Está en la página 1de 150

ALCALDIA MUNICIPIO VALLE DEL GUAMUEZ

NIT: 800.102.912-2
ACTA PARCIAL Nº 01
DESCRIPCION CONTRATO

SECRETARIA DE PLANEACION Y OBRAS OBJETO: MEJORAMIENTO MANTENIMIENTO Y REHABILITACIÓN EN EL


FECHA DE INICIO 4/4/2022

PUBLICAS CORREDOR LA YE SAN MARCOS ESCUELA MIRAVALLE DEL MUNICIPIO FECHA DE TERMINACION INICIAL: 9/3/2022
VALLE DEL GUAMUEZ DEPARTAMENTO DEL PUTUMAYO DEL PROGRAMA ACTA PARCIAL Nº 01
COLOMBIA RURAL. DOS (2) MESES Y
PRORROGA N°01
DOCE (12) DIAS
FECHA DE INICIO: 9/4/2022
FECHA DE TERMINACION 2: 11/15/2022
PRORROGA N°02 UNO(1) MES
CONTRATO DE OBRA No. SPOPM-CO-LP-617-2021 FECHA DE INICIO: 11/16/2022
FECHA DE TERMINACION 3: 12/15/2022
PRORROGA N°03 QUINCE DIAS(15)
FECHA DE INICIO: 12/16/2022
FECHA DE TERMINACION 3: 12/30/2022
VALOR TOTAL CONTRATO: $997,912,517.00 FECHA: Wednesday, November 30, 2022
R.L. / HABERTH RODRIGUEZ URRESTI
CONTRATISTA: CONSORCIO MIRAVALLE NIT: 901.551.274-3
C.C. No. 18.186.152 DE PUERTO ASIS (P)
PERIODO EJECUTADO DEL ACTA DESDE: Monday, April 4, 2022 HASTA: Wednesday, November 30, 2022

En el Municipio Valle del Guamuez, a los treinta (30) días del mes de noviembre del año 2022, se reunieron en las instalaciones de la Secretaría de Planeación y Obras Públicas Municipal, el ingeniero CESAR AUGUSTO RODRIGUEZ VARGAS, Secretario de Planeación y Obras Públicas Municipal, en calidad de
SUPERVISOR del Contrato de Obra No. SPOPM-LP-CO-139-2022, El ingeniero JORGE GOMEZ FALLA identificado con cedula de ciudadanía No. 72.007.216 DE BARRANQUILLA, INTERVENTOR según Contrato de Interventoría No. 2107 DE 2021 y el CONSORCIO MIRAVALLE Identificado con Nit. No.
901.551.274-3, donde el ingeniero HABERTH RODRIGUEZ URRESTI identificado con cedula de ciudadanía No. 18.186.152 de Puerto Asis (P), Representante Legal del Contratista de Obra, mediante el presente documento se deja constancia del Acta parcial N° 1, teniendo en cuenta las actividades contractuales
detalladas a continuación:

OBRA EJECUTADA
CONDICIONES ACTUALIZADAS SEGÚN MODIFICATRIO ACUMULADO ACTAS ANTERIORES SALDOS
PRESENTE ACTA

ITEM DESCRIPCION DE LA OBRA UND. CANT. VALOR UNT. VALOR TOTAL CANT. VALOR TOTAL CANT. VALOR TOTAL CANTIDAD VALOR
SECCIÓN 1 - ACTIVIDADES DE MEJORAMIENTO

CONSTRUCCIÓN DE 690 ML APROX DE PLACA HUELLA

600.1.1 Excavaciones varias sin clasificar m3 416.2 $ 52,685.00 $ 21,930,079.00 $ - 376.1 $ 19,815,355.00 40.14 $ 2,114,723.00

320.3 Subbase granular clase C. m3 540.1 $ 175,178.00 $ 94,614,689.00 $ - 333.51 $ 58,422,739.00 206.60 $ 36,191,950.00

630.4 Concreto de resistenica 21 Mpa m3 488.1 $ 640,345.00 $ 312,562,000.00 $ - 152.47 $ 97,630,200.00 335.65 $ 214,931,799.00

630.7 Concreto ciclópeo Clase 14 Mpa m3 136.2 $ 440,384.00 $ 59,989,108.00 $ - 39.6900 $ 17,478,841.00 96.53 $ 42,510,268.00

640.10 Acero de refuerzo fy = 420 Mpa kg 22855.8 $ 8,371.00 $ 191,326,115.00 $ - 7085.22 $ 59,310,379.00 15770.61 $ 132,015,736.00

CONSTRUCCIÓN DE ( 7 ) ALCANTARILLAS DE 36"

201.70 Demolicion de Estructuras und 7.0 $ 445,241.00 $ 3,116,687.00 $ - 7.00 0.00 $ -


$ 3,116,687.00
600.1.1 Excavaciones varias sin clasificar m3 308.0 $ 52,685.00 $ 16,226,980.00 $ - 308.00 $ 16,226,980.00 0.00 $ -

661.1 Tubería de concreto de 36'' de 900 mm m 42.0 $ 554,787.00 $ 23,301,054.00 42.00 $ 23,301,054.00 0.00 $ -

630.6 Concreto simple clase 14 Mpa m3 13.3 $ 531,326.00 $ 7,066,636.00 $ - 13.30 0.00 $ -
$ 7,066,636.00
630.4 Concreto de resistencia 21 Mpa m3 54.6 $ 640,345.00 $ 34,962,837.00 $ - 50.70 3.90 $ 2,497,346.00
$ 32,465,491.00
640.1 Acero de refuerzo fy = 420 Mpa kg 4050.9 $ 8,371.00 $ 33,910,084.00 3928.60 $ 32,886,311.00 122.30 $ 1,023,773.00

610.1 Relleno para estructuras con material seleccionado m3 151.2 $ 116,430.00 $ 17,604,216.00 $ - 151.20 0.00 $ -
$ 17,604,216.00
ITEMS NO PREVISTOS

230.10 Mejoramiento de via, espesor 20cm m3 839.385 $ 134,490.00 $ 112,888,889.00 $ - 839.385 0.00 $ -
$ 112,888,889.00
242.P Sello de juntas de placa huella m 840.0 $ 13,271.00 $ 11,147,640.00 $ - 0.0 840.00 $ 11,147,640.00
$ -
SECCIÓN 2 - ACTIVIDADES DE MANTENIMIENTO PERIÓDICO

311.1 Afirmado m3 279.0 $ 106,733.00 $ 29,775,819.00 $ - 0.0 278.97 $ 29,775,819.00


$ -
SECCIÓN 3 - ACTIVIDADES DE MANTENIMIENTO RUTINARIO

Limpieza de Alcantarillas con diametro menor o igual a 36",


1P und 3.0 $ 312,919.00 $ 938,757.00 3.0 0.00 $ -
incluye rectificación de descoles $ 938,757.00
Rocería a cada lado de la vía y/o zonas necesarias para buena
2P ha 0.69 $ 618,294.00 $ 425,386.00 $ - 0.69 0.00 $ -
visibilidad $ 425,386.00
SECCIÓN 4 - PROTOCOLO DE BIOSEGURIDAD

102.1P Implementación Protocolo de Bioseguridad por COVID-19 Gl 1.00 $ 1,057,575.00 $ 1,057,575.00 $ - 0.73 0.27 $ 288,430.00
$ 769,145.00
SECCIÓN 5 - ACTIVIDES DE CONSULTORIA

3P Caracterización vial del corredor postulado km 5.10 $ 684,383.00 $ 3,490,353.00 $ - 0.00 $ -


$ -
Revisión, ajuste y/o actualización y/o modificación y/o
4P Gl 1.00 $ 9,400,000.00 $ 9,400,000.00 0.00 $ -
complementación de estudios y diseños base $ -
SUB-TOTAL BÁSICO DE OBRA=(A) $ 972,844,551.00 $ - $ 500,347,067.00 $ 472,497,484.00
OBRAS DE COMPENSACIÓN AMBIENTAL Y/O COMPLEMENTARIAS (1%) = ( B ) $ 9,728,446.00 $ - $ 9,728,446.00
VALOR BASICO OBRA = ( C ) $ 982,572,997.00 $ - $ 500,347,067.00 $ 482,225,930.00
VALOR BASICO ACTIVIDADES DE CONSULTORIA = ( D ) $ 12,890,353.00 $ - $ - $ 12,890,353.00
VALOR IVA ACTIVIDADES DE CONSULTORIA (19% ) = E $ 2,449,167.00 $ - $ - $ 2,449,167.00

VALOR TOTAL DE LA OBRA= C+D+E AIU=30%


A= 20% I=5% U=5% $ 997,912,517.00 $ - $ 500,347,067.00 $ 497,565,450.00

BALANCE A LA FECHA BALANCE DEL ANTICIPO:


VALOR CONTRATO $ 997,912,517.00 VALOR ANTICIPO $ 0.00
AMORTIZACIÒN ACTA PARCIAL
VALOR ACTA PARCIAL N°01 $ 500,347,067.00 $ 0.00
N°01
VALOR EJECUTADO ACUMULADO $ 500,347,067.00 SALDO POR AMORTIZAR $ 0.00
SALDO POR EJECUTAR $ 497,565,450.00
VALOR EJECUTADO EN LA PRESENTE ACTA PORCENTAJE 50.14% $ 500,347,067.00
VALOR PENDIENTE POR EJECUTAR PORCENTAJE 49.86% $ 497,565,450.00

TOTAL A PAGAR EN LA PRESENTE ACTA $ 500,347,067.00

SON : QUINIENTOS MILLONES TRECIENTOS CUARENTA Y SIETE MIL SESENTA Y SIETE PESOS MDA/CTE

DESCRIPCIÓN DE LA ETAPA O EL PERÍODO FACTURADO: INFORME PARCIAL OBRA


FECHA DE ELABORACIÓN: Wednesday, November 30, 2022

LA PRESENTE ACTA NO EXIME AL CONTRATISTA DE REPARAR, Y/O ENMENDAR LAS OBRAS AQUÍ CONTEMPLADAS O RESARCIR LOS DAÑOS POR CAUSAS QUE LE SEAN IMPUTADAS AL CONTRATISTA Y QUEDA SUJETA EN UN TODO A LA LIQUIDACIÓN DEL CONTRATO

POR EL CONTRATISTA POR LA INTERVENTORÍA POR LA SUPERVISIÓN

R.L. / HABERTH RODRIGUEZ URRESTI JORGE GOMEZ FALLA


C.C. No. 18.186.152 DE PUERTO ASIS (P) CESAR AUGUSTO RODRIGUEZ VARGAS
C.C. No. 72.007.216 DE BARRANQUILLA
CONSORCIO MIRAVALLE GNG SERVICIOS DE INGENIERIA SAS
SECRETARIO DE PLANEACIÓN Y OBRAS PUBLICAS
NIT: 901.552.084-5 NIT 901.383.717-3
MEMORIA DE CANTIDADES EJECUTADAS

SECCIÓN 1 - ACTIVIDADES DE MEJORAMIENTO

CONSTRUCCIÓN DE 690 ML APROX DE PLACA HUELLA

ITEM DESCRIPCION UND DIMENSIONES


DESCRIPCIÓN GRAFICA
600.1.1 Excavaciones varias sin clasificar M3 CANTIDAD LONGITUD ANCHO ESPESOR ESPESOR AREA VOL TOTAL

VOLUMEN DE CORTE

TRAMO 1 1 272 5 ### 0.08 1360 110.40 110.40 110.40


TRAMO 2 y 3 1 278 5 0.18 1390 248.46 248.46 248.459

SUBTOTAL 358.86

VIGAS RIOSTRAS
TRAMO 1 40 5 0.2 ### 0.25 10.00
TRAMO 2 29 5 0.2 ### 0.25 7.25

SUBTOTAL 17.25

TOTAL 376.11
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


ITEM DESCRIPCION UND DIMENSIONES
DESCRIPCIÓN GRAFICA TOTAL
320.3 Subbase granular clase C. M3 CANTIDAD LONGITUD ANCHO ESPESOR ESPESOR AREA VOL

vol sub base granular

TRAMO 1 1 100 5 ### 0.15 500 76.53 76.53 76.53


TRAMO 2 y 3 1 278 5 0.18 1390 251.17 251.17 251.17

SUBTOTAL 327.70

LOSA TRANSICION 5.80 5.80

SUBTOTAL 661.20

TOTAL 333.51
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


ITEM DESCRIPCION UND DIMENSIONES
DESCRIPCIÓN GRAFICA TOTAL
630.4 Concreto de resistenica 21 Mpa M3 CANTIDAD LONGITUD ANCHO ESPESOR VOL

TRAMO3 PR 0+503 A PR 0+628


TRAMO3 PR 0+503 A PR 0+628

LOSAS TIPO 1 7 3 1.8 ### 0.81 5.67


LOSAS TIPO 2 29 3 2.7 ### 1.22 35.24
LOSA DE CUNETA 39 3 0.55 ### 0.25 19.31
BORDILLO 39 3 0.3 ### 0.13 10.53
VIGAS RIOSTRAS 40 5 0.2 ### 0.25 10.00
SUBTOTAL 80.74

PR 0+027 A PR 0+220
PR 0+027 A PR 0+223

LOSAS TIPO 1 25 3 1.8 ### 0.81 20.25


LOSAS TIPO 2 24 3 2.7 ### 1.22 29.16
LOSA DE CUNETAS 42 3 0.55 ### 0.25 10.40
BORDILLO 42 3 0.3 ### 0.13 5.67
VIGAS RIOSTRAS 25 5 0.2 ### 0.25 6.25
SUBTOTAL 71.73

TOTAL 152.4650000
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


ITEM DESCRIPCION UND DIMENSIONES
DESCRIPCIÓN GRAFICA TOTAL
630.7 Concreto ciclópeo Clase 14 Mpa M3 CANTIDAD LONGITUD ANCHO ESPESOR VOL
TRAMO3 PR 0+503 A PR 0+628
TRAMO3 PR 0+503 A PR 0+628

LOSAS TIPO 1 7 3 1.8 ### 0.81 5.67


LOSAS TIPO 2 32 3 0.9 ### 0.41 12.96

SUBTOTAL 18.63

TRAMO2 PR 0+027 A PR 0+220

LOSAS TIPO 1 17 3 1.8 ### 0.81 13.77


LOSAS TIPO 2 18 3 0.9 ### 0.41 7.29
TRAMO2 PR 0+027 A PR 0+220

SUBTOTAL 21.06

TOTAL 39.69
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


ITEM DESCRIPCION UND DIMENSIONES TOTAL
D
I
A
M
E
T
R
DESCRIPCIÓN GRAFICA O PESO VARILLA PESO TOTAL
640.1 Acero de refuerzo fy = 420 Mpa KG SENTIDO LONGITUD ANCHO LONGITUD LONG TOTAL N° LOSAS PESO TOTAL (Kg/m2)
(Kg/m2) (Kg/m2)
(
p
u
l
g
.
)

TRAMO3 PR 0+503 A PR 0+628


TRAMO3 PR 0+503 A PR 0+628

LOSAS TIPO 1 Transversal 3 0.9 3/8 0.8 12.8 0.56 7.168 7 100.35
Longitudinal 0.9 3 3/8 2.9 15.95 0.56 8.932 7 125.05
LOSAS TIPO 2 Transversal 3 1.35 3/8 1.25 20 0.56 11.2 32 716.80
Longitudinal 1.35 3 3/8 2.9 22.475 0.56 12.586 32 805.50
LOSAS TIPO 3 Transversal 3 3.15 3/8 3.05 48.8 0.56 27.328 0 0.00
Longitudinal 0 3 3/8 2.9 2.9 0.56 1.624 0 0.00
RIOSTRAS Longitudinal 5 - 3/8 4.9 19.6 0.56 10.976 40 439.04
Estribos (aros) 5 - 3/8 0.65 13.65 0.56 7.644 40 305.76
BORDILLO Longitudinal 125 3/8 124.9 249.8 0.56 139.888 - 279.78
Transversal 125 3/8 0.35 175.35 0.56 98.196 - 196.39
CUNETA Longitudinal 125 3/8 124.9 374.7 0.56 209.832 - 419.66
Transversal 125 3/8 0.7 350.7 0.56 196.392 - 392.78
TRASLAPOS EN LOSAS Longitudinal - 3/8 0.6 76.16125 0.56 42.6503 - 42.65
TRASLAPOS EN CUNETA Longitudinal - 3/8 0.6 34.375 0.56 19.25 - 38.50
TRASLAPO EN LOS BORDILLOS Longitudinal - 3/8 0.6 22.9166666666667 0.56 12.8333333333333 - 25.67

SUBTOTAL 3887.93
TRAMO2 PR 0+027 A PR 0+220
TRAMO2 PR 0+027 A PR 0+220

LOSAS TIPO 1 Transversal 3 0.9 3/8 0.8 12.8 0.56 7.168 17 243.71
Longitudinal 0.9 3 3/8 2.9 15.95 0.56 8.932 17 303.69
LOSAS TIPO 2 Transversal 3 1.35 3/8 1.25 20 0.56 11.2 18 403.20
Longitudinal 1.35 3 3/8 2.9 22.475 0.56 12.586 18 453.10
RIOSTRAS Longitudinal 5 - 3/8 4.9 19.6 0.56 10.976 29 318.30
Estribos (aros) 5 - 3/8 0.65 13.65 0.56 7.644 29 221.68
BORDILLO Longitudinal 111 3/8 110.9 221.8 0.56 124.208 - 248.42
Transversal 111 3/8 0.35 155.75 0.56 87.22 - 174.44
CUNETA Longitudinal 111 3/8 110.9 332.7 0.56 186.312 - 372.62
Transversal 111 3/8 0.7 311.5 0.56 174.44 - 348.88
TRASLAPOS EN LOSAS Longitudinal - 3/8 0.6 61.9391666666667 0.56 34.6859333333333 - 69.370
TRASLAPOS EN CUNETA Longitudinal - 3/8 0.6 30.525 0.56 17.094 - 17.09
TRASLAPO EN LOS BORDILLOS Longitudinal - 3/8 0.6 20.35 0.56 11.396 - 22.79

SUBTOTAL 3197.2900
factor de expansión
TOTAL 7085.22
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


ITEMS NO PREVISTOS

ITEM DESCRIPCION UND DIMENSIONES


DESCRIPCIÓN GRAFICA TOTAL
230.1 Mejoramiento de via, espesor 20cm M3 CANTIDAD LONGITUD ANCHO ESPESOR ESPESOR AREA VOL

VOLUMEN DE MEJORAMIENTO
TRAMO 1 322.835
1 370 5 0.175 1850.000 322.835
TRAMO 2 y 3 278 5 0.21 1390.000 286.390 286.390 286.39

SUBTOTAL 609.22

VOLUMEN DE TERRAPLEN

TRAMO 1 370 1.2 0.27 444.00 121.28 121.28 121.28

TRAMO 2 y 3 278 1.2 0.33 333.60 108.88 108.88 108.88

SUBTOTAL 230.16

TOTAL 839.38
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


Firma Firma
Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES
Residente de obra Residente de Interventoría
Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD
CONSTRUCCIÓN DE (7) ALCANTARILLAS DE 36"

ITEM
DESCRIPCION UND DIMENSIONES
DESCRIPCIÓN GRAFICA 201.7 Demolicion de Estructuras UND CANTIDAD LONGITUD ANCHO ESPESOR VOL TOTAL

Alcantarilla Est. K0+234 1 1.00


Alcantarilla Est. K0+296 1 1.00
Alcantarilla Est. K0+773 1 1.00
Alcantarilla Est. K1+486 1 1.00
Alcantarilla Est. K1+683 1 1.00
Alcantarilla Est. K1+780 1 1.00
Alcantarilla Est. K1+851 1 1.00

SUBTOTAL 7.00

TOTAL 7.00
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


ITEM DESCRIPCION UND DIMENSIONES
DESCRIPCIÓN GRAFICA TOTAL
600.1.1 Excavaciones varias sin clasificar M3 CANTIDAD LONGITUD ANCHO ESPESOR VOL

Volumen de excavación para instalar la 7 6 1.5 ### 22.95 160.65


tubería

8.26 57.83
Volumen de excavación para construir la caja 7 1.8 2.55 ###
Volumen de excavación para construir las 10.85 75.94
aletas 7 2.2 1.27 ###
Volumen descole 7 5 0.65 ### 1.95 13.65

SUBTOTAL 308.00

TOTAL 308.00
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


ITEM DESCRIPCION UND DIMENSIONES
DESCRIPCIÓN GRAFICA TOTAL
661.1 Tubería de concreto de 36'' de 900 mm ML CANTIDAD LONGITUD ANCHO ESPESOR VOL

Alcantarilla Est. K0+234 6 1 6.00


Alcantarilla Est. K0+296 6 1 6.00
Alcantarilla Est. K0+773 6 1 6.00
Alcantarilla Est. K1+486 6 1 6.00
Alcantarilla Est. K1+683 6 1 6.00
Alcantarilla Est. K1+780 6 1 6.00
Alcantarilla Est. K1+851 6 1 6.00

SUBTOTAL 42.00

TOTAL 42.00
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


ITEM DESCRIPCION UND DIMENSIONES
DESCRIPCIÓN GRAFICA TOTAL
630.6 Concreto simple clase 14 Mpa M3 CANTIDAD LONGITUD ANCHO ESPESOR VOL

Croncreto solado para las aletas 7 2.2 4.5 ### 0.40 3.00
Croncreto solado para la caja 7 1.9 1.9 ### 0.36 2.50
Croncreto solado tubería 7 6.2 1.8 ### 1.12 7.80

SUBTOTAL 13.30

TOTAL 13.30
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


ITEM DESCRIPCION UND DIMENSIONES
DESCRIPCIÓN GRAFICA TOTAL
630.4 Concreto de resistencia 21 Mpa M3 CANTIDAD LONGITUD ANCHO ESPESOR VOL

Alcantarilla Est. K0+234 1 3.90 3.90


Alcantarilla Est. K0+296 1 7.80 7.80
Alcantarilla Est. K0+773 1 7.80 7.80
Alcantarilla Est. K1+486 1 7.80 7.80
Alcantarilla Est. K1+683 1 7.80 7.80
Alcantarilla Est. K1+780 1 7.80 7.80
Alcantarilla Est. K1+851 1 7.80 7.80

SUBTOTAL 50.70

TOTAL 50.70
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


C
A
N
T
ITEM DESCRIPCION UND DIMENSIONES I
D
A
DESCRIPCIÓN GRAFICA D TOTAL
CANTIDAD DE
640.1 Acero de refuerzo fy = 420 Mpa KG ALCANTARILLAS ϴ Long (m) Peso Total kg
D
E
7
REFUERZO HORIZONTAL ALETAS Y MURO A
3 1.94 C
### 2.17 2.17
3 2.25 E
### 1.26 1.26
R
LADO INTERNO ALETAS 3 4.87 ###
O 2.73 2.73
3 5.79 ### 6.48 6.48
3 5.08 ### 11.38 11.38
3 2.3 ### 1.29 1.29
3 5.02 ### 2.81 2.81
LADO EXTERNO ALETAS
3 5.9 ### 6.61 6.61
3 5.22 ### 11.69 11.69
4 3.45 ### 27.43 27.43
MURO 4 1.6 ### 12.72 12.72
SUBTOTAL 86.57
REFUERZO PLACA DESCOLE
4 3.04 ### 6.04 6.04
4 3.04 ### 6.04 6.04
4 3.48 ### 6.92 6.92
4 3.48 ### 6.92 6.92
4 4.92 ### 9.78 9.78
4 4.36 ### 8.67 8.67
4 4.36 ### 8.67 8.67
4 4.8 ### 9.54 9.54
4 4.8 ### 9.54 9.54
4 5.1 ### 10.14 10.14
ACERO SUPERIOR E INFERIOR 4 5.1 ### 10.14 10.14
4 1.2 ### 2.39 2.39
4 1.6 ### 3.18 3.18
4 1.8 ### 3.58 3.58
4 2.2 ### 4.37 4.37
4 2.62 ### 33.86 33.86
4 1.1 ### 2.19 2.19
4 1.5 ### 2.98 2.98
4 1.7 ### 3.38 3.38
4 2.1 ### 4.17 4.17
4 2.52 ### 32.56 32.56
SUBTOTAL 185.06
REFUERZO VERTICAL ALETAS Y MURO
4 3.2 ### 12.72 12.72
4 3 ### 11.93 11.93
MURO
4 1.4 ### 11.13 11.13
MURO
3 1.64 ### 7.35 7.35
4 2.26 ### 4.49 4.49
4 2.22 ### 4.41 4.41
4 2.18 ### 4.33 4.33
4 2.14 ### 4.25 4.25
ALETAS CARA INTERNA 4 2.1 ### 4.17 4.17
4 2.06 ### 4.1 4.1
4 2.02 ### 4.02 4.02
4 1.98 ### 3.94 3.94
4 1.94 ### 3.86 3.86
4 2.3 ### 4.57 4.57
4 2.26 ### 4.49 4.49
4 2.22 ### 4.41 4.41
4 2.18 ### 4.33 4.33
ALETAS CARA EXTERNA 4 2.14 ### 4.25 4.25
4 2.1 ### 4.17 4.17
4 2.06 ### 4.1 4.1
4 2.02 ### 4.02 4.02
4 1.98 ### 3.94 3.94
SUBTOTAL 118.98
REFUERZO VERTICAL
4 4.24 ### 37.93 37.93
3 3.9 ### 19.66 19.66
4 2.06 ### 2.05 2.05
3 1.86 ### 1.04 1.04
4 3.34 ### 3.32 3.32
3 2.94 ### 1.65 1.65
4 3.48 ### 20.75 20.75
3 5.8 ### 19.49 19.49
POCETA 4 5.9 ### 17.59 17.59
3 4.7 ### 7.9 7.9
4 2.28 ### 9.07 9.07
3 2.28 ### 5.11 5.11
4 2.08 ### 16.54 16.54
3 2.08 ### 9.32 9.32
4 1.54 ### 6.12 6.12
4 1.36 ### 5.41 5.41
4 1.28 ### 5.09 5.09
SUBTOTAL 188.04
578.70
TOTAL 3928.60
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


ITEM DESCRIPCION UND DIMENSIONES
DESCRIPCIÓN GRAFICA Relleno para estructuras con material TOTAL
610.1 M3 CANTIDAD LONGITUD ANCHOESPESOR VOL
seleccionado

RELLENO DE VÍA NVELACIÓN


ALCANTARILLA 7 6 1.8 ### 21.60 151.20

SUBTOTAL 151.2

TOTAL 151.2
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


SECCIÓN 2 - ACTIVIDADES DE MANTENIMIENTO RUTINARIO

ITEM DESCRIPCION UND DIMENSIONES


DESCRIPCIÓN GRAFICA Limpieza de Alcantarillas con diametro menor o TOTAL
1P UND CANTIDAD LONGITUD ANCHO ESPESOR VOL
igual a 36", incluye rectificación de descoles

Alcantarilla Est. K0+000 1 1.00


Alcantarilla Est. K0+935 1 1.00
Alcantarilla Est. K2+254 1 1.00

SUBTOTAL 3.00

TOTAL 3.00
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


ITEM DESCRIPCION UND DIMENSIONES

DESCRIPCIÓN GRAFICA Rocería a cada lado de la vía y/o zonas necesarias TOTAL
2P UND CANTIDAD LONGITUD ANCHO ESPESOR VOL
para buena visibilidad

Area total 1 0.69

SUBTOTAL 0.69

TOTAL 0.69
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD

ITEM DESCRIPCION UND DIMENSIONES


DESCRIPCIÓN GRAFICA Implementacion de protocolo de bioseguridad por TOTAL
102.1P UND VALOR CANTIDAD VALOR UNITARIO
VALOR TOTAL VOL
COVID-19

Implementacion de protocolo de bioseguridad por


1 MES $ 1,057,575 0.73 $ 96,143.18 $ 769,145.00
COVID-19
SUBTOTAL

TOTAL $ 769,145.00
OBSERVACIONES:

Firma Firma

Nombre: HUBER DANILO VILLAREAL Nombre: HEYNER HUGO ROASLES

Residente de obra Residente de Interventoría

Matrícula Profesional No.: 70202107028TLM Matrícula Profesional No.: 17202229590CLD


CAMINO:
TRAMO: ESTACION:
SUB-TRAMO: ORIGEN:

SIMBOLOGIA NOTA: Los conceptos que se incluirán en el cálculo de


volúmenes aparecen subrayados. Se ha considerado el
DC DESPALME EN CORTE terreno ya despalmado al calcular áreas y volúmenes de
DT DESPALME EN TERRAPLEN corte y terraplén.
C CORTE
T TERRAPLEN
MJ MEJORAMIENTO
SB SUB BASE
CRC CRC

COORDENADA INICIAL DE CURVA MASA 10,000.00 AREAS VOLUMENES

SECCIONES DE ELEVACIONES ESPESORES DESPALME DESPALME


Factor de
TN SEMI- RESUMEN (ORDENADAS DE LA
LEVANTADAS
C T MJ SB abundamiento DISTANCIA
C T MJ SB
CURVA MASA)
EN CAMPO en corte
TN RASANTE C T DC DT DC DT

0+000.000 342.099 342.276 0.00 0.18 0.00 0.00 0.00 0.00 0.00 0.00 0+000.000 10,000.00
0+009.167 342.294 342.567 0.00 0.27 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4.58 0.00 0.00 0.00 0.00 0.00 0.00 0+009.167 10,013.81
0+010.000 342.321 342.596 0.00 0.28 0.00 0.00 0.60 0.04 0.93 0.00 1.00 0.42 0.00 0.00 0.00 0.00 0.00 0.00 0+010.000 10,014.75
0+010.705 342.343 342.622 0.00 0.28 0.00 0.00 0.54 0.03 0.93 0.00 1.00 0.35 0.00 0.00 0.40 0.03 0.65 0.00 0+010.705 10,015.51
0+012.244 342.391 342.678 0.00 0.29 0.00 0.00 0.41 0.03 0.93 0.00 1.00 0.77 0.00 0.00 0.73 0.05 1.43 0.00 0+012.244 10,017.00
0+013.705 342.437 342.735 0.00 0.30 0.00 0.00 0.35 0.04 0.93 0.00 1.00 0.73 0.00 0.00 0.56 0.05 1.36 0.00 0+013.705 10,018.29
0+020.000 342.679 343.004 0.00 0.32 0.00 0.00 0.40 0.03 0.90 0.00 1.00 3.15 0.00 0.00 2.39 0.22 5.75 0.00 0+020.000 10,023.82
0+030.000 343.145 343.517 0.00 0.37 0.00 0.00 0.36 0.03 0.89 0.00 1.00 5.00 0.00 0.00 3.83 0.35 8.92 0.00 0+030.000 10,031.65
0+035.252 343.415 343.829 0.00 0.41 0.00 0.00 0.30 0.04 0.85 0.00 1.00 2.63 0.00 0.00 1.75 0.19 4.55 0.00 0+035.252 10,034.98
0+036.714 343.494 343.921 0.00 0.43 0.00 0.00 0.30 0.03 0.85 0.00 1.00 0.73 0.00 0.00 0.44 0.05 1.24 0.00 0+036.714 10,035.86
0+038.252 343.575 344.018 0.00 0.44 0.00 0.00 0.34 0.03 0.84 0.00 1.00 0.77 0.00 0.00 0.50 0.05 1.30 0.00 0+038.252 10,036.81
0+039.791 343.656 344.115 0.00 0.46 0.00 0.00 0.39 0.04 0.83 0.00 1.00 0.77 0.00 0.00 0.56 0.06 1.29 0.00 0+039.791 10,037.83
0+040.000 343.667 344.128 0.00 0.46 0.00 0.00 0.38 0.04 0.83 0.00 1.00 0.10 0.00 0.00 0.08 0.01 0.17 0.00 0+040.000 10,037.97
0+050.000 344.263 344.758 0.00 0.50 0.00 0.00 0.36 0.07 0.83 0.00 1.00 5.00 0.00 0.00 3.71 0.56 8.29 0.00 0+050.000 10,044.48
0+060.000 344.962 345.388 0.00 0.43 0.00 0.00 0.48 0.03 0.82 0.00 1.00 5.00 0.00 0.00 4.17 0.52 8.25 0.00 0+060.000 10,051.48
0+062.329 345.121 345.535 0.00 0.41 0.00 0.00 0.53 0.03 0.82 0.00 1.00 1.16 0.00 0.00 1.17 0.08 1.92 0.00 0+062.329 10,053.35
0+064.910 345.298 345.698 0.00 0.40 0.00 0.00 0.52 0.03 0.83 0.00 1.00 1.29 0.00 0.00 1.36 0.09 2.14 0.00 0+064.910 10,055.48
0+067.491 345.474 345.860 0.00 0.39 0.00 0.00 0.51 0.03 0.84 0.00 1.00 1.29 0.00 0.00 1.34 0.09 2.15 0.00 0+067.491 10,057.60
0+068.910 345.571 345.950 0.00 0.38 0.00 0.00 0.53 0.03 0.84 0.00 1.00 0.71 0.00 0.00 0.74 0.05 1.19 0.00 0+068.910 10,058.76
0+070.000 345.647 346.018 0.00 0.37 0.00 0.00 0.54 0.03 0.84 0.00 1.00 0.54 0.00 0.00 0.58 0.04 0.91 0.00 0+070.000 10,059.67
0+080.000 346.259 346.648 0.00 0.39 0.00 0.00 0.30 0.03 0.88 0.00 1.00 5.00 0.00 0.00 4.22 0.35 8.57 0.00 0+080.000 10,066.88
0+090.000 346.799 347.218 0.00 0.42 0.00 0.00 0.11 0.14 0.89 0.00 1.00 5.00 0.00 0.00 2.06 0.88 8.85 0.00 0+090.000 10,071.41
0+096.419 347.044 347.511 0.00 0.47 0.00 0.00 0.01 0.20 0.87 0.00 1.00 3.21 0.00 0.00 0.39 1.09 5.66 0.00 0+096.419 10,072.86
0+097.839 347.096 347.568 0.00 0.47 0.00 0.00 0.01 0.20 0.87 0.00 1.00 0.71 0.00 0.00 0.01 0.28 1.23 0.00 0+097.839 10,073.07
0+100.000 347.175 347.650 0.00 0.48 0.00 0.00 0.03 0.17 0.86 0.00 1.00 1.08 0.00 0.00 0.04 0.40 1.87 0.00 0+100.000 10,073.43
0+100.419 347.190 347.665 0.00 0.48 0.00 0.00 0.04 0.16 0.86 0.00 1.00 0.21 0.00 0.00 0.01 0.07 0.36 0.00 0+100.419 10,073.51
0+103.000 347.279 347.753 0.00 0.47 0.00 0.00 0.09 0.15 0.85 0.00 1.00 1.29 0.00 0.00 0.16 0.40 2.20 0.00 0+103.000 10,074.14
0+110.000 347.496 347.946 0.00 0.45 0.00 0.00 0.13 0.10 0.84 0.00 1.00 3.50 0.00 0.00 0.75 0.86 5.92 0.00 0+110.000 10,076.37
0+120.000 347.782 348.167 0.00 0.38 0.00 0.00 0.40 0.06 0.84 0.00 1.00 5.00 0.00 0.00 2.65 0.82 8.42 0.00 0+120.000 10,081.55
0+130.000 347.998 348.386 0.00 0.39 0.00 0.00 0.47 0.03 0.86 0.00 1.00 5.00 0.00 0.00 4.38 0.49 8.51 0.00 0+130.000 10,088.79
0+140.000 348.202 348.581 0.00 0.38 0.00 0.00 0.45 0.03 0.86 0.00 1.00 5.00 0.00 0.00 4.63 0.35 8.61 0.00 0+140.000 10,096.41
0+150.000 348.335 348.741 0.00 0.41 0.00 0.00 0.26 0.03 0.86 0.00 1.00 5.00 0.00 0.00 3.57 0.35 8.60 0.00 0+150.000 10,102.99
0+160.000 348.451 348.866 0.00 0.42 0.00 0.00 0.37 0.03 0.85 0.00 1.00 5.00 0.00 0.00 3.17 0.35 8.55 0.00 0+160.000 10,109.16
0+170.000 348.555 348.981 0.00 0.43 0.00 0.00 0.24 0.03 0.87 0.00 1.00 5.00 0.00 0.00 3.05 0.35 8.61 0.00 0+170.000 10,115.21
0+180.000 348.651 349.095 0.00 0.44 0.00 0.00 0.22 0.04 0.87 0.00 1.00 5.00 0.00 0.00 2.29 0.35 8.72 0.00 0+180.000 10,120.49
0+190.000 348.757 349.211 0.00 0.45 0.00 0.00 0.17 0.05 0.87 0.00 1.00 5.00 0.00 0.00 1.93 0.43 8.71 0.00 0+190.000 10,125.34
0+200.000 348.886 349.376 0.00 0.49 0.00 0.00 0.08 0.17 0.88 0.00 1.00 5.00 0.00 0.00 1.21 1.09 8.76 0.00 0+200.000 10,128.81
0+210.000 349.061 349.626 0.00 0.56 0.00 0.00 0.00 0.55 0.92 0.00 1.00 5.00 0.00 0.00 0.38 3.58 9.03 0.00 0+210.000 10,128.96
0+215.559 349.181 349.785 0.00 0.60 0.00 0.00 0.00 0.74 0.95 0.00 1.00 2.78 0.00 0.00 0.00 3.58 5.20 0.00 0+215.559 10,126.98
0+218.286 349.239 349.878 0.00 0.64 0.00 0.00 0.00 0.95 0.97 0.00 1.00 1.36 0.00 0.00 0.00 2.31 2.62 0.00 0+218.286 10,125.19
0+220.000 349.275 349.949 0.00 0.67 0.00 0.00 0.00 1.18 0.98 0.00 1.00 0.86 0.00 0.00 0.00 1.83 1.68 0.00 0+220.000 10,123.53
0+221.013 349.297 349.996 0.00 0.70 0.00 0.00 0.00 1.37 0.99 0.00 1.00 0.51 0.00 0.00 0.00 1.29 1.00 0.00 0+221.013 10,122.30
0+222.786 349.336 350.085 0.00 0.75 0.00 0.00 0.00 1.73 0.99 0.00 1.00 0.89 0.00 0.00 0.00 2.74 1.75 0.00 0+222.786 10,119.64
0+230.000 349.502 350.530 0.00 1.03 0.00 0.00 0.00 3.24 1.00 0.00 1.00 3.61 0.00 0.00 0.00 17.94 7.15 0.00 0+230.000 10,102.00
0+240.000 349.822 350.787 0.00 0.97 0.00 0.00 0.00 2.80 1.00 0.00 1.00 5.00 0.00 0.00 0.00 30.22 9.95 0.00 0+240.000 10,072.13
0+248.768 350.184 350.849 0.00 0.66 0.00 0.00 0.00 1.08 0.97 0.00 1.00 4.38 0.00 0.00 0.00 17.02 8.60 0.00 0+248.768 10,055.65
0+250.000 350.235 350.871 0.00 0.64 0.00 0.00 0.00 0.96 0.96 0.00 1.00 0.62 0.00 0.00 0.00 1.26 1.19 0.00 0+250.000 10,054.52
0+250.541 350.258 350.883 0.00 0.63 0.00 0.00 0.00 0.93 0.96 0.00 1.00 0.27 0.00 0.00 0.00 0.51 0.52 0.00 0+250.541 10,054.07
0+253.268 350.363 350.959 0.00 0.60 0.00 0.00 0.00 0.78 0.93 0.00 1.00 1.36 0.00 0.00 0.00 2.32 2.58 0.00 0+253.268 10,052.18
0+255.996 350.540 351.065 0.00 0.52 0.00 0.00 0.00 0.34 0.90 0.00 1.00 1.36 0.00 0.00 0.00 1.53 2.50 0.00 0+255.996 10,051.36
0+260.000 350.816 351.273 0.00 0.46 0.00 0.00 0.14 0.05 0.87 0.00 1.00 2.00 0.00 0.00 0.29 0.79 3.54 0.00 0+260.000 10,052.18
0+269.005 351.454 351.946 0.00 0.49 0.00 0.00 0.16 0.10 0.85 0.00 1.00 4.50 0.00 0.00 1.35 0.71 7.75 0.00 0+269.005 10,055.84
0+270.000 351.550 352.032 0.00 0.48 0.00 0.00 0.16 0.09 0.85 0.70 1.00 0.50 0.00 0.00 0.16 0.10 0.85 0.00 0+270.000 10,056.23
0+270.655 351.614 352.090 0.00 0.48 0.00 0.00 0.17 0.09 0.85 0.70 1.00 0.33 0.00 0.00 0.11 0.06 0.56 0.46 0+270.655 10,056.50
0+272.305 351.774 352.240 0.00 0.47 0.00 0.00 0.19 0.08 0.85 0.70 1.00 0.82 0.00 0.00 0.30 0.14 1.40 1.15 0+272.305 10,057.22
0+273.955 351.934 352.396 0.00 0.46 0.00 0.00 0.25 0.09 0.84 0.69 1.00 0.83 0.00 0.00 0.36 0.14 1.39 1.14 0+273.955 10,057.99
0+280.000 352.520 353.015 0.00 0.50 0.00 0.00 0.23 0.12 0.83 0.68 1.00 3.02 0.00 0.00 1.44 0.64 5.04 4.13 0+280.000 10,060.83
0+280.861 352.607 353.109 0.00 0.50 0.00 0.00 0.22 0.14 0.83 0.68 1.00 0.43 0.00 0.00 0.19 0.12 0.71 0.58 0+280.861 10,061.20
0+282.511 352.781 353.294 0.00 0.51 0.00 0.00 0.17 0.17 0.83 0.68 1.00 0.83 0.00 0.00 0.32 0.26 1.37 1.12 0+282.511 10,061.81
0+284.161 352.954 353.485 0.00 0.53 0.00 0.00 0.21 0.19 0.82 0.67 1.00 0.82 0.00 0.00 0.32 0.30 1.36 1.11 0+284.161 10,062.39
0+285.811 353.126 353.675 0.00 0.55 0.00 0.00 0.24 0.21 0.82 0.67 1.00 0.82 0.00 0.00 0.37 0.33 1.35 1.10 0+285.811 10,062.99
0+290.000 353.564 354.160 0.00 0.60 0.00 0.00 0.21 0.29 0.83 0.68 1.00 2.09 0.00 0.00 0.94 1.06 3.46 2.83 0+290.000 10,064.30
0+300.000 354.665 355.255 0.00 0.59 0.00 0.00 0.55 0.36 0.85 0.70 1.00 5.00 0.00 0.00 3.81 3.25 8.40 6.90 0+300.000 10,069.73
0+306.725 355.338 355.885 0.00 0.55 0.00 0.00 0.40 0.39 0.87 0.72 1.00 3.36 0.00 0.00 3.18 2.50 5.75 4.75 0+306.725 10,074.37
0+308.947 355.550 356.079 0.00 0.53 0.00 0.00 0.00 0.35 0.83 0.68 1.00 1.11 0.00 0.00 0.44 0.81 1.88 1.55 0+308.947 10,074.84
0+310.000 355.664 356.171 0.00 0.51 0.00 0.00 0.00 0.31 0.82 0.67 1.00 0.53 0.00 0.00 0.00 0.34 0.87 0.71 0+310.000 10,074.72
0+311.169 355.790 356.275 0.00 0.49 0.00 0.00 0.00 0.27 0.82 0.67 1.00 0.58 0.00 0.00 0.00 0.34 0.96 0.78 0+311.169 10,074.64
0+311.947 355.874 356.345 0.00 0.47 0.00 0.00 0.00 0.23 0.81 0.66 1.00 0.39 0.00 0.00 0.00 0.20 0.63 0.52 0+311.947 10,074.62
0+320.000 356.717 357.090 0.00 0.37 0.00 0.00 0.80 0.11 0.83 0.68 1.00 4.03 0.00 0.00 3.21 1.37 6.63 5.42 0+320.000 10,078.76
0+325.718 357.263 357.639 0.00 0.38 0.00 0.00 0.69 0.07 0.83 0.68 1.00 2.86 0.00 0.00 4.25 0.52 4.75 3.89 0+325.718 10,087.85
0+326.496 357.335 357.714 0.00 0.38 0.00 0.00 0.62 0.06 0.83 0.68 1.00 0.39 0.00 0.00 0.51 0.05 0.64 0.53 0+326.496 10,089.62
0+328.718 357.539 357.928 0.00 0.39 0.00 0.00 0.72 0.04 0.87 0.72 1.00 1.11 0.00 0.00 1.49 0.11 1.89 1.55 0+328.718 10,096.75
0+330.000 357.657 358.051 0.00 0.39 0.00 0.00 0.83 0.04 0.87 0.72 1.00 0.64 0.00 0.00 1.00 0.05 1.12 0.92 0+330.000 10,102.11
0+330.941 357.744 358.141 0.00 0.40 0.00 0.00 0.73 0.04 0.87 0.72 1.00 0.47 0.00 0.00 0.73 0.04 0.82 0.68 0+330.941 10,106.27
0+340.000 358.590 359.015 0.00 0.42 0.00 0.00 0.84 0.04 0.84 0.69 1.00 4.53 0.00 0.00 7.09 0.34 7.74 6.38 0+340.000 10,139.63
0+341.189 358.702 359.132 0.00 0.43 0.00 0.00 0.59 0.04 0.84 0.69 1.00 0.59 0.00 0.00 0.85 0.05 1.00 0.82 0+341.189 10,142.86
0+343.689 358.931 359.380 0.00 0.45 0.00 0.00 0.96 0.10 0.83 0.68 1.00 1.25 0.00 0.00 1.94 0.17 2.09 1.72 0+343.689 10,148.50
0+346.189 359.170 359.631 0.00 0.46 0.00 0.00 0.32 0.14 0.83 0.68 1.00 1.25 0.00 0.00 1.60 0.30 2.09 1.71 0+346.189 10,152.45
0+348.689 359.455 359.885 0.00 0.43 0.00 0.00 0.07 0.14 0.81 0.66 1.00 1.25 0.00 0.00 0.49 0.35 2.05 1.68 0+348.689 10,154.36
0+350.000 359.581 360.020 0.00 0.44 0.00 0.00 0.39 0.14 0.82 0.67 1.00 0.66 0.00 0.00 0.30 0.18 1.07 0.87 0+350.000 10,154.75
0+360.000 360.493 361.018 0.00 0.53 0.00 0.00 0.45 0.37 0.88 0.72 1.00 5.00 0.00 0.00 4.22 2.55 8.49 6.91 0+360.000 10,156.50
0+366.551 360.902 361.450 0.00 0.55 0.00 0.00 0.43 0.39 0.89 0.73 1.00 3.28 0.00 0.00 2.87 2.49 5.79 4.74 0+366.551 10,156.60
0+369.051 361.038 361.556 0.00 0.52 0.00 0.00 0.45 0.27 0.89 0.73 1.00 1.25 0.00 0.00 1.10 0.82 2.23 1.83 0+369.051 10,156.77
0+370.000 361.057 361.587 0.00 0.53 0.00 0.00 0.43 0.30 0.90 0.74 1.00 0.47 0.00 0.00 0.42 0.27 0.85 0.70 0+370.000 10,156.88
0+371.551 361.092 361.628 0.00 0.54 0.00 0.00 0.40 0.31 0.90 0.74 1.00 0.78 0.00 0.00 0.64 0.48 1.39 1.15 0+371.551 10,156.98
0+374.051 361.149 361.668 0.00 0.52 0.00 0.00 0.43 0.23 0.90 0.74 1.00 1.25 0.00 0.00 1.03 0.68 2.24 1.85 0+374.051 10,157.21
0+380.000 361.286 361.643 0.00 0.36 0.00 0.00 0.88 0.06 0.88 0.72 1.00 2.97 0.00 0.00 3.89 0.85 5.28 4.35 0+380.000 10,160.25
TOTAL 110.40 121.28 322.83 76.5266

DIEGO FERNANDO PANTOJA


Topógrafo
LP. N° 01-14235 CPNT
CAMINO:
TRAMO: ESTACION:
SUB-TRAMO: ORIGEN:

SIMBOLOGIA NOTA: Los conceptos que se incluirán en el cálculo de


volúmenes aparecen subrayados. Se ha considerado el
DC DESPALME EN CORTE
terreno ya despalmado al calcular áreas y volúmenes
DT DESPALME EN TERRAPLEN de corte y terraplén.
C CORTE
T TERRAPLEN
MJ MEJORAMIENTO
SB SUB BASE

COORDENADA INICIAL DE CURVA MASA 10,000.00 AREAS VOLUMENES

SECCIONES DE ELEVACIONES ESPESORES DESPALME DESPALME


Factor de
TN SEMI- RESUMEN (ORDENADAS DE LA
LEVANTADAS
C T MJ SB abundamiento DISTANCIA
C T MJ SB
CURVA MASA)
EN CAMPO en corte
TN RASANTE C T DC DT DC DT

0+000.000 296.906 296.800 0.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0+000.000 10,000.00
0+010.000 296.877 296.974 0.00 0.10 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0+010.000 10,025.09
0+020.000 297.131 297.311 0.00 0.18 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0+020.000 10,043.69
0+027.000 297.438 297.662 0.00 0.22 0.00 0.00 1.09 0.31 0.87 0.76 1.00 3.50 0.00 0.00 0.00 0.00 0.00 0.00 0+027.000 10,054.71
0+030.000 297.602 297.826 0.00 0.22 0.00 0.00 1.02 0.34 0.89 0.77 1.00 1.50 0.00 0.00 3.17 0.98 2.64 2.30 0+030.000 10,059.03
0+040.000 297.880 298.230 0.00 0.35 0.00 0.00 0.26 0.46 0.93 0.82 1.00 5.00 0.00 0.00 6.38 4.01 9.09 7.96 0+040.000 10,069.25
0+050.000 297.975 298.195 0.00 0.22 0.00 0.00 1.00 0.35 0.90 0.78 1.00 5.00 0.00 0.00 6.29 4.05 9.13 8.00 0+050.000 10,079.38
0+060.000 297.210 297.711 0.00 0.50 0.00 0.00 0.09 0.45 0.89 0.78 1.00 5.00 0.00 0.00 5.46 3.98 8.93 7.80 0+060.000 10,088.44
0+070.000 296.630 297.017 0.00 0.39 0.00 0.00 0.43 0.39 0.91 0.80 1.00 5.00 0.00 0.00 2.60 4.16 9.00 7.89 0+070.000 10,094.65
0+080.000 296.344 296.614 0.00 0.27 0.00 0.00 0.77 0.47 0.95 0.84 1.00 5.00 0.00 0.00 5.97 4.30 9.33 8.21 0+080.000 10,104.46
0+087.840 296.270 296.571 0.00 0.30 0.00 0.00 0.36 0.88 1.00 0.86 1.00 3.92 0.00 0.00 4.41 5.32 7.65 6.66 0+087.840 10,111.61
0+090.000 296.299 296.601 0.00 0.30 0.00 0.00 0.43 0.54 0.94 0.83 1.00 1.08 0.00 0.00 0.85 1.54 2.10 1.82 0+090.000 10,113.20
0+090.697 296.309 296.614 0.00 0.31 0.00 0.00 0.45 0.46 0.92 0.81 1.00 0.35 0.00 0.00 0.31 0.35 0.65 0.57 0+090.697 10,113.77
0+093.554 296.381 296.690 0.00 0.31 0.00 0.00 0.56 0.32 0.86 0.76 1.00 1.43 0.00 0.00 1.44 1.11 2.55 2.25 0+093.554 10,116.30
0+096.697 296.523 296.810 0.00 0.29 0.00 0.00 0.64 0.31 0.86 0.75 1.00 1.57 0.00 0.00 1.88 0.98 2.70 2.37 0+096.697 10,119.39
0+100.000 296.671 296.976 0.00 0.30 0.00 0.00 0.61 0.32 0.87 0.77 1.00 1.65 0.00 0.00 2.06 1.04 2.86 2.51 0+100.000 10,122.71
0+110.000 297.387 297.623 0.00 0.24 0.00 0.00 0.95 0.29 0.85 0.75 1.00 5.00 0.00 0.00 7.78 3.05 8.63 7.58 0+110.000 10,134.33
0+117.214 297.862 298.095 0.00 0.23 0.00 0.00 0.94 0.29 0.86 0.76 1.00 3.61 0.00 0.00 6.79 2.09 6.18 5.43 0+117.214 10,143.89
0+120.000 298.018 298.278 0.00 0.26 0.00 0.00 0.80 0.32 0.88 0.77 1.00 1.39 0.00 0.00 2.42 0.85 2.42 2.13 0+120.000 10,147.38
0+120.356 298.038 298.302 0.00 0.26 0.00 0.00 0.78 0.32 0.88 0.77 1.00 0.18 0.00 0.00 0.28 0.11 0.31 0.28 0+120.356 10,147.80
0+123.214 298.198 298.466 0.00 0.27 0.00 0.00 0.79 0.33 0.89 0.78 1.00 1.43 0.00 0.00 2.25 0.94 2.52 2.22 0+123.214 10,151.15
0+126.071 298.357 298.590 0.00 0.23 0.00 0.00 1.01 0.32 0.88 0.77 1.00 1.43 0.00 0.00 2.57 0.94 2.52 2.22 0+126.071 10,154.81
0+130.000 298.433 298.704 0.00 0.27 0.00 0.00 0.81 0.36 0.90 0.79 1.00 1.96 0.00 0.00 3.57 1.34 3.49 3.08 0+130.000 10,159.89
0+140.000 298.394 298.668 0.00 0.27 0.00 0.00 0.80 0.33 0.88 0.78 1.00 5.00 0.00 0.00 8.05 3.44 8.90 7.85 0+140.000 10,171.78
0+150.000 297.890 298.172 0.00 0.28 0.00 0.00 1.08 0.28 0.85 0.74 1.00 5.00 0.00 0.00 9.39 3.05 8.65 7.60 0+150.000 10,185.01
0+151.613 297.735 298.051 0.00 0.32 0.00 0.00 1.11 0.27 0.87 0.76 1.00 0.81 0.00 0.00 1.77 0.44 1.38 1.21 0+151.613 10,187.40
0+153.368 297.567 297.904 0.00 0.34 0.00 0.00 1.09 0.28 0.88 0.78 1.00 0.88 0.00 0.00 1.94 0.49 1.53 1.35 0+153.368 10,190.01
0+155.122 297.398 297.741 0.00 0.34 0.00 0.00 1.09 0.28 0.88 0.78 1.00 0.88 0.00 0.00 1.91 0.50 1.55 1.36 0+155.122 10,192.59
0+158.368 297.087 297.430 0.00 0.34 0.00 0.00 1.31 0.29 0.89 0.78 1.00 1.62 0.00 0.00 3.89 0.94 2.87 2.53 0+158.368 10,197.73
0+160.000 296.931 297.279 0.00 0.35 0.00 0.00 1.38 0.29 0.89 0.78 1.00 0.82 0.00 0.00 2.19 0.48 1.45 1.28 0+160.000 10,200.55
0+163.796 296.643 296.964 0.00 0.32 0.00 0.00 1.06 0.31 0.89 0.79 1.00 1.90 0.00 0.00 4.63 1.15 3.38 2.98 0+163.796 10,206.64
0+167.041 296.451 296.732 0.00 0.28 0.00 0.00 0.92 0.34 0.88 0.78 1.00 1.62 0.00 0.00 3.22 1.06 2.88 2.54 0+167.041 10,211.11
0+168.796 296.348 296.622 0.00 0.27 0.00 0.00 1.03 0.35 0.90 0.79 1.00 0.88 0.00 0.00 1.71 0.60 1.56 1.37 0+168.796 10,213.49
0+170.000 296.277 296.552 0.00 0.28 0.00 0.00 1.05 0.34 0.90 0.79 1.00 0.60 0.00 0.00 1.25 0.41 1.08 0.95 0+170.000 10,215.20
0+170.550 296.244 296.522 0.00 0.28 0.00 0.00 1.05 0.34 0.89 0.79 1.00 0.28 0.00 0.00 0.58 0.19 0.49 0.43 0+170.550 10,215.99
0+175.259 295.967 296.305 0.00 0.34 0.00 0.00 0.70 0.40 0.92 0.82 1.00 2.35 0.00 0.00 4.10 1.74 4.28 3.78 0+175.259 10,221.91
0+176.147 295.939 296.272 0.00 0.33 0.00 0.00 0.58 0.46 0.95 0.84 1.00 0.44 0.00 0.00 0.57 0.38 0.83 0.73 0+176.147 10,222.81
0+177.036 295.925 296.243 0.00 0.32 0.00 0.00 0.54 0.52 0.96 0.85 1.00 0.44 0.00 0.00 0.50 0.44 0.85 0.75 0+177.036 10,223.65
0+178.147 295.906 296.209 0.00 0.30 0.00 0.00 0.58 0.61 0.98 0.86 1.00 0.56 0.00 0.00 0.62 0.63 1.08 0.95 0+178.147 10,224.70
0+180.000 295.875 296.162 0.00 0.29 0.00 0.00 0.64 1.02 0.99 0.85 1.00 0.93 0.00 0.00 1.13 1.51 1.83 1.58 0+180.000 10,226.41
0+184.041 295.818 296.100 0.00 0.28 0.00 0.00 0.62 4.20 1.02 0.86 1.00 2.02 0.00 0.00 2.54 10.55 4.06 3.46 0+184.041 10,227.95
0+185.152 295.810 296.093 0.00 0.28 0.00 0.00 0.66 1.42 1.02 0.86 1.00 0.56 0.00 0.00 0.71 3.12 1.13 0.95 0+185.152 10,228.33
0+186.041 295.812 296.090 0.00 0.28 0.00 0.00 0.77 1.09 1.02 0.86 1.00 0.44 0.00 0.00 0.63 1.12 0.90 0.76 0+186.041 10,229.16
0+186.929 295.818 296.090 0.00 0.27 0.00 0.00 0.90 0.89 1.02 0.86 1.00 0.44 0.00 0.00 0.74 0.88 0.90 0.77 0+186.929 10,230.16
0+188.219 295.826 296.094 0.00 0.27 0.00 0.00 0.92 0.71 1.01 0.86 1.00 0.64 0.00 0.00 1.17 1.03 1.31 1.11 0+188.219 10,231.77
0+189.552 295.835 296.101 0.00 0.27 0.00 0.00 0.86 0.67 1.00 0.86 1.00 0.67 0.00 0.00 1.19 0.92 1.34 1.15 0+189.552 10,233.46
0+190.000 295.837 296.103 0.00 0.27 0.00 0.00 0.84 0.65 0.99 0.86 1.00 0.22 0.00 0.00 0.38 0.30 0.45 0.38 0+190.000 10,234.01
0+190.885 295.843 296.108 0.00 0.26 0.00 0.00 0.80 0.63 0.99 0.85 1.00 0.44 0.00 0.00 0.72 0.57 0.88 0.76 0+190.885 10,235.06
0+192.552 295.854 296.117 0.00 0.26 0.00 0.00 0.80 0.55 0.96 0.83 1.00 0.83 0.00 0.00 1.33 0.98 1.62 1.41 0+192.552 10,237.03
0+200.000 295.886 296.156 0.00 0.27 0.00 0.00 0.81 0.37 0.90 0.80 1.00 3.72 0.00 0.00 5.98 3.43 6.92 6.07 0+200.000 10,245.89
0+206.904 295.924 296.206 0.00 0.28 0.00 0.00 0.78 0.37 0.90 0.80 1.00 3.45 0.00 0.00 5.49 2.57 6.20 5.50 0+206.904 10,254.04
0+208.571 295.954 296.228 0.00 0.27 0.00 0.00 0.85 0.35 0.89 0.79 1.00 0.83 0.00 0.00 1.36 0.61 1.49 1.33 0+208.571 10,256.04
0+209.904 295.977 296.250 0.00 0.27 0.00 0.00 0.94 0.33 0.88 0.78 1.00 0.67 0.00 0.00 1.19 0.46 1.19 1.05 0+209.904 10,257.75
0+210.000 295.979 296.252 0.00 0.27 0.00 0.00 0.94 0.33 0.88 0.78 1.00 0.05 0.00 0.00 0.09 0.03 0.08 0.08 0+210.000 10,257.88
0+211.237 296.001 296.275 0.00 0.27 0.00 0.00 1.00 0.32 0.88 0.78 1.00 0.62 0.00 0.00 1.20 0.40 1.09 0.97 0+211.237 10,259.56
0+220.000 296.239 296.519 0.00 0.28 0.00 0.00 1.07 0.29 0.85 0.75 1.00 4.38 0.00 0.00 9.05 2.66 7.57 6.69 0+220.000 10,271.98
0+220.109 296.244 296.523 0.00 0.28 0.00 0.00 1.07 0.29 0.85 0.75 1.00 0.05 0.00 0.00 0.12 0.03 0.09 0.08 0+220.109 10,272.14
0+223.267 296.393 296.646 0.00 0.25 0.00 0.00 0.00 0.00 0.00 1.00 1.58 0.00 0.00 0.00 0.00 0.00 0.00 0+223.267 10,276.87
0+226.425 296.542 296.777 0.00 0.24 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.58 0.00 0.00 0.00 0.00 0.00 0.00 0+226.425 10,281.74
0+229.267 296.667 296.895 0.00 0.23 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.42 0.00 0.00 0.00 0.00 0.00 0.00 0+229.267 10,286.14
0+230.000 296.696 296.925 0.00 0.23 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.37 0.00 0.00 0.00 0.00 0.00 0.00 0+230.000 10,287.27
0+240.000 297.087 297.281 0.00 0.19 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0+240.000 10,302.78
0+240.233 297.094 297.287 0.00 0.19 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.12 0.00 0.00 0.00 0.00 0.00 0.00 0+240.233 10,303.15
0+243.075 297.127 297.358 0.00 0.23 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.42 0.00 0.00 0.00 0.00 0.00 0.00 0+243.075 10,307.26
0+246.233 297.162 297.421 0.00 0.26 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.58 0.00 0.00 0.00 0.00 0.00 0.00 0+246.233 10,311.16
0+249.391 297.195 297.467 0.00 0.27 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.58 0.00 0.00 0.00 0.00 0.00 0.00 0+249.391 10,314.70
0+250.000 297.201 297.474 0.00 0.27 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.30 0.00 0.00 0.00 0.00 0.00 0.00 0+250.000 10,315.35
0+251.111 297.212 297.488 0.00 0.28 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.56 0.00 0.00 0.00 0.00 0.00 0.00 0+251.111 10,316.45
0+252.825 297.225 297.512 0.00 0.29 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.86 0.00 0.00 0.00 0.00 0.00 0.00 0+252.825 10,317.52
0+254.111 297.240 297.534 0.00 0.29 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.64 0.00 0.00 0.00 0.00 0.00 0.00 0+254.111 10,316.08
0+258.372 297.281 297.628 0.00 0.35 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.13 0.00 0.00 0.00 0.00 0.00 0.00 0+258.372 10,311.55
0+259.658 297.327 297.663 0.00 0.34 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.64 0.00 0.00 0.00 0.00 0.00 0.00 0+259.658 10,312.22
0+260.000 297.339 297.673 0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.17 0.00 0.00 0.00 0.00 0.00 0.00 0+260.000 10,312.44
0+261.372 297.388 297.714 0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.69 0.00 0.00 0.00 0.00 0.00 0.00 0+261.372 10,313.45
0+263.087 297.449 297.771 0.00 0.32 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.86 0.00 0.00 0.00 0.00 0.00 0.00 0+263.087 10,314.94
0+266.979 297.607 297.919 0.00 0.31 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.95 0.00 0.00 0.00 0.00 0.00 0.00 0+266.979 10,318.91
0+270.000 297.752 298.052 0.00 0.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.51 0.00 0.00 0.00 0.00 0.00 0.00 0+270.000 10,322.27
0+271.354 297.817 298.118 0.00 0.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.68 0.00 0.00 0.00 0.00 0.00 0.00 0+271.354 10,323.79
0+275.729 298.027 298.328 0.00 0.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.19 0.00 0.00 0.00 0.00 0.00 0.00 0+275.729 10,328.66
0+278.354 298.132 298.446 0.00 0.31 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.31 0.00 0.00 0.00 0.00 0.00 0.00 0+278.354 10,331.47
0+279.293 298.163 298.487 0.00 0.32 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.47 0.00 0.00 0.00 0.00 0.00 0.00 0+279.293 10,332.42
0+280.000 298.186 298.516 0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.35 0.00 0.00 0.00 0.00 0.00 0.00 0+280.000 10,333.11
0+281.918 298.249 298.594 0.00 0.34 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.96 0.00 0.00 0.00 0.00 0.00 0.00 0+281.918 10,334.87
0+286.293 298.393 298.755 0.00 0.36 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.19 0.00 0.00 0.00 0.00 0.00 0.00 0+286.293 10,338.62
0+290.000 298.513 298.874 0.00 0.36 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.85 0.00 0.00 0.00 0.00 0.00 0.00 0+290.000 10,341.78
0+290.668 298.535 298.893 0.00 0.36 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 0+290.668 10,342.37
0+300.000 298.758 299.113 0.00 0.36 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4.67 0.00 0.00 0.00 0.00 0.00 0.00 0+300.000 10,350.65
0+310.000 298.945 299.255 0.00 0.31 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0+310.000 10,360.66
0+316.235 298.982 299.337 0.00 0.35 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3.12 0.00 0.00 0.00 0.00 0.00 0.00 0+316.235 10,367.47
0+320.000 299.010 299.386 0.00 0.38 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.88 0.00 0.00 0.00 0.00 0.00 0.00 0+320.000 10,371.32
0+321.378 299.020 299.404 0.00 0.38 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.69 0.00 0.00 0.00 0.00 0.00 0.00 0+321.378 10,372.64
0+326.521 299.102 299.471 0.00 0.37 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.57 0.00 0.00 0.00 0.00 0.00 0.00 0+326.521 10,377.24
0+330.000 299.169 299.517 0.00 0.35 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.74 0.00 0.00 0.00 0.00 0.00 0.00 0+330.000 10,380.18
0+330.378 299.176 299.522 0.00 0.35 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.19 0.00 0.00 0.00 0.00 0.00 0.00 0+330.378 10,380.49
0+331.678 299.201 299.539 0.00 0.34 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.65 0.00 0.00 0.00 0.00 0.00 0.00 0+331.678 10,381.60
0+335.535 299.268 299.590 0.00 0.32 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.93 0.00 0.00 0.00 0.00 0.00 0.00 0+335.535 10,385.08
0+340.000 299.322 299.648 0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.23 0.00 0.00 0.00 0.00 0.00 0.00 0+340.000 10,389.42
0+340.678 299.331 299.657 0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.34 0.00 0.00 0.00 0.00 0.00 0.00 0+340.678 10,390.10
0+345.821 299.398 299.724 0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.57 0.00 0.00 0.00 0.00 0.00 0.00 0+345.821 10,395.32
0+350.000 299.450 299.779 0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.09 0.00 0.00 0.00 0.00 0.00 0.00 0+350.000 10,399.66
0+352.682 299.484 299.814 0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.34 0.00 0.00 0.00 0.00 0.00 0.00 0+352.682 10,402.45
0+356.366 299.532 299.863 0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.84 0.00 0.00 0.00 0.00 0.00 0.00 0+356.366 10,406.16
0+360.000 299.579 299.910 0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.82 0.00 0.00 0.00 0.00 0.00 0.00 0+360.000 10,409.51
0+360.050 299.579 299.911 0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0+360.050 10,409.55
0+363.366 299.631 299.954 0.00 0.32 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.66 0.00 0.00 0.00 0.00 0.00 0.00 0+363.366 10,412.59
0+370.000 299.732 300.033 0.00 0.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3.32 0.00 0.00 0.00 0.00 0.00 0.00 0+370.000 10,419.46
0+378.870 299.736 300.049 0.00 0.31 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4.43 0.00 0.00 0.00 0.00 0.00 0.00 0+378.870 10,429.21
0+380.000 299.721 300.043 0.00 0.32 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.57 0.00 0.00 0.00 0.00 0.00 0.00 0+380.000 10,430.42
0+382.185 299.692 300.027 0.00 0.34 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.09 0.00 0.00 0.00 0.00 0.00 0.00 0+382.185 10,432.66
0+385.870 299.640 299.984 0.00 0.34 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.84 0.00 0.00 0.00 0.00 0.00 0.00 0+385.870 10,436.33
0+389.554 299.567 299.921 0.00 0.35 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.84 0.00 0.00 0.00 0.00 0.00 0.00 0+389.554 10,439.84
0+390.000 299.553 299.912 0.00 0.36 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.22 0.00 0.00 0.00 0.00 0.00 0.00 0+390.000 10,440.25
0+396.102 299.362 299.763 0.00 0.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3.05 0.00 0.00 0.00 0.00 0.00 0.00 0+396.102 10,445.00
0+398.734 299.280 299.683 0.00 0.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.32 0.00 0.00 0.00 0.00 0.00 0.00 0+398.734 10,446.68
0+400.000 299.244 299.641 0.00 0.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.63 0.00 0.00 0.00 0.00 0.00 0.00 0+400.000 10,447.45
0+401.366 299.213 299.593 0.00 0.38 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.68 0.00 0.00 0.00 0.00 0.00 0.00 0+401.366 10,448.31
0+403.734 299.109 299.504 0.00 0.39 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.18 0.00 0.00 0.00 0.00 0.00 0.00 0+403.734 10,449.68
0+404.651 299.069 299.467 0.00 0.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.46 0.00 0.00 0.00 0.00 0.00 0.00 0+404.651 10,450.14
0+407.019 298.964 299.365 0.00 0.40 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.18 0.00 0.00 0.00 0.00 0.00 0.00 0+407.019 10,451.41
0+409.651 298.848 299.242 0.00 0.39 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.32 0.00 0.00 0.00 0.00 0.00 0.00 0+409.651 10,453.14
0+410.000 298.833 299.225 0.00 0.39 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.17 0.00 0.00 0.00 0.00 0.00 0.00 0+410.000 10,453.40
0+412.283 298.739 299.111 0.00 0.37 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.14 0.00 0.00 0.00 0.00 0.00 0.00 0+412.283 10,455.32
0+420.000 298.371 298.673 0.00 0.30 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3.86 0.00 0.00 0.00 0.00 0.00 0.00 0+420.000 10,463.12
0+429.602 297.783 298.004 0.00 0.22 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4.80 0.00 0.00 0.00 0.00 0.00 0.00 0+429.602 10,476.82
0+430.000 297.758 297.974 0.00 0.22 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.20 0.00 0.00 0.00 0.00 0.00 0.00 0+430.000 10,477.52
0+431.356 297.675 297.868 0.00 0.19 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.68 0.00 0.00 0.00 0.00 0.00 0.00 0+431.356 10,479.96
0+433.111 297.557 297.729 0.00 0.17 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.88 0.00 0.00 0.00 0.00 0.00 0.00 0+433.111 10,483.22
0+436.356 297.234 297.459 0.00 0.23 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.62 0.00 0.00 0.00 0.00 0.00 0.00 0+436.356 10,488.72
0+440.000 296.865 297.139 0.00 0.27 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.82 0.00 0.00 0.00 0.00 0.00 0.00 0+440.000 10,494.22
0+449.646 295.968 296.202 0.00 0.23 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4.82 0.00 0.00 0.00 0.00 0.00 0.00 0+449.646 10,508.22
0+450.000 295.940 296.167 0.00 0.23 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.18 0.00 0.00 0.00 0.00 0.00 0.00 0+450.000 10,508.72
0+452.892 295.711 295.881 0.00 0.17 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0+452.892 10,513.05
0+454.646 295.579 295.720 0.00 0.14 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.88 0.00 0.00 0.00 0.00 0.00 0.00 0+454.646 10,515.97
0+456.401 295.451 295.570 0.00 0.12 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.88 0.00 0.00 0.00 0.00 0.00 0.00 0+456.401 10,519.24
0+459.990 295.190 295.293 0.00 0.10 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.79 0.00 0.00 0.00 0.00 0.00 0.00 0+459.990 10,526.54
0+460.000 295.189 295.293 0.00 0.10 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0+460.000 10,526.56
0+464.551 294.873 294.993 0.00 0.12 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.28 0.00 0.00 0.00 0.00 0.00 0.00 0+464.551 10,536.16
0+469.113 294.644 294.761 0.00 0.12 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.28 0.00 0.00 0.00 0.00 0.00 0.00 0+469.113 10,545.74
0+470.000 294.600 294.724 0.00 0.12 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.44 0.00 0.00 0.00 0.00 0.00 0.00 0+470.000 10,547.55
0+477.551 294.332 294.501 0.00 0.17 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3.78 0.00 0.00 0.00 0.00 0.00 0.00 0+477.551 10,561.57
0+480.000 294.270 294.467 0.00 0.20 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.22 0.00 0.00 0.00 0.00 0.00 0.00 0+480.000 10,565.54
0+483.465 294.300 294.450 0.00 0.15 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.73 0.00 0.00 0.00 0.00 0.00 0.00 0+483.465 10,571.07
0+488.009 294.435 294.485 0.00 0.05 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.27 0.00 0.00 0.00 0.00 0.00 0.00 0+488.009 10,579.83
0+490.000 294.493 294.522 0.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0+490.000 10,584.32
0+490.465 294.507 294.532 0.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.23 0.00 0.00 0.00 0.00 0.00 0.00 0+490.465 10,585.41
0+492.921 294.578 294.596 0.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.23 0.00 0.00 0.00 0.00 0.00 0.00 0+492.921 10,591.28
0+495.480 294.654 294.682 0.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.28 0.00 0.00 0.00 0.00 0.00 0.00 0+495.480 10,595.29
0+500.000 292.043 294.884 0.00 2.84 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2.26 0.00 0.00 0.00 0.00 0.00 0.00 0+500.000 10,555.07
0+501.807 295.063 294.983 0.08 0.00 0.00 0.00 1.02 3.54 1.03 0.87 1.00 0.90 0.00 0.00 0.00 0.00 0.00 0.00 0+501.807 10,534.12
0+501.821 295.063 294.984 0.08 0.00 0.00 0.00 1.11 3.48 1.03 0.87 1.00 0.01 0.00 0.00 0.01 0.05 0.01 0.01 0+501.821 10,534.06
0+508.163 295.194 295.335 0.00 0.14 0.00 0.00 1.28 0.12 0.92 0.82 1.00 3.17 0.00 0.00 7.59 11.39 6.19 5.34 0+508.163 10,526.15
0+510.000 295.259 295.436 0.00 0.18 0.00 0.00 1.11 0.14 0.93 0.82 1.00 0.92 0.00 0.00 2.20 0.23 1.70 1.50 0+510.000 10,529.34
0+514.821 295.451 295.702 0.00 0.25 0.00 0.00 0.75 0.19 0.95 0.83 1.00 2.41 0.00 0.00 4.47 0.79 4.54 3.99 0+514.821 10,536.40
0+518.939 295.661 295.930 0.00 0.27 0.00 0.00 0.71 0.18 0.93 0.82 1.00 2.06 0.00 0.00 2.99 0.77 3.87 3.41 0+518.939 10,541.60
0+520.000 295.714 295.989 0.00 0.27 0.00 0.00 0.69 0.17 0.92 0.82 1.00 0.53 0.00 0.00 0.74 0.19 0.98 0.87 0+520.000 10,542.91
0+527.134 296.086 296.383 0.00 0.30 0.00 0.00 0.61 0.12 0.89 0.79 1.00 3.57 0.00 0.00 4.65 1.03 6.47 5.72 0+527.134 10,551.39
0+530.000 296.251 296.541 0.00 0.29 0.00 0.00 0.61 0.10 0.88 0.78 1.00 1.43 0.00 0.00 1.74 0.31 2.54 2.24 0+530.000 10,554.67
0+534.939 296.536 296.814 0.00 0.28 0.00 0.00 0.66 0.10 0.88 0.78 1.00 2.47 0.00 0.00 3.13 0.48 4.36 3.85 0+534.939 10,560.46
0+540.000 296.815 297.094 0.00 0.28 0.00 0.00 0.67 0.06 0.87 0.77 1.00 2.53 0.00 0.00 3.36 0.39 4.44 3.92 0+540.000 10,566.54
0+542.743 296.960 297.245 0.00 0.28 0.00 0.00 0.64 0.03 0.85 0.75 1.00 1.37 0.00 0.00 1.80 0.12 2.36 2.08 0+542.743 10,569.81
0+542.981 296.972 297.257 0.00 0.29 0.00 0.00 0.64 0.03 0.85 0.75 1.00 0.12 0.00 0.00 0.15 0.01 0.20 0.18 0+542.981 10,570.09
0+544.759 297.066 297.352 0.00 0.29 0.00 0.00 0.57 0.02 0.84 0.74 1.00 0.89 0.00 0.00 1.08 0.04 1.51 1.32 0+544.759 10,572.12
0+546.537 297.160 297.444 0.00 0.28 0.00 0.00 0.89 0.01 0.88 0.78 1.00 0.89 0.00 0.00 1.30 0.03 1.53 1.35 0+546.537 10,574.38
0+548.759 297.274 297.556 0.00 0.28 0.00 0.00 0.93 0.00 0.87 0.76 1.00 1.11 0.00 0.00 2.03 0.01 1.94 1.71 0+548.759 10,577.60
0+548.897 297.280 297.563 0.00 0.28 0.00 0.00 0.93 0.00 0.87 0.76 1.00 0.07 0.00 0.00 0.13 0.00 0.12 0.11 0+548.897 10,577.81
0+550.000 297.324 297.616 0.00 0.29 0.00 0.00 0.99 0.01 0.87 0.77 1.00 0.55 0.00 0.00 1.06 0.01 0.96 0.85 0+550.000 10,579.46
0+551.119 297.369 297.670 0.00 0.30 0.00 0.00 1.03 0.01 0.88 0.78 1.00 0.56 0.00 0.00 1.13 0.01 0.98 0.86 0+551.119 10,581.19
0+552.897 297.441 297.753 0.00 0.31 0.00 0.00 1.10 0.01 0.88 0.78 1.00 0.89 0.00 0.00 1.90 0.02 1.56 1.38 0+552.897 10,584.04
0+554.675 297.513 297.833 0.00 0.32 0.00 0.00 1.18 0.01 0.88 0.78 1.00 0.89 0.00 0.00 2.03 0.02 1.56 1.38 0+554.675 10,587.02
0+560.000 297.729 298.057 0.00 0.33 0.00 0.00 1.16 0.01 0.88 0.77 1.00 2.66 0.00 0.00 6.22 0.05 4.69 4.12 0+560.000 10,596.11
0+567.775 298.062 298.359 0.00 0.30 0.00 0.00 1.55 0.01 0.88 0.76 1.00 3.89 0.00 0.00 10.54 0.08 6.82 5.96 0+567.775 10,610.82
0+570.000 298.157 298.445 0.00 0.29 0.00 0.00 1.56 0.01 0.88 0.76 1.00 1.11 0.00 0.00 3.47 0.02 1.95 1.70 0+570.000 10,615.48
0+571.304 298.212 298.496 0.00 0.28 0.00 0.00 1.55 0.01 0.88 0.77 1.00 0.65 0.00 0.00 2.03 0.01 1.15 1.00 0+571.304 10,618.21
0+574.833 298.328 298.632 0.00 0.30 0.00 0.00 0.81 0.02 0.89 0.77 1.00 1.76 0.00 0.00 4.16 0.05 3.11 2.71 0+574.833 10,624.26
0+577.304 298.406 298.728 0.00 0.32 0.00 0.00 0.56 0.03 0.87 0.75 1.00 1.24 0.00 0.00 1.69 0.06 2.17 1.89 0+577.304 10,627.28
0+580.000 298.490 298.832 0.00 0.34 0.00 0.00 0.34 0.04 0.85 0.74 1.00 1.35 0.00 0.00 1.21 0.09 2.32 2.01 0+580.000 10,629.94
0+590.000 298.845 299.219 0.00 0.37 0.00 0.00 0.09 0.18 0.94 0.83 1.00 5.00 0.00 0.00 2.16 1.10 8.96 7.83 0+590.000 10,637.47
0+596.981 299.140 299.489 0.00 0.35 0.00 0.00 0.15 0.19 0.95 0.83 1.00 3.49 0.00 0.00 0.83 1.30 6.59 5.80 0+596.981 10,642.06
0+599.452 299.262 299.582 0.00 0.32 0.00 0.00 0.30 0.17 0.93 0.82 1.00 1.24 0.00 0.00 0.56 0.44 2.32 2.04 0+599.452 10,643.95
0+600.000 299.289 299.602 0.00 0.31 0.00 0.00 0.35 0.16 0.93 0.82 1.00 0.27 0.00 0.00 0.18 0.09 0.51 0.45 0+600.000 10,644.42
0+602.981 299.433 299.706 0.00 0.27 0.00 0.00 0.62 0.11 0.91 0.80 1.00 1.49 0.00 0.00 1.45 0.39 2.74 2.41 0+602.981 10,647.48
0+606.510 299.598 299.821 0.00 0.22 0.00 0.00 0.95 0.05 0.87 0.76 1.00 1.76 0.00 0.00 2.77 0.28 3.14 2.76 0+606.510 10,652.15
0+610.000 299.706 299.924 0.00 0.22 0.00 0.00 0.99 0.04 0.87 0.76 1.00 1.74 0.00 0.00 3.38 0.17 3.04 2.66 0+610.000 10,657.40
0+620.000 299.923 300.172 0.00 0.25 0.00 0.00 0.98 0.03 0.86 0.75 1.00 5.00 0.00 0.00 9.87 0.37 8.64 7.54 0+620.000 10,672.65
0+626.800 300.102 300.327 0.00 0.22 0.00 0.00 0.97 0.04 0.87 0.76 1.00 3.40 0.00 0.00 6.64 0.25 5.88 5.13 0+626.800 10,682.94
TOTAL 248.46 108.88 286.39 251.17

DIEGO FERNANDO PANTOJA


Topógrafo
LP. N° 01-14235 CPNT
MEMORIA DE CANTIDADES

MOVIMEINTO DE TIERRA
DIMENSIONES
DESCRIPCIÓN GRAFICA ITEM DESCRIPCION UND TOTAL
CANTIDAD LONGITUD ANCHO ESPESOR AREA VOL

600.1.1 excavacion CALZADA #REF!

VOLUMEN DE CORTE TRAMOS 358.50


1, 2 Y 3

SUBTOTAL 0.00
factor de expansión
TOTAL 0.00
OBSERVACIONES:

DIMENSIONES
DESCRIPCIÓN GRAFICA ITEM DESCRIPCION UND TOTAL
CANTIDAD LONGITUD ANCHO ESPESOR AREA VOL

220.10

vol de mejoramiento 609.225

VOLUMEN DE TERRAPLEN
TRAMOS 1, 2 Y 3 230.16

SUBTOTAL 0.00
factor de expansión
TOTAL 839.39
OBSERVACIONES:

DIMENSIONES
DESCRIPCIÓN GRAFICA ITEM DESCRIPCION UND TOTAL
CANTIDAD LONGITUD ANCHO ESPESOR AREA VOL

201.70 DEMOLICION

alcantarillas existentes 3

SUBTOTAL 0.00
factor de expansión
TOTAL 7.00
OBSERVACIONES:

DIMENSIONES
DESCRIPCIÓN GRAFICA ITEM DESCRIPCION UND TOTAL
CANTIDAD LONGITUD ANCHO ESPESOR AREA VOL

#REF! #REF! #REF!

vol sub base granular 534.30


LOSA TRANSICION 5.805

SUBTOTAL 540.11
factor de expansión
TOTAL 0.00
OBSERVACIONES:
DIMENSIONES
DESCRIPCIÓN GRAFICA ITEM DESCRIPCION UND TOTAL
CANTIDAD LONGITUD ANCHO ALTURA AREA VOL

#REF! #REF! #REF!

TRAMO1 266.09
TRAMO2 131.83
TRAMO3 84.39
LOSA TRANSICION 5.80

SUBTOTAL 488.11
factor de expansión
TOTAL 488.11
OBSERVACIONES:

DIMENSIONES
DESCRIPCIÓN GRAFICA ITEM DESCRIPCION UND TOTAL

#REF! #REF! #REF!

TRAMO1 11871.68
TRAMO2 6346.58385
TRAMO3 3887.9303
LOSA TRANSICION 749.63

SUBTOTAL 22855.83
factor de expansión
TOTAL 22855.83
OBSERVACIONES:

DIMENSIONES
DESCRIPCIÓN GRAFICA ITEM DESCRIPCION UND TOTAL
CANTIDAD LONGITUD ANCHO ESPESOR AREA VOL

#REF! #REF! #REF!

TRAMO1 83.17
TRAMO2 34.43
TRAMO3 18.63

SUBTOTAL 136.22
factor de expansión
TOTAL 136.22
OBSERVACIONES:

DIMENSIONES
DESCRIPCIÓN GRAFICA ITEM DESCRIPCION UND TOTAL
CANTIDAD LONGITUD ANCHO ESPESOR AREA VOL

600.1.1 excavacion RIOSTRAS #REF!

RIOSTRAS
TRAMO1 31.75
TRAMO2 16.00
TRAMO3 10

SUBTOTAL 57.75
factor de expansión
TOTAL 57.75
OBSERVACIONES:

DIMENSIONES
DESCRIPCIÓN GRAFICA ITEM DESCRIPCION UND TOTAL
CANTIDAD LONGITUD ANCHO ESPESOR AREA VOL

642.00 SELLO DE JUNTAS #REF!

LONG MODULOS ANCHO


TRAMO1 380 126.666666667 3.6 456.00
TRAMO2 190 63.3333333333 3.6 228.00
TRAMO3 130 43.3333333333 3.6 156.00

SUBTOTAL 840.00
factor de expansión
TOTAL 840.00
OBSERVACIONES:
NT
O,
MA
NTE
NIM
IEN
TO
Y
RE
HA
BILI
TA
CÍO
N
DE
CO
AUNAR ESPFUERZOS PARA EL MEJORAMIENTO, MANTENIMIENTO Y REHABILITACÍON
RRCORREDORES PRODUTIVOS - EN EL MUNICIPIO DE SIBUNDOY DEPARTAMENTO DE
DE MEMORIA DE CÁLCULO ALCANTARILLA 36"
ED PUTUMAYO - "COLOMBIA RURAL".
OR
ES
PR
TRAMO
OD : #REF! Cantidad de Alcantarillas 7
UTI
VO
S - CALCULO DEL VOLUMEN DE EXCAVACION PARA LA ALCANTARILLA
EN
EL
MU
NICI Volumen de excavacion para instalar la Tuberia Volumen de excavacion para construir la caja
PIO
DE
SIB
UN ancho Alto = 2.55
DO
Y h = 2.55 largo ancho = 1.80
DE o
nch
PA h' ancho = 1.50 A largo = 1.80
RT
AM largo = 6.00
o
rg

ENT Vol  Alto * Ancho * largo


(h  h' ) Al 2
a

O
L

Vol  * Ancho * largo


DE 1
2
to Vol 2 = 8.26
PUT
UM
Vol 1 = 22.95
AYh
O-
"CO
LO
MBI
A
RU
RA
L". Volumen excavacion para la construccion de las Aletas

menor menor= 2.20

mayor= 4.50

Ancho Ancho= 1.27

(menor  mayor)
Area  * Ancho
mayor 2
Area = 4.25

h= 2.55

h' h

Altura = 2.55

Volumen de la excavacion de aletas Vol 3  Area * Altura

Vol 3 = 10.85

Volumen Descole

Largo= 5.00

ancho= 0.65 Vol 4 = 1.95

h= 0.600

VOLUMEN TOTAL DE EXCAVACION = Vol 1 + Vol 2 + Vol 3 + Vol 4 = 44.00


AUNAR ESPFUERZOS PARA EL MEJORAMIENTO, MANTENIMIENTO Y REHABILITACÍON
DE CORREDORES PRODUTIVOS - EN EL MUNICIPIO DE SIBUNDOY DEPARTAMENTO DE MEMORIA DE CÁLCULO ALCANTARILLA 36"
PUTUMAYO - "COLOMBIA RURAL".

TRAMO #REF! ALCANTARILLA No 7 ABSCISA: 0

VOLUMEN CONCRETO SIMPLE CLASE 14 Mpa


Concreto Solado para la Caja Concreto Solado para las aletas

menor
o
ch
An e
A
n
c
h
o
Larg
o

mayor

Ancho = 1.9 menor = 2.2

Largo = 1.9 mayor = 4.5

e = 0.10 Ancho 1.20

Vol Cto1 = Ancho * Largo * e e = 0.10


Vol Cto1 = 0.36 (menor  mayor)
Area  * Ancho * e
2

Vol Cto2 = 0.40

Concreto solado tuberia = Vol Cto3 = ( ancho x L tuberia x espesor) Vol Cto 3= 1.12

Total concreto simple para solados = Vol Cto1 + Vol Cto2 + Vol Cto3 = 1.90

VOLUMEN CONCRETO CLASE 21 Mpa Vol Cto3 7.80

RELLENO DE VÍA NIVELACIÓN ALCANTARILLA (1)

Largo = 6.00 ml
Alto = 2.00 ml
Ancho = 1.80 ml

VOLUMEN RELLENO NIVELACIÓN VIA 21.60

VOLUMEN RELLENOS = 21.6

ACERO DE REFUERZO FY = 420 Mpa

REFUERZO HORIZONTAL ALETAS Y MURO REFUERZO PLACA DESCOLE


Masa Masa
Peso Total
ITEM Ǿ Long (m) Cant. Nominal
Kg
ITEM Ǿ Long (m) Cant. Nominal Peso Total Kg
(Kg/m) (Kg/m)
3 1.94 2 0.560 2.17 4 3.04 2 0.994 6.04
LADO INTERNO

3 2.25 1 0.560 1.26 4 3.04 2 0.994 6.04


ALETAS

3 4.87 1 0.560 2.73 4 3.48 2 0.994 6.92


3 5.79 2 0.560 6.48 4 3.48 2 0.994 6.92
3 5.08 4 0.560 11.38 4 4.92 2 0.994 9.78
3 2.30 1 0.560 1.29 4 4.36 2 0.994 8.67
EXTERNO

ACERO SUPERIOR E INFERIOR


ALETAS

3 5.02 1 0.560 2.81 4 4.36 2 0.994 8.67


LADO

3 5.90 2 0.560 6.61 4 4.80 2 0.994 9.54


3 5.22 4 0.560 11.69 4 4.80 2 0.994 9.54
4 3.45 8 0.994 27.43 4 5.10 2 0.994 10.14
MURO
4 1.60 8 0.994 12.72 4 5.10 2 0.994 10.14
SUBTOTAL 86.57 4 1.20 2 0.994 2.39
4 1.60 2 0.994 3.18
4 1.80 2 0.994 3.58
4 2.20 2 0.994 4.37
4 2.62 13 0.994 33.86
4 1.10 2 0.994 2.19
4 1.50 2 0.994 2.98
4 1.70 2 0.994 3.38
4 2.10 2 0.994 4.17
4 2.52 13 0.994 32.56
SUBTOTAL 185.06
AUNAR ESPFUERZOS PARA EL MEJORAMIENTO, MANTENIMIENTO Y REHABILITACÍON
DE CORREDORES PRODUTIVOS - EN EL MUNICIPIO DE SIBUNDOY DEPARTAMENTO DE MEMORIA DE CÁLCULO ALCANTARILLA 36"
PUTUMAYO - "COLOMBIA RURAL".

TRAMO #REF! ALCANTARILLA No ABSCISA:

REFUERZO VERTICAL ALETAS Y MURO REFUERZO VERTICAL ALETAS Y MURO

Masa Masa
Peso Total
ITEM Ǿ Long (m) Cant. Nominal
Kg
ITEM Ǿ Long (m) Cant. Nominal Peso Total Kg
(Kg/m) (Kg/m)
4 3.20 4 0.994 12.72 4 4.24 9 0.994 37.93
MURO

4 3.00 4 0.994 11.93 3 3.9 9 0.56 19.66


4 1.40 8 0.994 11.13 4 2.06 1 0.994 2.05
3 1.64 8 0.56 7.35 3 1.86 1 0.56 1.04
4 2.26 2 0.994 4.49 4 3.34 1 0.994 3.32
ALETAS CARA INTERNA

4 2.22 2 0.994 4.41 3 2.94 1 0.56 1.65


4 2.18 2 0.994 4.33 4 3.48 6 0.994 20.75
4 2.14 2 0.994 4.25 3 5.8 6 0.56 19.49

POCETA
4 2.10 2 0.994 4.17 4 5.9 3 0.994 17.59
4 2.06 2 0.994 4.10 3 4.7 3 0.56 7.9
4 2.02 2 0.994 4.02 4 2.28 4 0.994 9.07
4 1.98 2 0.994 3.94 3 2.28 4 0.56 5.11
4 1.94 2 0.994 3.86 4 2.08 8 0.994 16.54
4 2.30 2 0.994 4.57 3 2.08 8 0.56 9.32
ALETAS CARA EXTERNA

4 2.26 2 0.994 4.49 4 1.54 4 0.994 6.12


4 2.22 2 0.994 4.41 4 1.36 4 0.994 5.41
4 2.18 2 0.994 4.33 4 1.28 4 0.994 5.09
4 2.14 2 0.994 4.25 SUBTOTAL 188.04
4 2.10 2 0.994 4.17
4 2.06 2 0.994 4.10
4 2.02 2 0.994 4.02
4 1.98 2 0.994 3.94
SUBTOTAL 118.98

Total Acero Alcantarilla 578.7 Kg

RESUMEN DE CANTIDADES ALCANTARILLAS

DESCRIPCION CANTIDAD UNIDAD

Excavaciones varias sin clasificar 308.0 m3

Tubería de concreto reforzado de 900 mm de diámetro interior 42.0 m

Concreto clase 14 Mpa 13.3 m3

Concreto clase 21 Mpa 54.6 m3

Acero de refuerzo fy = 420 Mpa 4050.9 kg

Relleno para estructuras con material seleccionado 151.2 m3

Excavaciones en roca 21.6 m3

Elaboró:LUIS ALBERTO RODRIGUEZ


Cargo: PROFESIONAL DE APOYO SRT
M.P. No. 19202-356706 CAU
TRAMO 3 PR 0+503 A PR 0+628

LOSAS TIPO 1
CONCRETO PLACA HUELLA
h 0.15
a 1.8
l 3
N° losas 7
Volumen concreto por módulo de 3 m 0.81
Volumen concreto losas tipo 1 5.67

CONCRETO CICLOPEO
h 0.15
a 1.8
l 3
N° losas 7
Volumen concreto por módulo de 3 m 0.81
Volumen concreto losas tipo 2 5.67

LOSAS TIPO 2
CONCRETO PLACA HUELLA
h 0.15
a 2.7
l 3
N° losas 32
Volumen concreto por módulo de 3 m 1.215
Volumen concreto losas tipo 2 38.88

CONCRETO CICLOPEO
h 0.15
a 0.9
l 3
N° losas 32
Volumen concreto por módulo de 3 m 0.405
Volumen concreto losas tipo 1 12.96

LOSAS TIPO 3
CONCRETO PLACA HUELLA
h 0.15
a 3.15
l 3
N° losas 0
Volumen concreto por módulo de 3 m 1.4175
Volumen concreto losas tipo 3 0
CONCRETO CICLOPEO
h 0.15
a 0.45
l 3
N° losas 0
Volumen concreto por módulo de 3 m 0.2025
Volumen concreto losas tipo 3 0

RIOSTRAS
h 0.25
a 0.2
l 5
N° riostras 40
Volumen concreto por unidad de riostra 0.25
Volumen concreto riostras 10

CUNETAS
Bordillo Losa de cuneta
h 0.15 0.15
a 0.3 0.55
l 3 3
N° cunetas de L=3 m 39 39
Volumen concreto por cuneta L= 3 m 0.135 0.2475
Volumen concreto 5.265 9.6525
Volumen cuneta (2 costados) 29.835

ACEROS
ELEMENTO SENTIDO LONGITUD ANCHO DIAMETRO (pulg.)
CANTIDAD VARILLAS
LOSAS TIPO 1 Transversal 3 0.9 3/8 16
Longitudinal 0.9 3 3/8 6
LOSAS TIPO 2 Transversal 3 1.35 3/8 16
Longitudinal 1.35 3 3/8 8
LOSAS TIPO 3 Transversal 3 3.15 3/8 16
Longitudinal 3.15 3 3/8 17
RIOSTRAS Longitudinal 5 - 3/8 4
Estribos (aros) 5 - 3/8 21
BORDILLO Longitudinal 125 3/8 2
Transversal 125 3/8 501
CUNETA Longitudinal 125 3/8 3
Transversal 125 3/8 501
TRASLAPOS EN LAS LOSAS Longitudinal - 3/8 138
TRASLAPOS EN LA CUNETA Longitudinal - 3/8 63
TRASLAPOS EN LOS BORDILLOS Longitudinal - 3/8 42
DESCRIPCION CANTIDAD UNIDAD
Concreto reforzado clase 21 MPa 84.4 m3
Concreto ciclopeo clase 14 MPa 18.6 m3
Acero de refuerzo fy = 420 Mpa 3887.9 kg
excavacion manual riostra 10 m3
LONGITUD LONG TOTAL
PESO VARILLAPESO
(Kg/m2)
TOTAL (Kg/m2)
N° LOSAS
PESO TOTAL (Kg/m2)
0.8 12.8 0.56 7.168 7 100.35
2.9 15.95 0.56 8.932 7 125.05
1.25 20 0.56 11.2 32 716.80
2.9 22.475 0.56 12.586 32 805.50
3.05 48.8 0.56 27.328 0 0.00
2.9 48.575 0.56 27.202 0 0.00
4.9 19.6 0.56 10.976 40 439.04
0.65 13.65 0.56 7.644 40 305.76
124.9 249.8 0.56 139.888 - 279.78
0.35 175.35 0.56 98.196 - 196.39
124.9 374.7 0.56 209.832 - 419.66
0.7 350.7 0.56 196.392 - 392.78
0.6 76.16125 0.56 42.6503 - 42.65
0.6 34.375 0.56 19.25 - 38.50
0.6 22.9166667 0.56 12.8333333 - 25.67
3887.93
TRAMO 2 PR 0+027 A PR 0+220

LOSAS TIPO 1
CONCRETO PLACA HUELLA
h 0.15
a 1.8
l 3
N° losas 26
Volumen concreto por módulo de 3 m 0.81
Volumen concreto losas tipo 1 21.06

CONCRETO CICLOPEO
h 0.15
a 1.8
l 3
N° losas 26
Volumen concreto por módulo de 3 m 0.81
Volumen concreto losas tipo 2 21.06

LOSAS TIPO 2
CONCRETO PLACA HUELLA
h 0.15
a 2.7
l 3
N° losas 29
Volumen concreto por módulo de 3 m 1.215
Volumen concreto losas tipo 2 35.235

CONCRETO CICLOPEO
h 0.15
a 0.9
l 3
N° losas 29
Volumen concreto por módulo de 3 m 0.405
Volumen concreto losas tipo 1 11.745

LOSAS TIPO 3
CONCRETO PLACA HUELLA
h 0.15
a 3.15
l 3
N° losas 8
Volumen concreto por módulo de 3 m 1.4175
Volumen concreto losas tipo 3 11.34
CONCRETO CICLOPEO
h 0.15
a 0.45
l 3
N° losas 8
Volumen concreto por módulo de 3 m 0.2025
Volumen concreto losas tipo 3 1.62

RIOSTRAS
h 0.25
a 0.2
l 5
N° riostras 64
Volumen concreto por unidad de riostra 0.25
Volumen concreto riostras 16

CUNETAS
Bordillo Losa de cuneta
h 0.15 0.15
a 0.3 0.55
l 3 3
N° cunetas de L=3 m 63 63
Volumen concreto por cuneta L= 3 m 0.135 0.2475
Volumen concreto 8.505 15.5925
Volumen cuneta (2 costados) 48.195

ACEROS
ELEMENTO SENTIDO LONGITUD ANCHO DIAMETRO (pulg.)
LOSAS TIPO 1 Transversal 3 0.9 3/8
Longitudinal 0.9 3 3/8
LOSAS TIPO 2 Transversal 3 1.35 3/8
Longitudinal 1.35 3 3/8
LOSAS TIPO 3 Transversal 3 3.15 3/8
Longitudinal 3.15 3 3/8
RIOSTRAS Longitudinal 5 - 3/8
Estribos (aros) 5 - 3/8
BORDILLO Longitudinal 201.8 3/8
Transversal 201.8 3/8
CUNETA Longitudinal 201.8 3/8
Transversal 201.8 3/8
TRASLAPOS EN LAS LOSAS Longitudinal - 3/8
TRASLAPOS EN LA CUNETA Longitudinal - 3/8
TRASLAPOS EN LOS BORDILLOS Longitudinal - 3/8
TRAMO 2
DESCRIPCION CANTIDAD UNIDAD
Concreto reforzado clase 21 MPa 131.8 m3
Concreto ciclopeo clase 14 MPa 34.4 m3
Acero de refuerzo fy = 420 Mpa 6346.6 kg
excavacion manual riostra 16 m3
30
22

4.05 7.425
22.95

CANTIDAD VARILLAS
LONGITUD LONG TOTAL
PESO VARILLAPESO
(Kg/m2)
TOTAL (Kg/m2)
N° LOSAS
PESO TOTAL (Kg/m2)
16 0.8 12.8 0.56 7.168 26 372.74
6 2.9 15.95 0.56 8.932 26 464.46
16 1.25 20 0.56 11.2 29 649.60
8 2.9 22.475 0.56 12.586 29 729.99
16 3.05 48.8 0.56 27.328 8 437.25
17 2.9 48.575 0.56 27.202 8 217.62
4 4.9 19.6 0.56 10.976 64 702.46
21 0.65 13.65 0.56 7.644 64 489.22
2 201.7 403.4 0.56 225.904 - 451.81
808 0.35 282.87 0.56 158.4072 - 316.81
3 201.7 605.1 0.56 338.856 - 677.71
808 0.7 565.74 0.56 316.8144 - 633.63
243 0.6 133.381875 0.56 74.69385 - 74.69
101 0.6 55.495 0.56 31.0772 - 62.15
67 0.6 36.9966667 0.56 20.7181333 - 41.44
6321.58
3375.23
TRAMO 1 PR 0+010 A PR 0+380

LOSAS TIPO 1
CONCRETO PLACA HUELLA
h 0.15
a 1.8
l 3
N° losas 68 -6
Volumen concreto por módulo de 3 m 0.81
Volumen concreto losas tipo 1 55.08

CONCRETO CICLOPEO
h 0.15
a 1.8
l 3
N° losas 68
Volumen concreto por módulo de 3 m 0.81
Volumen concreto losas tipo 2 55.08

LOSAS TIPO 2
CONCRETO PLACA HUELLA
h 0.15
a 2.7
l 3
N° losas 56
Volumen concreto por módulo de 3 m 1.215
Volumen concreto losas tipo 2 68.04

CONCRETO CICLOPEO
h 0.15
a 0.9
l 3
N° losas 56
Volumen concreto por módulo de 3 m 0.405
Volumen concreto losas tipo 1 22.68

LOSAS TIPO 3
CONCRETO PLACA HUELLA
h 0.15
a 3.15
l 3
N° losas 2
Volumen concreto por módulo de 3 m 1.4175
Volumen concreto losas tipo 3 2.835

CONCRETO CICLOPEO
h 0.15
a 0.45
l 3
N° losas 2
Volumen concreto por módulo de 3 m 0.2025
Volumen concreto losas tipo 3 0.405

RIOSTRAS
h 0.25
a 0.2
l 5
N° riostras 127
Volumen concreto por unidad de riostra 0.25
Volumen concreto riostras 31.75

CUNETAS
Bordillo Losa de cuneta
h 0.15 0.15
a 0.3 0.55
l 3 3
N° cunetas de L=3 m 126 126
Volumen concreto por cuneta L= 3 m 0.135 0.2475
Volumen concreto 17.01 31.185
Volumen cuneta (2 costados) 96.39

ACEROS
ELEMENTO SENTIDO LONGITUD ANCHO DIAMETRO (pulg.)
LOSAS TIPO 1 Transversal 3 0.9 3/8
Longitudinal 0.9 3 3/8
LOSAS TIPO 2 Transversal 3 1.35 3/8
Longitudinal 1.35 3 3/8
LOSAS TIPO 3 Transversal 3 3.15 3/8
Longitudinal 3.15 3 3/8
RIOSTRAS Longitudinal 5 - 3/8
Estribos (aros) 5 - 3/8
BORDILLO Longitudinal 403.4 3/8
Transversal 403.4 3/8
CUNETA Longitudinal 403.4 3/8
Transversal 403.4 3/8
TRASLAPOS EN LAS LOSAS Longitudinal - 3/8
TRASLAPOS EN LA CUNETA Longitudinal - 3/8
TRASLAPOS EN LOS BORDILLOS Longitudinal - 3/8

TRAMO 1
DESCRIPCION CANTIDAD UNIDAD
Concreto reforzado clase 21 MPa 266.1 m3
Concreto ciclopeo clase 14 MPa 83.2 m3
Acero de refuerzo fy = 420 Mpa 11871.7 kg
excavacion manual riostra 31.75 m3
JUNTAS
CANTIDAD VARILLAS
LONGITUD LONG TOTAL
PESO VARILLAPESO
(Kg/m2)
TOTAL (Kg/m2)
N° LOSAS
PESO TOTAL (Kg/m2)
16 0.8 12.8 0.56 7.168 68 974.85
6 2.9 15.95 0.56 8.932 68 1214.75
16 1.25 20 0.56 11.2 56 1254.40
8 2.9 22.475 0.56 12.586 56 1409.63
16 3.05 48.8 0.56 27.328 2 109.31
17 2.9 48.575 0.56 27.202 2 54.40
4 4.9 19.6 0.56 10.976 127 1393.95
21 0.65 13.65 0.56 7.644 127 970.79
2 403.3 806.6 0.56 451.696 - 903.39
1615 0.35 565.11 0.56 316.4616 - 632.92
3 403.3 1209.9 0.56 677.544 - 1355.09
1615 0.7 1130.22 0.56 632.9232 - 1265.85
407 0.6 223.69875 0.56 125.2713 - 125.27
202 0.6 110.935 0.56 62.1236 - 124.25
134 0.6 73.9566667 0.56 41.4157333 - 82.83
11871.68
LOSA DE TRANSICIÓN

LOSA DE TRANSICIÓN
H 0.15
B 5
b 3.6
h 1.5
N° losas 6
Área concreto m2 6.45
Volumen concreto m3 0.9675
Volumen concreto losas m3 5.805

MATERIAL GRANULAR DEBAJO DE LOSA


H 0.15
B 5
b 3.6
h 1.5
N° losas 6
Área material m2 6.45
Volumen material una losa m3 0.9675
Volumen material total m3 5.805

ACERO DE REFUERZO

ELEMENTO LONGITUD TOTAL


DIAMETRO (pulg.)
VARILLA #4 62.72 1/2
PESO VARILLAPESO
(Kg/m2)
TOTAL (Kg/m2)
N° LOSAS PESO TOTAL (Kg/m2)
0.996 62.46912 6 749.63
alto palmira
Tipo Abscisa Longitud Area SecciónArea SecciónCorte Corte Terraplen
Punto m m Corte Terraplen Area Planta Volumen (m3Area Planta
0 1.738 0.09
10 48.852 11.354 10.233
10 0.856 0.287
1.391 6.522 1.174 1.958
PC 11.391 0.823 0.294
8.609 41.324 5.521 10.808
20 0.574 0.198
10 45.903 4.136 13.875
30 0.251 0.267
7.568 19.125 1.912 24.776
PT 37.568 0.205 0.245
2.432 3.403 0.492 10.379
40 0.184 0.282
10 16.815 2.038 37.699
50 0.164 0.182
10 28.844 2.605 24.153
60 0.296 0.036
7.5 25.91 1.807 14.891
PC 67.5 0.202 0.144
2.5 10.26 0.412 4.017
70 0.208 0.134
5 25.207 1.364 3.33
75 0.238 0.139
5 14.189 0.521 14.886
80 0.032 0.376
0
80 0.032 0.376
5 2.465 0.045 27.111
85 0.002 0.617
5 0.785 0.014 28.915
90 0.782
5 2.582 0.155 26.81
95 0.037 0.91
0
95 0.037 0.91
2.823 0.987 0.045 15.464
PT 97.823 0.022 0.766
2.177 1.678 0.095 10.794
100 0.064 0.538
10 14.115 1.313 41.948
110 0.149 0.428
0
110 0.149 0.428
10 22.203 1.856 34.982
120 0.182 0.312
10 20.278 1.851 36.545
130 0.228 0.239
10 26.538 1.921 30.625
140 0.067 0.288
8.363 2.289 0.152 47.039
PQ 148.363 0.624
1.637 0.25 0.004 9.503
150 0.004 0.569
10 5.765 0.18 52.726
160 0.041 0.302
10 8.117 0.351 49.969
170 0.02 0.528
10 2.651 0.049 56.44
180 0.001 0.614
2.258 0.211 0.002 13.221
PQ 182.258 0.001 0.62
7.742 0.155 0.001 46.188
190 0.749
10 0.003 60.12
200 0.811
10 1.184 0.038 58.87
210 0.001 0.667
9.695 11.175 0.158 47.228
PC 219.695 0.07 0.348
0.305 0.961 0.022 0.87
220 0.075 0.341
10 38.018 2.661 20.906
230 0.72 0.148
10 49.1 8.016 8.998
240 0.738 0.219
10 48.304 4.952 10.252
250 0.108 0.224
1.838 4.052 0.061 6.857
PT 251.838 0.412
8.162 10.068 0.257 38.367
260 0.102 0.279
10 16.919 0.717 41.147
270 0.053 0.481
1.617 2.069 0.093 7.175
PC 271.617 0.092 0.416
8.383 11.206 0.985 34.998
280 0.084 0.443
3.177 3.497 0.316 14.001
PT 283.177 0.131 0.414
6.823 11.017 1.295 25.979
290 0.392 0.174
10 27.69 3.279 25.962
300 0.62 0.197
9.935 13.54 2.492 39.645
PC 309.935 0.282 0.4
0.065 0.055 0.017 0.303
310 0.256 0.391
5 5.76 0.393 20.878
315 0.114 0.207
5 15.875 1.036 10.017
320 0.2 0.134
5 16.386 2.483 9.795
325 0.631 0.053
2.709 11.804 2.208 2.589
PT 327.709 0.931 0.035
2.291 10.807 2.617 1.74
330 1.214 0.008
10 55.236 18.702 2.068
340 0.978 0.013
4.498 20.561 3.346 4.418
PC 344.498 0.88 0.021
5.502 23.138 3.512 6.096
350 0.66 0.006
10 49.18 6.441 2.128
360 0.396 0.06
10 34.099 2.378 22.29
370 0.131 0.317
0.724 1.46 0.077 2.843
PT 370.724 0.095 0.401
9.276 4.22 0.118 53.06
380 0.016 0.401
10 48.183 3.874 12.652
390 0.457 0.214
10 50.216 3.671 8.983
400 0.273 0.2
10 49.243 2.629 9.182
410 0.236 0.211
1.755 6.736 0.421 3.528
PC 411.755 0.261 0.234
8.245 30.313 2.173 18.159
420 0.284 0.242
6.296 23.467 1.843 13.589
PT 426.296 0.31 0.242
3.704 15.475 1.141 6.296
430 0.292 0.205
7.649 38.347 3.737 5.067
PC 437.649 0.743 0.076
2.351 11.786 1.931 1.159
440 0.909 0.06
6.96 34.837 7.96 3.425
PT 446.96 1.35 0.056
3.04 15.211 4.462 1.212
450 1.581 0.032
2.964 14.829 5.01 0.872
452.964 1.793 0.017

Tipo Abscisa Longitud Materiales Estructura (m3)

[5] Concreto [6] Concreto MEJORAMIE


Rigido Rigido NTO DE
Punto m m [4] Subbase PLACAS CUNETAS SRTE [9] Piedra
0
10 7.651 2.7 2.538 8.723 2.701
10
1.391 1.065 0.376 0.353 1.214 0.376
PC 11.391
8.609 6.59 2.324 2.185 7.514 2.328
20
10 7.654 2.7 2.538 8.728 2.704
30
7.568 5.793 2.043 1.921 6.605 2.046
PT 37.568
2.432 1.861 0.657 0.617 2.122 0.657
40
10 7.651 2.7 2.538 8.723 2.701
50
10 7.651 2.7 2.538 8.724 2.701
60
7.5 5.738 2.025 1.904 6.543 2.026
PC 67.5
2.5 1.913 0.675 0.635 2.181 0.676
70
5 3.826 1.35 1.269 4.363 1.351
75
5 3.826 1.35 1.269 4.363 1.351
80
0
80
5 3.826 1.35 1.269 4.363 1.351
85
5 3.826 1.35 1.269 4.363 1.351
90
5 3.826 1.35 1.269 4.363 1.351
95
0
95
2.823 2.161 0.762 0.717 2.463 0.763
PT 97.823
2.177 1.666 0.588 0.553 1.899 0.588
100
10 7.651 2.7 2.538 8.723 2.701
110
0
110
10 7.651 2.7 2.538 8.724 2.701
120
10 7.651 2.7 2.538 8.724 2.701
130
10 7.651 2.7 2.538 8.724 2.701
140
8.363 6.399 2.258 2.123 7.295 2.259
PQ 148.363
1.637 1.253 0.442 0.416 1.428 0.442
150
10 7.651 2.7 2.538 8.724 2.701
160
10 7.651 2.7 2.538 8.724 2.701
170
10 7.651 2.7 2.538 8.724 2.701
180
2.258 1.728 0.61 0.573 1.97 0.61
PQ 182.258
7.742 5.923 2.09 1.965 6.753 2.091
190
10 7.651 2.7 2.538 8.724 2.701
200
10 7.651 2.7 2.538 8.724 2.701
210
9.695 7.418 2.618 2.461 8.457 2.619
PC 219.695
0.305 0.234 0.082 0.078 0.266 0.083
220
10 7.653 2.7 2.538 8.726 2.703
230
10 7.653 2.7 2.538 8.726 2.703
240
10 7.653 2.7 2.538 8.726 2.703
250
1.838 1.407 0.496 0.467 1.604 0.497
PT 251.838
8.162 6.245 2.204 2.072 7.12 2.205
260
10 7.651 2.7 2.538 8.723 2.701
270
1.617 1.238 0.437 0.411 1.412 0.437
PC 271.617
8.383 6.417 2.263 2.128 7.316 2.267
280
3.177 2.432 0.858 0.807 2.773 0.859
PT 283.177
6.823 5.221 1.842 1.732 5.952 1.843
290
10 7.651 2.7 2.538 8.725 2.701
300
9.935 7.602 2.682 2.522 8.669 2.683
PC 309.935
0.065 0.05 0.018 0.016 0.057 0.018
310
5 3.826 1.35 1.269 4.362 1.351
315
5 3.826 1.35 1.269 4.362 1.351
320
5 3.826 1.35 1.269 4.362 1.351
325
2.709 2.073 0.731 0.688 2.364 0.732
PT 327.709
2.291 1.753 0.619 0.582 2 0.619
330
10 7.651 2.7 2.538 8.732 2.701
340
4.498 3.442 1.214 1.142 3.926 1.215
PC 344.498
5.502 4.212 1.486 1.397 4.802 1.488
350
10 7.655 2.7 2.538 8.728 2.704
360
10 7.655 2.7 2.538 8.728 2.704
370
0.724 0.554 0.195 0.184 0.632 0.196
PT 370.724
9.276 7.098 2.505 2.355 8.093 2.506
380
10 7.651 2.7 2.538 8.724 2.701
390
10 7.651 2.7 2.538 8.724 2.701
400
10 7.651 2.7 2.538 8.723 2.701
410
1.755 1.343 0.474 0.445 1.531 0.474
PC 411.755
8.245 6.31 2.226 2.093 7.195 2.229
420
6.296 4.818 1.7 1.598 5.494 1.702
PT 426.296
3.704 2.834 1 0.94 3.232 1.001
430
7.649 5.853 2.065 1.942 6.674 2.067
PC 437.649
2.351 1.799 0.635 0.597 2.052 0.636
440
6.96 5.327 1.879 1.767 6.074 1.882
PT 446.96
3.04 2.326 0.821 0.772 2.652 0.821
450
2.964 2.268 0.8 0.752 2.585 0.8
452.964
0
Terraplen Corte Terraplen
Volumen (m3)

2.178 11.354 2.178

0.401 1.174 0.401

2.16 5.521 2.16

2.358 4.136 2.358

2.067 1.912 2.067

0.643 0.492 0.643

1.923 2.038 1.923

0.937 2.605 0.937

0.504 1.807 0.504

0.384 0.412 0.384

0.559 1.364 0.559

1.136 0.521 1.136

2.351 0.045 2.351

3.465 0.014 3.465

3.966 0.155 3.966

2.416 0.045 2.416

1.343 0.095 1.343

4.411 1.313 4.411


2.762 1.856 2.762

2.778 1.851 2.778

1.922 1.921 1.922

4.427 0.152 4.427

0.977 0.004 0.977

4.049 0.18 4.049

4.05 0.351 4.05

5.761 0.049 5.761

1.323 0.002 1.323

5.037 0.001 5.037

7.68 7.68

7.318 0.038 7.318

4.156 0.158 4.156

0.105 0.022 0.105

2.197 2.661 2.197

1.677 8.016 1.677

1.96 4.952 1.96

0.533 0.061 0.533

2.978 0.257 2.978

3.315 0.717 3.315

0.726 0.093 0.726

2.917 0.985 2.917


1.482 0.316 1.482

2.444 1.295 2.444

2.076 3.279 2.076

3.057 2.492 3.057

0.026 0.017 0.026

1.579 0.393 1.579

0.665 1.036 0.665

0.509 2.483 0.509

0.063 2.208 0.063

0.035 2.617 0.035

0.019 18.702 0.019

0.165 3.346 0.165

0.122 3.512 0.122

0.12 6.441 0.12

1.513 2.378 1.513

0.26 0.077 0.26

5.296 0.118 5.296

2.434

1.899

1.679

0.377

1.893

1.382
0.748

0.955

0.135

0.448
110.04 121.281
0.123 tramo 1

0.063

MEJORAMIE
NTO DE
[4] Subbase SRTE

1.065 1.214

6.59 7.514

7.654 8.728

5.793 6.605

1.861 2.122

7.651 8.723

7.651 8.724
5.738 6.543

1.913 2.181

3.826 4.363

3.826 4.363

3.826 4.363

3.826 4.363

3.826 4.363

2.161 2.463

1.666 1.899

7.651 8.723 68.873

7.651 8.724

7.651 8.724

7.651 8.724

6.399 7.295

1.253 1.428

7.651 8.724

7.651 8.724

7.651 8.724

1.728 1.97
5.923 6.753

7.651 8.724

7.651 8.724

7.418 8.457

0.234 0.266

7.653 8.726

7.653 8.726

7.653 8.726

1.407 1.604

6.245 7.12

7.651 8.723

1.238 1.412

6.417 7.316

2.432 2.773

5.221 5.952

7.651 8.725

7.602 8.669

0.05 0.057

3.826 4.362

3.826 4.362

3.826 4.362

2.073 2.364

1.753 2
7.651 8.732

3.442 3.926

4.212 4.802

7.655 8.728

7.655 8.728

0.554 0.632

7.098 8.093

283.131 322.835
miravalle
Tipo Abscisa Longitud Area SecciónArea SecciónCorte Corte Terraplen
Punto m m Corte Terraplen Area Planta Volumen (m3Area Planta
0 1.786 0.199
10 51.946 10.685 8.451
10 0.305 0.218
10 49.102 2.169 8.869
20 0.171 0.17
10 48.991 5.602 7.633
30 1.08 0.117
0.104 0.519 0.111 0.066
PQ 30.104 1.086 0.116
9.896 49.571 10.628 6.13
40 0.823 0.127
10 50.038 12.352 5.631
50 1.807 0.035
10 50.097 11.716 4.582
60 0.456 0.091
10 37.686 1.754 19.867
70 0.001 0.412
2.86 0.061 17.09
PQ 72.86 0.772
7.14 1.573 0.015 42.904
80 0.021 0.592
10 4.7 0.095 66.949
90 1.012
1.365 1.015 0.015 7.483
PC 91.365 0.035 0.774
8.635 23.028 1.626 26.213
100 0.287 0.14
10 46.046 6.983 8.379
110 1.367 0.025
10 50.056 18.24 1.621
120 2.043 0.004
2.548 12.746 5.264 0.381
PT 122.548 2.098 0.008
7.452 37.361 16.569 1.17
130 2.131 0.009
10 50.077 21.86 1.528
140 2.136 0.008
10 50.298 21.196 1.266
150 1.87 0.008
9.643 48.984 11.53 2.053
PC 159.643 0.516 0.058
0.357 1.447 0.168 0.481
160 0.478 0.07
2.527 6.621 0.871 7.033
PT 162.527 0.3 0.132
7.473 18.679 0.868 23.709
170 0.016 0.378
6.252 0.941 0.009 38.304
PC 176.252 1.439
3.748 0.037 25.357
180 1.545
5 2.925 0.045 39.13
185 0.007 1.625
0.944 0.355 0.002 6.882
PT 185.944 1.412
1.684 0.183 0.001 12.442
PC 187.628 0.001 1.243
2.372 1.062 0.003 16.163
190 0.002 0.984
5 0.921 0.002 33.339
195 0.824
5 0.103 0.001 32.252
200 0.773
5 0.012 31.732
205 0.875
5 0.088 31.273
210 0.001 0.674
1.832 0.668 0.002 10.663
PT 211.832 0.003 0.606
8.168 10.343 0.277 39.311
220 0.22 0.212
3.828 19.228 1.75 2.871
PC 223.828 0.694 0.113
6.172 30.892 6.105 3.214
230 1.145 0.051
10 50.041 12.915 4.105
240 1.387 0.046
5.672 28.39 6.145 3.613
PT 245.672 0.754 0.201
1.684 8.137 1.083 1.944
PC 247.356 0.538 0.304
2.644 11.619 1.005 4.752
250 0.231 0.436
10 10.1 0.343 60.633
260 1.165
5.112 0.492 0.006 30.946
PT 265.112 0.004 0.824
4.888 1.745 0.056 27.245
270 0.019 0.389
3.547 7.29 0.204 13.275
PC 273.547 0.111 0.207
1.453 5.243 0.206 3.111
275 0.182 0.167
5 24.832 1.258 3.817
280 0.233 0.162
4.071 17.341 0.794 6.054
PT 284.071 0.173 0.194
5.929 24.955 0.897 9.215
290 0.188 0.146
10 50.079 2.29 6.988
300 0.202 0.156
10 50.213 3.043 7.142
310 0.371 0.155
10 43.148 3.476 15.016
320 0.356 0.304
2.938 10.191 1.093 7.093
PC 322.938 0.363 0.255
7.062 22.761 2.525 18.958
330 0.408 0.305
9.092 33.451 4.39 20.68
PT 339.092 0.493 0.299
0.908 3.422 0.436 1.973
340 0.483 0.288
10 42.867 4.274 16.608
350 0.417 0.219
7.846 39.268 3.701 7.637
PC 357.846 0.522 0.222
2.154 10.772 1.118 2.144
360 0.515 0.222
10 50.044 6.805 8.656
370 0.843 0.146
10 50.044 7.553 7.726
380 0.5 0.175
4.364 21.837 1.889 3.882
PT 384.364 0.377 0.227
5.636 24.326 2.047 9.954
390 0.269 0.387
6.264 20.653 1.362 17.997
PC 396.264 0.16 0.415
3.736 13.819 0.662 9.228
400 0.23 0.332
5 23.67 1.597 6.965
405 0.405 0.297
5 23.038 2.327 7.066
410 0.501 0.351
2.094 9.646 1.095 2.966
PT 412.094 0.564 0.299
7.906 39.743 5.591 6.368
420 0.868 0.144
1.757 8.81 1.602 1.232
PC 421.757 0.92 0.165
3.243 16.448 3.257 1.787
425 1.041 0.129
5 25.176 5.948 2.711
430 1.329 0.097
5 25.39 7.137 1.705
435 1.256 0.028
5 25.212 4.677 1.437
440 0.572 0.042
5 19.417 1.649 7.294
445 0.263 0.176
5 7.884 0.961 19.097
450 0.188 0.285
5 3.985 0.681 23.529
455 0.097 0.29
5 12.311 0.67 15.668
460 0.321 0.128
4.069 20.471 1.725 2.254
PT 464.069 0.613 0.109
3.767 18.903 1.649 2.963
PC 467.836 0.353 0.198
2.164 10.153 0.675 2.607
470 0.283 0.282
5 14.486 0.734 20.644
475 0.104 0.804
5 11.985 0.66 21.848
480 0.107 0.517
5 14.469 0.858 16.515
485 0.367 0.473
3.461 14.062 1.492 8.391
PT 488.461 0.531 0.608
1.539 6.546 0.852 3.862
490 0.6 0.645
3.072 13.552 1.925 7.928
PQ 493.072 0.641 0.728
6.928 14.858 2.078 21.873
500 12.023
4.789 11.108 2.242 12.866
PC 504.789 1.211 0.019
0.211 1.006 0.257 0.049
505 1.238 0.011
5 25.059 6.179 4.431
510 1.21 0.152
10 50.15 12.02 6.713
520 1.279 0.102
10 50.175 12.238 3.811
530 1.084 0.039
0.695 3.476 0.744 0.2
PT 530.695 1.07 0.025
9.305 46.791 7.716 4.288
540 0.553 0.112
5.839 25.667 2.634 6.032
PC 545.839 0.371 0.085
4.161 15.042 1.461 6.882
550 0.315 0.096
1.697 5.534 0.478 3.397
PT 551.697 0.254 0.11
8.303 14.219 1.196 30.231
560 0.079 0.297
10 7.744 1.379 46.647
570 0.254 0.323
4.083 3.893 0.995 18.39
PC 574.083 0.128 0.253
5.917 4.153 0.45 28.609
580 0.039 0.399
10 1.427 0.054 59.19
590 0.478
10 28.21 1.9 32.378
600 0.684 0.163
0.206 1.03 0.146 0.164
PT 600.206 0.744 0.159
9.794 49.09 13.313 4.718
610 1.812 0.021
0.13 0.647 0.234 0.035
PQ 610.13 1.814 0.021
9.87 49.502 19.122 2.064
620 1.98 0.009
8.212 41.201 15.896 1.716
628.212 1.814 0.021
0
Total Areas y Volumenes : 390.584
Tipo Abscisa Longitud Materiales Estructura (m3)

[5] Concreto [6] Concreto MEJORAMIE


Rigido Rigido NTO DE
Punto m m [4] Subbase PLACAS CUNETAS SRTE [9] Piedra
0
10 7.651 2.7 2.538 8.724 2.701
10
10 7.651 2.7 2.538 8.724 2.701
20
10 7.651 2.7 2.538 8.724 2.701
30
0.104 0.079 0.028 0.026 0.09 0.028
PQ 30.104
9.896 7.572 2.672 2.512 8.633 2.673
40
10 7.651 2.7 2.538 8.724 2.701
50
10 7.651 2.7 2.538 8.724 2.701
60
10 7.651 2.7 2.538 8.724 2.701
70
2.86 2.188 0.772 0.726 2.495 0.773
PQ 72.86
7.14 5.463 1.928 1.812 6.228 1.929
80
10 7.651 2.7 2.538 8.724 2.701
90
1.365 1.045 0.369 0.347 1.191 0.369
PC 91.365
8.635 6.61 2.331 2.192 7.537 2.336
100
10 7.655 2.7 2.538 8.729 2.705
110
10 7.655 2.7 2.538 8.729 2.705
120
2.548 1.95 0.688 0.647 2.224 0.689
PT 122.548
7.452 5.703 2.012 1.892 6.503 2.013
130
10 7.651 2.7 2.538 8.725 2.701
140
10 7.651 2.7 2.538 8.725 2.701
150
9.643 7.38 2.603 2.448 8.416 2.606
PC 159.643
0.357 0.274 0.097 0.091 0.312 0.097
160
2.527 1.936 0.682 0.642 2.207 0.685
PT 162.527
7.473 5.719 2.018 1.897 6.52 2.02
170
6.252 4.784 1.688 1.587 5.454 1.689
PC 176.252
3.748 2.87 1.012 0.952 3.272 1.014
180
5 3.828 1.35 1.269 4.364 1.352
185
0.944 0.722 0.255 0.24 0.824 0.255
PT 185.944
1.684 1.288 0.455 0.427 1.469 0.455
PC 187.628
2.372 1.815 0.64 0.602 2.069 0.64
190
5 3.826 1.35 1.269 4.362 1.35
195
5 3.826 1.35 1.269 4.362 1.351
200
5 3.826 1.35 1.269 4.362 1.351
205
5 3.826 1.35 1.269 4.362 1.351
210
1.832 1.402 0.495 0.465 1.598 0.495
PT 211.832
8.168 6.249 2.205 2.073 7.125 2.206
220
3.828 2.929 1.034 0.972 3.339 1.034
PC 223.828
6.172 4.724 1.666 1.567 5.386 1.669
230
10 7.654 2.7 2.538 8.727 2.704
240
5.672 4.34 1.531 1.44 4.948 1.532
PT 245.672
1.684 1.288 0.455 0.427 1.469 0.455
PC 247.356
2.644 2.023 0.714 0.671 2.307 0.714
250
10 7.654 2.7 2.538 8.726 2.703
260
5.112 3.913 1.38 1.298 4.461 1.382
PT 265.112
4.888 3.741 1.32 1.241 4.265 1.321
270
3.547 2.715 0.958 0.9 3.095 0.959
PC 273.547
1.453 1.112 0.392 0.369 1.268 0.393
275
5 3.827 1.35 1.269 4.363 1.351
280
4.071 3.116 1.099 1.034 3.553 1.1
PT 284.071
5.929 4.536 1.601 1.505 5.172 1.602
290
10 7.651 2.7 2.538 8.723 2.701
300
10 7.651 2.7 2.538 8.724 2.701
310
10 7.651 2.7 2.538 8.723 2.701
320
2.938 2.249 0.793 0.746 2.564 0.794
PC 322.938
7.062 5.405 1.907 1.793 6.162 1.909
330
9.092 6.959 2.455 2.308 7.934 2.458
PT 339.092
0.908 0.695 0.245 0.23 0.792 0.245
340
10 7.652 2.7 2.538 8.724 2.701
350
7.846 6.004 2.119 1.992 6.846 2.12
PC 357.846
2.154 1.648 0.581 0.547 1.879 0.582
360
10 7.654 2.7 2.538 8.727 2.704
370
10 7.654 2.7 2.538 8.727 2.704
380
4.364 3.34 1.178 1.108 3.809 1.18
PT 384.364
5.636 4.312 1.522 1.431 4.916 1.522
390
6.264 4.792 1.691 1.59 5.464 1.691
PC 396.264
3.736 2.859 1.009 0.948 3.259 1.009
400
5 3.826 1.35 1.269 4.362 1.351
405
5 3.826 1.35 1.269 4.362 1.351
410
2.094 1.602 0.565 0.531 1.826 0.566
PT 412.094
7.906 6.049 2.135 2.007 6.897 2.135
420
1.757 1.344 0.474 0.446 1.532 0.474
PC 421.757
3.243 2.482 0.876 0.823 2.829 0.876
425
5 3.826 1.35 1.269 4.362 1.351
430
5 3.826 1.35 1.269 4.362 1.351
435
5 3.826 1.35 1.269 4.362 1.351
440
5 3.826 1.35 1.269 4.362 1.351
445
5 3.826 1.35 1.269 4.362 1.351
450
5 3.826 1.35 1.269 4.362 1.351
455
5 3.826 1.35 1.269 4.362 1.351
460
4.069 3.113 1.099 1.033 3.55 1.099
PT 464.069
3.767 2.882 1.017 0.956 3.286 1.017
PC 467.836
2.164 1.656 0.584 0.549 1.888 0.585
470
5 3.829 1.35 1.269 4.366 1.353
475
5 3.83 1.35 1.269 4.367 1.354
480
5 3.829 1.35 1.269 4.366 1.354
485
3.461 2.649 0.934 0.879 3.02 0.935
PT 488.461
1.539 1.178 0.416 0.391 1.343 0.416
490
3.072 2.351 0.829 0.78 2.68 0.83
PQ 493.072
6.928 5.301 1.871 1.759 6.043 1.871
500
4.789 3.665 1.293 1.216 4.179 1.294
PC 504.789
0.211 0.161 0.057 0.054 0.184 0.057
505
5 3.827 1.35 1.269 4.364 1.352
510
10 7.655 2.7 2.538 8.728 2.705
520
10 7.655 2.7 2.538 8.728 2.705
530
0.695 0.532 0.188 0.176 0.607 0.188
PT 530.695
9.305 7.123 2.512 2.362 8.122 2.517
540
5.839 4.47 1.577 1.482 5.097 1.58
PC 545.839
4.161 3.185 1.123 1.056 3.632 1.126
550
1.697 1.299 0.458 0.431 1.481 0.459
PT 551.697
8.303 6.354 2.242 2.108 7.245 2.244
560
10 7.651 2.7 2.538 8.725 2.7
570
4.083 3.125 1.102 1.037 3.563 1.103
PC 574.083
5.917 4.528 1.598 1.502 5.163 1.599
580
10 7.653 2.7 2.538 8.726 2.703
590
10 7.653 2.7 2.538 8.726 2.703
600
0.206 0.157 0.056 0.052 0.18 0.056
PT 600.206
9.794 7.494 2.644 2.486 8.544 2.645
610
0.13 0.099 0.035 0.033 0.113 0.035
PQ 610.13
9.87 7.552 2.665 2.506 8.611 2.666
620
8.212 6.284 2.217 2.085 7.165 2.218
628.212
0
Totales Volúmenes (m3) : 480.749 169.617 159.458 548.141 169.766
Terraplen Corte Terraplen
Volumen (m3)

1.588

1.603

1.23 5.602 1.23

0.012 0.111 0.012

1.017 10.628 1.017

0.865 12.352 0.865

0.598 11.716 0.598

1.738 1.754 1.738

1.652 1.652

4.916 0.015 4.916

14.349 0.095 14.349

1.17 T 0.015 1.17

2.785
R 1.626 2.785
A
0.768 M 6.983 0.768

0.081
O 18.24 0.081

0.016 2 5.264 0.016

0.045 16.569 0.045

0.057 21.86 0.057

0.053 21.196 0.053

0.263 11.53 0.263

0.024 0.168 0.024


0.351 0.871 0.351

1.59 0.868 1.59

5.996 0.009 5.996

5.249 5.249

15.762 0.045 15.762

1.378 0.002 1.378

2.262 0.001 2.262

2.607 0.003 2.607

4.329 0.002 4.329

3.853 0.001 3.853

4.031 4.031

4.217 4.217

1.101 0.002 1.101

3.858 0.277 3.858

0.549
147.805 88.223
0.415

0.445

0.582

0.404

0.956

15.759

4.742
2.824

1.009

0.226

0.769

0.636

1.069

1.444

1.415

2.017

0.721

1.958

2.667

0.253

2.325

1.678

0.477

1.713

1.417

0.781

1.669

2.559

1.299

1.599
1.479

0.64

1.344

0.256

0.289

0.518

0.264

0.155

0.45

0.963

1.647

0.972

0.44

0.64

0.496

3.022

3.135

2.4

1.916

0.94

2.045

0.379
2.242

0.257

0.826 6.179 0.826

1.132 12.02 1.132

0.586 12.238 0.586

0.021 0.744 0.021

0.741 7.716 0.741

0.436 2.634 0.436

0.327 T 1.461 0.327


R
0.162
A 0.478 0.162

1.408 M 1.196 1.408

2.985
O 1.379 2.985

1.151
3 0.995 1.151

1.647 0.45 1.647

5.035 0.054 5.035

3.277 1.9 3.277

0.032 0.146 0.032

0.652 13.313 0.652

0.003 0.234 0.003

0.125 19.122 0.125

0.11 15.896 0.11

192.837 100.654 20.656


248.459 108.879 T2 Y T3

MEJORAMIE
NTO DE
[4] Subbase SRTE

7.651 8.724

0.079 0.09

7.572 8.633

7.651 8.724

7.651 8.724

7.651 8.724

2.188 2.495

5.463 6.228

7.651 8.724

1.045 1.191
6.61 7.537

T2 7.655 8.729

7.655 8.729

1.95 2.224

5.703 6.503

7.651 8.725

7.651 8.725

7.38 8.416

0.274 0.312

1.936 2.207

5.719 6.52

4.784 5.454

2.87 3.272

3.828 4.364

0.722 0.824

1.288 1.469

1.815 2.069

3.826 4.362

3.826 4.362

3.826 4.362

3.826 4.362

1.402 1.598
6.249 7.125

153.0480 174.507
3.665 4.179

0.161 0.184

3.827 4.364

7.655 8.728

7.655 8.728

0.532 0.607

7.123 8.122

4.47 5.097

3.185 3.632

1.299 1.481

T3 6.354 7.245

7.651 8.725

3.125 3.563

4.528 5.163
7.653 8.726

7.653 8.726

0.157 0.18

7.494 8.544

0.099 0.113

7.552 8.611

6.284 7.165

98.1220 111.883

251.17 286.39 T2 Y T3
AUNAR ESFUERZOS PARA EL MEJORAMIENTO, MANTENIMIENTO Y REHABILITACÍON DE CORREDORES
CONVENIO No. PRODUCTIVOS - EN EL MUNICIPIO DE VALLE DEL GUAMUEZ DEPARTAMENTO DE PUTUMAYO - "COLOMBIA
RURAL".

Long
TRAMO MUNICIPIO CORREDOR Punto Inicio Punto Final
(Km)

1 VALLE DEL GUAMEZ VEREDA ALTO PALMIRA 0.370 PR0+010 PR0+380

2 VALLE DEL GUAMEZ VEREDA MIRAVALLE 0.153 PR0+027 PR0+180

3 VALLE DEL GUAMEZ VEREDA MIRAVALLE 0.125 PR0+503 PR0+628

Construccion de (6) alcantarillas de 36''


Construccion de 648 ml placa huella
Meta física programada:
Instalación de 80 ml de afirmado
Caracterización vial 1 km

No ITEM DE PAGO
ESPECIFICACIONES

DESCRIPCION UNID CANTIDAD VALOR UNITARIO VALOR TOTAL


CRONOGRAMA DE OBRA
GENERAL 2013 PARTICULAR
PRECONTRACTUAL ESTUDIOS EJECUCION PRECONTRACTUAL TOTAL
SECCIÓN 1 - ACTIVIDADES DE MEJORAMIENTO
MES 1 MES 2 MES 3 MES 1 MES 2 MES 3 MES 4 MES 1 MES 2
CONSTRUCCIÓN DE 648 ML APROX DE PLACA HUELLA
Excavaciones en material comun de explanaciones y canales
1 210.2.2 m3 358.5 $ 25,808.00 $ 9,252,142.00
(Incluye transporte) $ 9,252,142.00

1 600.1.1 600.1.1P Excavaciones varias sin clasificar a mano m3 57.8 $ 52,685.00 $ 3,042,559.00
$ 3,042,559.00

201.70 Demolicion de Estructuras m3 7.0 $ 445,241.00 $ 3,116,687.00


$ 3,116,687.00

220.10 Terraplen m3 839.4 $ 134,490.00 $ 112,888,889.00


$ 56,444,444.50 $ 56,444,444.50

2 320.3 320.00 Subbase granular clase C. m3 534.3 $ 175,178.00 $ 93,597,781.00


$ 28,079,334.30 $ 65,518,446.70

3 630.4 630-13 Concreto de resistenica 21 Mpa m3 488.1 $ 640,345.00 $ 312,562,000.00


$ 104,187,333.33 $ 104,187,333.33 $ 104,187,333.33

4 630.7 630-13 Concreto ciclópeo Clase 14 Mpa m3 136.2 $ 440,384.00 $ 59,989,108.00


$ 29,994,554.00 $ 29,994,554.00

5 640.10 640.00 Acero de refuerzo fy = 420 Mpa Kg 22,855.8 $ 8,371.00 $ 191,326,115.00


$ 63,775,371.67 $ 63,775,371.67 $ 63,775,371.67

SUB-TOTAL $ 785,775,281.00

CONSTRUCCIÓN DE (6) ALCANTARILLAS DE 36"


1 600.1.1 600-13 Excavaciones varias sin clasificar(a maquina) m³ 308.0 $ 20,774.00 $ 6,398,392.00 $ 6,398,392.00

2 661.1 663-13 Tubería de concreto de 36'' de 900 mm m 42.0 $ 554,787.00 $ 23,301,054.00


$ 11,650,527.00 $ 11,650,527.00
3 630.6 630-13 Concreto simple clase 14 Mpa m³ 13.3 $ 531,326.00 $ 7,066,636.00 $ 3,533,318.00 $ 3,533,318.00
4 630.4 630-13 Concreto de resistencia 21 Mpa m³ 54.6 $ 640,345.00 $ 34,962,837.00 $ 17,481,418.50 $ 17,481,418.50
5 640.1 640-13 Acero de refuerzo fy = 420 Mpa Kg 4,050.9 $ 8,371.00 $ 33,910,084.00 $ 16,955,042.00 $ 16,955,042.00
210.2.1 P 210-13 210.2.1 P Excavaciones en Roca de explanaciones y canales m³ 21.6 $ 154,325.00 $ 3,327,247.00 $ 3,327,247.00
6 610.1 610-13 Relleno para estructuras con suelo m³ 151.2 $ 116,430.00 $ 17,604,216.00 $ 8,802,108.00 $ 8,802,108.00

SUB-TOTAL $ 126,570,466.00

SUB-TOTAL ACTIVIDADES DE MANTENIMIENTO PERIÓDICO $ 912,345,747.00


$ 124,844,650.80 $ 339,545,901.70 $ 241,195,827.50 $ 206,759,367.00

SECCIÓN 2 - ACTIVIDADES DE MANTENIMIENTO PERIÓDICO

19 311.1 300-13 Afirmado m³ 279 $ 106,733.00 $ 29,775,819.00


$ 29,775,819.00

SUB-TOTAL $ 29,775,819.00

SUB-TOTAL ACTIVIDADES DE MANTENIMIENTO PERIÓDICO $ 29,775,819.00


AUNAR ESFUERZOS PARA EL MEJORAMIENTO, MANTENIMIENTO Y REHABILITACÍON DE CORREDORES
CONVENIO No. PRODUCTIVOS - EN EL MUNICIPIO DE VALLE DEL GUAMUEZ DEPARTAMENTO DE PUTUMAYO - "COLOMBIA
RURAL".

Long
TRAMO MUNICIPIO CORREDOR Punto Inicio Punto Final
(Km)

1 VALLE DEL GUAMEZ VEREDA ALTO PALMIRA 0.370 PR0+010 PR0+380

2 VALLE DEL GUAMEZ VEREDA MIRAVALLE 0.153 PR0+027 PR0+180

3 VALLE DEL GUAMEZ VEREDA MIRAVALLE 0.125 PR0+503 PR0+628

Construccion de (6) alcantarillas de 36''


Construccion de 648 ml placa huella
Meta física programada:
Instalación de 80 ml de afirmado
Caracterización vial 1 km

No ITEM DE PAGO
ESPECIFICACIONES

DESCRIPCION UNID CANTIDAD VALOR UNITARIO VALOR TOTAL


CRONOGRAMA DE OBRA
GENERAL 2013 PARTICULAR
PRECONTRACTUAL ESTUDIOS EJECUCION PRECONTRACTUAL TOTAL
SECCIÓN 3 - ACTIVIDADES DE MANTENIMIENTO RUTINARIO
Limpieza de Alcantarillas con diametro menor o igual a 36",
20 1P 1P Un 7 $ 312,919.00 $ 2,190,433.00
incluye rectificación de descoles
Rocería a cada lado de la vía y/o zonas necesarias para buena
22 2P 2P Ha 0.65 $ 618,294.00 $ 400,655.00
visibilidad

SUB-TOTAL $ 2,591,088.00

SUB-TOTAL ACTIVIDADES DE MANTENIMIENTO RUTINARIO $ 2,591,088.00


AUNAR ESFUERZOS PARA EL MEJORAMIENTO, MANTENIMIENTO Y REHABILITACÍON DE CORREDORES
CONVENIO No. PRODUCTIVOS - EN EL MUNICIPIO DE VALLE DEL GUAMUEZ DEPARTAMENTO DE PUTUMAYO - "COLOMBIA
RURAL".

Long
TRAMO MUNICIPIO CORREDOR Punto Inicio Punto Final
(Km)

1 VALLE DEL GUAMEZ VEREDA ALTO PALMIRA 0.370 PR0+010 PR0+380

2 VALLE DEL GUAMEZ VEREDA MIRAVALLE 0.153 PR0+027 PR0+180

3 VALLE DEL GUAMEZ VEREDA MIRAVALLE 0.125 PR0+503 PR0+628

Construccion de (6) alcantarillas de 36''


Construccion de 648 ml placa huella
Meta física programada:
Instalación de 80 ml de afirmado
Caracterización vial 1 km

No ITEM DE PAGO
ESPECIFICACIONES

DESCRIPCION UNID CANTIDAD VALOR UNITARIO VALOR TOTAL


CRONOGRAMA DE OBRA
GENERAL 2013 PARTICULAR
PRECONTRACTUAL ESTUDIOS EJECUCION PRECONTRACTUAL TOTAL
SECCIÓN 4 - PROTOCOLO DE BIOSEGURIDAD
23 102.1P 102.1P Implementación Protocolo de Bioseguridad por COVID-19 Gl 1.00 $ 1,057,575 $ 1,057,575.00 $ 264,393.75 $ 264,393.75 $ 264,393.75 $ 264,393.75

SUB-TOTAL $ 1,057,575.00

SECCIÓN 5 - ACTIVIDES DE CONSULTORIA


24 3P 3P Caracterización vial del corredor postulado Km 1.00 $ 684,383 $ 684,383.00 $ 684,383.00
Revisión, ajuste y/o actualización y/o modificación y/o
25 4P 4P Gl 1.00 $ 9,400,000.00 $ 9,400,000.00
complementación de estudios y diseños base $ 9,400,000.00

SUB-TOTAL $ 10,084,383.00

SUB-TOTAL BÁSICO DE OBRA = (A) $ 945,770,229 30,040,212.75 264,393.75 264,393.75 264,393.75


OBRAS DE COMPENSACIÓN AMBIENTAL Y/O COMPLEMENTARIAS (1%) = ( B ) $ 9,457,702.00 2,364,425.50 2,364,425.50 2,364,425.50 2,364,425.50
VALOR BASICO OBRA = ( C ) $ 955,227,931
VALOR BASICO ACTIVIDADES DE CONSULTORIA = ( D ) $ 10,084,383
VALOR IVA ACTIVIDADES DE CONSULTORIA (19% ) = (E) $ 1,916,033

VALOR TOTAL = C+D+E


AIU = 30% $ 967,228,347.00 10,084,383.00 157,249,289.05 342,174,720.95 243,824,646.75 209,388,186.25 962,721,226.00
A = 20%, I = 5%, U = 5%)

NOTAS
1. En la SECCIÓN 1 y SECCIÓN 2, se presentan las actividades de mejoramiento y de mantenimiento periódico, teniendo en cuenta el valor asignado para cada una en el convenio.

2. En la SECCIÓN 4 se agrupan las siguientes actividades de consultoría:


a.- Revisión y/o ajuste al estudio y diseño, calculado en forma particular para la construcción de la Placa Huella
b.- Caracterización del tramo vial, conforme a la Resolución vigente, para la longitud postulada.

3. Los valores calculados para los ítems: "Revisión y/o ajuste al estudio y diseño" y "Obras de compensación ambiental y/o complementarias" , son fijos, no se pueden modificar.

4. El archivo de presupuesto debe incluir el Análisis de Precios Unitarios (APU) para cada ítem dentro del mismo libro del presupuesto en hojas subsiguientes, según modelo adjunto.

5. El valor de cada item debe incluir costo directo + indirecto (AIU - A=20%, I= 5%, U=5%).

6. Los valores de los materiales de obra y tarifas de maquinaria y equipos se revisan y proponen de acuerdo con los que se manejan comercialmente en la zona objeto del contrato.

7. Para el transporte de mateariales se toma la distancia de acarreo a las fuentes de materiales autorizadas en la zona, que para el caso particular es de 20 Km.

8. El valor de las obras de compensación ambiental y/o complementarias es menor o igual al 1% del valor básico de obra.
9. De conformidad con la exclusión que establece el artículo 100 de la Ley 21 de 1992, en relación con los contratos de obra pública que celebren las Entidades Territoriales, en el
presente presupuesto no se considera IVA sobre la utilidad de obra.
10. El control de tráfico temporal (controladores de tráfico) y la señalización provisional necesarios para la ejecución de las obras será por cuenta y riesgo del Contratista.
11. La provisión de recursos para la implementación del protocolo de bioseguridad requerido para contratos de obra en la CIRCULAR CONJUNTA 003 del 8 de abril de 2020, adoptada
por INVIAS mediante Circular Externa No.02 del 13 de abril de 2010, es un valor fijo; es decir, no puede ser modificado. Su ejecución se realizará de acuerdo a lo establecido en la
Circular Externa No.003 de fecha 7 de mayo y su complemento del 13 de mayo de 2020. El pago por este concepto se incluirá en las actas parciales de obra, de acuerdo a lo que se
establece en la especificación particular INVIAS 102.1P Implementación del Protocolo de Bioseguridad por COVID-19.

12. Teniendo en cuenta, el convenio 01030 del año 2021 entre el Instituto Nacional de Vías- INVIAS con Nit 800215807-2 y el municipio de Sibundo Putumayo con Nit. 891201645-
6, se hizo la visita técnica en el corredo rTAMBIOY - SAN FELIZ - SAGRADO CORAZÓN para desarrollar el presente presupuesto.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

210.2.2 EXCAVACIÓN EN MATERIAL COMUN DE LA EXPLANACIÓN Y CANALES (INCLUYE TRANSPORTE) M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Retroexcavadora sobre oruga, potencia 158 kw, balde de 1.5 m3 $ 235,000.00 2.50 $ 3,501.59
herramineta menor 5% $ 1,470.67
SUB-TOTAL $ 3,501.59

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO


Derecho de explotación y/o disposición de materiales m3 1.300 5500.00 $ 7,150.00

SUBTOTAL $ $ 7,150.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
material proveniente de excavaciones m3-km 1.30 5.00 6.50 $ 1,200.00 $ 7,800.00

$ -
SUBTOTAL $ $ 7,800.00

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Obrero (1) 1 $ 30,284.00 1.85 $ 56,025.40 40.00 $ 1,400.64

SUBTOTAL $ $ 1,400.64

TOTAL COSTO DIRECTO $ $ 19,852.23

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 3,970.45
IMPREVISTOS 5% $ 992.61
UTILIDAD 5% $ 992.61
SUBTOTAL $ $ 5,955.67

Precio Unitario Total Aproximado al Peso $ $ 25,808

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.
Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

600.1.1 Excavaciones varias sin clasificar M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO


Retroexcavadora sobre oruga, potencia 138 HP, balde de 1,5 m³. $ 193,090.57 30.0 $ 6,436.35
Herramienta Menor (%) 10% $ 44.82
SUBTOTAL $ $ 6,481.17

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO


$ -
SUBTOTAL $ $ -

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Transporte de material m3/km 1.30 21.54 28.00 $ 1,200.00 $ 33,597.72
$ -
SUBTOTAL $ $ 33,597.72

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)

Obrero (2) 2 $ 60,568.00 1.85 $ 112,050.80 250.0 $ 448.20


SUBTOTAL $ $ 448.20

TOTAL COSTO DIRECTO $ $ 40,527.09

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 8,105.42
IMPREVISTOS 5% $ 2,026.35
UTILIDAD 5% $ 2,026.35
SUBTOTAL $ $ 12,158.12

Precio Unitario Total Aproximado al Peso $ $ 52,685.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes
manteniendo el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el
proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

210.2.1 EXCAVACIÓN EN ROCA DE LA EXPLANACIÓN Y CANALES M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

compresor 120 HP , con martillo $ 120,000.00 50.0 $ 2,400.00


Retroexcavadora sobre oruga, potencia 158 kw, balde de 1.5 m3 $ 235,000.00 5.00 $ 39,509.53
herramineta menor 5% $ 8,297.00
SUB-TOTAL $ 41,909.53

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO


anfo kg 0.250 30000.00 $ 7,500.00
cordon detonante m 2.000 8500.00 $ 17,000.00
explosivos 75%(indugel) lb 0.200 30000.00 $ 6,000.00
fulminante UNIDAD 1.000 10000.00 $ 10,000.00
mecha lenta ml 0.500 10000.00 $ 5,000.00
escolta y tansporte (tarifa poecentual de 40%) por cada metro cubico exportado y transportado % $ 15,600.00

SUBTOTAL $ $ 61,100.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
material proveniente de excavaciones m3-km 1.30 5.00 6.50 $ 1,200.00 $ 7,800.00

$ -
SUBTOTAL $ $ 7,800.00

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Obrero (3) 3 $ 90,852.00 1.85 $ 168,076.20 40.00 $ 4,201.91
Oficial experto en explocivos $ 80,000.00 1.85 $ 148,000.00 40.00 $ 3,700.00
SUBTOTAL $ $ 7,901.91

TOTAL COSTO DIRECTO $ $ 118,711.44

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 23,742.29
IMPREVISTOS 5% $ 5,935.57
UTILIDAD 5% $ 5,935.57
SUBTOTAL $ $ 35,613.43

Precio Unitario Total Aproximado al Peso $ $ 154,325

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.
Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

220.1 Mejoramiento de via, espesor 20cm M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Carrotanque $ 70,000.00 23.00 $ 3,043.48


Motoniveladora potencia 215 HP, ancho de cuchilla 4,27 m, peso 18 ton. $ 190,000.00 23.00 $ 8,260.87
Vibrocompatador, potencia 153 HP, peso 10 Ton. $ 170,000.00 23.00 $ 7,391.30
Herramienta Menor (%) 5% $ 23.34
SUBTOTAL $ $ 18,718.99

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Material de mejoramineto de subrasante M3 1.30 $ 37,500.00 $ 48,750.00


Agua LT 24.00 $ 80.00 $ 1,920.00
SUBTOTAL $ $ 50,670.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Material de relleno m3/km 1.30 21.5 28.00 $ 1,200.00 $ 33,597.72
SUBTOTAL $ $ 33,597.72

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 60,568.00 1.85 $ 112,050.80 360.00 $ 311.25
Obrero (2) 1 $ 30,284.00 1.85 $ 56,025.40 360.00 $ 155.63
SUBTOTAL $ 466.88

TOTAL COSTO DIRECTO $ $ 103,453.59

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 20,690.72
IMPREVISTOS 5% $ 5,172.68
UTILIDAD 5% $ 5,172.68
SUBTOTAL $ $ 31,036.08

Precio Unitario Total Aproximado al Peso $ $ 134,490.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

320.3 Subbase Granular Clase C. M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Carrotanque $ 70,000.00 45 $ 1,555.56


Motoniveladora $ 190,000.00 45 $ 4,222.22
Vibrocompatador, potencia 153 HP, peso 10 Ton. $ 170,000.00 45 $ 3,777.78
Herramienta Menor (%) 1% $ 6.23
SUBTOTAL $ $ 9,561.79

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Subbase Granulat Clase C M3 1.30 $ 68,500.00 $ 89,050.00


Agua LT 24.00 $ 80.00 $ 1,920.00
SUBTOTAL $ $ 90,970.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Subbase Granulat Clase C m3/km 1.30 21.5 28.00 $ 1,200.00 $ 33,597.72
SUBTOTAL $ $ 33,597.72

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 60,568.00 1.85 $ 112,050.80 360.00 $ 311.25
Obrero (2) 2 $ 60,568.00 1.85 $ 112,050.80 360.00 $ 311.25
SUBTOTAL $ 622.50

TOTAL COSTO DIRECTO $ $ 134,752.01

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 26,950.40
IMPREVISTOS 5% $ 6,737.60
UTILIDAD 5% $ 6,737.60
SUBTOTAL $ $ 40,425.60

Precio Unitario Total Aproximado al Peso $ $ 175,178.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

600.1.1P Excavaciones varias sin clasificar (a maquina) M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO


Retroexcavadora sobre oruga, potencia 158 kw, balde de 1.5 m3 $ 235,000.00 0.50 $ 1,120.51
Herramienta Menor (%) 5% $ 336.15
SUBTOTAL $ $ 1,456.66

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO


$ -
SUBTOTAL $ $ -

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Transporte de material m3/km 1.30 5.00 6.50 $ 1,200.00 $ 7,800.00
$ -
SUBTOTAL $ $ 7,800.00

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)

oficial $ 60,568.00 1.85 $ 112,050.80 25.00 $ 4,482.03

Obrero (1) 1 $ 30,284.00 1.85 $ 56,025.40 25.00 $ 2,241.02


SUBTOTAL $ $ 6,723.05

TOTAL COSTO DIRECTO $ $ 15,979.71

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 3,195.94
IMPREVISTOS 5% $ 798.99
UTILIDAD 5% $ 798.99
SUBTOTAL $ $ 4,793.92

Precio Unitario Total Aproximado al Peso $ $ 20,774.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes
manteniendo el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el
proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

610.2 Relleno para Estructuras con material seleccionado M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Compactador Manual - Saltarín Tipo Rana $ 15,000.00 2.5 $ 6,000.00


Herramienta Menor (%) 5% $ 420.19
SUBTOTAL $ $ 6,420.19

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Material seleccionado para relleno M3 1.30 $ 29,800.00 $ 38,740.00


Agua LT 30.00 $ 80.00 $ 2,400.00
SUBTOTAL $ $ 41,140.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Material seleccionado para relleno m3/km 1.30 21.5 28.00 $ 1,200.00 $ 33,597.72
SUBTOTAL $ $ 33,597.72

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Obrero (3) 3 $ 90,852.00 1.85 $ 168,076.20 20 $ 8,403.81
SUBTOTAL $ 8,403.81

TOTAL COSTO DIRECTO $ $ 89,561.72

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 17,912.34
IMPREVISTOS 5% $ 4,478.09
UTILIDAD 5% $ 4,478.09
SUBTOTAL $ $ 26,868.52

Precio Unitario Total Aproximado al Peso $ $ 116,430.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA 18 6 2020
(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO: MANTENIMIENTO Y MEJORAMIENTO DE VIAS RURALES EN EL MUNICIPIO DE PUERTO CAICEDO, DEPARTAMENTO DE
PUTUMAYO DEL PROGRAMA “COLOMBIA RURAL

CORREDOR: LA CURVA - EL VENADO - EL VERGEL SECTOR: VEREDA EL VENADO

MUNICIPIO: PUERTO CAICEDO

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

310.1 Conformación de la calzada existente M2

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Carrotanque $ 70,000.00 600.0 $ 116.67


Motoniveladora $ 190,000.00 600.0 $ 316.67
Vibrocompactador $ 170,000.00 600.0 $ 283.33
Herramienta Menor (%) 1% $ 0.45
SUBTOTAL $ $ 717.12

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Agua LT 3.00 $ 80.00 $ 240.00


SUBTOTAL $ $ 240.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)

SUBTOTAL $ $ -

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 58,520.00 1.85 $ 108,262.00 4800.00 $ 22.55
Obrero (2) $ 58,520.00 1.85 $ 108,262.00 4800.00 $ 22.55
SUBTOTAL $ 45.10

TOTAL COSTO DIRECTO $ $ 1,002.22

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 200.44
IMPREVISTOS 5% $ 50.11
UTILIDAD 5% $ 50.11
SUBTOTAL $ $ 300.66

Precio Unitario Total Aproximado al Peso $ $ 1,303.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA 5 3 2020
(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO: MANTENIMIENTO Y MEJORAMIENTO DE VIAS RURALES EN EL MUNICIPIO DE PUERTO CAICEDO, DEPARTAMENTO DE
PUTUMAYO DEL PROGRAMA “COLOMBIA RURAL

CORREDOR: LA CURVA - EL VENADO - EL VERGEL SECTOR: VEREDA EL VENADO

MUNICIPIO: PUERTO CAICEDO

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

630.4 Concreto reforzado clase 28 Mpa M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Mezcladora de Concreto 1 Bulto $ 14,000.00 1.0 $ 14,000.00


Vibrador de Concreto $ 8,500.00 1.0 $ 8,500.00
Herramienta Menor (%) 10% $ 9,021.83
SUBTOTAL $ $ 31,521.83

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Agregado Triturado M3 0.67 $ 95,900.00 $ 64,253.00


Arena Lavada M3 0.67 $ 35,900.00 $ 24,053.00
Cemento Portland KG 420.00 $ 540.00 $ 226,800.00
Formaleta Metálica GL $ 18,000.00 $ 18,000.00
Agua LT 190.00 $ 80.00 $ 15,200.00
SUBTOTAL $ $ 348,306.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Agregado Triturado m3/km 0.67 3.5 2.35 $ 1,000.00 $ 2,345.00
Arena Lavada m3/km 0.67 3.5 2.35 $ 1,000.00 $ 2,345.00
SUBTOTAL $ $ 4,690.00

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 58,520.00 1.85 $ 108,262.00 6.00 $ 18,043.67
Obrero (8) $ 234,080.00 1.85 $ 433,048.00 6.00 $ 72,174.67
SUBTOTAL $ 90,218.34

TOTAL COSTO DIRECTO $ $ 474,736.17

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 94,947.23
IMPREVISTOS 5% $ 23,736.81
UTILIDAD 5% $ 23,736.81
SUBTOTAL $ $ 142,420.85

Precio Unitario Total Aproximado al Peso $ $ 617,157.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA 5 3 2020
(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: CAQUETÁ

OBJETO DEL CONTRATO: MANTENIMIENTO Y MEJORAMIENTO DE VIAS RURALES EN EL MUNICIPIO DE SAN VICENTE DEL CAGUAN, DEPARTAMENTO
DE CAQUETÁ DEL PROGRAMA “COLOMBIA RURAL

CORREDOR: LA DANTA - SAN VENANCIO - ALTO CACAO SECTOR: VEREDA LA MEDIA - ALTO CACAO

MUNICIPIO: SAN VICENTE DEL CAGUAN

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

673.1 Geotextil tipo NT 2500 M2

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Herramienta Menor (%) 5% $ 22.55


SUBTOTAL $ $ 22.55

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Geotextil tipo NT 2500 M3 1.10 $ 4,200.00 $ 4,620.00


SUBTOTAL $ $ 4,620.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)

SUBTOTAL $ $ -

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Obrero (2) $ 58,520.00 1.85 $ 108,262.00 240.00 $ 451.09
SUBTOTAL $ 451.09

TOTAL COSTO DIRECTO $ $ 5,093.64

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 1,018.73
IMPREVISTOS 5% $ 254.68
UTILIDAD 5% $ 254.68
SUBTOTAL $ $ 1,528.09

Precio Unitario Total Aproximado al Peso $ $ 6,622.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA 5 3 2020
(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: CAQUETÁ

OBJETO DEL CONTRATO: MANTENIMIENTO Y MEJORAMIENTO DE VIAS RURALES EN EL MUNICIPIO DE SAN VICENTE DEL CAGUAN, DEPARTAMENTO
DE CAQUETÁ DEL PROGRAMA “COLOMBIA RURAL

CORREDOR: LA DANTA - SAN VENANCIO - ALTO CACAO SECTOR: VEREDA LA MEDIA - ALTO CACAO

MUNICIPIO: SAN VICENTE DEL CAGUAN

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

673.2 Material granular drenante M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Herramienta Menor (%) 10% $ 927.96


SUBTOTAL $ $ 927.96

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Material drenante M3 1.10 $ 75,000.00 $ 82,500.00


SUBTOTAL $ $ 82,500.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Material drenante m3/km 1.10 80.0 88.00 $ 1,000.00 $ 88,000.00
SUBTOTAL $ $ 88,000.00

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 58,520.00 1.85 $ 108,262.00 35.00 $ 3,093.20
Obrero (4) $ 117,040.00 1.85 $ 216,524.00 35.00 $ 6,186.40
SUBTOTAL $ 9,279.60

TOTAL COSTO DIRECTO $ $ 180,707.56

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 36,141.51
IMPREVISTOS 5% $ 9,035.38
UTILIDAD 5% $ 9,035.38
SUBTOTAL $ $ 54,212.27

Precio Unitario Total Aproximado al Peso $ $ 234,920.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA 5 3 2020
(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: CAQUETÁ

OBJETO DEL CONTRATO: MANTENIMIENTO Y MEJORAMIENTO DE VIAS RURALES EN EL MUNICIPIO DE SAN VICENTE DEL CAGUAN, DEPARTAMENTO
DE CAQUETÁ DEL PROGRAMA “COLOMBIA RURAL

CORREDOR: LA DANTA - SAN VENANCIO - ALTO CACAO SECTOR: VEREDA LA MEDIA - ALTO CACAO

MUNICIPIO: SAN VICENTE DEL CAGUAN

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

673.4 Tubería pvc perforada de 4" ML

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Herramienta Menor (%) 5% $ 67.66


SUBTOTAL $ $ 67.66

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Tubo Drenaje 100 PVC Corr (M) ml 1.00 $ 22,000.00 $ 22,000.00


SUBTOTAL $ $ 22,000.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)

SUBTOTAL $ $ -

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Obrero $ 29,260.00 1.85 $ 54,131.00 0.03 $ 1,353.28
SUBTOTAL $ 1,353.28

TOTAL COSTO DIRECTO $ $ 23,420.94

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 4,684.19
IMPREVISTOS 5% $ 1,171.05
UTILIDAD 5% $ 1,171.05
SUBTOTAL $ $ 7,026.29

Precio Unitario Total Aproximado al Peso $ $ 30,447.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

661.1 Tubería de concreto reforzado clase D, de 900 mm de diámetro interior ML

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Diferencial de 2Toneladas $ 4,500.00 2.5 $ 1,800.00


Herramienta Menor (%) 10% $ 4,201.91
SUBTOTAL $ $ 6,001.91

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Tubo de Concreto de 900 mm ML 1.00 $ 370,500.00 $ 370,500.00


Mortero 1:3 para anillos M3 0.02 $ 383,500.00 $ 7,670.00
SUBTOTAL $ $ 378,170.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)

Transporte de Tubería de Concreto Reforzado kgk 0.28 1.00 0.28 $ 2.14 $ 0.60
Transporte de Material de Solado y Atraque Tubería de Concreto Reforzado m3k 0.46 1.00 0.46 $ 1,234.28 $ 567.77

SUBTOTAL $ $ 568.37

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 60,568.00 1.85 $ 112,050.80 8 $ 14,006.35
Obrero (4) 4 $ 121,136.00 1.85 $ 224,101.60 8 $ 28,012.70
SUBTOTAL $ 42,019.05

TOTAL COSTO DIRECTO $ $ 426,759.33

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 85,351.87
IMPREVISTOS 5% $ 21,337.97
UTILIDAD 5% $ 21,337.97
SUBTOTAL $ $ 128,027.81

Precio Unitario Total Aproximado al Peso $ $ 554,787.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

630.4 Concreto RESISTENCIA 21 Mpa M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Mezcladora de Concreto 1 Bulto $ 14,000.00 1 $ 14,000.00


Vibrador de Concreto $ 8,500.00 1 $ 8,500.00
Herramienta Menor (%) 10% $ 8,003.63
SUBTOTAL $ $ 30,503.63

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Agregado Triturado M3 0.86 $ 95,900.00 $ 82,474.00


Arena Lavada M3 0.57 $ 35,900.00 $ 20,463.00
Cemento Portland KG 357.00 $ 630.00 $ 224,910.00
Formaleta Metálica GL $ 18,000.00 $ 18,000.00
Agua LT 270.00 $ 80.00 $ 21,600.00
SUBTOTAL $ $ 367,447.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Agregado Triturado m3/km 0.86 8.5 7.31 $ 1,200.00 $ 8,772.00
Arena Lavada m3/km 0.57 8.5 4.85 $ 1,200.00 $ 5,814.00
SUBTOTAL $ $ 14,586.00

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 60,568.00 1.85 $ 112,050.80 7 $ 16,007.26
Obrero (6) 8 $ 242,272.00 1.85 $ 448,203.20 7 $ 64,029.03
SUBTOTAL $ 80,036.29

TOTAL COSTO DIRECTO $ $ 492,572.92

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 98,514.58
IMPREVISTOS 5% $ 24,628.65
UTILIDAD 5% $ 24,628.65
SUBTOTAL $ $ 147,771.88

Precio Unitario Total Aproximado al Peso $ $ 640,345.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

630.6 Concreto simple clase 14 Mpa M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Mezcladora de Concreto 1 Bulto $ 14,000.00 1.3 $ 10,769.23


Herramienta Menor (%) 10% $ 5,602.54
SUBTOTAL $ $ 16,371.77

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Agregado Triturado M3 0.86 $ 95,900.00 $ 82,474.00


Arena Lavada M3 0.84 $ 35,900.00 $ 30,156.00
Cemento Portland KG 265.00 $ 630.00 $ 166,950.00
Agua LT 160.00 $ 80.00 $ 12,800.00
SUBTOTAL $ $ 292,380.00

III. TRANSPORTE

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Agregado Triturado m3/km 0.86 21.5 18.52 $ 1,200.00 $ 22,226.18
Arena Lavada m3/km 0.84 21.5 18.09 $ 1,200.00 $ 21,709.30
SUBTOTAL $ $ 43,935.48

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 60,568.00 1.85 $ 112,050.80 8 $ 14,006.35
Obrero (6) 6 $ 181,704.00 1.85 $ 336,152.40 8 $ 42,019.05
SUBTOTAL $ 56,025.40

TOTAL COSTO DIRECTO $ $ 408,712.65

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 81,742.53
IMPREVISTOS 5% $ 20,435.63
UTILIDAD 5% $ 20,435.63
SUBTOTAL $ $ 122,613.79

Precio Unitario Total Aproximado al Peso $ $ 531,326.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

630.7 Concreto ciclópeo Clase 14 Mpa M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Mezcladora de Concreto 1 Bulto $ 14,000.00 1.3 $ 10,769.23


Herramienta Menor (%) 5% $ 3,501.59
SUBTOTAL $ $ 14,270.82

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Agregado Triturado M3 0.520 $ 95,900.00 $ 49,868.00


Agregado Piedra Rajón M3 0.40 $ 75,900.00 $ 30,360.00
Arena Lavada M3 0.510 $ 35,900.00 $ 18,309.00
Cemento Portland KG 160.00 $ 630.00 $ 100,800.00
Formaleta Metálica GL $ 10,000.00 $ 10,000.00
Agua LT 102.00 $ 80.00 $ 8,160.00
SUBTOTAL $ $ 217,497.00

III. TRANSPORTES

MATERIAL UNIDAD CANTIDAD (1) DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO

Agregado Triturado m3/km 0.52 21.5 11.20 $ 1,200.00 $ 13,439.09


Agregado Piedra Rajón m3/km 0.40 21.5 8.61 $ 1,200.00 $ 10,337.76
Arena Lavada m3/km 0.51 21.5 10.98 $ 1,200.00 $ 13,180.64
SUBTOTAL $ $ 36,957.49

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 60,568.00 1.85 $ 112,050.80 8 $ 14,006.35
Obrero (6) 8 $ 242,272.00 1.85 $ 448,203.20 8 $ 56,025.40
SUBTOTAL $ 70,031.75

TOTAL COSTO DIRECTO $ $ 338,757.06

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 67,751.41
IMPREVISTOS 5% $ 16,937.85
UTILIDAD 5% $ 16,937.85
SUBTOTAL $ $ 101,627.11

Precio Unitario Total Aproximado al Peso $ $ 440,384.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo el
mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

642P SELLO DE JUNTAS DE PLACA HUELLA ML

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Herramienta Menor (%) 10% $ 28.01


SUBTOTAL $ $ 28.01

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Sello de poliuretano en cinta para juntas M 1.00 $ 1,400.00 $ 1,400.00


Sello de silicona o sellador autonivelante M 1.00 $ 8,500.00 $ 8,500.00
SUBTOTAL $ $ 9,900.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)

SUBTOTAL $ $ -

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 60,568.00 1.85 $ 112,050.80 1000 $ 112.05
Obrero (3) 3 $ 90,852.00 1.85 $ 168,076.20 1000 $ 168.08
SUBTOTAL $ 280.13

TOTAL COSTO DIRECTO $ $ 10,208.14

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 2,041.63
IMPREVISTOS 5% $ 510.41
UTILIDAD 5% $ 510.41
SUBTOTAL $ $ 3,062.45

Precio Unitario Total Aproximado al Peso $ $ 13,271.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

640.1 Acero de Refuerzo fy = 420 Mpa KG

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Cizalla manual $ 1,000.00 30.0 $ 33.33


Herramienta Menor (%) 10% $ 93.38
SUBTOTAL $ $ 126.71

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Acero PDR-60 KG 1.05 $ 4,980.00 $ 5,229.00


Alambre Negro KG 0.03 $ 5,000.00 $ 150.00
SUBTOTAL $ $ 5,379.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)

SUBTOTAL $ $ -

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 60,568.00 1.85 $ 112,050.80 300 $ 373.50
Obrero (3) 3 $ 90,852.00 1.85 $ 168,076.20 300 $ 560.25
SUBTOTAL $ 933.75

TOTAL COSTO DIRECTO $ $ 6,439.46

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 1,287.89
IMPREVISTOS 5% $ 321.97
UTILIDAD 5% $ 321.97
SUBTOTAL $ $ 1,931.83

Precio Unitario Total Aproximado al Peso $ $ 8,371.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS
UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

311.1 Afirmado M3

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Carrotanque $ 70,000.00 45.0 $ 1,555.56


Motoniveladora potencia 215 HP, ancho de cuchilla 4,27 m, peso 18 ton. $ 190,000.00 45.0 $ 4,222.22
Vibrocompatador, potencia 153 HP, peso 10 Ton. $ 170,000.00 45.0 $ 3,777.78
Herramienta Menor (%) 1% $ 6.23
SUBTOTAL $ $ 9,561.79

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Afirmado M3 1.30 $ 28,000.00 $ 36,400.00


Agua LT 24.00 $ 80.00 $ 1,920.00
SUBTOTAL $ $ 38,320.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Afirmado m3/km 1.30 21.5 28.00 $ 1,200.00 $ 33,597.72
SUBTOTAL $ $ 33,597.72

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Oficial $ 60,568.00 1.85 $ 112,050.80 360.00 $ 311.25
Obrero (2) 2 $ 60,568.00 1.85 $ 112,050.80 360.00 $ 311.25
SUBTOTAL $ 622.50

TOTAL COSTO DIRECTO $ $ 82,102.01

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 16,420.40
IMPREVISTOS 5% $ 4,105.10
UTILIDAD 5% $ 4,105.10
SUBTOTAL $ $ 24,630.60

Precio Unitario Total Aproximado al Peso $ $ 106,733.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.

Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS

UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

1P Limpieza de Alcantarillas con diametro menor o igual a 36", incluye rectificación de descoles UND

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Herramienta Menor (%) 5% $ 11,205.08


SUBTOTAL $ $ 11,205.08

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO


$ -
SUBTOTAL $ $ -

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Material Desmontado m3/km 2.70 2.0 5.40 $ 1,000.00 $ 5,400.00
SUBTOTAL $ $ 5,400.00

IV. MANO DE OBRA

PRESTACIONE
DESCRIPCIÓN JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Obrero (2) 2 $ 60,568.00 1.85 $ 112,050.80 0.5 $ 224,101.60
SUBTOTAL $ 224,101.60

TOTAL COSTO DIRECTO $ $ 240,706.68

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 20% $ 48,141.34
IMPREVISTOS 5% $ 12,035.33
UTILIDAD 5% $ 12,035.33
SUBTOTAL $ $ 72,212.00

Precio Unitario Total Aproximado al Peso $ $ 312,919.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.
Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS

UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

3P Rocería a cada lado de la vía y/o zonas necesarias para buena visibilidad HA

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

Guadañadora $ 4,116.00 0.36 $ 11,433.33


Motosierra $ 4,326.00 0.103 $ 42,000.00
Herramienta Menor (%) 5% $ 18,675.13
SUBTOTAL $ $ 72,108.46

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO


$ -
SUBTOTAL $ $ -

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)
Material Desmontado m3/km 30.00 1.0 30.00 $ 1,000.00 $ 30,000.00
SUBTOTAL $ $ 30,000.00

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Obrero (2) 2 $ 60,568.00 1.85 $ 112,050.80 0.3 $ 373,502.67
SUBTOTAL $ 373,502.67

TOTAL COSTO DIRECTO $ $ 475,611.13

V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACION 20% $ 95,122.23
IMPREVISTOS 5% $ 23,780.56
UTILIDAD 5% $ 23,780.56
SUBTOTAL $ $ 142,683.35

Precio Unitario Total Aproximado al Peso $ $ 618,294.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.
Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS

UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉRREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

4P Caracterización Vial Km

I. EQUIPO
DESCRIPCIÓN TIPO TARIFA/DIA RENDIMIENTO Vr. UNITARIO
GPS DE PRECISIÓN SUBMETRICA $ 280,000.00 2.00 $ 140,000.00
EQUIPO DE CÓMPUTO (Receptora y Post-proceso) $ 34,500.00 1.00 $ 34,500.00
CAMIONETA (Superior a 2000 c.c) $ 212,000.00 2.00 $ 106,000.00
SUBTOTAL $ 280,500.00

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO


$ -
SUBTOTAL $ -

III. TRANSPORTES

MATERIAL UNIDAD CANTIDAD (1) DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO

$ -
SUBTOTAL $ -

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)
Topógrafo $ 100,100.00 1.85 $ 185,185.00 2.0 $ 92,593.00
Cadenero $ 43,950.00 1.85 $ 81,307.50 2.0 $ 40,654.00
Profesional SIG $ 60,920.00 1.85 $ 112,702.00 1.0 $ 112,702.00
SUBTOTAL $ 245,949.00

TOTAL COSTO DIRECTO $ 526,449.00

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total

ADMINISTRACION 20% $ 105,290.00


IMPREVISTOS 5% $ 26,322.00
UTILIDAD 5% $ 26,322.00
SUBTOTAL $ 157,934.00

Precio Unitario Total Aproximado al Peso $ 684,383.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo el
mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.
Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS

UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉRREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

5P Revisión, ajuste y/o actualización y/o modificación y/o complementación de estudios y diseños base Gl

I. PERSONAL

DESCRIPCIÓN COSTO MENSUAL PARTICIPACIÓN Vr. UNITARIO


Especialista en geotecnia y/o pavimentos $ 4,000,000.00 0.5 $ 2,000,000.00
Especialista en Hidráulica e Hidrología $ 4,000,000.00 0.3 $ 1,200,000.00
SUBTOTAL $ 3,200,000.00

II. OTROS COSTOS

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Trabajo de Topografía 0.40 $ 5,500,000.00 $ 2,200,000.00


Ensayos de Laboratorio Gl 1.00 $ 4,000,000.00 $ 4,000,000.00
SUBTOTAL $ 6,200,000.00

III. TRANSPORTES

MATERIAL UNIDAD CANTIDAD (1) DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO

$ -
SUBTOTAL $ -

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)

SUBTOTAL $ -

TOTAL COSTO DIRECTO $ 9,400,000.00

V. COSTOS INDIRECTOS
Descripción Porcentaje Valor Total
ADMINISTRACION
IMPREVISTOS
UTILIDAD
SUBTOTAL $ -

Precio Unitario Total Aproximado al Peso $ 9,400,000.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo el
mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.
Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los costos
correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
CÓDIGO MINFRA-MN-IN-10-FR-1
INSTITUTO NACIONAL DE VIAS
PROCESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
VERSIÓN 1
MANUAL DE INTERVENTORÍA OBRA PÚBLICA
ANÁLISIS DE PRECIOS UNITARIOS
PÁGINA DE

FECHA #REF! #REF! #REF!


(Día) (Mes) (Año)
ITEMS DE LA PROPUESTA ECONÓMICA ITEMS NO PREVISTOS

UNIDAD EJECUTORA: SUBDIRECCIÓN RED TERCIARIA Y FÉREA DIRECCIÓN TERRITORIAL: PUTUMAYO

OBJETO DEL CONTRATO:


#REF!

CORREDOR: #REF! SECTOR: #REF!

MUNICIPIO: #REF!

INTERVENTOR: CTO No.: DE

DATOS ESPECÍFICOS

ITEM DESCRIPCIÓN UNIDAD CANTIDAD

102.1P Implementación Protocol de Bioseguridad por COVID-19 GL (10 Personas)

I. EQUIPO

DESCRIPCIÓN TIPO TARIFA/HORA RENDIMIENTO Vr. UNITARIO

II. MATERIALES

DESCRIPCIÓN UNIDAD CANTIDAD PRECIO UNIT. Vr. UNITARIO

Tapabocas reutilizable en tela und 200 $ 1,000.00 $ 200,000.00


Jabón líquido antibacterial lt 8 $ 3,995.00 $ 29,962.50
Gel Antibacterial lt 5 $ 11,085.00 $ 49,882.50
Alcohol desinfectante al 70% lt 9 $ 9,000.00 $ 81,000.00
Guantes Nitrilo por 100 und par 400 $ 598.00 $ 239,200.00
Termómetro clínico infrarrojo Digital und 1 $ 299,900.00 $ 299,900.00
Hipoclorito de uso doméstico lt 3 $ 2,774.00 $ 6,935.00
Bomba de espalda und 1 $ 124,900.00 $ 124,900.00
SUBTOTAL $ $ 1,031,780.00

III. TRANSPORTES

CANTIDAD
MATERIAL UNIDAD DISTANCIA (2) (1) * (2) TARIFA Vr. UNITARIO
(1)

SUBTOTAL $

IV. MANO DE OBRA

PRESTACIONE
TRABAJADOR JORNAL JORNAL TOTAL RENDIMIENTO Vr. UNITARIO
S (%)

SUBTOTAL $

TOTAL COSTO DIRECTO $ $ 1,031,780.00

V. COSTOS INDIRECTOS

Descripción Porcentaje Valor Total


ADMINISTRACION 2.5% $ 25,794.50

SUBTOTAL $ $ 25,794.50

Precio Unitario Total Aproximado al Peso $ $ 1,057,575.00

Firma
Nombre:
Representante Legal del Contratista o su Apoderado
Matricula No. :

OBSERVACIONES INTERVENTORÍA:

APROBACIÓN POR INTERVENTORÍA


Nota 1: Cuando se trate de Análisis de precios unitarios correspondientes a ítems de la propuesta económica aprobada, el Interventor aprueba el desglose de los componentes manteniendo
el mismo precio unitario de cada ítem, cumpliendo con las especificaciones de construcción vigentes para el proyecto.
Nota 2: Cuando se trate de Análisis de precios unitarios de ítems no previstos, el Interventor aprueba el desglose y precio unitario de cada ítem no previsto, exigiendo la aplicación de los
costos correspondientes a insumos y tarifas de la propuesta económica inicial cuando estén contemplados, cumpliendo con las especificaciones de construcción vigente para el proyecto.

Firma
Nombre:
Representante Legal del Interventor o su Apoderado
Matricula No. :

Original: Archivo de Gestión del Contrato (Subdirección Administrativa).


Copias: Unidad Ejecutora, Contratista, Interventor y Dirección Territorial.
AUNAR ESPFUERZOS PARA EL MEJORAMIENTO, MANTENIMIENTO Y REHABILITACÍON
DE CORREDORES PRODUTIVOS - EN EL MUNICIPIO DE SIBUNDOY DEPARTAMENTO DE MEMORIA DE CÁLCULO AFIRMADO
PUTUMAYO - "COLOMBIA RURAL".

TRAMO : #REF! ABSCISA INICIO: ABSCISA FINAL: LONG: 310 m

INICIO: ABSCISA FINAL: LONG: 0

LONGITUD TOTAL AFIRMADO = 310 m

311.1 AFIRMADO

Volumen de suministro, instalación y compactación de afirmado

ancho
h = 0.15

ancho = 6.00

largo = 1.00
o
rg
a
L

h Vol = 0.9

Vol Total Afirm. = 279.0

RESUMEN DE CANTIDADES AFIRMADO

DESCRIPCION CANTIDAD UNIDAD


Afirmado 279.0 m3
#REF! MEMORIA DE CÁLCULO BOX CULVERT 1.0 m X 1.0 m

TRAMO : ### BOX CULVERT No 1 ABSCISA: PR5+955

600.1.1 EXCAVACIONES VARIAS SIN CLASIFICAR

Volumen de excavacion cuerpo box

ancho
h = 1.60

Long = 8.00

Ancho = 2.50
o
rg
a
L

h Vol 1 = 32.00

Volumen excavacion para la construccion de las Aletas

menor menor= 1.50

mayor= 3.00

Ancho Ancho= 1.4

(menor  mayor)
Area  * Ancho
mayor 2
Area = 3.15

h= 1.50

h' h h' = 1.00

Altura = 1.25

Vol 3  Area * Altura

Vol 2 = 7.88

Vol Total Excavación 39.9

630.4CONCRETO SIMPLE CLASE 14 Mpa

Volumen concreto simple 14 MPa Cuerpo Box

ancho
h = 0.05
Long = 8.00
o

Ancho = 1.50
rg
a
L

h Vol 1 = 0.60
#REF! MEMORIA DE CÁLCULO BOX CULVERT 1.0 m X 1.0 m

CANTIDADES POR METRO LINEAL - CUERPO BOX CULVERT Long. Calzada = 8.00 m

630.6 CONCRETO SIMPLE


CLASE 14 MPa

V1 = 0.6 m3

630. CONCRETO REFORZADO


CLASE 21 MPa

V1 = 10.64 m3

640.1 ACERO DE REFUERZO


FY = 420 MPA

Peso 1 = 764.4 kg

Fuente Tabla: Plano No. 7 - Pagina No. 31 - Cartilla Obras Menores de Drenaje y Estructuras Viales Programa Colombia Rural

CANTIDADES - ALETAS, BASE ALETAS Y GUARDARUEDAS

Planta Box Culvert: Plano No. 16 - Pagina No. 40 - Cartilla Obras Menores de Drenaje y Estructuras Viales Programa Colombia Rural
#REF! MEMORIA DE CÁLCULO BOX CULVERT 1.0 m X 1.0 m

Fuente Tabla: Plano No. 17 - Pagina No. 41 - Cartilla Obras Menores de Drenaje y Estructuras Viales Programa Colombia Rural

630.6 CONCRETO SIMPLE CLASE 14 Mpa Vol 2 = 0.41

630.6 CONCRETO SIMPLE CLASE 14 Mpa Vol 2 = 2.77

640.1 ACERO DE REFUERZO FY = 420 MPA Peso 2 = 149.66

610.1 RELLENO PARA ESTRUCTURAS CON SUELO Vol = 23.9

690.1 IMPERMEABILIZACIÓN DE ESTRUCTURAS (CINTA PVC)

Longitud Muro = 8 m

Long. Cinta PVC = 16

RESUMEN DE CANTIDADES BOX CULVERT 1.0 m x 1.0 m

DESCRIPCION CANTIDAD UNIDAD


Excavaciones varias sin clasificar 39.9 m3

Concreto simple clase 14 Mpa 1.0 m

Concreto reforzado clase 21 MPa 13.4 m3

Acero de refuerzo fy = 420 Mpa 914.1 m3

Relleno para estructuras con suelo 23.9 kg

Impermeabilización de estructuras (Cinta Pvc) 16.0 kg

Elaboró: FELIPE ANDRÉS VACA CORTÉS


Cargo: GESTOR TÉCNICO
M.P. No. 25202 - 195276 BYC
#REF! MEMORIA DE CÁLCULO BOX CULVERT 3.0 m X 3.0 m

TRAMO : #REF!
BOX CULVERT No 2 ABSCISA: PR5+660

600.1.1 EXCAVACIONES VARIAS SIN CLASIFICAR

Volumen de excavacion cuerpo box

ancho
h = 3.80

Long = 8.00

Ancho = 4.70
o
rg
a
L

h Vol 1 = 142.88

Volumen excavacion para la construccion de las Aletas

menor menor= 3.70

mayor= 7.00

Ancho Ancho= 4

(menor  mayor)
Area  * Ancho
mayor 2
Area = 21.40

h= 3.50

h' h h' = 2.20

Vol 3  Area * Altura


Altura = 2.85

Vol 2 = 121.98

Vol Total Excavación 264.9

630.4CONCRETO SIMPLE CLASE 14 Mpa

Volumen concreto simple 14 MPa Cuerpo Box

ancho
h = 0.05
Long = 8.00
o

Ancho = 3.70
rg
a
L

h Vol 1 = 1.48
#REF! MEMORIA DE CÁLCULO BOX CULVERT 3.0 m X 3.0 m

CANTIDADES POR METRO LINEAL - CUERPO BOX CULVERT Long. Calzada = 8.00 m

630.6 CONCRETO SIMPLE


CLASE 14 MPa

V1 = 1.48 m3

633. CONCRETO REFORZADO


CLASE 28 MPa

V1 = 39.04 m3

640.1 ACERO DE REFUERZO


FY = 420 MPA

Peso 1 = 3756.8 kg

Fuente Tabla: Plano No. 8 - Pagina No. 32 - Cartilla Obras Menores de Drenaje y Estructuras Viales Programa Colombia Rural

CANTIDADES - ALETAS, BASE ALETAS Y GUARDARUEDAS

Planta Box Culvert: Plano No. 16 - Pagina No. 40 - Cartilla Obras Menores de Drenaje y Estructuras Viales Programa Colombia Rural
#REF! MEMORIA DE CÁLCULO BOX CULVERT 3.0 m X 3.0 m

Fuente Tabla: Plano No. 17 - Pagina No. 41 - Cartilla Obras Menores de Drenaje y Estructuras Viales Programa Colombia Rural

630.6 CONCRETO SIMPLE CLASE 14 Mpa Vol 2 = 2.33

630.6 CONCRETO SIMPLE CLASE 14 Mpa Vol 2 = 13.26

640.1 ACERO DE REFUERZO FY = 420 MPA Peso 2 = 2212.87

610.1 RELLENO PARA ESTRUCTURAS CON SUELO Vol = 397.4

690.1 IMPERMEABILIZACIÓN DE ESTRUCTURAS (CINTA PVC)

Longitud Muro = 8 m

Long. Cinta PVC = 16

RESUMEN DE CANTIDADES BOX CULVERT 3.0 m x 3.0 m

DESCRIPCION CANTIDAD UNIDAD


Excavaciones varias sin clasificar 264.9 m3

Concreto simple clase 14 Mpa 3.8 m

Concreto reforzado clase 28 MPa 52.3 m3

Acero de refuerzo fy = 420 Mpa 5969.7 m3

Relleno para estructuras con suelo 397.4 kg

Impermeabilización de estructuras (Cinta Pvc) 16.0 kg

Elaboró: FELIPE ANDRÉS VACA CORTÉS


Cargo: GESTOR TÉCNICO
M.P. No. 25202 - 195276 BYC
#REF! MEMORIA DE CÁLCULO FILTRO

TRAMO : ### ABSCISA INICIO: PR10+544 ABSCISA FINAL: PR10+892 LONG: 348 m

LONGITUD TOTAL FILTRO = 348 m

600.1.1 EXCAVACIONES VARIAS SIN CLASIFICAR

Volumen de excavacion para viga riostras

ancho
h = 1.00

ancho = 0.60

largo = 348.00
o
rg
a
L

h Vol = 208.8

Vol Total Excavac. = 208.8

673.1 GEOTEXTIL TIPO NT 2500

Volumen de suministro e instalación de subbase granular

ancho

ancho = 3.80

largo = 348.00
o
rg
a
L

h Vol = 1322.4

Vol Total Geotex = 1322.4

673.2 MATERTIAL GRANULAR DRENANTE

Volumen de concreto Huellas

ancho
h = 1.00

ancho = 0.60

largo = 348.00
o
rg
a
L

h Vol = 208.8

VolTotMat.Gran= 208.8
#REF! MEMORIA DE CÁLCULO FILTRO

673.4 TUBERÍA PVC PERFORADA DE 4"

ancho
largo = 348.0

Long. = 348.0
o
rg
a
L

Long = 348.0

RESUMEN DE CANTIDADES FILTRO

DESCRIPCION CANTIDAD UNIDAD


Excavaciones varias sin clasificar 208.8 m3

Geotextil Tipo NT 2500 1322.4 m2

Material Granular Drenante 208.8 m3

Tubería perforada PVC de 4" 348.0 m

Elaboró: FELIPE ANDRÉS VACA CORTÉS


Cargo: GESTOR TÉCNICO
M.P. No. 25202 - 195276 BYC