“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:
OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %
01.01.01 INSTALACION DE CAMPAMENTO PROVISIONAL(INCLUYE OFICINA ,COSINA ,COMEDOR) GB 1.00 41115.02 41,115.02 100.00% 0.00 0.00 0.00 0.00
41,115.02
01.01.02 DESMONTAJ DE COBERTURA M2 280.91 18.41 5,171.55 100.00% 0.00 0.00 0.00 0.00
5,171.55
01.01.03 DESMONTAJE DE ESTRUCTURA DE MADERA M2 293.08 7.45 1,091.73 50.00% 1,091.73 50.00% 0.00 0.00 0.00
2,183.45
01.01.04 DENOMINACION DE PISOS INTERIORES Y EXTERIORES M2 181.17 11.38 2,061.71 100.00% 0.00 0.00 0.00 0.00
2,061.71
01.01.05 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GB 1.00 4557.60 4,557.60 100.00% 0.00 0.00 0.00 0.00
4,557.60
01.01.06 CERCO DE OBRA CON POSTES ROLLIZOS Y ARPILLERA M 110.00 22.48 2,472.80 100.00% 0.00 0.00 0.00 0.00
2,472.80
01.01.07 CARTEL DE ACTIVIDAD 3.80 X 3.00 UND 1.00 1020.81 1,020.81 100.00% 0.00 0.00 0.00 0.00
1,020.81
01.01.08 LIMPIEZA DE TERRENO MANUAL M2 356.75 2.2 784.85 100.00% 0.00 0.00 0.00 0.00
784.85
01.01.09 INSTALACION SANITARIA PROVISIONAL GB 1.00 3492.7 3,492.70 100.00% 0.00 0.00 0.00 0.00
3,492.70
01.01.10 SUMINISTRO PROVISIONAL DE ENERGIA ELECTRICA MES 4.00 3079.09 1,539.55 12.50% 3,079.09 25.00% 3,079.09 25.00% 3,079.09 25.00% 1,539.55 12.50%
12,316.36
01.02.01 EQUIPOS DE PROCTECCION PERSONAL GB 1.00 14080.00 14,080.00 100.00% 0.00 0.00 0.00 0.00
14,080.00
01.02.02 SEÑALES DE SEGURIDAD DURANTE EL MANTENIMIENTO GB 1.00 6628.59 6,628.59 100.00% 0.00 0.00 0.00 0.00
6,628.59
01.02.03 RESPUESTAS ANTE ENERGENCIAS Y SALUD GB 1.00 1450.00 181.25 12.50% 362.50 25.00% 362.50 25.00% 362.50 25.00% 181.25 12.50%
1,450.00
2.01 TRAZO Y REPLANTEO PRELIMINAR M2 190.97 3.84 733.32 733.32 100.00% 0.00 0.00 0.00 0.00
03.01.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.40M PROFUNDIDAD M3 15.96 62.65 999.89 100.00% 0.00 0.00 0.00
999.89
03.01.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORIDOS M3 1.24 62.65 77.69 100.00% 0.00 0.00 0.00
77.69
03.01.03 EXCAVACION DE ZANJAS PARA CANALES DE EVACUACION DE AGUAS PLUMALES M3 5.70 62.65 0.00 357.11 100.00% 0.00 0.00
357.11
03.01.04 EXCAVACION DE ZANJAS PARA VIGAS DE CONEXIÓN H=1.0MPROFUNDIDAD M3 19.93 62.65 1,248.61 100.00% 0.00 0.00 0.00
1,248.61
03.02.01 RELLENOS DE ZAPATAS CON MATERIAL PROPIO M3 29.67 76.2 0.00 2,260.85 100.00% 0.00 0.00
2,260.85
03.02.02 ELIMINACION DE MATERIAL EXCEDENTE M3 15.78 9.03 0.00 142.49 100.00% 0.00 0.00
142.49
03.03.01 CONCRETO EEN SOLADOS F.C 100 KG/CM2 EN ZAPATAS M2 25.72 50.3 1,293.72 100.00% 0.00 0.00 0.00
1,293.72
CRONOGRAMA VALORIZADO REPROGRAMADO DE ACTIVIDADES
FTE.FTO : CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES
“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:
OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %
03.03.02 CONCRETO CICLOPEO EN CIMIENTO CORRIDO M3 1.24 580.97 720.40 100.00% 0.00 0.00 0.00
720.40
03.03.03 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS M2 12.05 64.12 772.65 100.00% 0.00 0.00 0.00
772.65
03.03.04 CONCRETO CICLOPEO EN SOBRECIMIENTOS M3 0.45 626.36 281.86 100.00% 0.00 0.00 0.00
281.86
03.04.01.01 ACERO ESTRUCTURAL F.Y=4200 KG/CM2 PARA ZAPATAS KG 116.58 9.19 1,071.37 100.00% 0.00 0.00 0.00
1,071.37
03.04.01.02 CONCRETO EN ZAPATAS F.C=210KG/CM2 M3 4.56 849.27 3,872.67 100.00% 0.00 0.00 0.00
3,872.67
03.04.02.01 ACERO ESTRUCTURAL F.Y=4200 KG/CM2 PARA VIGAS DE CONEXCION KG 603.83 9.19 5,549.20 100.00% 0.00 0.00 0.00
5,549.20
03.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONEXIÓN M2 34.37 99.64 3,424.63 100.00% 0.00 0.00 0.00
3,424.63
03.04.02.03 CONCRETO EN VIGAS DE CONEXIÓN F.C=210 KG/CM2 M2 4.30 823.48 3,540.96 100.00% 0.00 0.00 0.00
3,540.96
03.04.03.01 ACERO ESTRUCTURAL F.Y 4200KG/CM2 PARA SOBRECIMIENTOS REFORZADOS KG 577.18 9.19 5,304.28 100.00% 0.00 0.00 0.00
5,304.28
03.04.03.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS REFORZADOS M2 121.47 96.73 11,749.79 100.00% 0.00 0.00 0.00
11,749.79
03.04.03.03 CONCRETO EN SOBRECIMIENTOS REFORZADOS F.C=210KG/CM2 M3 9.11 823.48 7,501.90 100.00% 0.00 0.00 0.00
7,501.90
03.04.04.01 ACERO ESTRUCTURAL F.Y=4200KG/CM2PARA COLUMNAS KG 691.74 9.19 5,085.67 80.00% 1,271.42 20.00% 0.00 0.00
6,357.09
03.04.04.02 EENCOFRADO Y DESENCOFRADO EN COLUMNAS M2 61.34 73.41 3,602.38 80.00% 900.59 20.00% 0.00 0.00
4,502.97
03.04.04.03 CONCRETO EN COLUMNAS FC=210KG/CM2 M3 4.00 881.59 2,821.09 80.00% 705.27 20.00% 0.00 0.00
3,526.36
03.04.05.01 ACERO ESTRUCTURAL F Y=4200KG/CM2 PARA VIGAS KG 758.58 9.42 0.00 7,145.82 100.00% 0.00 0.00
7,145.82
03.04.05.02 ENCOFRADO Y DESENCOFRADO EN VIGAS M2 67.41 115.79 0.00 7,805.40 100.00% 0.00 0.00
7,805.40
03.04.05.03 CONCRETO EN VIGAS DE CONEXIÓN F.C=210 KG/CM2 M3 6.64 825.78 0.00 5,483.18 100.00% 0.00 0.00
5,483.18
03.04.06.01 ACERO ESTRUTURAL F Y= 4200KG/CCM2 PARA MESA DECONCRETO KG 11.89 9.19 0.00 0.00 109.27 100.00% 0.00
109.27
03.04.06.02 ENCOFRADO Y DESENCOFRADO EN MESAS DE CONCRETO M2 5.49 102.55 0.00 0.00 563.00 100.00% 0.00
563.00
03.04.06.03 CONCRETO EN MESAS DE CONCRETO F.C=210KG/CM2 M3 0.34 823.48 0.00 0.00 279.98 100.00% 0.00
279.98
03.04.07.01 ESTUDIO DE SUELOS PARACAPACIDAD PORTANTE UND 1.00 1200 1,200.00 100.00% 0.00 0.00 0.00 0.00
1,200.00
03.05.01 TIJERAL DE ESTRUCTURA METALICA TIPO I UND 2.00 2067.86 0.00 4,135.72 100.00% 0.00 0.00
4,135.72
CRONOGRAMA VALORIZADO REPROGRAMADO DE ACTIVIDADES
FTE.FTO : CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES
“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:
OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %
03.05.02 TIJERAL DE ESTRUCTURA METALICA TIPO II UND 1.00 3726.9 0.00 3,726.90 100.00% 0.00 0.00
3,726.90
03.05.03 TIJERAL DE ESTRUCTURAL METALICA TIPO III UND 1.00 1755.86 0.00 1,755.86 100.00% 0.00 0.00
1,755.86
03.05.04 TIJERAL DE ESTRUCTURAL METALICA TIPO IV UND 5.00 3368.29 0.00 16,841.45 100.00% 0.00 0.00
16,841.45
03.05.05 CORREAS PARA CUBIERTA 2X3 X 6M =2MM MTS 474.68 66.38 0.00 31,509.26 100.00% 0.00 0.00
31,509.26
03.05.06 REPOSICION DE ANCLAJES PARA VIGAS PRINCIPALES SEGÚN DISEÑO UND 18.00 109.16 0.00 1,964.88 100.00% 0.00 0.00
1,964.88
04.01.01 MUROS DE BLOQUETAS M2 85.46 104.24 0.00 8,908.35 100.00% 0.00 0.00
8,908.35
04.02.01 TARRAJEO EN COLUMNAS M2 51.48 38.52 0.00 0.00 1,983.01 100.00% 0.00
1,983.01
04.02.02 TARRAJEO EN VIGAS M2 75.21 46.77 0.00 0.00 3,517.57 100.00% 0.00
3,517.57
04.02.03 TARRAJEO MUROS INTERIORES Y EXTERIORES M2 129.84 28.41 0.00 0.00 3,688.75 100.00% 0.00
3,688.75
04.03.01 NIVELACON INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO M2 113.80 5.22 0.00 0.00 594.04 100.00% 0.00
594.04
04.03.02 EMPEDRADO EN PISO E=10CM M2 113.80 63.23 0.00 0.00 7,195.57 100.00% 0.00
7,195.57
04.03.03 FALSO PISO C :H 1 :8 E 4º M2 113.80 76.91 0.00 0.00 8,752.36 100.00% 0.00
8,752.36
04.03.04 PISO CERAMICO DE 40*0.40M M2 113.80 121.7 0.00 0.00 13,849.46 100.00% 0.00
13,849.46
04.03.05 CONTRAZOCALO DE CERAMICO .H=10CM M 34.31 70.46 0.00 0.00 2,417.48 100.00% 0.00
2,417.48
04.03.06 ZOCALO DE CERAMICO 40*40 CM M2 73.84 97.36 0.00 0.00 7,189.06 100.00% 0.00
7,189.06
04.04.01 REPOSICION DE ESTRUCTURA DE MADERA DE 2º X3º M 530.28 22.41 0.00 0.00 8,912.68 75.00% 2,970.89 25.00%
11,883.57
04.04.02 PROVISION Y MONNTAJE DE TABIQUERIA CON MADERA MACHIMBRADA M2 262.36 174.94 0.00 0.00 34,422.95 75.00% 11,474.32 25.00%
45,897.26
04.04.03 REPOSICION DE PUERTAS DE MADERA CON TABLERO REBAJADO M2 25.44 650 0.00 0.00 12,402.00 75.00% 4,134.00 25.00%
16,536.00
04.05.01 PROVISION Y MONTAJE DE COBERTURAS M2 413.54 331.65 0.00 137,150.54 100.00% 0.00 0.00
137,150.54
04.05.02 PROVISION Y COBERTURA CUMBRERA M 32.30 0.00 2,915.08 100.00% 0.00 0.00
90.25 2,915.08
04.06.01 REPOSICION DE CANALETAS DE AGUA PLUVIAL M 64.60 0.00 0.00 3,255.19 100.00% 0.00
50.39 3,255.19
04.06.02 TUBERIA DE PVC SAP 3º PARA BAJADA DE PLUVIALES M 206.00 0.00 0.00 12,640.16 100.00% 0.00
61.36 12,640.16
04.06.03 ENCOFRADO Y DESENCOFRADO EN CANAL M2 25.25 0.00 0.00 1,619.03 100.00% 0.00
64.12 1,619.03
“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:
OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %
04.06.05 FALSAS COLUMNAS PARA PROTECCION DE MONTANTES 4º UND 10.00 0.00 0.00 4,896.50 100.00% 0.00
489.65 4,896.50
04.07.01 COMPACTAD0 DE 4ª PARA VEREDAS M2 127.55 0.00 0.00 579.08 100.00% 0.00
4.54 579.08
04.07.03 EMPEDRADO Y DESEMCOFRADO EN VEREDAS M2 29.79 0.00 0.00 1,910.13 100.00% 0.00
64.12 1,910.13
04.07.04 REPOSICION DE VEREDAS DE CONCRETO 1C= 140 KG/CM2 E = 0.30 M2 127.55 0.00 0.00 15,827.68 100.00% 0.00
124.09 15,827.68
04.08.01 LACA SELLADORA EN ESTRUCTURAS DE MADERA M2 519.11 0.00 0.00 8,740.52 75.00% 2,913.51 25.00%
22.45 11,654.02
04.08.02 BARNIZADO DE ESTRUCTURAS DE MADERA M2 519.11 0.00 0.00 7,728.25 75.00% 2,576.08 25.00%
19.85 10,304.33
04.08.03 PINTURA ANTICORROSIVA Y ESMALTE EN ESTRUCTURAS MET DE COBERTURA M2 163.89 0.00 3,376.13 100.00% 0.00 0.00
20.60 3,376.13
04.08.04 PINTURA ESMALTE EN COLUMNAS Y VIGAS M2 701.96 0.00 0.00 5,168.18 25.00% 15,504.54 75.00%
29.45 20,672.72
04.09.01 VENTANA DE MADERA AGUANO SEGÚN DISEÑO M2 101.30 0.00 0.00 22,336.65 75.00% 7,445.55 25.00%
294.00 29,782.20
04.09.02 INSTALACION DE MALLA MOSQUIETO Y MALLA CUADRADO M2 101.30 0.00 0.00 8,757.64 75.00% 2,919.21 25.00%
115.27 11,676.85
04.10.01 MARCO CON MALLA METALICA M2 24.72 191.41 4,731.66 0.00 0.00 4,731.66 100.00% 0.00
04.10.02 SEPARADOR DE SRVICIOS HIGIENICOS M2 12.20 249.17 3,039.87 0.00 0.00 3,039.87 100.00% 0.00
05.01.01 MANTENIMIENTO DE REDES ELECTRICAS PTO 54.00 0.00 0.00 2,777.22 100.00% 0.00
51.43 2,777.22
05.01.02 REPOSICION DE TABLEROS DE DISTRIBUCIOON EQ 3.00 0.00 0.00 2,753.61 100.00% 0.00
917.87 2,753.61
05.01.03 REEMPLAZO DE EQUIPO FLUORECENTES 36 W UND 19.00 0.00 0.00 5,119.93 100.00% 0.00
269.47 5,119.93
04.01.04 RENPLAZO DE PLACA DE INTERRUPTOR SIMPLE PTO 10.00 0.00 0.00 1,708.80 100.00% 0.00
170.88 1,708.80
05.01.05 REEMPLAZO DE PLACA DE TOMACORRIENTE DOBLE PTO 22.00 0.00 0.00 4,353.36 100.00% 0.00
197.88 4,353.36
5.02 SISTEMA DE PROTECCION TIPO POZO DE PUESTA A TIERRA 2,036.26 0.00 0.00 0.00 0.00
05.02.01 REPARACION DE POZO PUESTA TIERRA UND 1.00 0.00 0.00 0.00 2,036.26 100.00%
2,036.26 2,036.26
5.03 REPOSICION DE PANELES SOLARES (INCL.ACCESORIOS) 26,870.49 0.00 0.00 0.00 0.00
05.03.01 REPOSICION DE PANELES SOLARES (INCL BATERIAS E INVERSOR PTO 1.00 0.00 0.00 0.00 26,870.49 100.00%
26,870.49 26,870.49
“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:
OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %
06.01.01.01 INODORO BLANCO UND 2.00 0.00 0.00 0.00 740.00 100.00%
370.00 740.00
06.01.01.02 LAVATORIO BLANCO UND 2.00 0.00 0.00 0.00 344.00 100.00%
172.00 344.00
06.01.01 .03 URINARIO UND 1.00 0.00 0.00 0.00 352.00 100.00%
352.00 352.00
06.01.04 LAVADERRO DE ACERO INOXIDABLE UND 1.00 0.00 0.00 0.00 118.75 100.00%
118.75 118.75
06.01.02.010 GRIFERIA PARA LAVATORI0 UND 2.00 0.00 0.00 0.00 90.00 100.00%
45.00 90.00
06.01.02.02 GRIFERIA PARA LAVATORI0 UND 1.00 0.00 0.00 0.00 45.00 100.00%
45.00 45.00
06.01.04.01 COLOCACION DE APARATOS SANITARIOS UND 6.00 0.00 0.00 0.00 726.00 100.00%
121.00 726.00
06.01.04.01 COLOCACION DE ACCESORIOS SANITARIOS UND 5.00 0.00 0.00 0.00 391.70 100.00%
78.34 391.70
06.02.01.01 SALIDA DE AGUA FRIA TUBERIA PV C- 10 1/2ª PTO 6.00 0.00 0.00 816.12 100.00% 0.00
136.02 816.12
06.02.02.01.01 TRAZO Y REPLANTEO PARA IISS M 23.20 0.00 0.00 111.36 100.00% 0.00
4.80 111.36
06.02.02.02 MOVIMIENTO DE TIERRA RED DE AGUA 1,133.39 0.00 0.00 0.00 0.00
06.02.02.02.01 EXCAVACION MANUAL DE ZANJAS MEN TERRENO NORMAL M3 2.09 0.00 0.00 163.69 100.00% 0.00
78.32 163.69
06.02.02.02.02 RELLENO YY COMPACTACION DE ZANJAS MANUAL M3 2.09 0.00 0.00 969.70 100.00% 0.00
463.97 969.70
06.02.02.03.01 VALVULA ESFERICA DE 1/2º UND 2.00 0.00 0.00 0.00 239.48 100.00%
119.74 239.48
06.02.02.03.02 VALVULA COMPUERTA DE 3/4º UND 1.00 0.00 0.00 0.00 123.61 100.00%
123.61 123.61
06.03.01.01 SALIDA DESAGUE PVC SAL 2º PTO 9.00 0.00 0.00 1,056.96 100.00% 0.00
117.44 1,056.96
06.03.01.02 SALIDA DESAGUE PVC- SAL 4º PTO 4.00 0.00 0.00 723.60 100.00% 0.00
180.90 723.60
06.03.02.01.01 TRAZO Y REPLANTEO PARA IISS M 42.00 0.00 0.00 201.60 100.00% 0.00
4.80 201.60
“MANTENIMIENTO DE LA INFRAESTRUCTURA DEL SALON COMUNAL DE LA COMUNIDAD NATIVA DE NUEVA LUZ DEL DISTRITO DE MEGANTONI, LA CONVENCION, CUSCO"
ACTIVIDAD:
OCTUBRE (16 AL 31) NOVIEMBRE (1 AL 30) DICIEMBRE (1 AL 31) ENERO(01 AL 31) FEBRERO (01 AL 12)
P. UNITARIO PARCIAL
ITEM DESCRIPCION UND METRADO
S/. S/.
PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. % PARCIAL S/. %
06.03.02.02.01 EXCAVACION MANUAL DE ZANJAS MEN TERRENO NORMAL M3 3.78 0.00 0.00 296.05 100.00% 0.00
78.32 296.05
06.03.02.02.02 RELLENO Y COMPACTACION DE ZANJAS MANUAL M3 3.78 0.00 0.00 1,753.81 100.00% 0.00
463.97 1,753.81
06.03.02.03.01 SUMINISTRO Y COLOCACION EN TUBERIA PVC SAL 2ª M 18.00 0.00 0.00 430.20 100.00% 0.00
23.90 430.20
06.03.02.03.02 SUMINISTRO YCOLOCACION DE TUBERIA PVC SAL 4ª M 24.00 0.00 0.00 874.32 100.00% 0.00
36.43 874.32
06.03.02.03.03 CAJAS DE REGISTROS DE DESAGUE 12ªX24ª UND 3.00 0.00 0.00 1,462.86 100.00% 0.00
487.62 1,462.86
06.03.02.04.01 TRAZO Y REPLANTEO PRELIMINAR M2 14.86 0.00 0.00 57.06 100.00% 0.00
3.84 57.06
06.03.02.04.02 EXCAVACION DE ZANJAS PARA BIODIGESTOR M3 39.07 0.00 0.00 3,059.96 100.00% 0.00
78.32 3,059.96
06.03.02.04.03 REFINE EN ZANJA INCLUYE CAMA EN TERRENO NORMAL M2 72.25 0.00 0.00 1,652.36 100.00% 0.00
22.87 1,652.36
06.03.02.04.04 INSTALACION DE TANQUES BIODIGESTORES UND 1.00 0.00 0.00 15,335.45 100.00% 0.00
15,335.45 15,335.45
06.03.02.04.05 INSTALACION DE CAJA DE REGISTRO DE LODOS UND 1.00 0.00 0.00 1,171.63 100.00% 0.00
1,171.63 1,171.63
06.03.02.04.06 INSTALACION DE POZOS DE PRECOLACION UND 1.00 0.00 0.00 1,580.29 100.00% 0.00
1,580.29 1,580.29
06.03.02.04.07 LOSA DE PROTECCION MEZCLA 1.8 E=4ª M2 1.00 0.00 0.00 203.86 100.00% 0.00
203.86 203.86
7.01 EQUIPAMIENTO PROVISIONAL PARA MANEJO DE RR.SS. 4,830.00 0.00 0.00 0.00 0.00
7.01.01 EQUIPAMENTO PROVISIONAL PARA RR.SS UND 1.00 820.00 820.00 102.50 12.50% 205.00 25.00% 205.00 25.00% 205.00 25.00% 102.50 12.50%
7.01.02 EQUIPAMENTO PERMANENTE PARA RR .SS UND 1.00 4,010.00 4,010.00 1,002.50 25.00% 1,002.50 25.00% 1,002.50 25.00% 1,002.50 25.00%
07.02.01 LIMPIEZA EN INFRAESTRUCTURA M2 370.97 7.83 2,904.70 0.00 0.00 0.00 2,904.70 100.00%
8.01 TRANSPORTE DE MATERIALES FLUVIAL DE MALANQUIATO A NUEVA VIDA VJA 32.00 4,436.00 141,952.00 63,878.40 45.00% 63,878.40 45.00% 14,195.20 10.00% 0.00
COSTO DIRECTO 920,652.50 86,233.98 9.37% 137,490.26 14.93% 315,836.08 34.31% 293,346.31 31.86% 87,745.87 9.52%
GASTOS GENERALES 146,844.07 13,754.32 9.37% 21,929.70 14.93% 50,375.85 34.31% 46,788.74 31.86% 13,980.78 9.52%
15.95%
GASTOS INSPECCION 52,477.19 4,915.34 9.37% 7,836.94 14.93% 18,002.66 34.31% 16,720.74 31.86% 4,996.27 9.52%
5.70%
GASTOS DE LIQUIDACIÒN TÈCNICA Y FINANCIERA 11,968.48 1,121.04 9.37% 1,787.37 14.93% 4105.87 34.31% 3,813.50 31.86% 1,139.50 9.52%
1.30%
GASTOS DE ELEABORACIÒN DE PLAN DE TRABAJO 32,000.00 2,997.32 9.37% 4,778.88 14.93% 10977.82 34.31% 10,196.12 31.86% 3,046.67 9.52%
3.48%
GASTOS DE EVALUACION DE PLAN DE TRABAJO 8,500.00 796.16 9.37% 1,269.39 14.93% 2915.98 34.31% 2,708.34 31.86% 809.27 9.52%
0.92%
GASTOS DE GESTIÒN ADMINISTRATIVA 40,692.84 3,811.54 9.37% 6,077.07 14.93% 13959.95 34.31% 12,965.91 31.86% 3,874.30 9.52%
4.42%
GASTOS DE CONTROVERSIA 5,615.98 526.03 9.37% 838.69 14.93% 1926.60 34.31% 1,789.41 31.86% 534.69 9.52%
0.61%
PRESUPUESTO TOTAL 1,218,751.06 114,155.73 9.37% 182,008.30 14.93% 418,100.81 34.31% 388,329.07 31.86% 116,127.16 9.52%
VALORIZADO ACUMULADO 114,155.73 9.37% 296,164.03 24.31% 714,264.84 58.62% 1,102,593.91 90.48% 1,218,721.06 100.00%
157965.93 129480.06 172702.28
29296.17
13693.17
956.88
9613.78
1480.00
1642.51
15603.00
7924.00
819.00
2000.00
4860.00
2865.30
1642.80
293.37
321.17
478.30
129.66
30991.40 16069.65
335.54
167.37
32.24
135.93
9591.11
9591.11
3268.99
1997.89
4324.23
21064.75 16069.65
10471.84
832.27 2496.81
1986.28
9022.56
9760.64
2564.00
24240.92 79902.66 46291.67
20489.33 26320.37
17546.92 26320.37
2942.41
22057.46 3914.84
11510.07 3914.84
171.65
2885.73
5320.82
3131.87 3914.84
10547.39
180.93
1013.92
3041.78
5604.91
705.85
571.69
571.69
1611.77 55498.49 3465.70
34208.73
10362.47
3995.90
6931.39 3465.70
1611.77
1227.10
384.67
16505.60
8400.67
8400.67
6454.09
4331.74
2122.35
1650.84
878.67
277.89
421.20
73.08
2251.00 67984.51
2251.00 7124.80
2251.00 1125.50
2338.82
1827.80
659.00
1173.68
5532.93
2122.34
461.80
895.93
1939.84
113.02
1861.04
1861.04
46250.00
39800.00
6450.00
2369.97
2369.97
4845.77
4845.77
2492.22 18167.86 55196.28
3981.78
2541.00
1414.50
1126.50
766.00
274.50
91.50
400.00
621.48
621.48
53.30
53.30
1517.37 1218.80
264.04
264.04
1517.37 954.76
1517.37
0.00 954.76
668.24 9432.48 1049.13
668.24 297.73
450.16
218.08
0.00 297.73
3210.12
1562.68
725.88
921.56
5924.63 1049.13
1363.18
4196.53 1049.13
364.92
306.61 3534.80
306.61
17.66
120.68
63.68
104.59
303.80
202.16
101.64
0.00 3231.00
0.00 574.62
824.36
737.26
1094.76
37019.84
376.11
13.29
208.86
49.15
104.81
4405.74
257.23
1454.73
2693.78
24069.09
14353.51
9715.58
8168.90
5756.14
2412.76
17127.31
99.30
51.90
47.40
1814.53
933.44
92.32
788.77
686.91
194.70
492.21
147.94
93.50
54.44
182.46
182.46
733.86
198.49
198.49
425.31
14.18
300.10
43.51
67.52
110.06
110.06
7358.74
160.82
102.92
7095.00
6103.57
1908.48
1308.66
1219.23
893.60
598.60
175.00
68079.92 13088.89
24904.00
40950.00 9750.00
2225.92 3338.89
3229.82
2129.01
298.73
172.88
635.00
1022.40
1100.81
345.75
608.50
87.28
59.28