Coninor - Val #04 - Val N°05 - 16 Junio 2022
Coninor - Val #04 - Val N°05 - 16 Junio 2022
VALORIZACION
MONTO CONTRACTUAL MONTO ADICIONAL
DESCRIPCION (S/IGV) (S/IGV) SALDO
ANTERIOR ACTUAL ACUMULADO
7) MONTO A FACTURAR
EN VALORIZACION NETA (VN) 19,576,508.89 0.00 #REF! #REF! #REF!
EN I.G.V (18%*VN) 3,523,771.60 0.00 #REF! #REF! #REF!
TOTAL (F) 23,100,280.49 0.00 #REF! #REF! #REF!
PARA FACTURAR
SUBTOTAL #REF!
IGV 18% #REF!
TOTAL #REF!
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION
UND METR. P. UNIT. S/. PRESUP. METR. VALORIZ. S/. % METR. VALORIZ. S/. % METR. VALORIZ. S/. % METR. VALORIZ. S/. %
04 MOVIMIENTO DE TIERRAS
04.02 CONFORMACION DEL DIQUE CON MATERIAL PROPIO m3 11000.00 S/ 1.94 21,340.00 3,700.31 S/ 7,178.60 33.64% S/ - 0.00% 3,700.31 S/ 7,178.60 33.64% 7299.69 S/ 14,161.40 66.36%
04.03 CORTE DE TERRAPLEN EXISTENTE (ALINEACION DEL DIQUE) m3 11060.00 S/ 2.66 29,419.60 25,469.82 S/ 67,749.72 230.29% S/ - 0.00% 25,469.82 S/ 67,749.72 230.29% -14409.82 -S/ 38,330.12 -130.29%
04.04 REFINE Y PERFILADO DE TALUD DE DIQUE m2 18040.00 S/ 1.22 22,008.80 9,015.00 S/ 10,998.30 49.97% S/ - 0.00% 9,015.00 S/ 10,998.30 49.97% 9025.00 S/ 11,010.50 50.03%
04.06 EXCAVACION PARA CONFORMACION DE UÑA ANTISOCAVANTE m3 32000.00 S/ 3.82 122,240.00 15,328.33 S/ 58,554.20 47.90% S/ - 0.00% 15,328.33 S/ 58,554.20 47.90% 16671.67 S/ 63,685.80 52.10%
04.08 LASTRADO Y ACABADO DE AFIRMADO DE LA CORONA DE DIQUES m2 18000.00 S/ 8.70 156,600.00 - S/ - 0.00% S/ - 0.00% - S/ - 0.00% 18000.00 S/ 156,600.00 100.00%
05 ENROCADO
05.04 SUMINISTRO E INSTALACION DE GEOTEXTIL NO TEJIDO m2 38800.00 S/ 0.72 27,936.00 7,991.88 S/ 5,754.15 20.60% 570.00 S/ 410.40 1.47% 8,561.88 S/ 6,164.55 22.07% 30238.13 S/ 21,771.45 77.93%
05.06 RECUBRIMIENTO DE GEOTEXTIL CON MATERIAL SELECCIONADO m3 32440.00 S/ 5.56 180,366.40 606.22 S/ 3,370.60 1.87% 277.78 S/ 1,544.46 0.86% 884.00 S/ 4,915.06 2.73% 31556.00 S/ 175,451.35 97.27%
05.07 COLOCACION Y ACOMODO DE ROCA EN UÑA DE DIQUE m3 32000.00 S/ 10.55 337,600.00 4,527.27 S/ 47,762.73 14.15% 2,586.95 S/ 27,292.32 8.08% 7,114.22 S/ 75,055.05 22.23% 24885.78 S/ 262,544.95 77.77%
05.08 COLOCACION Y ACOMODO DE TALUD DE DIQUE m3 22,520.00 13.15 296,138.00 2,539.30 S/ 33,391.85 11.28% 1,562.38 S/ 20,545.35 6.94% 4,101.69 S/ 53,937.20 18.21% 18418.31 S/ 242,200.79 81.79%
COSTO DIRECTO 1,193,648.80 S/. 234,760.15 19.67% S/ 49,792.53 4.17% S/. 284,552.68 23.84% S/. 909,096.12 76.16%
SUB TOTAL 1,193,648.80 234,760.15 S/ 49,792.53 284,552.68 909,096.12
I.G.V. (18.00%) 214,856.78 42,256.83 S/ 8,962.66 51,219.48 163,637.30
PRESUPUESTO TOTAL 1,408,505.58 277,016.98 S/ 58,755.19 335,772.16 1,072,733.42
COSTO DE CONTRATO S/ 49,792.53 HORAS MAQUINAS TOTAL DE COMBUSTIBLE UTILIZADO COMBUSTIBLE NO APLICABLE
COSTO HORA MAQUINA S/ 25,242.00 HORAS P. UNIT. S/. PRESUP. GALONES COST/GAL PRESUP. HORAS GAL/H GAL COST/GAL PRESUP.
COSTO DIRECTO S/ 75,034.53 120.20 S/ 210.00 S/ 25,242.00 1150.00 13.98 S/ 16,080.51 120.20 5.50 661.10 13.98 S/ 9,244.19
COSTO DE COMBUSTIBLE TOTAL UTILIZADO S/ -16,080.51 SUB TOTAL S/ 25,242.00 SUB TOTAL S/ 16,080.51 SUB TOTAL S/ 9,244.19
COSTO DE COMBUSTIBLE NO APLICABLE S/ 9,244.19 IGV S/ 4,543.56 IGV S/ 2,894.49 IGV S/ 1,663.96
AMORTIZACION DE LA SEGUNDA PARTE DEL ADELANTO (118,644.08 S/IGV) S/ -39,548.02 TOTAL S/ 29,785.56 TOTAL S/ 18,975.00 TOTAL S/ 10,908.15
SUB TOTAL S/ 28,650.19
IGV (18 %) S/ 5,157.03 NOTA
COSTO TOTAL A FACTURAR S/ 33,807.22 S/ 3,580.48 COMBUSTIBLE A REEMBOLSAR SEGÚN NUEVO CALCULO DE LA VALORIZACION N° 03
S/ 1,650.00 MONTO COMBUSTIBLE QUE SE DEBE DE PAGAR POR MOTIVO DE QUE NO SE HA UTILIZADO
TOTAL DE COMBUSTIBLE NO UTILIZADO
GALONES COST/GAL PRESUP.
100.00 13.98 S/ 1,398.31
SUB TOTAL S/ 1,398.31
IGV S/ 251.69
OPTIMIZACION DE TRABAJOS CON 2 MAQUINAS POR 11 DIAS TRABAJADOS (9 DIC. - 21 DIC) TOTAL S/ 1,650.00
DESCRIPCION DE PARTIDA MAQUINA DISTANCIA METRADO COSTO UNITARIO COSTO PARCIAL N° DE DIAS COSTO TOTAL
05.08 COLOCACION Y ACOMODO DE TALUD DE DIQUE 2 EXCAVADORA 30.00 9.38 S/ 13.15 S/ 3,700.41 11.00 S/ 40,704.51
S/ 74,511.73
S/ 169,705.42
S/ 244,217.15 TOTAL A PAGAR EN VALORIZACION N° 04 S/ 79,742.21 INCL IGV
S/ 405,217.15 PAGO POR ELIMINACION PENDIENTE S/ 71,819.13 INCL IGV
S/ 151,561.34 INCL IGV
S/ 144,371.93
ROCA EN UÑA (DRCH) ROCA EN UÑA (IZQ) ROCA EN TALUD (DRCH)
PROGRESIVA
AREA VOL. AREA VOL. AREA VOL.
1+050 0.727
1+060 - 0.727 7.270 -
1+070 - 0.727 7.270 -
1+080 - 0.727 7.270 -
1+090 - 0.727 7.270 -
1+100 - 0.727 7.270 -
1+110 - 0.727 7.270 -
1+120 - 0.727 7.270 -
1+130 - 0.727 7.270 -
1+140 - 0.727 7.270 -
1+160 - 0.727 14.540 -
1+180 - 0.727 14.540 -
1+200 - 0.727 14.540 -
1+220 - 0.727 14.540 -
1+230 - 0.727 7.270 -
1+240 3.500 17.500 0.727 7.270 4.699 23.495
1+250 3.500 17.500 0.727 7.270 4.699 46.989
1+260 3.500 35.000 0.727 7.270 4.699 46.989
1+270 3.500 35.000 0.727 7.270 4.699 46.989
1+280 3.500 35.000 0.727 7.270 4.699 46.989
1+290 3.500 35.000 0.727 7.270 4.699 46.989
1+300 3.500 35.000 0.727 7.270 4.699 46.989
1+310 3.500 35.000 0.727 7.270 4.699 46.989
1+320 3.500 35.000 0.727 7.270 4.699 46.989
1+330 3.500 35.000 0.727 7.270 4.699 46.989
1+340 3.500 35.000 0.727 7.270 4.699 46.989
1+350 3.500 35.000 0.727 7.270 4.699 46.989
1+360 3.500 35.000 0.727 7.270 4.699 46.989
1+370 3.500 35.000 0.727 7.270 4.699 46.989
1+380 3.500 35.000 0.727 7.270 4.699 46.989
1+400 3.500 70.000 0.727 14.540 4.699 93.978
1+420 3.500 70.000 0.727 14.540 4.699 93.978
1+440 3.500 70.000 0.727 14.540 4.699 93.978
1+460 3.500 70.000 0.727 14.540 4.699 93.978
1+480 3.500 70.000 0.727 14.540 4.699 93.978
1+490 3.500 35.000 8.000 43.635 4.699 46.989
1+495 3.500 17.500 8.000 40.000 4.699 23.495
1+500 3.500 17.500 8.000 40.000 4.699 23.495
1+520 3.500 70.000 8.000 160.000 4.699 93.978
1+540 3.500 70.000 8.000 160.000 4.699 93.978
1+545 8.000 28.750 8.000 40.000 11.747
1+550 8.000 40.000 20.000 -
1+560 0.800 44.000 - -
1+570 0.800 8.000 8.000 40.000 -
1+580 0.800 8.000 8.000 80.000 -
1+590 0.800 8.000 0.800 44.000 -
1+600 0.800 8.000 0.800 8.000 -
1+620 0.800 16.000 0.800 16.000 -
1+640 0.800 16.000 0.800 16.000 -
1+660 0.800 16.000 0.800 16.000 -
1+670 0.800 8.000 0.800 8.000 -
1+680 0.800 8.000 0.800 8.000 -
1+690 0.800 8.000 0.800 8.000 -
1+700 0.800 8.000 0.800 8.000 -
1+710 0.800 8.000 0.727 7.635 -
1+720 0.800 8.000 0.727 7.270 -
1+730 0.800 8.000 0.727 7.270 -
1+740 0.800 8.000 0.727 7.270 -
1+750 0.800 8.000 0.727 7.270 -
1+760 0.800 8.000 0.727 7.270 -
1+770 0.800 8.000 0.727 7.270 -
1+780 0.800 8.000 0.727 7.270 -
1+785 0.800 4.000 0.727 3.635 -
1+790 0.800 4.000 0.727 3.635 -
1+800 0.800 8.000 0.727 7.270 -
1+820 0.800 16.000 0.727 14.540 -
1+840 0.800 16.000 0.727 14.540 -
1+860 8.000 0.727 14.540 -
1+880 - 7.270 -
1+900 - - -
1+920 - - -
1+940 - - -
1+960 - - -
1+980 - - -
2+000 - - -
2+020 - - -
2+040 - - -
2+060 - - -
2+080 - - -
2+100 - - -
TOTALES 1,394.750 1,192.200 1,444.912
ROCA EN TALUD (IZQ) GEOTEXTIL (IZQ) AFIRMADO
AREA VOL. ANCHO M2 AREA VOL.
-
-
-
-
-
-
-
-
-
- - -
- - -
- - -
- - -
- - -
- - 0.817 4.085
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 8.170
- - 0.817 16.340
- - 0.817 16.340
- - 0.817 16.340
- - 0.817 16.340
- - 0.817 16.340
- - 0.817 8.170
- - 0.817 4.085
- 9.500 23.750 0.817 4.085
- 9.500 190.000 0.817 16.340
- 9.500 190.000 0.817 16.340
4.699 11.747 9.500 47.500 0.817 4.085
11.747 23.750 0.817 4.085
- - 0.817 8.170
4.699 23.495 9.500 47.500 0.817 8.170
4.699 46.989 47.500 4.085
23.495 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
117.473 570.000 277.780 583.92
8
4.5
3.5
105.00
CONSORCIO INMOBILIARIO DEL NORTE S.A.C “CREACION DEL SERVICIO DE PROTECCION EN RIBERAS DEL RIO CASMA VULNERABLE ANTE EL PELIGRO EN EL SECTOR CASA BLANCA-
CONINOR S.A.C HUALGAYOC, DISTRITO DE CASMA, PROVINCIA DE CASMA, DEPARTAMENTO DE ANCASH”
AVANCES
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
PART. DESCRIPCION
UND METR. P. UNIT. S/. PRESUP. METR. VALORIZ. S/. % METR. VALORIZ. S/. % METR. VALORIZ. S/. % METR. VALORIZ. S/. %
04 MOVIMIENTO DE TIERRAS
04.02 CONFORMACION DEL DIQUE CON MATERIAL PROPIO m3 11000.00 S/ 1.94 21,340.00 3,700.31 S/ 7,178.60 33.64% S/ - 0.00% 3,700.31 S/ 7,178.60 33.64% 7299.69 S/ 14,161.40 66.36%
04.03 CORTE DE TERRAPLEN EXISTENTE (ALINEACION DEL DIQUE) m3 11060.00 S/ 2.66 29,419.60 25,469.82 S/ 67,749.72 230.29% S/ - 0.00% 25,469.82 S/ 67,749.72 230.29% -14409.82 -S/ 38,330.12 -130.29%
04.04 REFINE Y PERFILADO DE TALUD DE DIQUE m2 18040.00 S/ 1.22 22,008.80 9,015.00 S/ 10,998.30 49.97% S/ - 0.00% 9,015.00 S/ 10,998.30 49.97% 9025.00 S/ 11,010.50 50.03%
04.06 EXCAVACION PARA CONFORMACION DE UÑA ANTISOCAVANTE m3 32000.00 S/ 3.82 122,240.00 15,328.33 S/ 58,554.20 47.90% S/ - 0.00% 15,328.33 S/ 58,554.20 47.90% 16671.67 S/ 63,685.80 52.10%
04.08 LASTRADO Y ACABADO DE AFIRMADO DE LA CORONA DE DIQUES m2 18000.00 S/ 8.70 156,600.00 - S/ - 0.00% S/ - 0.00% - S/ - 0.00% 18000.00 S/ 156,600.00 100.00%
05 ENROCADO
05.04 SUMINISTRO E INSTALACION DE GEOTEXTIL NO TEJIDO m2 38800.00 S/ 0.72 27,936.00 8,561.88 S/ 6,164.55 22.07% 5,130.00 S/ 3,693.60 13.22% 13,691.88 S/ 9,858.15 35.29% 25108.13 S/ 18,077.85 64.71%
05.06 RECUBRIMIENTO DE GEOTEXTIL CON MATERIAL SELECCIONADO m3 32440.00 S/ 5.56 180,366.40 884.00 S/ 4,915.05 2.73% 445.26 S/ 2,475.67 1.37% 1,329.27 S/ 7,390.72 4.10% 31110.73 S/ 172,975.67 95.90%
05.07 COLOCACION Y ACOMODO DE ROCA EN UÑA DE DIQUE m3 32000.00 S/ 10.55 337,600.00 7,389.27 S/ 77,956.83 23.09% 3,636.00 S/ 38,359.80 11.36% 11,025.27 S/ 116,316.63 34.45% 20974.73 S/ 221,283.37 65.55%
05.08 COLOCACION Y ACOMODO DE TALUD DE DIQUE m3 22,520.00 13.15 296,138.00 4,101.69 S/ 53,937.21 18.21% 3,806.11 S/ 50,050.33 16.90% 7,907.80 S/ 103,987.54 35.11% 14612.20 S/ 192,150.46 64.89%
COSTO DIRECTO 1,193,648.80 S/. 287,454.46 24.08% S/ 94,579.40 7.92% S/. 382,033.86 32.01% S/. 811,614.93 67.99%
SUB TOTAL 1,193,648.80 287,454.46 S/ 94,579.40 382,033.86 811,614.93
I.G.V. (18.00%) 214,856.78 51,741.80 S/ 17,024.29 68,766.09 146,090.69
PRESUPUESTO TOTAL 1,408,505.58 339,196.26 S/ 111,603.69 450,799.95 957,705.62
COSTO DE CONTRATO S/ 94,579.40 HORAS MAQUINAS TOTAL DE COMBUSTIBLE UTILIZADO COMBUSTIBLE NO APLICABLE
COSTO HORA MAQUINA S/ 19,824.00 HORAS P. UNIT. S/. PRESUP. GALONES COST/GAL PRESUP. HORAS GAL/H GAL COST/GAL PRESUP.
COSTO DIRECTO S/ 114,403.40 94.40 S/ 210.00 S/ 19,824.00 1584.40 13.98 S/ 22,154.75 94.40 5.50 519.20 13.98 S/ 7,260.00
COSTO DE COMBUSTIBLE TOTAL UTILIZADO S/ 22,154.75 SUB TOTAL S/ 19,824.00 SUB TOTAL S/ 22,154.75 SUB TOTAL S/ 7,260.00
COSTO DE COMBUSTIBLE NO APLICABLE S/ 7,260.00 IGV S/ 3,568.32 IGV S/ 3,987.85 IGV S/ 1,306.80
AMORTIZACION DE LA SEGUNDA PARTE DEL ADELANTO (118,644.08 S/IGV) S/ - TOTAL S/ 23,392.32 TOTAL S/ 26,142.60 TOTAL S/ 8,566.80
SUB TOTAL S/ 143,818.15
IGV (18 %) S/ 25,887.27
COSTO TOTAL A FACTURAR S/ 169,705.42
=D45+'VAL04'!J56
0
ROCA EN UÑA (DRCH) ROCA EN UÑA (IZQ) ROCA EN TALUD (DRCH)
PROGRESIVA
AREA VOL. AREA VOL. AREA VOL.
1+050
1+060 - - -
1+070 - - -
1+080 - - -
1+090 - - -
1+100 - - -
1+110 - - -
1+120 - - -
1+130 - - -
1+140 - - -
1+160 - - -
1+180 - - -
1+200 - - -
1+220 - - -
1+230 - - -
1+240 - - -
1+250 - - -
1+260 - - -
1+270 - - -
1+280 - - -
1+290 - - -
1+300 - - -
1+310 - - -
1+320 - - -
1+330 - - -
1+340 - - -
1+350 - - -
1+360 - - -
1+370 - - -
1+380 - - -
1+400 - - -
1+420 - - -
1+440 - - -
1+460 - - -
1+480 - - -
1+490 - - -
1+495 - - -
1+500 - - -
1+520 - - -
1+540 - - -
1+545 - - -
1+550 - - -
1+560 - - -
1+570 - - 4.699 23.495
1+580 - - 4.699 46.989
1+590 - - 4.699 46.989
1+600 - 7.200 36.000 4.699 46.989
1+620 - 7.200 144.000 4.699 93.978
1+640 - 7.200 144.000 4.699 93.978
1+660 - 7.200 144.000 4.699 93.978
1+670 - 7.200 72.000 4.699 46.989
1+680 - 7.200 72.000 4.699 46.989
1+690 - 7.200 72.000 4.699 46.989
1+700 - 7.200 72.000 4.699 46.989
1+710 - 7.200 72.000 4.699 46.989
1+720 - 7.200 72.000 4.699 46.989
1+730 - 7.200 72.000 4.699 46.989
1+740 - 7.200 72.000 4.699 46.989
1+750 - 7.200 72.000 4.699 46.989
1+760 - 7.200 72.000 4.699 46.989
1+770 - 7.200 72.000 4.699 46.989
1+780 - 7.200 72.000 4.699 46.989
1+785 - 7.200 36.000 4.699 23.495
1+790 - 7.200 36.000 4.699 23.495
1+800 - 7.200 72.000 4.699 46.989
1+820 - 7.200 144.000 4.699 93.978
1+840 - 7.200 144.000 4.699 93.978
1+860 - 7.200 144.000 4.699 93.978
1+880 - 7.200 144.000 46.989
1+900 - 7.200 144.000 -
1+920 - 7.200 144.000 -
1+940 - 7.200 144.000 -
1+960 - 7.200 144.000 -
1+980 - 7.200 144.000 -
2+000 - 7.200 144.000 -
2+020 - 7.200 144.000 -
2+040 - 7.200 144.000 -
2+060 - 7.200 144.000 -
2+080 - 7.200 144.000 -
2+100 - 7.200 144.000 -
TOTALES - 3,636.000 1,433.165
ROCA EN TALUD (IZQ) GEOTEXTIL (DER) GEOTEXTIL (IZQ) AFIRMADO DER.
AREA VOL. ANCHO M2 ANCHO M2 AREA
- -
- -
- -
- -
- -
- -
- -
- -
- -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
4.699 23.495 - 9.500 47.500
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 46.989 - 9.500 95.000
4.699 46.989 - 9.500 95.000
4.699 46.989 - 9.500 95.000
4.699 46.989 - 9.500 95.000
4.699 46.989 - 9.500 95.000
4.699 46.989 - 9.500 95.000
4.699 46.989 - 9.500 95.000
4.699 46.989 - 9.500 95.000
4.699 46.989 - 9.500 95.000
4.699 46.989 - 9.500 95.000
4.699 46.989 - 9.500 95.000
4.699 46.989 - 9.500 95.000
4.699 23.495 9.500
4.699 23.495 - 9.500 47.500
4.699 46.989 - 9.500 95.000
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 93.978 9.500 95.000 9.500 190.000 0.817
4.699 93.978 9.500 190.000 9.500 190.000 0.817
4.699 93.978 95.000 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
4.699 93.978 - 9.500 190.000
2,372.945 380.000 4,750.000
AFIRMADO DER. AFIRMADO IZQ.
VOL. AREA VOL.
-
-
-
-
-
-
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 0.817 4.085
- 0.817 16.340
- 0.817 16.340
- 0.817 16.340
- 0.817 8.170
- 0.817 8.170
- 0.817 8.170
- 0.817 8.170
- 0.817 8.170
- 0.817 8.170
- 0.817 8.170
- 0.817 8.170
- 0.817 8.170
- 0.817 8.170
- 0.817 8.170
- 0.817 8.170
- 0.817 4.085
- 0.817 4.085
- 0.817 8.170
- 0.817 16.340
- 0.817 16.340
8.170 0.817 16.340
16.340 0.817 16.340
8.170 0.817 16.340
- 0.817 16.340
- 0.817 16.340
- 0.817 16.340
- 0.817 16.340
- 0.817 16.340
- 0.817 16.340
- 0.817 16.340
- 0.817 16.340
- 0.817 16.340
- 0.817 16.340
32.680 412.585 583.92
PLANILLA DE METRADOS
“CREACION DEL SERVICIO DE PROTECCION EN RIBERAS DEL RIO CASMA VULNERABLE ANTE EL PELIGRO EN EL SECTOR CASA BLANCA-
Obra :
HUALGAYOC, DISTRITO DE CASMA, PROVINCIA DE CASMA, DEPARTAMENTO DE ANCASH”
08.01 ELABORACION DE PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DE COVID glb 1.00
1.00 1.00
08.02 ESPECIALISTA SALUD OCUPACIONAL Y COVID 19 mes 1.00
1.00 1.00
08.03 IDENTIFICACION DE SINTOMATOLOGIA COVID-19 AL INICIO Y DURANTE LA OBRA und 164.00
164.00 164.00
SENSIBILIZACION DE LA PREVENCION DE CONTAGIO COVID-19 EN OBRA Y
08.04 glb 0.17
SEÑALIZACIONES
0.17 0.17
08.05 EQUIPO DE PROTECCION PERSONAL DESINFECCION Y LIMPIEZA glb 1.00
1.00 1.00
08.06 ALIMENTACION DE PERSONAL und/alim 14940.00
14940.00 14940.00
08.07 MEDIDAS PREVENTIVAS COLECTIVAS E IMPLEMENTACION DE ZONAS DE CONTROL glb 1.00
1.00 1.00
08.08 MEDIDAS PREVENTIVAS INDIVIDUALES PARA LA VIGILANCIA DE LA SALUD glb 1.00
1.00 1.00