CRONOGRAMA VALORIZADO REPROGRAMADO DE ACTIVIDADES

FTE.FTO : CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

UNIDAD GEST. : MUNICIPALIDAD DISTRITAL DE MEGANTONI

“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:

OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %

“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA


0 DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"

01 ACTIVIDADES PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 97,335.44

01.01 ACTIVIDADES PROVICIONALES Y TRABAJOS PRELIMINARES 75,176.85

01.01.01 INSTALACION DE CAMPAMENTO PROVISIONAL(INCLUYE OFICINA ,COSINA ,COMEDOR) GB 1.00 41115.02 41,115.02 100.00% 0.00 0.00 0.00 0.00
41,115.02

01.01.02 DESMONTAJ DE COBERTURA M2 280.91 18.41 5,171.55 100.00% 0.00 0.00 0.00 0.00
5,171.55

01.01.03 DESMONTAJE DE ESTRUCTURA DE MADERA M2 293.08 7.45 1,091.73 50.00% 1,091.73 50.00% 0.00 0.00 0.00
2,183.45

01.01.04 DENOMINACION DE PISOS INTERIORES Y EXTERIORES M2 181.17 11.38 2,061.71 100.00% 0.00 0.00 0.00 0.00
2,061.71

01.01.05 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GB 1.00 4557.60 4,557.60 100.00% 0.00 0.00 0.00 0.00
4,557.60

01.01.06 CERCO DE OBRA CON POSTES ROLLIZOS Y ARPILLERA M 110.00 22.48 2,472.80 100.00% 0.00 0.00 0.00 0.00
2,472.80

01.01.07 CARTEL DE ACTIVIDAD 3.80 X 3.00 UND 1.00 1020.81 1,020.81 100.00% 0.00 0.00 0.00 0.00
1,020.81

01.01.08 LIMPIEZA DE TERRENO MANUAL M2 356.75 2.2 784.85 100.00% 0.00 0.00 0.00 0.00
784.85

01.01.09 INSTALACION SANITARIA PROVISIONAL GB 1.00 3492.7 3,492.70 100.00% 0.00 0.00 0.00 0.00
3,492.70

01.01.10 SUMINISTRO PROVISIONAL DE ENERGIA ELECTRICA MES 4.00 3079.09 1,539.55 12.50% 3,079.09 25.00% 3,079.09 25.00% 3,079.09 25.00% 1,539.55 12.50%
12,316.36

1.02 SEGURIDAD DURANTE EI MANTENIMIENTO 22,158.59 0.00 0.00 0.00 0.00

01.02.01 EQUIPOS DE PROCTECCION PERSONAL GB 1.00 14080.00 14,080.00 100.00% 0.00 0.00 0.00 0.00
14,080.00

01.02.02 SEÑALES DE SEGURIDAD DURANTE EL MANTENIMIENTO GB 1.00 6628.59 6,628.59 100.00% 0.00 0.00 0.00 0.00
6,628.59

01.02.03 RESPUESTAS ANTE ENERGENCIAS Y SALUD GB 1.00 1450.00 181.25 12.50% 362.50 25.00% 362.50 25.00% 362.50 25.00% 181.25 12.50%
1,450.00

2 TRAZO Y REPLANTEO 733.32 0.00 0.00 0.00 0.00

2.01 TRAZO Y REPLANTEO PRELIMINAR M2 190.97 3.84 733.32 733.32 100.00% 0.00 0.00 0.00 0.00

3 REPOSICION DE ESTRUCTURAS 147,077.21 0.00 0.00 0.00 0.00

3.01 MOVIMIENTO DE TIERRAS 2,683.30 0.00 0.00 0.00 0.00

03.01.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.40M PROFUNDIDAD M3 15.96 62.65 999.89 100.00% 0.00 0.00 0.00
999.89

03.01.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORIDOS M3 1.24 62.65 77.69 100.00% 0.00 0.00 0.00
77.69

03.01.03 EXCAVACION DE ZANJAS PARA CANALES DE EVACUACION DE AGUAS PLUMALES M3 5.70 62.65 0.00 357.11 100.00% 0.00 0.00
357.11

03.01.04 EXCAVACION DE ZANJAS PARA VIGAS DE CONEXIÓN H=1.0MPROFUNDIDAD M3 19.93 62.65 1,248.61 100.00% 0.00 0.00 0.00
1,248.61

3.02 RELLENOS 2,403.34 0.00 0.00 0.00 0.00

03.02.01 RELLENOS DE ZAPATAS CON MATERIAL PROPIO M3 29.67 76.2 0.00 2,260.85 100.00% 0.00 0.00
2,260.85

03.02.02 ELIMINACION DE MATERIAL EXCEDENTE M3 15.78 9.03 0.00 142.49 100.00% 0.00 0.00
142.49

3.03 ACTIVIDADES DE CONCRETO SIMPLE 3,068.63 0.00 0.00 0.00 0.00

03.03.01 CONCRETO EEN SOLADOS F.C 100 KG/CM2 EN ZAPATAS M2 25.72 50.3 1,293.72 100.00% 0.00 0.00 0.00
1,293.72
CRONOGRAMA VALORIZADO REPROGRAMADO DE ACTIVIDADES
FTE.FTO : CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

UNIDAD GEST. : MUNICIPALIDAD DISTRITAL DE MEGANTONI

“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:

OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %

03.03.02 CONCRETO CICLOPEO EN CIMIENTO CORRIDO M3 1.24 580.97 720.40 100.00% 0.00 0.00 0.00
720.40

03.03.03 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS M2 12.05 64.12 772.65 100.00% 0.00 0.00 0.00
772.65

03.03.04 CONCRETO CICLOPEO EN SOBRECIMIENTOS M3 0.45 626.36 281.86 100.00% 0.00 0.00 0.00
281.86

3.04 ACTIVIDADES DE CONCRETO ARMADO 78,987.87 0.00 0.00 0.00 0.00

03.04.01 ZAPATAS 0.00 0.00 0.00 0.00


4,944.04

03.04.01.01 ACERO ESTRUCTURAL F.Y=4200 KG/CM2 PARA ZAPATAS KG 116.58 9.19 1,071.37 100.00% 0.00 0.00 0.00
1,071.37

03.04.01.02 CONCRETO EN ZAPATAS F.C=210KG/CM2 M3 4.56 849.27 3,872.67 100.00% 0.00 0.00 0.00
3,872.67

03.04.02 VIGAS DE CONEXIÓN 0.00 0.00 0.00 0.00


12,514.79

03.04.02.01 ACERO ESTRUCTURAL F.Y=4200 KG/CM2 PARA VIGAS DE CONEXCION KG 603.83 9.19 5,549.20 100.00% 0.00 0.00 0.00
5,549.20

03.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONEXIÓN M2 34.37 99.64 3,424.63 100.00% 0.00 0.00 0.00
3,424.63

03.04.02.03 CONCRETO EN VIGAS DE CONEXIÓN F.C=210 KG/CM2 M2 4.30 823.48 3,540.96 100.00% 0.00 0.00 0.00
3,540.96

03.04.03 SOBRECIMIENTOS REFORZADOS 0.00 0.00 0.00 0.00


24,555.97

03.04.03.01 ACERO ESTRUCTURAL F.Y 4200KG/CM2 PARA SOBRECIMIENTOS REFORZADOS KG 577.18 9.19 5,304.28 100.00% 0.00 0.00 0.00
5,304.28

03.04.03.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS REFORZADOS M2 121.47 96.73 11,749.79 100.00% 0.00 0.00 0.00
11,749.79

03.04.03.03 CONCRETO EN SOBRECIMIENTOS REFORZADOS F.C=210KG/CM2 M3 9.11 823.48 7,501.90 100.00% 0.00 0.00 0.00
7,501.90

03.04.04 COLUMNAS 0.00 0.00 0.00 0.00


14,386.42

03.04.04.01 ACERO ESTRUCTURAL F.Y=4200KG/CM2PARA COLUMNAS KG 691.74 9.19 5,085.67 80.00% 1,271.42 20.00% 0.00 0.00
6,357.09

03.04.04.02 EENCOFRADO Y DESENCOFRADO EN COLUMNAS M2 61.34 73.41 3,602.38 80.00% 900.59 20.00% 0.00 0.00
4,502.97

03.04.04.03 CONCRETO EN COLUMNAS FC=210KG/CM2 M3 4.00 881.59 2,821.09 80.00% 705.27 20.00% 0.00 0.00
3,526.36

03.04.05 VIGAS 0.00 0.00 0.00 0.00


20,434.40

03.04.05.01 ACERO ESTRUCTURAL F Y=4200KG/CM2 PARA VIGAS KG 758.58 9.42 0.00 7,145.82 100.00% 0.00 0.00
7,145.82

03.04.05.02 ENCOFRADO Y DESENCOFRADO EN VIGAS M2 67.41 115.79 0.00 7,805.40 100.00% 0.00 0.00
7,805.40

03.04.05.03 CONCRETO EN VIGAS DE CONEXIÓN F.C=210 KG/CM2 M3 6.64 825.78 0.00 5,483.18 100.00% 0.00 0.00
5,483.18

03.04.06 MESA DE COCINA 0.00 0.00 0.00 0.00


952.25

03.04.06.01 ACERO ESTRUTURAL F Y= 4200KG/CCM2 PARA MESA DECONCRETO KG 11.89 9.19 0.00 0.00 109.27 100.00% 0.00
109.27

03.04.06.02 ENCOFRADO Y DESENCOFRADO EN MESAS DE CONCRETO M2 5.49 102.55 0.00 0.00 563.00 100.00% 0.00
563.00

03.04.06.03 CONCRETO EN MESAS DE CONCRETO F.C=210KG/CM2 M3 0.34 823.48 0.00 0.00 279.98 100.00% 0.00
279.98

03.04.07 PRUEBAS DE LABORATORIO 0.00 0.00 0.00 0.00


1,200.00

03.04.07.01 ESTUDIO DE SUELOS PARACAPACIDAD PORTANTE UND 1.00 1200 1,200.00 100.00% 0.00 0.00 0.00 0.00
1,200.00

3.05 REPOSICION DE ESTRUCTURA METALICA 59,934.07 0.00 0.00 0.00 0.00

03.05.01 TIJERAL DE ESTRUCTURA METALICA TIPO I UND 2.00 2067.86 0.00 4,135.72 100.00% 0.00 0.00
4,135.72
CRONOGRAMA VALORIZADO REPROGRAMADO DE ACTIVIDADES
FTE.FTO : CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

UNIDAD GEST. : MUNICIPALIDAD DISTRITAL DE MEGANTONI

“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:

OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %

03.05.02 TIJERAL DE ESTRUCTURA METALICA TIPO II UND 1.00 3726.9 0.00 3,726.90 100.00% 0.00 0.00
3,726.90

03.05.03 TIJERAL DE ESTRUCTURAL METALICA TIPO III UND 1.00 1755.86 0.00 1,755.86 100.00% 0.00 0.00
1,755.86

03.05.04 TIJERAL DE ESTRUCTURAL METALICA TIPO IV UND 5.00 3368.29 0.00 16,841.45 100.00% 0.00 0.00
16,841.45

03.05.05 CORREAS PARA CUBIERTA 2X3 X 6M =2MM MTS 474.68 66.38 0.00 31,509.26 100.00% 0.00 0.00
31,509.26

03.05.06 REPOSICION DE ANCLAJES PARA VIGAS PRINCIPALES SEGÚN DISEÑO UND 18.00 109.16 0.00 1,964.88 100.00% 0.00 0.00
1,964.88

4 ARQUITECTURA 425,214.77 0.00 0.00 0.00 0.00

4.01 MUROS Y TABIQUES ALBAÑILERIA 8,908.35 0.00 0.00 0.00 0.00

04.01.01 MUROS DE BLOQUETAS M2 85.46 104.24 0.00 8,908.35 100.00% 0.00 0.00
8,908.35

4.02 REVOQUES Y ENLUCIDOS 9,189.33 0.00 0.00 0.00 0.00

04.02.01 TARRAJEO EN COLUMNAS M2 51.48 38.52 0.00 0.00 1,983.01 100.00% 0.00
1,983.01

04.02.02 TARRAJEO EN VIGAS M2 75.21 46.77 0.00 0.00 3,517.57 100.00% 0.00
3,517.57

04.02.03 TARRAJEO MUROS INTERIORES Y EXTERIORES M2 129.84 28.41 0.00 0.00 3,688.75 100.00% 0.00
3,688.75

4.03 PISOS ,ZOCALOS Y CONTRAZOCALOS 39,997.97 0.00 0.00 0.00 0.00

04.03.01 NIVELACON INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO M2 113.80 5.22 0.00 0.00 594.04 100.00% 0.00
594.04

04.03.02 EMPEDRADO EN PISO E=10CM M2 113.80 63.23 0.00 0.00 7,195.57 100.00% 0.00
7,195.57

04.03.03 FALSO PISO C :H 1 :8 E 4º M2 113.80 76.91 0.00 0.00 8,752.36 100.00% 0.00
8,752.36

04.03.04 PISO CERAMICO DE 40*0.40M M2 113.80 121.7 0.00 0.00 13,849.46 100.00% 0.00
13,849.46

04.03.05 CONTRAZOCALO DE CERAMICO .H=10CM M 34.31 70.46 0.00 0.00 2,417.48 100.00% 0.00
2,417.48

04.03.06 ZOCALO DE CERAMICO 40*40 CM M2 73.84 97.36 0.00 0.00 7,189.06 100.00% 0.00
7,189.06

4.04 CARPINTERIA DE MADERA 74,316.83 0.00 0.00 0.00 0.00

04.04.01 REPOSICION DE ESTRUCTURA DE MADERA DE 2º X3º M 530.28 22.41 0.00 0.00 8,912.68 75.00% 2,970.89 25.00%
11,883.57

04.04.02 PROVISION Y MONNTAJE DE TABIQUERIA CON MADERA MACHIMBRADA M2 262.36 174.94 0.00 0.00 34,422.95 75.00% 11,474.32 25.00%
45,897.26

04.04.03 REPOSICION DE PUERTAS DE MADERA CON TABLERO REBAJADO M2 25.44 650 0.00 0.00 12,402.00 75.00% 4,134.00 25.00%
16,536.00

04 .05 REPOSICION DE COBERTURA 140,065.62 0.00 0.00 0.00 0.00

04.05.01 PROVISION Y MONTAJE DE COBERTURAS M2 413.54 331.65 0.00 137,150.54 100.00% 0.00 0.00
137,150.54

04.05.02 PROVISION Y COBERTURA CUMBRERA M 32.30 0.00 2,915.08 100.00% 0.00 0.00
90.25 2,915.08

4.06 SISTEMA DE DRENAJE PLUVIAL 26,998.42 0.00 0.00 0.00 0.00

04.06.01 REPOSICION DE CANALETAS DE AGUA PLUVIAL M 64.60 0.00 0.00 3,255.19 100.00% 0.00
50.39 3,255.19

04.06.02 TUBERIA DE PVC SAP 3º PARA BAJADA DE PLUVIALES M 206.00 0.00 0.00 12,640.16 100.00% 0.00
61.36 12,640.16

04.06.03 ENCOFRADO Y DESENCOFRADO EN CANAL M2 25.25 0.00 0.00 1,619.03 100.00% 0.00
64.12 1,619.03

04.06.04 M3 6.06 0.00 0.00 4,587.54 100.00% 0.00


CONCRETO FC = 175KG CM 2EN EL CANAL 757.02 4,587.54
CRONOGRAMA VALORIZADO REPROGRAMADO DE ACTIVIDADES
FTE.FTO : CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

UNIDAD GEST. : MUNICIPALIDAD DISTRITAL DE MEGANTONI

“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:

OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %

04.06.05 FALSAS COLUMNAS PARA PROTECCION DE MONTANTES 4º UND 10.00 0.00 0.00 4,896.50 100.00% 0.00
489.65 4,896.50

4.07 VEREDAS 30,500.47 0.00 0.00 0.00 0.00

04.07.01 COMPACTAD0 DE 4ª PARA VEREDAS M2 127.55 0.00 0.00 579.08 100.00% 0.00
4.54 579.08

04.07.02 EMPEDRADO DE VEREDAS E= 10 CM M2 127.55 0.00 0.00 12,183.58 100.00% 0.00


95.52 12,183.58

04.07.03 EMPEDRADO Y DESEMCOFRADO EN VEREDAS M2 29.79 0.00 0.00 1,910.13 100.00% 0.00
64.12 1,910.13

04.07.04 REPOSICION DE VEREDAS DE CONCRETO 1C= 140 KG/CM2 E = 0.30 M2 127.55 0.00 0.00 15,827.68 100.00% 0.00
124.09 15,827.68

4.08 PINTURAS 46,007.20 0.00 0.00 0.00 0.00

04.08.01 LACA SELLADORA EN ESTRUCTURAS DE MADERA M2 519.11 0.00 0.00 8,740.52 75.00% 2,913.51 25.00%
22.45 11,654.02

04.08.02 BARNIZADO DE ESTRUCTURAS DE MADERA M2 519.11 0.00 0.00 7,728.25 75.00% 2,576.08 25.00%
19.85 10,304.33

04.08.03 PINTURA ANTICORROSIVA Y ESMALTE EN ESTRUCTURAS MET DE COBERTURA M2 163.89 0.00 3,376.13 100.00% 0.00 0.00
20.60 3,376.13

04.08.04 PINTURA ESMALTE EN COLUMNAS Y VIGAS M2 701.96 0.00 0.00 5,168.18 25.00% 15,504.54 75.00%
29.45 20,672.72

4.09 VENTANAS 41,459.05 0.00 0.00 0.00 0.00

04.09.01 VENTANA DE MADERA AGUANO SEGÚN DISEÑO M2 101.30 0.00 0.00 22,336.65 75.00% 7,445.55 25.00%
294.00 29,782.20

04.09.02 INSTALACION DE MALLA MOSQUIETO Y MALLA CUADRADO M2 101.30 0.00 0.00 8,757.64 75.00% 2,919.21 25.00%
115.27 11,676.85

4.10 CARPINTERIA METALICA 7,771.53 0.00 0.00 0.00 0.00

04.10.01 MARCO CON MALLA METALICA M2 24.72 191.41 4,731.66 0.00 0.00 4,731.66 100.00% 0.00

04.10.02 SEPARADOR DE SRVICIOS HIGIENICOS M2 12.20 249.17 3,039.87 0.00 0.00 3,039.87 100.00% 0.00

5 REPARACION EN INSTALACIONES ELCTRICAS 45,619.67 0.00 0.00 0.00 0.00

5.01 SISTEMA ELECTRICO 16,712.92 0.00 0.00 0.00 0.00

05.01.01 MANTENIMIENTO DE REDES ELECTRICAS PTO 54.00 0.00 0.00 2,777.22 100.00% 0.00
51.43 2,777.22

05.01.02 REPOSICION DE TABLEROS DE DISTRIBUCIOON EQ 3.00 0.00 0.00 2,753.61 100.00% 0.00
917.87 2,753.61

05.01.03 REEMPLAZO DE EQUIPO FLUORECENTES 36 W UND 19.00 0.00 0.00 5,119.93 100.00% 0.00
269.47 5,119.93

04.01.04 RENPLAZO DE PLACA DE INTERRUPTOR SIMPLE PTO 10.00 0.00 0.00 1,708.80 100.00% 0.00
170.88 1,708.80

05.01.05 REEMPLAZO DE PLACA DE TOMACORRIENTE DOBLE PTO 22.00 0.00 0.00 4,353.36 100.00% 0.00
197.88 4,353.36

5.02 SISTEMA DE PROTECCION TIPO POZO DE PUESTA A TIERRA 2,036.26 0.00 0.00 0.00 0.00

05.02.01 REPARACION DE POZO PUESTA TIERRA UND 1.00 0.00 0.00 0.00 2,036.26 100.00%
2,036.26 2,036.26

5.03 REPOSICION DE PANELES SOLARES (INCL.ACCESORIOS) 26,870.49 0.00 0.00 0.00 0.00

05.03.01 REPOSICION DE PANELES SOLARES (INCL BATERIAS E INVERSOR PTO 1.00 0.00 0.00 0.00 26,870.49 100.00%
26,870.49 26,870.49

6 INSTALACIONES SANITARIAS 35,091.42 0.00 0.00 0.00 0.00

6.01 APARATOS SANITARIOS Y ACCESORIOS 2,807.45 0.00 0.00 0.00 0.00

06.01.01 SUMINISTRO DE ACCESORIOS SANITARIOS 0.00 0.00 0.00 0.00


1,554.75
CRONOGRAMA VALORIZADO REPROGRAMADO DE ACTIVIDADES
FTE.FTO : CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

UNIDAD GEST. : MUNICIPALIDAD DISTRITAL DE MEGANTONI

“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:

OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %

06.01.01.01 INODORO BLANCO UND 2.00 0.00 0.00 0.00 740.00 100.00%
370.00 740.00

06.01.01.02 LAVATORIO BLANCO UND 2.00 0.00 0.00 0.00 344.00 100.00%
172.00 344.00

06.01.01 .03 URINARIO UND 1.00 0.00 0.00 0.00 352.00 100.00%
352.00 352.00

06.01.04 LAVADERRO DE ACERO INOXIDABLE UND 1.00 0.00 0.00 0.00 118.75 100.00%
118.75 118.75

06.01.02 SUMINISTRO DE ACCESORIOS 135.00 0.00 0.00 0.00 0.00

06.01.02.010 GRIFERIA PARA LAVATORI0 UND 2.00 0.00 0.00 0.00 90.00 100.00%
45.00 90.00

06.01.02.02 GRIFERIA PARA LAVATORI0 UND 1.00 0.00 0.00 0.00 45.00 100.00%
45.00 45.00

06.01.03 INSTALACIONES DE APRAATOS SANITARIOS 726.00 0.00 0.00 0.00

06.01.04.01 COLOCACION DE APARATOS SANITARIOS UND 6.00 0.00 0.00 0.00 726.00 100.00%
121.00 726.00

06.01.04 INSTALACION DE ACCESORIIOS 391.70 0.00 0.00 0.00 0.00

06.01.04.01 COLOCACION DE ACCESORIOS SANITARIOS UND 5.00 0.00 0.00 0.00 391.70 100.00%
78.34 391.70

6.02 SISTEMA DE AGUA FRIA 2,423.96 0.00 0.00 0.00 0.00

06.02.01 SALIDA DE AGUA FRIA 816.12 0.00 0.00 0.00 0.00

06.02.01.01 SALIDA DE AGUA FRIA TUBERIA PV C- 10 1/2ª PTO 6.00 0.00 0.00 816.12 100.00% 0.00
136.02 816.12

06.02.02 REDES DE DISTRIBUCION 1,607.84 0.00 0.00 0.00 0.00

06.02.02.01 TRABAJOS PRELIMINARES 111.36 0.00 0.00 0.00 0.00

06.02.02.01.01 TRAZO Y REPLANTEO PARA IISS M 23.20 0.00 0.00 111.36 100.00% 0.00
4.80 111.36

06.02.02.02 MOVIMIENTO DE TIERRA RED DE AGUA 1,133.39 0.00 0.00 0.00 0.00

06.02.02.02.01 EXCAVACION MANUAL DE ZANJAS MEN TERRENO NORMAL M3 2.09 0.00 0.00 163.69 100.00% 0.00
78.32 163.69

06.02.02.02.02 RELLENO YY COMPACTACION DE ZANJAS MANUAL M3 2.09 0.00 0.00 969.70 100.00% 0.00
463.97 969.70

06.02.02.03 VALVULAS 363.09 0.00 0.00 0.00 0.00

06.02.02.03.01 VALVULA ESFERICA DE 1/2º UND 2.00 0.00 0.00 0.00 239.48 100.00%
119.74 239.48

06.02.02.03.02 VALVULA COMPUERTA DE 3/4º UND 1.00 0.00 0.00 0.00 123.61 100.00%
123.61 123.61

6.03 DESAGUE 29,860.01 0.00 0.00 0.00 0.00

06.03.01 SAIDA DE DESAGUE 0.00 0.00 0.00 0.00


1,780.56

06.03.01.01 SALIDA DESAGUE PVC SAL 2º PTO 9.00 0.00 0.00 1,056.96 100.00% 0.00
117.44 1,056.96

06.03.01.02 SALIDA DESAGUE PVC- SAL 4º PTO 4.00 0.00 0.00 723.60 100.00% 0.00
180.90 723.60

06.03.02 REDES DE DERIVACION 0.00 0.00 0.00 0.00


28,079.45

06.03.02.01 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00


201.60

06.03.02.01.01 TRAZO Y REPLANTEO PARA IISS M 42.00 0.00 0.00 201.60 100.00% 0.00
4.80 201.60

06..03.02.02 MOVIMIENTO DE TIERRA RED DE DESAGUE 0.00 0.00 0.00 0.00


2,049.86
CRONOGRAMA VALORIZADO REPROGRAMADO DE ACTIVIDADES
FTE.FTO : CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES

UNIDAD GEST. : MUNICIPALIDAD DISTRITAL DE MEGANTONI

“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:

OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %

06.03.02.02.01 EXCAVACION MANUAL DE ZANJAS MEN TERRENO NORMAL M3 3.78 0.00 0.00 296.05 100.00% 0.00
78.32 296.05

06.03.02.02.02 RELLENO Y COMPACTACION DE ZANJAS MANUAL M3 3.78 0.00 0.00 1,753.81 100.00% 0.00
463.97 1,753.81

06.03.02.03 REDES COLECTORAS 2,767.38 0.00 0.00 0.00 0.00

06.03.02.03.01 SUMINISTRO Y COLOCACION EN TUBERIA PVC SAL 2ª M 18.00 0.00 0.00 430.20 100.00% 0.00
23.90 430.20

06.03.02.03.02 SUMINISTRO YCOLOCACION DE TUBERIA PVC SAL 4ª M 24.00 0.00 0.00 874.32 100.00% 0.00
36.43 874.32

06.03.02.03.03 CAJAS DE REGISTROS DE DESAGUE 12ªX24ª UND 3.00 0.00 0.00 1,462.86 100.00% 0.00
487.62 1,462.86

06.03.02.04 SISTEMA DE ELIMINACION DE EXCRETAS 23,060.61 0.00 0.00 0.00 0.00

06.03.02.04.01 TRAZO Y REPLANTEO PRELIMINAR M2 14.86 0.00 0.00 57.06 100.00% 0.00
3.84 57.06

06.03.02.04.02 EXCAVACION DE ZANJAS PARA BIODIGESTOR M3 39.07 0.00 0.00 3,059.96 100.00% 0.00
78.32 3,059.96

06.03.02.04.03 REFINE EN ZANJA INCLUYE CAMA EN TERRENO NORMAL M2 72.25 0.00 0.00 1,652.36 100.00% 0.00
22.87 1,652.36

06.03.02.04.04 INSTALACION DE TANQUES BIODIGESTORES UND 1.00 0.00 0.00 15,335.45 100.00% 0.00
15,335.45 15,335.45

06.03.02.04.05 INSTALACION DE CAJA DE REGISTRO DE LODOS UND 1.00 0.00 0.00 1,171.63 100.00% 0.00
1,171.63 1,171.63

06.03.02.04.06 INSTALACION DE POZOS DE PRECOLACION UND 1.00 0.00 0.00 1,580.29 100.00% 0.00
1,580.29 1,580.29

06.03.02.04.07 LOSA DE PROTECCION MEZCLA 1.8 E=4ª M2 1.00 0.00 0.00 203.86 100.00% 0.00
203.86 203.86

7 MITIGACION DE IMPACTOS AMBIENTALES 7,734.70 0.00 0.00 0.00 0.00

7.01 EQUIPAMIENTO PROVISIONAL PARA MANEJO DE RR.SS. 4,830.00 0.00 0.00 0.00 0.00

7.01.01 EQUIPAMENTO PROVISIONAL PARA RR.SS UND 1.00 820.00 820.00 102.50 12.50% 205.00 25.00% 205.00 25.00% 205.00 25.00% 102.50 12.50%

7.01.02 EQUIPAMENTO PERMANENTE PARA RR .SS UND 1.00 4,010.00 4,010.00 1,002.50 25.00% 1,002.50 25.00% 1,002.50 25.00% 1,002.50 25.00%

7.02 LIMPIEZA FINAL DE ACTIVIDAD 2,904.70 0.00 0.00 0.00 0.00

07.02.01 LIMPIEZA EN INFRAESTRUCTURA M2 370.97 7.83 2,904.70 0.00 0.00 0.00 2,904.70 100.00%

8 TRANSPORTES DE MATEIALES 161,845.97 0.00 0.00 0.00 0.00

8.01 TRANSPORTE DE MATERIALES FLUVIAL DE MALANQUIATO A NUEVA VIDA VJA 32.00 4,436.00 141,952.00 63,878.40 45.00% 63,878.40 45.00% 14,195.20 10.00% 0.00

TRANSPORTE TERRESTRE DE MATERIALES DEL PUERTO A ALMACEN DE


8.02 KG 117,023.34 0.17 19,893.97 8,952.29 45.00% 8,952.29 45.00% 1,989.40 10.00% 0.00
ACTIVIDAD D=0.5 KM

COSTO DIRECTO 920,652.50 86,233.98 9.37% 137,490.26 14.93% 315,836.08 34.31% 293,346.31 31.86% 87,745.87 9.52%

GASTOS GENERALES 146,844.07 13,754.32 9.37% 21,929.70 14.93% 50,375.85 34.31% 46,788.74 31.86% 13,980.78 9.52%
15.95%

GASTOS INSPECCION 52,477.19 4,915.34 9.37% 7,836.94 14.93% 18,002.66 34.31% 16,720.74 31.86% 4,996.27 9.52%
5.70%

GASTOS DE LIQUIDACIÒN TÈCNICA Y FINANCIERA 11,968.48 1,121.04 9.37% 1,787.37 14.93% 4105.87 34.31% 3,813.50 31.86% 1,139.50 9.52%
1.30%

GASTOS DE ELEABORACIÒN DE PLAN DE TRABAJO 32,000.00 2,997.32 9.37% 4,778.88 14.93% 10977.82 34.31% 10,196.12 31.86% 3,046.67 9.52%
3.48%

GASTOS DE EVALUACION DE PLAN DE TRABAJO 8,500.00 796.16 9.37% 1,269.39 14.93% 2915.98 34.31% 2,708.34 31.86% 809.27 9.52%
0.92%

GASTOS DE GESTIÒN ADMINISTRATIVA 40,692.84 3,811.54 9.37% 6,077.07 14.93% 13959.95 34.31% 12,965.91 31.86% 3,874.30 9.52%
4.42%

GASTOS DE CONTROVERSIA 5,615.98 526.03 9.37% 838.69 14.93% 1926.60 34.31% 1,789.41 31.86% 534.69 9.52%
0.61%

PRESUPUESTO TOTAL 1,218,751.06 114,155.73 9.37% 182,008.30 14.93% 418,100.81 34.31% 388,329.07 31.86% 116,127.16 9.52%
VALORIZADO ACUMULADO 114,155.73 9.37% 296,164.03 24.31% 714,264.84 58.62% 1,102,593.91 90.48% 1,218,721.06 100.00%
157965.93 129480.06 172702.28
29296.17
13693.17
956.88
9613.78
1480.00
1642.51
15603.00
7924.00
819.00
2000.00
4860.00
2865.30
1642.80
293.37
321.17
478.30
129.66
30991.40 16069.65
335.54
167.37
32.24
135.93
9591.11
9591.11
3268.99
1997.89
4324.23
21064.75 16069.65
10471.84
832.27 2496.81
1986.28
9022.56
9760.64
2564.00
24240.92 79902.66 46291.67
20489.33 26320.37
17546.92 26320.37
2942.41
22057.46 3914.84
11510.07 3914.84
171.65
2885.73
5320.82
3131.87 3914.84
10547.39
180.93
1013.92
3041.78
5604.91
705.85
571.69
571.69
1611.77 55498.49 3465.70
34208.73
10362.47
3995.90
6931.39 3465.70
1611.77
1227.10
384.67
16505.60
8400.67
8400.67
6454.09
4331.74
2122.35
1650.84
878.67
277.89
421.20
73.08
2251.00 67984.51
2251.00 7124.80
2251.00 1125.50
2338.82
1827.80
659.00
1173.68
5532.93
2122.34
461.80
895.93
1939.84
113.02
1861.04
1861.04
46250.00
39800.00
6450.00
2369.97
2369.97
4845.77
4845.77
2492.22 18167.86 55196.28
3981.78
2541.00
1414.50
1126.50
766.00
274.50
91.50
400.00
621.48
621.48
53.30
53.30
1517.37 1218.80
264.04
264.04
1517.37 954.76
1517.37
0.00 954.76
668.24 9432.48 1049.13
668.24 297.73
450.16
218.08
0.00 297.73
3210.12
1562.68
725.88
921.56
5924.63 1049.13
1363.18
4196.53 1049.13
364.92
306.61 3534.80
306.61
17.66
120.68
63.68
104.59
303.80
202.16
101.64
0.00 3231.00
0.00 574.62
824.36
737.26
1094.76
37019.84
376.11
13.29
208.86
49.15
104.81
4405.74
257.23
1454.73
2693.78
24069.09
14353.51
9715.58
8168.90
5756.14
2412.76
17127.31
99.30
51.90
47.40
1814.53
933.44
92.32
788.77
686.91
194.70
492.21
147.94
93.50
54.44
182.46
182.46
733.86
198.49
198.49
425.31
14.18
300.10
43.51
67.52
110.06
110.06
7358.74
160.82
102.92
7095.00
6103.57
1908.48
1308.66
1219.23
893.60
598.60
175.00
68079.92 13088.89
24904.00
40950.00 9750.00
2225.92 3338.89
3229.82
2129.01
298.73
172.88
635.00
1022.40
1100.81
345.75
608.50
87.28
59.28