Está en la página 1de 14

PROYECTA CONSTRUYE Y SOLUCIONA

PRESENTACION HORAS EXCAVADORA 336D2LME


U.MEDIDA MAQUINARIA 336D2LME
ITEM FECHA LUGAR DE TRABAJOHORA/I HORA /T TOTAL/HORA HORAS ACU N. DE PARTE
7/3/2023 PAHUAL 12545 12551 6 6 974
7/4/2023 LAMPA _HUANCAS 12551 12561 10 16 975
7/5/2023 LAMPA _HUANCAS 12561 12571 10 26 976
7/6/2023 LAMPA _HUANCAS 26
7/7/2023 LAMPA _HUANCAS 26
7/8/2023 LAMPA _HUANCAS 12571 12574 3 29 977
7/9/2023 LAMPA _HUANCAS 29
7/10/2023 LAMPA _HUANCAS 12574 12578 4 33 978
7/11/2023 LAMPA _HUANCAS 12578 12586 8 41 979
7/12/2023 LAMPA _HUANCAS 12586 12594 8 48 980
7/13/2023 LAMPA _HUANCAS 12594 12604 10 58 981
7/14/2023 LAMPA _HUANCAS 12604 12610 6 64 982
7/15/2023 LAMPA _HUANCAS 12610 12616 6 70 983
7/16/2023 LAMPA _HUANCAS 70
7/17/2023 LAMPA _HUANCAS 12616 12624 8 78 984

7/18/2023 LAMPA _HUANCAS 12624 12633 9 87 985

7/19/2023 LAMPA _HUANCAS 12633 12641 8 95 984


7/20/2023 LAMPA _HUANCAS 12641 12648 7 102 987
7/21/2023 LAMPA _HUANCAS 12648 12654 6 108 988
7/22/2023 LAMPA _HUANCAS 12654 12664 10 118 989
7/23/2023 LAMPA _HUANCAS 118
7/24/2023 LAMPA _HUANCAS 12664 12674 10 127 990
7/25/2023 LAMPA _HUANCAS 12674 12683 9 136 991
7/26/2023 LAMPA _HUANCAS 12683 12694 11 147 993
7/27/2023 LAMPA _HUANCAS 0 0 147
7/28/2023 LAMPA _HUANCAS 0 0 147
7/29/2023 LAMPA _HUANCAS 0 0 147
7/30/2023 LAMPA _HUANCAS 147
7/31/2023 LAMPA _HUANCAS 12694 12698 4 151

TOTAL DE HORAS 146.9


COSTO POR HORAS S/200.00
TOTAL A PAGAR S/29,380.00
ONA

DORA 336D2LME
36D2LME
DETALLE
CARGUIO DEMATERIAL EN EL K M 44+120
CORTE Y CARGIO EN EL KM 44+130
CORTE Y CARGIO EN EL KM 44 +130

TRASLADO DE EQUIPO DE PAHUAL_HUANCAS

CARGIO DE MATERIAL KM
CORTE Y CARGUIO DE MATERIAL KM 71+800
CORTE Y CARGIO EN EL KM 71+700
CORTE Y CARGIO KM 71+700
CORTE Y CARGIO EN EL KM71+700
CORTE Y CARGIO KM 71+690
DOMINGO
CORTE Y CARGIO EN EL KM 71+698
CORTE Y CARGIO EN EL 71+680 y APERTURA DE
UÑAS EN EL DME 32A APOYO A LOS CHINOS
APOYO A LOS CHINOS APOYO A
APOYO A LOS CHINOS LOS CHINOS

SE TRABAJO EN EL DME 32/ UÑA PARA EL BOTADERO


APOYO A LOS CHINOS
CORTE Y CARGIO EN EL KM 71+660
DOMINGO
CORTE Y CARGIO EN KM 71+500
CORTE Y CARGIO EN KM 71+670
CORTE Y CARGIO EN KM 71+700

DOMINGO
PROYECTA CONSTRUYE Y SOLUCIONA

PRESENTACION HORAS ERWIN PEREZ


U.MEDIDA MAQUINARIA
ITEM FECHA LUGAR DE TRA HORA/I HORA /T TOTAL/HORA HORAS ACU N. DE PARTE
1 7/3/2023 PAHUAL 13931.1 13937.4 6.2 6.2 874
2 7/4/2023 LAMPA _HUAN 13937.4 13945.9 8.4 14.6 875
3 7/5/2023 LAMPA _HUAN 13945.9 13955.6 9.6 24.2 876
4 7/6/2023 LAMPA _HUAN 13955.6 13959.6 3.9 28.1 877
5 7/14/2023 LAMPA _HUAN 13974.2 13977.3 3 31.1 878
6 7/15/2023 LAMPA _HUAN 13977.3 13980.9 3.5 34.6 879
7 7/18/2023 LAMPA _HUAN 13992.1 13998.3 6.1 40.7 880
8 7/19/2023 LAMPA _HUAN 13998.3 14006.3 7.9 48.6 881
9 7/20/2023 LAMPA _HUAN 14006.3 14014.5 8.1 56.7 882
10 7/21/2023 LAMPA _HUAN 14014.5 14021.3 6.7 63.4 883
11 7/22/2023 LAMPA _HUAN 14021.3 14030.4 9 72.4 884
12 7/24/2023 LAMPA _HUAN 14030.4 14037.9 7.4 79.8 885
13
14
15
16

TOTAL DE HORAS 79.8


COSTO POR HORAS S/90.00
TOTAL A PAGAR S/7,182.00

TOTAL DE HORAS 0
COSTO POR HORAS S/90.00
TOTAL A PAGAR S/0.00
REZ

DETALLE
ELIMINACION AL DME
ELIMINACION AL DME 32A
ELIMINACION AL DME 32A
ELIMINACION AL DME 32A
ELIMINACION AL DME 32A
ELIMINACION AL DME 32A
APOYO A LOS CHINOS KM 71+130
APOYO A LOS CHINOS KM 71+130
APOYO A LOS CHINOS KM 71+130
APOYO A LOS CHINOS KM 71+130
ELIMINACON DEL KM 71+620
ELIMINACON DEL KM 71+620
PROYECTA CONSTRUYE Y SOLUCIONA

PRESENTACION HORAS ABILIO


U.MEDIDA MAQUINARIA AJI-709
ITEM FECHA LUGAR DE TRA HORA/I HORA /T TOTAL/HORA HORAS ACU N. DE PARTE
1 7/3/2023 PAHUAL 5987.2 5993.6 6.3 6.3 1738
2 7/4/2023 LAMPA-HUAN 5993.6 6001.8 8.1 14.4 1739
3 7/5/2023 LAMPA-HUAN 6001.8 6011.3 9.4 23.8 1740
4 7/6/2023 LAMPA-HUAN 6011.3 6015.5 4.1 27.9 1741
5 7/11/2023 LAMPA-HUAN 6039.8 6046.9 7 34.9 1742
6 7/12/2023 LAMPA-HUAN 6046.9 6055.7 8.7 43.6 1743
7 7/13/2023 LAMPA-HUAN 6055.7 6063.8 8 51.6 1744
8 7/14/2023 LAMPA-HUAN 6063.8 6067.3 3.4 55 1745
9 7/15/2023 LAMPA-HUAN 6067.3 6072 4.6 59.6 1746
10 7/17/2023 LAMPA-HUAN 6072 6076 3.9 63.5 1747
11 7/18/2023 LAMPA-HUAN 6076 6078 1.9 65.4 1748
12 7/18/2023 LAMPA-HUAN 6078 6084 5.9 71.3 1749
13 7/19/2023 LAMPA-HUAN 6084 6084 4 75.3 1750
14 7/20/2023 LAMPA-HUAN 6085.3 6094.4 9 84.3 1751
15 7/21/2023 LAMPA-HUAN 6094.4 6101.3 6.8 91.1 900
16 7/22/2023 LAMPA-HUAN 6101.3 6109.8 8.4 99.5 1754
17 7/24/2023 LAMPA-HUAN 6109.8 6118.2 8.3 107.8 1755
18 7/25/2023 LAMPA-HUAN 6118.2 6126.2 7.9 115.7 1756
19 7/26/2023 LAMPA-HUAN 6126.2 6128.5 2.2 117.9 1757
20 7/27/2023 LAMPA-HUAN 6128.5 6135.9 7.3 125.2 1758
21 7/28/2023 LAMPA-HUAN 0 0 0 125.2 1759
22 7/29/2023 LAMPA-HUAN 0 0 0 125.2 1760
23 7/30/2023 LAMPA-HUAN 0 0 0 125.2 1761
24 7/31/2023 LAMPA-HUAN 6137.5 6142.4 4.8 130 1762

TOTAL DE HORAS 130


COSTO POR HORAS S/90.00
TOTAL A PAGAR S/11,700.00
OLUCIONA

ABILIO
AJI-709
DETALLE

ELIMINACION AL DM 32
APOYO A LOS CHINOS
APOYO A LOS CHINOS SE CONSIDERA HORAS MINIMAS
APOYO A LOS CHINOS
APOYO A LOS CHINOS
ELIMINACION AL DM 32
ELIMINACION AL DM 32
ELIMINACION AL DM 32
ELIMINACION AL DM 32
ELIMINACION AL DM 32
ELIMINACION AL DM 32
ELIMINACION AL DM 32
ELIMINACION AL DM 32
ELIMINACION AL DM 32
PROYECTA CONSTRUYE Y SOLUCIONA

PRESENTACION HORAS SALOMON


U.MEDIDA MAQUINARIA BUI-796
ITEM FECHA LUGAR DE TRABAJO HORA/I HORA /T TOTAL/HORA HORAS ACU N. DE PARTE
1 7/3/2023 PAHUAL 669.2 674.8 5.5 5.5 612
2 7/4/2023 LAMPA-HUANCAS 674.8 683 8.1 13.6 613
3 7/5/2023 LAMPA-HUANCAS 683 692.6 9.5 23.1 614
4 7/6/2023 LAMPA-HUANCAS 692.6 698.7 6 29.1 615
5 7/10/2023 LAMPA-HUANCAS 698.7 702.5 3.7 32.8 616
6 7/11/2023 LAMPA-HUANCAS 702.5 709.7 7.1 39.9 617
7 7/12/2023 LAMPA-HUANCAS 709.7 718.3 8.5 48.4 618
8 7/13/2023 LAMPA-HUANCAS 718.3 726.5 8.1 56.5 619
9 7/14/2023 LAMPA-HUANCAS 726.5 730 3.4 59.9 620
10 7/15/2023 LAMPA-HUANCAS 730 734.7 4.6 64.5 621
11 7/17/2023 LAMPA-HUANCAS 734.7 738.4 3.6 68.1 622
12 7/18/2023 LAMPA-HUANCAS 738.4 740.4 1.9 70 623
13 7/18/2023 LAMPA-HUANCAS 740.4 740.4 4 74 624
14 7/19/2023 LAMPA-HUANCAS 740.9 746 5 79 625
15 7/24/2023 LAMPA-HUANCAS 763 771 7.9 86.9 626
16 7/25/2023 LAMPA-HUANCAS 771 778.3 7.2 94.1 627
17 7/26/2023 LAMPA-HUANCAS 778.3 781.3 2.9 97 628
18 7/27/2023 LAMPA-HUANCAS 781.3 789.2 7.8 104.8 629
19 7/28/2023 LAMPA-HUANCAS 0 0 0 104.8 0
20 7/29/2023 LAMPA-HUANCAS 0 0 0 104.8 0
21 7/30/2023 LAMPA-HUANCAS 0 0 0 104.8 0
22 7/31/2023 LAMPA-HUANCAS 789.2 793.6 4.3 109.1 630
23
24
25
26
27

TOTAL DE HORAS 109.1


COSTO POR HORAS S/90.00
TOTAL A PAGAR S/9,819.00
LUCIONA

SALOMON
BUI-796
DETALLE

ELIMINACION AL DM 32
ELIMINACION AL DM 32
APOYO A LOS CHINOS SE CONSIDERA HORAS MINIMAS
APOYO A LOS CHINOS
ELIMINACION AL DM 32
ELIMINACION AL DM 32
ELIMINACION AL DM 32
ELIMINACION AL DM 32

ELIMINACION AL DM 32
FECHA MAQ H.INICIAL H. FINAL T.HORAS N.PARTE D
7/12/2023 ORUGA 2110.2 2117.4 7.2 383
7/13/2023 ORUGA 2117.4 2121.6 4.2 385
7/15/2023 330 CAT 130.9 135.1 4.2
7/22/2026 BVH-946 170.3 173.9 3.6
7/18/2023 AJI-709 6078 6084 6 1749
7/18/2023 BUI_796 738.4 738.4 5 624
7/18/2023 D7Y-795 13992.1 13998.3 6.2 880
7/19/2023 D7Y-795 13998.3 14006.3 8 881
7/19/2023 BUI_796 740.9 746 5.1 625
7/19/2023 AJI-709 6084 6084 5 1751
7/20/2023 AJI-709 6085 6094 9 1752
7/20/2023 D7Y-795 14006.3 14014.5 8.2 882
7/21/2023 AJI-709 6094.4 6101.3 6.9 900
7/21/2023 D7Y-795 14014.5 14021.3 6.8 883
7/18/2023 336D2LME 12624 12633 9 985
7/19/2023 336D2LME 12633 12641 8 986
7/20/2023 336D2LME 12641 12648 7 987
7/21/2023 336D2LME 12648 12654 6 988

TOTAL DE HORAS 4.2


EXCAVADOR
A 330CAT COSTO POR HORAS S/90.00
CHINOS TOTAL A PAGAR S/378.00
DETALLE
SE TRABAJO EN EL DME 32A TOTAL DE HORAS 11.4
COSTO POR HORAS S/180.00
PRESTO A PCS TOTAL A PAGAR S/2,052.00
PRESTO A PCS

HORAS MINIMAS
KM71+130
TOTAL DE HORAS 66.2
COSTO POR HORAS S/100.00
HORAS MINIMAS TOTAL A PAGAR S/6,620.00
26 VIAJES

SE TRABAJO PARA LOS CHINOS KM 71+590


SE TRABAJO EN EL DME 32A APERTURA DE UÑA TOTAL DE HORAS 30
SE TRABAJO EN EL DME 32A APERTURA DE UÑA COSTO POR HORAS S/210.00
SE TRABAJO EN EL DME 32 APERTURA DE UÑA TOTAL A PAGAR S/6,300.00
SE TRABAJO EN EL DME 32 APERTURA DE UÑA

12:00 8:00 4:00


ORUGA

VOLQUETE

EXCAVADORA
336D2LME
MAQUINARIA FECHA MAQ H.INICIAL H. FINAL T.HORAS
7/3/2023 TRACTOR ORUGA 2081.3 2087.1 5.7
7/4/2023 TRACTOR ORUGA 2087.1 2095.3 8.1
TRACTOR 7/25/2023 TRACTOR ORUGA 2176.1 2183.4 7.2
ORUGA

7/22/2023 BDD-727 419.8 423.8 3.9


7/22/2023 BDD-727 423.8 426.1 2.2
7/22/2023 D9H-925 3200.6 3204.1 3.4
7/24/2023 BDD-727 432.3 439.8 7.4
VOLQUETE
7/25/2023 BDD-727 440.3 446.5 6.1
7/26/2023 BDD-727 446.5 449 2.4
7/31/2023 BDD-727 472.2 476 3.7
7/26/2023 330 CAT 8370.8 8374 3.2
EXCAVADORA 7/31/2023 330 CAT 8398.9 8403 4.1

TOTAL DE HORAS
TRACTOR
ORUGA COSTO POR HORAS
TOTAL A PAGAR
TOTAL DE HORAS
VOLQUETE COSTO POR HORAS
TOTAL A PAGAR
EXCAVADORATOTAL DE HORAS
COSTO POR HORAS
TOTAL A PAGAR
N.PARTE D
374
8.1 375
15.3

3.9 775
6.1 754
9.5 278
16.9 758
23 759
25.4
29.1
3.2
7.3

15.3
S/180.00
S/2,754.00
29.1
S/90.00
S/2,619.00
7.3
S/200.00
S/1,460.00
DETALLE
SETRABAJO EN EL CORTE SERRADO EN EL TRAMO DE JHOEL QUISPE KM 44+120
SE TRABAJO EN EL CORTE CERRADO EN EL TRAMO DE JHOEL QUISPE EN LE KM 44+200

ELIMACION DE MATERIAL EXEDENTE DME 32 KM 71+660


KM 71+660 DESMONTE AL DME
ELIMACION DE MATERIAL EXEDENTE DME 32 KM 71+670
ELIMACION DE MATERIAL EXEDENTE DME 32 KM 71+670

COTE DE BANQUETA EN KM 71+670

180
200
210