1.00
1.10
1.20
1.30
1.40
2.00
2.10
2.20
2.30
2.40
2.50
3.00
3.10
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.20
3.2.1
3.2.2
3.2.3
3.30
3.3.1
3.3.1.1
3.3.1.2
3.3.1.3
3.3.2
3.3.2.1
3.3.2.2
3.3.2.3
3.3.3
3.3.3.1
3.3.3.2
3.3.3.3
3.3.3.4
3.40
3.4.1
3.4.2
3.4.3
3.50
3.5.1
4.00
4.10
4.20
4.30
5.00
5.10
5.20
6.00
6.10
6.20
7.00
7.10
7.10
Descripción
OBRAS PROVISIONALES
SEÑALES ILUMIN. NOCTURNA C/ LAMPARA INTERM. CADA 10m (LINEA HASTA DE 10")
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
ENTIBADO METÁLICO AMBAS CARAS, TIPO CAJÓN (BOX), DE ZANJAS HASTA1.75 M DE PROF. (INCL.INSTALACION,MANTENIMIENTO Y
RETIRO)
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC-U UF NTP ISO 4435 SN-2 DN 200 mm INCL. ANILLO + 2%DESPERDICIOS
MOVIMIENTO DE TIERRAS
DEMOLICIÓN DE BUZÓN EN MAL ESTADO, DE 1,76 A 2,00 m DE PROFUNDIDAD(INCL. ACOMODO DEL DESMONTE PARA SU ELIMINACIÓN)
CONCRETO ARMADO
ELIMINACION)
REPOSICION DE PAVIMENTO
VARIOS
CONTROL DE CALIDAD
FLETE
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
3.2.1 TUBERIA PVC-U UF NTP ISO 4435 SN-2 DN 200 mmmINCL. ANILLO + 2%DESPERDICIOS
3,874.90 147,672.44 0
3.3.3.3 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60kg 3,851.72 24,651.01 15
4 VARIOS 42,701.40
7 FLETE 28,671.65
S/ 3,487.41 S/ 2,789.93
S/ 4,513.65
S/ 70,111.48 S/ 42,066.89
S/ 213,620.14 S/ 1,126,244.83 S/ 671,471.20 S/ 73,906.95 S/ 73,906.95 S/ 73,906.95
S/ 23,016.91 S/ 46,033.81
S/ 2,354.00 S/ 7,062.01
S/ 85,170.66 S/ 340,682.65
S/ 63,548.36
S/ 265,419.65
S/ 82,031.63 S/ 164,063.27
S/ 326,964.07
S/ 179,291.63
S/ 147,672.44
S/ 83,025.96 S/ 69,352.90
S/ 65,418.10 S/ 13,083.62
S/ 17,607.86 S/ 7,043.15
S/ 49,226.13
S/ 130,411.58 S/ 217,352.63
S/ 130,411.58 S/ 217,352.63
S/ 435,628.60
S/ 217,814.30
S/ 217,814.30
S/ 53,201.40
S/ 42,701.40
S/ 10,500.00
S/ 29,563.86
S/ 17,202.93
S/ 12,360.93
S/ 66,607.06
S/ 4,631.88
S/ 758.73
S/ 3,873.15
S/ 28,671.65
S/ 28,671.65
MES 2 MES 4 MES 5
SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13
S/ 235,254.45
S/ 235,254.45
S/ 235,254.45
S/ 921.16
S/ 234,333.29