No. URAIAN QTY PO-16 SAT HARGA SATUAN JUMLAH HARGA
MUTU
1 2 3 4 5 6 7
PEKERJAAN FOTO SPOT ZONA 5
1 H 200x200x8x12 (L= 6 m) 7,00 BTG Rp 5.899.500,00 Rp 41.296.500,00 BJ-37 (fy=240)

2 IWF 200x100x5,5x8 (L= 6 m) 12,00 BTG Rp 2.442.600,00 Rp 29.311.200,00 BJ-37 (fy=240)

3 UNP 200x75x8.5 (L= 6 m) 7,00 BTG Rp 2.173.500,00 Rp 15.214.500,00 BJ-37 (fy=240)

4 CHECKER PLAT 3.2 mm (1.2 x 2.4 m) 6,00 Lbr Rp 1.469.700,00 Rp 8.818.200,00 Galvaniz

5 HOLLOW 50x50x2 mm (L= 6 m) 15,00 BTG Rp 192.920,00 Rp 2.893.800,00

6 HOLLOW 25x50x2 mm (L= 6 m) 19,00 BTG Rp 152.250,00 Rp 2.892.750,00

7 HOLLOW 30x30x2 mm (L= 6 m) 19,00 BTG Rp 119.600,00 Rp 2.272.400,00

8 PLAT 10 mm (1.2 x 2.4 m) 1,00 Lbr Rp 3.553.000,00 Rp 3.553.000,00

9 BESI POLOS Ø12 235,00 Btg Rp 102.000,00 Rp 23.970.000,00 BJTP 280

10 BESI POLOS Ø10 183,00 Btg Rp 68.000,00 Rp 12.444.000,00 BJTP 280

11 BESI POLOS Ø8 183,00 Btg Rp 46.000,00 Rp 8.418.000,00 BJTP 280

JUMLAH TOTAL Rp 151.084.350,00