Está en la página 1de 1

33kV RED DE

DISTRIBUCIÓN CFE
POR OTROS
POR M3
(3)LA'S
200 A

710-CT-001
710-CT-002
710-CT-003 M

MEDICIÓN CFE

710-BK-001
PT´S RESTAURADOR EN
BY PASS 35 kV-127 V MEDIA TENSIÓN
52

POSTE 33A POSTE 18A POSTE 9A


GOS - GANG GOS - GANG GOS - GANG
OPERATED SWITCH OPERATED SWITCH OPERATED SWITCH
33 kV, 1/C #3/0 AWG, AAC 710-GOS-007 710-GOS-003 33 kV, 1/C #3/0 AWG, AAC 710-GOS-002 33 kV, 1/C #3/0 AWG, AAC

(3)LA`S 200 A (3)LA`S (3)LA`S (3)LA`S (3)LA`S (3)LA`S (3)LA`S


POSTE 05
(3)LA`S 20 A (3)LA`S 3A 125A 3A 3A 12 A GOS - GANG
150 A VER NOTA 6 175 A 3A
OPERATED SWITCH
710-GOS-001
200 A 500-TX-001 904-TX-001 550-TX-001 52 908-TX-001 910-TX-001 903-TX-001
(3)LA`S 901-TX-001
100-US-001 75 kVA 45 kVA
3,500 KVA, KNAN 500 KVA 75 KVA 300 KVA 45 kVA
33KV-480/277V 33KV-480/277V 33KV-220/127V 33kV-220/127V 33kV-220/127V 33KV-220/127V 33kV-220/127V
2 In = 196 A In = 118 A
175 A In= 4,210 A. In= 601 A In= 196 A In= 787 A In = 118 A
2 900 900 900 (TIPO POSTE) (TIPO POSTE) 1
VER NOTA 4 VER NOTA 4 (PEDESTAL) (TIPO POSTE) (TIPO POSTE) (TIPO POSTE)
ATS KVAR KVAR KVAR
200-TX-001
100-TX-001 100-TX-002 3,000 / 3,750 KVA, 2
KNAN / KNAF ALCANCE
1500 kVA 1500 kVA
33KV-4.16KV DE KCA 904-DP-001 550-LP-001 908-DP-001 910-LP-001 903-DP-001 901-LP-001
33kV-4.16kV 33kV-480/277V
In= 416 / 520 A. LABORATORIO TALLER DE 710-CP-002 ESTACIÓN DE ALMACÉN Y CERCO OFICINAS GENERALES DE CASETA DE VIGILANCIA Y
VER NOTA 4 MANTENIMIENTO DE BANCO DE CAPACITORES 2.7 MVAR SEGURIDAD /
500-GE-001 COMBUSTIBLES PERIMETRAL ADMINISTRACIÓN / CLÍNICA
MERRILL CROWE / PROCESO MÉDICA / OFICINAS DE PLANTA TRATADORA DE AGUA
1,500 kW @ 0.8FP
APILAMIENTO DE PATIO REFINERÍA / PATIO DE 480 VAC, 60Hz PENDIENTE
100-TX-001 100-TX-002 CONSTRUCCIÓN.
TRITURACIÓN TRITURACIÓN DE LIXIVIACIÓN LIXIVIACIÓN Y PILETAS

PLANTA DE PROCESOS EDIFICIOS AUXILIARES EDIFICIOS AUXILIARES

33 kV, 1/C #3/0 AWG, AAC NOTAS:

1. VER DIBUJO 000-EL-001 PARA SÍMBOLOS Y


POSTE 2K ABREVIATURAS.
POSTE 1F POSTE 34
GOS - GANG GOS - GANG GOS - GANG
OPERATED SWITCH 2. VER DIBUJO 000-EL-002 PARA NOTAS
OPERATED SWITCH OPERATED SWITCH
710-GOS-006 GENERALES.
33 kV, 1/C #1/0 AWG AAC 710-GOS-004 710-GOS-005 33 kV, 1/C #3/0 AWG, AAC 33 kV, 1/C #1/0 AWG, AAC
3. EL SISTEMA ELÉCTRICO TENDRÁ UN
(3)LA`S (3)LA`S (3)LA`S (3)LA`S (3)LA`S (3)LA`S (3)LA`S (3)LA`S (3)LA`S (3)LA`S
SUMINISTRO DE ENERGÍA EN 33 kV POR
CFE.
3A 3A 12 A (3)LA`S (3)LA`S 7A 12A
7A 7A 7A 7A 10A 7A 12A
4. PARA INFORMACIÓN ESPECÍFICA DE CADA
920-TX-002 TRANSFORMADOR, VER DIBUJOS
908-TX-002 050-TX-001 906-TX-001 920-TX-001 920-TX-003 920-TX-004 920-TX-006 920-TX-005 650-TX-001 650-TX-002 650-TX-003
150 kVA 150 kVA 150 kVA 150 kVA 225 kVA 150 kVA 300 kVA 150 kVA 300 kVA ELÉCTRICOS DEL ÁREA
75 kVA 45 kVA 300 kVA CORRESPONDIENTE.
33kV-220/127V 33kV-220/127V 33kV-480/277V 33kV-220/127V 33kV-220/127V 33kV-220/127V 33kV-220/127V 33kV-220/127V 33kV-220/127V 33kV-480/277V 33kV-480/277V 33kV-480/277V
In = 196 A In = 118 A In = 360 A In = 395 A In = 395 A In = 395 A In = 395 A In = 590 A In = 395 A In = 360 A In = 180 A In = 360 A
(TIPO POSTE) (TIPO POSTE) (TIPO POSTE) (TIPO POSTE) (TIPO POSTE) (TIPO POSTE) (TIPO POSTE) (TIPO POSTE) 2 (TIPO POSTE) 5. EL FACTOR DE POTENCIA DE PLANTA DE
PENDIENTE (TIPO POSTE) (TIPO POSTE) (TIPO POSTE)
ATS ATS MERRILL-CROWE ES DE 0.90, SEGÚN
ESTUDIOS ELÉCTRICOS DE KCA.
PENDIENTE

908-DP-002 050-BG-002 906-DP-001 6. CRUCE SUBTERRÁNEO POLEA DE CABEZA


920-DP-002 920-DP-003 920-DP-004 920-DP-006 920-DP-005 650-DP-001 SOFT STARTER BANDA 200-CV-001 CABLE 3-1/C#1/0 XLP EPR
ESTACIÓN DE OFICINAS DE TALLER DE 920-GE-001 920-DP-001 400A, 3F, 4H 400A, 3F, 4H 400A, 3F, 4H 600A, 3F, 4H 400A, 3F, 4H 400A, 3F 650-GE-001 400A, 3F
650-DP-002 133% 35KV.
COMBUSTIBLES Y CONTRATISTA MANTENIMIENTO DE 53 kW @ 0.8FP 400A, 3F, 4H 100 kW @ 0.8FP POZOS DE AGUA CRUDA
LAVANDERÍA / MÓDULOS B, 109, 110, MÓDULOS A, 101, 102, MÓDULOS A, 103, 104, 107, MÓDULOS B, 112, 113, DISTRIBUCIÓN Y 400A, 3F
ALMACENAMIENTO CAMIONES DE MINA 220/127 VAC, 60Hz COMEDOR 480 VAC, 60Hz 650-ST-023
EDIFICIO RECREATIVO 111 105, 106 108. PLANTA TRATADORA 114 SUMINISTRO DE AGUA POZOS DE AGUA CRUDA
DE AGUAS 650-ST-021

EDIFICIOS AUXILIARES ÁREA DE CAMPAMENTO PERMANENTE EDIFICIOS AUXILIARES

DIAGRAMA UNIFILAR GENERAL APROBADO PARA CONSTRUCCIÓN 5 4 3


SIN ESCALA
CAMBIO DE ALCANCE
VER CLIENTE FECHA REV
ADMINISTRACIÓN
DE PROYECTO
PARA COPIAS
MAESTRAS
CON FIRMAS RAFAEL SÁNCHEZ 13 MAR 20 0
SIN ESCALA LOS DIBUJOS 11 X 17
REFERENCIAS REFERENCIAS REVISIONES REVISIONES
PLANO NO. TÍTULO PLANO NO. TÍTULO NO. DESCRIPCIÓN POR APR. FECHA CLIENTE NO. DESCRIPCIÓN POR APR. FECHA CLIENTE
ESCALA: SIN ESCALA FECHA MINERA CAMINO ROJO S.A. DE C.V.
ARQUITECTURA
000-EL-001 SÍMBOLOS Y ABREVIATURAS 650-EL-011 650-DP-002 DIAGRAMA UNIFILAR 4 REVISIÓN GENERAL DE DIAGRAMA Y CARGAS FM RG 29 ENE 21 RS DISEÑADO POR : MA DIC 19 PROYECTO NO. M3-PN 190350
000-EL-002 NOTAS GENERALES 710-EL-600 PLANTA GENERAL LÍNEAS 3 REVISIÓN GENERAL DE CARGAS FM RG 06 OCT 20 RS DIBUJADO POR : FM DIC 19 INGENIERÍA
PROYECTO CAMINO ROJO PLANO NO.

920-EL-001 DIAGRAMA UNIFILAR GENERAL 2 SE AGREGA TRANSFORMADOR PARA ÁREA 550 FM RG 11 JUN 20 RS REVISADO POR: RG MAR 20
PLANTA GENERAL 000-EL-010
920-EL-400 DISTRIBUCIÓN ELÉCTRICA 1 CAMBIO DE CAPACIDAD DE TRANSFORMADOR FM RG 08 MAY 20 RS GTE. DE PROY.: RG MAR 20
ADMINISTRACIÓN DE CONSTRUCCIÓN
ELÉCTRICO REV. NO. FECHA

650-EL-010 650-DP-001 DIAGRAMA UNIFILAR 5 ACTUALIZACIÓN DE CARGAS Y EQUIPOS FM RG 25 MAY 21 RS 0 APROBADO PARA CONSTRUCCIÓN FM RG 06 MAR 20 RS CLIENTE: RS MAR 20 M3ENG.COM DIAGRAMA UNIFILAR GENERAL 5 25 MAY 21

También podría gustarte