CANTIDADES
COMEDOR Y CANTIDADE
N° ADMINISTRACI
VIVIENDA PORTERIA Y VIVIENDA
GUARDERIA SALA DE PU [Bs]
GERENTE CONTROL PERSONAL S TOTALES EXTERIORES (EXT)
ON (ADM) (GUAR) REUNIONES
(GER) (POR) (PER)
(COC)
EST.1 0.00 0.00 0.00 0.00 0.00 0.00 1.00 18,801.85 18,801.85
EST.2 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,116.93 2,116.93
EST.3 89.56 24.02 18.12 36.62 45.30 165.60 1,124.47 85.91 14,692.76
EST.4 76.79 16.13 12.09 24.19 34.27 98.09 1,026.33 70.51 0.00
EST.5 10.39 2.80 3.50 4.20 5.95 18.92 170.54 2,354.47 78,403.85
EST.6 8.91 2.58 3.22 3.86 5.47 21.41 191.51 3,180.01 79,420.75
EST.7 30.97 1.94 2.66 3.03 7.11 6.68 164.49 3,063.75 0.00
EST.8 350.68 0.00 0.00 0.00 0.00 0.00 350.68 439.83 0.00
EST.9 1.57 0.00 0.00 0.00 0.00 0.00 1.57 3,601.50 0.00
EST.10 5,371.31 0.00 0.00 1,807.43 1,689.06 3,818.27 38,623.91 19.63 60,508.89
EST.11 0.00 0.00 0.00 0.00 0.00 0.00 3,390.72 469.85 0.00
EST.12 0.00 0.00 0.00 0.00 0.00 0.00 270.40 253.42 0.00
EST.13 0.00 0.00 0.00 0.00 0.00 0.00 6.00 21,643.78 0.00
EST.14 0.00 0.00 0.00 0.00 0.00 0.00 1.00 11,332.50 0.00
EST.15 0.00 0.00 0.00 0.00 0.00 0.00 6.00 11,265.96 0.00
EST.16 0.00 0.00 0.00 0.00 0.00 0.00 3.00 16,772.29 0.00
EST.17 0.00 0.00 0.00 0.00 0.00 7.00 7.00 17,430.22 0.00
EST.18 0.00 0.00 0.00 0.00 0.00 3.00 3.00 4,047.44 0.00
EST.19 0.00 0.00 0.00 0.00 0.00 1.00 1.00 11,453.52 0.00
EST.20 0.00 0.00 0.00 0.00 0.00 1.00 1.00 10,758.60 0.00
EST.21 13.00 0.00 0.00 0.00 0.00 0.00 13.00 6,643.40 0.00
EST.22 0.00 0.00 0.00 0.00 4.00 0.00 4.00 7,693.61 0.00
EST.23 0.00 0.00 0.00 0.00 3.00 0.00 3.00 4,531.87 0.00
EST.24 0.00 0.00 0.00 0.00 2.00 0.00 2.00 6,451.19 0.00
EST.25 0.00 0.00 0.00 0.00 1.00 0.00 1.00 4,272.69 0.00
EST.26 0.00 0.00 0.00 0.00 1.00 0.00 1.00 3,152.15 0.00
EST.27 0.00 0.00 0.00 0.00 1.00 0.00 1.00 2,999.48 0.00
EST.28 0.00 60.11 65.21 98.19 188.54 403.45 5,745.77 190.64 0.00
EST.29 0.00 0.00 0.00 0.00 8.37 24.40 71.32 127.80 1,725.30
TOTAL 255,670.32
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
4
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
EST.21 ESTRUCTURA METÁLICAS VIVIENDA PERSONAL, GERENTE Y SERENO pza Total = 0.00
5
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
P2-P3-P4-P5-P6-P9-
P10-P11-P12-P13-
P16-P19-P22-P23-
NAV 0.00 23.00 2.00 1.90 1.60 6.08 139.84
P24-P25-P26-P29-
P30-P31-P32-P33-
P36
P7-P8-P27-P28-P14-
NAV 0.00 8.00 2.00 1.95 1.90 7.41 59.28
P15-P34-P35
EJES G y D (ENTRE
NAV CIMIENTOS CORRIDOS 0.00 2.00 0.60 0.50 87.70 26.31 52.62
1 - 23)
EJES G y D (ENTRE
NAV 0.00 -19.00 0.60 0.50 0.30 0.09 -1.71
1 - 23)
P1-P2-P4-P5-P6-
NAV ZAPATAS DE HºA 0.00 8.00 2.00 0.80 0.80 1.28 10.24
P13-P14-P15
NAV ZAPATAS DE HºA 0.00 EJES G-L (2-9) 18.00 2.50 1.55 1.55 6.01 108.11
NAV CIMIENTOS CORRIDOS 0.00 EJES 2-4-7 (G-L) 3.00 0.50 0.40 21.45 4.29 12.87
NAV 0.00 -18.00 0.50 0.40 0.30 0.06 -1.08
NAV 0.00 EJES 9 (H-L) 1.00 0.50 0.40 17.25 3.45 3.45
NAV 0.00 -5.00 0.50 0.40 0.30 0.06 -0.30
NAV 0.00 EJES G (2-7) 1.00 0.50 0.40 9.90 1.98 1.98
6
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
7
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
NAV ZAPATAS DE HºA EJES A-G (1-4) 23.00 2.15 1.55 1.55 5.17 118.80
NAV -23.00 2.15 0.25 0.25 0.13 -3.09
NAV NAVE INDUSTRIAL - SILOS 0.00 0.00
NAV ZAPATAS DE HºA EJE 1 (A-M) 13.00 2.15 1.20 1.25 3.22 41.93
NAV -13.00 2.15 0.25 0.45 0.24 -3.14
NAV EJE 2 (A y M) 2.00 2.15 1.20 1.25 3.22 6.45
NAV -2.00 2.15 0.25 0.45 0.24 -0.48
NAV EJE 3M 1.00 2.15 1.20 1.25 3.22 3.22
NAV -1.00 2.15 0.25 0.45 0.24 -0.24
NAV EJE 3 (A-J) 10.00 2.50 1.20 1.25 3.75 37.50
NAV -10.00 2.15 0.25 0.45 0.24 -2.42
EST.5 HORMIGÓN PARA ZAPATAS m3 Total = 91.48
NAV NAVE INDUSTRIAL
NAV ZAPATAS DE HºA P(1-20-21-40) 4.00 0.30 1.30 1.60 0.62 2.50
P(2-3-4-5-6-9-10-11-
12-13-16-19-22-23-
NAV 24.00 0.35 1.60 1.90 1.06 25.54
24-25-26-29-30-31-
32-33-36-40)
8
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
NAV EJE E' (entre 6-7) (8) 2.00 0.35 1.00 1.00 0.35 0.70
NAV EJE 22 (B-C-D-E) 4.00 0.35 1.00 1.00 0.35 1.40
NAV EJE 25 (B-C-D-E) 4.00 0.35 1.00 1.00 0.35 1.40
NAV EJE C (entre 26-27) 1.00 0.35 1.00 1.00 0.35 0.35
NAV NAVE - ALMACEN DE MATERIA PRIMA
P1 P2 P4 P5 P6
NAV ZAPATAS DE HºA 8.00 0.30 0.80 0.80 0.19 1.54
P13 P14 P15
NAV ZAPATAS DE HºA EJES A-G (1-4) 23.00 0.35 1.55 1.55 0.84 19.34
NAV NAVE INDUSTRIAL - SILOS
E5-1, E5-0, E6-1,
NAV ZAPATAS DE HºA 4.00 0.35 1.30 1.30 0.59 2.37
E6-0
NAV ZAPATA TIPO 28.00 0.35 1.20 1.25 0.53 14.70
EST.6 HORMIGÓN PARA COLUMNAS m3 Total = 121.09
NAV NAVE INDUSTRIAL
NAV EJE D (P21-P40) 20.00 11.00 0.30 0.60 1.98 39.60
NAV EJE N (P1-P20) 20.00 11.00 0.30 0.60 1.98 39.60
NAV EJE 23 (B-C-D-E) 4.00 10.15 0.25 0.25 0.63 2.54
NAV EJE 4 (B-C-D-E) 4.00 5.15 0.25 0.25 0.32 1.29
NAV EJE 5 (B-C-D-E) 4.00 5.15 0.25 0.25 0.32 1.29
NAV EJE E' (entre 6-7) (8) 2.00 5.15 0.25 0.25 0.32 0.64
NAV EJE 22 (B-C-D-E) 4.00 5.15 0.25 0.25 0.32 1.29
NAV EJE 25 (B-C-D-E) 4.00 5.15 0.25 0.25 0.32 1.29
NAV EJE C (entre 26-27) 1.00 5.15 0.25 0.25 0.32 0.32
NAV NAVE - ALMACEN DE MATERIA PRIMA
P1 P2 P3 P4 P5 P6
NAV 9.00 7.15 0.20 0.30 0.43 3.86
P13 P14 P15
NAV EJES A-G (1-4) 23.00 5.15 0.25 0.25 0.32 7.40
NAV NAVE INDUSTRIAL - SILOS
E5-1, E5-0, E6-1,
NAV 4.00 8.66 0.20 0.35 0.61 2.42
E6-0
NAV COLUMNA TIPO 28.00 8.66 0.20 0.35 0.61 16.97
EST.7 HORMIGÓN PARA VIGAS m3 Total = 112.11
NAV NAVE INDUSTRIAL
NAV NIVEL + 9,00 EJE D 1.00 0.20 0.60 88.30 10.60 10.60
9
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
PORTICO 1 (+3.00 y
NAV NAVE - ALMACEN DE MATERIA PRIMA 2.00 0.20 0.30 21.00 1.26 2.52
+5.15)
NAV JEFATURA DE PRODUCCION - SALA DE CONTROL - LABORATORIO EJES (1-3) (A-G) 3.00 0.20 0.40 22.00 1.76 5.28
10
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
EST.11 ESTRUCTURA METALICA DE NAVE INDUSTRIAL DE 38.40 x 88.30 mts m2 Total = 3390.72
EST.21 ESTRUCTURA METÁLICAS VIVIENDA PERSONAL, GERENTE Y SERENO pza Total = 0.00
11
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
JEFATURA-
NAV 1.00 17.70 17.70
VESTIDORES
12
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
13
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
14
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
15
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
PORTICO 3 (C3-
ADM
C18)
1.00 0.20 0.40 32.35 2.59 2.59 ###
PORTICO 4 (B26-
ADM
C3)
1.00 0.20 0.40 7.16 0.57 0.57 ###
PORTICO 5 (B16-
ADM
C7)
1.00 0.25 0.45 7.06 0.79 0.79 ###
PORTICO 6 (B17-
ADM
C9)
1.00 0.25 0.45 7.06 0.79 0.79 ###
PORTICO 7 (B24-
ADM
C11)
1.00 0.20 0.40 7.06 0.56 0.56 ###
ADM PORTICO 8(B22-B9) 1.00 0.20 0.40 7.73 0.62 0.62 ###
PORTICO 9 (B14-
ADM
C15)
1.00 0.20 0.40 1.25 0.10 0.10 ###
PORTICO 10 (C16-
ADM
B8)
1.00 0.20 0.40 7.73 0.62 0.62 ###
PORTICO 11(B14-
ADM
C4)
1.00 0.25 0.45 1.25 0.14 0.14 ###
PORTICO 12 (C21-
ADM
C5)
1.00 0.25 0.45 1.80 0.20 0.20 ###
PORTICO 13 (C20-
ADM
B25)
1.00 0.25 0.40 9.17 0.92 0.92 ###
PORTICO 1 (B13-
ADM vigas de arriostre
C16)
1.00 0.25 0.40 2.90 0.29 0.29 ###
PORTICO 2 (C3-
ADM
C18)
1.00 0.25 0.40 32.37 3.24 3.24 ###
ADM PORTICO 3 (C2-C3) 1.00 0.25 0.40 6.05 0.61 0.61 ###
PORTICO 4 (C4-
ADM
C5)
1.00 0.25 0.40 6.08 0.61 0.61 ###
ADM PORTICO 5 (C6-C7) 1.00 0.25 0.40 6.05 0.61 0.61 ###
ADM PORTICO 6 (C8-C9) 1.00 0.25 0.40 6.05 0.61 0.61 ###
PORTICO 7 (C13-
ADM
C14)
1.00 0.25 0.40 6.08 0.61 0.61 ###
PORTICO 8 (B13-
ADM
C15)
1.00 0.25 0.40 1.25 0.13 0.13 ###
PORTICO 9 (C16-
ADM
C18)
1.00 0.25 0.40 7.06 0.71 0.71 ###
PORTICO 10 (C2-
ADM
C15)
1.00 0.25 0.40 29.71 2.97 2.97 ###
PORTICO 11 (C10-
ADM
C11)
1.00 0.25 0.40 6.06 0.61 0.61 ###
EST.8 LOSAS ALIVIANDA m2 Total = 350.68
ADM losa de techo ejes 1-2/C-D 1.00 0.15 2.97 0.45 2.97 ###
ADM ejes 1-2/A-C 1.00 0.15 16.62 2.49 16.62 ###
ADM ejes 2-3/C-D 1.00 0.15 5.53 0.83 5.53 ###
ADM ejes 2-3/A-C 1.00 0.15 3.96 0.59 3.96 ###
ADM ejes 3-4/C-D 1.00 0.15 4.84 0.73 4.84 ###
ADM ejes 3-4/A-C 1.00 0.15 27.35 4.10 27.35 ###
ADM ejes 4-5/C-D 1.00 0.15 4.95 0.74 4.95 ###
ADM ejes 4-5/A-C 1.00 0.15 27.62 4.14 27.62 ###
ADM ejes 5-7/C-D 1.00 0.15 6.49 0.97 6.49 ###
ADM ejes 5-7/A-C 1.00 0.15 36.72 5.51 36.72 ###
ADM ejes 7-8/C-D 1.00 0.15 3.25 0.49 3.25 ###
ADM ejes 7-8/A-C 1.00 0.15 35.09 5.26 35.09 ###
ADM ejes 7-8/A-C 1.00 0.15 4.60 0.69 4.60 ###
ADM losa planta alta ejes 1-2/C-D 1.00 0.15 2.95 0.44 2.95 ###
ADM ejes 1-2/A-B 1.00 0.15 3.90 0.59 3.90 ###
16
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
EST.21 ESTRUCTURA METÁLICAS VIVIENDA PERSONAL, GERENTE Y SERENO pza Total = 13.00
17
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
18
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
EST.11 ESTRUCTURA METALICA DE NAVE INDUSTRIAL DE 38.40 x 88.30 mts m2 Total = 0.00
EST.21 ESTRUCTURA METÁLICAS VIVIENDA PERSONAL, GERENTE Y SERENO pza Total = 0.00
19
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
20
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
EST.11 ESTRUCTURA METALICA DE NAVE INDUSTRIAL DE 38.40 x 88.30 mts m2 Total = 0.00
21
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
EST.21 ESTRUCTURA METÁLICAS VIVIENDA PERSONAL, GERENTE Y SERENO pza Total = 0.00
22
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
23
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
EST.21 ESTRUCTURA METÁLICAS VIVIENDA PERSONAL, GERENTE Y SERENO pza Total = 0.00
24
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
25
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
EST.21 ESTRUCTURA METÁLICAS VIVIENDA PERSONAL, GERENTE Y SERENO pza Total = 0.00
26
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
27
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
28
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
COC EJE 6(C-A) 1.00 0.25 0.30 8.09 0.61 0.61 ###
COC EJE 5(D-C) 1.00 0.25 0.30 3.20 0.24 0.24 ###
COC EJE 4(F-D) 1.00 0.25 0.30 5.50 0.41 0.41 ###
COC EJE 3(F-E) 1.00 0.25 0.30 2.70 0.20 0.20 ###
COC EJE 0(E-A) 1.00 0.25 0.30 14.80 1.11 1.11 ###
EST.8 LOSAS ALIVIANDA m2 Total = 0.00
EST.9 HORMIGON PARA ESCALERAS m3 Total = 0.00
EST.10 ACERO DE CONSTRUCCIÓN kg Total = 3818.27
COC COMEDOR-COCINA-BAÑOS 0.00 ###
COC vigas 1.00 526.70 526.70 ###
COC columnas 1.00 1618.07 1618.07 ###
COC mensulas 1.00 311.22 311.22
COC zapatas 1.00 1362.28 1362.28 ###
EST.11 ESTRUCTURA METALICA DE NAVE INDUSTRIAL DE 38.40 x 88.30 mts m2 Total = 0.00
EST.21 ESTRUCTURA METÁLICAS VIVIENDA PERSONAL, GERENTE Y SERENO pza Total = 0.00
29
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
30
BUEZO LEGLISE
CA
N° DESCRIPCIÓN UNIDAD EXTERIORES
NAVE
ADMINISTRACI
INDUSTRIAL
(EXT) ON (ADM)
(NAV)
ARQ.1 CIMIENTO DE HORMIGON CICLOPEO (50%PIEDRA) m3 137.48 0.00 0.00
ARQ.2 SOBRECIMIENTO DE HORMIGON CICLOPEO(40%PIEDRA) m3 22.00 0.00 0.00
ARQ.3 IMPERMEABILIZACION DE SOBRECIMIENTOS m2 109.98 0.00 0.00
ARQ.4 PISO DE CEMENTO ENLUCIDO H=7CM C/EMPEDRADO m2 1,775.35 4,524.89 242.41
ARQ.5 MURO DE LADRILLO 6H ESP=10 CM m2 1,349.91 4,723.62 549.67
ARQ.6 DINTEL DE LADRILLO ARMADO m 0.00 304.62 76.92
ARQ.7 ZOCALO DE MADERA ROBLE m 0.00 0.00 290.94
ARQ.8 CIELO FALSO DE YESO m2 5.25 1,319.05 214.48
ARQ.9 CIELO RASO DE YESO SOBRE LOSA m2 0.00 0.00 144.78
ARQ.10 CIELO FALSO PLACA DE DRY WALL m2 0.00 681.00 0.00
ARQ.11 REVOQUE CAL-CEMENTO m2 0.00 2,951.14 361.60
ARQ.12 REVOQUE INTERIOR ESTUCO m2 0.00 8,978.75 652.66
ARQ.13 FACHADA DE VIDRIO TEMPLADO m2 0.00 0.00 42.62
ARQ.14 VENTANA DE ALUMINIO m2 0.00 214.73 0.00
ARQ.15 PROV Y COLOC DE VIDRIOS TRANSPARENTES DOBLES m2 0.00 214.73 0.00
ARQ.16 BOTAGUAS DE HºAº m 0.00 77.66 63.02
ARQ.17 PINTURA INTERIOR LATEX m2 0.00 10,310.40 1,007.70
ARQ.18 PINTURA EXTERIOR LATEX m2 0.00 2,952.22 402.10
ARQ.19 PINTURA AL OLEO SOBRE MUROS m2 0.00 138.24 11.54
ARQ.20 PINTURA EPOXICA m2 0.00 1,276.44 0.00
ARQ.21 REVESTIMIENTOS DE CERAMICA m2 0.00 338.91 6.63
ARQ.22 PISO DE CERAMICA CON COLOR SOBRE LOSA O PISO FROTACHADO m2 0.00 4,048.17 2.47
ARQ.23 PISO DE PARQUET TAJIBO m2 0.00 0.00 0.00
ARQ.24 COLOCADO DE PISO DE MADERA LAMINADO FLOTANTE m2 0.00 0.00 312.38
ARQ.25 PUERTA METALICA m2 21.88 479.47 1.89
ARQ.26 PROV Y COLOC DE PUERTA DE CEDRO m2 0.00 11.13 22.89
ARQ.27 PROV Y COLOCADO PUERTA DE VIDRIO TEMPLADO e=10 mm m2 0.00 0.00 11.55
ARQ.28 PROV. Y COLOC. DE FRENO HIDRAULICO PARA PUERTA DE VIDRIO pza 0.00 0.00 4.00
ARQ.29 PROV Y COLOC DE CHAPA INTERIOR pza 0.00 28.00 12.00
ARQ.30 PROV Y COLOC DE CHAPAS EXTERIORES DE DOBLE GOLPE pza 5.00 19.00 0.00
ARQ.31 PROV. Y COLOC. BARANDA CON TUBERIAS DE FG Y VIDRIO TEMPLADO DE 10 mm m 0.00 0.00 15.50
ARQ.32 PROVISIÓN Y COLOCADO INODORO pza 0.00 10.00 1.00
ARQ.33 PROVISIÓN Y COLOCACIÓN LAVAMANOS C/GRIFO TEMPORIZADOR pza 0.00 10.00 1.00
BUEZO LEGLISE
CA
N° DESCRIPCIÓN UNIDAD EXTERIORES
NAVE
ADMINISTRACI
INDUSTRIAL
(EXT) ON (ADM)
(NAV)
ARQ.34 PROVISIÓN Y COLOCADO DE DUCHA TIPO LORENZETTI pza 0.00 12.00 1.00
ARQ.35 PROVISIÓN Y COLOCADO DE BASE DE DUCHA FIBRA DE VIDRIO pza 0.00 12.00 1.00
ARQ.36 PROVISIÓN Y COLOCADO REJILLA DE PISO pza 0.00 7.00 1.00
ARQ.37 PROVISIÓN Y COLOCADO DE URINARIO C/GRIFO TEMPORIZADOR pza 0.00 4.00 0.00
ARQ.38 PROVISIÓN Y COLOCADO DE LAVANDERIA pza 0.00 0.00 0.00
ARQ.39 PROVISIÓN Y COLOCADO DE LAVAPLATOS pza 0.00 1.00 0.00
ARQ.40 MESON DE HºAº m2 0.00 21.17 0.55
ARQ.41 ARMARIO EMPOTRADO m2 0.00 0.00 5.00
ARQ.42 DIVISIONES DE MELAMINA EN BAÑOS m2 0.00 27.89 0.00
ARQ.43 MALLA OLIMPICA Y TUBOS FG 2" c /2.5 m m2 62.53 0.00 0.00
ARQ.44 RETIRO DE ESCROMBROS m3 0.00 3,807.24 114.20
ARQ.45 JARDINES m2 2,598.09 0.00 0.00
ARQ.46 BOTAGUAS DE LADRILLO, MORTERO 1:4 m 549.90 0.00 0.00
ARQ.47 HORMIGON SIMPLE H21 m3 0.00 20.18 0.00
BUEZO LEGLISE
CANTIDADES PR
COMEDOR Y CANTIDADES
N° VIVIENDA PORTERIA Y VIVIENDA
GUARDERIA SALA DE PU [Bs] NAVE
ADMINISTRACIO
GERENTE CONTROL PERSONAL TOTALES EXTERIORES (EXT) INDUSTRIAL
(GUAR) REUNIONES N (ADM)
(GER) (POR) (PER) (NAV)
(COC)
ARQ.1 0.00 0.00 0.00 0.00 0.00 137.48 834.62 114,739.38 0.00 0.00
ARQ.2 0.00 0.00 0.00 0.00 0.00 22.00 1,138.01 25,031.67 0.00 0.00
ARQ.3 0.00 0.00 0.00 0.00 0.00 109.98 53.36 5,868.53 0.00 0.00
ARQ.4 73.20 101.13 106.16 217.48 359.07 7,399.69 200.79 356,472.53 908,552.66 48,673.50
ARQ.5 64.26 136.16 227.69 261.29 323.36 7,635.95 178.31 240,702.45 842,267.79 98,011.66
ARQ.6 15.10 9.90 17.60 31.71 31.87 487.72 108.77 0.00 33,133.52 8,366.59
ARQ.7 28.72 35.95 80.40 100.89 49.60 586.50 61.63 0.00 0.00 17,930.63
ARQ.8 49.33 54.01 74.98 166.10 346.36 2,229.56 214.80 1,127.70 283,331.94 46,070.30
ARQ.9 0.00 0.00 0.00 0.00 0.00 144.78 94.08 0.00 0.00 13,620.90
ARQ.10 0.00 0.00 0.00 0.00 0.00 681.00 266.06 0.00 181,186.86 0.00
ARQ.11 129.09 138.06 214.80 215.31 306.85 4,316.85 214.34 0.00 632,548.10 77,505.13
ARQ.12 73.71 107.16 195.96 244.93 138.77 10,391.94 169.79 0.00 1,524,502.73 110,814.29
ARQ.13 0.00 0.00 0.00 0.00 0.00 42.62 777.84 0.00 0.00 33,151.54
ARQ.14 17.64 6.74 16.96 29.40 30.22 315.68 700.52 0.00 150,419.86 0.00
ARQ.15 17.64 6.74 16.96 29.40 30.22 315.68 228.91 0.00 49,152.93 0.00
ARQ.16 11.40 5.20 10.60 40.75 20.17 228.80 199.28 0.00 15,476.08 12,558.63
ARQ.17 68.75 142.09 258.84 317.71 323.61 12,429.10 229.88 0.00 2,370,155.79 231,648.93
ARQ.18 99.01 138.06 151.43 215.31 306.85 4,264.98 242.61 0.00 716,238.94 97,553.24
ARQ.19 7.64 19.60 13.90 34.96 457.93 683.81 82.06 0.00 11,343.97 946.97
ARQ.20 0.00 0.00 0.00 0.00 0.00 1,276.44 122.63 0.00 156,529.84 0.00
ARQ.21 15.38 37.40 28.24 60.38 242.36 729.30 265.17 0.00 89,868.76 1,758.08
ARQ.22 9.22 15.78 5.10 22.20 332.98 4,435.92 270.37 0.00 1,094,503.72 667.81
ARQ.23 38.83 35.17 67.46 0.00 0.00 141.46 257.04 0.00 0.00 0.00
ARQ.24 0.00 0.00 0.00 143.88 0.00 456.26 183.13 0.00 0.00 57,206.15
ARQ.25 3.57 0.00 3.57 0.00 1.89 512.27 462.02 10,109.00 221,525.65 873.22
ARQ.26 7.77 9.87 14.70 7.98 5.88 80.22 1,203.95 0.00 13,399.96 27,558.42
ARQ.27 0.00 0.00 0.00 13.44 16.80 41.79 1,903.72 0.00 0.00 21,987.97
ARQ.28 0.00 0.00 0.00 8.00 8.00 20.00 2,197.61 0.00 0.00 8,790.44
ARQ.29 2.00 2.00 6.00 4.00 4.00 58.00 369.97 0.00 10,359.16 4,439.64
ARQ.30 2.00 3.00 2.00 0.00 0.00 31.00 480.49 2,402.45 9,129.31 0.00
ARQ.31 0.00 0.00 0.00 0.00 0.00 15.50 1,018.68 0.00 0.00 15,789.54
ARQ.32 1.00 2.00 2.00 4.00 2.00 22.00 1,566.02 0.00 15,660.20 1,566.02
ARQ.33 1.00 3.00 2.00 6.00 10.00 33.00 1,589.51 0.00 15,895.10 1,589.51
BUEZO LEGLISE
CANTIDADES PR
COMEDOR Y CANTIDADES
N° VIVIENDA PORTERIA Y VIVIENDA
GUARDERIA SALA DE PU [Bs] NAVE
ADMINISTRACIO
GERENTE CONTROL PERSONAL TOTALES EXTERIORES (EXT) INDUSTRIAL
(GUAR) REUNIONES N (ADM)
(GER) (POR) (PER) (NAV)
(COC)
ARQ.34 1.00 1.00 2.00 0.00 0.00 17.00 812.81 0.00 9,753.72 812.81
ARQ.35 1.00 1.00 2.00 0.00 0.00 17.00 429.93 0.00 5,159.16 429.93
ARQ.36 1.00 2.00 2.00 2.00 6.00 21.00 163.98 0.00 1,147.86 163.98
ARQ.37 0.00 0.00 0.00 2.00 0.00 6.00 1,511.10 0.00 6,044.40 0.00
ARQ.38 0.00 1.00 0.00 0.00 0.00 1.00 927.66 0.00 0.00 0.00
ARQ.39 0.00 0.00 0.00 0.00 1.00 2.00 773.49 0.00 773.49 0.00
ARQ.40 2.81 3.52 0.00 2.67 27.53 58.25 2,480.90 0.00 52,520.65 1,364.50
ARQ.41 5.00 5.00 30.00 0.00 0.00 45.00 563.54 0.00 0.00 2,817.70
ARQ.42 0.00 4.94 0.00 13.02 7.41 53.26 553.19 0.00 15,427.36 0.00
ARQ.43 0.00 0.00 0.00 0.00 0.00 62.53 205.95 12,877.02 0.00 0.00
ARQ.44 13.81 23.61 21.66 62.95 123.07 4,166.54 187.93 0.00 715,494.33 21,460.76
ARQ.45 0.00 0.00 0.00 0.00 0.00 2,598.09 42.68 110,886.48 0.00 0.00
ARQ.46 0.00 0.00 0.00 0.00 0.00 549.90 139.40 76,656.06 0.00 0.00
ARQ.47 0.00 0.00 0.00 0.00 0.00 20.18 #VALUE! #VALUE! #VALUE! #VALUE!
BUEZO LEGLISE
EXT noreste 0 Muro perimetral 1 0.00 0.20 83.81 16.76 0.00 16.76 ###
EXT 0 0 0 1 0.00 0.20 9.70 1.94 0.00 1.94 ###
EXT 0 0 0 1 0.00 0.20 23.74 4.75 0.00 4.75 ###
EXT 0 0 0 1 0.00 0.20 52.00 10.40 0.00 10.40 ###
EXT norte 0 0 1 0.00 0.20 154.15 30.83 0.00 30.83 ###
EXT suroeste 0 0 1 0.00 0.20 95.64 19.13 0.00 19.13 ###
EXT sur 0 0 1 0.00 0.20 130.86 26.17 0.00 26.17 ###
PISO DE CEMENTO ENLUCIDO H=7CM
ARQ.4 m2 0 0 0 0.00 0.00 0.00 0.00 Total = 1775.35
C/EMPEDRADO
EXT (area de autocad) 0 mantenimiento 1 0 0 0 241.41 0.00 241.41 ###
EXT (area de autocad) 0 sala de bomba 1 0 0 0 6.72 0.00 6.72 ###
EXT (area de autocad) 0 atrio 1 0 0 0 1527.22 0.00 1527.22 ###
ARQ.5 MURO DE LADRILLO 6H ESP=10 CM m2 0 0 0 0.00 0.00 0.00 0.00 Total = 1349.91
EXT 0 0 sala de bomba 2 2.50 0.00 2.50 6.25 0.00 12.50 ###
EXT 0 0 sala de bomba 2 2.50 0.00 2.40 6.00 0.00 12.00 ###
EXT menos puerta 0 0 -1 2.10 0.00 0.80 1.68 0.00 -1.68 ###
EXT parapeto 0 0 2 0.80 0.00 2.50 2.00 0.00 4.00 ###
EXT 0.00 0 0 2 0.80 0.00 2.40 1.92 0.00 3.84 ###
EXT noreste 0 Muro perimetral 1 2.50 0.00 83.81 209.53 0.00 209.53 ###
EXT 0 0 0 1 2.50 0.00 9.70 24.25 0.00 24.25 ###
EXT 0 0 0 1 2.50 0.00 23.74 59.35 0.00 59.35 ###
EXT 0 0 0 1 2.50 0.00 52.00 130.00 0.00 130.00 ###
EXT norte 0 0 1 2.50 0.00 154.15 385.38 0.00 385.38 ###
EXT suroeste 0 0 1 2.50 0.00 95.64 239.10 0.00 239.10 ###
EXT sur 0 0 1 2.50 0.00 130.86 327.15 0.00 327.15 ###
EXT menos columnas 0 0 -111 2.50 0.00 0.20 0.50 0.00 -55.50 ###
ARQ.6 DINTEL DE LADRILLO ARMADO m 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.7 ZOCALO DE MADERA ROBLE m 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.8 CIELO FALSO DE YESO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 5.25
EXT (area de autocad) 0 sala bomba 1 0 0 0 5.25 0.00 5.25 ###
37
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - EXTERIORES
MEDIDAS EN MTS
ARQ.9 CIELO RASO DE YESO SOBRE LOSA m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.10 CIELO FALSO PLACA DE DRY WALL m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.11 REVOQUE CAL-CEMENTO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.12 REVOQUE INTERIOR ESTUCO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.13 FACHADA DE VIDRIO TEMPLADO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.17 PINTURA INTERIOR LATEX m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.18 PINTURA EXTERIOR LATEX m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.19 PINTURA AL OLEO SOBRE MUROS m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
EXT 0 0 sala bomba 1 2.10 0.00 0.80 1.68 0.00 1.68 ###
EXT peatonal 0 muro perimetral 1 2.10 0.00 1.00 2.10 0.00 2.10 ###
ARQ.26 PROV Y COLOC DE PUERTA DE CEDRO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
PROV Y COLOCADO PUERTA DE VIDRIO
ARQ.27 m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
TEMPLADO e=10 mm
ARQ.29 PROV Y COLOC DE CHAPA INTERIOR pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
PROV Y COLOC DE CHAPAS EXTERIORES DE
ARQ.30 pza 0 0 0 0.00 0.00 0.00 0.00 Total = 5.00
DOBLE GOLPE
EXT 0 0 puertas metalicas corredizas 1 0 0 0 0.00 0.00 1.00 ###
ARQ.32 PROVISIÓN Y COLOCADO INODORO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
38
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - EXTERIORES
MEDIDAS EN MTS
ARQ.39 PROVISIÓN Y COLOCADO DE LAVAPLATOS pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
39
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
40
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
NAV menos puerta 0 0 -2 2.10 0.00 1.00 2.10 0.00 -4.20 ###
NAV 0 0 0 -2 2.10 0.00 3.50 7.35 0.00 -14.70 ###
NAV menos puerta metalica 0 0 -2 4.20 0.00 1.49 6.26 0.00 -12.52 ###
NAV 0 0 0 -2 4.20 0.00 4.00 16.80 0.00 -33.60 ###
NAV 0 0 0 -1 4.20 0.00 4.20 17.64 0.00 -17.64 ###
NAV eje horizontal 0 baños damas y varones 1 6.40 0.00 6.65 42.56 0.00 42.56 ###
NAV 0 0 0 2 2.50 0.00 2.48 6.20 0.00 12.40 ###
NAV 0 0 0 1 2.50 0.00 2.95 7.38 0.00 7.38 ###
NAV eje vertical 0 0 1 6.40 0.00 5.25 33.60 0.00 33.60 ###
NAV 0 0 0 1 2.50 0.00 4.50 11.25 0.00 11.25 ###
NAV 0 0 0 2 2.50 0.00 0.90 2.25 0.00 4.50 ###
NAV menos ventana 0 0 -1 0.90 0.00 1.30 1.17 0.00 -1.17 ###
NAV 0 0 0 -1 0.90 0.00 1.21 1.09 0.00 -1.09 ###
NAV menos puerta 0 0 -2 2.10 0.00 0.90 1.89 0.00 -3.78 ###
NAV ejr horizontal 0 pasillo entre baños y vestidores 1 6.40 0.00 3.50 22.40 0.00 22.40 ###
NAV ejr horizontal 0 vestidores 1 2.50 0.00 2.48 6.20 0.00 6.20 ###
NAV 0 0 0 1 2.50 0.00 2.95 7.38 0.00 7.38 ###
NAV 0 0 0 1 2.50 0.00 2.45 6.13 0.00 6.13 ###
NAV 0 0 0 2 2.50 0.00 1.10 2.75 0.00 5.50 ###
NAV 0 0 0 1 6.40 0.00 6.65 42.56 0.00 42.56 ###
NAV eje vertical 0 0 1 6.40 0.00 5.25 33.60 0.00 33.60 ###
NAV 0 0 0 1 6.40 0.00 2.35 15.04 0.00 15.04 ###
NAV 0 0 0 2 2.50 0.00 0.90 2.25 0.00 4.50 ###
NAV 0 0 0 1 2.50 0.00 4.50 11.25 0.00 11.25 ###
NAV 0 0 0 1 2.50 0.00 2.50 6.25 0.00 6.25 ###
NAV menos puerta 0 0 -2 2.10 0.00 0.90 1.89 0.00 -3.78 ###
NAV menos ventana 0 0 -2 0.90 0.00 1.20 1.08 0.00 -2.16 ###
NAV eje vertical 0 baños 1 2.50 0.00 4.25 10.63 0.00 10.63 ###
NAV 0 0 0 1 2.50 0.00 4.07 10.18 0.00 10.18 ###
NAV eje horizontal 0 0 1 2.50 0.00 1.89 4.73 0.00 4.73 ###
NAV 0 0 0 1 2.50 0.00 1.73 4.33 0.00 4.33 ###
NAV menos puerta 0 0 -1 2.10 0.00 0.80 1.68 0.00 -1.68 ###
NAV 0 0 0 -1 2.10 0.00 0.90 1.89 0.00 -1.89 ###
NAV menos ventana 0 0 -2 0.90 0.00 0.60 0.54 0.00 -1.08 ###
enfermeria - deposito de
NAV eje vertical 0 1 4.80 0.00 4.00 19.20 0.00 19.20 ###
reactivos
NAV 0 0 0 1 4.80 0.00 3.55 17.04 0.00 17.04 ###
NAV eje horizontal 0 0 1 4.80 0.00 10.65 51.12 0.00 51.12 ###
NAV menos puerta metalica 0 0 -1 4.20 0.00 5.00 21.00 0.00 -21.00 ###
NAV eje horizontal 0 planta de procesamiento 2 9.05 0.00 66.10 598.21 0.00 1196.41 ###
NAV 0 0 0 2 4.80 0.00 10.45 50.16 0.00 100.32 ###
NAV 0 0 0 1 4.80 0.00 2.65 12.72 0.00 12.72 ###
NAV eje vertical 0 0 1 9.05 0.00 37.20 336.66 0.00 336.66 ###
NAV 0 0 0 2 4.80 0.00 37.20 178.56 0.00 357.12 ###
NAV 0 0 0 1 4.80 0.00 2.48 11.90 0.00 11.90 ###
NAV 0 0 0 1 4.80 0.00 4.69 22.51 0.00 22.51 ###
NAV menos puerta metalica 0 0 -9 4.20 0.00 5.00 21.00 0.00 -189.00 ###
NAV menos ventana 0 0 -28 1.30 0.00 4.80 6.24 0.00 -174.72 ###
41
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
NAV menos puerta metalica 0 0 -3 4.20 0.00 4.00 16.80 0.00 -50.40 ###
NAV 0 0 0 -10 4.20 0.00 5.00 21.00 0.00 -210.00 ###
NAV menos puerta 0 0 -8 2.10 0.00 0.60 1.26 0.00 -10.08 ###
NAV 0 0 0 -2 2.10 0.00 1.20 2.52 0.00 -5.04 ###
NAV 0 0 0 -1 2.10 0.00 1.00 2.10 0.00 -2.10 ###
NAV parapeto 0 area produccion 1 0.50 0.00 35.57 17.79 0.00 17.79 ###
NAV parapeto 0 0 1 0.50 0.00 23.84 11.92 0.00 11.92 ###
NAV parapeto 0 baños 1 0.50 0.00 8.25 4.13 0.00 4.13 ###
NAV parapeto 0 silos 1 0.50 0.00 69.85 34.93 0.00 34.93 ###
NAV parapeto 0 0 1 0.50 0.00 48.30 24.15 0.00 24.15 ###
ARQ.6 DINTEL DE LADRILLO ARMADO m 0 0 0 0.00 0.00 0.00 0.00 Total = 304.62
NAV Ventana 0 baño 1 0.00 0.00 1.30 0.00 0.00 1.30 ###
NAV 0 0 baño 1 0.00 0.00 1.21 0.00 0.00 1.21 ###
NAV 0 0 baño 2 0.00 0.00 0.60 0.00 0.00 1.20 ###
NAV 0 0 vestidores 2 0.00 0.00 1.20 0.00 0.00 2.40 ###
NAV 0 0 jefatura de produccion 1 0.00 0.00 4.35 0.00 0.00 4.35 ###
NAV 0 0 norte 14 0 0 4.80 0.00 0.00 67.20 ###
NAV 0 0 sur 14 0 0 4.80 0.00 0.00 67.20 ###
NAV Puerta 0 baño 1 0.00 0.00 0.90 0.00 0.00 0.90 ###
NAV 0 0 baño 1 0.00 0.00 0.80 0.00 0.00 0.80 ###
NAV 0 0 pasillos 6 0.00 0.00 3.50 0.00 0.00 21.00 ###
NAV 0 0 baños 2 0.00 0.00 0.90 0.00 0.00 1.80 ###
NAV 0 0 vestidores 2 0.00 0.00 0.90 0.00 0.00 1.80 ###
NAV 0 0 jefatura produccion 2 0.00 0.00 1.00 0.00 0.00 2.00 ###
NAV 0 0 sala de control 1 0.00 0.00 1.50 0.00 0.00 1.50 ###
NAV 0 0 laboratorio 1 0.00 0.00 1.00 0.00 0.00 1.00 ###
NAV 0 0 0 1 0.00 0.00 1.50 0.00 0.00 1.50 ###
NAV 0 0 bomba de aire 1 0.00 0.00 2.00 0.00 0.00 2.00 ###
NAV 0 0 enfermeria 1 0.00 0.00 1.00 0.00 0.00 1.00 ###
NAV 0 0 control de calidad 1 0.00 0.00 1.00 0.00 0.00 1.00 ###
NAV 0 0 plantta de procesamiento 4 0.00 0.00 1.20 0.00 0.00 4.80 ###
NAV 0 0 compresor 1 0.00 0.00 1.20 0.00 0.00 1.20 ###
NAV 0 0 generador 1 0.00 0.00 1.20 0.00 0.00 1.20 ###
NAV 0 0 oficina de almacenes 1 0.00 0.00 1.00 0.00 0.00 1.00 ###
NAV puerta metalica 0 silos 5 0 0 2.00 0.00 0.00 10.00 ###
NAV 0 0 seleccion y lavado 1 0 0 4.00 0.00 0.00 4.00 ###
NAV 0 0 0 1 0 0 1.49 0.00 0.00 1.49 ###
NAV 0 0 plantta de procesamiento 1 0 0 4.00 0.00 0.00 4.00 ###
NAV 0 0 0 1 0 0 1.49 0.00 0.00 1.49 ###
NAV 0 0 0 9 0 0 5.00 0.00 0.00 45.00 ###
NAV 0 0 servicios auxiliares 1 0 0 4.35 0.00 0.00 4.35 ###
NAV 0 0 deposito de reactivos 1 0 0 5.00 0.00 0.00 5.00 ###
NAV 0 0 almacen de materia prima 1 0 0 4.20 0.00 0.00 4.20 ###
NAV 0 0 0 1 0 0 2.03 0.00 0.00 2.03 ###
NAV 0 0 almacen refrigerado 2 0 0 4.00 0.00 0.00 8.00 ###
42
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
NAV 0 0 sala de bomba 1 0.00 0.00 0.80 0.00 0.00 0.80 ###
ARQ.7 ZOCALO DE MADERA ROBLE m 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.8 CIELO FALSO DE YESO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 1319.05
NAV (area de autocad) 0 almacen de materia prima 1 0 0 0 115.29 0.00 115.29 ###
NAV (area de autocad) 0 silo 1 1 0 0 0 138.20 0.00 138.20 ###
NAV (area de autocad) 0 silo 2 1 0 0 0 73.00 0.00 73.00 ###
NAV (area de autocad) 0 silo 3 1 0 0 0 73.00 0.00 73.00 ###
NAV (area de autocad) 0 silo 4 1 0 0 0 73.00 0.00 73.00 ###
NAV (area de autocad) 0 silo 5 1 0 0 0 126.80 0.00 126.80 ###
NAV (area de autocad) 0 selección y lavado 1 0 0 0 309.75 0.00 309.75 ###
NAV (area de autocad) 0 laboratorio 1 0 0 0 46.14 0.00 46.14 ###
NAV (area de autocad) 0 bomba de aire 1 0 0 0 10.94 0.00 10.94 ###
NAV (area de autocad) 0 sala de control 1 0 0 0 33.37 0.00 33.37 ###
NAV (area de autocad) 0 jefatura de produccion 1 0 0 0 54.68 0.00 54.68 ###
NAV (area de autocad) 0 baño varones exterior 1 0 0 0 3.71 0.00 3.71 ###
NAV (area de autocad) 0 baño damas exterior 1 0 0 0 3.66 0.00 3.66 ###
NAV (area de autocad) 0 baño varones 1 0 0 0 17.36 0.00 17.36 ###
NAV (area de autocad) 0 baño damas 1 0 0 0 17.36 0.00 17.36 ###
NAV (area de autocad) 0 pasillo de circulacion baños 1 0 0 0 28.29 0.00 28.29 ###
NAV (area de autocad) 0 vestidor varones 1 0 0 0 25.70 0.00 25.70 ###
NAV (area de autocad) 0 vestidor damas 1 0 0 0 25.70 0.00 25.70 ###
NAV (area de autocad) 0 servicios auxiliares 1 0 0 0 143.10 0.00 143.10 ###
ARQ.9 CIELO RASO DE YESO SOBRE LOSA m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.10 CIELO FALSO PLACA DE DRY WALL m2 0 0 0 0.00 0.00 0.00 0.00 Total = 681.00
NAV PB (area de autocad) 0 control de calidad 1 0 0 0 22.50 0.00 22.50 ###
NAV PB (area de autocad) 0 enfermeria 1 1 0 0 0 11.40 0.00 11.40 ###
NAV PB (area de autocad) 0 deposito de reactivos 1 0 0 0 30.10 0.00 30.10 ###
NAV PB (area de autocad) 0 almacen refrigerado 1 0 0 0 125.40 0.00 125.40 ###
NAV PB (area de autocad) 0 oficina almacenes 1 0 0 0 11.72 0.00 11.72 ###
NAV PB (area de autocad) 0 almacen de producto terminado 1 0 0 0 170.04 0.00 170.04 ###
43
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
NAV menos puertas metalicas 0 0 -1 2.40 0.00 4.00 9.60 0.00 -9.60 ###
NAV 0 0 0 -9 2.40 0.00 5.00 12.00 0.00 -108.00 ###
NAV menos vacios 0 0 -1 2.65 0.00 21.00 55.65 0.00 -55.65 ###
NAV 0 0 0 -1 1.05 0.00 3.70 3.89 0.00 -3.89 ###
NAV 0 0 0 -1 5.35 0.00 13.95 74.63 0.00 -74.63 ###
NAV menos ventanas de fachadas laterales 0 0 -28 1.30 0.00 4.80 6.24 0.00 -174.72 ###
ARQ.12 REVOQUE INTERIOR ESTUCO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 8978.75
NAV (perimetro autcad) 0 servicios auxiliares 1 6.40 0 49.00 313.60 0.00 313.60 ###
NAV 0 0 column interm 2 6.40 0.00 1.00 6.40 0.00 12.80 ###
NAV menos puerta metalica 0 0 -1 4.20 0.00 4.35 18.27 0.00 -18.27 ###
NAV (perimetro autcad) 0 almacen materia prima 1 6.40 0.00 50.00 320.00 0.00 320.00 ###
NAV menos puerta metalica 0 0 -2 4.20 0.00 4.20 17.64 0.00 -35.28 ###
NAV (perimetro autcad) 0 seleccion y lavado 1 9.05 0.00 86.95 786.90 0.00 786.90 ###
NAV menos puerta metalica 0 0 -5 4.20 0.00 2.00 8.40 0.00 -42.00 ###
NAV menos puerta metalica 0 0 -1 4.20 0.00 4.00 16.80 0.00 -16.80 ###
NAV menos puerta metalica 0 0 -1 4.20 0.00 1.49 6.26 0.00 -6.26 ###
NAV menos puerta 0 0 -1 2.10 0.00 1.00 2.10 0.00 -2.10 ###
NAV (perimetro autcad) 0 silos 1 1 9.05 0.00 129.80 1174.69 0.00 1174.69 ###
NAV menos puerta metalica 0 0 -1 4.20 0.00 2.00 8.40 0.00 -8.40 ###
NAV (perimetro autcad) 0 silos 2,3,4 3 9.05 0.00 34.60 313.13 0.00 939.39 ###
NAV menos puerta metalica 0 0 -3 4.20 0.00 2.00 8.40 0.00 -25.20 ###
NAV (perimetro autcad) 0 silo 5 1 9.05 0.00 48.60 439.83 0.00 439.83 ###
NAV menos puerta metalica 0 0 -1 4.20 0.00 2.00 8.40 0.00 -8.40 ###
NAV (perimetro autcad) 0 bomba de aire 1 6.40 0.00 13.38 85.63 0.00 85.63 ###
NAV menos puerta 0 0 -2 2.10 0.00 1.00 2.10 0.00 -4.20 ###
NAV 0 0 control de calidad 1 9.05 0.00 19.30 174.67 0.00 174.67 ###
NAV menos puerta 0 0 -2 2.10 0.00 0.75 1.58 0.00 -3.15 ###
NAV menos puerta 0 0 -1 2.10 0.00 1.00 2.10 0.00 -2.10 ###
NAV menos puerta 0 0 -4 2.10 0.00 1.00 2.10 0.00 -8.40 ###
NAV menos puerta 0 0 -6 2.10 0.00 3.50 7.35 0.00 -44.10 ###
NAV (perimetro autcad) 0 laboratorio 1 6.40 0.00 27.65 176.96 0.00 176.96 ###
NAV menos puerta 0 0 -3 2.10 0.00 1.00 2.10 0.00 -6.30 ###
NAV (perimetro autcad) 0 sala de control 1 6.40 0.00 23.34 149.38 0.00 149.38 ###
NAV menos puerta 0 0 -2 2.10 0.00 0.75 1.58 0.00 -3.15 ###
NAV (perimetro autcad) 0 jefatura de produccion 1 6.40 0.00 30.25 193.60 0.00 193.60 ###
44
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
NAV menos puerta 0 0 -2 2.10 0.00 1.00 2.10 0.00 -4.20 ###
NAV menos ventana 0 0 -1 1.50 0.00 4.35 6.52 0.00 -6.52 ###
NAV (perimetro autcad) 0 baños damas y varones 1 0.40 0.00 40.81 16.32 0.00 16.32 ###
NAV 0 0 baños 1 0.40 0.00 7.68 3.07 0.00 3.07 ###
NAV 0 0 pasillo entre baños y vestidores 2 6.40 0.00 3.50 22.40 0.00 44.80 ###
NAV menos puerta 0 0 -2 2.10 0.00 3.50 7.35 0.00 -14.70 ###
NAV (perimetro autcad) 0 vestidores 1 0.40 0.00 59.40 23.76 0.00 23.76 ###
NAV (perimetro autcad) 0 enfermeria 1 4.80 0.00 13.85 66.48 0.00 66.48 ###
NAV menos puerta 0 0 -1 2.10 0.00 1.00 2.10 0.00 -2.10 ###
NAV (perimetro autcad) 0 deposito de reactivos 1 4.80 0.00 24.03 115.32 0.00 115.32 ###
NAV menos puerta metalica 0 0 -1 4.20 0.00 5.00 21.00 0.00 -21.00 ###
NAV 0 0 planta de procesamiento 1 9.05 0.00 196.30 1776.52 0.00 1776.52 ###
NAV 0 0 alm refrigerado 1 4.80 0.00 40.53 194.54 0.00 194.54 ###
NAV 0 0 producto terminado 1 4.80 0.00 73.55 353.04 0.00 353.04 ###
NAV menos puerta metalica 0 0 -11 4.20 0.00 5.00 21.00 0.00 -231.00 ###
NAV 0 0 0 -6 4.20 0.00 4.00 16.80 0.00 -100.80 ###
NAV 0 0 0 -1 4.20 0.00 1.49 6.26 0.00 -6.26 ###
NAV menos puerta 0 0 -16 2.10 0.00 0.60 1.26 0.00 -20.16 ###
NAV 0 0 0 -2 2.10 0.00 1.20 2.52 0.00 -5.04 ###
NAV 0 0 0 -2 2.10 0.00 1.00 2.10 0.00 -4.20 ###
NAV menos ventana 0 0 -28 1.50 0.00 4.80 7.20 0.00 -201.60 ###
ARQ.13 FACHADA DE VIDRIO TEMPLADO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
45
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
NAV 0 0 jefatura de produccion 1 1.50 0.00 4.35 6.52 0.00 6.52 ###
NAV menos puerta metalica 0 0 -1 4.20 0 2.00 8.40 0.00 -8.40 ###
NAV (perimetro autcad) 0 bomba de aire 1 6.40 0 13.38 85.63 0.00 85.63 ###
46
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
NAV (perimetro autcad) 0 laboratorio 1 6.40 0 27.65 176.96 0.00 176.96 ###
NAV (perimetro autcad) 0 sala de control 1 6.40 0 23.34 149.38 0.00 149.38 ###
NAV (perimetro autcad) 0 jefatura de produccion 1 6.40 0 30.25 193.60 0.00 193.60 ###
NAV 0 0 pasillo entre baños y vestidores 2 6.40 0 3.50 22.40 0.00 44.80 ###
NAV (perimetro autcad) 0 vestidores 1 0.40 0 59.40 23.76 0.00 23.76 ###
NAV (perimetro autcad) 0 enfermeria 1 4.80 0 13.85 66.48 0.00 66.48 ###
NAV (perimetro autcad) 0 deposito de reactivos 1 4.80 0 24.03 115.32 0.00 115.32 ###
NAV menos puerta metalica 0 0 -1 4.20 0 5.00 21.00 0.00 -21.00 ###
47
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
NAV vestidores (area de autocad) 0.00 0.00 1 0.40 0.00 57.60 23.04 0.00 23.04 ###
NAV cielo falso (area de autocad 1) 0.00 0.00 1 0.00 0.00 0 51.37 0.00 51.37 ###
NAV baños (area de autocad) 0.00 0.00 2 0.40 0.00 18.88 7.55 0.00 15.10 ###
NAV cielo falso - baños (area de autocad 1) 0.00 0.00 2 0.00 0.00 0 17.60 0.00 35.20 ###
baño parte posterior bloque de 2 pisos (area de
NAV 0 0 1 0.40 0 7.71 3.08 0.00 3.08 ###
autocad)
cielo falso - baño parte posterior bloque de 2
NAV 0 0 1 0.00 0 0 3.71 0.00 3.71 ###
pisos (area de autocad 1)
baño parte posterior bloque de 2 pisos (area de
NAV 0 0 1 0.40 0 7.68 3.07 0.00 3.07 ###
autocad)
cielo falso - baño parte posterior bloque de 2
NAV 0 0 1 0.00 0 0 3.66 0.00 3.66 ###
pisos (area de autocad 1)
ARQ.20 PINTURA EPOXICA m2 0 0 0 0.00 0.00 0.00 0.00 Total = 1276.44
NAV cielo falso (area de autocad 1) 0 area de embasado 1 1 0.00 0.00 402.66 0.00 402.66 ###
NAV muros (perimetro autocad) 0 area de embasado 1 4.8 0.00 98.15 471.12 0.00 471.12 ###
NAV suelo (area de autocad ) 0 area de embasado 1 1.00 0.00 0.00 402.66 0.00 402.66 ###
NAV vestidores (area de autocad) 0.00 0.00 1 2.10 0.00 57.60 120.96 0.00 120.96 ###
48
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
NAV baños (area de autocad) 0.00 0.00 2 2.10 0.00 18.88 39.65 0.00 79.30 ###
NAV baño y vestidores (area de autocad) 0.00 0.00 2 2.10 0.00 28.62 60.10 0.00 120.20 ###
baño parte posterior bloque de 2 pisos (area de
NAV 0 0 1 2.10 0 7.71 16.19 0.00 16.19 ###
autocad)
baño parte posterior bloque de 2 pisos (area de
NAV 0 0 1 2.10 0 7.68 16.13 0.00 16.13 ###
autocad)
NAV menos puertas 0 0 -5 2.10 0 0.90 1.89 0.00 -9.45 ###
NAV (area de autocad) 0 baño varones exterior 1 0 0 0 3.71 0.00 3.71 ###
NAV (area de autocad) 0 baño damas exterior 1 0 0 0 3.66 0.00 3.66 ###
NAV (area de autocad) 0 almacen de producto terminado 1 0 0 0 257.49 0.00 257.49 ###
49
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
ARQ.23 PISO DE PARQUET TAJIBO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
COLOCADO DE PISO DE MADERA LAMINADO
ARQ.24 m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
FLOTANTE
ARQ.25 PUERTA METALICA m2 0 0 0 0.00 0.00 0.00 0.00 Total = 479.47
NAV puertas 0 bloque de procesamiento 21 2.10 0.00 1.00 2.10 0.00 44.10 ###
NAV puertas metalicas 0 materia prima 1 4.20 0.00 2.03 8.53 0.00 8.53 ###
NAV 0 0 serv auxiliares 1 4.20 0.00 4.35 18.27 0.00 18.27 ###
NAV 0 0 producto terminado 1 4.20 0.00 4.00 16.80 0.00 16.80 ###
ARQ.26 PROV Y COLOC DE PUERTA DE CEDRO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 11.13
NAV vestidores y baños 0 0 5 2.10 0.00 0.90 1.89 0.00 9.45 ###
PROV Y COLOCADO PUERTA DE VIDRIO
ARQ.27 m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
TEMPLADO e=10 mm
ARQ.29 PROV Y COLOC DE CHAPA INTERIOR pza 0 0 0 0.00 0.00 0.00 0.00 Total = 28.00
ARQ.32 PROVISIÓN Y COLOCADO INODORO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 10.00
50
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - NAVE INDUSTRIAL
MEDIDAS EN MTS
ARQ.36 PROVISIÓN Y COLOCADO REJILLA DE PISO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 7.00
ARQ.38 PROVISIÓN Y COLOCADO DE LAVANDERIA pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.39 PROVISIÓN Y COLOCADO DE LAVAPLATOS pza 0 0 0 0.00 0.00 0.00 0.00 Total = 1.00
NAV meson (area autocad) 0 baño varones 1 0 0.00 0.00 1.87 0.00 1.87 ###
NAV meson (area autocad) 0 baño damas 1 0 0.00 0.00 2.76 0.00 2.76 ###
NAV mesones (area autocad) 0 laboratorio 1 0 0.00 0.00 8.62 0.00 8.62 ###
NAV mesones (area autocad) 0 deposito de reactivos 1 0 0.00 0.00 7.92 0.00 7.92 ###
51
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - ADMINISTRACION
MEDIDAS EN MTS
52
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - ADMINISTRACION
MEDIDAS EN MTS
ADM 0 0 area de sistemas 1 0.00 0.00 19.57 0.00 0.00 19.57 ###
53
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - ADMINISTRACION
MEDIDAS EN MTS
ADM menos puerta 0 0 -8 0.00 0.00 1.00 0.00 0.00 -8.00 ###
ADM 0 0 0 -2 0.00 0.00 1.20 0.00 0.00 -2.40 ###
ADM 0 0 0 -1 0.00 0.00 0.80 0.00 0.00 -0.80 ###
ADM 0 0 0 -1 0.00 0.00 3.50 0.00 0.00 -3.50 ###
ARQ.8 CIELO FALSO DE YESO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 214.48
vacio sobre recibidor - pasillo e
ADM (area de autocad) 0.00 1 0.00 0.00 0.00 86.83 0.00 86.83 ###
circulacion
ADM (area de autocad) 0.00 area de sistemas 1 0.00 0.00 0.00 24.57 0.00 24.57 ###
ADM (area de autocad) 0.00 archivo 1 0.00 0.00 0.00 25.00 0.00 25.00 ###
ADM (area de autocad) 0.00 reuniones - gerencia - balcon 1 0.00 0.00 0.00 74.57 0.00 74.57 ###
ADM (area de autocad) 0.00 baño 1 0.00 0.00 0.00 3.51 0.00 3.51 ###
ARQ.9 CIELO RASO DE YESO SOBRE LOSA m2 0 0 0 0.00 0.00 0.00 0.00 Total = 144.78
ADM PB (area de autocad) 0 cajero 1 0 0 0 19.80 0.00 19.80 ###
ADM PB (area de autocad) 0 caja 1 0 0 0 27.00 0.00 27.00 ###
ADM PB (area de autocad) 0 contabilidad 1 0 0 0 27.00 0.00 27.00 ###
ADM PB (area de autocad) 0 archivos 1 0 0 0 8.71 0.00 8.71 ###
ADM PB (area de autocad) 0 caja fuerte 1 0 0 0 5.52 0.00 5.52 ###
ADM PB (area de autocad) 0 archivo 2 1 0 0 0 4.87 0.00 4.87 ###
ADM PB (area de autocad) 0 pasillo de circulacion 1 0 0 0 51.88 0.00 51.88 ###
ARQ.10 CIELO FALSO PLACA DE DRY WALL m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.11 REVOQUE CAL-CEMENTO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 361.60
ADM alzado frontal bloque 2 pisos 0 0 1 6.40 0.00 34.35 219.84 0.00 219.84 ###
ADM alzado posterior bloque 2 pisos 0 0 1 6.40 0.00 8.90 56.96 0.00 56.96 ###
ADM 0 0 0 1 6.40 0.00 11.76 75.26 0.00 75.26 ###
ADM alzado lateral izquierda bloque 2 pisos 0 0 1 6.40 0.00 7.05 45.12 0.00 45.12 ###
ADM alzado ateral derecha bloque 2 pisos 0 0 1 6.40 0.00 7.85 50.24 0.00 50.24 ###
ADM menos puertas 0 0 -1 2.10 0.00 3.50 7.35 0.00 -7.35 ###
ADM menos ventana 0 0 -1 5.00 0.00 4.45 22.25 0.00 -22.25 ###
ADM 0 0 0 -1 2.50 0.00 4.45 11.13 0.00 -11.13 ###
ADM 0 0 0 -2 1.90 0.00 1.00 1.90 0.00 -3.80 ###
ADM 0 0 0 -1 1.00 0.00 0.80 0.80 0.00 -0.80 ###
ADM 0 0 0 -2 1.50 0.00 13.50 20.25 0.00 -40.50 ###
ARQ.12 REVOQUE INTERIOR ESTUCO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 652.66
ADM PB (perimetro autocad) 0 archivos 1 2.50 0.00 9.20 23.00 0.00 23.00 ###
ADM 0 0 caja fuerte 1 2.50 0.00 11.17 27.93 0.00 27.93 ###
ADM 0 0 archivos 1 2.50 0.00 8.71 21.78 0.00 21.78 ###
ADM 0 0 pasillo yrecepcion 1 2.50 0.00 85.88 214.70 0.00 214.70 ###
ADM 0 0 contabilidad 1 2.50 0.00 21.80 54.50 0.00 54.50 ###
ADM 0 0 caja 1 2.50 0.00 21.85 54.63 0.00 54.63 ###
ADM menos puertas 0 0 -10 2.10 0.00 1.00 2.10 0.00 -21.00 ###
ADM 0 0 0 -1 2.10 0.00 0.80 1.68 0.00 -1.68 ###
ADM puerta y ventana 0 0 -1 5.00 0.00 3.50 17.50 0.00 -17.50 ###
ADM menos ventana 0 0 -1 1.70 0.00 13.50 22.95 0.00 -22.95 ###
ADM 0 0 0 -1 2.10 0.00 1.00 2.10 0.00 -2.10 ###
ADM 0 0 0 -1 6.20 0.00 4.45 27.59 0.00 -27.59 ###
ADM PA (perimetro autocad) 0 sala de reuniones y of 1 2.50 0.00 54.20 135.50 0.00 135.50 ###
54
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - ADMINISTRACION
MEDIDAS EN MTS
ADM 0 0 area de sistemas 1 2.50 0.00 19.57 48.93 0.00 48.93 ###
ADM alzado frontal 0 0 1 2.10 0.00 0.75 1.58 0.00 1.58 ###
ADM PA norte 0 sobre recepcion 1 2.70 0.00 3.50 9.45 0.00 9.45 ###
ADM PB - PA suroeste 0 lado escaleras 1 5.20 0.00 4.45 23.14 0.00 23.14 ###
ADM PA noreste 0 sala de reuniones 1 1.90 0.00 4.45 8.46 0.00 8.46 ###
55
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - ADMINISTRACION
MEDIDAS EN MTS
ADM PA muros 0 area de sistemas 1 2.50 0 19.57 48.93 0.00 48.93 ###
ADM baño (area de autocad) 0 0 1 0.40 0.00 8.03 3.21 0.00 8.03 ###
ADM cielo falso - baño (area de autocad 1) 0 0 1 0.00 0.00 0.00 3.51 0.00 3.51 ###
ADM baño (area de autocad) 0 0 1 2.10 0.00 8.03 16.86 0.00 8.03 ###
ARQ.23 PISO DE PARQUET TAJIBO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
COLOCADO DE PISO DE MADERA LAMINADO
ARQ.24 m2 0 0 0 0.00 0.00 0.00 0.00 Total = 312.38
FLOTANTE
ADM PB (area de autocad) 0 cajero 1 0 0 0 19.80 0.00 19.80 ###
56
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - ADMINISTRACION
MEDIDAS EN MTS
ARQ.26 PROV Y COLOC DE PUERTA DE CEDRO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 22.89
ADM PB 0 cajas - contabilidad - archivos 4 2.10 0 1.00 2.10 0.00 8.40 ###
ARQ.29 PROV Y COLOC DE CHAPA INTERIOR pza 0 0 0 0.00 0.00 0.00 0.00 Total = 12.00
cajas - contabilidad - archivos -
ADM PB 0 6 0 0 0 0.00 0.00 6.00 ###
pasillo de circulacion
area de sistemas - archivo -
ADM PA 0 6 0 0 0 0.00 0.00 6.00 ###
oficina de gerencia
PROV Y COLOC DE CHAPAS EXTERIORES DE
ARQ.30 pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
DOBLE GOLPE
ARQ.32 PROVISIÓN Y COLOCADO INODORO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 1.00
57
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - ADMINISTRACION
MEDIDAS EN MTS
ARQ.36 PROVISIÓN Y COLOCADO REJILLA DE PISO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 1.00
ARQ.39 PROVISIÓN Y COLOCADO DE LAVAPLATOS pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
58
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - VIVIENDA GERENTE
MEDIDAS EN MTS
GER eje horizontal 0 0 2 2.50 0.00 10.45 26.13 0.00 20.90 ###
GER menos puerta 0 0 -2 2.10 0.00 1.00 2.10 0.00 -2.00 ###
GER menos ventana 0 0 -3 1.40 0.00 3.00 4.20 0.00 -9.00 ###
GER 0 0 0 -1 1.40 0.00 1.40 1.96 0.00 -1.96 ###
GER 0 0 0 -1 1.00 0.00 1.00 1.00 0.00 -1.00 ###
GER eje horizontal 0 parapeto 2 0.80 0.00 11.05 8.84 0.00 17.68 ###
GER eje vertical 0 0 2 0.80 0.00 4.70 3.76 0.00 9.40 ###
GER 0 0 muro retiro 1 0.50 0.00 30.08 15.04 0.00 15.04 ###
ARQ.6 DINTEL DE LADRILLO ARMADO m 0 0 0 0.00 0.00 0.00 0.00 Total = 15.10
GER Ventana 0 norte 1 0.00 0.00 3.00 0.00 0.00 3.00 ###
GER 0 0 norte 1 0.00 0.00 1.00 0.00 0.00 1.00 ###
GER 0 0 sur 1 0.00 0.00 3.00 0.00 0.00 3.00 ###
GER 0 0 elvacion suroeste 1 0.00 0.00 3.00 0.00 0.00 3.00 ###
GER 0 0 noreste 1 0.00 0.00 1.40 0.00 0.00 1.40 ###
GER Puerta 0 ingreso 2 0.00 0.00 1.00 0.00 0.00 2.00 ###
GER 0 0 baño 1 0.00 0.00 0.80 0.00 0.00 0.80 ###
GER 0 0 dormitorio 1 0.00 0.00 0.90 0.00 0.00 0.90 ###
ARQ.7 ZOCALO DE MADERA ROBLE m 0 0 0 0.00 0.00 0.00 0.00 Total = 28.72
GER 0 0 comedor 1 0.00 0.00 25.65 0.00 0.00 25.65 ###
59
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - VIVIENDA GERENTE
MEDIDAS EN MTS
ARQ.10 CIELO FALSO PLACA DE DRY WALL m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.11 REVOQUE CAL-CEMENTO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 129.09
GER alzado frontal - posterior 0 0 2 3.70 0.00 11.05 40.89 0.00 81.77 ###
GER alzados laterales 0 0 2 3.70 0.00 5.00 18.50 0.00 37.00 ###
GER menos puertas 0 0 -2 2.10 0.00 1.00 2.10 0.00 -4.20 ###
GER menos ventanas 0 0 -3 1.40 0.00 3.00 4.20 0.00 -12.60 ###
GER 0 0 0 -1 1.40 0.00 1.40 1.96 0.00 -1.96 ###
GER 0 0 0 -1 1.00 0.00 1.00 1.00 0.00 -1.00 ###
GER 0 0 muro retiro 2 0.50 0.00 30.08 15.04 0.00 30.08 ###
ARQ.12 REVOQUE INTERIOR ESTUCO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 73.71
GER 0 0 comedor 1 2.50 0.00 25.65 64.13 0.00 64.13 ###
GER menos puerta 0 0 -2 2.10 0.00 1.00 2.10 0.00 -4.20 ###
GER menos ventana 0 0 -3 1.60 0.00 3.00 4.80 0.00 -14.40 ###
ARQ.13 FACHADA DE VIDRIO TEMPLADO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
60
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - VIVIENDA GERENTE
MEDIDAS EN MTS
ARQ.18 PINTURA EXTERIOR LATEX m2 0 0 0 0.00 0.00 0.00 0.00 Total = 99.01
GER alzado frontal - posterior 0 0 2 3.70 0.00 11.05 40.89 0.00 81.77 ###
GER alzados laterales 0 0 2 3.70 0.00 5.00 18.50 0.00 37.00 ###
GER menos puertas 0 0 -2 2.10 0.00 1.00 2.10 0.00 -4.20 ###
GER menos ventanas 0 0 -3 1.40 0.00 3.00 4.20 0.00 -12.60 ###
GER 0 0 0 -1 1.40 0.00 1.40 1.96 0.00 -1.96 ###
GER 0 0 0 -1 1.00 0.00 1.00 1.00 0.00 -1.00 ###
ARQ.19 PINTURA AL OLEO SOBRE MUROS m2 0 0 0 0.00 0.00 0.00 0.00 Total = 7.64
GER cielo falso - baño (area de autocad 1) 0 0 1 0 0 0 4.20 0.00 4.20 ###
ARQ.23 PISO DE PARQUET TAJIBO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 38.83
ARQ.26 PROV Y COLOC DE PUERTA DE CEDRO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 7.77
ARQ.29 PROV Y COLOC DE CHAPA INTERIOR pza 0 0 0 0.00 0.00 0.00 0.00 Total = 2.00
61
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - VIVIENDA GERENTE
MEDIDAS EN MTS
ARQ.32 PROVISIÓN Y COLOCADO INODORO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 1.00
ARQ.36 PROVISIÓN Y COLOCADO REJILLA DE PISO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 1.00
ARQ.39 PROVISIÓN Y COLOCADO DE LAVAPLATOS pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
62
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - PORTERIA Y CONTROL
MEDIDAS EN MTS
63
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - PORTERIA Y CONTROL
MEDIDAS EN MTS
ARQ.8 CIELO FALSO DE YESO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 54.01
POR (area de autocad 1) 0 comedor - cocineta 1 0 0 0 24.91 0.00 24.91 ###
POR (area de autocad 2) 0 control 1 0 0 0 8.93 0.00 8.93 ###
POR (area de autocad 3) 0 baño 1 1 0 0 0 4.20 0.00 4.20 ###
POR (area de autocad 4) 0 baño 2 1 0 0 0 7.53 0.00 7.53 ###
POR (area de autocad 5) 0 dormitorio 1 0 0 0 8.44 0.00 8.44 ###
ARQ.9 CIELO RASO DE YESO SOBRE LOSA m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.10 CIELO FALSO PLACA DE DRY WALL m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.11 REVOQUE CAL-CEMENTO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 138.06
POR alzado frontal 0 0 1 3.70 0.00 14.74 54.54 0.00 54.54 ###
POR alzado posterior 0 0 1 3.70 0.00 19.64 72.67 0.00 72.67 ###
POR alzado lateral izquierda 0 0 1 3.70 0.00 2.85 10.55 0.00 10.55 ###
POR alzado ateral derecha 0 0 1 3.70 0.00 3.45 12.77 0.00 12.77 ###
POR menos puertas 0 0 -3 2.10 0.00 1.00 2.10 0.00 -6.30 ###
POR menos ventanas 0 0 -1 1.37 0.00 1.25 1.71 0.00 -1.71 ###
POR 0 0 0 -1 1.40 0.00 2.00 2.80 0.00 -2.80 ###
POR 0 0 0 -1 0.80 0.00 0.80 0.64 0.00 -0.64 ###
POR 0 0 0 -1 1.00 0.00 1.00 1.00 0.00 -1.00 ###
ARQ.12 REVOQUE INTERIOR ESTUCO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 107.16
POR (perimetro autocad) 0 control 1 2.50 0.00 12.20 30.50 0.00 30.50 ###
POR menos puerta 0 0 -1 2.10 0.00 1.00 2.10 0.00 -2.10 ###
POR menos ventana 0 0 -1 1.00 0.00 0.80 0.80 0.00 -0.80 ###
POR (perimetro autocad) 0 comedor 1 2.50 0.00 20.70 51.75 0.00 51.75 ###
POR menos puerta 0 0 -1 2.10 0.00 1.00 2.10 0.00 -2.10 ###
POR 0 0 0 -1 2.10 0.00 0.90 1.89 0.00 -1.89 ###
POR 0 0 0 -1 2.10 0.00 0.80 1.68 0.00 -1.68 ###
POR menos ventana 0 0 -1 1.60 0.00 2.00 3.20 0.00 -3.20 ###
POR (perimetro autocad) 0 baño 1 0.40 0.00 8.65 3.46 0.00 3.46 ###
POR (perimetro autocad) 0 dormitotio 1 2.50 0.00 12.95 32.38 0.00 32.38 ###
POR menos puerta 0 0 -1 2.10 0.00 0.90 1.89 0.00 -1.89 ###
POR menos ventana 0 0 -1 1.39 0.00 1.25 1.74 0.00 -1.74 ###
POR (perimetro autocad) 0 baño externo 1 0.40 0.00 11.18 4.47 0.00 4.47 ###
ARQ.13 FACHADA DE VIDRIO TEMPLADO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
64
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - PORTERIA Y CONTROL
MEDIDAS EN MTS
POR baño 1 0.00 0.00 1 0.40 0.00 8.60 3.44 0.00 3.44 ###
POR cielo falso - baño (area de autocad 1) 0.00 0.00 1 0.00 0.00 0.00 4.20 0.00 4.20 ###
POR baño 2 0.00 0.00 1 0.40 0.00 11.08 4.43 0.00 4.43 ###
POR cielo falso - baño (area de autocad 2) 0.00 0.00 1 0.00 0.00 0.00 7.53 0.00 7.53 ###
65
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - PORTERIA Y CONTROL
MEDIDAS EN MTS
ARQ.23 PISO DE PARQUET TAJIBO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 35.17
ARQ.26 PROV Y COLOC DE PUERTA DE CEDRO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 9.87
ARQ.29 PROV Y COLOC DE CHAPA INTERIOR pza 0 0 0 0.00 0.00 0.00 0.00 Total = 2.00
ARQ.32 PROVISIÓN Y COLOCADO INODORO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 2.00
ARQ.36 PROVISIÓN Y COLOCADO REJILLA DE PISO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 2.00
66
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - PORTERIA Y CONTROL
MEDIDAS EN MTS
ARQ.39 PROVISIÓN Y COLOCADO DE LAVAPLATOS pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
67
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA -VIVIENDA PERSONAL
MEDIDAS EN MTS
68
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA -VIVIENDA PERSONAL
MEDIDAS EN MTS
PER menos ventanas 0 0 -4.0 1.4 0.0 0.8 1.12 0.00 -4.48 ###
PER 0 0 0 -2.0 0.8 0.0 0.8 0.64 0.00 -1.28 ###
PER 0 0 0 -4.0 1.4 0.0 0.8 1.12 0.00 -4.48 ###
PER 0 0 0 -2.0 1.4 0.0 1.3 1.82 0.00 -3.64 ###
PER 0 0 muro retiro 2 0.50 0.00 63.37 31.69 0.00 63.37 ###
ARQ.12 REVOQUE INTERIOR ESTUCO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 195.96
PER 0 0 dormitorio doble 4 2.50 0.00 17.40 43.50 0.00 174.00 ###
69
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA -VIVIENDA PERSONAL
MEDIDAS EN MTS
PER cielo falso - baño (area de autocad 1) 0 0 2 0 0 0 3.75 0.00 7.50 ###
ARQ.23 PISO DE PARQUET TAJIBO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 67.46
ARQ.26 PROV Y COLOC DE PUERTA DE CEDRO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 14.70
PER 0.00 0.00 0.00 6 2.10 0.00 0.90 1.89 0.00 11.34 ###
PER 0.00 0.00 0.00 2 2.10 0.00 0.80 1.68 0.00 3.36 ###
PROV Y COLOCADO PUERTA DE VIDRIO
ARQ.27 m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
TEMPLADO e=10 mm
ARQ.29 PROV Y COLOC DE CHAPA INTERIOR pza 0 0 0 0.00 0.00 0.00 0.00 Total = 6.00
ARQ.32 PROVISIÓN Y COLOCADO INODORO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 2.00
70
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA -VIVIENDA PERSONAL
MEDIDAS EN MTS
ARQ.36 PROVISIÓN Y COLOCADO REJILLA DE PISO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 2.00
ARQ.39 PROVISIÓN Y COLOCADO DE LAVAPLATOS pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
71
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - GUARDERIA
MEDIDAS EN MTS
72
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - GUARDERIA
MEDIDAS EN MTS
73
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - GUARDERIA
MEDIDAS EN MTS
GUAR menos puerta 0 0 -8 0.00 0.00 0.75 0.00 0.00 -6.00 ###
GUAR 0 0 0 -4 0.00 0.00 1.00 0.00 0.00 -4.00 ###
GUAR 0 0 0 -4 0.00 0.00 0.85 0.00 0.00 -3.40 ###
GUAR 0 0 0 -2 0.00 0.00 0.90 0.00 0.00 -1.80 ###
ARQ.8 CIELO FALSO DE YESO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 166.10
GUAR (area de autocad) 0 guarderia sala 1 1 0.00 0.00 0.00 37.45 0.00 37.45 ###
GUAR (area de autocad) 0 guarderia sala 2 1 0.00 0.00 0.00 42.22 0.00 42.22 ###
GUAR (area de autocad) 0 oficina 1 0.00 0.00 0.00 9.62 0.00 9.62 ###
GUAR (area de autocad) 0 deposito 1 0.00 0.00 0.00 4.80 0.00 4.80 ###
GUAR (area de autocad 0 baño damas 1 0.00 0.00 0.00 11.11 0.00 11.11 ###
GUAR (area de autocad 0 baño varones 1 0.00 0.00 0.00 11.11 0.00 11.11 ###
GUAR (area de autocad 1) 0 control 1 0 0 0 8.92 0.00 8.92 ###
GUAR (area de autocad) 0 pasillo de circulacion 1 0.00 0.00 0.00 40.87 0.00 40.87 ###
ARQ.9 CIELO RASO DE YESO SOBRE LOSA m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.10 CIELO FALSO PLACA DE DRY WALL m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.11 REVOQUE CAL-CEMENTO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 215.31
GUAR alzado frontal 0 0 1 3.70 0.00 23.57 87.21 0.00 87.21 ###
GUAR alzado posterior 0 0 1 3.70 0.00 21.72 80.36 0.00 80.36 ###
GUAR alzado lateral izquierda 0 0 1 3.70 0.00 7.10 26.27 0.00 26.27 ###
GUAR alzado ateral derecha 0 0 1 3.70 0.00 15.26 56.46 0.00 56.46 ###
GUAR menos puertas 0 0 -2 2.10 0.00 1.70 3.57 0.00 -7.14 ###
GUAR menos ventanas alzado frontal 0 0 -2 0.90 0.00 1.50 1.35 0.00 -2.70 ###
GUAR 0 0 0 -4 1.90 0.00 0.50 0.95 0.00 -3.80 ###
GUAR 0 0 0 -1 0.60 0.00 5.65 3.39 0.00 -3.39 ###
GUAR alzado lateral izquierda 0 0 -1 0.50 0.00 0.50 0.25 0.00 -0.25 ###
GUAR 0 0 0 -1 1.00 0.00 0.25 0.25 0.00 -0.25 ###
GUAR 0 0 0 -1 0.25 0.00 2.50 0.63 0.00 -0.63 ###
GUAR 0 0 0 -1 0.75 0.00 2.25 1.69 0.00 -1.69 ###
GUAR 0 0 0 -1 1.75 0.00 1.00 1.75 0.00 -1.75 ###
GUAR 0 0 0 -1 1.75 0.00 0.45 0.79 0.00 -0.79 ###
GUAR alzado posterior 0 0 -1 0.25 0.00 4.00 1.00 0.00 -1.00 ###
GUAR 0 0 0 -1 0.50 0.00 0.50 0.25 0.00 -0.25 ###
GUAR 0 0 0 -1 0.25 0.00 0.50 0.13 0.00 -0.13 ###
GUAR 0 0 0 -1 1.20 0.00 0.50 0.60 0.00 -0.60 ###
GUAR 0 0 0 -1 1.20 0.00 0.75 0.90 0.00 -0.90 ###
GUAR 0 0 0 -1 1.00 0.00 0.45 0.45 0.00 -0.45 ###
GUAR 0 0 0 -1 1.50 0.00 0.50 0.75 0.00 -0.75 ###
GUAR 0 0 0 -1 0.50 0.00 1.00 0.50 0.00 -0.50 ###
GUAR 0 0 0 -1 0.50 0.00 1.95 0.98 0.00 -0.98 ###
GUAR 0 0 0 -1 0.25 0.00 2.75 0.69 0.00 -0.69 ###
GUAR 0 0 0 -1 0.50 0.00 0.50 0.25 0.00 -0.25 ###
GUAR 0 0 0 -1 0.50 0.00 1.00 0.50 0.00 -0.50 ###
GUAR alzado lateral derecho 0 0 -1 1.75 0.00 0.25 0.44 0.00 -0.44 ###
GUAR 0 0 0 -1 0.50 0.00 0.75 0.38 0.00 -0.38 ###
GUAR 0 0 0 -1 0.50 0.00 2.00 1.00 0.00 -1.00 ###
GUAR 0 0 0 -1 0.50 0.00 0.50 0.25 0.00 -0.25 ###
GUAR 0 0 0 -1 0.50 0.00 3.00 1.50 0.00 -1.50 ###
GUAR 0 0 0 -1 1.00 0.00 0.50 0.50 0.00 -0.50 ###
74
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - GUARDERIA
MEDIDAS EN MTS
75
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - GUARDERIA
MEDIDAS EN MTS
76
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - GUARDERIA
MEDIDAS EN MTS
77
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - GUARDERIA
MEDIDAS EN MTS
GUAR cielo falso - baño varones (area de autocad 1) 0 0 1 0.00 0 0 11.11 0.00 11.11 ###
GUAR cielo falso - baño damas (area de autocad 1) 0 0 1 0 0 0 11.11 0.00 11.11 ###
ARQ.23 PISO DE PARQUET TAJIBO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
COLOCADO DE PISO DE MADERA LAMINADO
ARQ.24 m2 0 0 0 0.00 0.00 0.00 0.00 Total = 143.88
FLOTANTE
GUAR (area de autocad) 0 guarderia sala 1 1 0.00 0.00 0.00 37.45 0.00 37.45 ###
GUAR (area de autocad) 0 guarderia sala 2 1 0.00 0.00 0.00 42.22 0.00 42.22 ###
GUAR (area de autocad) 0 oficina 1 0.00 0.00 0.00 9.62 0.00 9.62 ###
GUAR (area de autocad) 0 deposito 1 0.00 0.00 0.00 4.80 0.00 4.80 ###
GUAR (area de autocad 1) 0 control 1 0 0 0 8.92 0.00 8.92 ###
GUAR (area de autocad) 0 pasillo de circulacion 1 0.00 0.00 0.00 40.87 0.00 40.87 ###
ARQ.25 PUERTA METALICA m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.26 PROV Y COLOC DE PUERTA DE CEDRO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 7.98
ARQ.29 PROV Y COLOC DE CHAPA INTERIOR pza 0 0 0 0.00 0.00 0.00 0.00 Total = 4.00
78
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - GUARDERIA
MEDIDAS EN MTS
ARQ.32 PROVISIÓN Y COLOCADO INODORO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 4.00
ARQ.38 PROVISIÓN Y COLOCADO DE LAVANDERIA pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.39 PROVISIÓN Y COLOCADO DE LAVAPLATOS pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
GUAR meson 1 (area autocad) 0 baño varones 1 0 0 0 0.87 0.00 0.87 ###
GUAR meson 1 (area autocad) 0 baño damas 1 0 0 0 1.80 0.00 1.80 ###
79
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - COMEDOR Y SALA DE REUNIONES
MEDIDAS EN MTS
COC 0 0 area lavado 1 2.50 0.00 1.30 3.25 0.00 3.25 ###
COC 0 0 bano cocina 1 2.50 0.00 6.06 15.15 0.00 15.15 ###
80
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - COMEDOR Y SALA DE REUNIONES
MEDIDAS EN MTS
COC Ventana 0 norte 1 0.00 0.00 1.15 0.00 0.00 1.15 ###
COC 0 0 norte 1 0.00 0.00 2.00 0.00 0.00 2.00 ###
COC 0 0 norte 1 0.00 0.00 6.55 0.00 0.00 6.55 ###
COC 0 0 sur 1 0.00 0.00 6.55 0.00 0.00 6.55 ###
COC 0 0 este 2 0.00 0.00 1.96 0.00 0.00 3.92 ###
COC Puerta 0 ingreso comedor 3 0.00 0.00 2.00 0.00 0.00 6.00 ###
COC 0 0 ingreso banos 1 0.00 0.00 1.00 0.00 0.00 1.00 ###
COC 0 0 baños 2 0.00 0.00 0.90 0.00 0.00 1.80 ###
COC 0 0 ingreso cocina 1 0.00 0.00 2.00 0.00 0.00 2.00 ###
COC 0 0 congelador 1 0.00 0.00 0.90 0.00 0.00 0.90 ###
ARQ.7 ZOCALO DE MADERA ROBLE m 0 0 0 0.00 0.00 0.00 0.00 Total = 49.60
COC 0 0 comedor 1 0.00 0.00 53.60 0.00 0.00 53.60 ###
COC menos puerta 0 0 -6 0.00 0.00 1.00 0.00 0.00 -6.00 ###
ARQ.8 CIELO FALSO DE YESO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 346.36
COC (area de autocad 1) 0.00 exteriores 4 0.00 0.00 0.00 3.92 0.00 15.68 ###
COC (area de autocad 2) 0.00 comedor 1 0.00 0.00 0.00 201.70 0.00 201.70 ###
COC (area de autocad 3) 0.00 cocina 1 0.00 0.00 0.00 99.44 0.00 99.44 ###
COC (area de autocad 4) 0.00 congelador 1 0.00 0.00 0.00 3.37 0.00 3.37 ###
COC (area de autocad 5) 0.00 baño damas 1 0.00 0.00 0.00 5.26 0.00 5.26 ###
COC (area de autocad 6) 0.00 baño varones 1 0.00 0.00 0.00 5.78 0.00 5.78 ###
COC (area de autocad 7) 0.00 lavamanos 1 0.00 0.00 0.00 15.13 0.00 15.13 ###
ARQ.9 CIELO RASO DE YESO SOBRE LOSA m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.10 CIELO FALSO PLACA DE DRY WALL m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
ARQ.11 REVOQUE CAL-CEMENTO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 306.85
COC alzado frontal 0 0 1 3.70 0.00 35.07 129.76 0.00 129.76 ###
COC alzado posterior 0 0 1 3.70 0.00 24.70 91.39 0.00 91.39 ###
COC alzado lateral izquierda 0 0 1 3.70 0.00 23.40 86.58 0.00 86.58 ###
COC alzado ateral derecha 0 0 1 3.70 0.00 11.90 44.03 0.00 44.03 ###
COC menos puertas 0 0 -8 2.10 0.00 1.00 2.10 0.00 -16.80 ###
COC 0 0 0 -1 2.10 0.00 1.00 2.10 0.00 -2.10 ###
COC menos ventanas 0 0 -2 1.50 0.00 6.55 9.83 0.00 -19.65 ###
COC 0 0 0 -2 0.90 0.00 1.96 1.76 0.00 -3.53 ###
COC 0 0 0 -1 0.90 0.00 2.00 1.80 0.00 -1.80 ###
COC 0 0 0 -1 0.90 0.00 1.15 1.04 0.00 -1.04 ###
ARQ.12 REVOQUE INTERIOR ESTUCO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 138.77
COC 0 0 congelador 1 0.40 0.00 7.90 3.16 0.00 3.16 ###
COC 0 0 baño varones 1 0.40 0.00 10.92 4.37 0.00 4.37 ###
COC 0 0 baño damas 1 0.40 0.00 9.51 3.80 0.00 3.80 ###
COC menos puerta 0 0 -6 2.10 0.00 1.00 2.10 0.00 -12.60 ###
COC menos ventana 0 0 -2 1.70 0.00 6.55 11.14 0.00 -22.27 ###
81
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - COMEDOR Y SALA DE REUNIONES
MEDIDAS EN MTS
ARQ.13 FACHADA DE VIDRIO TEMPLADO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
COC 0 0 baño varones 1 1.10 0.00 1.15 1.27 0.00 1.27 ###
COC 0 0 baño varones 1 1.10 0.00 1.15 1.27 0.00 1.27 ###
ARQ.18 PINTURA EXTERIOR LATEX m2 0 0 0 0.00 0.00 0.00 0.00 Total = 306.85
COC alzado frontal 0 0 1 3.70 0.00 35.07 129.76 0.00 129.76 ###
COC alzado posterior 0 0 1 3.70 0.00 24.70 91.39 0.00 91.39 ###
COC alzado lateral izquierda 0 0 1 3.70 0.00 23.40 86.58 0.00 86.58 ###
COC alzado ateral derecha 0 0 1 3.70 0.00 11.90 44.03 0.00 44.03 ###
COC menos puertas 0 0 -8 2.10 0.00 1.00 2.10 0.00 -16.80 ###
COC 0 0 0 -1 2.10 0.00 1.00 2.10 0.00 -2.10 ###
COC menos ventanas 0 0 -2 1.50 0.00 6.55 9.83 0.00 -19.65 ###
COC 0 0 0 -2 0.90 0.00 1.96 1.76 0.00 -3.53 ###
COC 0 0 0 -1 0.90 0.00 2.00 1.80 0.00 -1.80 ###
COC 0 0 0 -1 0.90 0.00 1.15 1.04 0.00 -1.04 ###
ARQ.19 PINTURA AL OLEO SOBRE MUROS m2 0 0 0 0.00 0.00 0.00 0.00 Total = 457.93
82
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - COMEDOR Y SALA DE REUNIONES
MEDIDAS EN MTS
COC muro intermedio cocina 0 0 1 0.40 0.00 11.00 4.40 0.00 4.40 ###
COC cielo falso - comedor y cocina (area de autocad) 0 0 1 0.00 0.00 0.00 301.15 0.00 301.15 ###
COC cielo falso - congelador (area de autocad) 0 0 1 0.00 0.00 0.00 3.37 0.00 3.37 ###
COC baño damas 0 0 1 0.40 0.00 10.95 4.38 0.00 4.38 ###
COC cielo falso - baño damas (area de autocad) 0 0 1 0.00 0.00 0.00 7.05 0.00 7.05 ###
COC baño varones 0 0 1 0.40 0.00 8.54 3.42 0.00 3.42 ###
COC cielo falso - baño varones (area de autocad) 0 0 1 0.00 0.00 0.00 5.11 0.00 5.11 ###
COC ingreso a baños 0 0 1 0.40 0.00 3.19 1.28 0.00 1.28 ###
COC cielo falso - ingreso a baños (area de autocad) 0 0 1 0.00 0.00 0.00 1.17 0.00 1.17 ###
COC cielo falso - lavamanos (area de autocad) 0 0 1 0.00 0.00 0.00 15.13 0.00 15.13 ###
COC menos puertas 0 0 -6 1.60 0.00 1.00 1.60 0.00 -9.60 ###
COC menos ventanas 0 0 -2 1.50 0.00 6.55 9.83 0.00 -13.10 ###
COC baño damas 0 0 1 2.10 0.00 10.95 23.00 0.00 23.00 ###
COC baño varones 0 0 1 2.10 0.00 8.54 17.93 0.00 17.93 ###
COC ingreso a baños 0 0 1 2.10 0.00 3.19 6.70 0.00 6.70 ###
COC menos puertas 0 0 -6 0.50 0.00 1.00 0.50 0.00 -3.00 ###
COC (area de autocad 2) 0.00 refrigerador 1 0.00 0.00 0.00 3.37 0.00 3.37 ###
COC (area de autocad 3) 0.00 baño damas 1 0.00 0.00 0.00 7.05 0.00 7.05 ###
COC (area de autocad 4) 0.00 baño varones 1 0.00 0.00 0.00 5.11 0.00 5.11 ###
COC (area de autocad 5) 0.00 ingeso a banos 1 0.00 0.00 0.00 1.17 0.00 1.17 ###
83
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - COMEDOR Y SALA DE REUNIONES
MEDIDAS EN MTS
COC (area de autocad 5) 0.00 lavamanos 1 0.00 0.00 0.00 15.13 0.00 15.13 ###
ARQ.23 PISO DE PARQUET TAJIBO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
COLOCADO DE PISO DE MADERA LAMINADO
ARQ.24 m2 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
FLOTANTE
ARQ.25 PUERTA METALICA m2 0 0 0 0.00 0.00 0.00 0.00 Total = 1.89
ARQ.26 PROV Y COLOC DE PUERTA DE CEDRO m2 0 0 0 0.00 0.00 0.00 0.00 Total = 5.88
COC baño damas - varones 0 0 2 2.10 0.00 0.90 1.89 0.00 3.78 ###
ARQ.29 PROV Y COLOC DE CHAPA INTERIOR pza 0 0 0 0.00 0.00 0.00 0.00 Total = 4.00
baño damas - varones -
COC 0 0 4 0 0 0 0.00 0.00 4.00 ###
lavamanos - refrigerador
PROV Y COLOC DE CHAPAS EXTERIORES DE
ARQ.30 pza 0 0 0 0.00 0.00 0.00 0.00 Total = 0.00
DOBLE GOLPE
ARQ.32 PROVISIÓN Y COLOCADO INODORO pza 0 0 0 0.00 0.00 0.00 0.00 Total = 2.00
84
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA - COMEDOR Y SALA DE REUNIONES
MEDIDAS EN MTS
ARQ.39 PROVISIÓN Y COLOCADO DE LAVAPLATOS pza 0 0 0 0.00 0.00 0.00 0.00 Total = 1.00
COC meson 1 (area autocad) 0 cocina 1 0 0.00 0.00 4.65 0.00 4.65 ###
COC meson 2 (area autocad) 0 cocina 1 0 0.00 0.00 3.98 0.00 3.98 ###
COC meson (area autocad) 0 area lavado 1 0 0.00 0.00 7.01 0.00 7.01 ###
COC meson 3 (area autocad) 0 division cocina comedor 1 0 0.00 0.00 6.47 0.00 6.47 ###
COC meson (area autocad) 0 baño varones 1 0 0 0 0.47 0.00 0.47 ###
COC meson (area autocad) 0 baño damas 1 0 0 0 0.66 0.00 0.66 ###
85
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CANTIDADES
CANTIDADE
N° POTABLE SANITARIO
DRENAJE
PLUVIAL S TOTALES
(POT) (SAN)
(PLUV)
HSAN.1 45.61 0.00 0.00 45.61
HSAN.2 140.28 0.00 0.00 140.28
HSAN.3 323.02 0.00 0.00 323.02
HSAN.4 185.00 0.00 0.00 185.00
HSAN.5 101.54 0.00 0.00 101.54
HSAN.6 38.01 0.00 0.00 38.01
HSAN.7 54.70 0.00 0.00 54.70
HSAN.8 3.50 0.00 0.00 3.50
HSAN.9 161.12 0.00 0.00 161.12
HSAN.10 2.00 0.00 0.00 2.00
HSAN.11 2.00 0.00 0.00 2.00
HSAN.12 1.00 0.00 0.00 1.00
HSAN.13 3.00 0.00 0.00 3.00
HSAN.14 4.00 0.00 0.00 4.00
HSAN.15 2.00 0.00 0.00 2.00
HSAN.16 2.00 0.00 0.00 2.00
HSAN.17 2.00 0.00 0.00 2.00
HSAN.18 4.00 0.00 0.00 4.00
HSAN.19 0.00 53.30 0.00 53.30
HSAN.20 0.00 30.10 0.00 30.10
HSAN.21 0.00 168.06 0.00 168.06
HSAN.22 0.00 686.01 372.29 1,058.30
HSAN.23 0.00 0.00 344.58 344.58
HSAN.24 0.00 0.00 222.11 222.11
HSAN.25 0.00 0.00 79.31 79.31
HSAN.26 0.00 19.00 7.00 26.00
HSAN.27 0.00 11.00 14.00 25.00
HSAN.28 0.00 2.00 10.00 12.00
HSAN.29 0.00 19.00 0.00 19.00
HSAN.30 0.00 0.00 31.00 31.00
HSAN.31 0.00 87.94 0.00 87.94
HSAN.32 0.00 0.00 9.00 9.00
HSAN.33 0.00 0.00 398.97 398.97
HSAN.34 0.00 0.00 15.18 15.18
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CANTIDADES
CANTIDADE
N° POTABLE SANITARIO
DRENAJE
PLUVIAL S TOTALES
(POT) (SAN)
(PLUV)
HSAN.35 0.00 0.00 29.35 29.35
HSAN.36 0.00 0.00 411.01 411.01
HSAN.37 0.00 1.00 0.00 1.00
HSAN.38 0.00 1.00 0.00 1.00
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
PRECIO TOTAL
N°
[Bs]
PRECIO TOTAL
N°
[Bs]
MEDIDAS EN MTS
N° DESCRIPCIÓN Unidad Ubicación N° A B C D=BxC E=AxD PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.1 m Total = 45.61
POTABLE PVC 1/2” E-40
POT 1.00 45.61 45.61 ###
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.2 m Total = 140.28
POTABLE PVC 3/4” E-40
POT 1.00 140.28 140.28 ###
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.3 m Total = 323.02
POTABLE PVC 1” E-40
POT 1.00 323.02 323.02 ###
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.4 m Total = 185.00
POTABLE PVC 1 1/2” E-40
POT 1.00 185.00 185.00 ###
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.5 m Total = 101.54
POTABLE PVC 2” E-40
POT 1.00 101.54 101.54 ###
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.6 m Total = 38.01
POTABLE PVC 2 1/2” E-40
POT 1.00 38.01 38.01
HSAN.7 TUBERIA AGUA POTABLE FG 3/4" m Total = 54.70
POT 1.00 54.70 54.70 ###
HSAN.8 TUBERIA AGUA POTABLE FG 1" m Total = 3.50
POT 1.00 3.50 3.50 ###
HSAN.9 TUBERIA AGUA POTABLE FG 3" m Total = 161.12
POT 1.00 161.12 161.12 ###
HSAN.10 TANQUE PREFABRICADO DE 5000 LT pza Total = 2.00
POT 2.00 2.00 ###
HSAN.11 TANQUE CISTERNA DE 72 M3 pza Total = 2.00
POT 2.00 2.00 ###
HSAN.12 TANQUE CISTERNA DE 10 M3 pza Total = 1.00
POT 1.00 1.00 ###
HSAN.13 TANQUE HIDROCELE 86 GL pza Total = 3.00
POT 3.00 3.00 ###
HSAN.14 BOMBA DE AGUA 0,5HP pza Total = 4.00
POT 4.00 4.00 ###
HSAN.15 BOMBA DE AGUA 3HP pza Total = 2.00
POT 2.00 2.00 ###
HSAN.16 BOMBA DE AGUA 4HP pza Total = 2.00
POT 2.00 2.00 ###
HSAN.17 BOMBA DE AGUA 20 HP pza Total = 2.00
POT 2.00 2.00 ###
HSAN.18 HIDRANTES pza Total = 4.00
POT 4.00 4.00 ###
HSAN.19 TUBERIA PVC 1 1/2" C9 m Total = 0.00
HSAN.20 TUBERIA PVC 2" C9 m Total = 0.00
HSAN.21 TUBERIA PVC 3" C9 m Total = 0.00
HSAN.22 TUBERIA PVC 4" C9 m Total = 0.00
HSAN.23 TUBERIA PVC 6" C9 m Total = 0.00
HSAN.24 TUBERIA PVC 8" C9 m Total = 0.00
HSAN.25 TUBERIA PVC 10" C9 m Total = 0.00
HSAN.26 CAMARAS DE INSPECCIÓN DE 60 x 60 pza Total = 0.00
HSAN.27 CAMARAS DE INSPECCIÓN DE 100 x 100 pza Total = 0.00
HSAN.28 CAMARAS DE INSPECCIÓN CIRCULAR D=1,20 M pza Total = 0.00
HSAN.29 CAMARAS DE REGISTRO SANITARIO pza Total = 0.00
92
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
N° DESCRIPCIÓN Unidad Ubicación N° A B C D=BxC E=AxD PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
HSAN.30 CAMARAS DE REGISTRO PLUVIAL pza Total = 0.00
HSAN.31 SUMIDEROS DE PISO m Total = 0.00
HSAN.32 BOCA DE TORMENTA pza Total = 0.00
HSAN.33 CUNETA H 0,15 m Total = 0.00
HSAN.34 CUNETA H 0,18 m Total = 0.00
HSAN.35 CUNETA H 0,22 m Total = 0.00
HSAN.36 CANALETA CORTE 45 m Total = 0.00
HSAN.37 TANQUE SEPTICO-POZO ABSORVENTE pza Total = 0.00
HSAN.38 POZO DE AGUA Gbl Total = 0.00
HSAN.39 PRUEBA HIDRAULICA Y DESINFECCION m Total = 1052.78
POT POTABLE ml 1.00 1052.78 1052.78 ###
POT 0.00 ###
POT 0.00
HSAN.40 PRUEBA HIDRAULICA SANITARIO Y PLUVIAL m Total = 0.00
HSAN.41 HIPOCLORADOR CON DOSIFICADOR VENTURI gbl Total = 1.00
POT 1.00 1.00
93
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
N° DESCRIPCIÓN Unidad Ubicación N° A B C D=BxC E=AxD PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.1 m Total = 0.00
POTABLE PVC 1/2” E-40
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.2 m Total = 0.00
POTABLE PVC 3/4” E-40
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.3 m Total = 0.00
POTABLE PVC 1” E-40
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.4 m Total = 0.00
POTABLE PVC 1 1/2” E-40
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.5 m Total = 0.00
POTABLE PVC 2” E-40
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.6 m Total = 0.00
POTABLE PVC 2 1/2” E-40
HSAN.7 TUBERIA AGUA POTABLE FG 3/4" m Total = 0.00
HSAN.8 TUBERIA AGUA POTABLE FG 1" m Total = 0.00
HSAN.9 TUBERIA AGUA POTABLE FG 3" m Total = 0.00
HSAN.10 TANQUE PREFABRICADO DE 5000 LT pza Total = 0.00
HSAN.11 TANQUE CISTERNA DE 72 M3 pza Total = 0.00
HSAN.12 TANQUE CISTERNA DE 10 M3 pza Total = 0.00
HSAN.13 TANQUE HIDROCELE 86 GL pza Total = 0.00
HSAN.14 BOMBA DE AGUA 0,5HP pza Total = 0.00
HSAN.15 BOMBA DE AGUA 3HP pza Total = 0.00
HSAN.16 BOMBA DE AGUA 4HP pza Total = 0.00
HSAN.17 BOMBA DE AGUA 20 HP pza Total = 0.00
HSAN.18 HIDRANTES pza Total = 0.00
HSAN.19 TUBERIA PVC 1 1/2" C9 m Total = 53.30
SAN SANIATRIO 1.00 53.30 53.30 ###
HSAN.20 TUBERIA PVC 2" C9 m Total = 30.10
SAN SANIATRIO 1.00 30.10 30.10
HSAN.21 TUBERIA PVC 3" C9 m Total = 168.06
SAN SANIATRIO 1.00 95.80 95.80 ###
SAN VENTILACION 1.00 72.26 72.26 ###
HSAN.22 TUBERIA PVC 4" C9 m Total = 686.01
SAN SANIATRIO 1.00 686.01 686.01 ###
HSAN.23 TUBERIA PVC 6" C9 m Total = 0.00
HSAN.24 TUBERIA PVC 8" C9 m Total = 0.00
HSAN.25 TUBERIA PVC 10" C9 m Total = 0.00
HSAN.26 CAMARAS DE INSPECCIÓN DE 60 x 60 pza Total = 19.00
SAN SANIATRIO 19.00 19.00 ###
HSAN.27 CAMARAS DE INSPECCIÓN DE 100 x 100 pza Total = 11.00
SAN SANIATRIO 11.00 11.00 ###
HSAN.28 CAMARAS DE INSPECCIÓN CIRCULAR D=1,20 M pza Total = 2.00
SAN SANIATRIO 2.00 2.00 ###
HSAN.29 CAMARAS DE REGISTRO SANITARIO pza Total = 19.00
SAN SANIATRIO 19.00 19.00 ###
HSAN.30 CAMARAS DE REGISTRO PLUVIAL pza Total = 0.00
HSAN.31 SUMIDEROS DE PISO m Total = 87.94
SAN SANIATRIO REJILLA 1 1.00 37.68 37.68 ###
SAN REJILLA 2 1.00 37.81 37.81 ###
SAN REJILLA 3 1.00 12.45 12.45 ###
HSAN.32 BOCA DE TORMENTA pza Total = 0.00
HSAN.33 CUNETA H 0,15 m Total = 0.00
HSAN.34 CUNETA H 0,18 m Total = 0.00
HSAN.35 CUNETA H 0,22 m Total = 0.00
HSAN.36 CANALETA CORTE 45 m Total = 0.00
HSAN.37 TANQUE SEPTICO-POZO ABSORVENTE pza Total = 1.00
SAN 1.00 1.00 ###
94
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
N° DESCRIPCIÓN Unidad Ubicación N° A B C D=BxC E=AxD PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
HSAN.38 POZO DE AGUA Gbl Total = 1.00
SAN PTR 1 1.00
HSAN.39 PRUEBA HIDRAULICA Y DESINFECCION m Total = 0.00
HSAN.40 PRUEBA HIDRAULICA SANITARIO Y PLUVIAL m Total = 865.21
SAN SANITARIO ml 1.00 865.21 865.21
HSAN.41 HIPOCLORADOR CON DOSIFICADOR VENTURI gbl Total = 0.00
95
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
N° DESCRIPCIÓN Unidad Ubicación N° A B C D=BxC E=AxD PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.1 m Total = 0.00
POTABLE PVC 1/2” E-40
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.2 m Total = 0.00
POTABLE PVC 3/4” E-40
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.3 m Total = 0.00
POTABLE PVC 1” E-40
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.4 m Total = 0.00
POTABLE PVC 1 1/2” E-40
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.5 m Total = 0.00
POTABLE PVC 2” E-40
PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA
HSAN.6 m Total = 0.00
POTABLE PVC 2 1/2” E-40
HSAN.7 TUBERIA AGUA POTABLE FG 3/4" m Total = 0.00
HSAN.8 TUBERIA AGUA POTABLE FG 1" m Total = 0.00
HSAN.9 TUBERIA AGUA POTABLE FG 3" m Total = 0.00
HSAN.10 TANQUE PREFABRICADO DE 5000 LT pza Total = 0.00
HSAN.11 TANQUE CISTERNA DE 72 M3 pza Total = 0.00
HSAN.12 TANQUE CISTERNA DE 10 M3 pza Total = 0.00
HSAN.13 TANQUE HIDROCELE 86 GL pza Total = 0.00
HSAN.14 BOMBA DE AGUA 0,5HP pza Total = 0.00
HSAN.15 BOMBA DE AGUA 3HP pza Total = 0.00
HSAN.16 BOMBA DE AGUA 4HP pza Total = 0.00
HSAN.17 BOMBA DE AGUA 20 HP pza Total = 0.00
HSAN.18 HIDRANTES pza Total = 0.00
HSAN.19 TUBERIA PVC 1 1/2" C9 m Total = 0.00
HSAN.20 TUBERIA PVC 2" C9 m Total = 0.00
HSAN.21 TUBERIA PVC 3" C9 m Total = 0.00
PLU PLUVIAL 1.00 0.00 0.00 ###
HSAN.22 TUBERIA PVC 4" C9 m Total = 372.29
PLU PLUVIAL 1.00 372.29 372.29 ###
HSAN.23 TUBERIA PVC 6" C9 m Total = 344.58
PLU PLUVIAL 1.00 344.58 344.58 ###
HSAN.24 TUBERIA PVC 8" C9 m Total = 222.11
PLU PLUVIAL 1.00 222.11 222.11 ###
HSAN.25 TUBERIA PVC 10" C9 m Total = 79.31
PLU PLUVIAL 1.00 79.31 79.31 ###
HSAN.26 CAMARAS DE INSPECCIÓN DE 60 x 60 pza Total = 7.00
PLU PLUVIAL 7.00 7.00 ###
HSAN.27 CAMARAS DE INSPECCIÓN DE 100 x 100 pza Total = 14.00
PLU PLUVIAL 14.00 14.00 ###
HSAN.28 CAMARAS DE INSPECCIÓN CIRCULAR D=1,20 M pza Total = 10.00
PLU PLUVIAL 10.00 10.00 ###
HSAN.29 CAMARAS DE REGISTRO SANITARIO pza Total = 0.00
HSAN.30 CAMARAS DE REGISTRO PLUVIAL pza Total = 31.00
PLU PLUVIAL 31.00 31.00 ###
HSAN.31 SUMIDEROS DE PISO m Total = 0.00
HSAN.32 BOCA DE TORMENTA pza Total = 9.00
PLU 9.00 9.00 ###
HSAN.33 CUNETA H 0,15 m Total = 398.97
PLU TRAMO 1 1.00 21.13 21.13 ###
PLU TRAMO 2 1.00 42.04 42.04 ###
PLU TRAMO 3 1.00 34.41 34.41 ###
PLU TRAMO 4 1.00 21.54 21.54 ###
PLU 1.00 35.81 35.81 ###
96
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
N° DESCRIPCIÓN Unidad Ubicación N° A B C D=BxC E=AxD PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
97
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
N° DESCRIPCIÓN Unidad Ubicación N° A B C D=BxC E=AxD PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
98
CUADRO N° 101 CUADRO DE INVERSIONES
Precio
Precio Total Bs. Precio Total $us
N° ACTIVIDAD Unidad Cantidad Unitario Precio Unitario (Literal)
(Numeral) T/C 6.96
(Numeral)
1. DISEÑO ARQUITECTONICO
ARQ.1 CIMIENTO DE HORMIGON CICLOPEO (50%PIEDRA) m3 137.48 834.62 Ochocientos Treinta Y Cuatro 62/100 114,739.38 16,485.54
ARQ.2 SOBRECIMIENTO DE HORMIGON CICLOPEO(40%PIEDRA) m3 22.00 1,138.01 Un Mil Ciento Treinta Y Ocho 01/100 25,031.67 3,596.50
ARQ.3 IMPERMEABILIZACION DE SOBRECIMIENTOS m2 109.98 53.36 Cincuenta Y Tres 36/100 5,868.53 843.18
ARQ.4 PISO DE CEMENTO ENLUCIDO H=7CM C/EMPEDRADO m2 7399.69 200.79 Doscientos 79/100 1,485,783.76 213,474.68
ARQ.5 MURO DE LADRILLO 6H ESP=10 CM m2 7635.95 178.31 Ciento Setenta Y Ocho 31/100 1,361,566.42 195,627.36
ARQ.6 DINTEL DE LADRILLO ARMADO m 487.72 108.77 Ciento Ocho 77/100 53,049.30 7,622.03
ARQ.7 ZOCALO DE MADERA ROBLE m 586.50 61.63 Sesenta Y Un 63/100 36,146.00 5,193.39
ARQ.8 CIELO FALSO DE YESO m2 2229.56 214.80 Doscientos Catorce 80/100 478,909.49 68,808.83
ARQ.9 CIELO RASO DE YESO SOBRE LOSA m2 144.78 94.08 Noventa Y Cuatro 08/100 13,620.90 1,957.03
ARQ.10 CIELO FALSO PLACA DE DRY WALL m2 681.00 266.06 Doscientos Sesenta Y Seis 06/100 181,186.86 26,032.59
ARQ.11 REVOQUE CAL-CEMENTO m2 4316.85 214.34 Doscientos Catorce 34/100 925,274.59 132,941.75
ARQ.12 REVOQUE INTERIOR ESTUCO m2 10391.94 169.79 Ciento Sesenta Y Nueve 79/100 1,764,447.15 253,512.52
ARQ.13 FACHADA DE VIDRIO TEMPLADO m2 42.62 777.84 Setecientos Setenta Y Siete 84/100 33,151.54 4,763.15
ARQ.14 VENTANA DE ALUMINIO m2 315.68 700.52 Setecientos 52/100 221,140.50 31,773.06
ARQ.15 PROV Y COLOC DE VIDRIOS TRANSPARENTES DOBLES m2 315.68 228.91 Doscientos Veintiocho 91/100 72,262.42 10,382.53
ARQ.16 BOTAGUAS DE HºAº m 228.80 199.28 Ciento Noventa Y Nueve 28/100 45,595.26 6,551.04
ARQ.17 PINTURA INTERIOR LATEX m2 12429.10 229.88 Doscientos Veintinueve 88/100 2,857,200.82 410,517.36
ARQ.18 PINTURA EXTERIOR LATEX m2 4264.98 242.61 Doscientos Cuarenta Y Dos 61/100 1,034,727.89 148,667.80
ARQ.19 PINTURA AL OLEO SOBRE MUROS m2 683.81 82.06 Ochenta Y Dos 06/100 56,113.12 8,062.23
ARQ.20 PINTURA EPOXICA m2 1276.44 122.63 Ciento Veintidos 63/100 156,529.84 22,489.92
ARQ.21 REVESTIMIENTOS DE CERAMICA m2 729.30 265.17 Doscientos Sesenta Y Cinco 17/100 193,388.22 27,785.66
ARQ.22 PISO DE CERAMICA CON COLOR SOBRE LOSA O PISO FROTACHADO m2 4435.92 270.37 Doscientos Setenta 37/100 1,199,339.69 172,318.92
ARQ.23 PISO DE PARQUET TAJIBO m2 141.46 257.04 Doscientos Cincuenta Y Siete 04/100 36,360.88 5,224.26
ARQ.24 COLOCADO DE PISO DE MADERA LAMINADO FLOTANTE m2 456.26 183.13 Ciento Ochenta Y Tres 13/100 83,554.89 12,005.01
ARQ.25 PUERTA METALICA m2 512.27 462.02 Cuatrocientos Sesenta Y Dos 02/100 236,679.91 34,005.73
ARQ.26 PROV Y COLOC DE PUERTA DE CEDRO m2 80.22 1,203.95 Un Mil Doscientos Tres 95/100 96,580.87 13,876.56
ARQ.27 PROV Y COLOCADO PUERTA DE VIDRIO TEMPLADO e=10 mm m2 41.79 1,903.72 Un Mil Novecientos Tres 72/100 79,556.46 11,430.53
ARQ.28 PROV. Y COLOC. DE FRENO HIDRAULICO PARA PUERTA DE VIDRIO pza 20.00 2,197.61 Dos Mil Ciento Noventa Y Siete 61/100 43,952.20 6,314.97
ARQ.29 PROV Y COLOC DE CHAPA INTERIOR pza 58.00 369.97 Trescientos Sesenta Y Nueve 97/100 21,458.26 3,083.08
ARQ.30 PROV Y COLOC DE CHAPAS EXTERIORES DE DOBLE GOLPE pza 31.00 480.49 Cuatrocientos Ochenta 49/100 14,895.19 2,140.11
ARQ.31 PROV. Y COLOC. BARANDA CON TUBERIAS DE FG Y VIDRIO TEMPLADO DE 10 mm m 15.50 1,018.68 Un Mil Dieciocho 68/100 15,789.54 2,268.61
ARQ.32 PROVISIÓN Y COLOCADO INODORO pza 22.00 1,566.02 Un Mil Quinientos Sesenta Y Seis 02/100 34,452.44 4,950.06
ARQ.33 PROVISIÓN Y COLOCACIÓN LAVAMANOS C/GRIFO TEMPORIZADOR pza 33.00 1,589.51 Un Mil Quinientos Ochenta Y Nueve 51/100 52,453.83 7,536.47
ARQ.34 PROVISIÓN Y COLOCADO DE DUCHA TIPO LORENZETTI pza 17.00 812.81 Ochocientos Doce 81/100 13,817.77 1,985.31
ARQ.35 PROVISIÓN Y COLOCADO DE BASE DE DUCHA FIBRA DE VIDRIO pza 17.00 429.93 Cuatrocientos Veintinueve 93/100 7,308.81 1,050.12
ARQ.36 PROVISIÓN Y COLOCADO REJILLA DE PISO pza 21.00 163.98 Ciento Sesenta Y Tres 98/100 3,443.58 494.77
ARQ.37 PROVISIÓN Y COLOCADO DE URINARIO C/GRIFO TEMPORIZADOR pza 6.00 1,511.10 Un Mil Quinientos Once 10/100 9,066.60 1,302.67
ARQ.38 PROVISIÓN Y COLOCADO DE LAVANDERIA pza 1.00 927.66 Novecientos Veintisiete 66/100 927.66 133.28
ARQ.39 PROVISIÓN Y COLOCADO DE LAVAPLATOS pza 2.00 773.49 Setecientos Setenta Y Tres 49/100 1,546.98 222.27
ARQ.40 MESON DE HºAº m2 58.25 2,480.90 Dos Mil Cuatrocientos Ochenta 90/100 144,502.50 20,761.85
ARQ.41 ARMARIO EMPOTRADO m2 45.00 563.54 Quinientos Sesenta Y Tres 54/100 25,359.30 3,643.58
ARQ.42 DIVISIONES DE MELAMINA EN BAÑOS m2 53.26 553.19 Quinientos Cincuenta Y Tres 19/100 29,460.69 4,232.86
ARQ.43 MALLA OLIMPICA Y TUBOS FG 2" c /2.5 m m2 62.53 205.95 Doscientos Cinco 95/100 12,877.02 1,850.15
ARQ.44 RETIRO DE ESCROMBROS m3 4166.54 187.93 Ciento Ochenta Y Siete 93/100 783,017.03 112,502.45
ARQ.45 JARDINES m2 2598.09 42.68 Cuarenta Y Dos 68/100 110,886.48 15,931.97
ARQ.46 BOTAGUAS DE LADRILLO, MORTERO 1:4 m 549.90 139.40 Ciento Treinta Y Nueve 40/100 76,656.06 11,013.80
ARQ.47 HORMIGON SIMPLE H21 m3 20.18 #VALUE! Dos mil novesientos once 63/100 #VALUE! #VALUE!
ARQ.48 ACERO DE CONSTRUCCION kg 1407.99 16.46 diesiseis 46/100 23,172.14 3,329.33
100
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
PRESUPUESTO DE OBRA
Precio
Precio Total Bs. Precio Total $us
N° ACTIVIDAD Unidad Cantidad Unitario Precio Unitario (Literal)
(Numeral) T/C 6.96
(Numeral)
EST.14 ESTRUCTURA METALICAS JEFATURA DE PRODUCCION (CERCHA 2) pza 1.00 11,332.50 Once Mil Trescientos Treinta Y Dos 50/100 11,332.50 1,628.23
EST.15 ESTRUCTURA METALICAS SILOS (CERCHA 1) EJES D a F pza 6.00 11,265.96 Once Mil Doscientos Sesenta Y Cinco 96/100 67,595.76 9,712.03
EST.16 ESTRUCTURA METALICAS SILOS (CERCHA 2) EJES I H' G pza 3.00 16,772.29 Dieciseis Mil Setecientos Setenta Y Dos 29/100 50,316.87 7,229.44
EST.17 ESTRUCTURA METÁLICAS COMEDOR CERCHA TIPO 1 (INC CERCHA CONTRAVENTEO) pza 7.00 17,430.22 Diecisiete Mil Cuatrocientos Treinta 22/100 122,011.54 17,530.39
EST.18 ESTRUCTURA METÁLICAS COMEDOR CERCHA TIPO 2 pza 3.00 4,047.44 Cuatro Mil Cuarenta Y Siete 44/100 12,142.32 1,744.59
EST.19 ESTRUCTURA METÁLICAS COMEDOR CERCHA TIPO 3 pza 1.00 11,453.52 Once Mil Cuatrocientos Cincuenta Y Tres 52/100 11,453.52 1,645.62
EST.20 ESTRUCTURA METÁLICAS COMEDOR CERCHA TIPO 4 pza 1.00 10,758.60 Diez Mil Setecientos Cincuenta Y Ocho 60/100 10,758.60 1,545.78
EST.21 ESTRUCTURA METÁLICAS VIVIENDA PERSONAL, GERENTE Y SERENO pza 13.00 6,643.40 Seis Mil Seiscientos Cuarenta Y Tres 40/100 86,364.20 12,408.65
EST.22 ESTRUCTURA METÁLICAS GUARDERÍA TIPO 1 pza 4.00 7,693.61 Siete Mil Seiscientos Noventa Y Tres 61/100 30,774.44 4,421.61
EST.23 ESTRUCTURA METÁLICAS GUARDERÍA TIPO 2 pza 3.00 4,531.87 Cuatro Mil Quinientos Treinta Y Un 87/100 13,595.61 1,953.39
EST.24 ESTRUCTURA METÁLICAS GUARDERÍA TIPO 3 pza 2.00 6,451.19 Seis Mil Cuatrocientos Cincuenta Y Un 19/100 12,902.38 1,853.79
EST.25 ESTRUCTURA METÁLICAS GUARDERÍA TIPO 4 pza 1.00 4,272.69 Cuatro Mil Doscientos Setenta Y Dos 69/100 4,272.69 613.89
EST.26 ESTRUCTURA METÁLICAS GUARDERÍA TIPO 5 pza 1.00 3,152.15 Tres Mil Ciento Cincuenta Y Dos 15/100 3,152.15 452.90
EST.27 ESTRUCTURA METÁLICAS GUARDERÍA TIPO 6 pza 1.00 2,999.48 Dos Mil Novecientos Noventa Y Nueve 48/100 2,999.48 430.96
EST.28 CUBIERTA DE CALAMINA Nº 28 m2 5745.77 190.64 Ciento Noventa 64/100 1,095,373.46 157,381.24
EST.29 CUMBRERA DE CALAMINA CORTE 50 m 71.32 127.80 Ciento veintisiete 80/100 9,114.70 1,309.58
3. DISEÑO VIAL
VIA.1 EXCAVACION NO CLASIFICADA m3 303.70 32.28 Treinta Y Dos 28/100 9,803.44 1,408.54
VIA.2 ESCARIFICADO Y RECOMPACTADO DE RASANTE m3 1031.61 26.31 Veintiseis 31/100 27,141.66 3,899.66
VIA.3 CONFORMACION DE TERRAPLEN m3 171.00 72.53 Setenta Y Dos 53/100 12,402.63 1,781.99
VIA.4 RETIRO DE MATERIAL EXCEDENTARIO m3 223.81 30.15 Treinta 15/100 6,747.87 969.52
VIA.5 PAVIMENTO RIGIDO m3 414.40 1,620.12 Un Mil Seiscientos Veinte 12/100 671,375.14 96,461.94
VIA.6 PROTECCION DE GAVIONES m3 286.86 688.04 Seiscientos Ochenta Y Ocho 04/100 197,371.15 28,357.92
TOTAL 3. DISEÑO VIAL 924,841.89 132,879.58
4. DISEÑO HIDRO-SANITARIO
HSAN.1 PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA POTABLE PVC 1/2” E-40 m 45.61 71.51 Setenta Y Un 51/100 3,261.57 468.62
HSAN.2 PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA POTABLE PVC 3/4” E-40 m 140.28 73.61 Setenta Y Tres 61/100 10,326.01 1,483.62
HSAN.3 PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA POTABLE PVC 1” E-40 m 323.02 80.71 Ochenta 71/100 26,070.94 3,745.83
HSAN.4 PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA POTABLE PVC 1 1/2” E-40 m 185.00 105.84 Ciento Cinco 84/100 19,580.40 2,813.28
HSAN.5 PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA POTABLE PVC 2” E-40 m 101.54 115.09 Ciento Quince 09/100 11,686.24 1,679.06
HSAN.6 PROVISIÓN E INSTALACIÓN DE TUBERÍA AGUA POTABLE PVC 2 1/2” E-40 m 38.01 120.58 Ciento veinte 58/100 4,583.25 658.51
HSAN.7 TUBERIA AGUA POTABLE FG 3/4" m 54.70 81.17 Ochenta Y Un 17/100 4,440.00 637.93
HSAN.8 TUBERIA AGUA POTABLE FG 1" m 3.50 116.65 Ciento dieciseis 65/100 408.28 58.66
HSAN.9 TUBERIA AGUA POTABLE FG 3" m 161.12 236.92 Dosientos treinta y seis 92/100 38,172.55 5,484.56
HSAN.10 TANQUE PREFABRICADO DE 5000 LT pza 2.00 9,818.78 Nueve Mil Ochocientos Dieciocho 78/100 19,637.56 2,821.49
HSAN.11 TANQUE CISTERNA DE 72 M3 pza 2.00 101,408.14 Ciento Un Mil Cuatrocientos Ocho 14/100 202,816.28 29,140.27
HSAN.12 TANQUE CISTERNA DE 10 M3 pza 1.00 27,600.96 Veintisiete Mil Seiscientos 96/100 27,600.96 3,965.66
HSAN.13 TANQUE HIDROCELE 86 GL pza 3.00 5,010.44 Cinco Mil Diez 44/100 15,031.32 2,159.67
HSAN.14 BOMBA DE AGUA 0,5HP pza 4.00 2,933.87 Dos Mil Novecientos Treinta Y Tres 87/100 11,735.48 1,686.13
HSAN.15 BOMBA DE AGUA 3HP pza 2.00 5,260.81 Cinco mil docientos sesenta 81/100 10,521.62 1,511.73
HSAN.16 BOMBA DE AGUA 4HP pza 2.00 6,118.11 seis mil ciento diesiecho 11/100 12,236.22 1,758.08
HSAN.17 BOMBA DE AGUA 20 HP pza 2.00 31,592.06 Treinta Y Un Mil Quinientos Noventa Y Dos 06/100 63,184.12 9,078.18
HSAN.18 HIDRANTES pza 4.00 5,873.17 Cinco Mil Ochocientos Setenta Y Tres 17/100 23,492.68 3,375.39
HSAN.19 TUBERIA PVC 1 1/2" C9 m 53.30 149.45 Ciento Cuarenta Y Nueve 45/100 7,965.68 1,144.49
HSAN.20 TUBERIA PVC 2" C9 m 30.10 157.09 Ciento Cincuenta Y Siete 09/100 4,728.41 679.37
HSAN.21 TUBERIA PVC 3" C9 m 168.06 199.18 Ciento Noventa Y Nueve 18/100 33,474.19 4,809.51
HSAN.22 TUBERIA PVC 4" C9 m 1058.30 227.45 Doscientos Veintisiete 45/100 240,710.34 34,584.82
HSAN.23 TUBERIA PVC 6" C9 m 344.58 326.57 Trescientos Veintiseis 57/100 112,529.49 16,168.03
HSAN.24 TUBERIA PVC 8" C9 m 222.11 422.49 Cuatrocientos Veintidos 49/100 93,839.25 13,482.65
HSAN.25 TUBERIA PVC 10" C9 m 79.31 519.73 Quinientos Diecinueve 73/100 41,219.79 5,922.38
HSAN.26 CAMARAS DE INSPECCIÓN DE 60 x 60 pza 26.00 1,741.41 Un Mil setecientos cuarenta y uno 41/100 45,276.66 6,505.27
HSAN.27 CAMARAS DE INSPECCIÓN DE 100 x 100 pza 25.00 1,973.52 Un Mil Novecientos Setenta Y Tres 52/100 49,338.00 7,088.79
HSAN.28 CAMARAS DE INSPECCIÓN CIRCULAR D=1,20 M pza 12.00 2,605.63 Dos Mil Seiscientos Cinco 63/100 31,267.56 4,492.47
HSAN.29 CAMARAS DE REGISTRO SANITARIO pza 19.00 242.22 Doscientos Cuarenta Y Dos 22/100 4,602.18 661.23
HSAN.30 CAMARAS DE REGISTRO PLUVIAL pza 31.00 266.72 Doscientos Sesenta Y Seis 72/100 8,268.32 1,187.98
HSAN.31 SUMIDEROS DE PISO m 87.94 772.21 Setecientos Setenta Y Dos 21/100 67,908.15 9,756.92
HSAN.32 BOCA DE TORMENTA pza 9.00 743.89 Setecientos Cuarenta Y Tres 89/100 6,695.01 961.93
HSAN.33 CUNETA H 0,15 m 398.97 221.11 Doscientos Veintiun 11/100 88,216.26 12,674.75
HSAN.34 CUNETA H 0,18 m 15.18 223.08 Doscientos Veintitres 08/100 3,386.35 486.55
HSAN.35 CUNETA H 0,22 m 29.35 232.54 Doscientos Treinta Y Dos 54/100 6,825.05 980.61
HSAN.36 CANALETA CORTE 45 m 411.01 149.02 Ciento Cuarenta Y Nueve 02/100 61,248.71 8,800.10
101
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
PRESUPUESTO DE OBRA
Precio
Precio Total Bs. Precio Total $us
N° ACTIVIDAD Unidad Cantidad Unitario Precio Unitario (Literal)
(Numeral) T/C 6.96
(Numeral)
HSAN.37 TANQUE SEPTICO-POZO ABSORVENTE glb 1.00 67,187.12 Sesenta Y Siete Mil Ciento Ochenta Y Siete 12/100 67,187.12 9,653.32
HSAN.38 POZO DE AGUA glb 1.00 27,916.93 Veintisiete Mil Novecientos Dieciseis 93/100 27,916.93 4,011.05
HSAN.39 PRUEBA HIDRAULICA Y DESINFECCION PARA AGUA POTABLE m 1052.78 11.08 once 08/100 11,664.80 1,675.98
HSAN.40 PRUEBA HIDRAULICA SANITARIO Y PLUVIAL m 1883.50 11.68 once 68/100 21,999.28 3,160.82
HSAN.41 HIPOCLORADOR CON DOSIFICADOR VENTURI gbl 1.00 7,492.71 siete mil cuatrosientos noventa y dos 71/100 7,492.71 1,076.54
HSAN.R.1 CAMARA ROMPE PRESIÓN pza 1.00 1,392.92 Un Mil Trescientos Noventa Y Dos 92/100 1,392.92 200.13
HSAN.R.2 DESARENADOIR (INCLUYE CANAL PARSHALL) pza 1.00 4,471.18 Cuatro Mil Cuatrocientos Setenta Y Un 18/100 4,471.18 642.41
HSAN.R.3 CONTRAPISO DE H° ( INCLUYE EMPEDRADO) m2 0.94 185.51 Ciento Ochenta Y Cinco 51/100 173.92 24.99
HSAN.R.4 HORMIGON ARMADO 1:2:3 m3 2.08 4,549.48 Cuatro Mil Quinientos Cuarenta Y Nueve 48/100 9,440.17 1,356.35
HSAN.R.5 IMPERMEABILIZACION INTERIOR TANQUE DE AGUA m2 30.16 243.30 Doscientos Cuarenta Y Tres 30/100 7,337.93 1,054.30
HSAN.R.6 PROVISIÓN Y COLOCADO DE TAPA METALICA PZA 2.00 921.35 Novecientos Veintiun 35/100 1,842.70 264.76
HSAN.R.7 CIMIENTO DE H°C° M3 0.99 735.95 Setecientos Treinta Y Cinco 95/100 730.06 104.89
HSAN.R.8 SOBRECIMIENTOS DE HºCº M3 0.14 1,525.98 Un Mil Quinientos Veinticinco 98/100 210.59 30.26
HSAN.R.9 MURO DE LADRILLO GAMBOTE 12 CM VISTO M2 10.36 450.68 Cuatrocientos Cincuenta 68/100 4,669.04 670.84
HSAN.R.10 MURO DE LADRILLO CELOSIA ORNAMENTAL M2 0.40 206.50 Doscientos Seis 50/100 82.60 11.87
HSAN.R.11 CONTRAPISO DE H° ( INCLUYE EMPEDRADO) M3 0.26 185.51 Ciento Ochenta Y Cinco 51/100 47.31 6.80
HSAN.R.12 CUBIERTA DE CALAMINA N. 28 INCLUYE MADERAMEN M2 2.88 325.25 Trescientos Veinticinco 25/100 936.72 134.59
HSAN.R.13 PUERTA DE METAL DE PLANCHA DE 1/8" PZA 1.44 689.80 Seiscientos Ochenta Y Nueve 80/100 993.31 142.72
HSAN.R.14 CAMARAS DE VÁLVULAS 100 x 100 PZA 1.00 1,524.04 Un Mil Quinientos Veinticuatro 04/100 1,524.04 218.97
HSAN.R.15 PROV Y COLOCACIÓN TUBERIA PVC 2" C9 (INCLUYE VALVULAS + ACCESORIOS EN CAMARA DE SALIDA) m 31.00 1,262.66 Un Mil Doscientos Sesenta Y Dos 66/100 39,142.46 5,623.92
HSAN.R.16 CLAPETA DN 6" PZA 1.00 1,295.00 Un Mil Doscientos Noventa Y Cinco 00/100 1,295.00 186.06
HSAN.R.17 PROV Y COLOCACIÓN TUBERIA PVC 6" C9 m 30.00 100.05 Cien 05/100 3,001.50 431.25
HSAN.R.18 BOMBA DE AGUA 1HP pza 2.00 2,995.10 Dos Mil Novecientos Noventa Y Cinco 10/100 5,990.20 860.66
HSAN.R.19 INSTALACION HIDRÁLICA BOMBAS DE AGUA glb 1.00 2,683.50 Dos Mil Seiscientos Ochenta Y Tres 50/100 2,683.50 385.56
HSAN.R.20 INSTALACION ELÉCTRICA DE BOMBAS glb 1.00 723.96 Setecientos Veintitres 96/100 723.96 104.02
HSAN.R.21 PROVISIÓN E INST. DE TUBERÍA AGUA POTABLE PVC 1 1/2” E-40 (IMPULSIÓN) m 80.00 104.60 Ciento Cuatro 60/100 8,368.00 1,202.30
HSAN.R.22 ACCESORIOS EN TUB. RED DE IMPULSION 1 1/2" (INCLUYE PUNTOS DE CONEXIÓN) glb 1.00 303.09 Trescientos Tres 09/100 303.09 43.55
HSAN.R.23 SUMIDEROS (DESAGUE) EN LÍNEA DE PRODUCCIÓN (HACIA LA TUBERÍA RECOLECTORA) PZA 8.00 950.08 Novecientos Cincuenta 08/100 7,600.64 1,092.05
HSAN.R.24 TUBERIA PVC 4" C9 (DESAGUE HACIA EL TANQUE DE ACUMULACIÓN) (INCLUYE REBALSE A RED PLUVIAL m 80.00 84.51 Ochenta Y Cuatro 51/100 6,760.80 971.38
HSAN.R.25 EMPEDRADO Y HORMIGON POBRE PARA TANQUE m2 6.25 185.51 Ciento Ochenta Y Cinco 51/100 1,159.44 166.59
HSAN.R.26 PROV E INSTALACION TANQUE DE POLIPROPILENO CAP 2000 LT - INCLUYE INST.HIDRAUL. PZA 3.00 4,117.72 cuatro mil ciento diesisiete 72/100 12,353.16 1,774.88
HSAN.R.27 PEDESTAL DE HºAº (BASE TANQUE POLIETILENO) M3 2.14 4,549.48 Cuatro Mil Quinientos Cuarenta Y Nueve 48/100 9,754.09 1,401.45
HSAN.R.28 PROV E INSTALACION TANQUE HIDROCELE 100 GL (1+1) PZA 2.00 5,928.98 cinco mil novesientos noventa y cinco 10/100 11,857.96 1,703.73
HSAN.R.29 PROVISIÓN Y COLOCACIÓN DE BOMBA HP (PARA PRESUPRIZAR EL SISTEMA) (1+1) PZA 2.00 2,995.10 Dos Mil Novecientos Noventa Y Cinco 10/100 5,990.20 860.66
HSAN.R.30 PROV. E INST. DE TUBERIA PVC 1 1/2" - LÍNEA DE IMPULSIÓN m 40.00 104.60 Ciento Cuatro 60/100 4,184.00 601.15
HSAN.R.31 EXCAVACION MANUAL 0-2 m M3 2,217.43 95.93 Noventa Y Cinco 93/100 212,718.06 30,562.94
HSAN.R.32 RELLENO COMPACTADO M3 1,862.73 95.93 Noventa Y Cinco 93/100 178,691.48 25,674.06
HSAN.R.33 RETIRO DE EXCAVACION SOBRANTE M3 26.89 157.27 ciento cincuenta y siete 27/100 4,229.30 607.66
HSAN.R.34 RELLENO Y COMPACTADO MANUAL C/CON MATERIAL SELECCIONADO m3 309.57 261.56 Dosientos sesenta y uno 56/100 80,971.13 11,633.78
TOTAL 4. DISEÑO HIDRO-SANITARIO 2,180,176.17 313,243.70
6. DISEÑO ELÉCTRICO
ELEC.1 EXCAVACION MANUAL 0-1 m m3 320.00 92.50 Noventa y dos 50/100 29,600.00 4,252.87
ELEC.2 RELLENO Y COMPACTADO m3 320.00 129.33 Ciento Veintinueve 33/100 41,385.60 5,946.21
ELEC.3 CAMARA DE INSPECCION 40 X 40 X 60 pza 6.00 580.73 Quinientos Ochenta 73/100 3,484.38 500.63
ELEC.4 CAMARA DE INSPECCION 1 X 1 X 1.2 pza 8.00 1,991.27 Un Mil Novecientos Noventa Y Un 27/100 15,930.16 2,288.82
ELEC.5 CAJON DE PROTECCION M 378.00 136.25 Ciento Veintiun 98/100 51,502.50 7,399.78
ELEC.6 CINTA DE SEGURIDAD m 378.00 2.67 Dos 67/100 1,009.26 145.01
ELEC.7 BASE DE POSTE DE ILUMINACION VIAL pza 12.00 552.59 Quinientos Cincuenta Y Dos 59/100 6,631.08 952.74
ELEC.8 CABLE MONOPOLAR 2.5 mm² m 5290.00 11.88 Once 88/100 62,845.20 9,029.48
ELEC.9 CABLE MONOPOLAR 4.0 mm² m 4935.00 13.78 Trece 78/100 68,004.30 9,770.73
ELEC.10 CABLE MONOPOLAR 6.0 mm² m 1945.00 16.18 Dieciseis 18/100 31,470.10 4,521.57
ELEC.11 CABLE MONOPOLAR 10.0 mm² m 1500.00 22.60 Veintidos 60/100 33,900.00 4,870.69
ELEC.12 CABLE MONOPOLAR 16.0 mm² m 105.00 30.97 Treinta 97/100 3,251.85 467.22
ELEC.13 CABLE MONOPOLAR 35 mm² m 20.00 59.47 Cincuenta Y Nueve 47/100 1,189.40 170.89
ELEC.14 CABLE MONOPOLAR 120 mm² m 28.00 182.22 Ciento Ochenta Y Dos 22/100 5,102.16 733.07
ELEC.15 CABLE TRIPOLAR DE 4.0 mm² m 215.00 31.56 Treinta Y Un 56/100 6,785.40 974.91
ELEC.16 CABLE TRIPOLAR DE 6.0 mm² m 255.00 39.13 Treinta Y Nueve 13/100 9,978.15 1,433.64
ELEC.17 CABLE TRIPOLAR DE 10.0 mm² m 540.00 45.44 Cuarenta Y Cinco 44/100 24,537.60 3,525.52
ELEC.18 CABLE TETRAPOLAR 4.0 mm² m 353.00 35.45 Treinta Y Cinco 45/100 12,513.85 1,797.97
ELEC.19 CABLE TETRAPOLAR 6.0 mm² m 65.00 46.71 Cuarenta Y Seis 71/100 3,036.15 436.23
ELEC.20 CABLE TETRAPOLAR 10.0 mm² m 100.00 75.71 Setenta Y Cinco 71/100 7,571.00 1,087.79
ELEC.21 CABLE TETRAPOLAR 16.0 mm² m 110.00 101.56 Ciento Un 56/100 11,171.60 1,605.11
ELEC.22 CABLE TETRAPOLAR 25.0 mm² m 195.00 164.01 Ciento Sesenta Y Cuatro 01/100 31,981.95 4,595.11
102
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
PRESUPUESTO DE OBRA
Precio
Precio Total Bs. Precio Total $us
N° ACTIVIDAD Unidad Cantidad Unitario Precio Unitario (Literal)
(Numeral) T/C 6.96
(Numeral)
ELEC.23 CABLE TETRAPOLAR 50.0 mm² m 20.00 313.77 Trescientos Trece 77/100 6,275.40 901.64
ELEC.24 CABLE MONOPOLAR 185.0 mm² m 190.00 288.15 Doscientos Ochenta Y Ocho 15/100 54,748.50 7,866.16
ELEC.25 CABLE MONOPOLAR 240.0 mm² m 1380.00 361.63 Trescientos Sesenta Y Un 63/100 499,049.40 71,702.50
ELEC.26 PUNTO ELECTRICO (MAQUINA) pto 11.00 595.66 Quinientos Noventa Y Cinco 66/100 6,552.26 941.42
ELEC.27 ACCESORIOS DE CABLEADO INDUSTRIAL glb 1.00 7,847.80 Siete Mil Ochocientos Cuarenta Y Siete 80/100 7,847.80 1,127.56
ELEC.28 DUCTO PVC 3/4 " m 1986.00 40.72 Cuarenta 72/100 80,869.92 11,619.24
ELEC.29 DUCTO EMT 3/4" m 380.00 107.31 Ciento Siete 31/100 40,777.80 5,858.88
ELEC.30 DUCTO EMT DE 1" m 147.00 122.76 Ciento Veintidos 76/100 18,045.72 2,592.78
ELEC.31 TUBO PVC CLASE 9 DE 2" m 149.00 107.31 Ciento Siete 31/100 15,989.19 2,297.30
ELEC.32 TUBO PVC CLASE 9 DE 4" m 222.00 152.07 Ciento Cincuenta Y Dos 07/100 33,759.54 4,850.51
ELEC.33 DUCTO POLITUBO DE 1" m 275.00 23.53 Veintitres 53/100 6,470.75 929.71
ELEC.34 CAJA 10X10 METALICA ESTANCA pza 18.00 241.52 Doscientos Cuarenta Y Un 52/100 4,347.36 624.62
ELEC.35 BANDEJA CON TAPA DE 20X5 m 332.00 358.94 Trescientos Cincuenta Y Ocho 94/100 119,168.08 17,121.85
ELEC.36 TEE DE BANDEJA CON TAPA DE 20 X 5 pza 5.00 317.86 Trescientos Diecisiete 86/100 1,589.30 228.35
ELEC.37 CODO DE 90 ° DE 20 X 5 CON TAPA pza 7.00 316.06 Trescientos Dieciseis 06/100 2,212.42 317.88
ELEC.38 CONDUIT METALICO FLEXIBLE DE 1" m 52.00 148.20 Ciento Cuarenta Y Ocho 20/100 7,706.40 1,107.24
ELEC.39 CONDUIT METALICO FLEXIBLE DE 3/4" m 10.00 112.26 Ciento Doce 26/100 1,122.60 161.29
ELEC.40 CONDULET 3/4" pza 26.00 70.17 Setenta 17/100 1,824.42 262.13
ELEC.41 CONDULET 1" pza 17.00 80.41 Ochenta 41/100 1,366.97 196.40
ELEC.42 CONDULET 2" pza 18.00 192.58 Ciento Noventa Y Dos 58/100 3,466.44 498.05
ELEC.43 SOLDADURA TIPO CADWELD pto 32.00 209.24 Doscientos Nueve 24/100 6,695.68 962.02
ELEC.44 PREVISION E INSTALACION DE PARARRAYOS glb 1.00 27,736.17 Veintisiete Mil Setecientos Treinta Y Seis 17/100 27,736.17 3,985.08
ELEC.45 CABLE DESNUDO DE 70 MM m 36.00 120.79 Ciento Veinte 79/100 4,348.44 624.78
ELEC.46 CABLE DESNUDO DE 50 MM² m 135.00 82.97 Ochenta Y Dos 97/100 11,200.95 1,609.33
ELEC.47 CABLE DESNUDO DE 35 MM² m 31.00 63.10 Sesenta Y Tres 10/100 1,956.10 281.05
ELEC.48 JABALINA 3/4 X 2,4 METROS pza 32.00 286.66 Doscientos Ochenta Y Seis 66/100 9,173.12 1,317.98
ELEC.49 ATERRAMIENTO POSTE DE ILUMINACION VIAL pza 12.00 287.82 Doscientos Ochenta Y Siete 82/100 3,453.84 496.24
ELEC.50 LUMINARIA TORTUGA LED, 15 w pza 25.00 361.85 Trescientos Sesenta Y Un 85/100 9,046.25 1,299.75
ELEC.51 LUMINARIA FLOURECENTE 2X26 pza 119.00 392.88 Trescientos Noventa Y Dos 88/100 46,752.72 6,717.34
ELEC.52 LUMINARIA FLOURECENTE 2X36 pza 81.00 478.48 Cuatrocientos Setenta Y Ocho 48/100 38,756.88 5,568.52
ELEC.53 LUMINARIA INDUSTRIAL 250W TIPO CAMPANA pza 21.00 2,940.15 Dos Mil Novecientos Cuarenta 15/100 61,743.15 8,871.14
ELEC.54 LUMINARIA INDUSTRIAL 400 W TIPO CAMPANA pza 44.00 3,063.72 Tres Mil Sesenta Y Tres 72/100 134,803.68 19,368.34
ELEC.55 LUMINARIA VAPOR DE SODIO 250 W VIAL pza 31.00 1,958.07 Un Mil Novecientos Cincuenta Y Ocho 07/100 60,700.17 8,721.29
ELEC.56 POSTE METALICO pza 12.00 3,067.39 Tres Mil Sesenta Y Siete 39/100 36,808.68 5,288.60
ELEC.57 BALIZA PARA EL PARARRAYOS pza 1.00 1,086.24 Un Mil Ochenta Y Seis 24/100 1,086.24 156.07
ELEC.58 TOMA CORRIENTES pza 162.00 109.61 Ciento Nueve 61/100 17,756.82 2,551.27
ELEC.59 TOMA MONOFASICA INDUSTRIAL, 16 A pza 5.00 132.45 Ciento Treinta Y Dos 45/100 662.25 95.15
ELEC.60 TOMA TRIFASICA INDUSTRIAL, 32 A pza 3.00 244.68 Doscientos Cuarenta Y Cuatro 68/100 734.04 105.47
ELEC.61 DUCHA COMPLETA pto 17.00 336.32 Trescientos Treinta Y Seis 32/100 5,717.44 821.47
ELEC.62 INTERRUPTOR TIPO PLACA SIMPLE pza 66.00 74.03 Setenta Y Cuatro 03/100 4,885.98 702.01
ELEC.63 INTERRUPTOR TIPO PLACA CONMUTABLE pza 28.00 125.51 Ciento Veinticinco 51/100 3,514.28 504.93
ELEC.64 TABLERO DE DISTRIBUCION TD-1 pza 1.00 6,106.85 Seis Mil Ciento Seis 85/100 6,106.85 877.42
ELEC.65 TABLERO DE DISTRIBUCION TD-2 pza 1.00 3,902.38 Tres Mil Novecientos Dos 38/100 3,902.38 560.69
ELEC.66 TABLERO DE DISTRIBUCION TD-3 pza 1.00 4,269.79 Cuatro Mil Doscientos Sesenta Y Nueve 79/100 4,269.79 613.48
ELEC.67 TABLERO DE DISTRIBUCION TD-4 pza 1.00 4,147.32 Cuatro Mil Ciento Cuarenta Y Siete 32/100 4,147.32 595.88
ELEC.68 TABLERO DE DISTRIBUCION TD-5 pza 1.00 6,649.62 Seis Mil Seiscientos Cuarenta Y Nueve 62/100 6,649.62 955.41
ELEC.69 TABLERO DE DISTRIBUCION TD-6 pza 1.00 13,438.42 Trece Mil Cuatrocientos Treinta Y Ocho 42/100 13,438.42 1,930.81
ELEC.70 TABLERO DE DISTRIBUCION TD-7 pza 1.00 6,106.85 Seis Mil Ciento Seis 85/100 6,106.85 877.42
ELEC.71 TABLERO DE DISTRIBUCION TD-8-1 pza 1.00 4,269.79 Cuatro Mil Doscientos Sesenta Y Nueve 79/100 4,269.79 613.48
ELEC.72 TABLERO DE DISTRIBUCION TD-8 pza 1.00 6,229.33 Seis Mil Doscientos Veintinueve 33/100 6,229.33 895.02
ELEC.73 TABLERO DE DISTRIBUCION TD-9 pza 1.00 4,269.79 Cuatro Mil Doscientos Sesenta Y Nueve 79/100 4,269.79 613.48
ELEC.74 TABLERO DE DISTRIBUCION TD-10 pza 1.00 4,147.32 Cuatro Mil Ciento Cuarenta Y Siete 32/100 4,147.32 595.88
ELEC.75 TABLERO PRINCIPAL pza 1.00 113,864.57 Ciento Trece Mil Ochocientos Sesenta Y Cuatro 57/100 113,864.57 16,359.85
ELEC.76 TABLERO GENERAL pza 1.00 52,331.27 Cincuenta Y Dos Mil Trescientos Treinta Y Un 27/100 52,331.27 7,518.86
ELEC.77 TABLERO DE CONDENSADORES pza 1.00 138,060.92 Ciento Treinta Y Ocho Mil Sesenta 92/100 138,060.92 19,836.34
ELEC.78 GENERADOR DE ENERGIA ELECTRICA + LLAVE AUTOMATICA DE TRANSFERENCIA pza 1.00 293,930.21 Doscientos Noventa Y Tres Mil Novecientos Treinta 21/100 293,930.21 42,231.35
ELEC.79 REPLANTEO DE LA MEDIA TENSION glb 1.00 853.05 Ochocientos Cincuenta Y Tres 05/100 853.05 122.56
ELEC.80 ESTRUCTURA VC8-3 pza 2.00 4,307.46 Cuatro Mil Trescientos Siete 46/100 8,614.92 1,237.78
ELEC.81 ESTRUCTURA VC7-3 pza 2.00 3,405.99 Tres Mil Cuatrocientos Cinco 99/100 6,811.98 978.73
ELEC.82 ESTRUCTURA VC1-1 pza 1.00 3,022.89 Tres Mil Veintidos 89/100 3,022.89 434.32
ELEC.83 ESTRUCTURA VM2-11T pza 4.00 1,296.15 Un Mil Doscientos Noventa Y Seis 15/100 5,184.60 744.91
ELEC.84 ESTRUCTURA VE1-MT pza 1.00 432.81 Cuatrocientos Treinta Y Dos 81/100 432.81 62.19
ELEC.85 SECCIONADOR VM3-30 pza 1.00 8,132.17 Ocho Mil Ciento Treinta Y Dos 17/100 8,132.17 1,168.42
103
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
PRESUPUESTO DE OBRA
Precio
Precio Total Bs. Precio Total $us
N° ACTIVIDAD Unidad Cantidad Unitario Precio Unitario (Literal)
(Numeral) T/C 6.96
(Numeral)
ELEC.86 RECONECTADOR pza 1.00 148,776.50 Ciento Cuarenta Y Ocho Mil Setecientos Setenta Y Seis 50/100 148,776.50 21,375.93
ELEC.87 ESTRUCTURA DE TRANSICION UV-5 pza 1.00 22,266.73 Veintidos Mil Doscientos Sesenta Y Seis 73/100 22,266.73 3,199.24
ELEC.88 PUNTO DE MEDICION pza 1.00 108,486.51 Ciento Ocho Mil Cuatrocientos Ochenta Y Seis 51/100 108,486.51 15,587.14
ELEC.89 CABLE DE POTENCIA DE 35 mm² m 100.00 168.29 Ciento Sesenta Y Ocho 29/100 16,829.00 2,417.96
ELEC.90 CABLE DE ALUMINIO # 2 AWG ACSR km 0.18 13,705.32 Trece Mil Setecientos Cinco 32/100 2,466.96 354.45
ELEC.91 CABLE DE ALUMINIO # 4 AWG ACSR km 0.06 12,647.52 Doce Mil Seiscientos Cuarenta Y Siete 52/100 758.85 109.03
ELEC.92 POSTE DE HORMIGON TIPO A pza 4.00 3,689.17 Tres Mil Seiscientos Ochenta Y Nueve 17/100 14,756.68 2,120.21
ELEC.93 ENSAMBLE DE ANCLA F2-2 pza 1.00 1,047.73 Un Mil Cuarenta Y Siete 73/100 1,047.73 150.54
ELEC.94 TRANSFORMADOR DE POTENCIA DE 1000 KVA pza 1.00 243,042.75 Doscientos Cuarenta Y Tres Mil Cuarenta Y Dos 75/100 243,042.75 34,919.94
ELEC.95 INSTALACION DEL TRANSFORMADOR DE POTENCIA DE 1000 KVA pza 1.00 17,427.80 Diecisiete Mil Cuatrocientos Veintisiete 80/100 17,427.80 2,503.99
ELEC.96 AJUSTES Y PRUEBAS glb 1.00 1,273.29 Un Mil Doscientos Setenta Y Tres 29/100 1,273.29 182.94
TOTAL 6. DISEÑO ELÉCTRICO 3,135,514.49 450,504.96
7. DISEÑO DEL SISTEMA DE TRANSMISIÓN DE CALOR NECESARIO PARA EL PROCESO
CLR.1 TUBERIA AN SCH-40 D=3" (PROV. Y TEND.) ML 19.16 542.34 Quinientos Cuarenta Y Dos 34/100 10,391.23 1,492.99
CLR.2 TUBERIA AN SCH-40 D=2 1/2" (PROV. Y TEND.) ML 242.00 493.64 Cuatrocientos Noventa Y Tres 64/100 119,460.88 17,163.92
CLR.3 TUBERIA AN SCH-40 D=2" (PROV. Y TEND.) ML 28.00 400.27 Cuatrocientos 27/100 11,207.56 1,610.28
CLR.4 TUBERIA AN SCH-40 D=1" (PROV. Y TEND.) ML 27.00 302.20 Trescientos Dos 20/100 8,159.40 1,172.33
CLR.5 CODO 90° AN SCH-40 D=3" (PROV. E INST.) PZA 4.00 236.29 Doscientos Treinta Y Seis 29/100 945.16 135.80
CLR.6 CODO 90° AN SCH-40 D=2 1/2" (PROV. E INST.) PZA 28.00 232.98 Doscientos Treinta Y Dos 98/100 6,523.44 937.28
CLR.7 CODO 90° AN SCH-40 D=2" (PROV. E INST.) PZA 5.00 142.23 Ciento Cuarenta Y Dos 23/100 711.15 102.18
CLR.8 CODO 90° AN SCH-40 D=1" (PROV. E INST.) PZA 5.00 92.20 Noventa Y Dos 20/100 461.00 66.24
CLR.9 "T" AN SCH-40 D=2" (PROV. E INST.) PZA 2.00 370.60 Trescientos Setenta 60/100 741.20 106.49
CLR.10 "T" AN SCH-40 D=1" (PROV. E INST.) PZA 1.00 246.47 Doscientos Cuarenta Y Seis 47/100 246.47 35.41
CLR.11 "T" AN SCH-40 D=2 1/2" (PROV. E INST.) PZA 8.00 411.38 Cuatrocientos Once 38/100 3,291.04 472.85
CLR.12 PUENTE DE REGULACION Y MEDICION PRM PZA 2.00 127,859.64 Ciento Veintisiete Mil Ochocientos Cincuenta Y Nueve 64/100 255,719.28 36,741.28
CLR.13 VALVULA D=2 1/2" PARA AN (PROV. E INST.) PZA 24.00 458.07 Cuatrocientos Cincuenta Y Ocho 07/100 10,993.68 1,579.55
CLR.14 VALVULA D=2" PARA AN (PROV. E INST.) PZA 5.00 443.44 Cuatrocientos Cuarenta Y Tres 44/100 2,217.20 318.56
CLR.15 VALVULA D=1" PARA AN (PROV. E INST.) PZA 4.00 177.01 Ciento Setenta Y Siete 01/100 708.04 101.73
CLR.16 FABRICACION E INST. CHIMENEA CALDERAS PZA 2.00 40,162.08 Cuarenta Mil Ciento Sesenta Y Dos 08/100 80,324.16 11,540.83
CLR.17 PROV. E INST. AISLANTE PARA CONDUCTOS M2 360.00 72.89 Setenta Y Dos 89/100 26,240.40 3,770.17
CLR.18 PLANCHA DE ACERO GALVANIZADO #20 M2 230.00 310.77 Trescientos Diez 77/100 71,477.10 10,269.70
CLR.19 NIPLE AN 3" PZA 3.00 57.06 Cincuenta Y Siete 06/100 171.18 24.59
CLR.20 NIPLE AN 2 1/2" PZA 6.00 47.10 Cuarenta Y Siete 10/100 282.60 40.60
CLR.21 NIPLE AN 2" PZA 2.00 37.41 Treinta Y Siete 41/100 74.82 10.75
CLR.22 NIPLE AN 1" PZA 2.00 34.81 Treinta Y Cuatro 81/100 69.62 10.00
CLR.23 CALDERA DE VAPOR HORIZONTAL DE 2350 KG/HR PZA 1.00 1,111,838.24 un millon ciento once mil ochocientos treinta y ocho 24/100 1,111,838.24 159,746.87
TOTAL 7. DISEÑO DEL SISTEMA DE TRANSMISIÓN DE CALOR NECESARIO PARA EL PROCESO 1,722,254.85 247,450.41
104
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
PRESUPUESTO DE OBRA
Precio
Precio Total Bs. Precio Total $us
N° ACTIVIDAD Unidad Cantidad Unitario Precio Unitario (Literal)
(Numeral) T/C 6.96
(Numeral)
TOTAL 9. SISTEMA DE AIRE COMPRIMIDO 464,017.92 66,669.24
105
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA
N° DESCRIPCIÓN Unidad Ubicación N° MEDIDAS EN MTS PARCIAL TOTAL
CIMIENTO DE HORMIGON CICLOPEO
ARQ.1 m3 Total = 137.48
(50%PIEDRA)
SOBRECIMIENTO DE HORMIGON
ARQ.2 m3 Total = 22.00
CICLOPEO(40%PIEDRA)
106
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ARQUITECTURA
N° DESCRIPCIÓN Unidad Ubicación N° MEDIDAS EN MTS PARCIAL TOTAL
107
L L L L L L l
BUEZO LEGLISE
ANALISIS DE PRECIOS UNITARIOS
PLANTA PROCESADORA DE PAPA - INCAHUASI
Actividad: ARQ.22 PISO DE CERAMICA CON COLOR SOBRE LOSA O PISO FROTACHADO
Unidad : m2 0.00
Rendimiento1.00 0.00
Moneda : Bs 0.00
PISO DE C 270.370 0.00
Descripcion Unidad Rendimiento Precio Costo
Unitario Total
1. MATERIALES 0.00
Arena fina m3 0.01 160.00 1.60
Cemento kg 9.00 1.26 11.34
Cerámica de piso nacional m2 1.05 73.10 76.76
Ocre nacional kg 0.30 16.00 4.80
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
TRABAJOS PRELIMINARES
EST.1 INSTALACION DE FAENA glb Total = 1.00
EXT 0 1 1.00 ###
EST.2 REPLANTEO Y TRAZADO glb 446339.03 Total = 1.00
EXT 0 1 1.00 ###
MOVIMIENTO DE TIERRAS ###
EST.3 EXCAVACIONES m3 Total = 1124.47
EXT MURO PERIMETRAL
MURO
EXT ZAPATAS DE HºA 1.00X1.00X0.30
PERIMETRAL
111.00 0.30 1.00 1.00 0.30 33.30 ###
MURO
EXT CIMIENTOS MURO
PERIMETRAL
1.00 0.50 0.50 1.00 0.25 0.25 ###
MURO
EXT
PERIMETRAL
1 0.50 0.50 83.81 20.95 20.95 ###
EXT 1 0.50 0.50 9.70 2.43 2.43 ###
EXT 1 0.50 0.50 23.74 5.94 5.94 ###
EXT 1 0.50 0.50 52.00 13.00 13.00 ###
EXT 1 0.50 0.50 154.15 38.54 38.54 ###
EXT 1 0.50 0.50 95.64 23.91 23.91 ###
EXT 1 0.50 0.50 130.86 32.72 32.72 ###
NAV NAVE INDUSTRIAL 0.00 ###
NAV ZAPATAS DE HºA 0.00 P1-P20-P21-P40 4.00 2.00 1.60 1.30 4.16 16.64 ###
P2-P3-P4-P5-P6-P9-
P10-P11-P12-P13-
P16-P19-P22-P23-
NAV 0.00
P24-P25-P26-P29-
23.00 2.00 1.90 1.60 6.08 139.84 ###
P30-P31-P32-P33-
P36
NAV 0.00 P17-P18 2.00 2.00 1.80 1.50 5.40 10.80 ###
NAV 0.00 P37 1.00 2.00 1.70 1.40 4.76 4.76 ###
NAV 0.00 P38-P39 2.00 2.00 2.00 1.70 6.80 13.60 ###
P7-P8-P27-P28-P14-
NAV 0.00
P15-P34-P35
8.00 2.00 1.95 1.90 7.41 59.28 ###
EJES G y D (ENTRE
NAV CIMIENTOS CORRIDOS 0.00
1 - 23)
2.00 0.60 0.50 87.70 26.31 52.62 ###
EJES G y D (ENTRE
NAV 0.00
1 - 23)
-19.00 0.60 0.50 0.30 0.09 -1.71 ###
NAV NAVE - ALMACEN DE MATERIA PRIMA 0.00 0.00 0.00 ###
P1-P2-P4-P5-P6-
NAV ZAPATAS DE HºA 0.00
P13-P14-P15
8.00 2.00 0.80 0.80 1.28 10.24 ###
128
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
NAV 0.00 EJE A (2 - 4) -1.00 0.50 0.40 0.20 0.04 -0.04 ###
NAV 0.00 EJE A (7 - 10) 1.00 0.50 0.40 5.50 1.10 1.10 ###
NAV 0.00 EJE A (7 - 10) 1.00 0.50 0.40 0.20 0.04 0.04 ###
NAV 0.00 EJE 10 (A-D) 2.00 0.50 0.40 4.20 0.84 1.68 ###
NAV 0.00 EJE 10 (A-D) -1.00 0.50 0.40 0.30 0.06 -0.06 ###
NAV 0.00 EJE 2 (B - D) 1.00 0.50 0.40 8.85 1.77 1.77 ###
EJE 2 (B - D) -2.00 0.50 0.40 0.30 0.06 -0.12
NAV JEFATURA DE PRODUCCION - SALA DE CONTROL - LABORATORIO 0.00 0.00 0.00 ###
NAV ZAPATAS DE HºA 0.00 EJES G-L (2-9) 18.00 2.50 1.55 1.55 6.01 108.11 ###
NAV CIMIENTOS CORRIDOS 0.00 EJES 2-4-7 (G-L) 3.00 0.50 0.40 21.45 4.29 12.87 ###
NAV 0.00 -18.00 0.50 0.40 0.30 0.06 -1.08 ###
NAV 0.00 EJES 9 (H-L) 1.00 0.50 0.40 17.25 3.45 3.45 ###
NAV 0.00 -5.00 0.50 0.40 0.30 0.06 -0.30 ###
NAV 0.00 EJES G (2-7) 1.00 0.50 0.40 9.90 1.98 1.98 ###
-1.00 0.50 0.40 0.25
NAV 0.00 EJES H-K (7-9) 2.00 0.50 0.40 6.65 1.33 2.66 ###
NAV 0.00 EJES I (2-4) 1.00 0.50 0.40 6.25 1.25 1.25 ###
NAV 0.00 EJES J-L (2-9) 2.00 0.50 0.40 16.75 3.35 6.70 ###
NAV 0.00 -2.00 0.50 0.40 0.25 0.05 -0.10 ###
COC COMEDOR - COCINA - BAÑO 0.00 0.00 0.00 ###
EJE (A (0-6), E(0-4),
COC ZAPATAS DE HºA 0.00
D5, C6
18.00 2.50 1.45 1.65 5.98 107.66 ###
F4, F4', F3, D1, C0,
COC 0.00 C1, B'0, B'1, B'5, B1, 11.00 2.50 1.00 1.00 2.50 27.50 ###
B5
COC CIMIENTOS CORRIDOS 0.00 EJE F (3-4) 1.00 0.50 0.40 5.96 1.19 1.19 ###
COC 0.00 -1.00 0.50 0.40 0.25 0.05 -0.05 ###
COC 0.00 EJE 1E(0-4) 1.00 0.50 0.40 20.86 4.17 4.17 ###
COC 0.00 -5.00 0.50 0.40 0.30 0.06 -0.30 ###
COC 0.00 EJE D (3-5) 1.00 0.50 0.40 7.85 1.57 1.57 ###
COC 0.00 EJES (C-B') (5-6) 2.00 0.50 0.40 1.30 0.26 0.52 ###
COC 0.00 EJE B (3-6) 1.00 0.50 0.40 9.40 1.88 1.88 ###
-1.00 0.50 0.40 0.25 0.05 -0.05
COC 0.00 EJE A (0-6) 1.00 0.50 0.40 24.10 4.82 4.82 ###
-7.00 0.50 0.40 0.30 0.06 -0.42
COC 0.00 EJE 6 (C-B') 1.00 0.50 0.40 2.75 0.55 0.55 ###
COC 0.00 EJE 6 (A-B) 1.00 0.50 0.40 2.65 0.53 0.53 ###
COC 0.00 EJE 5 (D-C) 1.00 0.50 0.40 2.55 0.51 0.51 ###
COC 0.00 EJE 4 (D-F) 1.00 0.50 0.40 4.90 0.98 0.98 ###
-1.00 0.50 0.40 0.45
129
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
COC 0.00 EJE 5 (A-B) 1.00 0.50 0.40 1.60 0.32 0.32 ###
COC 0.00 EJE 5 (E-I) 1.00 0.50 0.40 10.55 2.11 2.11 ###
COC 0.00 -3.00 0.50 0.40 0.30 0.06 -0.18 ###
COC 0.00 EJE 6 (A-D) 1.00 0.50 0.40 11.15 2.23 2.23 ###
COC 0.00 -3.00 0.50 0.40 0.30 0.06 -0.18 ###
COC 0.00 EJE 7 (E-I) 1.00 0.50 0.40 10.55 2.11 2.11 ###
COC 0.00 EJE A (1-3) 1.00 0.50 0.40 5.80 1.16 1.16 ###
COC 0.00 EJE A (4-6) 1.00 0.50 0.40 5.75 1.15 1.15 ###
COC 0.00 EJE E (1-2) 1.00 0.50 0.40 2.40 0.48 0.48 ###
COC 0.00 EJE E (5-7) 1.00 0.50 0.40 5.19 1.04 1.04 ###
COC 0.00 -2.50 0.50 0.40 0.45 0.09 -0.23 ###
COC 0.00 EJE F (5-7) 1.00 0.50 0.40 5.19 1.04 1.04 ###
COC 0.00 -2.50 0.50 0.40 0.45 0.09 -0.23 ###
COC 0.00 EJE H (1-7) 1.00 0.50 0.40 3.94 0.79 0.79 ###
COC 0.00 EJE G (5-7) 1.00 0.50 0.40 16.84 3.37 3.37 ###
COC 0.00 -5.00 0.50 0.40 0.45 0.09 -0.45 ###
NAV NAVE INDUSTRIAL - SILOS 0.00 0.00 0.00 ###
NAV ZAPATAS DE HºA 0.00 EJE 1 (A-M) 13.00 2.50 1.20 1.25 3.75 48.75 ###
NAV 0.00 EJE 2 (A y M) 2.00 2.50 1.20 1.25 3.75 7.50 ###
NAV 0.00 EJE 3M 1.00 2.50 1.20 1.25 3.75 3.75 ###
NAV 0.00 EJE 3 (A-J) 10.00 2.50 1.20 1.25 3.75 37.50 ###
NAV CIMIENTOS CORRIDOS 0.00 EJE 1 (A-M) 1.00 0.50 0.40 44.80 8.96 8.96 ###
NAV 0.00 -10.00 0.50 0.40 0.25 0.05 -0.50 ###
NAV 0.00 -2.00 0.50 0.40 0.20 0.04 -0.08 ###
EJE A(1-4) y
NAV 0.00
EJE M(1-4)
2.00 0.50 0.40 13.65 2.73 5.46 ###
NAV 0.00 -2.00 0.50 0.40 0.25 0.05 -0.10 ###
PER VIVIENDA PERSONAL 0.00 0.00 0.00 ###
EJE A(1-6) y
PER ZAPATAS DE HºA 0.00
EJE B(1-6)
12.00 2.50 1.00 1.00 2.50 30.00 ###
EJE A(1-6) y
PER CIMIENTOS CORRIDOS 0.00
EJE B(1-6)
2.00 0.50 0.40 18.05 3.61 7.22 ###
PER 0.00 -12.00 0.50 0.40 0.25 0.05 -0.60 ###
GER VIVIENDA GERENTE 0.00 0.00 0.00 ###
EJE A(1-4) y
GER ZAPATAS DE HºA 0.00
EJE B(1-4)
8.00 2.50 1.00 1.00 2.50 20.00 ###
EJE A(1-4) y
GER CIMIENTOS CORRIDOS 0.00
EJE B(1-4)
2.00 0.50 0.40 11.05 2.21 4.42 ###
GER 0.00 -8.00 0.50 0.40 0.25 0.05 -0.40 ###
POR VIVIENDA PORTERO 0.00 0.00 0.00 ###
EJE A(1-3) y
POR ZAPATAS DE HºA 0.00
EJE B(1-3)
6.00 2.50 1.00 1.00 2.50 15.00 ###
130
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
EJE A(1-3) y
POR CIMIENTOS CORRIDOS 0.00
EJE B(1-3)
2.00 0.50 0.40 8.55 1.71 3.42 ###
POR 0.00 -6.00 0.50 0.40 0.25 0.05 -0.30 ###
GUAR GUARDERIA 0.00 0.00 0.00 ###
EJE 1(A-E) y
GUAR ZAPATAS DE HºA 0.00
EJE 3(A-E)
10.00 2.50 1.00 1.00 2.50 25.00 ###
GUAR 0.00 EJE 4E 1.00 2.50 1.00 1.00 2.50 2.50 ###
EJE 5(B-D) y
GUAR 0.00
EJE 7(B-D)
6.00 2.50 1.00 1.00 2.50 15.00 ###
GUAR CIMIENTOS CORRIDOS 0.00 EJE 1(A-E) 1.00 0.50 0.40 15.26 3.05 3.05 ###
GUAR 0.00 -5.00 0.50 0.40 0.25 0.05 -0.25 ###
ADM ADMINISTRACION 0.00 0.00 0.00 ###
ADM ZAPATAS DE HºA 0.00 ZAPATAS 2 y16 2.00 2.50 1.00 1.00 2.50 5.00 ###
ADM 0.00 ZAPATAS 3 y15 2.00 2.50 1.00 1.00 2.50 5.00 ###
ADM 0.00 ZAPATAS 4 1.00 2.50 1.35 1.35 4.56 4.56 ###
ADM 0.00 ZAPATAS 5 y18 2.00 2.50 1.05 1.05 2.76 5.51 ###
ADM 0.00 ZAPATAS 6 1.00 2.50 1.55 1.55 6.01 6.01 ###
ADM 0.00 ZAPATAS 7 1.00 2.50 1.35 1.35 4.56 4.56 ###
ADM 0.00 ZAPATAS 8 1.00 2.50 1.65 1.65 6.81 6.81 ###
ADM 0.00 ZAPATAS 9 1.00 2.50 1.45 1.45 5.26 5.26 ###
ADM 0.00 ZAPATAS 10 1.00 2.50 1.75 1.75 7.66 7.66 ###
ADM 0.00 ZAPATAS 11 y17 2.00 2.50 1.25 1.25 3.91 7.81 ###
ADM 0.00 ZAPATA 12 1.00 2.50 1.15 1.15 3.31 3.31 ###
ADM 0.00 ZAPATA 13 1.00 2.50 1.75 1.75 7.66 7.66 ###
ADM 0.00 ZAPATA 14 1.00 2.50 1.45 1.45 5.26 5.26 ###
ADM 0.00 ZAPATA 20 1.00 2.50 1.00 1.00 2.50 2.50 ###
ADM 0.00 ZAPATA 21 1.00 2.50 1.00 1.00 2.50 2.50 ###
ADM VIGAS DE ARRIOSTRE 0.00 DE Z3 a Z18 1.00 0.40 0.25 32.35 3.24 3.24 ###
ADM 0.00 -8.00 0.40 0.25 0.25 0.03 -0.20 ###
ADM 0.00 DE Z2 a Z15 1.00 0.40 0.25 29.70 2.97 2.97 ###
ADM 0.00 -7.00 0.40 0.25 0.25 0.03 -0.18 ###
ADM 0.00 DE Z16 a Z16 1.00 0.40 0.25 3.65 0.37 0.37 ###
ADM 0.00 DE Z2 a Z3 1.00 0.40 0.25 5.55 0.56 0.56 ###
ADM 0.00 DE Z4 a Z5 1.00 0.40 0.25 5.55 0.56 0.56 ###
ADM 0.00 DE Z6 a Z7 1.00 0.40 0.25 5.55 0.56 0.56 ###
ADM 0.00 DE Z8 a Z9 1.00 0.40 0.25 5.55 0.56 0.56 ###
ADM 0.00 DE Z10 a Z11 1.00 0.40 0.25 5.55 0.56 0.56 ###
ADM 0.00 DE Z13 a Z14 1.00 0.40 0.25 5.55 0.56 0.56 ###
ADM 0.00 DE Z16 a Z18 1.00 0.40 0.25 6.55 0.66 0.66 ###
###
###
131
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
###
132
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
133
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
EJE A(1-3) y
POR ZAPATAS DE HºA
EJE B(1-3)
6.00 2.15 1.00 1.00 2.15 12.90 ###
POR -6.00 2.15 0.25 0.25 0.13 -0.81 ###
GUAR GUARDERIA 0.00 0.00 ###
EJE 1(A-E) y
GUAR ZAPATAS DE HºA
EJE 3(A-E)
10.00 2.15 1.00 1.00 2.15 21.50 ###
GUAR -10.00 2.15 0.25 0.25 0.13 -1.34 ###
GUAR EJE 4E 1.00 2.15 1.00 1.00 2.15 2.15 ###
GUAR -1.00 2.15 0.25 0.25 0.13 -0.13 ###
EJE 5(B-D) y
GUAR
EJE 7(B-D)
6.00 2.15 1.00 1.00 2.15 12.90 ###
GUAR -6.00 2.15 0.25 0.25 0.13 -0.81 ###
ADM ADMINISTRACION 0.00 0.00 ###
ADM ZAPATAS DE HºA ZAPATAS 2 y16 2.00 2.50 1.00 1.00 2.50 5.00 ###
ADM -2.00 2.20 0.25 0.25 0.14 -0.28 ###
ADM ZAPATAS 3 y15 2.00 2.50 1.00 1.00 2.50 5.00 ###
ADM -2.00 2.20 0.25 0.25 0.14 -0.28 ###
ADM ZAPATAS 4 1.00 2.50 1.35 1.35 4.56 4.56 ###
ADM -1.00 2.20 0.25 0.25 0.14 -0.14 ###
ADM ZAPATAS 5 y18 2.00 2.50 1.05 1.05 2.76 5.51 ###
ADM -2.00 2.20 0.25 0.25 0.14 -0.28 ###
ADM ZAPATAS 6 1.00 2.50 1.55 1.55 6.01 6.01 ###
ADM -1.00 2.15 0.25 0.25 0.13 -0.13 ###
ADM ZAPATAS 7 1.00 2.50 1.35 1.35 4.56 4.56 ###
ADM -1.00 2.20 0.25 0.25 0.14 -0.14 ###
ADM ZAPATAS 8 1.00 2.50 1.65 1.65 6.81 6.81 ###
ADM -1.00 2.15 0.25 0.25 0.13 -0.13 ###
ADM ZAPATAS 9 1.00 2.50 1.45 1.45 5.26 5.26 ###
ADM -1.00 2.20 0.25 0.25 0.14 -0.14 ###
ADM ZAPATAS 10 1.00 2.50 1.75 1.75 7.66 7.66 ###
ADM -1.00 2.10 0.25 0.25 0.13 -0.13 ###
ADM ZAPATAS 11 y17 2.00 2.50 1.25 1.25 3.91 7.81 ###
ADM -2.00 2.20 0.25 0.25 0.14 -0.28 ###
ADM ZAPATA 12 1.00 2.50 1.15 1.15 3.31 3.31 ###
ADM -1.00 2.20 0.25 0.25 0.14 -0.14 ###
ADM ZAPATA 13 1.00 2.50 1.75 1.75 7.66 7.66 ###
ADM -1.00 2.10 0.25 0.25 0.13 -0.13 ###
ADM ZAPATA 14 1.00 2.50 1.45 1.45 5.26 5.26 ###
ADM -1.00 2.20 0.25 0.25 0.14 -0.14 ###
ADM ZAPATA 20 1.00 2.50 1.00 1.00 2.50 2.50 ###
ADM -1.00 2.20 0.25 0.25 0.14 -0.14 ###
134
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
135
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
136
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
NAV EJE 25 (B-C-D-E) 4.00 5.15 0.25 0.25 0.32 1.29 ###
NAV EJE C (entre 26-27) 1.00 5.15 0.25 0.25 0.32 0.32 ###
NAV NAVE - ALMACEN DE MATERIA PRIMA ###
P1 P2 P3 P4 P5 P6
NAV
P13 P14 P15
9.00 7.15 0.20 0.30 0.43 3.86 ###
P7 P8 P9 P11 P12 5.00 7.15 0.20 0.30 0.43 2.15
137
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
ADM COLUMNAS 3 y15 2.00 7.50 0.25 0.25 0.47 0.94 ###
ADM COLUMNA 4 1.00 7.50 0.25 0.25 0.47 0.47 ###
ADM COLUMNAS 5 y18 2.00 7.50 0.25 0.25 0.47 0.94 ###
ADM COLUMNA 6 1.00 7.50 0.25 0.25 0.47 0.47 ###
ADM COLUMNA 7 1.00 7.50 0.25 0.25 0.47 0.47 ###
ADM COLUMNA 8 1.00 7.50 0.25 0.25 0.47 0.47 ###
ADM COLUMNA 9 1.00 7.50 0.25 0.25 0.47 0.47 ###
ADM COLUMNA 10 1.00 7.50 0.25 0.25 0.47 0.47 ###
ADM COLUMNAS 11 y17 2.00 7.50 0.25 0.25 0.47 0.94 ###
ADM COLUMNA 12 1.00 7.50 0.25 0.25 0.47 0.47 ###
ADM COLUMNA 13 1.00 7.50 0.25 0.25 0.47 0.47 ###
ADM COLUMNA 14 1.00 7.50 0.25 0.25 0.47 0.47 ###
ADM COLUMNA 20 1.00 7.50 0.25 0.25 0.47 0.47 ###
ADM COLUMNA 21 1.00 7.50 0.25 0.25 0.47 0.47 ###
EST.7 HORMIGÓN PARA VIGAS m3 Total = 164.49
NAV NAVE INDUSTRIAL ###
NAV NIVEL + 9,00 EJE D 1.00 0.20 0.60 88.30 10.60 10.60 ###
NAV 1.00 0.40 0.25 88.30 8.83 8.83 ###
NAV EJE N 1.00 0.20 0.60 88.30 10.60 10.60 ###
NAV 1.00 0.40 0.25 88.30 8.83 8.83 ###
NAV NIVEL + 4,70 EJE D 1.00 0.50 0.25 88.30 11.04 11.04 ###
NAV 1.00 0.50 0.25 88.30 11.04 11.04 ###
NAV EJE N 1.00 0.50 0.25 88.30 11.04 11.04 ###
NAV 1.00 0.50 0.25 88.30 11.04 11.04 ###
PORTICO 1 (+3.00 y
NAV NAVE - ALMACEN DE MATERIA PRIMA
+5.15)
2.00 0.20 0.30 21.00 1.26 2.52 ###
NAV PORTICO 2 (5.15) 1.00 0.20 0.40 13.45 1.08 1.08 ###
NAV PORTICO 2 (3) 1.00 0.20 0.30 4.80 0.29 0.29 ###
PORTICO 3 (5.15) 1.00 0.20 0.40 13.45 1.08 1.08
PORTICO 3 (3) 1.00 0.20 0.30 3.45 0.21 0.21
PORTICO 4 (5.15) 1.00 0.20 0.40 13.46 1.08 1.08
PORTICO 4 y 5 (3) 2.00 0.20 0.30 12.60 0.76 1.51
NAV JEFATURA DE PRODUCCION - SALA DE CONTROL - LABORATORIO EJES (1-3) (A-G) 3.00 0.20 0.40 22.00 1.76 5.28 ###
NAV EJE 4(A-G) 1.00 0.20 0.40 17.85 1.43 1.43 ###
NAV EJE (B y E')(3-4) 3.00 0.20 0.40 7.24 0.58 1.74 ###
NAV EJE B' (1-2) 1.00 0.20 0.40 6.65 0.53 0.53 ###
NAV EJE (D' y G)(1-4) 2.00 0.20 0.40 17.35 1.39 2.78 ###
COC COMEDOR - COCINA - BAÑO EJE F (4-3) 1.00 0.25 0.30 7.60 0.57 0.57 ###
138
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
COC EJE E(3-0) 1.00 0.25 0.30 15.13 1.13 1.13 ###
COC EJE D(5-4) 1.00 0.25 0.30 2.09 0.16 0.16 ###
COC EJES C, B, B'(6-5) 3.00 0.25 0.30 1.70 0.13 0.38 ###
COC EJE A(6-0) 1.00 0.25 0.30 24.80 1.86 1.86 ###
COC EJE 6(C-A) 1.00 0.25 0.30 8.09 0.61 0.61 ###
COC EJE 5(D-C) 1.00 0.25 0.30 3.20 0.24 0.24 ###
COC EJE 4(F-D) 1.00 0.25 0.30 5.50 0.41 0.41 ###
COC EJE 3(F-E) 1.00 0.25 0.30 2.70 0.20 0.20 ###
COC EJE 0(E-A) 1.00 0.25 0.30 14.80 1.11 1.11 ###
EJE 1 (+3.50 Y
NAV NAVE INDUSTRIAL - SILOS
+6.16)
2.00 0.25 0.30 22.68 1.70 3.40 ###
EJE 0 (+3.50 Y
NAV
+6.16)
2.00 0.20 0.30 22.68 1.36 2.72 ###
EJE D0 (+3.50 Y
NAV
+6.16)
2.00 0.20 0.30 10.54 0.63 1.26 ###
EJE I (+3.50 Y
NAV
+6.16)
2.00 0.20 0.30 14.25 0.86 1.71 ###
EJE 2(G'-H)(+3.50 Y
NAV
+6.16)
2.00 0.20 0.30 4.17 0.25 0.50 ###
PER VIVIENDA PERSONAL EJES A y B (1-5) 2.00 0.20 0.30 18.05 1.08 2.17 ###
PER EJES (1, 2 y 5) 3.00 0.20 0.30 4.80 0.29 0.86 ###
GER VIVIENDA GERENTE EJES Ay B (1-3) 2.00 0.20 0.30 11.14 0.67 1.34 ###
GER EJE 1 y 3 2.00 0.20 0.30 5.00 0.30 0.60 ###
POR VIVIENDA PORTERO EJES C(4-2) 1.00 0.20 0.30 8.35 0.50 0.50 ###
POR EJES B('5-4) 1.00 0.20 0.30 2.54 0.15 0.15 ###
POR EJES B('5-4) 1.00 0.20 0.30 3.65 0.22 0.22
POR EJES A(1-5) 1.00 0.20 0.30 14.54 0.87 0.87
POR EJES 5(A-B) 1.00 0.20 0.30 3.18 0.19 0.19
POR EJES (4 Y 2)(A-C) 2.00 0.20 0.30 4.70 0.28 0.56
POR EJES 1(A-B) 1.00 0.20 0.30 2.62 0.16 0.16
GUAR GUARDERIA EJES 1 y 3 (A-F) 2.00 0.20 0.35 15.27 1.07 2.14 ###
GUAR EJE 4' (B-C') 1.00 0.20 0.35 4.15 0.29 0.29 ###
GUAR EJE 4' (D-E) 1.00 0.20 0.35 5.28 0.37 0.37 ###
GUAR EJE 5' y 7(B-D) 2.00 0.20 0.35 7.11 0.50 1.00 ###
GUAR EJE A, C', D y E(1-6) 4.00 0.20 0.35 5.65 0.40 1.58 ###
GUAR EJES B y D (3-7) 2.00 0.20 0.35 11.00 0.77 1.54 ###
GUAR EJE C'(4'-5') 1.00 0.20 0.35 2.80 0.20 0.20 ###
ADM ADMINISTRACION ###
PORTICO 1 (B16-
ADM losa de techo
C16)
1.00 0.20 0.35 2.85 0.20 0.20 ###
PORTICO 2 (C2-
ADM
C10)
1.00 0.20 0.35 19.36 1.36 1.36 ###
PORTICO 2 (C10-
ADM
C13)
1.00 0.25 0.40 6.80 0.68 0.68 ###
PORTICO 2 (C13-
ADM
C15)
1.00 0.20 0.35 3.55 0.25 0.25 ###
PORTICO 3 (C3-
ADM
C18)
1.00 0.20 0.35 32.35 2.26 2.26 ###
139
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
PORTICO 4 (B26-
ADM
C3)
1.00 0.20 0.35 7.06 0.49 0.49 ###
PORTICO 5 (B28-
ADM
C5)
1.00 0.25 0.45 7.08 0.80 0.80 ###
PORTICO 6 (B29-
ADM
C7)
1.00 0.25 0.45 7.06 0.79 0.79 ###
PORTICO 7 (B30-
ADM
C9)
1.00 0.25 0.45 7.06 0.79 0.79 ###
PORTICO 8(B31-
ADM
C11)
1.00 0.20 0.35 7.06 0.49 0.49 ###
PORTICO 9 (B32-
ADM
C13)
1.00 0.20 0.35 1.13 0.08 0.08 ###
PORTICO 9 (C13-
ADM
C14)
1.00 0.25 0.40 5.80 0.58 0.58 ###
PORTICO 9 (C14-
ADM
B9)
1.00 0.20 0.35 0.90 0.06 0.06 ###
PORTICO 10 (B27-
ADM
C15)
1.00 0.20 0.35 1.25 0.09 0.09 ###
PORTICO 11 (C16-
ADM
B8)
1.00 0.20 0.35 7.93 0.56 0.56 ###
PORTICO 1 (B23-
ADM losa planta alta
C16)
1.00 0.20 0.40 2.85 0.23 0.23 ###
PORTICO 2 (C2-
ADM
C15)
1.00 0.20 0.40 29.71 2.38 2.38 ###
PORTICO 3 (C3-
ADM
C18)
1.00 0.20 0.40 32.35 2.59 2.59 ###
PORTICO 4 (B26-
ADM
C3)
1.00 0.20 0.40 7.16 0.57 0.57 ###
PORTICO 5 (B16-
ADM
C7)
1.00 0.25 0.45 7.06 0.79 0.79 ###
PORTICO 6 (B17-
ADM
C9)
1.00 0.25 0.45 7.06 0.79 0.79 ###
PORTICO 7 (B24-
ADM
C11)
1.00 0.20 0.40 7.06 0.56 0.56 ###
ADM PORTICO 8(B22-B9) 1.00 0.20 0.40 7.73 0.62 0.62 ###
PORTICO 9 (B14-
ADM
C15)
1.00 0.20 0.40 1.25 0.10 0.10 ###
PORTICO 10 (C16-
ADM
B8)
1.00 0.20 0.40 7.73 0.62 0.62 ###
PORTICO 11(B14-
ADM
C4)
1.00 0.25 0.45 1.25 0.14 0.14 ###
PORTICO 12 (C21-
ADM
C5)
1.00 0.25 0.45 1.80 0.20 0.20 ###
PORTICO 13 (C20-
ADM
B25)
1.00 0.25 0.40 9.17 0.92 0.92 ###
PORTICO 1 (B13-
ADM vigas de arriostre
C16)
1.00 0.25 0.40 2.90 0.29 0.29 ###
PORTICO 2 (C3-
ADM
C18)
1.00 0.25 0.40 32.37 3.24 3.24 ###
ADM PORTICO 3 (C2-C3) 1.00 0.25 0.40 6.05 0.61 0.61 ###
PORTICO 4 (C4-
ADM
C5)
1.00 0.25 0.40 6.08 0.61 0.61 ###
ADM PORTICO 5 (C6-C7) 1.00 0.25 0.40 6.05 0.61 0.61 ###
ADM PORTICO 6 (C8-C9) 1.00 0.25 0.40 6.05 0.61 0.61 ###
PORTICO 7 (C13-
ADM
C14)
1.00 0.25 0.40 6.08 0.61 0.61 ###
PORTICO 8 (B13-
ADM
C15)
1.00 0.25 0.40 1.25 0.13 0.13 ###
PORTICO 9 (C16-
ADM
C18)
1.00 0.25 0.40 7.06 0.71 0.71 ###
PORTICO 10 (C2-
ADM
C15)
1.00 0.25 0.40 29.71 2.97 2.97 ###
PORTICO 11 (C10-
ADM
C11)
1.00 0.25 0.40 6.06 0.61 0.61 ###
EST.8 LOSAS ALIVIANDA m2 Total = 350.68
ADM losa de techo ejes 1-2/C-D 1.00 0.15 2.97 0.45 2.97 ###
140
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
141
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
142
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
EST.21 ESTRUCTURA METÁLICAS VIVIENDA PERSONAL, GERENTE Y SERENO pza Total = 13.00
143
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
MEDIDAS EN MTS
A B C D=BxC E=AxD
N° DESCRIPCIÓN Unidad Ubicación N° PARCIAL TOTAL
ALTO ANCHO LARGO AREA VOLUMEN
144
BUEZO LEGLISE
ANALISIS DE PRECIOS UNITARIOS
PLANTA PROCESADORA DE PAPA - INCAHUASI
Actividad: EST.17 .- ESTRUCTURA METÁLICAS COMEDOR CERCHA TIPO 1 (INC CERCHA CONTRAVENTEO)
Unidad : pza 0.00
Rendimiento1.00 0.00
Moneda : Bs 0.00
ESTRUCTU 30,855.440 0.00
Descripcion Unidad Rendimiento Precio Costo
Unitario Total
1. MATERIALES 0.00
Costanera 150x50x15x3 m 84.700 50.00 4,235.00
Costanera 150x50x15x2 m 39.130 37.00 1,447.81
Costanera 100x50x15x2 m 27.600 29.68 819.17
Angular 1"x1/8" m 71.000 14.45 1,025.95
Plancha de acero e=3mm m2 0.260 155.00 40.30
Acero liso de construcción Kg 24.220 6.70 162.27
Pintura Anticorrosiva Gl 3.000 140.00 420.00
Electrodo Kg 25.000 25.00 625.00
175
1 1 1 L L L L
BUEZO LEGLISE
ANALISIS DE PRECIOS UNITARIOS
PLANTA PROCESADORA DE PAPA - INCAHUASI
1
ANALISIS DE PRECIOS UNITARIOS 1
1
1
Actividad: HSAN.38 Pozo de agua 1
Unidad : glb 1
Rendimiento: 1.00 1
Moneda : Bolivianos 1
0.000 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 1
1
Grava seleccionada m3 2.611 140.00 365.59 1
Tubería PVC E40 ø6" m 25.50 300.00 7,650.00 1
Cemento Kg 1,013.42 1.15 1,165.44 1
Arena m3 0.57 140.00 79.56 1
Acero de construcción Kg 5.16 5.57 28.73 1
1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 9,289.32 1
2. MANO DE OBRA 1
1
Albañil hr 8.00 21.25 170.00 1
Ayudante hr 36.00 12.50 450.00 1
Especialista en perforación hr 12.00 25.00 300.00 1
Operadorequipo pesado hr 12.00 22.97 275.64 1
1
1
SUBTOTAL MANO DE OBRA 1,195.64 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 657.60 1
IVA (% de 2) 13.94% 258.34 1
TOTAL MANO DE OBRA 2,111.58 1
3. MAQUINARIA Y EQUIPO 1
PERFORADORA VAGON DRILL (C/COMPRESORA) Hr 12.00 780.00 9,360.00 1
AGITADOR Hr 4.00 78.18 312.72
BOMBA DE INYECCIONES DE CEMENTO Hr 4.00 174.70 698.80
EQUIPO DE INYECCIONES DE CEMENTO Hr 4.00 116.21 464.84
MEZCLADORA DE INYECCIONES' Hr 4.00 139.28 557.12
1
1
1
Herramientas menores (% Tot. M.O.) 6.00% 126.69 1
TOTAL MAQUINARIA Y EQUIPO 11,520.17 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 1
Gastos Generales (% de 1+2+3) 7.00% 1,604.48 1
5. UTILIDAD 1
Utilidad (% de 1+2+3+4) 10.00% 2,452.55 1
6. IMPUESTOS 1
1
IT (% DE 1+2+3+4+5+6) 3.48% 938.84 1
TOTAL PRECIO UNITARIO Bs (1+2+3+4+5+6) 27,916.93 1
Total = 1.00
1.00
Total = 1.00
1.00
Total = 0.94
0.94
Total = 2.08
1.25
0.83
1.25
3.30
30.16
0.00
6.76
11.96
11.44
2.00
1.00
1.00
0.99
0.54
0.45
0.14
0.09
-0.03
0.08
10.36
6.80
-1.44
6.00
-1.00
0.40
0.40
0.26
0.26
2.88
2.88
1.44
1.44
Total = 1.00
0.00 1.00
Total = 31.00
0.00 30.00
Total = 1.00
1.00
Total = 30.00
0.00 30.00
Total = 2.00
2.00
Total = 1.00
1.00
Total = 1.00
1.00
Total = 80.00
80.00
Total = 1.00
1.00
Total = 8.00
3.00
5.00
Total = 80.00
20.00
20.00
40.00
Total = 6.25
6.25
Total = 3.00
3.00
Total = 2.14
1.02
0.32
0.80
Total = 2.00
2.00
Total = 2.00
2.00
Total = 40.00
20.00
20.00
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R1 CAMARA ROMPE PRESIÓN 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CAMARA R 1,392.920 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 15.00 1.11 16.70 1
ARENA COMUN m3 0.35 120.00 42.00 1
PIEDRA BRUTA m3 0.75 150.00 112.50 1
MADERA DE ENCOFRADO pie2 15.00 8.50 127.50 1
BARRA DE ACERO CORRUGADO kg 6.00 8.00 48.02 1
CLAVO kg 1.20 15.00 18.00 1
ALAMBRE DE AMARRE DE AL. NO.4 m 1.00 15.00 15.00 1
1
1
TOTAL MATERIALES 379.73 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 12.00 21.25 255.00 1
AYUDANTE hr 12.00 12.50 150.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 405.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 222.75 1
IVA (% de 2) 0.15 93.79 1
TOTAL MANO DE OBRA 721.54 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 36.08 1
TOTAL MAQUINARIA Y EQUIPO 36.08 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 90.99 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 122.83 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 41.75 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 1,392.92 1
Son: Un Mil Trescientos Noventa y Dos 92/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R2 DESARENADOIR (INCLUYE CANAL PARSHALL) 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
DESARENAD 4,471.180 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 600.00 1.11 668.16 1
ARENA COMUN m3 0.90 120.00 108.00 1
GRAVA m3 1.00 120.00 120.00 1
PIEDRA MANZANO (PARA SOLADURA) m2 0.65 12.00 7.80 1
MADERA DE ENCOFRADO pie2 15.00 8.50 127.50 1
BARRA DE ACERO CORRUGADO kg 6.00 8.00 48.02 1
CLAVO kg 1.20 15.00 18.00 1
ALAMBRE DE AMARRE DE AL. NO.4 m 1.00 15.00 15.00 1
OTROS MENORES glb 1.00 12.95 12.95 1
TOTAL MATERIALES 1,125.43 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 40.00 21.25 850.00 1
AYUDANTE hr 40.00 12.50 500.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 1,350.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 742.50 1
IVA (% de 2) 0.15 312.62 1
TOTAL MANO DE OBRA 2,405.12 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 120.26 1
TOTAL MAQUINARIA Y EQUIPO 120.26 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 292.07 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 394.29 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 134.02 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 4,471.18 1
Son: Cuatro Mil Cuatrocientos Setenta y Uno 18/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R3 CONTRAPISO DE H° ( INCLUYE EMPEDRADO) 1
Unidad : m2 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CONTRAPIS 185.510 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 20.00 1.11 22.27 1
ARENA COMUN m3 0.06 120.00 7.20 1
GRAVA COMUN m3 0.04 120.06 4.80 1
PIEDRA MANZANA m3 0.15 150.00 22.50 1
1
1
1
1
1
TOTAL MATERIALES 56.77 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 1.50 21.25 31.88 1
AYUDANTE hr 1.50 12.50 18.75 1
1
1
1
1
SUBTOTAL MANO DE OBRA 50.63 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 27.84 1
IVA (% de 2) 0.15 11.72 1
TOTAL MANO DE OBRA 90.19 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 4.51 1
TOTAL MAQUINARIA Y EQUIPO 4.51 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 12.12 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 16.36 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 5.56 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 185.51 1
Son: Ciento Ochenta y Cinco 51/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R4 HORMIGON ARMADO 1:2:3 1
Unidad : m3 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
HORMIGON 4,549.480 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 350.00 1.11 389.76 1
ARENA COMUN m3 0.45 120.00 54.00 1
GRAVA COMUN m3 0.92 120.06 110.46 1
MADERA DE ENCOFRADO pie2 80.00 8.50 680.00 1
BARRA DE ACERO CORRUGADO kg 60.00 8.00 480.24 1
CLAVO kg 2.00 15.00 30.00 1
ALAMBRE DE AMARRE DE AL. NO.4 m 2.00 15.00 30.00 1
1
1
TOTAL MATERIALES 1,774.46 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 10.00 21.25 212.50 1
ARMADOR hr 10.00 18.75 187.50 1
AYUDANTE hr 20.00 12.50 250.00 1
ENCOFRADOR hr 20.00 18.75 375.00 1
1
1
SUBTOTAL MANO DE OBRA 1,025.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 563.75 1
IVA (% de 2) 0.15 237.36 1
TOTAL MANO DE OBRA 1,826.11 1
3. MAQUINARIA Y EQUIPO 0.00 1
MEZCLADORA DE HORMIGON 300 LTS LTS/H LTS/H LTS/H HR. 1.00 17.72 17.72 1
VIBRADOR DE HORMIGON MIKAS-GY1830 HR. 0.80 6.44 5.16 1
1
1
Herramientas menores (% Tot. M.O.) 0.05 91.31 1
TOTAL MAQUINARIA Y EQUIPO 114.18 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 297.18 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 401.19 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 136.37 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 4,549.48 1
Son: Cuatro Mil Quinientos Cuarenta y Nueve 48/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R5 IMPERMEABILIZACION INTERIOR TANQUE DE AGUA 1
Unidad : m2 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
IMPERMEAB 243.300 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 16.00 1.11 17.82 1
ARENA FINA m3 0.05 160.00 8.00 1
SIKA 1 IMPERMEABILIZANTE kg 0.50 30.00 15.00 1
1
1
1
1
1
1
TOTAL MATERIALES 40.82 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 2.50 21.25 53.13 1
AYUDANTE hr 2.50 12.50 31.25 1
1
1
1
1
SUBTOTAL MANO DE OBRA 84.38 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 46.41 1
IVA (% de 2) 0.15 19.54 1
TOTAL MANO DE OBRA 150.32 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 7.52 1
TOTAL MAQUINARIA Y EQUIPO 7.52 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 15.89 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 21.46 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 7.29 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 243.30 1
Son: Doscientos Cuarenta y Tres 30/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R6 PROVISIÓN Y COLOCADO DE TAPA METALICA 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PROVISIÓN 921.350 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
BARRA DE ACERO CORRUGADO 3/8" (10 mm.) kg 1.50 3.81 5.72 1
PINTURA ANTICORROSIVA(BASE CROMATO ZINC) gal 0.05 157.85 7.89 1
ANGULAR 1/8" X 1 1 /2" m 3.50 16.36 57.25 1
ELECTRODO kg 0.70 17.89 12.52 1
PLETINA 1/4" X 1" m 5.00 11.14 55.68 1
1
1
1
1
TOTAL MATERIALES 139.06 1
2. MANO DE OBRA 0.00 1
AYUDANTE hr 6.00 12.50 75.00 1
ESPECIALISTA hr 8.00 25.00 200.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 275.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 151.25 1
IVA (% de 2) 0.15 63.68 1
TOTAL MANO DE OBRA 489.93 1
3. MAQUINARIA Y EQUIPO 0.00 1
SOLDADOR ELECTRICO HASTA 400 A GL GL GL HR. 2.50 39.53 98.82 1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 24.50 1
TOTAL MAQUINARIA Y EQUIPO 123.31 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 60.18 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 81.25 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 27.62 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 921.35 1
Son: Novecientos Veintiuno 35/100 0.00 1
BUEZO LEGLISE 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R7 CIMIENTO DE H°C° 1
Unidad : m3 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CIMIENTO 735.950 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 120.00 1.11 133.63 1
ARENA COMUN m3 0.20 120.00 24.00 1
GRAVA COMUN m3 0.30 120.06 36.02 1
PIEDRA BOLON PARA CIMIENTO m3 0.80 114.49 91.59 1
1
1
1
1
1
TOTAL MATERIALES 285.24 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 5.00 21.25 106.25 1
AYUDANTE hr 5.00 12.50 62.50 1
1
1
1
1
SUBTOTAL MANO DE OBRA 168.75 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 92.81 1
IVA (% de 2) 0.15 39.08 1
TOTAL MANO DE OBRA 300.64 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 15.03 1
TOTAL MAQUINARIA Y EQUIPO 15.03 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 48.07 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 64.90 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 22.06 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 735.95 1
Son: Setecientos Treinta y Cinco 95/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R8 SOBRECIMIENTO DE HO CO 1
Unidad : m3 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
SOBRECIMI 1,525.980 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 120.00 1.11 133.63 1
ARENA COMUN m3 0.25 120.00 30.00 1
GRAVA COMUN m3 0.35 120.06 42.02 1
PIEDRA MANZANA m3 0.80 150.00 120.00 1
SIKA 1 IMPERMEABILIZANTE kg 2.00 30.00 60.00 1
MADERA DE CONSTRUCCION pie2 25.00 8.50 212.50 1
CLAVO kg 0.60 15.00 9.00 1
ALAMBRE DE AMARRE DE AL. NO.4 m 0.50 15.00 7.50 1
1
TOTAL MATERIALES 614.65 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 10.00 21.25 212.50 1
AYUDANTE hr 10.00 12.50 125.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 337.50 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 185.63 1
IVA (% de 2) 0.15 78.16 1
TOTAL MANO DE OBRA 601.28 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 30.06 1
TOTAL MAQUINARIA Y EQUIPO 30.06 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 99.68 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 134.57 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 45.74 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 1,525.98 1
Son: Un Mil Quinientos Veinticinco 98/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R9 MURO DE LADRILLO GAMBOTE 12 CM VISTO 1
Unidad : m2 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
MURO DE L 450.680 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 14.00 1.11 15.59 1
ARENA FINA m3 0.06 160.00 9.60 1
LADRILLO CERAMICO GAMBOTE 24X11X6 pza 53.00 1.20 63.60 1
LADRILLO GAMBOTE 18 H 25 X 12 X 6 pza 63.00 1.11 70.16 1
1
1
1
1
1
TOTAL MATERIALES 158.95 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 3.20 21.25 68.00 1
AYUDANTE hr 3.50 12.50 43.75 1
1
1
1
1
SUBTOTAL MANO DE OBRA 111.75 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 61.46 1
IVA (% de 2) 0.15 25.88 1
TOTAL MANO DE OBRA 199.09 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 9.95 1
TOTAL MAQUINARIA Y EQUIPO 9.95 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 29.44 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 39.74 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 13.51 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 450.68 1
Son: Cuatrocientos Cincuenta 68/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R10 MURO DE LADRILLO CELOSIA ORNAMENTAL 1
Unidad : m2 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
MURO DE L 206.500 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 6.00 1.11 6.68 1
ARENA FINA m3 0.04 160.00 6.40 1
LADRILLO CELOSIA 12 X 16 X 16 pza 38.00 1.60 60.83 1
1
1
1
1
1
1
TOTAL MATERIALES 73.91 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 1.50 21.25 31.88 1
AYUDANTE hr 1.50 12.50 18.75 1
1
1
1
1
SUBTOTAL MANO DE OBRA 50.63 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 27.84 1
IVA (% de 2) 0.15 11.72 1
TOTAL MANO DE OBRA 90.19 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 4.51 1
TOTAL MAQUINARIA Y EQUIPO 4.51 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 13.49 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 18.21 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 6.19 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 206.50 1
Son: Doscientos Seis 50/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R11 CONTRAPISO DE H° ( INCLUYE EMPEDRADO) 1
Unidad : m2 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CONTRAPIS 185.510 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 20.00 1.11 22.27 1
ARENA COMUN m3 0.06 120.00 7.20 1
GRAVA COMUN m3 0.04 120.06 4.80 1
PIEDRA MANZANA m3 0.15 150.00 22.50 1
1
1
1
1
1
TOTAL MATERIALES 56.77 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 1.50 21.25 31.88 1
AYUDANTE hr 1.50 12.50 18.75 1
1
1
1
1
SUBTOTAL MANO DE OBRA 50.63 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 27.84 1
IVA (% de 2) 0.15 11.72 1
TOTAL MANO DE OBRA 90.19 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 4.51 1
TOTAL MAQUINARIA Y EQUIPO 4.51 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 12.12 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 16.36 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 5.56 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 185.51 1
Son: Ciento Ochenta y Cinco 51/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R12 CUBIERTA DE CALAMINA N. 28 INCLUYE MADERAMEN 1
Unidad : m2 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CUBIERTA 325.250 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
MADERA DE CONSTRUCCION pie2 5.80 8.50 49.30 1
CLAVO kg 0.20 15.00 3.00 1
CLAVO PARA CALAMINA (Estriados) kg 0.20 16.36 3.27 1
CALAMINA ONDULADA N°28 m2 1.18 45.00 53.10 1
1
1
1
1
1
TOTAL MATERIALES 108.67 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 2.30 21.25 48.88 1
AYUDANTE hr 2.80 12.50 35.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 83.88 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 46.13 1
IVA (% de 2) 0.15 19.42 1
TOTAL MANO DE OBRA 149.43 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 7.47 1
TOTAL MAQUINARIA Y EQUIPO 7.47 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 21.25 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 28.68 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 9.75 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 325.25 1
Son: Trescientos Veinticinco 25/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R13 PUERTA DE METAL DE PLANCHA DE 1/8" 1
Unidad : m2 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PUERTA DE 689.800 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
PERFIL ANGULAR 1 X 1/8" m 5.00 10.93 54.64 1
PINTURA ANTICORROSIVA(BASE CROMATO ZINC) gal 0.10 157.85 15.79 1
BISAGRA DOBLE 4" pza 3.00 8.63 25.89 1
ELECTRODO kg 0.80 17.89 14.31 1
PLANCHA METALICA 1/8 MM pza 0.50 344.03 172.02 1
1
1
1
1
TOTAL MATERIALES 282.64 1
2. MANO DE OBRA 0.00 1
ESPECIALISTA hr 6.00 25.00 150.00 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 150.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 82.50 1
IVA (% de 2) 0.15 34.74 1
TOTAL MANO DE OBRA 267.24 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 13.36 1
TOTAL MAQUINARIA Y EQUIPO 13.36 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 45.06 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 60.83 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 20.68 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 689.80 1
Son: Seiscientos Ochenta y Nueve 80/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R14 CAMARAS DE VÁLVULAS 100 x 100 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CAMARAS D 1,524.040 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 130.00 1.11 144.77 1
ARENA COMUN m3 0.30 120.00 36.00 1
PIEDRA BRUTA m3 0.65 150.00 97.50 1
MADERA DE ENCOFRADO pie2 15.00 8.50 127.50 1
BARRA DE ACERO CORRUGADO kg 6.00 8.00 48.02 1
CLAVO kg 1.20 15.00 18.00 1
ALAMBRE DE AMARRE DE AL. NO.4 m 1.00 15.00 15.00 1
1
1
TOTAL MATERIALES 486.79 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 12.00 21.25 255.00 1
AYUDANTE hr 12.00 12.50 150.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 405.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 222.75 1
IVA (% de 2) 0.15 93.79 1
TOTAL MANO DE OBRA 721.54 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 36.08 1
TOTAL MAQUINARIA Y EQUIPO 36.08 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 99.55 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 134.40 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 45.68 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 1,524.04 1
Son: Un Mil Quinientos Veinticuatro 04/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R15 PROV Y COLOCACIÓN TUBERIA PVC 2" C9 (INCLUYE VALVULAS + ACCESORIOS EN CAMARA DE SALIDA) 1
Unidad : m 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PROV Y COLO 1,262.660 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Tubería PVC D 2" C9 m 1.05 16.67 17.50 1
Pegamento para PVC lt 0.01 40.00 0.40 1
Limpiador PVC lt 0.01 40.00 0.40 1
Válvula mariposa pza 1.00 250.00 250.00 1
Valvulas de corte pza 2.00 150.00 300.00 1
Codos pza 1.00 40.00 40.00 1
Tess 2" pza 2.00 50.00 100.00 1
1
1
TOTAL MATERIALES 708.30 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 5.00 27.00 135.00 1
AYUDANTE hr 3.00 12.50 37.50 1
1
1
1
1
SUBTOTAL MANO DE OBRA 172.50 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 94.88 1
IVA (% de 2) 0.15 39.95 1
TOTAL MANO DE OBRA 307.32 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 15.37 1
TOTAL MAQUINARIA Y EQUIPO 15.37 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 82.48 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 111.35 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 37.85 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 1,262.66 1
Son: Un Mil Doscientos Sesenta y Dos 66/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R16 CLAPETA DN 6" 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CLAPETA DN 1,295.000 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Clapeta HR. 1.00 1000.00 1,000.00 1
Accesorios gbl 1.00 50.00 50.00 1
1
1
1
1
1
1
1
TOTAL MATERIALES 1,050.00 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 0.10 27.00 2.70 1
AYUDANTE hr 0.10 12.50 1.25 1
1
1
1
1
SUBTOTAL MANO DE OBRA 3.95 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 2.17 1
IVA (% de 2) 0.15 0.92 1
TOTAL MANO DE OBRA 7.04 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 0.35 1
TOTAL MAQUINARIA Y EQUIPO 0.35 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 84.59 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 114.20 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 38.82 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 1,295.00 1
Son: Un Mil Doscientos Noventa y Cinco 00/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R17 PROV Y COLOCACIÓN TUBERIA PVC 6" C9 1
Unidad : m 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PROV Y CO 100.050 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Tubería PVC D 6" C9 m 1.05 70.00 73.50 1
Pegamento para PVC lt 0.01 40.00 0.40 1
Limpiador PVC lt 0.01 40.00 0.40 1
1
1
1
1
1
1
TOTAL MATERIALES 74.30 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 0.10 27.00 2.70 1
AYUDANTE hr 0.10 12.50 1.25 1
1
1
1
1
SUBTOTAL MANO DE OBRA 3.95 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 2.17 1
IVA (% de 2) 0.15 0.92 1
TOTAL MANO DE OBRA 7.04 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 0.35 1
TOTAL MAQUINARIA Y EQUIPO 0.35 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 6.54 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 8.82 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 3.00 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 100.05 1
Son: Cien 05/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R18 BOMBA DE AGUA 1HP 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
BOMBA DE 2,995.100 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Bomba estacionaria trifásica 1 HP, 50 ciclos pza 1.00 2100.00 2,100.00 1
Accesorios gbl 1.00 50.00 50.00 1
1
1
1
1
1
1
1
TOTAL MATERIALES 2,150.00 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 4.00 27.00 108.00 1
AYUDANTE hr 4.00 12.50 50.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 158.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 86.90 1
IVA (% de 2) 0.15 36.59 1
TOTAL MANO DE OBRA 281.49 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 14.07 1
TOTAL MAQUINARIA Y EQUIPO 14.07 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 195.65 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 264.12 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 89.78 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 2,995.10 1
Son: Dos Mil Novecientos Noventa y Cinco 10/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R19 INSTALACION HIDRÁLICA BOMBAS DE AGUA 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
INSTALACI 2,683.500 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Accesorios para instalar 2 bombas m 1.00 1600.00 1,600.00 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 1,600.00 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 8.00 27.00 216.00 1
AYUDANTE hr 8.00 12.50 100.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 316.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 173.80 1
IVA (% de 2) 0.15 73.18 1
TOTAL MANO DE OBRA 562.98 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 28.15 1
TOTAL MAQUINARIA Y EQUIPO 28.15 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 175.29 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 236.64 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 80.44 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 2,683.50 1
Son: Dos Mil Seiscientos Ochenta y Tres 50/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R20 INSTALACION ELÉCTRICA DE BOMBAS 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
INSTALACI 723.960 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Accesorios eléctricos para instalar 2 bombas 0.00 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 0.00 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 8.00 27.00 216.00 1
AYUDANTE hr 8.00 12.50 100.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 316.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 173.80 1
IVA (% de 2) 0.15 73.18 1
TOTAL MANO DE OBRA 562.98 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 28.15 1
TOTAL MAQUINARIA Y EQUIPO 28.15 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 47.29 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 63.84 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 21.70 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 723.96 1
Son: Setecientos Veintitrés 96/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R21 PROVISIÓN E INST. DE TUBERÍA AGUA POTABLE PVC 1 1/2” E-40 (IMPULSIÓN) 1
Unidad : m 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PROVISIÓN 104.600 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
TUBERIA PVC 1 1/2" m 1.05 53.59 56.27 1
TEFLON 3/4" pza 0.30 5.99 1.80 1
1
1
1
1
1
1
1
TOTAL MATERIALES 58.07 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 0.37 27.00 9.99 1
AYUDANTE PLOMERO HR. 0.37 12.50 4.63 1
1
1
1
1
SUBTOTAL MANO DE OBRA 14.62 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 8.04 1
IVA (% de 2) 0.15 3.38 1
TOTAL MANO DE OBRA 26.04 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 1.30 1
TOTAL MAQUINARIA Y EQUIPO 1.30 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 6.83 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 9.22 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 3.14 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 104.60 1
Son: Ciento Cuatro 60/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R22 ACCESORIOS EN TUB. RED DE IMPULSION 1 1/2" (INCLUYE PUNTOS DE CONEXIÓN) 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
ACCESORIO 303.090 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
TEFLON 3/4" pza 2.00 5.99 11.97 1
UNION UNIVERSAL 1 1/2" pza 2.00 30.00 60.00 1
TEE 1 1/2" pza 2.00 25.00 50.00 1
CODO 90° 1 1/2" pza 3.00 25.00 75.00 1
1
1
1
1
1
TOTAL MATERIALES 196.97 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 1.00 27.00 27.00 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 27.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 14.85 1
IVA (% de 2) 0.15 6.25 1
TOTAL MANO DE OBRA 48.10 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 2.41 1
TOTAL MAQUINARIA Y EQUIPO 2.41 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 19.80 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 26.73 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 9.09 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 303.09 1
Son: Trescientos Tres 09/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R23 SUMIDEROS (DESAGUE) EN LÍNEA DE PRODUCCIÓN (HACIA LA TUBERÍA RECOLECTORA 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
SUMIDEROS 950.080 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Sumidero inox en línea de producción pza 1.00 700.00 700.00 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 700.00 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 1.50 27.00 40.50 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 40.50 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 22.28 1
IVA (% de 2) 0.15 9.38 1
TOTAL MANO DE OBRA 72.15 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 3.61 1
TOTAL MAQUINARIA Y EQUIPO 3.61 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 62.06 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 83.78 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 28.48 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 950.08 1
Son: Novecientos Cincuenta 08/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R24 TUBERIA PVC 4" C9 (DESAGUE HACIA EL TANQUE DE ACUMULACIÓN) (INCLUYE REBAL 1
Unidad : m 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
TUBERIA P 84.510 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Tuberia PVC 4" C9 pza 1.05 41.67 43.75 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 43.75 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 0.50 27.00 13.50 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 13.50 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 7.43 1
IVA (% de 2) 0.15 3.13 1
TOTAL MANO DE OBRA 24.05 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 1.20 1
TOTAL MAQUINARIA Y EQUIPO 1.20 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 5.52 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 7.45 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 2.53 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 84.51 1
Son: Ochenta y Cuatro 51/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R25 EMPEDRADO Y HORMIGON POBRE PARA TANQUE 1
Unidad : m2 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
EMPEDRADO 185.510 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 20.00 1.11 22.27 1
ARENA COMUN m3 0.06 120.00 7.20 1
GRAVA COMUN m3 0.04 120.06 4.80 1
PIEDRA MANZANA m3 0.15 150.00 22.50 1
1
1
1
1
1
TOTAL MATERIALES 56.77 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 1.50 21.25 31.88 1
AYUDANTE hr 1.50 12.50 18.75 1
1
1
1
1
SUBTOTAL MANO DE OBRA 50.63 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 27.84 1
IVA (% de 2) 0.15 11.72 1
TOTAL MANO DE OBRA 90.19 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 4.51 1
TOTAL MAQUINARIA Y EQUIPO 4.51 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 12.12 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 16.36 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 5.56 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 185.51 1
Son: Ciento Ochenta y Cinco 51/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R26 PROV E INSTALACION TANQUE DE POLIPROPILENO CAP 2000 LT - INCLUYE INST.HIDRA 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PROV E IN 4,117.720 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Tanque polipropileno con 2000 lts pza 1.00 3300.00 3,300.00 1
Accesorios - preuprizxa¡cion 0.00 1
1
1
1
1
1
1
1
TOTAL MATERIALES 3,300.00 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 1.00 27.00 27.00 1
AYUDANTE PLOMERO HR. 0.50 12.50 6.25 1
1
1
1
1
SUBTOTAL MANO DE OBRA 33.25 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 18.29 1
IVA (% de 2) 0.15 7.70 1
TOTAL MANO DE OBRA 59.24 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 2.96 1
TOTAL MAQUINARIA Y EQUIPO 2.96 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 268.98 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 363.12 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 123.42 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 4,117.72 1
Son: Cuatro Mil Ciento Diecisiete 72/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R27 PEDESTAL DE HºAº (BASE TANQUE POLIETILENO) 1
Unidad : m3 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PEDESTAL 4,549.480 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CEMENTO PORTLAND kg 350.00 1.11 389.76 1
ARENA COMUN m3 0.45 120.00 54.00 1
GRAVA COMUN m3 0.92 120.06 110.46 1
MADERA DE ENCOFRADO pie2 80.00 8.50 680.00 1
BARRA DE ACERO CORRUGADO kg 60.00 8.00 480.24 1
CLAVO kg 2.00 15.00 30.00 1
ALAMBRE DE AMARRE DE AL. NO.4 m 2.00 15.00 30.00 1
1
1
TOTAL MATERIALES 1,774.46 1
2. MANO DE OBRA 0.00 1
ALBAÑIL hr 10.00 21.25 212.50 1
ARMADOR hr 10.00 18.75 187.50 1
AYUDANTE hr 20.00 12.50 250.00 1
ENCOFRADOR hr 20.00 18.75 375.00 1
1
1
SUBTOTAL MANO DE OBRA 1,025.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 563.75 1
IVA (% de 2) 0.15 237.36 1
TOTAL MANO DE OBRA 1,826.11 1
3. MAQUINARIA Y EQUIPO 0.00 1
MEZCLADORA DE HORMIGON 300 LTS LTS/H LTS/H LTS/H HR. 1.00 17.72 17.72 1
VIBRADOR DE HORMIGON MIKAS-GY1830 HR. 0.80 6.44 5.16 1
1
1
Herramientas menores (% Tot. M.O.) 0.05 91.31 1
TOTAL MAQUINARIA Y EQUIPO 114.18 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 297.18 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 401.19 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 136.37 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 4,549.48 1
Son: Cuatro Mil Quinientos Cuarenta y Nueve 48/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R28 PROV E INSTALACION TANQUE HIDROCELE 100 GL (1+1) 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PROV E INS 5,928.980 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Tanque hidrocelle 100 galón pza 1.00 4000.00 4,000.00 1
Presostato gl 1.00 200.00 200.00 1
Accesorios gbl 1.00 50.00 50.00 1
1
1
1
1
1
1
TOTAL MATERIALES 4,250.00 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 8.00 27.00 216.00 1
AYUDANTE PLOMERO HR. 8.00 12.50 100.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 316.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 173.80 1
IVA (% de 2) 0.15 73.18 1
TOTAL MANO DE OBRA 562.98 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 28.15 1
TOTAL MAQUINARIA Y EQUIPO 28.15 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 387.29 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 522.84 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 177.71 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 5,928.98 1
Son: Cinco Mil Novecientos Veintiocho 98/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R29 PROVISIÓN Y COLOCACIÓN DE BOMBA CENTRIFUGA 1 HP (PARA PRESUPRIZAR EL SISTE1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PROVISIÓN 2,995.100 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Bomba estacionaria trifásica 1 HP, 50 ciclos pza 1.00 2100.00 2,100.00 1
Accesorios gbl 1.00 50.00 50.00 1
1
1
1
1
1
1
1
TOTAL MATERIALES 2,150.00 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 4.00 27.00 108.00 1
AYUDANTE hr 4.00 12.50 50.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 158.00 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 86.90 1
IVA (% de 2) 0.15 36.59 1
TOTAL MANO DE OBRA 281.49 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 14.07 1
TOTAL MAQUINARIA Y EQUIPO 14.07 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 195.65 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 264.12 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 89.78 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 2,995.10 1
Son: Dos Mil Novecientos Noventa y Cinco 10/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: HSAN.R30 PROV. E INST. DE TUBERIA PVC 1 1/2" - LÍNEA DE IMPULSIÓN 1
Unidad : m 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PROV. E IN 104.600 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
TUBERIA PVC 1 1/2" m 1.05 53.59 56.27 1
TEFLON 3/4" pza 0.30 5.99 1.80 1
1
1
1
1
1
1
1
TOTAL MATERIALES 58.07 1
2. MANO DE OBRA 0.00 1
PLOMERO hr 0.37 27.00 9.99 1
AYUDANTE PLOMERO HR. 0.37 12.50 4.63 1
1
1
1
1
SUBTOTAL MANO DE OBRA 14.62 1
Beneficios Sociales (% Sub Tot. M.O) 0.55 8.04 1
IVA (% de 2) 0.15 3.38 1
TOTAL MANO DE OBRA 26.04 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 0.05 1.30 1
TOTAL MAQUINARIA Y EQUIPO 1.30 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 0.08 6.83 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 0.10 9.22 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 0.03 3.14 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 104.60 1
Son: Ciento Cuatro 60/100 0.00 1
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ELECTRICO
MEDIDAS EN MTS
255
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS ELECTRICO
MEDIDAS EN MTS
256
1 1 1 1 1 1
BUEZO LEGLISE
ANALISIS DE PRECIOS UNITARIOS
PLANTA PROCESADORA DE PAPA - INCAHUASI
0.12
0.05224
0.22 0.66
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS TRANSMISION DE CALOR
MEDIDAS EN MTS
354
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN CHUQUISACA
CÓMPUTOS MÉTRICOS TRANSMISION DE CALOR
MEDIDAS EN MTS
355
PLANILLA DE CÓMPUTOS MÉTRICOS
SISTEMA DE VAPOR
CLR.5 CODO 90° AN SCH-40 D=3" (PROV. E INST.) PZA 4.00 4.00
4.00
CLR.6 CODO 90° AN SCH-40 D=2 1/2" (PROV. E INST.) PZA 28.00 28.00
28.00
CLR.7 CODO 90° AN SCH-40 D=2" (PROV. E INST.) PZA 5.00 5.00
5.00
CLR.8 CODO 90° AN SCH-40 D=1" (PROV. E INST.) PZA 5.00 5.00
5.00
CLR.11 "T" AN SCH-40 D=2 1/2" (PROV. E INST.) PZA 8.00 8.00
8.00
1 1.00
DAT.14 PATCH CORD DE 0,90 PATENTADO CAT 6 glb Total = 1.00
1 1.00
DAT.15 PATCH CORD DE 3 mts PATENTADO CAT 6 glb Total = 1.00
1 1.00
DAT.16 CAMARAS DE SEGURIDAD EXTERIORES TIPO BALA glb Total = 1.00
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.1 .- TENDIDO DE BANDEJAS PORTA CABLES DE 30 CM 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
TENDIDO D 69,451.180 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Bandejas Porta Cables de 30 cm m 130.00 96.000 12,480.00 1
Accesorio "T" de 30 cm pza 3.00 296.000 888.00 1
Tapas ciegas de bandeja de 30 cm m 9.00 125.000 1,125.00 1
Accesorios de anclaje glb 1.00 21,350.000 21,350.00 1
1
1
1
1
1
TOTAL MATERIALES 35,843.00 1
2. MANO DE OBRA 0.00 1
Especialista "A" hr 96.00 55.00 5,280.00 1
Ayudante hr 96.00 26.00 2,496.00 1
Ayudante hr 96.00 26.00 2,496.00 1
1
1
1
SUBTOTAL MANO DE OBRA 10,272.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 5,649.60 1
IVA (% de 2) 14.94% 2,378.69 1
TOTAL MANO DE OBRA 18,300.29 1
3. MAQUINARIA Y EQUIPO 0.00 1
Taladros hr 55.00 12.00 660.00 1
Amoladora hr 55.00 18.00 990.00 1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 915.01 1
TOTAL MAQUINARIA Y EQUIPO 2,565.01 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 4,536.66 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 6,124.50 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 2,081.72 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 69,451.18 1
Son: Sesenta y Nueve Mil Cuatrocientos Cincuenta y Uno 18/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.2 .- TENDIDO DE BANDEJAS PORTACABLES DE 10 CM 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
TENDIDO D 65,067.750 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Bandejas Porta Cables de 10 cm m 138.00 79.000 10,902.00 1
Accesorio "T" de 10 cm pza 1.00 227.000 227.00 1
Accesorio Codo de 10 cm pza 3.00 148.000 444.00 1
Accesorios de anclaje glb 1.00 19,536.000 19,536.00 1
Tapas ciegas de bandeja de 10 cm m 11.00 115.000 1,265.00 1
1
1
1
1
TOTAL MATERIALES 32,374.00 1
2. MANO DE OBRA 0.00 1
Especilista "A" hr 95.00 55.00 5,225.00 1
Ayudante hr 95.00 26.00 2,470.00 1
Ayudante hr 95.00 26.00 2,470.00 1
1
1
1
SUBTOTAL MANO DE OBRA 10,165.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 5,590.75 1
IVA (% de 2) 14.94% 2,353.91 1
TOTAL MANO DE OBRA 18,109.66 1
3. MAQUINARIA Y EQUIPO 0.00 1
Taladros hr 58.00 12.00 696.00 1
Amoladora hr 58.00 18.00 1,044.00 1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 905.48 1
TOTAL MAQUINARIA Y EQUIPO 2,645.48 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 4,250.33 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 5,737.95 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 1,950.33 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 65,067.75 1
Son: Sesenta y Cinco Mil Sesenta y Siete 75/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.3 .- TENDIDO DE DUCTOS PVC DE 4 " 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
TENDIDO D 2,709.530 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Ducto PVC de 4" m 19.00 20.000 380.00 1
Pegamento para PVC lt 1.00 55.000 55.00 1
Limpiador para PVC lt 1.00 55.000 55.00 1
Accesorios glb 1.00 120.000 120.00 1
Arena Comun m3 4.00 120.000 480.00 1
1
1
1
1
TOTAL MATERIALES 1,090.00 1
2. MANO DE OBRA 0.00 1
Albañil hr 10.00 35.00 350.00 1
Ayudante hr 10.00 25.00 250.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 600.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 330.00 1
IVA (% de 2) 14.94% 138.94 1
TOTAL MANO DE OBRA 1,068.94 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 53.45 1
TOTAL MAQUINARIA Y EQUIPO 53.45 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 176.99 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 238.94 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 81.22 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 2,709.53 1
Son: Dos Mil Setecientos Nueve 53/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.4 .- TENDIDO DE DUCTOS PVC DE 2 1/2 " 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
TENDIDO DE 7,944.660 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
DuctoPVC de 2 1/2" m 51.20 17.500 896.00 1
Pegamento PVC lt 1.50 55.000 82.50 1
Limpiador PVC lt 1.50 55.000 82.50 1
Accesorios glb 1.00 220.000 220.00 1
Arena comun m3 20.00 120.000 2,400.00 1
1
1
1
1
TOTAL MATERIALES 3,681.00 1
2. MANO DE OBRA 0.00 1
Albañil hr 25.00 35.00 875.00 1
Ayudante hr 25.00 25.00 625.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 1,500.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 825.00 1
IVA (% de 2) 14.94% 347.36 1
TOTAL MANO DE OBRA 2,672.36 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 133.62 1
TOTAL MAQUINARIA Y EQUIPO 133.62 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 518.96 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 700.59 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 238.13 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 7,944.66 1
Son: Siete Mil Novecientos Cuarenta y Cuatro 66/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.5 .- CAMARAS DE INSPECCION PARATENDIDO DE CABLES 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CAMARAS D 7,066.730 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Arena común m3 8.00 120.000 960.00 1
Arena fina m3 6.00 160.000 960.00 1
Cemento kg 300.00 3.000 900.00 1
Grava m3 0.86 120.000 103.20 1
Ladrillo Gambote glb 1.00 320.000 320.00 1
1
1
1
1
TOTAL MATERIALES 3,243.20 1
2. MANO DE OBRA 0.00 1
Albañil hr 32.00 25.00 800.00 1
Ayudante hr 32.00 15.00 480.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 1,280.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 704.00 1
IVA (% de 2) 14.94% 296.41 1
TOTAL MANO DE OBRA 2,280.41 1
3. MAQUINARIA Y EQUIPO 0.00 1
Mezcladora hr 5.00 26.50 132.50 1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 114.02 1
TOTAL MAQUINARIA Y EQUIPO 246.52 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 461.61 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 623.17 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 211.82 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 7,066.73 1
Son: Siete Mil Sesenta y Seis 73/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.6 .- INSTALACION DE DUCTOS PVC DE 1" 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
INSTALACI 5,501.960 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Tubo PVC de 1" m 369.00 3.660 1,350.54 1
Pegamento PVC lt 0.53 55.000 28.99 1
Alambre de amarre kg 5.00 15.000 75.00 1
1
1
1
1
1
1
TOTAL MATERIALES 1,454.53 1
2. MANO DE OBRA 0.00 1
Albañil hr 58.00 18.00 1,044.00 1
Ayudante hr 58.00 10.00 580.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 1,624.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 893.20 1
IVA (% de 2) 14.94% 376.07 1
TOTAL MANO DE OBRA 2,893.27 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 144.66 1
TOTAL MAQUINARIA Y EQUIPO 144.66 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 359.40 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 485.19 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 164.92 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 5,501.96 1
Son: Cinco Mil Quinientos Uno 96/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.7 .- TENDIDO Y CONECTORIZACION DE CABLE UTP CAT 6 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
TENDIDO Y 139,732.620 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Cable UTP Cat 6 m 4,734.00 6.000 28,404.00 1
Jack Cat 6 pza 132.00 44.000 5,808.00 1
Face Plate Simple pza 18.00 22.000 396.00 1
Face Plate Doble pza 57.00 22.000 1,254.00 1
Patch Panel de 24 Puertos Cat 6 pza 10.00 2,400.000 24,000.00 1
Precintos Belcro pza 58.00 135.000 7,830.00 1
Precintos Plasticos pza 100.00 45.000 4,500.00 1
1
1
TOTAL MATERIALES 72,192.00 1
2. MANO DE OBRA 0.00 1
Especialista "A" hr 180.00 40.00 7,200.00 1
Especialista "B" hr 180.00 40.00 7,200.00 1
Ayudante 1 hr 160.00 25.00 4,000.00 1
Ayudante 2 hr 160.00 25.00 4,000.00 1
1
1
SUBTOTAL MANO DE OBRA 22,400.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 12,320.00 1
IVA (% de 2) 14.94% 5,187.17 1
TOTAL MANO DE OBRA 39,907.17 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 1,995.36 1
TOTAL MAQUINARIA Y EQUIPO 1,995.36 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 9,127.56 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 12,322.21 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 4,188.32 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 139,732.62 1
Son: Ciento Treinta y Nueve Mil Setecientos Treinta y Dos 62/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.8 .- GABINETE RACK DE 42 UNIDADES Y ACCESORIOS 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
GABINETE 14,113.280 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Gabinete Rack de 42 Unidades pza 1.00 9,000.00 9,000.00 1
Bandejas de Rack de 2 Unidades pza 2.00 320.00 640.00 1
Organizador de Rack hori. De 19 " Met. pza 2.00 230.000 460.00 1
PDU Multitoma de 6 Tomas pza 2.00 450.000 900.00 1
1
1
1
1
1
TOTAL MATERIALES 11,000.00 1
2. MANO DE OBRA 0.00 1
Especialista "A" hr 4.00 45.00 180.00 1
Ayudante hr 4.00 25.00 100.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 280.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 154.00 1
IVA (% de 2) 14.94% 64.84 1
TOTAL MANO DE OBRA 498.84 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 24.94 1
TOTAL MAQUINARIA Y EQUIPO 24.94 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 921.90 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 1,244.57 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 423.03 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 14,113.28 1
Son: Catorce Mil Ciento Trece 28/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.9 .- GABINETE DE PARED DE 12 UNIDADES Y ACCESORIOS 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
GABINETE 3,470.560 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Gabinete Rack de 12 Unidades pza 1.00 1,400.00 1,400.00 1
Organizador de Rack hori. De 19 " Met. pza 2.00 230.000 460.00 1
PDU Multitoma de 6 Tomas pza 1.00 450.000 450.00 1
1
1
1
1
1
1
TOTAL MATERIALES 2,310.00 1
2. MANO DE OBRA 0.00 1
Especialista "A" hr 4.00 45.00 180.00 1
Ayudante hr 4.00 25.00 100.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 280.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 154.00 1
IVA (% de 2) 14.94% 64.84 1
TOTAL MANO DE OBRA 498.84 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 24.94 1
TOTAL MAQUINARIA Y EQUIPO 24.94 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 226.70 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 306.05 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 104.03 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 3,470.56 1
Son: Tres Mil Cuatrocientos Setenta 56/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.10 .- GABINETE RACK DE 9 UNIDADES DE PARED Y ACCESORIOS 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
GABINETE 9,297.200 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Gabinete Rack de 9 Unidades pza 3.00 1,250.00 3,750.00 1
Organizador de Rack hori. De 19 " Met. pza 4.00 230.000 920.00 1
PDU Multitoma de 6 Tomas pza 3.00 450.000 1,350.00 1
1
1
1
1
1
1
TOTAL MATERIALES 6,020.00 1
2. MANO DE OBRA 0.00 1
Especialista "A" hr 12.00 45.00 540.00 1
Ayudante hr 12.00 25.00 300.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 840.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 462.00 1
IVA (% de 2) 14.94% 194.52 1
TOTAL MANO DE OBRA 1,496.52 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 74.83 1
TOTAL MAQUINARIA Y EQUIPO 74.83 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 607.31 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 819.87 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 278.67 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 9,297.20 1
Son: Nueve Mil Doscientos Noventa y Siete 20/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.11 .- ETIQUETADO Y CERTIFICACION DE LOS PUNTOS DE VOZ Y DATOS 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
ETIQUETAD 2,991.010 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Cintas Permanentes de Nylon o Vinyl para Patch Panel 1
pza 195.00 3.00 585.00
puertos completos 1
1
pza 60.00 3.00 180.00
Cintas Permanentes de Nylon o Vinyl para Face Plates 1
1
1
1
1
1
TOTAL MATERIALES 765.00 1
2. MANO DE OBRA 0.00 1
Especialista "A" hr 16.00 25.00 400.00 1
Ayudante hr 16.00 15.00 240.00 1
1
1
1
1
SUBTOTAL MANO DE OBRA 640.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 352.00 1
IVA (% de 2) 14.94% 148.21 1
TOTAL MANO DE OBRA 1,140.21 1
3. MAQUINARIA Y EQUIPO 0.00 1
Equipo Certificador Calibrado (Fluke) hr 8.00 60.00 480.00 1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 57.01 1
TOTAL MAQUINARIA Y EQUIPO 537.01 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 195.38 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 263.76 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 89.65 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 2,991.01 1
Son: Dos Mil Novecientos Noventa y Uno 01/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.12 .- CAJAS RECTANGULARES METALICAS 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CAJAS REC 1,709.250 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Cajas rectangulares metalicas pza 75.00 11.50 862.50 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 862.50 1
2. MANO DE OBRA 0.00 1
Albañil hr 19.00 15.00 285.00 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 285.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 156.75 1
IVA (% de 2) 14.94% 66.00 1
TOTAL MANO DE OBRA 507.75 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 25.39 1
TOTAL MAQUINARIA Y EQUIPO 25.39 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 111.65 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 150.73 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 51.23 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 1,709.25 1
Son: Un Mil Setecientos Nueve 25/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.13 .- SWITCHDE 24 PUERTO LAYER 2 10/100/1000 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
SWITCHDE 2 57,661.510 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Switch de 24 puertos Capa 2 pza 8.00 5,780.00 46,240.00 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 46,240.00 1
2. MANO DE OBRA 0.00 1
Especialista A hr 10.00 45.00 450.00 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 450.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 247.50 1
IVA (% de 2) 14.94% 104.21 1
TOTAL MANO DE OBRA 801.71 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 40.09 1
TOTAL MAQUINARIA Y EQUIPO 40.09 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 3,766.54 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 5,084.83 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 1,728.34 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 57,661.51 1
Son: Cincuenta y Siete Mil Seiscientos Sesenta y Uno 51/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.14 .- PATCH CORD DE 0,90 PATENTADO CAT 6 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PATCH COR 13,727.720 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Patch Cord Cat 6 Patentado de 0,90 cm pza 140.00 50.00 7,000.00 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 7,000.00 1
2. MANO DE OBRA 0.00 1
Especialista A hr 45.00 50.00 2,250.00 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 2,250.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 1,237.50 1
IVA (% de 2) 14.94% 521.03 1
TOTAL MANO DE OBRA 4,008.53 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 200.43 1
TOTAL MAQUINARIA Y EQUIPO 200.43 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 896.72 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 1,210.57 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 411.47 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 13,727.72 1
Son: Trece Mil Setecientos Veintisiete 72/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.15 .- PATCH CORD DE 3 mts PATENTADO CAT 6 1
Unidad : glb 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
PATCH COR 14,865.900 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
Patch Cord Cat 6 Patentado de 0,90 cm pza 140.00 70.00 9,800.00 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 9,800.00 1
2. MANO DE OBRA 0.00 1
Especialista A hr 25.00 50.00 1,250.00 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 1,250.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 687.50 1
IVA (% de 2) 14.94% 289.46 1
TOTAL MANO DE OBRA 2,226.96 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 111.35 1
TOTAL MAQUINARIA Y EQUIPO 111.35 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 971.07 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 1,310.94 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 445.59 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 14,865.90 1
Son: Catorce Mil Ochocientos Sesenta y Cinco 90/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.16 .- CAMARAS DE SEGURIDAD EXTERIORES TIPO BALA 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CAMARAS D 30,888.600 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CAMARRAS DE SEGURIDAD TIPO BALA IP 65 Pza 23.00 950.00 21,850.00 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 21,850.00 1
2. MANO DE OBRA 0.00 1
Especialista A hr 45.00 40.00 1,800.00 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 1,800.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 990.00 1
IVA (% de 2) 14.94% 416.83 1
TOTAL MANO DE OBRA 3,206.83 1
3. MAQUINARIA Y EQUIPO 0.00 1
TALADROS HR 40.00 0.10 4.00 1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 160.34 1
TOTAL MAQUINARIA Y EQUIPO 164.34 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 2,017.69 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 2,723.89 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 925.85 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 30,888.60 1
Son: Treinta Mil Ochocientos Ochenta y Ocho 60/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.17 .- CABLE COAXIAL RG 65 1
Unidad : m 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CABLE COA 26,027.210 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CABLE RG 65 Mts 1800.00 7.00 12,600.00 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 12,600.00 1
2. MANO DE OBRA 0.00 1
Especialista A hr 185.00 25.00 4,625.00 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 4,625.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 2,543.75 1
IVA (% de 2) 14.94% 1,071.01 1
TOTAL MANO DE OBRA 8,239.76 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 411.99 1
TOTAL MAQUINARIA Y EQUIPO 411.99 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 1,700.14 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 2,295.19 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 780.14 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 26,027.21 1
Son: Veintiseis Mil Veintisiete 21/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.18 .- CABLE 2 X22 1
Unidad : m 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
CABLE 2 X2 19,413.780 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
CABLE 2X22 Mts 1800.00 4.00 7,200.00 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 7,200.00 1
2. MANO DE OBRA 0.00 1
Especialista A hr 185.00 25.00 4,625.00 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 4,625.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 2,543.75 1
IVA (% de 2) 14.94% 1,071.01 1
TOTAL MANO DE OBRA 8,239.76 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 411.99 1
TOTAL MAQUINARIA Y EQUIPO 411.99 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 1,268.14 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 1,711.99 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 581.91 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 19,413.78 1
Son: Diecinueve Mil Cuatrocientos Trece 78/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.19 .- FUENTE DE PODER CON GABINETE 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
FUENTE DE 7,291.810 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
FUENTE D EPODER CON GABINETE PZA 23.00 145.00 3,335.00 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 3,335.00 1
2. MANO DE OBRA 0.00 1
Especialista A hr 40.00 35.00 1,400.00 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 1,400.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 770.00 1
IVA (% de 2) 14.94% 324.20 1
TOTAL MANO DE OBRA 2,494.20 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 124.71 1
TOTAL MAQUINARIA Y EQUIPO 124.71 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 476.31 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 643.02 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 218.56 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 7,291.81 1
Son: Siete Mil Doscientos Noventa y Uno 81/100 0.00 1
BUEZO LEGLISE 1
ANALISIS DE PRECIOS UNITARIOS 1
PLANTA PROCESADORA DE PAPA - INCAHUASI 1
1
Actividad: DAT.20 .- NVER DE 23 PUERTOS 1
Unidad : pza 0.00 1
Rendimiento1.00 0.00 1
Moneda : Bs 0.00 1
NVER DE 2 7,636.470 0.00 1
Descripcion Unidad Rendimiento Precio Costo 1
Unitario Total 1
1. MATERIALES 0.00 1
NVR DE 23 PUERTOS PZA 1.00 5,300.00 5,300.00 1
1
1
1
1
1
1
1
1
TOTAL MATERIALES 5,300.00 1
2. MANO DE OBRA 0.00 1
Especialista A hr 10.00 50.00 500.00 1
1
1
1
1
1
SUBTOTAL MANO DE OBRA 500.00 1
Beneficios Sociales (% Sub Tot. M.O) 55.00% 275.00 1
IVA (% de 2) 14.94% 115.79 1
TOTAL MANO DE OBRA 890.79 1
3. MAQUINARIA Y EQUIPO 0.00 1
1
1
1
1
Herramientas menores (% Tot. M.O.) 5.00% 44.54 1
TOTAL MAQUINARIA Y EQUIPO 44.54 1
1
4. GASTOS GENERALES Y ADMINISTRATIVOS 0.00 1
Gastos Generales (% de 1+2+3) 8.00% 498.83 1
5. UTILIDAD 0.00 1
Utilidad (% de 1+2+3+4) 10.00% 673.42 1
6. IMPUESTOS 0.00 1
1
IT (% DE 1+2+3+4+5+6) 3.09% 228.89 1
TOTAL PRECIO UNITARIO (1+2+3+4+5+6) 7,636.47 1
Son: Siete Mil Seiscientos Treinta y Seis 47/100 0.00 1
ANÁLISIS DE PRECIO UNITARIO
IMPLEMENTACIÓN DE UNA PLANTA PROCESADORA DE PAPA EN CHUQUISACA
SISTEMA DE AIRE COMPRIMIDO
Actividad: AIR.1 - PROV. E INST. Y PUESTA EN MARCHA SISTEMA DE COMPRESION
Unitario: GLB
Cantidad: 1.00
Moneda: BOLIVIANOS
N° DESCRIPCIÓN TOTAL
GLP ###
408
BUEZO LEGLISE
PROYECTO: PLANTA PROCESADORA DE PAPA EN
CHUQUISACA
CÓMPUTOS MÉTRICOS TRANSMISION DE CALOR
N° DESCRIPCIÓN TOTAL
409
ANÁLISIS DE PRECIO UNITARIO
IMPLEMENTACIÓN DE UNA PLANTA PROCESADORA DE PAPA EN CHUQUISACA
SISTEMA DE GAS
Actividad: GLP.1 - APROBACION DEL PROYECTO DE GAS NATURAL CATEG. INDUSTRIAL
Unitario: GLB
Cantidad: 1.00
Moneda: BOLIVIANOS