2. Reporte de Recursos
Toneladas
Cut Off Toneladas de Mineral Potencia Med
>= 0 6.50 15.00 2.2
>= 20 4.50 14.00 1.5
>=40 2.90 9.00 1.2
>=60 3.30 10.00 1.1
>=80 3.50 6.00 0.95
>=100 6.10 4.00 0.9
Calculos previos
2. Reporte de Reservas
Por proporción
Toneladas
Cut Off Toneladas (Mt) Potencia Diluida Probados
>= 0 4.70 16.85 2.58
>= 20 3.18 15.73 1.77
>=40 2.83 10.11 1.35
>=60 2.36 11.24 1.30
>=80 2.28 6.74 1.14
>=100 2.46 4.49 1.23
800.0
700.0
600.0
500.0
400.0
300.0
200.0
100.0
0.0
1 2 3 4 5 6
DATOS
VP Au 59.43 US$/1g
VP Ag 0.74 US$/1g
Dilución 11%
P.E de Min 3.1 t/m3
P.E de Desm 2.7 t/m4
Toneladas Leyes
Ind Inf Au Ag EQ Au (g/t) VPT ($/t)
1.8 2.50 2.8 20 3.05 181.204 181.204
1.2 1.80 3 40 3.50 207.89 207.89
1.32 0.38 4 60 4.75 282.12 282.12
0.9 1.30 5 80 6.00 356.35 356.35
0.95 1.60 6.5 100 7.75 460.295 460.295
0.9 4.30 8.5 120 9.99 593.955 593.955
Toneladas
Au Ag
de desmonte (Mt)
0.70 0.08 2
0.48 0.12 2.5
0.31 0.16 2.4
0.36 0.22 3
0.38 0.22 3.5
0.66 0.25 3.2
Toneladas Leyes
Probables Au Ag VPT ($/t)
2.11 2.93 19.98 188.7
1.42 3.07 39.95 212.0
1.48 3.79 55.66 266.5
1.06 5.11 79.43 362.3
1.14 6.87 101.60 483.2
1.23 10.67 141.29 738.7
5.00
4.50
4.00
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00
4 5 6
Leyes INF Leyes MED + IND
Cut Off Inf Au Ag Au Ag
>= 0 2.50 1.80 15.00 3.4 23.1
>= 20 1.80 2.10 30.00 3.6 46.7
>=40 0.38 2.40 45.00 4.2 62.3
>=60 1.30 3.50 60.00 6.0 93.0
>=80 1.60 4.50 75.00 8.2 121.1
>=100 4.30 6.00 90.00 14.5 191.7