 TRAZO, NIVELES Y REPLANTEO 0.00 0.00
07.01.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR m2 664.61 1.01 671.26 664.61 1.01 671.26
7.02 MOVIMIENTO DE TIERRAS 0.00 0.00
07.02.01 EXCAVACION A NIVEL DE SUBRASANTE HASTA H=0.15 M m3 99.69 28.79 2,870.08 99.69 28.79 2,870.08
07.02.02 EXCAVACION DE ZANJAS m3 6.57 25.19 165.50 6.57 25.19 165.50
07.02.03 NIVELACION, RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO CAPAS DE 0.10 m2 664.61 24.98 16,601.96 664.61 24.98 16,601.96
07.02.04 ELIMINACION MATERIAL EXCEDENTE m3 132.83 10.47 1,390.73 132.83 10.47 1,390.73
7.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
07.03.01 CONCRETO LOSA DEPORTIVA F'C=175 KG/CM2 m3 79.78 299.06 23,859.01 79.78 299.06 23,859.01
07.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA DEPORTIVA m2 66.87 38.85 2,597.90 66.87 38.85 2,597.90
07.03.03 ACABADO DE LOSA C/MORTERO 1:2 X 1.5 CM DE ESPESOR m2 735.62 23.52 17,301.78 735.62 23.52 17,301.78
7.04 JUNTAS 0.00 0.00
07.04.01 SELLADO DE JUNTAS DE DILATACION m 412.48 1.28 527.97 412.48 1.28 527.97
7.05 CARPINTERIA METALICA 0.00 0.00
07.05.01 ARCO DE FULBITO Y TABLERO DE BASKETBOL und 2.00 1,908.83 3,817.66 2.00 1,908.83 3,817.66
07.05.02 POSTE DE NET DE VOLEYBOL (INCL. NET Y CABLE TENSOR) und 1.00 365.69 365.69 1.00 365.69 365.69
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL DISTRITO DE
OBRA
MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CON ST RUCCION Y DESARROLLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

07.05.03 ANCLAJE DE CARPAS PAR 240.00 35.51 8,522.40 240.00 35.51 8,522.40
7.06 PINTURA 0.00 0.00
07.06.01 PINTURA EN ARCO DE FULBITO CON ESMALTE Y ANTICORROSIVO m 22.80 9.97 227.32 22.80 9.97 227.32
07.06.02 PINTURA EN LINEA DEMARCATORIAS EN LOSA DEPORTIVA m 250.83 4.50 1,128.74 250.83 4.50 1,128.74
8 CERCO PERIMETRICO, INGRESO PRINCIPAL Y VEREDAS 0.00 0.00
8.01 TRABAJOS PRELIMINARES 0.00 0.00
08.01.01 LIMPIEZA DEL TERRENO 0.00 0.00
08.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 983.72 0.40 393.49 983.72 0.40 393.49
08.01.02 TRAZO, NIVELES Y REPLANTEO 0.00 0.00
08.01.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR m2 983.72 1.01 993.56 983.72 1.01 993.56
8.02 MOVIMIENTO DE TIERRAS 0.00 0.00
08.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 54.33 28.79 1,564.16 54.33 28.79 1,564.16
08.02.02 CORTE DE TERRENO PARA TALUD m3 903.83 8.74 7,899.47 903.83 8.74 7,899.47
08.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 14.11 34.59 488.06 14.11 34.59 488.06
08.02.04 ELIMINACION MATERIAL EXCEDENTE m3 1180.06 10.47 12,355.23 1180.06 10.47 12,355.23
8.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
08.03.01 CIMIENTOS CORRIDOS CONCRETO 1:10 CEMENTO-HORMIGÓN CONFITILLADO + 30% PIEDRA m3 27.90 155.94 4,350.73 27.90 155.94 4,350.73
08.03.02 SOBRECIMIENTO CONCRETO 1:8+25% P.M. m3 8.44 177.33 1,496.67 8.44 177.33 1,496.67
08.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIEMTO m2 56.30 17.25 971.18 56.30 17.25 971.18
8.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
08.04.01 COLUMNAS 0.00 0.00
08.04.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 4.26 428.17 1,824.00 4.26 428.17 1,824.00
08.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 71.50 44.60 3,188.90 71.50 44.60 3,188.90
08.04.01.03 ACERO F'Y= 4200 KG/CM2 EN COLUMNAS kg 1806.46 5.24 9,465.85 1806.46 5.24 9,465.85
08.04.02 VIGAS 0.00 0.00
08.04.02.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 0.91 388.14 353.21 0.91 388.14 353.21
08.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 8.45 35.75 302.09 8.45 35.75 302.09
08.04.02.03 ACERO F'Y= 4200 KG/CM2 EN VIGAS kg 455.69 5.24 2,387.82 455.69 5.24 2,387.82
8.05 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
08.05.01 TARRAJEO DE SUPERFICIE DE VIGAS MEZCLA 1:5, E=1.5 CM m2 7.31 23.52 171.93 7.31 23.52 171.93
08.05.02 TARRAJEO DE SUPERFICIE DE COLUMNAS MEZCLA 1:5, E=1.5 CM m2 59.40 22.27 1,322.84 59.40 22.27 1,322.84
8.06 CONTRAZOCALOS 0.00 0.00
08.06.01 CONTRAZOCALO DE CEMENTO PULIDO C/MORTERO 1:5 DE 2CM.X .20M. m 29.15 12.54 365.54 29.15 12.54 365.54
8.07 PISOS Y PAVIMENTOS 0.00 0.00
08.07.01 PISO DE ADOQUIN RECTANGULAR m2 39.53 43.99 1,738.92 39.53 43.99 1,738.92
08.07.02 PISO DE CONCRETO DE 4" SIN COLOREAR m2 61.78 51.23 3,164.99 61.78 51.23 3,164.99
8.08 CARPINTERIA METALICA 0.00 0.00
08.08.01 PUERTA METALICA S/DISEÑO INCLUYE COLOCACION und 1.00 1,543.20 1,543.20 1.00 1,543.20 1,543.20
08.08.02 CERCO ENREJADO + ARMADURA DE SUJECION und 255.00 91.16 23,245.80 255.00 91.16 23,245.80
08.08.03 CERCO PERIMETRICO CON MALLA METALICA m2 218.15 112.46 24,533.15 218.15 112.46 24,533.15
8.09 PINTURA 0.00 0.00
08.09.01 PINTURA EN VIGAS CON ESMALTE m2 7.31 15.56 113.74 7.31 15.56 113.74
08.09.02 PINTURA EN COLUMNAS CON ESMALTE m2 59.40 8.28 491.83 59.40 8.28 491.83
9 JARDINERIA 0.00 0.00
9.01 TRABAJOS PRELIMINARES 0.00 0.00
09.01.01 LIMPIEZA DEL TERRENO 0.00 0.00
09.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1500.00 0.40 600.00 1500.00 0.40 600.00
09.01.02 TRAZO, NIVELES Y REPLANTEO 0.00 0.00
09.01.02.01 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR m2 1500.00 1.01 1,515.00 1500.00 1.01 1,515.00
9.02 SEMBRIO DE PLANTAS 0.00 0.00
09.02.01 SEMBRADO DE GRAS m2 1179.29 13.42 15,826.07 1179.29 13.42 15,826.07
09.02.02 PLANTACION DE FLORES Y ARBUSTOS und 420.00 17.68 7,425.60 420.00 17.68 7,425.60
09.02.03 PLANTACION DE ARBOLES und 20.00 55.17 1,103.40 20.00 55.17 1,103.40
10 INSTALACIONES SANITARIAS 0.00 0.00
10.01 SISTEMA DE AGUA FRIA 0.00 0.00
10.01.01 SALIDA DE AGUA FRIA pto 19.00 16.80 319.20 19.00 16.80 319.20
10.02 REDES DE DISTRIBUCION 0.00 0.00
10.02.01 TUBERIA PVC SAP DE 3/4" C-10 m 161.46 7.86 1,269.08 161.46 7.86 1,269.08
10.02.02 VALVULA COMPUERTA und 12.00 27.24 326.88 12.00 27.24 326.88
10.02.03 CODO PVC SAP 3/4" X 90 und 34.00 9.75 331.50 34.00 9.75 331.50
10.02.04 TEE PVC-SAP 3/4" * 3/4" und 14.00 23.97 335.58 14.00 23.97 335.58
10.03 SUMINISTRO E INSTALACION DE ACCESORIOS 0.00 0.00
10.03.01 INSTALACION DE GRIFOS DE JARDINERIAS und 4.00 69.64 278.56 4.00 69.64 278.56
10.04 REDES DE DERIVACION 0.00 0.00
10.04.01 TUBERIA PVC SAL DE 2" m 3.87 13.74 53.17 3.87 13.74 53.17
10.04.02 TUBERIA PVC SAL DE 4" M 7.44 37.04 275.58 7.44 37.04 275.58
10.04.03 TUBERIA PVC SAL DE 6" m 95.05 42.87 4,074.79 95.05 42.87 4,074.79
10.04.04 CODO PVC SAL 4"X90° und 4.00 13.58 54.32 4.00 13.58 54.32
PRESUPUESTO BASE VS PRESUPUESTO EJECUTADO

: "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. RICARDO PALMA, DEL DISTRITO DE
OBRA
MADEAN, PROVINCIA DE YAUYOS - REGION LIMA."

ENTIDAD : MUNICIPALIDAD PROVINCIAL DE YAUYOS


CONTRATISTA : CONDIAL E.I.R.L.
SUPERVISOR DE OB : ING. ABRAHAN JUAN ABELARDO GENG OLAECHEA
RESIDENTE DE OBR : ING. ANNIE LADY GALINDO ANAYA
REGION : LIMA
PROVINCIA : YAUYOS
E.I.R.L
DISTRITO : MADEAN CON ST RUCCION Y DESARROLLO EN IN GEN IERIA APLICADA

PRESUPUESTO BASE PRESUPUESTO EJECUTADO

ITEM DESCRIPCIÓN
Und. Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)

10.04.05 CODO PVC SAL 4"X45° pza 10.00 9.69 96.90 10.00 9.69 96.90
10.04.06 YEE PVC SAL 4" A 3" und 7.00 26.28 183.96 7.00 26.28 183.96
10.04.07 YEE PVC SAL 6" A 4" und 7.00 24.66 172.62 7.00 24.66 172.62
10.04.08 REGISTRO ROSCADO DE BRONCE DE 6" und 10.00 30.38 303.80 10.00 30.38 303.80
10.05 SISTEMA DE DESAGUE CAJAS DE REGISTRO 0.00 0.00
10.05.01 CAJA DE REGISTRO DE DESAGUE 30" X 60" und 10.00 68.88 688.80 10.00 68.88 688.80
10.05.02 CAJA DE REGISTRO DE DESAGUE 25" X 60" und 4.00 53.30 213.20 4.00 53.30 213.20
10.06 DESAGUE PLUVIAL 0.00 0.00
10.06.01 REDES DE DERIVACION 0.00 0.00
10.06.01.01 TUBERIA PVC SAL DE 6" M 46.01 37.04 1,704.21 46.01 37.04 1,704.21
10.06.01.02 REGISTRO ROSCADO DE BRONCE DE 6" und 4.00 30.38 121.52 4.00 30.38 121.52
10.06.02 SISTEMA DE DESAGUE CAJAS DE REGISTRO 0.00 0.00
10.06.02.01 CAJA DE REGISTRO DE DESAGUE 30" X 60" und 3.00 68.88 206.64 3.00 68.88 206.64
10.06.02.02 CAJA DE REGISTRO DE DESAGUE 60" X 60" und 3.00 82.00 246.00 3.00 82.00 246.00
11 INSTALACIONES ELECTRICAS 0.00 0.00
11.01 CONDUCTORES ELECTRICOS 0.00 0.00
11.01.01 CONDUCTOR 2 x (2x1-10LSOH+1x1 - 16(T)CU) MM2 m 81.55 6.99 570.03 81.55 6.99 570.03
11.01.02 CONDUCTOR 2x2.5 mm2 NYY - 25 MM PVC-SEL m 75.58 6.92 523.01 75.58 6.92 523.01
11.02 TUBERIAS Y ACCESORIOS 0.00 0.00
11.02.01 TUBERIA PVC-SAP Ø 20 mm X 3M m 75.58 5.79 437.61 75.58 5.79 437.61
11.02.02 TUBERIA PVC-SAP Ø 20 mm X 3M (ALUMBRADO) m 81.55 5.79 472.17 81.55 5.79 472.17
11.02.03 CODO PVC - SAP 20MM und 44.00 10.10 444.40 44.00 10.10 444.40
11.03 ARTEFACTOS DE ILUMINACION 0.00 0.00
11.03.01 FAROLA ESFERICA 75 W und 2.00 189.33 378.66 2.00 189.33 378.66
11.03.02 LAMPARA REFLECTOR DE 200W CON ABRAZADERA und 4.00 358.84 1,435.36 4.00 358.84 1,435.36
11.03.03 COLUMNA DE FAROLA und 6.00 902.45 5,414.70 6.00 902.45 5,414.70
11.04 TABLEROS ELECTRICOS 0.00 0.00
11.04.01 TABLERO GENERAL und 1.00 808.52 808.52 1.00 808.52 808.52
11.04.02 TABLERO DE DISTRIBUCION und 5.00 464.27 2,321.35 5.00 464.27 2,321.35
11.04.03 CAJAS DE PASE und 5.00 37.84 189.20 5.00 37.84 189.20
11.05 PROTECCION CONTRA SOBRECARGAS 0.00 0.00
11.05.01 SISTEMA DE PROTECCION und 1.00 899.21 899.21 1.00 899.21 899.21
11.06 IMPLEMENTACION DE TANQUE CISTERNA 0.00 0.00
11.06.01 ELECTROBOMBA DE 1HP INC/ACC und 2.00 2,651.50 5,303.00 2.00 2,651.50 5,303.00
12 CONTROL DE CALIDAD 0.00 0.00
12.01 DISEÑO DE MEZCLA UND 7.00 205.00 1,435.00 7.00 205.00 1,435.00
12.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 30.00 28.70 861.00 30.00 28.70 861.00
13 IMPACTO AMBIENTAL 0.00 0.00
13.01 IMPACTO AMBIENTAL GLB 1.00 12,500.00 12,500.00 1.00 12,500.00 12,500.00
14 FLETE 0.00 0.00
14.01 FLETE TERRESTRE GLB 1.00 160,786.69 160,786.69 1.00 160,786.69 160,786.69
15 VARIOS 0.00 0.00
15.01 LIMPIEZA FINAL DE OBRA m2 2252.22 0.40 900.89 2252.22 0.40 900.89
15.02 PLACA RECORDATORIA und 1.00 344.63 344.63 1.00 344.63 344.63
15.03 SEÑALIZACION DE SEGURIDAD SEGUN PLANOS GLB 1.00 4,656.60 4,656.60 1.00 4,656.60 4,656.60

691,988.97 691,988.97