Está en la página 1de 3

METRADOS EJECUTADOS DEL MES DE REPORTE

PROYECTO : MANTENIMIENTO DE LOS AMBIENTES EXISTENTES DEL ESTADIO JOEL GUITIERREZ DEL DISTRITO CORONEL GREGORIO ALBARRACIN LANCHIPA, TACNA - TACNA.

ENTIDAD : MUNICIPALIDAD DISTRITITAL CRNL. GREGORIO A. LANCHIPA - TACNA - TACNA


REGIÓN : TACNA
PROVINCIA : TACNA
RESPONSABLE TECNICO : ARQ. FREDDY FLORES CUSI
INSPECTOR MANTENIMIENTO : ING. MANUEL EDWIN ALFREDO BALBOA RAMOS
DISTRITO : CRNL. GREGORIO A. LANCHIPA - TACNA - TACNA
1 2 0 0 0 0 1 3 3 3 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Item Descripcion Unid Metrado Precio Oct-23 Nov-23 SALDO 3-Oct 4-Oct 5-Oct 6-Oct 7-Oct 8-Oct 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct 14-Oct 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov 26-Nov 27-Nov 28-Nov 29-Nov 30-Nov T.
PUESTO DE SALUD SANTA CRUZ Oct-23 VALOR. Nov-23 VALOR. ACUMULA SALDO
01 M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J DO
01.01 OBRAS PROVISIONALES S/ 53,800.56 - 53,800.56 - 53,800.56
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.40 M CON UND 1.00 988.82 988.82 1.00 - - 1.00 1.00 988.82 - - 1.00 -
01.01.02 GIGANTOGRAFIA
CASETA DE ALMACEN, COMEDOR Y OFICINA DEL RESIDENTE M2 30.00 149.50 4,485.00 30.00 - - 30.00 30.00 4,485.00 - - 30.00 -
MOVILIZACIÓN Y DESMOVILIZACIÓN DE MATERIALES, EQUIPOS
01.01.03 GLB 1.00 3,355.20 3,355.20 - - 1.00
MENORES Y HERRAMIENTAS PARA LA OBRA - - - - - 1.00
01.02 SEGURIDAD Y SALUD EN EL TRABAJO - - - - - - - - - -
ELABORACION, IMPLEMENTACION Y ADQUISICION DE PLAN DE
01.02.01 GLB 1.00 2,550.00 2,550.00 - - 1.00
SEGURIDAD Y SALUD EN EL TRABAJO - - - - - 1.00
01.02.02 RECURSOS DE RESPUESTA ANTE EMERGENCIA GLB 1.00 420.00 420.00 - - 1.00 - - - - - 1.00
01.02.03 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD GLB 1.00 527.85 527.85 - - 1.00 - - - - - 1.00
01.02.04 EQUIPOS DE PROTECCION COLECTIVA PARA OBRA GLB 1.00 1,257.00 1,257.00 - - 1.00 - - - - - 1.00
01.02.05 EQUIPO DE PROTECCION PERSONAL UND 12.00 394.83 4,737.96 - - 12.00 - - - - - 12.00
01.02.06 PROVISION Y REPOSICION DE AGUA PARA CONSUMO MES 1.00 611.00 611.00 - - 1.00 - - - - - 1.00
01.03 TRABAJOS PRELIMINARES - - - - - - - - - -
01.03.01 LIMPIEZA DE AREA DE INTERVENCION M2 452.78 1.16 525.22 - - 452.78 - - - - - 452.78
LIMPIEZA Y LIJADO DE SUPERFICIES DE CONCRETO EN INTERIORES Y
01.03.02 M2 794.26 4.23 3,359.72 - - 794.26
EXTERIORES - - - - - 794.26
01.04 ESTRUCTURAS - - - - - - - - - -
01.04.01 COBERTURAS - - - - - - - - - -
01.04.01.01 DESMONTAJE DE COBERTURA DETERIORADA M2 102.55 7.12 730.16 102.55 - - 102.55 102.55 730.16 - - 102.55 -
01.04.01.02 REPOSICIÓN DE COBERTURA LIVIANA CALAMINA M2 102.55 18.78 1,925.89 102.55 - - 51.27 51.28 102.55 1,925.89 - - 102.55 -
01.04.01.03 REHABILITACIÓN DE TECHO DE LOSA ALIGERADA M2 142.70 128.35 18,315.55 142.70 - - 68.32 74.38 142.70 18,315.55 - - 142.70 -
01.04.02 CIELO RASO - - - - - - - - - -
01.04.02.01 DESMONTAJE DE CIELO RASO DETERIORADO M2 77.86 6.88 535.68 - - 77.86 - - - - - 77.86
01.04.02.02 REPOSICIÓN DE CIELO RASO DE TRIPLAY M2 63.59 41.29 2,625.63 - - 63.59 - - - - - 63.59
01.04.02.03 REPOSICIÓN DE CIELO RASO DE BALDOSAS DE YESO M2 14.27 33.79 482.18 - - 14.27 - - - - - 14.27
01.05 ARQUITECTURA - - - - - - - - - -
01.05.01 OBRAS DE CONCRETO SIMPLE - - - - - - - - - -
01.05.01.01 RESANE DE MUROS, CIELO RASO Y REVESTIMIENTOS M2 92.76 54.50 5,055.42 92.76 - - 92.76 92.76 5,055.42 - - 92.76 -
01.05.02 PINTURAS - - - - - - - - - -
01.05.02.01 EMPASTADO DE SUPERFICIES DE CONCRETO INTERIORES Y M2 127.78 8.63 1,102.74 127.78 - - 127.78 127.78 1,102.74 - - 127.78 -
01.05.02.02 EXTERIORES
PINTURA LATEX ACRILICO EN SUPERFICIES DE CONCRETO M2 382.99 12.18 4,664.82 382.99 - - 180.32 202.67 382.99 4,664.82 - - 382.99 -
INTERIORES
01.05.02.03 PINTURA LATEX ACRILICO EN SUPERFICIES DE CONCRETO M2 351.17 12.18 4,277.25 351.17 - - 165.16 186.01 351.17 4,277.25 - - 351.17 -
01.05.02.04 EXTERIORES
PINTURA LATEX EN CIELO RASO M2 112.60 12.18 1,371.47 112.60 - - 112.60 112.60 1,371.47 - - 112.60 -
01.05.03 VIDRIOS - - - - - - - - - -
01.05.03.01 VIDRIOS 6MM M2 3.03 25.54 77.39 - - 3.03 - - - - - 3.03
01.06 INSTALACIONES SANITARIAS - - - - - - - - - -
01.06.01 REVISIÓN Y REPARACIÓN DE APARATOS SANITARIOS JGO 6.00 763.11 4,578.66 - - 6.00 - - - - - 6.00
01.06.02 REVISIÓN Y REPARACIÓN DE ACCESORIOS SANITARIOS JGO 6.00 226.01 1,356.06 - - 6.00 - - - - - 6.00
LIMPIEZA Y REPARACIÓN DE TUBERIAS Y ACCESORIOS, VÁLVULAS
01.06.03 GLB 1.00 1,000.00 1,000.00 1.00 - -
DEL TANQUE ELEVADO 1.00 1.00 1,000.00 - - 1.00 -
01.06.04 REVISIÓN Y REPARACIÓN DE GRIFERIAS Y DESAGUES DE GLB 1.00 428.05 428.05 - - 1.00
LAVAPLATOS - - - - - 1.00
LIMPIEZA Y DESINFECCIÓN DE LAS REDES SANITARIAS INTERIORES
01.06.05 GLB 1.00 1,500.00 1,500.00 1.00 - -
Y EXTERIORES 1 1.00 1,500.00 - - 1.00 -
01.06.06 REVISIÓN Y REPARACIÓN DE CANALETAS + ACCESORIOS M 60.33 138.96 8,383.46 60.33 - - 24.6 13.78 21.95 60.33 8,383.46 - - 60.33 -
01.07 INSTALACIONES SELECTRICAS - - - - - - - - - -
01.07.01 DESMONTAJE CONDUCTOR ELÉCTRICO 4MM2 N2XOH Y LUMINARIAS M 281.82 7.50 2,113.65 - - 281.82 - - - - - 281.82
01.07.02 CABLEADO CONDUCTOR ELÉCTRICO 4MM2 N2XOH M 281.82 14.61 4,117.39 - - 281.82 - - - - - 281.82
01.07.03 CABLEADO DE CONDUCTOR RF - 70 (NMT) 2x12AWG 300/500V M 28.00 15.35 429.80 - - 28.00 - - - - - 28.00
01.07.04 TUBERIA CONDUIT EMT (ELECTRICA) DN =25mm M 3.00 37.26 111.78 - - 3.00 - - - - - 3.00
01.07.05 LUMINARIA LED PLAFON CIRCULAR 24W 100-240V UND 9.00 97.82 880.38 - - 9.00 - - - - - 9.00
01.07.06 EQUIPO FLUORESCENTE 2x36W UND 3.00 128.22 384.66 - - 3.00 - - - - - 3.00
01.07.07 TOMACORRIENTE DOBLE 16A, EMPOTRADA EN MURO UND 14.00 37.07 518.98 - - 14.00 - - - - - 14.00
01.07.08 INTERRUPTOR SIMPLE UND 8.00 24.83 198.64 - - 8.00 - - - - - 8.00
TABLERO DE DISTRIBUCION TIPO RIEL DIN DEL TIPO EMPOTRADO,
01.07.09 UND 1.00 376.40 376.40 - - 1.00
120-220V, 1F+N+T, 60HZ, 10 POLOS + RESERVA - - - - - 1.00
01.07.10 MANTENIMIENTO DE THERMA ELECTRICA EST 1.00 410.74 410.74 - - 1.00 - - - - - 1.00
01.08 VARIOS - - - - - - - - - -
01.08.01 LIMPIEZA FINAL DE OBRA M2 452.78 1.16 525.22 - - 452.78 - - - - - 452.78
NOVIEMBRE
Al 31/Oct/2023
Obra : MANTENIMIENTO DE LOS ESTABLECIMIENTOS DE SALUD POR PELIGRO INMINENTE ANTE INTENSAS PRECIPITACIONES PLUVIALES, EN EL DISTRITO CANDARAVE, PROVINCIA CANDARAVE, REGIÓ
Ubicacion : CRNL. GREGORIO A. LANCHIPA - TACNA - TACNA
Costo A : Oct/2023 Cliente : GOBIERNO REGIONAL DE TACNA

REFERENCIAL ACUMULADO ANTERIOR VALORIZACION ACTUAL TOTAL ACUMULADO SALDO POR VALORIZAR

Precio
Item Descripcion Unid Metrado Parcial Metrado Parcial % Metrado Parcial % Metrado Parcial % Metrado Parcial %
Unitario

CENTRO DE SALUD CANDARAVE


01 "MANTENIMIENTO DE LOS ESTABLECIMIENTOS DE SALUD POR PELIGRO INMINENTE ANTE INTENSAS PRECIPITACIONES PLUVIALES, EN EL DISTRITO CANDARAVE".
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2 und 1.00 1,000.33 1,000.33 - - - 1.00 1,000.33 100.00% 1.00 1,000.33 100.00% - - -

01.01.02 CASETA DE ALMACEN, COMEDOR Y OFICINA DEL m2 30.00 150.03 4,500.90 - - - 30.00 4,500.90 100.00% 30.00 4,500.90 100.00% - - -

01.01.03 MOVILIZACIÓN Y DESMOVILIZACIÓN DE MATERIA glb 1.00 3,355.20 3,355.20 - - - - - - - - - 1.00 3,355.20 100.00%
01.02 SEGURIDAD Y SALUD EN EL TRABAJO
01.02.01 ELABORACION, IMPLEMENTACION Y ADQUISICION glb 1.00 2,550.00 2,550.00 - - - - - - - - - 1.00 2,550.00 100.00%

01.02.02 RECURSOS DE RESPUESTA ANTE EMERGENCIA glb 1.00 405.00 405.00 - - - - - - - - - 1.00 405.00 100.00%

01.02.03 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD glb 1.00 527.85 527.85 - - - - - - - - - 1.00 527.85 100.00%

01.02.04 EQUIPOS DE PROTECCION COLECTIVA PARA OBR glb 1.00 1,257.00 1,257.00 - - - - - - - 1.00 1,257.00 100.00%

01.02.05 EQUIPO DE PROTECCION PERSONAL und 12.00 394.83 4,737.96 - - - - - - - - - 12.00 4,737.96 100.00%

01.02.06 PROVISION Y REPOSICION DE AGUA PARA CONS mes 1.00 611.00 611.00 - - - - - - - - - 1.00 611.00 100.00%

01.03 TRABAJOS PRELIMINARES


01.03.01 LIMPIEZA DE AREA DE INTERVENCION m2 866.04 1.16 1,004.61 - - - - - - - - - 866.04 1,004.61 100.00%
01.03.02 LIMPIEZA Y LIJADO DE SUPERFICIES DE CONCRE m2 298.80 4.22 1,260.94 - - - - - - - - - 298.80 1,260.94 100.00%

01.04 ESTRUCTURAS
01.04.01 COBERTURAS
01.04.01.01 DESMONTAJE DE COBERTURA DETERIORADA m2 308.96 7.12 2,199.80 - - - 102.55 730.16 33.19% 102.55 730.16 33.19% 206.41 1,469.64 66.81%

01.04.01.02 REPOSICIÓN DE COBERTURA LIVIANA POLICA m2 41.65 61.48 2,560.64 - 102.55 6,304.77 246.22% 102.55 6,304.77 246.22% -60.90 -3,744.13 -

01.04.01.03 REPOSICIÓN DE COBERTURA LIVIANA - TEJA m2 267.31 75.57 20,200.62 - - - 142.70 10,783.84 53.38% 142.70 10,783.84 53.38% 124.61 9,416.78 46.62%

01.04.02 CIELO RASO


01.04.02.01 DESMONTAJE DE CIELO RASO DETERIORADO m2 267.31 6.88 1,839.09 - - - - - - - - - 267.31 1,839.09 100.00%

01.04.02.02 REPOSICIÓN DE CIELO RASO DE BALDOSAS D m2 267.31 33.79 9,032.40 - - - - - - - - - 267.31 9,032.40 100.00%

01.05 ARQUITECTURA
01.05.01 PISOS
01.05.01.01 REHABILITACIÓN DE PISO REVESTIDO CON CE m2 322.79 44.75 14,444.85 - - - - - - - - - 322.79 14,444.85 100.00%

01.05.01.02 IMPRIMACIÓN CON EMULSIÓN ASFÁLTICA m2 322.79 49.22 15,887.72 - - - 92.76 4,565.65 28.74% 92.76 4,565.65 28.74% 230.03 11,322.08 71.26%

01.05.02 PINTURAS
01.05.02.01 EMPASTADO DE SUPERFICIES DE CONCRETO I m2 25.87 8.63 223.26 - - - 127.78 1,102.74 493.93% 127.78 1,102.74 493.93% -101.91 -879.48 -

01.05.02.02 PINTURA LATEX ACRILICO EN SUPERFICIES D m2 40.08 12.18 488.17 - - - 382.99 4,664.82 955.56% 382.99 4,664.82 955.56% -342.91 -4,176.64 -
01.05.02.03 PINTURA LATEX EN CIELO RASO m2 258.72 12.18 3,151.21 - - - 351.17 4,277.25 135.73% 351.17 4,277.25 135.73% -92.45 -1,126.04 -

01.06 INSTALACIONES SANITARIAS


01.06.01 REVISIÓN Y REPARACIÓN DE SUMIDEROS PLUVIAL glb 1.00 2,000.00 2,000.00 - - - - - - - - - 1.00 2,000.00 100.00%

01.06.02 REVISIÓN Y REPARACIÓN DE CANALETAS + ACCE m 40.40 138.96 5,613.98 - - - - - - - - - 40.40 5,613.98 100.00%

01.06.03 LIMPIEZA Y DESINFECCIÓN DE LAS REDES SANIT glb 1.00 1,500.00 1,500.00 - - - - - - - - - 1.00 1,500.00 100.00%

01.07 INSTALACIONES ELECTRICAS


01.07.01 MANTENIMIENTO TABLERO DE DISTRIBUCION TIPO und 1.00 226.47 226.47 - - - - - - - - - 1.00 226.47 100.00%

01.08 VARIOS
01.08.01 LIMPIEZA FINAL DE OBRA m2 866.04 1.16 1,004.61 - - - - - - - 866.04 1,004.61 100.00%
COSTO DIRECTO 101,583.61 - 37,930.46 37,930.46 63,653.17
GASTOS GENERALES 18 % 18,285.05 - 6,827.48 6,827.48 11,457.57
PRESUPUESTO TOTAL (CG + GG) 119,868.66 - 44,757.94 44,757.94 75,110.74
PORCENTAJE VALORIZADO 0.00% 37.34% 37.34% 62.66%

Página 2 de 3
VALORIZACION FISICA MENSUAL - OCTUBRE 2023 (CD + GG)
PROYECTO: "MANTENIMIENTO DE LOS ESTABLECIMIENTOS DE SALUD POR PELIGRO INMINENTE ANTE INTENSAS PRECIPITACIONES PLUVIALES, EN EL DISTRITO CANDARAVE".
EJECUTA: GOBIERNO REGIONAL DE TACNA
RESIDENTE:
INSPECTOR:
FECHA: AL 31 DE OCTUBRE DE 2023

MONTOS
VALORIZACION VALORIZACION VALORIZACION
ITEM DESCRIPCION DE LA ACTIVIDAD TOTALES SALDO
ANTERIOR ACTUAL ACUMULADO
(CD+GG)
MONTO % MONTO % MONTO % MONTO %
01 PLAN DE ACTIVIDAD DE MANTENIMIENTO 119,868.66 0.00 0.00% 44,757.94 37.34% 44,757.94 37.34% 75,110.72 62.66%

TOTAL PPTO (CD+GG) 119,868.66 0.00 0.00% 44,757.94 37.34% 44,757.94 37.34% 75,110.72 62.66%

VALORIZACIÓN DE AVANCE FÍSICO MENS


CORRESPONDIENTE AL MES DE OCTUBRE 2
44,757.94 37.34%

VALORIZACIÓN DE AVANCE FÍSICO ACUMULA 44,757.94 37.34%

También podría gustarte