Nombre del recurso Trabajo

Sin asignar 0 horas


SUMINISTRO, CIMENTACION, IZADO 0 horas
MEJORAMIENTO Y PINTADO DE POS 0 horas
MANTENIMIENTO DE ROTONDA (PER 0 horas
MEJORAMIENTO Y PINTADO DE POS 0 horas
MANTENIMIENTO DE ROTONDA (PER 0 horas
MANTENIMIENTO DE ROTONDA (PER 0 horas
MEJORAMIENTO Y PINTADO DE POS 0 horas
MEJORAMIENTO Y PINTADO DE POS 0 horas
MANTENIMIENTO (PERGOLA DE MADE 0 horas
MEJORAMIENTO Y PINTADO DE POS 0 horas
MANTENIMIENTO (PERGOLA DE MADE 0 horas
SUMINISTRO, CIMENTACION, IZADO 0 horas
MANTENIMIENTO DE ROTONDA (PER 0 horas
INICIO 0 horas
FIN 0 horas
CAPATAZ 609.12 horas 80.4h
OPERARIO 3,104.8 horas 400.72h
PARTICIPANTE 8,685.2 horas 1,463.44h
CLAVOS PARA MADERA C/C 3" 16,634.8 horas 15,930.8h
BANNER CON DESCRIPCION DE LA OBRA 8 horas 8h
POSTE DE MADERA H=8.00 M. 16 horas 16h
SOPORTE DE MADERA 16 horas 16h
GUARDIAN DE DIA 6 horas 6h
GUARDIAN DE NOCHE 6 horas 6h
ALMACEN DE OBRA 48 horas 48h
FLETE 8 horas 8h
GUANTES DE CUERO 480 horas 480h
GUANTES AISLANTE 120 horas 120h
BOTAS DE CAUCHO #43 480 horas 480h
BOTAS DE SEGURIDAD 48 horas 48h
TAPON PARA OIDOS 480 horas 480h
CASCO TIPO JOCKEY AZUL 480 horas 480h
CASCO PARA INGENIEROS Y TECNICOS 48 horas 48h
LENTES DE SEGURIDAD C/PROTECCION 480 horas 480h
LENTES DE S... 8 horas 8h
CINTA SEÑALIZADORA AMARILLA 64 horas 64h
SEÑALES PARA DESVIO DE TRANSITO 96 horas 96h
YESO BOLSA DE 28 kg 31,846.32 horas 31,846.32h
TOPOGRAFO 70.56 horas 70.56h
NIVEL TOPOGRAFICO CON TRIPODE 141.84 horas 141.84h
ESTACAS DE MADERA 70,061.04 horas 70,061.04h
WINCHA METALICA DE 50 m 318.24 horas 318.24h
MOVILIZACION Y DESMOVILIZACION D 0.32 horas 0.16h
PAGOS POR MEDIDOR DE LUZ Y OTRO 56 horas 56h
INGENIERO ELECTRICISTA 16 horas 16h
PAGOS POR MEDIDOR DE AGUA Y OT 56 horas 56h
CORTADORA DE CONCRETO 13HP 81.12 horas 14.72h
OFICIAL 2,136.48 horas 203.2h
GENERADOR ELECTRICO 81.12 horas 14.72h
CAMION VOLQUETE DE 15 m3 18.64 horas
MINICARGADOR 9.36 horas
PEGAMENTO PARA CERAMICA/PORCE 25,114.08 horas
FRAGUA DE COLOR 32,556 horas
CERAMICA/PORCELANATO SEGUN DIS 99,527.52 horas
AGUA PUESTA EN OBRA 4,622 horas 376.24h
COMPACTADORA VIBRATORIA TIPO PL 45.36 horas 15.52h
ADOQUIN DE CONCRETO COLOR SEGU 2,011.52 horas 811.2h
ARENA FINA 5,627.12 horas 831.68h
AFIRMADO 114.96 horas 46.4h
TUBERIA HDPE PN 16 Ø 1/2" 34,316.96 horas 6,230.4h
TUBERIA HDPE PN 16 Ø 1" 55,937.76 horas 8,484.4h
TUBERIA HDPE PN 16 Ø 1 1/2" 17,117.92 horas 2,100h
ADAPTADOR PVC SAP 1 " 560 horas 80h
UNION UNIVERSAL PVC-SAP C/R 1" 560 horas 80h
NIPLE PVC 1" x 2" C/R 560 horas 80h
CINTA TEFLON 212 horas 24h
VALVULA ESFERICA PVC DE 1" 280 horas 40h
ADAPTADOR PVC SAP 1 1/2" 288 horas 16h
UNION UNIVERSAL PVC-SAP C/R 1 1/2 288 horas 16h
NIPLE PVC SAP Ø 1 1/2" x 5" C/R 864 horas 48h
VALVULA ESFERICA PVC DE 1 1/2" 144 horas 8h
CAJA PORTAVALVULA ARQUETA GRA 416 horas 40h
ROTOR DE ASPERSION Ø 1/2" - SIIMIL 11,088 horas 1,680h
ROCIADOR DE 1/2" BOQUILLA VAN 18 1,144 horas 120h
ROCIADOR DE 1/2" BOQUILLA VAN 6 1,552 horas 120h
ROCIADOR DE 1/2" BOQUILLA VAN 4 1,368 horas 128h
TEE HDPE 1 1/2" x 1 1/2" PN 16 ACOP 296 horas 64h
TEE HDPE 1" x 1" PN 16 ACOPLE RAPI 2,944 horas 448h
REDUCCION HDPE 1 1/2" - 1" PN 16 A 368 horas 40h
REDUCCION HDPE 1" - 1/2" PN 16 AC 3,608 horas 1,248h
ADAPTADOR HDPE PN 16 Ø 1 1/2" 296 horas 64h
CODO HDPE 1" x 90° PN 16 ACOPLE R 544 horas 40h
CODO HDPE 1 1/2" x 45° PN 16 ACOPL 216 horas 48h
CARGADOR SOBRE LLANTAS DE 125-135 12.72 horas
ALAMBRE NEGRO RECOCIDO # 8 640 horas
MADERA TORNILLO 13,159.84 horas
CEMENTO PORTLAND TIPO V 42.5kg 24,838.24 horas 655.2h
VIBRADOR DE CONCRETO 4 HP 1.25" 12.72 horas
MEZCLADORA DE CONCRETO DE 9 - 11 12.72 horas
PLASTIFICANTE IMPERMEABILIZANTE 2,073.6 horas
PIEDRA CHANCADA 1/2" 172.8 horas
ARENA GRU... 24 horas
CIZALLA ELECTRICA 20.16 horas
ALAMBRE NEGRO RECOCIDO N°16 963.52 horas
FIERRO FY=4200KG/CM2 GRADO 60 16,860.8 horas
ADITIVO IMPERMEABILIZANTE PARA 697.92 horas
REGLA DE ALUMINIO 1" X 4" X 8" 0 horas
ELECTROBOMBA TRIFASICA 2 HP 380 V 160 horas 0h
ELECTRONIVEL 960 horas 0h
CINTA VULCANIZANTE 2229 520 horas 0h
CABLE 2x1x2.5 mm2 THW 3,200 horas
CABLE 2x1x6 mm2 THW 1,920 horas
CONTACTOR 18A 128 horas
INTERRUPTOR TERMOMAGNETICO DE 192 horas
INTERRUPTOR TERMOMAGNETICO DE 128 horas
PRUEBAS DE REDES Y PUESTA EN SERVI 64 horas
CAMION GRUA 135.44 horas 20.56h
HORMIGON 85.6 horas 14.72h
PINTURA ESMALTE 1,240.96 horas 378.24h
PINTURA ANTICORROSIVA 1,288.4 horas 512h
DISOLVENTE DE PINTURA 12,769.76 horas 609.52h
PASTORAL ESFERICO DE TUBO DE F° G 216 horas 32h
PERNO DE F°G° 1/2"x10" 432 horas 64h
CINTA AISLANTE 160 horas 25.6h
LUMINARIA SOLAR LED DE 120 W - S 1,600 horas 256h
LUXOMETRO 2.16 horas 0.32h
CAMIONETA PICK UP 1ton. 43.2 horas 6.4h
LIJA DE AGUA 2,800 horas 1,680h
PINTURA DE TRAFICO 27,831.2 horas 581.12h
BARNIZ 492.4 horas 172h
TRANSFORMADOR DE OXIDO 524.4 horas 188h
LISTONES DE MADERA PARA BANCAS 9,016 horas 3,440h
LIJA PARA MADERA 945.68 horas 292.4h
BROCHA PARA PINTOR 517.92 horas 135.84h
LIJA PARA FIERRO 1,179.36 horas 810.88h
SOGA Y RIEL PARA ASTA DE BANDERA 88 horas
CORTADOR DE CESPED A GASOLINA 2. 20.16 horas
GRASS SINTETICO 879.12 horas
REPOSICION DE JUEGOS INFANTILES 1.44 horas
MARTILLO NEUMATICO DE 10 kg 48.72 horas 14.72h
CEMENTO BLANCO (BOLSA 25KG) 39.6 horas 39.6h
PULIDORA DE TERRAZOS 29.52 horas 29.52h
GRANITO 71,271.36 horas 71,271.36h
MARMOLINA 27,716.64 horas 27,716.64h
ROCIADOR DE 1/2" BOQUILLA VAN 12 232 horas 120h
ROCIADOR DE 1/2" BOQUILLA VAN 8 232 horas 120h
CODO HDPE 1" x 45° PN 16 ACOPLE R 16 horas 16h
PINTURA EPOXICA (KIT) 1,288 horas 800h
PIEDRA MEDIANA 147.2 horas 25.6h
POSTE DE C.A.C 11.00/300/150/ 160 horas 32h
B... 40 horas 8h
SELLADOR PARA GRANITO 311.04 horas 311.04h
TACHO DE FIBRA DE VIDRIO 1,344 horas 720h
ESCALERA METALICA 10 PASOS 4.48 horas 0.8h
FAROLA ISLA LED +RELECTOR LED 100 1,520 horas 64h
POSTE METALICO ORNAMENTAL SEGU 160 horas 32h
COMPOST 84,783.36 horas 4,248.32h
HUMUS 339,130.08 horas 16,992.96h
PLASTICO 169,565.04 horas 8,496.48h
GRASS NATURALGRASS NATURAL 178,043.28 horas 8,921.28h
ARENA GRUESA 2,640.64 horas
REGLA DE ALUMINIO 1,700.48 horas
CODO HDPE 1 1/2" x 90° PN 16 ACOPL 8 horas
POSTE DE C.A.C 11.00/300/150/... 8 horas
BANCA DE MADERA Y METALICO 144 horas
TUBERIA DE F°G° 600 horas
GRAVILLA 206.08 horas
ROCIADOR DE 1/2" BOQUILLA VAN 10 88 horas
MEJORAMIENTO Y PINTADO DE POSTE 8 horas
REPARACION DE MAQUINAS DE GIMNA 0.16 horas
ROCIADOR DE 1/2" BOQUILLA VAN 24 400 horas
49.44h 79.04h 82.96h 70.16h 84.56h 98.8h 44.64h 19.12h
222.8h 445.76h 445.2h 357.92h 374.08h 469.36h 300.16h 88.8h
715.92h 1,183.12h 1,191.2h 946h 1,166.32h 1,019.44h 776.88h 222.88h
140.8h 281.6h 281.6h
0h 0h 0h 0h 0h 0h 0h 0.16h

2.08h 33.6h 0h 2.88h 12.16h 15.68h


204.4h 336.56h 364.88h 223.68h 330.24h 286.88h 160.72h 25.92h
2.08h 33.6h 0h 2.88h 12.16h 15.68h
3.12h 1.04h 4.56h 3.12h 6.08h 0.72h
1.6h 0.48h 2.32h 1.6h 3.04h 0.32h
77.76h 324h 2,059.36h 20,593.6h 2,059.36h
100.8h 420h 2,669.6h 26,696h 2,669.6h
308.16h 1,284h 8,161.28h 81,612.8h 8,161.28h
450.08h 380.32h 1,612.88h 181.04h 534.64h 465.92h 541.52h 79.36h
10.08h 6.24h 5.76h 3.44h 4.32h
531.2h 162.96h 302.4h 89.92h 113.84h
446.08h 970.32h 635.28h 720h 644.4h 1,016.24h 363.12h
30.4h 9.28h 17.28h 5.12h 6.48h
2,822.4h 4,185.6h 3,869.76h 3,712.96h 4,673.92h 6,903.2h 1,918.72h
5,194.8h 9,037.68h 5,443.2h 7,364.16h 4,666.24h 11,800.4h 3,946.88h
734.64h 1,799.6h 651.84h 3,795.2h 4,114.24h 2,444h 1,478.4h
48h 80h 112h 64h 128h 48h
48h 80h 112h 64h 128h 48h
48h 80h 112h 64h 128h 48h
16h 36h 36h 40h 36h 24h
24h 40h 56h 32h 64h 24h
16h 64h 32h 96h 16h 48h
16h 64h 32h 96h 16h 48h
48h 192h 96h 288h 48h 144h
8h 32h 16h 48h 8h 24h
32h 72h 72h 80h 72h 48h
1,280h 2,304h 1,120h 2,528h 560h 1,616h
144h 296h 112h 472h
144h 296h 112h 400h 480h
152h 88h 112h 400h 488h
32h 16h 48h 64h 40h 32h
768h 336h 480h 384h 480h 48h
72h 32h 72h 72h 40h 40h
928h 184h 480h 192h 480h 96h
32h 16h 48h 64h 40h 32h
200h 16h 80h 112h 72h 24h
40h 16h 48h 48h 16h
4.24h 4.24h 4.24h
128h 256h 256h
2,598.64h 166.64h 5,197.28h 5,030.64h 166.64h
219.76h 13,262h 7,632.88h 100.8h 118.32h 318.16h 2,531.12h
4.24h 4.24h 4.24h
4.24h 4.24h 4.24h
691.2h 691.2h 691.2h
57.6h 57.6h 57.6h
8h 8h 8h
5.04h 5.04h 10.08h
240.88h 240.88h 481.76h
4,215.2h 4,215.2h 8,430.4h
116.32h 116.32h 232.64h 116.32h 116.32h
0h 0h 0h
32h 16h 32h 32h 16h 16h 16h
96h 104h 192h 144h 168h 152h 104h
56h 56h 104h 80h 88h 80h 56h
400h 400h 800h 400h 400h 400h 400h
240h 240h 480h 240h 240h 240h 240h
16h 16h 32h 16h 16h 16h 16h
24h 24h 48h 24h 24h 24h 24h
16h 16h 32h 16h 16h 16h 16h
8h 8h 16h 8h 8h 8h 8h
0.64h 23.36h 20.56h 20.56h 20.56h 20.56h 8.64h
0.48h 11.04h 14.72h 14.72h 14.72h 14.72h 0.48h
28.96h 71.36h 145.6h 154.72h 90.88h 298.4h 69.6h 3.2h
22.4h 68.4h 100h 138.4h 89.6h 273.6h 48.8h 35.2h
647.68h 66.64h 423.68h 2,602h 5,113.44h 2,950.48h 353.12h 3.2h
40h 32h 32h 32h 32h 16h
80h 64h 64h 64h 64h 32h
25.6h 25.6h 25.6h 25.6h 25.6h 6.4h
256h 256h 256h 256h 256h 64h
0.16h 0.56h 0.32h 0.32h 0.32h 0.16h
3.2h 11.2h 6.4h 6.4h 6.4h 3.2h
240h 120h 40h 240h 80h 80h 320h
1,495.2h 726.72h 5,884.32h 12,060.8h 6,385.44h 697.6h
11.2h 16.4h 38h 65.2h 32.8h 132.8h 22.4h 1.6h
11.2h 21.6h 44h 65.2h 34.4h 132.8h 22.4h 4.8h
192h 16h 624h 1,272h 624h 2,656h 192h
16.32h 71.12h 140.56h 108.24h 53.04h 225.92h 38.08h
30.24h 30.16h 65.6h 65.36h 72.32h 74.24h 24h 20.16h
6.16h 80.72h 27.2h 4.16h 81.36h 8.88h 160h
40h 24h 24h
4.32h 1.12h 0.8h 3.2h 2.56h 2.4h 3.2h 2.56h
870.72h 8.4h
0.72h 0.72h
33.6h 0.4h
112h
112h

32h 112h 8h 32h 112h 192h


19.2h 25.6h 25.6h 25.6h 25.6h
32h 32h 32h 32h
8h 8h 8h 8h

96h 304h 128h 24h 40h 32h


0.8h 1.6h 1.28h
512h 176h 32h 128h 96h 512h
16h 64h 48h
14,869.12h 1,887.36h 56,194.56h 7,584h
59,475.36h 7,548.96h 224,776.8h 30,336h
29,737.68h 3,774.48h 112,388.4h 15,168h
31,224.48h 3,963.12h 118,008h 15,926.4h
1,536.16h 852.8h 2.08h 249.6h
1,092.24h 606.8h 1.44h
8h
8h
112h 8h 24h
256h 88h 256h
103.04h 103.04h
88h
8h
0.16h
400h
CRONOGRAMA DE ADQUISICION DE MATERIALES
OBRA: “RENOVACION DE ESPACIO DE RECREACION PASIVA; EN EL (LA) LOS PARQUES DEL DISTRITO DE PUEBLO NUEVO, PROVINCIA DE CHINCHA – DEPARTAMENTO DE ICA.” con CUI N°2616514
LUGAR: MUNICIPALIDAD DISTRITAL DE PUEBLO NUEVO
DISTRITO : PUEBLO NUEVO PROVINCIA : CHINCHA DPTO: ICA

Código Recurso Unidad Cantidad Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 TOTAL
MANO DE OBRA
0101010002 CAPATAZ hh 880.0000 28.72 25,273.50 4,212.25 4,212.25 4,212.25 4,212.25 4,212.25 4,212.25 25,273.50
0101010003 OPERARIO hh 4,063.9900 26.11 106,110.65 17,685.11 17,685.11 17,685.11 17,685.11 17,685.11 17,685.11 106,110.65
0101010004 OFICIAL hh 4,319.6500 20.54 88,725.71 14,787.62 14,787.62 14,787.62 14,787.62 14,787.62 14,787.62 88,725.71
0101010006 GUARDIAN DE DIA mes 6.0000 1,200.00 7,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 7,200.00
0101010007 GUARDIAN DE NOCHE mes 6.0000 1,200.00 7,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 7,200.00
0101030000 TOPOGRAFO hh 141.5400 26.11 3,695.55 1,847.78 1,847.78 3,695.55
0101030001 INGENIERO ELECTRICISTA hh 16.0000 60.00 960.00 960.00 960.00
0101030003 PARTICIPANTE hh 13,608.6100 18.58 252,847.97 42,141.33 42,141.33 42,141.33 42,141.33 42,141.33 42,141.33 252,847.97
MATERIALES
0203020001 FLETE glb 1.0000 12,000.00 12,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 12,000.00
02040100010003 ALAMBRE NEGRO RECOCIDO # 8 kg 48.0000 6.50 312.00 52.00 52.00 52.00 52.00 52.00 52.00 312.00
0204010002 ALAMBRE NEGRO RECOCIDO N°16 kg 90.3300 6.50 587.13 97.86 97.86 97.86 97.86 97.86 97.86 587.13
02041200010009 CLAVOS PARA MADERA C/C 3" kg 274.9500 5.00 1,374.76 229.13 229.13 229.13 229.13 229.13 229.13 1,374.76
02051900050005 ADAPTADOR PVC SAP 1 " und 70.0000 2.30 161.00 26.83 26.83 26.83 26.83 26.83 26.83 161.00
02051900050007 ADAPTADOR PVC SAP 1 1/2" und 36.0000 9.90 356.40 59.40 59.40 59.40 59.40 59.40 59.40 356.40
02052200020003 UNION UNIVERSAL PVC-SAP C/R 1" und 70.0000 10.90 763.00 127.17 127.17 127.17 127.17 127.17 127.17 763.00
02052200020005 UNION UNIVERSAL PVC-SAP C/R 1 1/2" und 36.0000 20.30 730.80 121.80 121.80 121.80 121.80 121.80 121.80 730.80
02070100010002 PIEDRA CHANCADA 1/2" m3 21.6000 59.00 1,274.40 212.40 212.40 212.40 212.40 212.40 212.40 1,274.40
0207010005 PIEDRA MEDIANA m3 21.6000 70.80 1,529.28 254.88 254.88 254.88 254.88 254.88 254.88 1,529.28
02070200010001 ARENA FINA m3 153.0300 106.20 16,252.23 2,708.71 2,708.71 2,708.71 2,708.71 2,708.71 2,708.71 16,252.23
02070200010002 ARENA GRUESA m3 46.9800 40.12 1,884.93 314.16 314.16 314.16 314.16 314.16 314.16 1,884.93
0207020002 AFIRMADO m3 9.5700 35.00 335.08 55.85 55.85 55.85 55.85 55.85 55.85 335.08
0207030001 HORMIGON m3 12.4200 37.76 468.99 78.17 78.17 78.17 78.17 78.17 78.17 468.99
0207070001 AGUA PUESTA EN OBRA m3 146.6300 7.20 1,055.75 175.96 175.96 175.96 175.96 175.96 175.96 1,055.75
0210050006 PLASTIFICANTE IMPERMEABILIZANTE kg 259.2000 6.50 1,684.80 421.20 421.20 421.20 421.20 1,684.80
0210050007 PLASTICO m 2,565.2500 2.89 7,413.58 1,235.60 1,235.60 1,235.60 1,235.60 1,235.60 1,235.60 7,413.58
02130100010004 CEMENTO PORTLAND TIPO V 42.5kg bol 446.9300 42.00 18,770.97 4,692.74 4,692.74 4,692.74 4,692.74 18,770.97
02130100010005 FRAGUA DE COLOR kg 190.6500 10.90 2,078.07 1,039.04 1,039.04 2,078.07
02130100010006 CERAMICA/PORCELANATO SEGUN DISEÑO m2 582.8400 55.90 32,580.74 16,290.37 16,290.37 32,580.74
02130100010007 CEMENTO BLANCO (BOLSA 25KG) bol 1.6500 73.00 120.44 60.22 60.22 120.44
02130300010003 YESO BOLSA DE 28 kg bol 442.3100 17.50 7,740.35 3,870.18 3,870.18 7,740.35
CRONOGRAMA DE ADQUISICION DE MATERIALES
OBRA: “RENOVACION DE ESPACIO DE RECREACION PASIVA; EN EL (LA) LOS PARQUES DEL DISTRITO DE PUEBLO NUEVO, PROVINCIA DE CHINCHA – DEPARTAMENTO DE ICA.” con CUI N°2616514
LUGAR: MUNICIPALIDAD DISTRITAL DE PUEBLO NUEVO
DISTRITO : PUEBLO NUEVO PROVINCIA : CHINCHA DPTO: ICA

Código Recurso Unidad Cantidad Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 TOTAL
0215040004 ADAPTADOR HDPE PN 16 Ø 1 1/2" und 37.0000 6.00 222.00 37.00 37.00 37.00 37.00 37.00 37.00 222.00
0215040005 ADOQUIN DE CONCRETO COLOR SEGUN PLAZA m2 167.5400 33.90 5,679.53
946.59 946.59 946.59 946.59 946.59 946.59 5,679.53
0215070002 TAPON PARA OIDOS und 60.0000 3.90 234.00 234.00 234.00
0215090002 PEGAMENTO PARA CERAMICA/PORCELANATO bol 147.0700 49.90 7,338.87
3,669.44 3,669.44 7,338.87
0216020011 GRASS NATURAL m2 2,693.5100 16.90 45,520.37 7,586.73 7,586.73 7,586.73 7,586.73 7,586.73 7,586.73 45,520.37
0216020012 COMPOST kg 1,282.6300 6.90 8,850.11 1,475.02 1,475.02 1,475.02 1,475.02 1,475.02 1,475.02 8,850.11
0216020013 HUMUS kg 5,130.5000 2.29 11,748.85 1,958.14 1,958.14 1,958.14 1,958.14 1,958.14 1,958.14 11,748.85
0216020014 GRANITO kg 2,969.6400 2.50 7,424.10 7,424.10 7,424.10
0216020015 MARMOLINA kg 1,154.8600 2.10 2,425.21 1,212.61 1,212.61 2,425.21
0216020016 GRASS SINTETICO m2 55.4700 29.90 1,658.60 1,658.60 1,658.60
0216020017 GRAVILLA m3 12.8800 59.00 759.75 759.75 759.75
02191400010003 NIPLE PVC 1" x 2" C/R und 70.0000 3.90 273.00 45.50 45.50 45.50 45.50 45.50 45.50 273.00
0219140004 NIPLE PVC SAP Ø 1 1/2" x 5" C/R und 108.0000 11.90 1,285.20 214.20 214.20 214.20 214.20 214.20 214.20 1,285.20
0222140009 BARNIZ gal 31.7500 105.00 3,333.75 555.63 555.63 555.63 555.63 555.63 555.63 3,333.75
02221700010002 ADITIVO IMPERMEABILIZANTE PARA CONCRETO bol 43.6300 6.50 283.62
1kg
70.91 70.91 70.91 70.91 283.62
0231010001 MADERA TORNILLO p2 974.5000 6.80 6,626.58 1,656.65 1,656.65 1,656.65 1,656.65 6,626.58
0231010004 LISTONES DE MADERA PARA BANCAS und 300.0000 10.00 3,000.00 500.00 500.00 500.00 500.00 500.00 500.00 3,000.00
0231040002 ESTACAS DE MADERA p2 973.0700 7.00 6,811.50 3,405.75 3,405.75 6,811.50
02380100030004 LIJA PARA FIERRO plg 65.6900 3.10 203.65 33.94 33.94 33.94 33.94 33.94 33.94 203.65
0238010005 LIJA PARA MADERA plg 116.0200 2.40 278.44 46.41 46.41 46.41 46.41 46.41 46.41 278.44
0238010006 LIJA DE AGUA plg 160.0000 3.10 496.00 82.67 82.67 82.67 82.67 82.67 82.67 496.00
0240020001 PINTURA ESMALTE gal 102.3200 59.90 6,129.22 1,021.54 1,021.54 1,021.54 1,021.54 1,021.54 1,021.54 6,129.22
0240020018 PINTURA DE TRAFICO gal 631.7000 91.00 57,484.95 9,580.83 9,580.83 9,580.83 9,580.83 9,580.83 9,580.83 57,484.95
0240070001 PINTURA ANTICORROSIVA gal 77.8500 59.90 4,663.22 777.20 777.20 777.20 777.20 777.20 777.20 4,663.22
0240070002 TRANSFORMADOR DE OXIDO gal 30.5500 140.00 4,277.00 712.83 712.83 712.83 712.83 712.83 712.83 4,277.00
0240070003 SELLADOR PARA GRANITO gal 12.9600 59.90 776.54 776.54 776.54
0240070004 PINTURA EPOXICA (KIT) gal 36.0000 339.00 12,204.00 3,051.00 3,051.00 3,051.00 3,051.00 12,204.00
0240080019 DISOLVENTE DE PINTURA gal 343.5300 43.50 14,943.55 2,490.59 2,490.59 2,490.59 2,490.59 2,490.59 2,490.59 14,943.55
0241020001 CINTA AISLANTE rll 10.8000 7.40 79.92 13.32 13.32 13.32 13.32 13.32 13.32 79.92
0241030001 CINTA TEFLON und 26.5000 2.50 66.25 11.04 11.04 11.04 11.04 11.04 11.04 66.25
CRONOGRAMA DE ADQUISICION DE MATERIALES
OBRA: “RENOVACION DE ESPACIO DE RECREACION PASIVA; EN EL (LA) LOS PARQUES DEL DISTRITO DE PUEBLO NUEVO, PROVINCIA DE CHINCHA – DEPARTAMENTO DE ICA.” con CUI N°2616514
LUGAR: MUNICIPALIDAD DISTRITAL DE PUEBLO NUEVO
DISTRITO : PUEBLO NUEVO PROVINCIA : CHINCHA DPTO: ICA

Código Recurso Unidad Cantidad Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 TOTAL
02410500010006 CINTA SEÑALIZADORA AMARILLA rll 8.0000 52.90 423.20 70.53 70.53 70.53 70.53 70.53 70.53 423.20
02490100010014 TUBERIA HDPE PN 16 Ø 1 1/2" m 491.2300 4.24 2,082.83 347.14 347.14 347.14 347.14 347.14 347.14 2,082.83
02490100010015 TUBERIA HDPE PN 16 Ø 1" m 1,513.0500 1.70 2,572.18 428.70 428.70 428.70 428.70 428.70 428.70 2,572.18
02490100010017 TUBERIA HDPE PN 16 Ø 1/2" m 931.5000 0.96 894.23 149.04 149.04 149.04 149.04 149.04 149.04 894.23
02490100010018 TUBERIA DE F°G° m 265.0000 12.00 3,180.00 530.00 530.00 530.00 530.00 530.00 530.00 3,180.00
0253020032 ROTOR DE ASPERSION Ø 1/2" - SIIMILAR A RAIN und 456.0000 78.00 35,568.00
BIRD
5,928.00 5,928.00 5,928.00 5,928.00 5,928.00 5,928.00 35,568.00
0253030013 ROCIADOR DE 1/2", BOQUILLA VAN 18 und 143.0000 24.50 3,503.50 583.92 583.92 583.92 583.92 583.92 583.92 3,503.50
0253030014 ROCIADOR DE 1/2", BOQUILLA VAN 12 und 29.0000 24.50 710.50 118.42 118.42 118.42 118.42 118.42 118.42 710.50
0253030015 ROCIADOR DE 1/2", BOQUILLA VAN 8 und 29.0000 24.50 710.50 118.42 118.42 118.42 118.42 118.42 118.42 710.50
0253030016 ROCIADOR DE 1/2", BOQUILLA VAN 6 und 194.0000 24.50 4,753.00 792.17 792.17 792.17 792.17 792.17 792.17 4,753.00
0253030017 ROCIADOR DE 1/2", BOQUILLA VAN 4 und 171.0000 24.50 4,189.50 698.25 698.25 698.25 698.25 698.25 698.25 4,189.50
0253030020 ROCIADOR DE 1/2", BOQUILLA VAN 10 und 11.0000 24.50 269.50 44.92 44.92 44.92 44.92 44.92 44.92 269.50
0253030021 ROCIADOR DE 1/2", BOQUILLA VAN 24 und 50.0000 24.50 1,225.00 204.17 204.17 204.17 204.17 204.17 204.17 1,225.00
0253100011 VALVULA ESFERICA PVC DE 1" und 35.0000 14.90 521.50 86.92 86.92 86.92 86.92 86.92 86.92 521.50
0253100012 VALVULA ESFERICA PVC DE 1 1/2" und 18.0000 120.90 2,176.20 362.70 362.70 362.70 362.70 362.70 362.70 2,176.20
02560400010013 CODO HDPE 1" x 90° PN 16 ACOPLE RAPIDO und 68.0000 10.90 741.20 123.53 123.53 123.53 123.53 123.53 123.53 741.20
02560400010014 TEE HDPE 1 1/2" x 1 1/2" PN 16 ACOPLE RAPIDO und 37.0000 14.10 521.70
86.95 86.95 86.95 86.95 86.95 86.95 521.70
02560400010015 REDUCCION HDPE 1 1/2" - 1" PN 16 ACOPLE RAPIDO und 46.0000 4.33 199.18
33.20 33.20 33.20 33.20 33.20 33.20 199.18
02560400010017 REDUCCION HDPE 1" - 1/2" PN 16 ACOPLE RAPIDO und 235.0000 1.72 404.20
67.37 67.37 67.37 67.37 67.37 67.37 404.20
02560400010018 REGLA DE ALUMINIO und 15.3500 149.90 2,301.38 575.35 575.35 575.35 575.35 2,301.38
02560400010019 TEE HDPE 1" x 1" PN 16 ACOPLE RAPIDO und 193.0000 4.92 949.56 158.26 158.26 158.26 158.26 158.26 158.26 949.56
02560400010020 CODO HDPE 1 1/2" x 90° PN 16 ACOPLE RAPIDO und 1.0000 10.90 10.90
10.90 10.90
02560400010021 CODO HDPE 1 1/2" x 45° PN 16 ACOPLE RAPIDO und 27.0000 10.90 294.30
294.30 294.30
02560400010022 CODO HDPE 1" x 45° PN 16 ACOPLE RAPIDO und 2.0000 10.90 21.80 21.80 21.80
0258040022 ELECTROBOMBA TRIFASICA 2 HP, 380 V, Ø und 20.0000 2,599.90 51,998.00
IMPULSION 1 1/2"
8,666.33 8,666.33 8,666.33 8,666.33 8,666.33 8,666.33 51,998.00
02610000010015 FIERRO FY=4200KG/CM2 GRADO 60 kg 1,580.7000 4.43 7,002.51 1,750.63 1,750.63 1,750.63 1,750.63 7,002.51
02610000010016 FAROLA ISLA LED +RELECTOR LED 100W und 556.0000 260.00 144,560.00 24,093.33 24,093.33 24,093.33 24,093.33 24,093.33 24,093.33 144,560.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
OBRA: “RENOVACION DE ESPACIO DE RECREACION PASIVA; EN EL (LA) LOS PARQUES DEL DISTRITO DE PUEBLO NUEVO, PROVINCIA DE CHINCHA – DEPARTAMENTO DE ICA.” con CUI N°2616514
LUGAR: MUNICIPALIDAD DISTRITAL DE PUEBLO NUEVO
DISTRITO : PUEBLO NUEVO PROVINCIA : CHINCHA DPTO: ICA

Código Recurso Unidad Cantidad Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 TOTAL
02610000010017 POSTE METALICO ORNAMENTAL SEGUN DISEÑO und 13.0000 800.00 10,400.00
1,733.33 1,733.33 1,733.33 1,733.33 1,733.33 1,733.33 10,400.00
02620400010016 CONTACTOR 18A und 16.0000 41.00 656.00 109.33 109.33 109.33 109.33 109.33 109.33 656.00
02620500010014 INTERRUPTOR TERMOMAGNETICO DE 3x15A 380V und 24.0000 69.90 1,677.60
279.60 279.60 279.60 279.60 279.60 279.60 1,677.60
02620500010015 INTERRUPTOR TERMOMAGNETICO DE 3x25A 380V und 16.0000 125.30 2,004.80
334.13 334.13 334.13 334.13 334.13 334.13 2,004.80
0262050002 INTERRUPTOR SIMPLE und 12.0000 12.90 154.80 25.80 25.80 25.80 25.80 25.80 25.80 154.80
02630200010005 POSTE DE C.A.C 11.00/300/150/ und 27.0000 1,195.00 32,265.00 5,377.50 5,377.50 5,377.50 5,377.50 5,377.50 5,377.50 32,265.00
02630500030005 PASTORAL ESFERICO DE TUBO DE F° G° und 27.0000 1,005.25 27,141.75 4,523.63 4,523.63 4,523.63 4,523.63 4,523.63 4,523.63 27,141.75
02670100010004 CASCO TIPO JOCKEY AZUL und 60.0000 14.90 894.00 894.00 894.00
02670100010006 CASCO PARA INGENIEROS Y TECNICOS und 6.0000 39.90 239.40 239.40 239.40
0267020009 LENTES DE SEGURIDAD C/PROTECCION UV und 60.0000 6.90 414.00 414.00 414.00
0267020010 LENTES DE SEGURIDAD C/PROTECCION UV und 60.0000 6.90 414.00
OSCURO
414.00 414.00
0267050011 GUANTES DE CUERO par 60.0000 9.90 594.00 594.00 594.00
0267050012 GUANTES AISLANTE par 15.0000 47.33 709.95 709.95 709.95
0267060018 CHALECO REFLECTIVO und 60.0000 29.90 1,794.00 1,794.00 1,794.00
02670700050006 BOTAS DE CAUCHO #43 par 60.0000 89.90 5,394.00 5,394.00 5,394.00
0267070006 BOTAS DE SEGURIDAD par 6.0000 314.90 1,889.40 1,889.40 1,889.40
02671100060005 BANNER CON DESCRIPCION DE LA OBRA DE und 1.0000 550.00 550.00
3.60x23.40M
550.00 550.00
02671100060006 BANCA DE MADERA Y METALICO und 11.0000 550.00 6,050.00 1,008.33 1,008.33 1,008.33 1,008.33 1,008.33 1,008.33 6,050.00
02671100160007 SEÑALES PARA DESVIO DE TRANSITO und 12.0000 125.00 1,500.00 250.00 250.00 250.00 250.00 250.00 250.00 1,500.00
02682900010061 ELECTRONIVEL und 120.0000 64.90 7,788.00 1,298.00 1,298.00 1,298.00 1,298.00 1,298.00 1,298.00 7,788.00
0268290003 CAJA PORTAVALVULA ARQUETA GRANDE und 52.0000 182.00 9,464.00 1,577.33 1,577.33 1,577.33 1,577.33 1,577.33 1,577.33 9,464.00
0270110344 LUMINARIA SOLAR LED DE 120 W - SISTEMA und 108.0000 4,520.00 488,160.00
INTEGRADO
81,360.00 81,360.00 81,360.00 81,360.00 81,360.00 81,360.00 488,160.00
0270110345 LUMINARIA LED 50 W und 30.0000 54.90 1,647.00 1,647.00 1,647.00
02702200010004 CABLE 2x1x2.5 mm2 THW m 550.0000 1.45 797.50 132.92 132.92 132.92 132.92 132.92 132.92 797.50
02702200010006 CABLE 2x1x6 mm2 THW m 240.0000 6.79 1,629.60 271.60 271.60 271.60 271.60 271.60 271.60 1,629.60
0271050109 POSTE DE MADERA H=8.00 M. und 2.0000 35.00 70.00 70.00 70.00
0271050205 SOPORTE DE MADERA und 2.0000 45.00 90.00 90.00 90.00
0271050206 PERNO DE F°G° 1/2"x10" und 54.0000 35.00 1,890.00 1,890.00 1,890.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
OBRA: “RENOVACION DE ESPACIO DE RECREACION PASIVA; EN EL (LA) LOS PARQUES DEL DISTRITO DE PUEBLO NUEVO, PROVINCIA DE CHINCHA – DEPARTAMENTO DE ICA.” con CUI N°2616514
LUGAR: MUNICIPALIDAD DISTRITAL DE PUEBLO NUEVO
DISTRITO : PUEBLO NUEVO PROVINCIA : CHINCHA DPTO: ICA

Código Recurso Unidad Cantidad Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 TOTAL
0271050207 SOGA Y RIEL PARA ASTA DE BANDERA und 11.0000 15.00 165.00 165.00 165.00
02760100100001 WINCHA METALICA DE 50 m und 4.4200 75.90 335.71 335.71 335.71
0290130022 AGUA und 360.0000 10.00 3,600.00 600.00 600.00 600.00 600.00 600.00 600.00 3,600.00
02901400020030 CINTA VULCANIZANTE 2229 und 65.0000 55.90 3,633.50 605.58 605.58 605.58 605.58 605.58 605.58 3,633.50
0290150032 TACHO DE FIBRA DE VIDRIO und 75.0000 575.00 43,125.00 7,187.50 7,187.50 7,187.50 7,187.50 7,187.50 7,187.50 43,125.00
0290230066 PRUEBAS DE REDES Y PUESTA EN SERVICIO glb 8.0000 150.00 1,200.00
200.00 200.00 200.00 200.00 200.00 200.00 1,200.00
EQUIPOS
0301000027 NIVEL TOPOGRAFICO CON TRIPODE hm 283.0800 9.50 2,689.22 1,344.61 1,344.61 2,689.22
0301010006 HERRAMIENTAS MANUALES %mo 16,897.07 2,816.18 2,816.18 2,816.18 2,816.18 2,816.18 2,816.18 16,897.07
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.2900 20.00 5.76 5.76 5.76
0301060003 CORTADOR DE CESPED A GASOLINA 2.6KW 146CC he 23.8300 10.00 238.28 39.71 39.71 39.71 39.71 39.71 39.71 238.28
0301060005 CORTADORA DE CONCRETO 13HP he 111.0500 35.00 3,886.71 971.68 971.68 971.68 971.68 3,886.71
0301060006 COMPACTADORA VIBRATORIA TIPO PLANCHA 7HP he 51.0600 5.50 280.82 46.80 46.80 46.80 46.80 46.80 46.80 280.82
03011600010003 CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 12.8000 220.00 2,815.29 469.22 469.22 469.22 469.22 469.22 469.22 2,815.29
03012200030005 CAMIONETA PICK UP 1ton. hm 43.2000 90.00 3,888.00 648.00 648.00 648.00 648.00 648.00 648.00 3,888.00
03012200040001 CAMION VOLQUETE DE 15 m3 hm 18.0100 223.30 4,020.68 670.11 670.11 670.11 670.11 670.11 670.11 4,020.68
0301220006 CAMION GRUA hm 138.6000 120.00 16,631.87 2,771.98 2,771.98 2,771.98 2,771.98 2,771.98 2,771.98 16,631.87
03012900010002 VIBRADOR DE CONCRETO 4 HP 1.25" hm 12.8000 25.00 319.98 80.00 80.00 80.00 80.00 319.98
0301290004 MEZCLADORA DE CONCRETO DE 9 - 11 P3 hm 12.8000 25.60 327.63 81.91 81.91 81.91 81.91 327.63
0301290007 MARTILLO NEUMATICO DE 10 kg he 48.7900 10.00 487.89 81.32 81.32 81.32 81.32 81.32 81.32 487.89
0301290008 MINICARGADOR hm 9.0200 180.00 1,623.58 270.60 270.60 270.60 270.60 270.60 270.60 1,623.58
0301290009 GENERADOR ELECTRICO hm 111.0500 20.00 2,220.97 370.16 370.16 370.16 370.16 370.16 370.16 2,220.97
0301330010 CIZALLA ELECTRICA hm 30.1100 8.00 240.87 240.87 240.87
0301340014 ESCALERA METALICA 10 PASOS he 5.2000 10.00 52.00 52.00 52.00
03013500030003 LUXOMETRO he 2.1600 199.00 429.84 429.84 429.84
03013500030004 PULIDORA DE TERRAZOS hm 228.4600 30.00 6,853.86 6,853.86 6,853.86
0301480002 BROCHA PARA PINTOR und 685.0000 32.50 22,262.53 3,710.42 3,710.42 3,710.42 3,710.42 3,710.42 3,710.42 22,262.53
SUBCONTRATOS
0400010003 ALMACEN DE OBRA mes 6.0000 350.00 2,100.00 350.00 350.00 350.00 350.00 350.00 350.00 2,100.00
0400010004 PAGOS POR MEDIDOR DE LUZ Y OTROS glb 7.0000 550.00 3,850.00 3,850.00 3,850.00
0400010005 PAGOS POR MEDIDOR DE AGUA Y OTROS glb 7.0000 250.00 1,750.00 1,750.00 1,750.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
OBRA: “RENOVACION DE ESPACIO DE RECREACION PASIVA; EN EL (LA) LOS PARQUES DEL DISTRITO DE PUEBLO NUEVO, PROVINCIA DE CHINCHA – DEPARTAMENTO DE ICA.” con CUI N°2616514
LUGAR: MUNICIPALIDAD DISTRITAL DE PUEBLO NUEVO
DISTRITO : PUEBLO NUEVO PROVINCIA : CHINCHA DPTO: ICA

Código Recurso Unidad Cantidad Precio S/. Parcial S/. MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 TOTAL
0400010006 REPOSICION DE JUEGOS INFANTILES glb 3.0000 450.00 1,350.00 450.00 900.00 1,350.00
0400010007 REPARACION DE MAQUINAS DE GIMNASIA glb 1.0000 450.00 450.00 450.00 450.00
0423130005 MOVILIZACION Y DESMOVILIZACION DE EQUPPOS und 1.0000 5,000.00 5,000.00 2,500.00 2,500.00 5,000.00
Y HERRAMIENTAS
COSTO DIRECTO 1,847,361.09 335,890.44 305,805.65 292,287.49 312,449.41 315,500.41 285,427.70 1,847,361.09
PORCENTAJE MENSUAL 18.18% 16.55% 15.82% 16.91% 17.08% 15.45% 100.00%
PORCENTAJE ACUMULADO 18.18% 34.74% 50.56% 67.47% 84.55% 100.00% 100.00%