CRONOGRAMA DE AQUISICIÓN DE MATERIALES

"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. SECUNDARIA MANUEL AREVALO DE SANTIAGO DE CAO, DISTRITO
DE SANTIAGO DE CAO - ASCOPE - LA LIBERTAD"
LUGAR: LA LIBERTAD - ASCOPE - SANTIAGO DE CAO

MES 01 MES 02
Precio
Descripción Und. Cantidad Parcial (S/.) Cantidad Parcial (S/.) Cantidad Parcial (S/.)
(S/.)
ACERO DE REFUERZO, Fy=4,200 kg/cm2. kg 1,672.07 5.00 8,360.36 1,672.0725 8,360.36 0.0000 -
AGUA m3 5.10 6.00 30.61 5.10 30.61 0.0000 -
ALAMBRE NEGRO # 16 kg 20.97 6.00 125.80 20.97 125.80 0.0000 -
ALAMBRE NEGRO N°16 kg 74.58 6.00 447.48 74.5806 447.48 0.0000 -
ALAMBRE NEGRO RECOCIDO # 8 kg 30.24 6.00 181.44 30.2400 181.44 0.0000 -
ALAMBRE TW 2.5 mm2 m 16.00 4.50 72.00 0.0000 - 16.0000 72.00
ARENA FINA m3 1.00 40.00 40.00 1.0000 40.00 0.0000 -
ARENA GRUESA m3 12.22 40.00 488.83 12.2208 488.83 0.0000 -
CABLE THW # 4 AWG m 270.90 4.50 1,219.05 0.0000 - 270.9000 1,219.05
CAJA DE REGISTRO DE CONCRETO 400x400x300mm PROF. pza 1.00 10.00 10.00 0.0000 - 1.0000 10.00
CARBON VEGETAL kg 100.00 4.00 400.00 0.0000 - 100.0000 400.00
CEMENTO PORTLAND TIPO MS (42.5KG) BOL 285.62 26.27 7,503.28 285.6216 7,503.28 0.0000 -
CINTILLOS 3/16" X 6" und 10.00 2.00 20.00 0.0000 - 10.0000 20.00
CLAVOS C/CABEZA DE 21/2",3", 4" kg 10.28 6.00 61.69 10.2816 61.69 0.0000 -
CLAVOS CON CABEZA DE 21/2",3",4" kg 4.55 6.00 27.30 4.5500 27.30 0.0000 -
CLAVOS PARA CONSTRUCCION C/C PROMEDIO kg 1.18 6.00 7.06 1.1760 7.06 0.0000 -
CLAVOS PARA MADERA C/C 3" kg 127.00 6.00 762.00 127.0000 762.00 0.0000 -
CONDUCTOR ELECTRICO TW 1x 25 mm2 m 12.50 5.00 62.50 0.0000 - 12.5000 62.50
CONDUCTOR DE COBRE DESNUDO 16 MM2 m 10.00 5.00 50.00 0.0000 - 10.0000 50.00
CONECTOR TIPO AB 5/8" und 2.00 5.00 10.00 0.0000 - 2.0000 10.00
CONECTORES A CAJA PVC SEL DE 1" pza 1.00 10.00 10.00 0.0000 - 1.0000 10.00
CUERDA ACERADA DE 3/8" m 538.76 3.00 1,616.29 0.0000 - 538.7648 1,616.29
CURVA PVC SEL ELECTRICA 20MM und 2.00 5.00 10.00 0.0000 - 2.0000 10.00
CURVA PVC SEL ELECTRICA 25MM und 26.87 5.00 134.35 0.0000 - 26.8707 134.35
CURVA PVC SEL PARA INSTALACIONES ELECTRICAS Ø1" und 2.00 5.00 10.00 0.0000 - 2.0000 10.00
DISCO DE CORTE pza 23.52 20.00 470.40 23.5200 470.40 0.0000 -
ESTRUCTURA METALICA COLUMNA und 12.00 1,400.00 16,800.00 12.0000 16,800.00 0.0000 -
GIGANTOGRAFIA und 1.00 400.00 400.00 1.0000 400.00 0.0000 -
HOJAS DE SIERRA und 445.44 4.00 1,781.77 445.4430 1,781.77 0.0000 -
HORMIGON m3 3.65 35.00 127.85 3.6528 127.85 0.0000 -
INTERRUPTOR TERMOMAGNETICO 3 X 60 AMP. 10KA und 2.00 80.00 160.00 0.0000 - 2.0000 160.00
LIJA DE FIERRO # 8 und 1.20 5.00 6.00 1.2000 6.00 0.0000 -
LONA DE COSTALILLO m 132.30 8.00 1,058.40 132.3000 1,058.40 0.0000 -
MADERA TORNILLO p2 187.86 7.00 1,315.00 187.8576 1,315.00 0.0000 -
MADERA TORNILLO CEPILLADA p2 70.00 7.00 490.00 70.0000 490.00 0.0000 -
MOVILIZACION DE MATERIALES DESDE ALMACEN GLB 1.00 4,500.00 4,500.00 1.0000 4,500.00 0.0000 -
MURETE DE LADRILLO 1.15x0.60x0.25 ml und 1.00 50.00 50.00 0.0000 - 1.0000 50.00
PALO DE EUCALIPTO DE 3" x 3.0m und 126.00 15.00 1,890.00 126.0000 1,890.00 0.0000 -
PANTALLA ALUMBRADO DE 400W und 8.00 485.00 3,880.00 0.0000 - 8.0000 3,880.00
PEGAMENTO PARA TUBERIA PVC gln 0.13 2.00 0.26 0.0000 - 0.1290 0.26
PEGAMENTO PVC gln 0.01 2.00 0.01 56.8750 - 0.0050 0.01
PERNO DE SUJECION m2 962.08 22.00 21,165.76 962.0800 21,165.76 0.0000 -
PERNOS 5/8" X 14" pza 12.00 5.00 60.00 12.0000 60.00 0.0000 -
CRONOGRAMA DE AQUISICIÓN DE MATERIALES
"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I.E. SECUNDARIA MANUEL AREVALO DE SANTIAGO DE CAO, DISTRITO
DE SANTIAGO DE CAO - ASCOPE - LA LIBERTAD"
LUGAR: LA LIBERTAD - ASCOPE - SANTIAGO DE CAO

MES 01 MES 02
Precio
Descripción Und. Cantidad Parcial (S/.) Cantidad Parcial (S/.) Cantidad Parcial (S/.)
(S/.)
PIEDRA CHANCADA DE 1/2" m3 11.99 45.00 539.71 11.9935 539.71 0.0000 -
PIEDRA CHANCADA DE 1/2"-3/4" m3 6.85 45.00 308.14 6.8476 308.14 0.0000 -
PIEDRA CHANCADA DE 3/4" m3 1.29 45.00 58.21 1.2936 58.21 0.0000 -
PINTURA ANTICORROSIVA gln 0.18 60.00 10.80 0.0000 - 0.1800 10.80
PINTURA BASE ANTICORROSIVA gln 35.60 60.00 2,135.82 0.0000 - 35.5970 2,135.82
PINTURA ESMALTE gln 35.60 60.00 2,135.82 0.0000 - 35.5970 2,135.82
PINTURA ESMALTE SUPER SINTETICO gln 0.18 60.00 10.80 0.0000 - 0.1800 10.80
PLANCHA TR4 0.35. COLOR NATURAL m2 962.08 27.00 25,976.16 0.0000 - 962.0800 25,976.16
PLATINA DE ANCLAJE EN BASES und 12.00 85.00 1,020.00 0.0000 - 12.0000 1,020.00
PROTECTOR DE COLUMNA ACOLCHADO DE 1.00 M DE ALTURA 0.0000 12.0000
und 12.00 120.00 1,440.00
E=5CM - 1,440.00
ROLADO CURVO m2 962.08 5.00 4,810.40 0.0000 - 962.0800 4,810.40
SOLDADURA kg 7.20 15.00 108.00 0.0000 - 7.2000 108.00
SOLDADURA CELLOCORD 1/8" kg 269.38 15.00 4,040.74 0.0000 - 269.3824 4,040.74
TABLERO ELECTRICO BLINDADO pza 1.00 40.00 40.00 0.0000 - 1.0000 40.00
TEMPLADORES 5/8" pza 163.55 12.00 1,962.64 0.0000 - 163.5536 1,962.64
TERMINALES DE COBRE PARA CONDUCTOR DE 2.5MM2 TIPO und 4.00 10.00 40.00 0.0000 - 4.0000 40.00
THINNER gln 71.19 13.45 957.56 0.0000 - 71.1939 957.56
TIERRA DE CHACRA m3 3.00 15.00 45.00 0.0000 - 3.0000 45.00
TUBO NEGRO Ø1 1/2", ESPESOR 3mm pza 213.77 80.00 17,101.94 0.0000 - 213.7742 17,101.94
TUBO NEGRO Ø1", ESPESOR 3mm pza 436.78 60.00 26,207.06 0.0000 - 436.7843 26,207.06
TUBO NEGRO Ø3", ESPESOR 3mm pza 240.52 180.00 43,293.60 0.0000 - 240.5200 43,293.60
TUBO NEGRO Ø3/4", ESPESOR 3mm pza 269.38 50.00 13,469.12 0.0000 - 269.3824 13,469.12
TUBO PVC SEL ELECTRICO 25MM m 135.45 5.00 677.25 0.0000 - 135.4500 677.25
TUBO PVC SEL Ø 1" pza 4.00 5.00 20.00 0.0000 - 4.0000 20.00
UNION PVC SEL ELECTRICA 25MM und 48.38 5.00 241.88 0.0000 - 48.3750 241.88
VARILLA DE COBRE DE 5/8" x 2.40m. und 1.00 250.00 250.00 0.0000 - 1.0000 250.00
YESO EN BOLSAS DE 25 KG. BOL 30.03 15.00 450.45 30.0300 450.45 0.0000 -

COSTO DIRECTO S/. 223,166.59 S/. 69,457.54 S/. 153,709.05


CRONOGRAMA DE AQUISICIÓN DE MATERIALES - EQUIPAMIENTO Y MOBILIARIO

Obra “RECUPERACIÓN DEL LOCAL ESCOLAR 2306 SOL NACIENTE CON CÓDIGO LOCAL 791577, DISTRITO DE LA ESPERANZA – TRUJILLO – LA
LIBERTAD”.
Lugar LA ESPERANZA - TRUJILLO - LA LIBERTAD
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
Precio
Descripción Und. Cantidad Parcial (S/.) Cantidad Parcial (S/.) Cantidad Parcial (S/.) Cantidad Parcial (S/.) Cantidad Parcial (S/.) Cantidad Parcial (S/.) Cantidad Parcial (S/.)
(S/.)
COMPUTADORA PC und 1.00 3,220.31 3,220.31 - - - - - - - - 0.60 1,932.19 0.40 1,288.12
COMPUTADORA PORTALIN - LAPTOP und 1.00 3,559.32 3,559.32 - - - - - - - - 0.60 2,135.59 0.40 1,423.73
SILLA GIRATORIA und 1.00 432.20 432.20 - - - - - - - - 0.60 259.32 0.40 172.88
SILLA APILABLE und 27.00 139.83 3,775.41 - - - - - - - - 16.20 2,265.25 10.80 1,510.16
SILLA METAL POLIPROPILENO INICIAL und 56.00 173.73 9,728.88 - - - - - - - - 33.60 5,837.33 22.40 3,891.55
SILLA METAL POLIPROPILENO DOCENTE und 4.00 216.10 864.40 - - - - - - - - 2.40 518.64 1.60 345.76
MESA METAL POLIPROPILENO DOCENTE und 4.00 576.27 2,305.08 - - - - - - - - 2.40 1,383.05 1.60 922.03
MESA METAL POLIPROPILENO INICIAL und 12.00 648.31 7,779.72 - - - - - - - - 7.20 4,667.83 4.80 3,111.89
EXHIBIDOR DE LIBROS und 3.00 847.46 2,542.38 - - - - - - - - 1.80 1,525.43 1.20 1,016.95
CREDENZA und 1.00 1,038.14 1,038.14 - - - - - - - - 0.60 622.88 0.40 415.26
ARCHIVADOR METALICO DE 04 GAVETAS und 1.00 737.29 737.29 - - - - - - - - 0.60 442.37 0.40 294.92
ARMARIO DE DOS PUERTAS (H: 1.05) INICIAL und 3.00 741.53 2,224.59 - - - - - - - - 1.80 1,334.75 1.20 889.84
CASILLEROS INDIVIDUALES (09) (NIVEL INICIAL) und 9.00 572.03 5,148.27 - - - - - - - - 5.40 3,088.96 3.60 2,059.31
MICROONDAS und 1.00 508.47 508.47 - - - - - - - - 0.60 305.08 0.40 203.39
ARMARIO DE METAL und 4.00 1,101.69 4,406.76 - - - - - - - - 2.40 2,644.06 1.60 1,762.70
EXHIBIDOR MOVIL - NIVEL INICIAL und 3.00 559.31 1,677.93 - - - - - - - - 1.80 1,006.76 1.20 671.17
REFRIGERADORA und 1.00 1,694.92 1,694.92 - - - - - - - - 0.60 1,016.95 0.40 677.97
EQUIPO DE SONIDO und 3.00 1,440.68 4,322.04 - - - - - - - - 1.80 2,593.22 1.20 1,728.82
RACK PARA DVD und 3.00 148.31 444.93 - - - - - - - - 1.80 266.96 1.20 177.97
RACK PARA LA TV und 3.00 148.31 444.93 - - - - - - - - 1.80 266.96 1.20 177.97
EQUIPO BLURAY und 3.00 635.59 1,906.77 - - - - - - - - 1.80 1,144.06 1.20 762.71
RACK EQUIPO MULTIMEDIA und 1.00 148.31 148.31 - - - - - - - - 0.60 88.99 0.40 59.32
TELEVISION und 3.00 2,372.88 7,118.64 - - - - - - - - 1.80 4,271.18 1.20 2,847.46
COCINA und 1.00 1,906.78 1,906.78 - - - - - - - - 0.60 1,144.07 0.40 762.71
PARLANTES MULTIMEDIA PARA LAPTOP und 1.00 381.36 381.36 - - - - - - - - 0.60 228.82 0.40 152.54
ECRAN und 1.00 296.61 296.61 - - - - - - - - 0.60 177.97 0.40 118.64
PROYECTOR MULTIMEDIA und 1.00 2,330.51 2,330.51 - - - - - - - - 0.60 1,398.31 0.40 932.20
ESCRITORIO CON MESA DE REUNIONES PARA 1,059.32
und 1.00 1,059.32
DIRECCION - - - - - - - - 0.60 635.59 0.40 423.73

ESTANTE PARA UTILES ESCOLARES (09 6,177.96


DIVISIONES) INICIAL und 9.00 686.44
- - - - - - - - 5.40 3,706.78 3.60 2,471.18
COSTO DIRECTO S/. 78,182.23 - - - - 46,909.35 31,272.88