CRONOGRAMA DE ADQUISICION DE INSUMOS

PROYEC
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LAS CALLES Y AVENIDAS COLINDANTES A LA PLAZA CÍVICA DE SAN MARTÍN DE PANGOA DEL DISTRITO DE PANGOA - PROVINCIA DE SATIPO - DEPARTAMENTO DE JUNIN” C.U.I.N°2466249

ENTIDA GOBIERNO REGIONAL DE JUNIN

ITEM DESCRIPCION UND METRADO COSTO TOTAL MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08 MES 09 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
I MANO DE OBRA
2 OPERARIO hh 82,915.60 27.82 2,306,711.86
128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66 128,150.66
3 OFICIAL hh 82,827.33 21.87 1,811,433.65
100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20 100,635.20
4 PEON hh 210,360.52 19.79 4,163,034.70
231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71 231,279.71
OPERADOR DE EQUIPO hh 17,548.79 28.88 506,809.08
28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06 28,156.06
8,787,989.29
II MATERIALES
1 GRASA MULTIPROPOSITO kg 1,737.82 4.31 7,490.02
1,248.34 1,248.34 1,248.34 1,248.34 1,248.34 1,248.34
2 GASOLINA gal 5,995.69 18.00 107,922.49
17,987.08 17,987.08 17,987.08 17,987.08 17,987.08 17,987.08
3 PETROLEO D-2 (PARA ENCOFRADO) gal 1,015.37 10.56 10,722.31
1,340.29 1,340.29 1,340.29 1,340.29 1,340.29 1,340.29 1,340.29 1,340.29
4 ASFALTO RC-250 gal 9,175.74 20.00 183,514.79
22,939.35 22,939.35 22,939.35 22,939.35 22,939.35 22,939.35 22,939.35 22,939.35
5 ALAMBRE NEGRO #16 kg 8,546.05 7.00 59,822.36
7,477.80 7,477.80 7,477.80 7,477.80 7,477.80 7,477.80 7,477.80 7,477.80
6 ALAMBRE NEGRO # 8 kg 14,058.42 7.00 98,408.97
12,301.12 12,301.12 12,301.12 12,301.12 12,301.12 12,301.12 12,301.12 12,301.12
7 ANGULO DE FIERRO DE 1 1/4"x1 1/4"x 1/8" pza 349.75 60.24 21,069.24
2,633.66 2,633.66 2,633.66 2,633.66 2,633.66 2,633.66 2,633.66 2,633.66
8 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 283,239.00 5.00 1,416,195.01
177,024.38 177,024.38 177,024.38 177,024.38 177,024.38 177,024.38 177,024.38 177,024.38
ACERO LISO EN VARILLAS DE 1/2" kg 101,389.49 6.35 643,823.26
128,764.65 128,764.65 128,764.65 128,764.65 128,764.65
11 CLAVOS PARA MADERA C/C 2" kg 8.41 4.38 36.84
36.84
12 CLAVOS PARA MADERA C/C 3" kg 12,641.38 7.00 88,489.65
14,748.28 14,748.28 14,748.28 14,748.28 14,748.28 14,748.28
13 MALLA DE SEGURIDAD SINTÉTICO H=1M rll 120.25 72.34 8,698.89
8,698.89
14 ESTRUCTURA METALICA DE SOPORTE PARA GIGANTOGRAFIA und 4.00 925.47 3,701.88
3,701.88
15 TUBERIA PVC SAP PRESIÓN C-10 DE 5/8" m 57,927.49 1.24 71,830.09
23,943.36 23,943.36 23,943.36
PIEDRA CHANCADA 1/2" m3 14,119.01 80.00 1,129,521.16
141,190.15 141,190.15 141,190.15 141,190.15 141,190.15 141,190.15 141,190.15 141,190.15
18 PIEDRA MEDIANA DE 6" m3 32.59 25.00 814.68
814.68
19 ARENA FINA m3 70.74 80.00 5,658.81
1,414.70 1,414.70 1,414.70 1,414.70
20 ARENA GRUESA m3 14,092.33 60.00 845,539.68
105,692.46 105,692.46 105,692.46 105,692.46 105,692.46 105,692.46 105,692.46 105,692.46
21 HORMIGON m3 49.06 60.00 2,943.87
1,471.94 1,471.94
22 MATERIAL GRANULAR PARA MEJ. m3 19,138.39 40.00 765,535.50
382,767.75 382,767.75
23 MATERIAL GRANULAR GRUESO (INCL. OVER) m3 12,150.00 25.00 303,750.00
151,875.00 151,875.00
24 MATERIAL DE PRESTAMO SELECCIONADO m3 3,208.51 20.00 64,170.24
32,085.12 32,085.12
25 MATERIAL AFIRMADO (SUB BASE) m3 33,359.58 45.00 1,501,180.88
750,590.44 750,590.44
26 TIERRA DE CHACRA m3 2,629.96 15.00 39,449.37
39,449.37
27 TECNOPOR DE 1"X4X8' pln 2,468.38 24.82 61,265.28
12,253.06 12,253.06 12,253.06 12,253.06 12,253.06
28 CEMENTO PORTLAND TIPO I (42.5 kg) bol 251,672.33 31.00 7,801,842.18
780,184.22 780,184.22 780,184.22 780,184.22 780,184.22 780,184.22 780,184.22 780,184.22 780,184.22 780,184.22
29 CEMENTO PORTLAND TIPO V MS(42.5 kg) bol 853.71 43.00 36,709.51
18,354.76 18,354.76
30 YESO EN BOLSA DE 25 KG bol 2,355.35 28.40 66,891.91
66,891.91
31 GRASS m2 13,536.57 8.64 116,955.95
116,955.95
32 ADOQUIN DE CONCRETO COLOR 20X10X8 CM m2 1,653.70 52.68 87,116.71
87,116.71
33 ADITIVO COLORANTE P/CONCRETO gal 53.51 42.25 2,260.60
753.53 753.53 753.53
34 ADITIVO CURADOR DE CONCRETO gal 5,255.89 130.88 687,890.46
229,296.82 229,296.82 229,296.82
35 MARMOLINA kg 18,171.82 32.52 590,947.48
590,947.48
36 GRANILLA BLANCO kg 32,258.23 10.45 337,098.51
337,098.51
37 GRANILLA ROJO kg 8,963.74 10.45 93,671.11
93,671.11
38 MADERA TORNILLO p2 29,553.98 4.50 132,992.91
16,624.11 16,624.11 16,624.11 16,624.11 16,624.11 16,624.11 16,624.11 16,624.11
39 MADERA TORNILLO PARA ENCOFRADOS INCLUYE CORTE p2 330,878.87 4.50 1,488,954.90
186,119.36 186,119.36 186,119.36 186,119.36 186,119.36 186,119.36 186,119.36 186,119.36
40 MADERA TORNILLO CEPILLADA p2 10,984.17 4.50 49,428.78
6,178.60 6,178.60 6,178.60 6,178.60 6,178.60 6,178.60 6,178.60 6,178.60
41 MADERA CEDRO p2 28.59 12.54 358.52
358.52
42 TRIPLAY DE 6mm pln 231.45 24.36 5,638.20
5,638.20
43 LIJA PARA MADERA plg 28.14 2.15 60.50
60.50
44 PINTURA ESMALTE SINTETICO gal 0.03 57.00 1.43
1.43
45 PINTURA ESMALTE PARA TRÁFICO gal 1,740.26 91.50 159,233.98
159,233.98
46 PINTURA DE TRANSITO gal 1.41 92.50 130.24
130.24
47 PINTURA ANTICORROSIVA gal 14.12 62.00 875.18
875.18
THINNER gal 10.61 59.90 635.37
635.37
50 XILOL gal 543.90 82.67 44,964.17
44,964.17
51 BARNIZ MARINO VENCEDOR gal 9.38 42.24 396.05
396.05
52 CINTA DE REFLECTIVAS DE 5 CM DE ANCHO m 25.00 36.48 912.00
912.00
53 ROLLO DE CINTA DE SEGURIDAD AMARILLO 110M rll 36.00 32.90 1,184.40
1,184.40
54 CINTA DE SEGURIDAD ROLLO 100M (ROJO Y AMARILLO) und 12.00 32.90 394.80
394.80
55 ROLLO DE CINTA DE SEGURIDAD ROJO 110M rll 35.00 32.90 1,151.50
1,151.50
56 OVEROL und 12.00 72.90 874.80
874.80
57 SOLDADURA CELLOCORD kg 283.14 12.00 3,397.62
3,397.62
58 INSTALACION DE HIDRANTES CONTRA INCENDIO(INCL. GRIFO Y VALVULA) glb 1.00 50,000.00 50,000.00
50,000.00
59 CASCO PARA INGENIEROS Y TECNICOS und 12.00 35.00 420.00
420.00
60 BARBIQUEJO und 12.00 3.50 42.00
42.00
61 LENTES DE POLICARBONATO LUNA OSCURA und 12.00 16.42 197.04
197.04
62 MASCARILLA DESECHABLE CONTRA POLVO und 12.00 1.50 18.00
18.00
63 GUANTES DE CUERO AMARILLO 9 1/2" FLEXIBLE par 12.00 29.90 358.80
358.80
CRONOGRAMA DE ADQUISICION DE INSUMOS
PROYEC
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LAS CALLES Y AVENIDAS COLINDANTES A LA PLAZA CÍVICA DE SAN MARTÍN DE PANGOA DEL DISTRITO DE PANGOA - PROVINCIA DE SATIPO - DEPARTAMENTO DE JUNIN” C.U.I.N°2466249

ENTIDA GOBIERNO REGIONAL DE JUNIN

ITEM DESCRIPCION UND METRADO COSTO TOTAL MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08 MES 09 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
64 GUANTES DE LONA par 12.00 26.70 320.40
320.40
65 CHALECO REFLECTIVO INCL. LOGO und 12.00 29.90 358.80
358.80
66 BOTAS IMPERMEABLES DE JEBE par 12.00 34.90 418.80
418.80
67 ZAPATOS DE SEGURIDAD par 12.00 147.12 1,765.44
1,765.44
68 CINTA DE SEÑALIZACION AMARILLO rll 26.00 35.62 926.12
926.12
69 CONO DE SEÑALIZACION NARANJA DE 28" DE ALTURA und 10.00 39.90 399.00
399.00
70 TRANQUERA DE MADERA DE 2.40 X 1.20 m und 10.00 220.00 2,200.00
2,200.00
71 CARTELES DE SEÑALIZACION und 145.00 52.30 7,583.50
7,583.50
72 GIGANTOGRAFIA 3.60x7.20M (INC. INSTALACION) und 2.00 625.45 1,250.90
1,250.90
73 SEÑAL INFORMATIVA INC. POSTE Y COLOCACIÓN und 53.00 143.25 7,592.25
7,592.25
74 CINTA DE SEÑALIZACION ROJO rll 26.00 35.62 926.12
926.12
75 SEÑAL PREVENTIVA INC. POSTE Y COLOCACIÓN und 64.00 143.25 9,168.00
9,168.00
76 CONO DE SEGURIDAD ANARANJADO H=50 CM und 10.00 35.28 352.80
352.80
77 CONO DE SEGURIDAD ANARANJADO H=100 CM und 25.00 68.24 1,706.00
1,706.00
78 SEÑAL REGULADORA INC. POSTE Y COLOCACIÓN und 67.00 143.25 9,597.75
9,597.75
79 PLAN DE MONITOREO ARQUEOLOGICO glb 1.00 45,000.00 45,000.00
2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00
80 IMPLEMENTACION DEL PLAN DE SEGURIDAD Y SALUD EN OBRA glb 1.00 5,521.34 5,521.34
5,521.34
81 KIT DE CAPACITACION EN SEGURIDAD Y SALUD EN OBRA glb 1.00 6,413.63 6,413.63
6,413.63
82 KIT DE SEGURIDAD P/GUARDIANIA glb 18.00 69.24 1,246.32
1,246.32
83 KIT DE RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y glb 1.00 6,254.15 6,254.15
6,254.15
84 MITIGACION DE IMPACTO AMBIENTAL glb 1.00 45,000.00 45,000.00
2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00
85 PLATINA DE 2" X 1/4" und 157.70 60.85 9,595.75
9,595.75
86 PARANTES DE CONCRETO pza 100.00 25.00 2,500.00
2,500.00
87 SERVICIOS HIGIENICOS PORTATIL STANDER mes 18.00 600.00 10,800.00
600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00
88 AGUA m3 60,275.22 0.50 30,137.61
3,767.20 3,767.20 3,767.20 3,767.20 3,767.20 3,767.20 3,767.20 3,767.20
89 LETRERO DE DESVIO DE TRANSITO und 15.00 35.64 534.60
534.60
90 REPOSICIÓN DE REDES DE AGUA Y DESAGÜE glb 1.00 6,500.00 6,500.00
3,250.00 3,250.00
91 REPOSICIÓN DE TECHOS DE BUZON INC. TAPAS glb 1.00 25,732.24 25,732.24
12,866.12 12,866.12
92 REPOSICIÓN INSTALACION DOMICILIARIA DE AGUA glb 1.00 8,563.20 8,563.20
4,281.60 4,281.60
93 REPOSICIÓN INSTALACION DOMICILIARIA DE DESAGUE glb 1.00 8,256.40 8,256.40
4,128.20 4,128.20
94 LINTERNA und 36.00 38.24 1,376.64
1,376.64
95 ESPONJA und 4,463.40 1.25 5,579.25
5,579.25
96 MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL mes 6.00 4,500.00 27,000.00
27,000.00
97 MANTENIMIENTO DE ACCESOS A CANTERAS, DME Y FUENTES DE AGUA mes 3.00 20,000.00 60,000.00
60,000.00
98 ELABORACION Y IMPLEMENTACION DEL PLAN DE DESVIO DE TRANSITO Y SE glb 1.00 20,000.00 20,000.00
20,000.00
99 CORDEL m 9,529.31 0.85 8,099.91
8,099.91
100 YUTE rll 840.94 36.24 30,475.73
30,475.73
101 SC INSTALACION DE ARTEFACTOS DE ILUMINACION glb 1.00 6,342.53 6,342.53
6,342.53
102 SC INSTALACIONES ELECTRICAS (ILUMINACION) glb 1.00 6,500.00 6,500.00
6,500.00
103 SC ESTRUCTURA PERGOLA SEMI CIRCULAR INCL. ACCESORIOS und 10.00 3,552.37 35,523.70
35,523.70
104 SC ESTRUCTURA PERGOLA RECTANGULAR INCL. ACCESORIOS und 42.00 2,153.64 90,452.88
90,452.88
105 SC SERVICIO DE MOVILIZACION DE EQUIPOS Y MAQUINARIA glb 1.00 50,614.05 50,614.05
50,614.05
106 SC SERVICIO DE FLETE TERRESTRE glb 1.00 286,114.50 286,114.50
286,114.50
107 SC SUMINISTRO E INSTALACION DE FAROLAS ESFERECICAS C/DOBLE LAMPA und 82.00 554.37 45,458.34
45,458.34
108 SC BARANDA ESCALERA # 1 und 274.26 73.74 20,223.93
20,223.93
109 SC BASUREROS BASCULANTES METALICO und 260.00 125.23 32,559.80
32,559.80
110 SC BASUREROS BASCULANTES MET. DECORATIVO und 30.00 185.67 5,570.10
5,570.10
111 SC SUMINISTRO Y COLOCACION DE PLACA RECORDATORIO SEGUN DISEÑO glb 1.00 1,252.35 1,252.35
1,252.35
112 SC REUBICACION DE POSTES DE ALUMBRADO glb 1.00 160,000.00 160,000.00
160,000.00
113 SC PLANTAS ORNAMENTALES und 1,200.00 25.53 30,636.00
30,636.00
114 SC PRUEBA DENSIDAD DE CAMPO und 600.00 32.97 19,782.00
19,782.00
115 SC PRUEBA DISEÑO DE MEZCLA DE CONCRETO und 3.00 250.00 750.00
750.00
116 SC PRUEBA ROTURA DE PROBETA (COMPRESION) und 990.00 25.00 24,750.00
24,750.00
117 SC ENSAYO DE CBR (MAT. CANTERA) und 13.00 324.65 4,220.45
4,220.45
118 SC INPLEMENTACION Y REUBICACION DE SEMAFOROS (INCL. INSTALACION) und 15.00 10,500.00 157,500.00
157,500.00
119 REGLA DE ALUMINIO und 1,655.48 25.49 42,198.27
5,274.78 5,274.78 5,274.78 5,274.78 5,274.78 5,274.78 5,274.78 5,274.78
120 ALQUILER DE LOCAL mes 18.00 500.00 9,000.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00 500.00

121 ALQUILER DE AREA P/MANIOBRAS mes 400.00 42.20 16,880.00 16,880.00

20,661,042.43
III EQUIPOS
1 MIRAS Y JALONES hm 1,089.14 4.62 5,031.82 5,031.82

2 NIVEL TOPOGRAFICO hm 2,198.83 15.36 33,773.99 33,773.99

3 PRISMA hm 423.65 8.00 3,389.18 3,389.18

4 ESTACION TOTAL hm 711.34 25.00 17,783.63 17,783.63

5 RODILLO LISO VIBRATORIO AUTOPROPULSADO 135hp 10-12ton hm 2,002.67 170.00 340,453.87


85,113.47 85,113.47 85,113.47 85,113.47
6 COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP hm 3,565.67 12.00 42,787.99
14,262.66 14,262.66 14,262.66
7 MARTILLO HIDRAULICO (para minicargador) hm 235.80 38.45 9,066.53
4,533.27 4,533.27
CRONOGRAMA DE ADQUISICION DE INSUMOS
PROYEC
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD DE LAS CALLES Y AVENIDAS COLINDANTES A LA PLAZA CÍVICA DE SAN MARTÍN DE PANGOA DEL DISTRITO DE PANGOA - PROVINCIA DE SATIPO - DEPARTAMENTO DE JUNIN” C.U.I.N°2466249

ENTIDA GOBIERNO REGIONAL DE JUNIN

ITEM DESCRIPCION UND METRADO COSTO TOTAL MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08 MES 09 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18
8 MARTILLO NEUMATICO (para compresora) hm 92.42 21.05 1,945.50
972.75 972.75
9 COMPRESORA NEUMATICA hm 50.04 38.67 1,934.93
967.47 967.47
10 RADIO WALKIE TALKIE und 36.00 285.34 10,272.24
10,272.24
11 CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 3,845.50 190.00 730,644.81
243,548.27 243,548.27 243,548.27
12 MINI CARGADOR BOB CAT 953 hm 4,047.31 85.00 344,020.98
114,673.66 114,673.66 114,673.66
13 EXCAVADORA SOBRE ORUGAS 115-165 HP hm 300.35 342.56 102,888.37
34,296.12 34,296.12 34,296.12
14 RETROEXCAVADORA SOBRE LLANTAS 80-110HP hm 328.38 190.00 62,392.11
20,797.37 20,797.37 20,797.37
15 TRACTOR DE ORUGAS DE 190-240 HP hm 1,042.06 250.00 260,514.13
86,838.04 86,838.04 86,838.04
16 MOTONIVELADORA 130 - 135 HP hm 2,002.67 250.00 500,667.43
166,889.14 166,889.14 166,889.14
17 CAMION VOLQUETE DE 15 m3 hm 4,579.52 180.00 824,313.67
274,771.22 274,771.22 274,771.22
18 CAMION CISTERNA (2,500 GLNS.) hm 2,002.67 180.00 360,480.53
120,160.18 120,160.18 120,160.18
19 PULIDORA DE CONCRETO hm 242.13 15.64 3,786.84
1,893.42 1,893.42
20 COMPRESORA DE AIRE DE 50L 2.5HP hm 1,590.26 10.00 15,902.61
1,987.83 1,987.83 1,987.83 1,987.83 1,987.83 1,987.83 1,987.83 1,987.83
21 VIBRADOR DE CONCRETO 4 HP 2.40" hm 9,648.99 10.00 96,489.91
12,061.24 12,061.24 12,061.24 12,061.24 12,061.24 12,061.24 12,061.24 12,061.24
22 MEZCLADORA DE CONCRETO 11 P3 (18 HP) hm 9,648.99 15.00 144,734.83
18,091.85 18,091.85 18,091.85 18,091.85 18,091.85 18,091.85 18,091.85 18,091.85
23 CIZALLA ELECTRICA DE FIERRO hm 11,100.32 10.00 111,003.16
111,003.16
24 MOCHILA AGRICOLA hm 4,674.24 6.54 30,569.50
30,569.50
25 ZARANDA METALICA hm 167.50 45.24 7,577.66
7,577.66
26 HERRAMIENTAS MANUALES %MO 1.00 463,614.60 463,614.60 25,756.37
25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37 25,756.37
4,526,040.82
COSTO DIRECTO 33,975,072.54 894,608.19 1,118,197.79 1,211,267.85 3,398,799.05 4,031,311.48 4,072,736.11 2,221,965.64 2,176,732.36 2,176,732.36 2,161,984.09 2,205,799.73 1,591,264.93 1,550,082.02 553,955.62 521,971.41 1,678,911.80 683,030.03 1,725,722.08
PORCENTAJE DE AVANCE MENSUAL % 2.63% 3.29% 3.57% 10.00% 11.87% 11.99% 6.54% 6.41% 6.41% 6.36% 6.49% 4.68% 4.56% 1.63% 1.54% 4.94% 2.01% 5.08%
PORCENTAJE DE AVANCE ACUMULADO % 2.63% 5.92% 9.49% 19.49% 31.36% 43.35% 49.89% 56.29% 62.70% 69.06% 75.56% 80.24% 84.80% 86.43% 87.97% 92.91% 94.92% 100.00%