Está en la página 1de 3

PRESUPUESTO CASCO PISO 2

CLIENTE: LUCHO MANRRIQUE


LUGAR: JOSE GALVEZ

ARQUITECTURA UND MET PARCIAL TOTAL


ALBAÑILERIA
MURO LAD KK SOGA C:A:1:5 m2 98.50 85.30 6,572.58
TARRAJEO INTERIOR C:A:1:5 E=1.5CM m2 384.05 31.80 12,212.79
TARRAJEO EXTERIOR C:A:1:5 E=1.5CM m2 53.93 37.19 2,005.66
DERRAMES A=15CM C:A:1:5 m 82.70 30.49 2,521.52
CIELO RASO C:A:1:5 m2 113.41 58.35 6,617.18
TARRAJEO FONDO ESCALERA C:A:1:5 m2 6.10 58.35 355.94
CONTRAPISO SEMIPULIDO E=6.50CM m2 113.41 48.54 5,504.68
VESTIDURA DE ESCALERA SEMIPULIDO m2 8.25 48.54 400.46
PISO EN CLOSET E=10CM SEMIPULIDO m2 4.39 56.27 247.03
DINTEL/PUERTAS Y VENT. AxH 15CMx20CM m 23.15 64.09 1,483.68
ACARREO VERTICAL glb 1.00 2500.00 2,500.00
ESTRUCTURAS
VIGAS
CONCRETO F'C=210KG/CM2 m3 8.50 380.00 3,230.00
ACERO F´y=4200KG/CM2 kg 1,964.50 8.50 16,698.25
ENCOFRADO Y DESENCOFRADO m2 43.81 69.32 3,036.91
CURADO m2 43.81 4.75 208.10
LOSA ALIGERADA
CONCRETO F'C=210KG/CM2 m3 8.90 380.00 3,382.00
ACERO F´y=4200KG/CM2 kg 985.50 8.50 8,376.75
ENCOFRADO Y DESENCOFRADO m2 113.96 65.50 7,464.38
LADRILLO 30x30x15 und 1,050.50 5.50 5,777.75
CURADO m2 113.96 4.75 541.31
LOSA MACIZA
CONCRETO F'C=210KG/CM2 m3 1.50 380.00 570.00
ACERO F´y=4200KG/CM2 kg 30.03 8.50 255.26
ENCOFRADO Y DESENCOFRADO m2 1.20 55.50 66.60
CURADO m2 1.20 4.75 5.70
ESCALERA
CONCRETO F'C=210KG/CM2 m3 1.50 380.00 570.00
ACERO F´y=4200KG/CM2 kg 240.30 8.50 2,042.55
ENCOFRADO Y DESENCOFRADO m2 10.90 55.50 604.95
CURADO m2 10.90 4.50 49.05

INSTALACIONES ELECTRICAS
SEGUNDO PISO SOLO TUB. Y CAJA
SALIDA DE CENTRO LUZ DICORICO pto 16.00 85.81 1,372.96
SALIDA DE CENTRO LUZ pto 18.00 85.81 1,544.58
SALIDA DE BRAQUET pto 2.00 85.81 171.62
SALIDA DE INTERUPTOR pto 22.00 40.50 891.00
SALIDA DE TOMACORRIENTES pto 25.00 85.81 2,145.25
SALIDA DE TV,TP,INTERN pto 9.00 88.96 800.64
SALIDA PARA TERMA pto 1.00 85.81 85.81
CAJAS PASE RECTANGULAR Y/O OCTOGONAL pto 6.00 85.81 514.86
CAJAS PASE 100x100x40 pto 4.00 29.24 116.96
CAJAS PASE 100x100x80 pto 2.00 38.44 76.89
TABLERO TD-2, SOLO TUBO glb 1.00 110.00 110.00
TABLERO 16 POLOS DOBLE MANDIL glb 1.00 1,700.00 1,700.00
NOTA: NO SE CONSIDERA MONTANTES YA QUE DEBERIAN ESTAR YA COLOCADAS EN PARED PERIMETRAL

INSTALACIONES SANITARIAS
SEGUNDO PISO
SALIDA AF 1/2" pto 20.00 130.95 2,619.00
SALIDA AC 1/2" pto 7.00 150.88 1,056.16
VALVULA COMP 1/2" pto 6.00 160.97 965.82
RED AF 1/2" pto 32.33 25.83 835.08
RED AC 1/2" pto 59.25 45.90 2,719.58
MEDIDOR INTERNO 1/2" pto 1.00 310.88 310.88
SALIDA DESAGUE 2" pto 11.00 150.95 1,660.45
SALIDA DESAGUE 4" pto 3.00 150.95 452.85
RR BRONCE 4" pto 3.00 110.19 330.57
RR BRONCE 2" pto 3.00 75.40 226.20
SUM 2" pto 6.00 55.93 335.58
MEZCLADORA MONO COMAN (DUCHA) glb 3.00 650.00 1,950.00
AZOTEA
RED AZOTEA AF 1/2" m 30.79 25.58 787.61
RED AZOTEA AC 1/2" m 7.08 61.98 438.82
BATERIA DESAGUE BAÑO glb 1 450 450.00
BATERIA DESAGUE LAVANDERIA glb 1.00 320.00 320.00

NOTA: NO SE CONSIDERA MONTANTES YA QUE DEBERIAN ESTAR YA COLOCADAS EN PARED PERIMETRAL

COSTO DIRECTO 118,290.23


UTILIDAD 15% 17,743.53
TOTAL 136,033.76
ED PERIMETRAL

S/M2 1182.90229
$/M2 311.290077

ED PERIMETRAL