Avances por fase 2023 SETIEMBRE

AvanceMTS (Varios elementos)

Zona Fase Nivel Veta TipoLab. Labor ALA Sección Ancho Sección Altura Avance (m)
BAJA PREPARACION 100 FARALLON RAMAL SN 977D E 3.5 3.8 10
VE 977-2 3.5 3.8 0
977D 3.5 3.8 20
VETA TRAVIESO SN 639E E 3.5 3.8 10
639D E 3.5 3.8 20
VE 639D-15 3.5 3.8 15
639D-16 3.5 3.8 15
639E-17 3.5 3.8 15
639E-16 3.5 3.8 15
CUATRO RAMAL SN 899D E 3.5 3.8 10
VE 899D-5 3.5 3.8 15
TRAVIESO RAMAL SN 106A E 3.5 3.8 10
W 3.5 3.8 15
107A W 3.5 3.8 0
VE 106A-3 3.5 3.8 15
106A-2 3.5 3.8 0
MILY RAMAL SN 157B E 3.5 3.8 25
W 3.5 3.8 15
COMETA RAMAL GAL 120 3.5 3.8 20
SN 126A E 3.5 3.8 20
W 3.5 3.8 10
120 3.5 3.8 10
VE 126-2 E 3.5 3.8 15
126-2A 3.5 3.8 10
180 PRODUCTORA RAMAL (CONJUNTO 51) GAL 790 E 3.5 3.8 15
VE 790-1 3.5 3.8 0
COMETA RAMAL SN 126 E 3.5 3.8 20
250 PRODUCTORA RAMAL (CONJUNTO 51) SN 180A 3.5 3.8 20
180B 3.5 3.8 20
VE 790B 3.5 3.8 15
DESARROLLO 100 FARALLON RAMAL BP 977E-W 3.5 3.8 10
RA 978(-) W 4.2 4.2 20
VETA TRAVIESO BP 639E E 4 4 20
639D E 4 4 20
RA 639 4.5 4.5 30
CUATRO RAMAL BP 899D E 4 4 30
RA 900 4.2 4.2 25
DANITZA RAMAL RA 689 3.5 3.8 10
TRAVIESO RAMAL BP 106A E 3.5 3.8 10
W 3.5 3.8 10
RA 106 3.5 3.8 25
MILY RAMAL BP 157B 3.5 3.8 25
COMETA RAMAL BP 120 4 4 20
RA 120 4 4 30
180 PRODUCTORA RAMAL (CONJUNTO 51) BP 180 E 3.5 3.8 20
W 3.5 3.8 20
RA 180 3.5 3.8 20
COMETA RAMAL BP 126 E 4 4 25
126A E 4 4 10
RA 126 3.5 3.8 30
OPERACION MINA100 FARALLON RAMAL CAM 977 E 4 4 5
978-2S 3.5 3.8 5
978-1S 3.5 3.8 10
PROVIDENCIA RAMAL CAM 1007 4 4 5
1005 3.5 3.8 5
VETA TRAVIESO CAM 639C 4 4 10
639D-13 4 4 5
CUATRO RAMAL CAM 899D-3 4 4 10
899D-4 4 4 10
TRAVIESO RAMAL CAM 106-2 3.5 3.8 5
106 -1 3.5 3.8 5
107A 3.5 3.8 5
COMETA RAMAL S/E 120 5 5 10
180 PROVIDENCIA RAMAL CAM 922 3.5 3.8 5
COMETA RAMAL BP 126A W 3.5 3.8 10
Total BAJA 915
MEDIA PREPARACION 100 VETA LLACSACOCHA VE 249D-1 W 3.5 3.8 20
VETA POZO D SN 201B E 3.5 3.8 25
W 3.5 3.8 15
180 VETA LLACSACOCHA SN 249C 3.5 3.8 10
VE 249C W 3.5 3.8 10
252A-2 3.5 3.8 15
BARNABE RAMAL SN 384 3.5 3.8 10
382A 3.5 3.8 10
VETA POZO D GAL 807 E 3.5 3.8 25
W 3.5 3.8 15
SN 382 3.5 3.8 10
806C E 3.5 3.8 5
VE 201B 3.5 3.8 20
DESARROLLO 100 VETA LLACSACOCHA BP 250B-W 4 4 30
RA 250 4 4 30
252 3.5 3.8 35
BARNABE RAMAL RA 382 4 4 30
LLACSACOCHA RAMAL SUR BP 249C W 4.2 4.2 5
180 VETA LLACSACOCHA RA 251(-) 4 4 30
249 3.5 3.8 35
veta pozo D ramal Norte RA 890 4.2 4.2 40
SHIUSHA RAMAL SUR BP 382 E 4.2 4.2 35
VETA POZO D RA 890-1 4 4 20
382E 3.5 3.8 30
OPERACION MINA180 VETA LLACSACOCHA CAM 249D 3.5 3.8 10
249B 3.5 3.8 10
VETA POZO D CAM 382-2 3.5 3.8 15
382-1 3.5 3.8 15
382-3 3.5 3.8 15
250 VETA POZO D CAM 382A 3.5 3.8 10
Total MEDIA 585
HORIZONTE PREPARACION 420 SAN PEDRO RAMAL RA 503 3.5 3.8 25
CUERPO ANDRES BP 990A W 3.5 3.8 25
990B W 3.5 3.8 25
VE 990-5 3.5 3.8 25
LUCERO RAMAL TECHO XC 503 3.5 3.8 25
450 LUCERO RAMAL TECHO XC 525 3.5 3.8 20
500 CUERPO ANDRES SN 990C E 3.5 3.8 30
W 3.5 3.8 30
990D W 3.5 3.8 30
VE 998 3.5 3.8 15
990-4 3.5 3.8 30
990B 3.5 3.8 10
VETA SUSY SN 710A W 3.5 3.8 30