Está en la página 1de 2

FORMATO 01 INVERSIONES EL PINO

GESTION DE PROYECTOS Ing. Jhon Huari C.


18/09/2023
PP- OC RESERVORIO ELEVADO 1300m3 OC RESERVORIO
Presupuesto
Presupuesto PP- OC RESERVORIO ELEVADO 1300m3
Cliente INVERSIONES EL PINO
Lugar PRADERAS - LURIN - LIMA
Item Descripción Und. Metrado Precio S/. Mano de Obra Material Equipo Subcontratos Parcial S/.
01 RESERVORIO ELEVADO 1300M3 0.00 1,127,663.15 0.00 814,002.17 1,941,240.32
01.01 TRABAJOS PROVISIONALES 0.00 491.50 0.00 5,716.80 6,208.30
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA (oficina, almacen y comedor) glb 1.00 3,000.00 3,000.00 3,000.00
01.01.02 LIMPIEZA MANUAL DEL TERRENO m2 452.76 0.28 128.36 128.36
01.01.03 TRAZO Y REPLANTEO EN TERRENO INICIAL m2 452.76 2.63 1,188.50 1,188.50
01.01.04 TRAZO Y REPLANTEO EN TERRENO FINAL m2 452.76 2.63 1,188.50 1,188.50
01.01.05 CERCO DE MALLA RASCHEL- POSTES DE MADERA H=2m m 85.33 8.24 491.50 211.45 702.95
01.02 MOVIMIENTO DE TIERRAS 0.00 2,921.60 0.00 59,192.99 62,114.59
01.02.01 EXCAVACION MASIVA TERRENO ARENOSO CON MAQUINARIA m3 1,364.43 17.64 24,068.55 24,068.55
01.02.02 REFINE Y NIVELACION m2 452.76 4.97 2,248.63 2,248.63
01.02.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 255.83 33.08 8,461.51 8,461.51
01.02.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO - AFIRMADO m3 131.93 49.71 2,921.60 3,636.33 6,557.93
01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 1,108.60 18.74 20,777.97 20,777.97
01.03 CONCRETO SIMPLE 0.00 21,440.37 0.00 2,601.53 24,041.90
01.03.01 CONCRETO FC´= 100KG/CM2 PARA SOLADO E=10CM m3 29.26 234.10 6,810.05 38.70 6,848.75
01.03.02 CONCRETO FC´= 175KG/CM2 PARA PISO DE CONCRETO E=15CM m3 14.94 412.91 4,323.16 1,844.40 6,167.56
01.03.03 ACERO ESTRUCTURAL FY=4200 kg/cm2 - PARA PISO kg 228.87 5.67 995.48 302.80 1,298.28
01.03.04 VEREDA RIGIDA CONCRETO FC´=140 KG/CM2 m2 37.70 258.03 9,311.68 415.63 9,727.31
ESTRUCTURAS
01.04 CONCRETO ARMADO 0.00 971,253.15 0.00 424,666.36 1,395,919.51
01.04.01 LOSA DE CIMENTACION 0.00 248,381.67 0.00 61,512.67 309,894.34
01.04.01.01 CONCRETO PREMEZCLADO F'C=280 kg/cm2 m3 468.08 374.43 149,459.46 25,803.17 175,262.63
01.04.01.02 ENCOFRADO Y DESENCOFRADO m2 97.01 55.13 5,347.81 5,347.81
01.04.01.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 22,949.13 5.63 98,922.21 30,361.70 129,283.91
01.04.02 VIGA DE CIMENTACION Y PASARELLA 0.00 45,953.17 0.00 19,483.30 65,436.46
01.04.02.01 CONCRETO PREMEZCLADO m3 85.42 374.43 27,275.48 4,708.93 31,984.41
01.04.02.02 ENCOFRADO Y DESENCOFRADO m2 164.95 55.13 9,093.12 9,093.12
01.04.02.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 4,294.21 5.67 18,677.68 5,681.24 24,358.93
01.04.03 FUSTE CIRCULAR 0.00 306,014.55 0.00 173,425.49 479,440.03
01.04.03.01 HASTA 5 METROS
01.04.03.01.01 CONCRETO PREMEZCALDO F`C=280 KG/CM2 - CEMENTO TIPO V m3 54.90 374.43 17,529.57 3,026.36 20,555.93
01.04.03.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 364.40 55.13 20,087.55 20,087.55
01.04.03.01.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 13,250.07 8.67 97,282.00 17,529.84 114,811.83
01.04.03.02 5 A 10 METROS
01.04.03.02.01 CONCRETO PREMEZCLADO F`C=280 kg/cm2 - CEMENTO TIPO I m3 54.90 379.94 17,529.57 3,329.00 20,858.57
01.04.03.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 364.40 60.64 22,096.31 22,096.31
01.04.03.02.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 3,411.02 8.67 25,043.69 4,512.78 29,556.47
01.04.03.03 10 A 15 METROS 0.00
01.04.03.03.01 CONCRETO PREMEZCALDO F`C=280 KG/CM2 - CEMENTO TIPO V m3 54.90 379.94 17,529.57 3,329.00 20,858.57
01.04.03.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 364.40 66.15 24,105.06 24,105.06
01.04.03.03.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 6,134.78 8.67 45,041.54 8,116.31 53,157.85
01.04.03.04 15 A 20 METROS
01.04.03.04.01 CONCRETO PREMEZCLADO F`C=280 KG/CM2 - CEMENTO TIPO I m3 54.90 385.45 17,529.57 3,631.64 21,161.21
01.04.03.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 364.40 66.15 24,105.06 24,105.06
01.04.03.04.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 4,209.76 8.67 30,908.03 5,569.51 36,477.54
01.04.03.05 20 A 25.10 METROS
01.04.03.05.01 CONCRETO PREMEZCLADO F`C=280 KG/CM2 - CEMENTO TIPO I m3 56.00 390.45 17,880.16 3,984.26 21,864.42
01.04.03.05.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 371.69 71.15 26,445.60 26,445.60
01.04.03.05.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 2,688.76 8.67 19,740.85 3,557.22 23,298.07
01.04.04 VIGA A,B,C,E 0.00 49,957.40 0.00 24,581.49 74,538.89
01.04.04.01 CONCRETO PREMEZCLADO F`C=280 KG/CM2 - CEMENTO TIPO I m3 50.59 379.94 16,154.09 3,067.79 19,221.88
01.04.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 225.97 68.25 15,422.48 15,422.48
01.04.04.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 4,604.10 8.67 33,803.31 6,091.23 39,894.53
01.04.05 CASQUETE ESFERICO DE FONDO DE CUBA 0.00 57,160.05 0.00 19,440.98 76,601.03
01.04.05.01 CONCRETO PREMEZCLADO F´C=280 KG/CM2 m3 30.77 379.94 9,823.96 1,865.64 11,689.61
01.04.05.02 ENCOFRADO Y DESENCOFRADO m2 123.07 73.50 9,045.55 9,045.55
01.04.05.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 6,447.30 8.67 47,336.09 8,529.78 55,865.87
01.04.06 CASQUETE TRONCO CONICO 0.00 119,354.04 0.00 34,550.69 153,904.73
01.04.06.01 CONCRETO PREMEZCLADO F`C=280 KG/CM2-CEMENTO TIPO I m3 67.07 382.30 21,416.91 4,225.70 25,642.61
01.04.06.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 134.15 94.50 12,677.10 12,677.10
01.04.06.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 13339.30 8.67 97,937.13 17,647.89 115,585.02
01.04.07 PARED DE CUBA 0.00 105,997.04 0.00 30,330.30 136,327.33
01.04.07.01 CONCRETO PREMEZCLADO F`C=280 KG/CM2 - CEMENTO TIPO I m3 20.36 382.30 6,502.25 1,282.94 7,785.19
01.04.07.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 162.91 68.25 11,118.79 11,118.79
01.04.07.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 13551.46 8.67 99,494.79 17,928.58 117,423.36
01.04.08 CASQUETE ESFERICO SUPERIOR DE CUBA - CUPULA SUPERIOR 0.00 21,802.14 0.00 21,200.23 43,002.37
01.04.08.01 CONCRETO PREMEZCLADO F`C=280 KG/CM2 - CEMENTO TIPO I m3 21.07 379.94 6,727.29 1,277.56 8,004.85
01.04.08.02 ENCOFRADO Y DESENCOFRADO m2 234.10 73.50 17,206.24 17,206.24
01.04.08.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 2053.23 8.67 15,074.85 2,716.43 17,791.28
01.04.09 CHIMENEA 0.00 7,465.68 0.00 5,779.84 13,245.52
01.04.09.01 CONCRETO PREMEZCLADO F`C=280 KG/CM2 - CEMENTO TIPO I m3 6.67 379.94 2,130.53 404.60 2,535.13
01.04.09.02 ENCOGFRADO Y DESENCOFRADO CARAVISTA m2 66.73 66.15 4,413.86 4,413.86
01.04.09.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 726.66 8.67 5,335.15 961.37 6,296.52
01.04.11 ARTESA 0.00 332.60 0.00 234.23 566.83
01.04.11.01 CONCRETO PREMEZCLADO F`C=280 KG/CM2 m3 0.48 442.78 153.42 59.33 212.76
01.04.11.02 ENCOFRADO Y DESENCOFRADO m2 1.99 71.66 142.61 142.61
01.04.11.03 ACERO ESTRUCTURAL FY=4200 KG/cm2 kg 24.40 8.67 179.18 32.29 211.47
01.04.12 OTROS 0.00 8,834.82 0.00 34,127.15 42,961.97
01.04.12.01 CAJA DE REBOSE glb 1 3,307.50 3,307.50 3,307.50
01.04.12.02 JUNTA WATER STOP ml 202.64 26.66 4,508.38 893.65 5,402.03
01.04.12.03 CURADO DE CONCRETO SUPERFICIAL m2 2943.16 2.79 4,326.44 3,893.80 8,220.24
01.04.12.04 IZAJE DE ACERO kg 70440.83 0.22 15,532.20 15,532.20
APUNTALAMIENTO DE ENCOFRADO (TRONCO CONICO, CASQUETE ESFERICO INFERIOR Y
glb 1 10,500.00
01.04.12.05 CUPULA SUPERIOR) 10,500.00 10,500.00
ARQUITECTURA
01.05 REVOQUES Y ENLUCIDOS 0.00 102,280.91 0.00 53,921.86 156,202.77
01.05.01 TRATAMIENTO INTERIOR DE JUNTAS EN MURO DE CUBA ml 189.5637 18.74 3,552.90 3,552.90
01.05.02 TARRAJEO CON IMPERMEABILIZANTE p/ LOSA FONDO CUBA m2 323.94 27.56 8,928.68 8,928.68
APLICACIÓN DE 1RA. CAPA ADITIVO IMPERMIABILIZANTE T/ CEMENTICO P/ ESTRUCTURA
01.05.03
HID. CONCENTRADO (3X1 AGUA) m2 558.04 110.94 50,045.15 11,865.36 61,910.51
APLICACIÓN DE 2DA. CAPA ADITIVO IMPERMIABILIZANTE T/ CEMENTICO P/ ESTRUCTURA
01.05.04
HID. CONCENTRADO (5X2 AGUA) m2 558.04 110.94 50,045.15 11,865.36 61,910.51
01.05.05 SOLAQUEO DE MURO INTERIOR Y EXTERIOR m2 2,007.89 9.91 2,190.61 17,709.57 19,900.18
01.06 PINTURA 0.00 24,499.16 0.00 39,264.10 63,763.27
01.06.01 PINTADO EXTER. RESERVORIO ELAV. C/LATEX LAVABLE FUSTE HASTA 5.00 M m2 364.40 27.29 3,917.30 6,026.27 9,943.57
01.06.02 PINTADO EXTER. RESERVORIO ELAV. C/LATEX LAVABLE FUSTE 5-10 S/NTN m2 364.40 27.29 3,917.30 6,026.27 9,943.57
01.06.03 PINTADO EXTER. RESERVORIO ELAV. C/LATEX LAVABLE FUSTE 10-15.00 S/NTN m2 364.40 28.39 3,917.30 6,428.02 10,345.32
01.06.04 PINTADO EXTER. RESERVORIO ELAV. C/LATEX LAVABLE FUSTE 15-20.00 S/NTN m2 364.40 28.39 3,917.30 6,428.02 10,345.32
01.06.05 PINTADO EXTER. RESERVORIO ELAV. C/LATEX LAVABLE FUSTE 20-25.10.00 S/NTN m2 371.69 28.39 3,995.65 6,556.58 10,552.22
01.06.06 PINTADOEXTERIOR PARED TRONCO CONICO m2 134.15 27.39 1,442.10 2,232.58 3,674.68
01.06.07 PINTADO EXTERIOR PARED CILINDRICA (EXTERIOR DE LA CUBA) m2 81.46 28.39 875.66 1,436.89 2,312.54
01.06.08 PINTADO EXTERIOR DE LOSA TECHO (CUPULA) m2 234.10 28.39 2,516.56 4,129.50 6,646.06
01.07 VARIOS 0.00 4,776.45 0.00 9,514.05 14,290.50
01.07.01 BLOCK DE VIDRIO DE 8"X8"X3" und 72 91.25 4,680.00 1,890.00 6,570.00
01.07.02 PUERTA METALICA DE INGRESO m2 2.098 315.00 660.87 660.87
01.07.03 ESCALERA TIPO MARINERO EN FUSTE A=50 CM ml 22.3 136.50 3,043.95 3,043.95
01.07.04 BARANDA METALICA EN PASARELA ml 23 94.50 2,173.50 2,173.50
01.07.05 ESCALERA EN RESERVORIO A 45 CM ml 20.51 63.00 1,292.13 1,292.13
01.07.06 TAPAS DE REBOSE und 2 126.00 252.00 252.00
01.07.07 BARANDA EN TECHO DE CUPULA und 1 52.50 52.50 52.50
01.07.08 RELLENO DE JUNTAS EN VEREDA- PISO INTERIOR ml 35.499997 6.92 96.45 149.10 245.55
INSTALACIÓN HIDRAULICA 0.00 0.00 0.00 200,000.00 200,000.00

01.08.01 glb 1 200,000.00 200,000.00 200,000.00


SUMINISTRO E IINSTALACIÓN HIDRAULICA- ACCESORIOS- VALVULAS- TEE- UNION- BRIDAS
01.09 PRUEBAS DE CALIDAD 0.00 0.00 0.00 19,124.48 18,699.48
01.09.01 PRUEBAS DE CALIDAD DE CONCRETO (PRUEBA A LA COMPRESIÓN) und 21 25.00 525.00 525.00
01.09.02 PRUEBA HIDRÁULICA CON EMPLEO DE LÍNEA DE INGRESO m3 1300 4.00 5,200.00 5,200.00
01.09.03 EVACUACIÓN DE AGUA DE PRUEBA CON EMPLEO DE LÍNEA DE SALIDA m3 1300 1.50 1,950.00 1,950.00
01.09.04 LIMPIEZA Y DESINFECCIÓN DE RESERVORIO ELEVADO m2 360.64 7.00 2,524.48 2,524.48
01.09.05 CUOTA SINDICAL glb 1 8,500.00 8,925.00 8,500.00

COSTO DIRECTO 0.00 1,127,663.15 0.00 814,002.17 1,941,665.32


GASTOS GENERALES 31,400.00 2,950.00 0.00 2,400.00 36,750.00
SUB TOTAL 31,400.00 1,130,613.15 0.00 816,402.17 1,978,415.32
IGV 203,510.37 0.00 146,952.39 350,462.76
TOTAL 31,400.00 1,334,123.51 0.00 963,354.56 2,328,878.07

MO MAT SERV PARCIAL


CD S/ 0.00 S/ 1,127,663.15 S/ 814,002.17 S/ 1,941,665.32
SUB TOTAL S/ 0.00 S/ 1,127,663.15 S/ 814,002.17 S/ 1,941,665.32
IGV S/ 202,979.37 S/ 146,520.39 S/ 349,499.76
TOTAL S/ 0.00 S/ 1,330,642.51 S/ 960,522.56 S/ 2,291,165.07

También podría gustarte