MUNICIPALIDAD DISTRITAL DE SAYLLA

SAYLLA – CUSCO – CUSCO


SUBGERENCIA DE INFRAESTRUCTURA

ÍNDICE

I. ANTECEDENTES:...................................................................................................................2

1. FICHA TÉCNICA.................................................................................................................2
1.1. NOMBRE DEL PROYECTO:......................................................................................2
1.2. ESTRUCTURA FUNCIONAL DEL PROYECTO.......................................................2
1.3. RESOLUCIONES DE APROBACIÓN........................................................................3
1.4. ESTRUCTURA PRESUPUESTAL:.............................................................................3
2. GASTOS FINANCIEROS DEL PROYECTO:.....................................................................4
2.1 AVANCE FINANCIERO (SEGÚN REPORTE FINANCIERO AL MES DE
DICIEMBRE 09/01/ 2022, A NIVEL DEVENGADO)...........................................................4
3. VALORIZACIÓN FÍSICA DE OBRA (AL 31 DE DICIEMBRE DEL 2022).....................6
II. INFORME TÉCNICO SITUACIONAL DE LA OBRA AL 09/01/2023..................................6

1. DE LA REVISIÓN DEL EXPEDIENTE TÉCNICO............................................................6


2. DE LA REVISIÓN DEL EXPEDIENTE TÉCNICO MODIFICADO..................................7
3. VISITA A OBRA (VIERNES 05/01/2023)...........................................................................8
4. DEL ALMACÉN DE OBRA..............................................................................................10
III. OBSERVACIONES............................................................................................................12

IV. CONCLUSIONES...............................................................................................................14

V. RECOMENDACIONES.........................................................................................................15

VI. PANEL FOTOGRÁFICO...................................................................................................16

1. ANTECEDENTES:

2. FICHA TÉCNICA

3. NOMBRE DEL PROYECTO:


“MEJORAMIENTO DE LA INSTALACIÓN DEPORTIVA EN LA APV MIRADOR, DISTRITO
DE SAYLLA – CUSCO - CUSCO”
IDENTIFICACIÓN EL PROYECTO (CUI) : 2556222

¡Todos juntos por Saylla! P á g i n a 1 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

4. ESTRUCTURA FUNCIONAL DEL PROYECTO


CLASIFICADOR FUNCIONAL
 FUNCIÓN : 21 CULTURA Y DEPORTE.
 DIVISIÓN FUNCIONAL : 046 DEPORTES.
 GRUPO FUNCIONAL : 0102 INFRAESTRUCTURA DEPORTIVA Y
RECREATIVA.
 RESPONSABLE FUNCIONAL : EDUCACIÓN
 FUENTE DE FINANCIAMIENTO : 01 CANON Y SOBRE CANON
 UNIDAD DE GESTIÓN : MUNICIPALIDAD DISTRITAL DE SAYLLA.
 META 2022 : 0061
DE LA UNIDAD EJECUTORA (RESPONSABLES DEL PROYECTO)
SECTOR : Gobiernos locales
NOMBRE : Municipalidad Distrital de Saylla
UNIDAD ORGANICA : Sub Gerencia de Infraestructura
1° RESIDENTE DE OBRA : Ing. Henry Sánchez Villalba (septiembre a diciembre
2022)
2° RESIDENTE DE OBRA (ACTUAL) : Ing. Julio César Mayorga Mayorga (del 05 de enero)
1° INSPECTOR DE OBRA : Ing, Yuri Vladimir Nieves Nuñoncca
2° INSPECTOR DE OBRA : Ing, Víctor Manuel Montesinos Contreras
PARALIZACIÓN DE OBRA : 25 DE DICIEMBRE

UBICACIÓN.

 LOCALIDAD : APV. MIRADOR


 DISTRITO : SAYLLA
 PROVINCIA : CUSCO
 DEPARTAMENTO : CUSCO
 COORDENADAS UTM : 8499400.84 N, 194510.74 E
 ALTITUD : 3526.80 msnm.

5. RESOLUCIONES DE APROBACIÓN

 RESOLUCIÓN DE APROBACIÓN DE EXPEDIENTE TÉCNICO (R.G.M. N° 125-2022-GM-MDS)


FECHA 31/08/2022)
 RESOLUCION DE MODIFICACION N°01 DEL EXPEDIENTE TECNICO ACTUALIZADO
(R.G.M. N° 173-2022-GM-MDS) FECHA 30/11/2022)

6. ESTRUCTURA PRESUPUESTAL:
DEL EXPEDIENTE TÉCNICO APROBADO
Descripción Parcial (S.)
COSTO DIRECTO S/ 480,686.79
GASTOS GENERALES S/ 54,977.46
SUB TOTAL S/ 535,664.25
GASTOS DE SUPERVISIÓN S/ 9,302.28
ELB. EXP. TÉCNICO S/ 9,001.39
GASTOS DE LIQUIDACIÓN DE S/ 8,124.60
OBRA S/ 562,092.52
Aprobado mediante resolución de (R.G.M. N° 125-2022-GM-MDS)
DEL EXPEDIENTE TÉCNICO MODIFICADO N° 01
¡Todos juntos por Saylla! P á g i n a 2 | 17
MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

Descripción Parcial (S.)


COSTO DIRECTO S/ 769,585.47
GASTOS GENERALES S/ 76,183.90
SUB TOTAL S/ 845,769.37
GASTOS DE SUPERVISIÓN S/ 16,397.09
ELB. EXP. TÉCNICO S/ 9,001.39
GASTOS DE LIQUIDACIÓN DE S/ 14,805.28
OBRA S/ 885,973.13
Aprobado mediante resolución de (R.G.M. N° 173-2022-GM-MDS)
PLAZO DE EJECUCIÓN:
Según el Expediente Aprobado ( 90 DIAS )
 FECHA DE INICIO EJECUCION : 05 de septiembre del 2022
 PLAZO DE EJECUCION : 90 dias (03 Meses)
 FECHA DE TERMINO PROGRAMADO : 03 de diciembre del 2022
Ampliación de Plazo N° 01 (28 DIAS)
 FECHA DE INICIO : 04 de diciembre del 2022
 FECHA DE CULMINACION : 31 de diciembre del 2022
 TIEMPO SOLICITADO : 28 dias calendário
 ACTO RESOLUTIVO : R.G.M. N° 173-2022-GM-
MDS)
DEL PRESUPUESTO:
a) DIFERENCIA PIP + PTO. EXP. APROBADO + EXP TECNICO MODIFICADO N° 01

EXPEDIENTE TÉCNICO MAYORES DEDUCTIVOS EXPEDIENTE TÉCNICO MODIFICADO N° 01


PARTIDAS
DESCRIPCIÓN METRADOS VINCULANTES
NUEVAS (+)
(+) (-) % VARIACIÓN
% S/. S/. INCREMENTO
AL EXP TEC
Gastos Generales 11.44% 54,977.46 21,206.44 76,183.90 38.57% S/ 21,206.44
Gastos de Supervisión 1.94% 9,302.28 7,094.81 16,397.09 76.27% S/ 7,094.81
Gastos de Elaboración del Expediente
1.87%
Técnico 9,001.39 9,001.39 0.00% S/ 0.00
Gastos de Liquidación de Obra 1.69% 8,124.60 6,680.68 14,805.28 82.23% S/ 6,680.68
TOTAL = 81,405.72 34,981.93 0.00 0.00 116,387.65 42.97% S/ 34,981.93

7. GASTOS FINANCIEROS DEL PROYECTO:

2.1 AVANCE FINANCIERO (SEGÚN REPORTE FINANCIERO AL MES DE


DICIEMBRE 09/01/ 2022, A NIVEL DEVENGADO)
La asignación presupuestal para el año en curso es de S/ 885,972.00 (ochoscientos ochenta y cinco
con novescientos setenta y dos con 00/100 soles) y a la fecha del 09 de enero se tiene un devengado de
S/ 640,892.33 (seiscientos cuarenta mil ochoscientos noventa y dos con 33/100 soles) según el
Sistema de Seguimiento de Inversiones (SSI), del informe mensual, informe financiero se tiene el
siguiente resumen:
ASIGNACIÓN PRESUPUESTAL

VALOR 2022 GASTOS EFECTUADOS (S/.)


ITEM RUBRO
FINANCIADO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ACUMULADO (%)
1.0 COSTO DIRECTO 769,585.47 S/. - S/. 74,009.53 S/. 97,622.00 S/. 396,617.42 S/. 568,248.95
2.0 GASTOS GENERALES DE OBRA
S /. 76,183.90 S/. - S/. 26,686.70 S/. - S/. 26,472.68 S/. 53,159.38
3.0 GASTOS DE SUPERVISIÓN S /. 16,397.09 S/. - S/. 9,592.00 S/. - S/. 9,892.00 S/. 19,484.00
4.0 GASTOS EXPEDIENTE TÉCNICO
S /. 9,001.39 S/. - S/. - S/. - S/. - S /. -
5.0 GASTOS DE LIQUIDACIÓN S /. 14,805.28 S/. - S/. - S/. - S/. - S /. -
TOTA L INVERSION S / . 8 8 5 , 9 7 3 . 13 S /. - S / . 110 , 2 8 8 . 2 3 S /. 9 7 ,6 2 2 .0 0 S / . 4 3 2 , 9 8 2 . 10 S /. 6 4 0 ,8 9 2 .3 3 72 .34 %
ASIGNACIÓN PRESUPUESTAL
PIM ASIGNACIÓN PTO. DEVENGADO

¡Todos juntos por Saylla! P á g i n a 3 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

PIM -2022 S/. 885,972.00 S/. 640,892.33

¡Todos juntos por Saylla! P á g i n a 4 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

DESAGREGADO DE GASTOS EFECTUADOS


VALOR 2022 GASTOS EFECTUADOS(S/.)
ITEM RUBRO
FINANCIADO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ACUMULADO (%)
S/.
1.0 COSTO DIRECTO S/. - S/.74,009.53 S/.97,622.00 S/.396,617.42
568,248.95
2.6.2.3.2.4 PERSONAL S/.197,646.41 S/.- S/.74,009.53 S/.- S/.115,101.17 S/. 189,110.70 95.68%
2.6.2.3.2.5 BIENES S/.448,387.77 S/.- S/.- S/.97,622.00 S/. 269,476.25 S/. 367,098.25 81.87%
2.6.2.3.2.6 SERVICIOS S/.123,551.29 S/.- S/.- S/.- S/.12,040.00 S/.12,040.00 9.74%
GASTOS S/.
2.0 S/. - S/.26,686.70 S/. - S/.26,472.68
GENERALESDE OBRA 53,159.38
2.6.2.3.2.4 PERSONAL S/. 69,444.40 S/.- S/. 25,169.70 S/.- S/. 25,872.68 S/.51,042.38 73.50%
2.6.2.3.2.5 BIENES S/. 1,889.50 S/.- S/. 1,517.00 S/.- S/. - S/. 1,517.00 80.29%
2.6.2.3.2.6 SERVICIOS S/.4,850.00 S/.- S/.- S/.- S/. 600.00 S/.600.00 12.37%
GASTOS DE S/.
3.0 S/. - S/.9,592.00 S/. - S/. 9,892.00
SUPERVISIÓN 19,484.00
2.6.2.3.2.4 PERSONAL S/.15,372.09 S/.- S/. 9,592.00 S/.- S/.9,892.00 S/.19,484.00 126.75%
2.6.2.3.2.5 BIENES S/. 1,025.00 S/.- S/.- S/.- S/. - S/. - 0.00%
2.6.2.3.2.6 SERVICIOS S/.- S/.- S/.- S/.- S/. - S/. - 0.00%
GASTOSEXPEDIENTE
4.0 S/. - S/. - S/. - S/.- S/. -
TÉCNICO
2.6.2.3.2.4 PERSONAL S/.5,596.39 S/.- S/.- S/.- S/. - S/. - 0.00%
2.6.2.3.2.5 BIENES S/.475.00 S/.- S/.- S/.- S/. - S/. - 0.00%
2.6.2.3.2.6 SERVICIOS S/.2,930.00 S/.- S/.- S/.- S/. - S/. - 0.00%
GASTOS DE
5.0 S/. - S/. - S/. - S/.- S/. -
LIQUIDACIÓN
2.6.2.3.2.4 PERSONAL S/.14,327.28 S/.- S/.- S/.- S/. - S/. - 0.00%
2.6.2.3.2.5 BIENES S/.478.00 S/.- S/.- S/.- S/. - S/. - 0.00%
2.6.2.3.2.6 SERVICIOS S/.- S/.- S/.- S/.- S/. - S/. - 0.00%
TOTAL INVERSION S/. 885,973.13 S/.- S/.110,288.23 S/. 97,622.00 S/. 432,982.10 S/. 640,892.33 72.34%
Según el reporte financiero se observa que se está próximo a concluirse en la específica de PERSONAL correspondiente a costo directo, esto requerirá una modificación
presupuestal así mismo en gastos de supervisión se superó el valor financiado según expediente técnico modificado N° 01.

¡Todos juntos por Saylla! P á g i n a 5 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

8. VALORIZACIÓN FÍSICA DE OBRA (AL 31 DE DICIEMBRE DEL 2022).


El avance Físico reportado al 31 de diciembre del 2022 es:
Se tiene una valorización física de S/ 255,036.21 (doscientos cincuenta y cinco mil treinta y seis con
21/100 soles). Que representa un porcentaje de 33.14% respecto al costo directo de expediente técnico
modificado N° 01

AVANCES
DESCRIPCIÓN PRESUPUESTO SALDO
ACUMULADO
PARTIDAS PROGRAMADAS S/. 769,585.47 S/. 255,036.21 33.14% S/. 514,549.26 66.86%
COSTO DIRECTO S/. 769,585.47 S/. 255,036.21 33.14% S/. 514,549.26 66.86%
GASTOS GENERALES S/. 76,183.90 S/. 53,159.38 69.78% S/. 23,024.52 30.22%
GASTOS DE SUPERVISIÓN S/. 16,397.09 S/. 19,484.00 118.83% S/. -3,086.91 -18.83%
GASTOS DE EXPEDIENTE TÉCNICO S/. 9,001.39 S/. - 0.00% S/. 9,001.39 100.00%
TOTAL "A" S/. 871,167.85 S/. 327,679.59 37.61% S/. 543,488.26 62.39%
GASTOS DE LIQUIDACIÓN S/. 14,805.28 S/. - 0.00% S/. 14,805.28 100.00%
TOTAL "B" S/. 885,973.13 S/. 327,679.59 36.99% S/. 558,293.54 63.01%

9. INFORME TÉCNICO SITUACIONAL DE LA OBRA AL 09/01/2023

1. DE LA REVISIÓN DEL EXPEDIENTE TÉCNICO.


Base legal RESOLUCIÓN DE CONTRALORÍA N° 195-88-CG
De la revisión del expediente técnico según la RESOLUCIÓN DE CONTRALORÍA N° 195-88-CG, debe
contar con lo siguiente:
 Memoria descriptiva.
Si presenta la memoria descriptiva indicando el nombre del proyecto la localización del proyecto la
unidad ejecutora
 Especificaciones técnicas.
Presenta especificaciones técnicas por componentes. Así mismo se tiene falta de precisión en los
materiales a usar o acabados en determinadas partidas.
 Planos.
No se tiene en planos los detalles completos, específicamente en el juego de planos no da detalle sobre el
armado de acero para los servicios higiénicos.
 Metrados.
Presenta planilla de metrados
 Presupuesto base.
Presenta un presupuesto general del proyecto por tres componentes, presenta así costo directo, gastos
generales, gastos de supervisión, gastos de expediente técnico, gastos de liquidación.
 Análisis de costos.
Presenta Acu por componentes. Pero es necesario indicar que siendo el avance físico y gasto presupuestal
no se corresponden en el gasto de mano de obra indicando este un posible bajo rendimiento por parte del
personal que anteriormente laboró en obra, así mismo esto puede ser corroborado en los diferentes
asientos registrados por el anterior residente.
 Cronograma de adquisición de materiales.
No presenta, incumpliendo las disposiciones de la resolución de contraloría.
 Cronograma de ejecución de obra.
Presenta un cronograma físico por componentes.
 Del presupuesto analítico.
El expediente técnico contempla los gastos en diversas específicas de gasto las cuales no corresponden a
las especificas usadas en los gastos ya ejecutados por el anterior residente.

¡Todos juntos por Saylla! P á g i n a 6 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

2. DE LA REVISIÓN DEL EXPEDIENTE TÉCNICO MODIFICADO.


 Memoria descriptiva.
Si presenta la memoria descriptiva indicando el nombre del proyecto la localización del proyecto la
unidad ejecutora así ismo modifica de acuerdo a lo planteado en la misma
 Especificaciones técnicas.
Presenta especificaciones técnicas únicamente de las partidas nuevas mismas que presentan
imprecisiones.
 Planos.
No se tiene en planos los detalles completos, ni de las variaciones planteadas en el modificado
 Metrados.
No presenta planilla de metrados de las modificaciones planteadas por el anterior residente.
 Presupuesto base.
Presenta un presupuesto general del proyecto por tres componentes, presenta así costo directo, gastos
generales, gastos de supervisión, gastos de expediente técnico, gastos de liquidación. Así mismo en su
cuadro comparativo detalla la variación en las diferentes partidas por adicionales, mayores metrados y
partidas nuevas, así como por deductivos vinculantes de obra.
 Análisis de costos.
Presenta Acu por adicionales, mayores metrados y partidas nuevas, así como por deductivos vinculantes.
 Cronograma de adquisición de materiales.
No presenta, incumpliendo las disposiciones de la resolución de contraloría.
 Cronograma de ejecución de obra.
Presenta un cronograma físico por componentes actualizado al plazo de ejecución modificado.
 Del presupuesto analítico.
El expediente técnico contempla los gastos en diversas específicas de gasto las cuales no corresponden a
las especificas usadas en los gastos ya ejecutados por el anterior residente.

3. VISITA A OBRA (VIERNES 05/01/2023)


Esta residencia realiza la verificación de los trabajos realizados, esta visita a obra se realizó en presencia de la
oficina de residencia actual, así como del inspector de obra Ing. Víctor Manuel Montesinos Contreras; sobre lo
cual informo que durante la etapa de ejecución por parte del anterior residente la obra se encuentra con un avance
del 33.14 respecto al costo directo. Así mismo se realizó un gasto de 640,892.33 soles que representan un 72.34%
del presupuesto total aprobado. Cabe indicar que el proyecto paraliza en fecha 25 de diciembre del presente año
por motivos de cierre del periodo fiscal 2022. Cabe indicar que se deja un saldo de almacén valorizado de s/.
157,020.53 soles.
A continuación, detallo el avance físico de la obra la fecha de corte:

ITEMS DESCRIPCION PARTIDA METRADO COSTOS ACUMULADO


PARCIAL
U.M. CANT P.U. METRADO VALORIZ
01 ADECUADA INFRAESTRUCTURA DEPORTIVA 637,767.74
01.01 OBRAS PROVISIONALES 8,236.25
CONSTRUCCION DE RESIDENCIA, ALMACEN Y
01.01.01 m2 55.00 90.12 4,956.60 55.00 4,956.60 100.00
VESTUARIOS
01.01.03 SERVICIOS HIGIENICOS PROVICIONALES m2 2.60 292.99 761.77 2.60 761.77 100.00
01.01.04 CERCO DE ARPILLERA h=2.20 mt m 50.00 17.93 896.50 50.00 896.50 100.00
01.02 TRABAJOS PRELIMINARES 24,731.68
01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 607.50 1.58 959.85 607.50 959.85 100.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y
01.02.02 glb 1.00 1500.00 1,500.00 0.70 1,050.00 70.00
MAQUINARIAS
01.02.03 TRAZO Y REPLANTEO INICIAL. m2 607.50 1.46 886.95 607.50 886.95 100.00
01.02.04 TRAZO Y REPLANTEO DURANTE LA EJECUCIÓN m2 607.50 3.26 1,980.45 607.50 1,980.45 100.00
EXTRACCION DE ESTRUCTURA METALICA
01.02.07 glb 1.00 638.30 638.30 1.00 638.30 100.00
EXISTENTE
DEMOLICION DE ESTRUCTURAS DE CONCRETO
01.02.08 m3 16.58 200.90 3,330.92 16.58 3,330.92 100.00
CICLOPEO EXISTENTE
01.02.09 PICADO DE TRIBUNAS EXISTENTES m2 71.25 186.87 13,314.49 71.25 100.00
13,314.49
01.03 MOVIMIENTO DE TIERRAS
155,117.64

¡Todos juntos por Saylla! P á g i n a 7 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

ITEMS DESCRIPCION PARTIDA METRADO COSTOS ACUMULADO


PARCIAL
U.M. CANT P.U. METRADO VALORIZ
01.03.02 EXCAVACION MANUAL EN TERRENO COMPACTO m3 188.62 22.24 4,194.91 141.28 3,142.07 74.90
NIVELACION Y COMPACTADO DE SUB RAZANTE
01.03.04 m2 78.09 2.99 233.49 7.50 22.43 9.60
CON EQUIPO LIVIANO
01.03.05 ACARREO DE MATERIAL EXCEDENTE (D=30 M) m3 226.35 10.91 2,469.48 205.31 2,239.93 90.70
01.03.06 ELIMINACION DE MATERIAL EXCEDENTE C/MAQ m3 877.65 19.94 17,500.34 36.00 717.84 4.10
EXCAVACION DE TERRENO COMPACTO CON
01.03.07 m3 32.50 13.24 430.30 32.50 430.30 100.00
MAQUINARIA
01.03.08 PERFILADO MANUAL DE TALUD m2 141.10 29.31 4,135.64 141.10 4,135.64 100.00
ACARREO DE MATERIAL PROPIO PARA RELLENO EN
01.03.09 m3 322.36 223.93 72,186.07 120.00 37.23
BUGUI 26,871.60
RELLENO Y COMPACTACION CON MATERIAL
01.03.10 m3 268.63 166.38 44,694.66 92.22 34.33
PROPIO 15,343.56
01.03.11 TRASLADO DE MATERIALES EN OBRA m3 243.26 14.97 3,641.60 45.29 677.99 18.62
01.04 MUROS DE CONTENCION
112,758.01
CONCRETO CICLOPEO PARA CIMENTACIONES
01.04.01 m3 51.41 238.60 12,266.43 46.75 90.94
MEZCLA 1:12 + 30 P.G. 11,154.55
01.04.02 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA m2 261.09 40.13 10,477.54 234.32 9,403.26 89.75
4039.1
01.04.03 ACERO fy=4,200 kg/cm2 GRADO 60 Kg 6.86 27,708.57 3,973.42 98.37
5 27,257.66
01.04.04 CONCRETO F´c=210 kg/cm2 m3 126.96 484.43 61,503.23 126.96 100.00
61,503.23
01.04.05 CURADO DE CONCRETO m2 261.09 2.73 712.78 261.09 712.78 100.00
01.05 CERCO PERIMETRICO 29,028.17
01.05.01 CIMIENTOS 1,544.26
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-
01.05.01.01 m3 5.04 306.40 1,544.26 4.34 1,329.78 86.11
HORMIGÓN 30 PIEDRA
01.05.02 SOBRECIMIENTOS 2,477.60
ENCOFRADO Y DESENCOFRADO NORMAL PARA
01.05.02.01 m2 29.55 27.80 821.49 28.71 798.14 97.16
SOBRECIMIENTO HASTA 0.30m0.30m
01.05.02.02 CONCRETO 1:8+25 PM PARA SOBRECIMIENTO m3 2.52 324.30 817.24 2.52 817.24 100.00
01.05.03 COLUMNETAS 7,294.79
ENCOFRADO Y DESENCOFRADO NORMAL EN
01.05.03.01 m2 27.34 40.13 1,097.15 27.34 1,097.15 100.00
COLUMNETAS
01.05.03.02 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS Kg 431.87 6.87 2,966.95 402.16 2,762.82 93.12
01.05.03.03 CONCRETO EN COLUMNETAS f'c=210 kg/cm2 m3 2.78 484.43 1,346.72 2.23 1,080.28 80.22
01.05.03.04 TARRAJEO DE COLUMNETAS m2 49.50 38.06 1,883.97 18.69 711.34 37.76
01.05.04 VIGAS 8,013.42
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 40.38 65.51 2,645.29 8.16 534.56 20.21
01.05.04.02 ACERO fy=4,200 kg/cm2 GRADO 60 EN VIGAS Kg 427.76 7.48 3,199.64 130.40 975.36 30.48
01.05.04.03 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 2.69 484.53 1,303.39 0.82 397.31 30.48
01.05.04.04 TARRAJEO DE VIGAS m2 22.73 38.06 865.10 12.24 465.85 53.85
01.05.05 ALBAÑILERIA 9,698.10
MURO DE LADRILLO KK 18H (9X13X24) SOGA
01.05.05.02 m2 72.94 132.96 9,698.10 72.94 9,698.10 100.00
ACABADO CARAVISTA
01.06 ESTRUCTURA METALICA Y COBERTURA
307,895.99
01.06.01 COLUMNA METALICA 68,691.43
01.06.01.01 SOLADOS CONCRETO F´C=100 kg/cm2 H=4" m2 34.36 47.66 1,637.60 26.52 1,263.94 77.18
01.06.01.02 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA m2 107.64 40.13 4,319.59 48.84 1,959.95 45.37
2045.6
01.06.01.03 ACERO fy=4,200 kg/cm2 GRADO 60 Kg 6.86 14,032.82 2,045.60 100.00
0 14,032.82
01.06.01.04 CONCRETO F´c=210 kg/cm2 m3 27.12 484.43 13,137.74 21.81 80.42
10,565.42
01.06.01.08 BARRAS DE ACERO LISO DE 1" PARA ANCLAJE und 138.00 84.73 11,692.74 40.00 3,389.20 28.99
02 ADECUADA INFRAESTRUCTURA COMPLEMENTARIA
112,823.81
02.01 CAMPO DEPORTIVO CON GRASS SINTETICO 62,280.51
02.02 GRADERIAS DE CONCRETO 12,813.55
02.02.01 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA m2 23.25 40.13 933.02 10.44 418.96 44.90
02.02.02 CONCRETO F´C=175 KG/CM2 + 30 PG. m3 29.12 371.43 10,816.04 4.38 1,626.86 15.04
02.02.03 CURADO DE CONCRETO m2 41.85 0.91 38.08 20.88 19.00 49.90
REPOSICION DE ESTRUCTURAS DE CONCRETO
02.03 8,017.63
CICLOPEO
02.03.01 CONCRETO F´C=175 KG/CM2 + 30 PG. m3 19.40 413.28 8,017.63 2.19 905.08 11.29
02.04 SERVICIOS HIGIENICOS 19,954.19

¡Todos juntos por Saylla! P á g i n a 8 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

ITEMS DESCRIPCION PARTIDA METRADO COSTOS ACUMULADO


PARCIAL
U.M. CANT P.U. METRADO VALORIZ
02.04.01 CONCRETO SIMPLE 884.02
02.04.01.01 SOLADOS 154.42
02.04.01.01.01 SOLADOS CONCRETO F´C=100 kg/cm2 H=2" m2 3.24 47.66 154.42 2.88 137.26 88.89
02.04.01.02 CIMIENTOS 208.35
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-
02.04.01.02.01 m3 0.68 306.40 208.35 0.68 208.35 100.00
HORMIGÓN 30 PIEDRA
02.04.01.03 SOBRECIMIENTOS 137.70
ENCOFRADO Y DESENCOFRADO NORMAL PARA
02.04.01.03.01 m2 2.62 27.80 72.84 2.62 72.84 100.00
SOBRECIMIENTO HASTA 0.30m
02.04.01.03.02 CONCRETO 1:8+25 PM PARA SOBRECIMIENTO m3 0.20 324.30 64.86 0.20 64.86 100.00
02.04.01.04 FALSO PISO 383.55
02.04.02 CONCRETO ARMADO 7,032.26
02.04.02.01 ZAPATAS 777.95
02.04.02.01.01 CONCRETO PARA ZAPATAS F´c=210 kg/cm2 m3 0.97 489.83 475.14 0.86 421.25 88.66
ADECUADA IMPLEMENTACION DE LA
03 18,993.92
INFRAESTRUCTURA DEPORTIVA
03.02 PLAN DE MANEJO AMBIENTAL 5,595.28
6075.0
03.02.05.01 LIMPIEZA MANUAL DE RESIDUOS SOLIDOS m2 0.27 1,640.25 625.00 168.75 10.29
0
DEPOSITOS PARA SEGREGACION DE RESIDUOS
03.02.05.02 und 2.00 84.24 168.48 1.00 84.24 50.00
SOLIDOS
03.02.05.03 ELIMINACION DE RESIDUOS SOLIDOS m3 5.00 106.91 534.55 1.00 106.91 20.00
03.03 PLAN DE SEGURIDAD 9,758.16
03.03.01 IMPLEMENTOS DE SEGURIDAD DE OBRA glb 1.00 5665.00 5,665.00 0.80 4,532.00 80.00
SEÑALIZACION Y SEGURIDAD PERMANENTE EN
03.03.02 glb 1.00 297.80 297.80 0.35 104.23 35.00
OBRA
CAPACITACION EN SEGURIDAD A PERSONAL DE
03.03.03 und 2.00 402.59 805.18 1.00 402.59 50.00
OBRA
03.03.04 CHARLAS DE PRIMEROS AUXILIOS und 2.00 402.59 805.18 1.00 402.59 50.00
03.03.05 EQUIPO DE PROTECCION ANTE EL COVID-19 glb 1.00 2185.00 2,185.00 0.50 1,092.50 50.00
COMENTARIO DE LA VALORIZACIÓN
Con respecto a la ejecución de los trabajos hasta la fecha, se observa que se vienen realizando el asentado
de muros del cerco perimétrico (fotografía N° 01 al 03), construcción de graderías o tribuna (empedrado
de la base) (fotografía N° 04 al 06)), reposición de estructuras de concreto y construcción de los servicios
higiénicos (estos están a nivel de cimentación) (fotografía N° 03); siendo estas las actividades
principalmente verificadas a priori. Adicionalmente se observaron avances en el tarrajeo primario o
solaqueo de columnas, avances en el relleno posterior al muro de contención siendo que este se encuentra
únicamente pendiente de relleno (fotografías N° 07 al 09), compactado y acabados finales.

4. DEL ALMACÉN DE OBRA


Del almacén del proyecto estuvo a cargo:
 Sra. SADITH LENKA PAZ BENITES identificada con DNI N°: 31043075. La
persona antes indicada se desempeñó como almacenera al 25 de diciembre del
2022.
Durante la visita a obra se realizó también la verificación de materiales por parte de la actual residencia
del proyecto, esta verificación se realiza junto al nuevo encargado de almacén de obra:
1) Sr. PLINIO GARCÍA AMAR identificado con DNI N°: 48302471.
Sobre lo cual informo que se verificaron materiales detallados en el siguiente cuadro resumen:
UNIDAD CANTIDA
ARTÍCULOS NUEVOS
MEDIDA D
EPPS
BOTAS DE JEBE PAR 10
GUANTES DE BADANA CUERO FLEXIBLE PAR 02
GUANTES DE JEBE CALIBRE 35 PAR 03
LENTES POLICARBONATO LUNA OSCURA UND 03
PROTECTOR AUDITIVO TIPO TAPON UND 05
PONCHO IMPERMIABLE CON CAPUCHA UND 13
ACEROS

¡Todos juntos por Saylla! P á g i n a 9 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

FIERRO CORRUGADO STM A615-GRADO 60/NTP341.031


VRLL 28
3/8"
FIERRO CORRUGADO STM A615-GRADO 60/NTP341.031
VRLL 04
1/2"
FIERRO CORRUGADO STM A615-GRADO 60/NTP341.031 3/4 VRLL 22
HERRAMIENTAS MANUALES
PALA TIPO CUCHARA UND 01
COMBA DE 25 lb UND 01
REPUESTO LLANTA DE CARRETILLA CON ARO
UND 06
COMPLETO
FERRETERIA
CLAVO PARA MADERA CON CABEZA DE 3" KLS 16
CLAVO PARA MADERA CON CABEZA DE 4" KLS 13.5
CLAVO PARA MADERA CON CABEZA DE 2" KLS 4.5
CLAVO PARA CALAMINA KLS 10
DISCO DE CORTE DE 7" PARA CONCRETO UND 15
DISCO DE CORTE DE 7" PARA MADERA UND 07
HOJA DE SIERRA N°18 BIMETALICA UND 03
CINTA SEÑALIZACION 200 m AMARILLO RLL 01
MALLA PLASTICA NARANJA 80 GR RLL 01
OCRE ROJO KLS 03
REGLA DE ALUMINIO ALBAÑIL DE 1 1/2" X 0.3" X 6M
UND 01
ESPESOR 2 MM
YESO 08
MATERIAL DE BIO SEGURIDAD
JABON LIQUIDO ANTIVACTERIAL x 1L UND 04
LEGIA (HIPOCLORITO DE SODIO) AL 8% X4 UND 06
ALCOHOL LIQUIDO DE 70% X1L UND 06
PAPEL TOALLA UND 05
COMBUSTIBLE
GASOLINA DE 90 OCT GLN 50
PETROLEO DIESEL B-5 S-5 GLN 82.5
LADRILLOS
LADRILLO KK 18 HUECOS 9x13x24Cm UND 1025
LADRILLO KK 18 HUECOS 9x12x24Cm UND 500
GRAS SINTETICO
CÉSPED SINTÉTICO M2 520
PERFILES METALICOS Y MALLAS
PERFIL METALICO PARA ARRIOSTER DE
UND 105
50X50X3MMX6M
PERFIL METALICO PARA CORREA DE 50X75X3MMX6M UND 205
PERFIL METALICO ANGULAR DE 1 1/2 X 1 1/2 X 3/16 X
UND 29
6MM
MALLA OLIMPICA 2X2X20M NRO 10 RLL 03
PERFIL DE PLATINA DE 1/2 X 1/8 X6M UND 40
PERFIL METALICO DE 100X100X4.5MM UND 02
PERFIL METALICO DE 150X150X6MM UND 10
AGREGADOS
ARENA FINA M3 05
ARENA GRUESA M3 14.61
CONFITILLO, MATERIAL LIMPIO DE PARTICULAS DE
M3 3.12
LEZNABLE
HORMIGON DEL RIO M3 13.37
PIEDRA CHANCADA DE 1/2" M3 20.32
PIEDRA GRANDE 6 A 8" M3 5.89
FERRETIA (PRESTAMO)
ALAMBRE NEGRO N16 KLS 11

¡Todos juntos por Saylla! P á g i n a 10 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

5. OBSERVACIONES
 Se realizó la verificación del terreno y se tiene disponibilidad del mismo.
 La ubicación del proyecto no permite acceso vehicular directo por medio de vía pavimentada siendo el
único acceso vehicular por una trocha carrozable misma que implica una demora aproximada de 15
minutos en camioneta desde la carretera Cusco – Paucartambo (carretera 3S)
 Se verifica que no se realizó el estudio arqueológico al inicio del proyecto siendo este considerado en
expediente técnico.
 Con respecto a la ejecución de los trabajos hasta la fecha, se vienen realizando el asentado de muros del
cerco perimétrico, construcción de graderías o tribuna (empedrado de la base), reposición de estructuras
de concreto y construcción de los servicios higiénicos (estos están a nivel de cimentación); siendo estas
las actividades principalmente verificadas a priori. Adicionalmente se observaron avances en el tarrajeo
primario o solaqueo de columnas, avances en el relleno posterior al muro de contención siendo que este
se encuentra únicamente pendiente de relleno, compactado y acabados finales.
 Así mismo se encontraron instalaciones eléctricas provisionales y la obra cercada con arpillera blanca
misma que corresponde a una partida ejecutada.
 Se encuentra lo almacenado en un ambiente cerrado y por otra parte con materiales expuestos a diversos
factores ambientales los cuales podrían verse afectados de no resguárdalos debidamente y dejarlos a la
intemperie expuestos a los diversos fenómenos meteorológicos propios de la zona.
 Se puede apreciar que el valor financiado según expediente técnico modificado en PERSONAL
correspondiente a Costo directo está próximo a llegar al 100% y en el Gastos de supervisión el monto
gastado supera el valor financiado.
 Del acervo documentario del proyecto se tiene el siguiente detalle:
ÍTE PRESENTA
DESCRIPCIÓN OBSERVACIONES
M SÍ NO
1 INFORME DE CORTE OBRA
1.1 Memoria descriptiva actualizada X Se mantiene del ultimo modificado
1.2 Especificaciones Técnicas Finales X Aún no se alcanzan metas al 100%
2 ACTAS
2.1 Acta de entrega de terreno X En cuaderno de obra
2.2 Acta de inicio de obra X En cuaderno de obra
2.3 Acta de paralización X Se encuetre en e informe mensual
2.4 Acta de Reinicio x No se reinició
3 RESOLUCIONES
3.1 Resolución de aprobación del Expediente Técnico X R.G.M. N° 125-2022-GM-MDS (en el expediente
3.2 Resoluciones de modificaciones al expediente técnico X R.G.M. N° 173-2022-GM-MDS (en el expediente)
3.3 Resolución de Transferencia de materiales X No se tienen materiales en transferencia
4 EJECUCIÓN FÍSICA
4.1 Resumen de Metrados
Metrado de Partidas del Expediente Técnico ultimo
4.1.1 X Del informe mensual Diciembre 2022
aprobado
4.1.2 Metrado de adiconales X Del informe mensual Diciembre 2022
4.2 Valorización Física Final a la fecha del corte Al 25 de diciembre del 2022
4.2.1 Según Presupuesto Aprobado X Del informe mensual Diciembre 2022
4.2.2 Valorización adicionales
4.3 Hojas de Tareo de Personal del año correspondiente X Último mes (Diciembre 2022)
5 GESTIÓN FINANCIERA
5.1 Manifiesto Total de Gastos de la Obra X Periodo fiscal 2022
Manifiesto Total de Gastos ordenado según
5.2 X Periodo fiscal 2022
específica de gastos

¡Todos juntos por Saylla! P á g i n a 11 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

ÍTE PRESENTA
DESCRIPCIÓN OBSERVACIONES
M SÍ NO
6 CONTROL DE ALMACÉN DE OBRA
Cuadro de Movimientos Diario de Almacén (ingresos
6.1 X Del informe mensual Diciembre 2022
- egresos por material)
6.2 Cuadro Resumen de Materiales (ingreso - utilizado) X Del informe mensual Diciembre 2022
6.3 Saldo Valorizado de Materiales Sobrantes X Del informe mensual Diciembre 2022
Acta de devolución de saldo de materiales y No corresponde, aún no se finaliza la etapa de
6.4 X
Herramientas a almacén y/o copia del NEA ejecución
Acta de Entrega de Bienes y/o Enseres (previa No se encontró en el acervo documentario del
6.5 X
autorización de patrimonio) anterior residente.
6.6 Equipos e implementos adquiridos para la obra X No corresponde
6.7 Partes diario de maquinaria X Copia única en informe mensual correspondiente
6.8 Notas de entrada y salida de almacén X Copia única en informe mensual correspondiente
7 CONTROL DE CALIDAD
7.1 Diseños de mezcla X Copia única en archivador de conformidades
8 PANEL FOTOGRÁFICA
8.1 Fotografías del proceso de ejecución de obra X De diciembre 2022
9 PLANOS
9.1 Planos de Ubicación y Localización x Copia única en expediente técnico
10 ANEXOS
01 cuaderno de solo hoja original
01 cuaderno solo original lleno hasta el folio 01-51
10.1 Cuaderno de obra legalizado Original x
y del folio 52 al 100 en blanco incluye sus tres
copias autopiativas

6. CONCLUSIONES
 Con respecto al acervo documentario faltan presentar algunos archivos que son subsanables.
 Se realizó los requerimientos de agregados, cemento, maderamen, fierros, Epp, etc.
 Con respecto a las observaciones realizadas adjunto fotografías.
 Con respecto al acceso, se observa que debido a la ubicación de la obra se requerirá volver a evaluar las
partidas de flete terrestre, así como de traslado de materiales.
 Se iniciará la ejecución de los trabajos una vez que se encuentren listos los materiales necesarios y el
personal de obra disponible.
 El equipo técnico realiza la revisión de la documentación en especial los planos para realizar una buena
compatibilidad debido a la cantidad de metas por ejecutar.
 De los metrados reportados por el anterior residente en el informe mensual se verifican los trabajos
ejecutados, siendo así esta residencia continuará con la ejecución del proyecto.
 El presupuesto de mano de obra según expediente técnico es muy bajo para cumplir con las metas del
expediente técnico.
 Según el reporte financiero se observa que se está próximo a concluirse en la específica de PERSONAL
correspondiente a costo directo, esto requerirá una modificación presupuestal así mismo en gastos de
supervisión se superó el valor financiado según expediente técnico modificado N° 01
 El expediente técnico no considera camioneta para movilización de personal técnico y obrero.
 No presentan compatibilidad de proyecto con el terreno.
 Las específicas de gasto no corresponden entre las usadas con las planteadas por el proyectista

¡Todos juntos por Saylla! P á g i n a 12 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

7. RECOMENDACIONES
• Se apruebe una futura ampliación de plazo y modificación presupuestal debido a los rendimientos
considerados en el expediente, debido a la actualización de costos de esta manera alcanzar las metas
propuestas para este proyecto. Así mismo se recomienda actualizar las específicas de gasto del expediente
técnico a las realmente usadas.
• Así mismo tomar en cuenta las observaciones para una futura aprobación de mayores metrados.
• Se aprueba una ampliación presupuestal para mano de obra.
• Se adquiera aditivos para continuar con los trabajos de obra.
• Se debe adquirir útiles de escritorio para continuar con los trabajos administrativos.

Atentamente.

8. PANEL FOTOGRÁFICO
Fotografía N° 01: estado cerco perimétrico lateral derecho.

Fotografía N° 02: cerco perimétrico puerta secundaria interior

Fotografía N° 03: estado entrada principal desde el interior

¡Todos juntos por Saylla! P á g i n a 13 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

Fotografía N° 04: estado muro de contención posterior

Fotografía N° 05: estado muro de contención posterior

Fotografía N° 06: estado enrocado tribunas posteriores

¡Todos juntos por Saylla! P á g i n a 14 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

Fotografía N° 07 y 08: pernos de anclaje en muro de contención.

¡Todos juntos por Saylla! P á g i n a 15 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

Fotografía N° 09: vista panorámica muro de contención

Fotografía N° 10: almacenamiento grass sintético y agregados.

Fotografía N° 11: materiales almacenados dentro de obra.

Fotografía N° 12: material excedente/desmonte para eliminación.

¡Todos juntos por Saylla! P á g i n a 16 | 17


MUNICIPALIDAD DISTRITAL DE SAYLLA
SAYLLA – CUSCO – CUSCO
SUBGERENCIA DE INFRAESTRUCTURA

Fotografía N° 13: estado servicios higiénicos.

Fotografía N° 14: sobre cimientos en servicios higiénicos.

¡Todos juntos por Saylla! P á g i n a 17 | 17