CREACION DEL SERVICIO DE TRANSITABILIDAD EN EL AA.HH. 14 DE FEBRERO DEL DISTRITO DE NUEVO CHIMBOTE - PROVINCIA DE SANTA -
PROYECTO:
DEPARTAMENTO DE ANCASH
05 VEREDAS DE CONCRETO
05.01 OBRAS PRELIMINARES
Mz - A
AREA 01 1.00 54.08 54.08
AREA 02 1.00 196.47 196.47
AREA 03 1.00 63.37 63.37
AREA 04 1.00 134.75 134.75
RAMPA BORDE DE MARTILLO 1.00 5.34 5.34
RAMPA BORDE DE MARTILLO 1.00 6.69 6.69
Mz - B
AREA 05 1.00 45.08 45.08
AREA 06 1.00 84.91 84.91
AREA 07 1.00 64.37 64.37
AREA 08 1.00 46.37 46.37
Mz - C
AREA 09 1.00 64.38 64.38
AREA 10 1.00 12.96 12.96
AREA 11 1.00 64.42 64.42
AREA 12 1.00 14.27 14.27
Mz - D
AREA 13 1.00 45.28 45.28
AREA 14 1.00 64.28 64.28
AREA 15 1.00 81.95 81.95
AREA 16 1.00 46.15 46.15
Mz - E
AREA 17 1.00 133.82 133.82
AREA 18 1.00 62.00 62.00
AREA 19 1.00 40.84 40.84
AREA 20 1.00 139.01 139.01
Mz - F
AREA 21 1.00 139.06 139.06
AREA 22 1.00 43.00 43.00
AREA 23 1.00 138.38 138.38
AREA 24 1.00 17.80 17.80
AREA 25 1.00 16.39 16.39
AREA 26 1.00 24.15 24.15
AREA DE MARTILLOS
Mz - A
MARTILLO M1 1.00 27.97 27.97
MARTILLO M2 1.00 29.45 29.45
MARTILLO M3 1.00 31.66 31.66
MARTILLO M4 1.00 25.48 25.48
Mz - B
MARTILLO M5 1.00 22.96 22.96
MARTILLO M6 1.00 9.54 9.54
MARTILLO M7 1.00 6.68 6.68
MARTILLO M8 1.00 21.03 21.03
Mz - C
MARTILLO M9 1.00 9.53 9.53
MARTILLO M10 1.00 9.51 9.51
MARTILLO M11 1.00 6.84 6.84
MARTILLO M12 1.00 6.67 6.67
Mz - D
MARTILLO M13 1.00 9.03 9.03
MARTILLO M14 1.00 34.05 34.05
MARTILLO M15 1.00 31.10 31.10
MARTILLO M16 1.00 7.76 7.76
Mz - E
MARTILLO M17 1.00 24.27 24.27
MARTILLO M18 1.00 20.19 20.19
MARTILLO M19 1.00 33.83 33.83
MARTILLO M20 1.00 26.12 26.12
Mz - F
MARTILLO M21 1.00 18.86 18.86
MARTILLO M22 1.00 20.36 20.36
MARTILLO M23 1.00 22.78 22.78
MARTILLO M24 1.00 18.44 18.44
AREA DE MARTILLOS
Mz - A
MARTILLO M1 1.00 27.97 27.97
MARTILLO M2 1.00 29.45 29.45
MARTILLO M3 1.00 31.66 31.66
MARTILLO M4 1.00 25.48 25.48
Mz - B
MARTILLO M5 1.00 22.96 22.96
MARTILLO M6 1.00 9.54 9.54
MARTILLO M7 1.00 6.68 6.68
MARTILLO M8 1.00 21.03 21.03
Mz - C
MARTILLO M9 1.00 9.53 9.53
MARTILLO M10 1.00 9.51 9.51
MARTILLO M11 1.00 6.84 6.84
MARTILLO M12 1.00 6.67 6.67
Mz - D
MARTILLO M13 1.00 9.03 9.03
MARTILLO M14 1.00 34.05 34.05
MARTILLO M15 1.00 31.10 31.10
MARTILLO M16 1.00 7.76 7.76
Mz - E
MARTILLO M17 1.00 24.27 24.27
MARTILLO M18 1.00 20.19 20.19
MARTILLO M19 1.00 33.83 33.83
MARTILLO M20 1.00 26.12 26.12
Mz - F
MARTILLO M21 1.00 18.86 18.86
MARTILLO M22 1.00 20.36 20.36
MARTILLO M23 1.00 22.78 22.78
MARTILLO M24 1.00 18.44 18.44
AREA DE MARTILLOS
Mz - A
MARTILLO M1 1.00 27.97 0.10 2.80
MARTILLO M2 1.00 29.45 0.10 2.95
MARTILLO M3 1.00 31.66 0.10 3.17
MARTILLO M4 1.00 25.48 0.10 2.55
Mz - B
MARTILLO M5 1.00 22.96 0.10 2.30
MARTILLO M6 1.00 9.54 0.10 0.95
MARTILLO M7 1.00 6.68 0.10 0.67
MARTILLO M8 1.00 21.03 0.10 2.10
Mz - C
MARTILLO M9 1.00 9.53 0.10 0.95
MARTILLO M10 1.00 9.51 0.10 0.95
MARTILLO M11 1.00 6.84 0.10 0.68
MARTILLO M12 1.00 6.67 0.10 0.67
Mz - D
MARTILLO M13 1.00 9.03 0.10 0.90
MARTILLO M14 1.00 34.05 0.10 3.40
MARTILLO M15 1.00 31.10 0.10 3.11
MARTILLO M16 1.00 7.76 0.10 0.78
Mz - E
MARTILLO M17 1.00 24.27 0.10 2.43
MARTILLO M18 1.00 20.19 0.10 2.02
MARTILLO M19 1.00 33.83 0.10 3.38
MARTILLO M20 1.00 26.12 0.10 2.61
Mz - F
MARTILLO M21 1.00 18.86 0.10 1.89
MARTILLO M22 1.00 20.36 0.10 2.04
MARTILLO M23 1.00 22.78 0.10 2.28
MARTILLO M24 1.00 18.44 0.10 1.84
AREA
Mz - A
TRANSV.
1.00 326.59 0.036 11.76
Mz - B
1.00 222.41 0.036 8.01
Mz - C
1.00 161.70 0.036 5.82
Mz - D
1.00 226.78 0.036 8.16
Mz - E
1.00 359.04 0.036 12.93
Mz - F
1.00 157.20 0.036 5.66
1.00 168.71 0.036 6.07
1.00 16.48 0.036 0.59
05.03.01.02 CONCRETO EN VEREDAS F'C=175 KG/CM2 E=4" INC. ACABADO C:A 1:2 UND: M2
Area/Long.
DESCRIPCION Nº veces Nº Elem. Ancho (m) Alto (m) Parcial Total
(m2/m)
2,262.12
AREA DE VEREDAS
Mz - A 1,849.56
AREA 01 1.00 54.08 54.08
AREA 02 1.00 196.47 196.47
AREA 03 1.00 63.37 63.37
AREA 04 1.00 134.75 134.75
RAMPA BORDE DE MARTILLO 1.00 5.34 5.34
RAMPA BORDE DE MARTILLO 1.00 6.69 6.69
Mz - B
AREA 05 1.00 45.08 45.08
AREA 06 1.00 84.91 84.91
AREA 07 1.00 64.37 64.37
AREA 08 1.00 46.37 46.37
Mz - C
AREA 09 1.00 64.38 64.38
AREA 10 1.00 12.96 12.96
AREA 11 1.00 64.42 64.42
AREA 12 1.00 14.27 14.27
Mz - D
AREA 13 1.00 45.28 45.28
AREA 14 1.00 64.28 64.28
AREA 15 1.00 81.95 81.95
AREA 16 1.00 46.15 46.15
Mz - E
AREA 17 1.00 133.82 133.82
AREA 18 1.00 62.00 62.00
AREA 19 1.00 40.84 40.84
AREA 20 1.00 139.01 139.01
Mz - F
AREA 21 1.00 139.06 139.06
AREA 22 1.00 43.00 43.00
AREA 23 1.00 138.38 138.38
AREA 24 1.00 17.80 17.80
AREA 25 1.00 16.39 16.39
AREA 26 1.00 24.15 24.15
AREA DE MARTILLOS
412.55
Mz - A
MARTILLO M1 1.00 27.97 27.97
05.03.01.03 CONCRETO EN RAMPAS F'C=175 KG/CM2 E=4" INC. ACABADO C:A 1:2 Y BRUÑADO UND: M2
Area/Long.
DESCRIPCION Nº veces Nº Elem. Ancho (m) Alto (m) Parcial Total
(m2/m)
61.54
AREA DE MARTILLOS
Mz - A
MARTILLO M2
Area de Rampa 2.00 1.578 3.16
MARTILLO M3
Area de Rampa 2.00 1.578 3.16
MARTILLO M4
Area de Rampa 2.00 1.578 3.16
Mz - B
MARTILLO M5
Area de Rampa 2.00 1.578 3.16
MARTILLO M6
Area de Rampa 2.00 1.578 3.16
MARTILLO M7
Area de Rampa 2.00 1.578 3.16
MARTILLO M8
Area de Rampa 2.00 1.578 3.16
Mz - C
MARTILLO M9
Area de Rampa 1.00 1.578 1.58
MARTILLO M10
Area de Rampa 1.00 1.578 1.58
MARTILLO M11
Area de Rampa 1.00 1.578 1.58
MARTILLO M12
Area de Rampa 1.00 1.578 1.58
Mz - D
MARTILLO M13
Area de Rampa 1.00 1.578 1.58
MARTILLO M14
Area de Rampa 2.00 1.578 3.16
MARTILLO M15
Area de Rampa 2.00 1.578 3.16
MARTILLO M16
Area de Rampa 1.00 1.578 1.58
Mz - E
MARTILLO M17
Area de Rampa 2.00 1.578 3.16
MARTILLO M18
Area de Rampa 2.00 1.578 3.16
MARTILLO M19
Area de Rampa 2.00 1.578 3.16
MARTILLO M20
Area de Rampa 2.00 1.578 3.16
Mz - F
MARTILLO M21
Area de Rampa 1.00 1.578 1.58
MARTILLO M22
Area de Rampa 2.00 1.578 3.16
MARTILLO M23
Area de Rampa 2.00 1.578 3.16
MARTILLO M24
Area de Rampa 2.00 1.578 3.16
Mz - A
1.00 326.59 0.20 65.32
Mz - B
1.00 222.41 0.20 44.48
Mz - C
1.00 161.70 0.20 32.34
Mz - D
1.00 226.78 0.20 45.36
Mz - E
1.00 359.04 0.20 71.81
Mz - F
1.00 157.20 0.20 31.44
1.00 168.71 0.20 33.74
1.00 16.48 0.20 3.30
05.04 VARIOS
Mz - A
1.00 36.25 1.80 65.25
1.00 36.87 1.55 57.15
Mz - B
1.00 11.79 1.80 21.23
1.00 32.52 1.20 39.02
Mz - C
1.00 32.49 1.20 38.99
Mz - D
1.00 11.38 1.80 20.48
1.00 32.48 1.20 38.97
Mz - E
1.00 17.12 1.80 30.82
1.00 56.85 1.20 68.22
Mz - F
1.00 5.97 1.80 10.75
1.00 66.34 1.20 79.61
MARTILLOS
Mz - A
MARTILLO M1 1.00 5.83 5.83
Mz - A
AREA 01 1.00 54.08 54.08
AREA 02 1.00 196.47 196.47
AREA 03 1.00 63.37 63.37
AREA 04 1.00 134.75 134.75
RAMPA BORDE DE MARTILLO 1.00 5.34 5.34
RAMPA BORDE DE MARTILLO 1.00 6.69 6.69
Mz - B
AREA 05 1.00 45.08 45.08
AREA 06 1.00 84.91 84.91
AREA 07 1.00 64.37 64.37
AREA 08 1.00 46.37 46.37
Mz - C
AREA 09 1.00 64.38 64.38
AREA 10 1.00 12.96 12.96
AREA 11 1.00 64.42 64.42
AREA 12 1.00 14.27 14.27
Mz - D
AREA 13 1.00 45.28 45.28
AREA 14 1.00 64.28 64.28
AREA 15 1.00 81.95 81.95
AREA 16 1.00 46.15 46.15
Mz - E
AREA 17 1.00 133.82 133.82
AREA 18 1.00 62.00 62.00
AREA 19 1.00 40.84 40.84
AREA 20 1.00 139.01 139.01
Mz - F
AREA 21 1.00 139.06 139.06
AREA 22 1.00 43.00 43.00
AREA 23 1.00 138.38 138.38
AREA 24 1.00 17.80 17.80
AREA 25 1.00 16.39 16.39
AREA 26 1.00 24.15 24.15
AREA DE MARTILLOS
Mz - A
MARTILLO M1 1.00 27.97 27.97
MARTILLO M2 1.00 29.45 29.45
MARTILLO M3 1.00 31.66 31.66
MARTILLO M4 1.00 25.48 25.48
Mz - B
MARTILLO M5 1.00 22.96 22.96
MARTILLO M6 1.00 9.54 9.54
MARTILLO M7 1.00 6.68 6.68
MARTILLO M8 1.00 21.03 21.03
Mz - C
MARTILLO M9 1.00 9.53 9.53
MARTILLO M10 1.00 9.51 9.51
MARTILLO M11 1.00 6.84 6.84
MARTILLO M12 1.00 6.67 6.67
Mz - D
MARTILLO M13 1.00 9.03 9.03
MARTILLO M14 1.00 34.05 34.05
MARTILLO M15 1.00 31.10 31.10
MARTILLO M16 1.00 7.76 7.76
Mz - E
MARTILLO M17 1.00 24.27 24.27
MARTILLO M18 1.00 20.19 20.19
MARTILLO M19 1.00 33.83 33.83
MARTILLO M20 1.00 26.12 26.12
Mz - F
MARTILLO M21 1.00 18.86 18.86
MARTILLO M22 1.00 20.36 20.36
MARTILLO M23 1.00 22.78 22.78
MARTILLO M24 1.00 18.44 18.44
Mz - A
1.00 326.59 0.15 48.99
Mz - B
1.00 222.41 0.15 33.36
Mz - C
1.00 161.70 0.15 24.25
Mz - D
1.00 226.78 0.15 34.02
Mz - E
1.00 359.04 0.15 53.86
Mz - F
1.00 157.20 0.15 23.58
1.00 168.71 0.15 25.31
1.00 16.48 0.15 2.47
Mz - A
1.00 32.00 32.00
Mz - B
1.00 14.00 14.00
Mz - C
1.00 1.00 1.00
Mz - D
1.00 11.00 11.00
Mz - E
1.00 32.00 32.00
Mz - F
1.00 32.00 32.00
Mz - A
1.00 32.00 32.00
Mz - B
1.00 14.00 14.00
Mz - C
1.00 1.00 1.00
Mz - D
1.00 11.00 11.00
Mz - E
1.00 32.00 32.00
Mz - F
1.00 32.00 32.00
MURO TIPO II
CALLE ARGENTINA
1.00 1.00 5.00 1.25 6.25
CALLE VENEZUELA
1.00 1.00 2.50 1.25 3.13
CALLE 2 (TRAMO 2.10 y 2.30M)
1.00 1.00 4.40 0.80 3.52
MURO 03 - CALLE 2
1.00 1.00 2.40 1.25 3.00
MURO 04 - CALLE 2
1.00 1.00 3.00 2.25 6.75
MURO 05 - CALLE 2
1.00 1.00 4.00 2.25 9.00
MURO 06 - CALLE 2
1.00 1.00 3.00 2.70 8.10
MURO 07 - CALLE 2
1.00 1.00 5.10 3.20 16.32
MURO 04 - CALLE 2
1.00 1.00 3.00 2.25 1.25 8.44
MURO 05 - CALLE 2
1.00 1.00 4.00 2.25 1.85 16.65
MURO 06 - CALLE 2
Volumen incl. Angulo de reposo (seccion transv.) 1.00 1.00 3.00 13.73 41.19
MURO 07 - CALLE 2
Volumen incl. Angulo de reposo (seccion transv.) 1.00 1.00 5.10 25.94 132.30
06.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO SELECCIONADO C/EQUIPO UND: M3
Area/Long.
DESCRIPCION Nº veces Nº Elem. Ancho (m) Alto (m) Parcial Total
(m2/m)
313.93
MURO TIPO I
CALLE S/N
1.00 1.00 133.25 0.50 0.15 9.99
1.00 1.00 133.25 1.30 0.50 86.61
MURO TIPO II
CALLE ARGENTINA
1.00 1.00 5.00 0.50 0.10 0.25
1.00 1.00 5.00 0.50 1.00 2.50
CALLE VENEZUELA
1.00 1.00 2.50 0.50 1.00 1.25
CALLE 2 (TRAMO 2.10 y 2.30M)
1.00 1.00 4.40 0.60 1.00 2.64
MURO 07 - CALLE 2
1.00 1.00 124.96 124.96
MURO 03 - CALLE 2
1.00 1.00 2.40 0.30 1.00 0.72
MURO 04 - CALLE 2
1.00 1.00 3.00 0.30 1.55 1.40
MURO 05 - CALLE 2
1.00 1.00 4.00 0.30 2.20 2.64
MURO 06 - CALLE 2
1.00 1.00 3.00 0.30 2.60 2.34
MURO 07 - CALLE 2
1.00 1.00 5.10 0.30 4.80 7.34
MURO TIPO II
CALLE ARGENTINA
1.00 1.00 5.00 1.25 6.25
CALLE VENEZUELA
1.00 1.00 2.50 1.25 3.13
CALLE 2 (TRAMO 2.10 y 2.30M)
1.00 1.00 4.40 0.80 3.52
MURO 03 - CALLE 2
1.00 1.00 2.40 1.25 3.00
MURO 04 - CALLE 2
1.00 1.00 3.00 2.25 6.75
MURO 05 - CALLE 2
1.00 1.00 4.00 2.25 9.00
MURO 06 - CALLE 2
1.00 1.00 3.00 2.70 8.10
MURO 07 - CALLE 2
1.00 1.00 5.10 3.20 16.32
MURO 03 - CALLE 2
1.00 1.00 2.40 1.25 0.40 1.20
MURO 04 - CALLE 2
1.00 1.00 3.00 2.25 0.50 3.38
MURO 05 - CALLE 2
1.00 1.00 4.00 2.25 0.65 5.85
TACON 1.00 1.00 4.00 0.40 0.30 0.48
MURO 03 - CALLE 2
1.00 1.00 2.40 0.25 1.80 1.08
MURO 04 - CALLE 2
1.00 1.00 3.00 0.77 2.30
MURO 05 - CALLE 2
1.00 1.00 4.00 1.07 4.29
MURO 06 - CALLE 2
1.00 1.00 3.00 1.32 3.95
MURO 07 - CALLE 2
1.00 1.00 5.10 1.80 9.18
06.04.03.03 ENCOFRADO Y DESENCOFRADO EN ZAPATAS UND: M2
Area/Long.
DESCRIPCION Nº veces Nº Elem. Ancho (m) Alto (m) Parcial Total
(m2/m)
23.06
MURO 06 - CALLE 2
1.00 2.00 3.00 0.65 3.90
1.00 2.00 2.70 0.65 3.51
TACON 1.00 2.00 3.00 0.30 1.80
MURO 07 - CALLE 2
1.00 2.00 5.10 0.65 6.63
1.00 2.00 3.20 0.65 4.16
TACON 1.00 2.00 5.10 0.30 3.06
76.61
MURO 06 - CALLE 2
1.00 2.00 3.00 4.05 24.30
1.00 2.00 1.32 2.63
MURO 07 - CALLE 2
1.00 2.00 4.80 4.80 46.08
1.00 2.00 1.80 3.60
06.05.01 BARANDAS METALICAS F°G° Ø4 - Ø2" INCL. ACABADO CON PINT. ANTICORROSIVA Y ESMALTE SINTETICO UND: GLB
DESCRIPCION Nº veces Ø4 Ø2" Ancho (m) Alto (m) Parcial Total
1.00
VER REPORTE DE METRADOS EN PLANOS Y/O ANEXO DE
ACERO 26.20 26.80
06.06 VARIOS
689.22
ENCOFRADO Y DESENCOFRADO CARAVISTA EN
06.04.01.04 1.00 1.00 400.50
PANTALLA DE MURO 400.50
ENCOFRADO Y DESENCOFRADO CARAVISTA EN
06.04.02.04 1.00 1.00 30.24
PANTALLA DE MURO 30.24
ENCOFRADO Y DESENCOFRADO CARAVISTA EN
06.04.03.04 1.00 1.00 181.87
PANTALLA DE MURO 181.87
ENCOFRADO Y DESENCOFRADO CARAVISTA EN
06.04.03.04 1.00 1.00 76.61
PANTALLA DE MURO 76.61
SUSTENTO METRADO DE ADICIONAL DE OBRA N° 1
PROYECTO: "CREACION DE LOS SERVICIOS DE TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA H.U.P. DAVID DASSO HOOKE
SECTOR B DEL DISTRITO DE NUEVO CHIMBOTE - PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH" C.U.I. N° 2557632
FECHA: Jul-23
01 PISTAS
1.01 VARIOS
01.02 REUBICACIÓN DE POSTES DE TELEFONÍA H=12M UND: UND
Area/Long.
DESCRIPCION Nº veces Nº Elem. Ancho (m) Alto (m) Parcial Total
(m2/m)
4.00
REUBICACION DE POSTES DE TELEFONÍA 1.00 4.00 4.00
03 SARDINELES
03.01 SARDINELES PERALTADOS
03.01.01 TRABAJOS PRELIMINARES
MURO DE CONTENCION 01
1,463.15 642.26
MURO DE CONTENCION 02
69.12 246.24
MURO DE CONTENCION 03
61.27 107.99
MURO DE CONTENCION 04
79.52 296.59
MURO DE CONTENCION 05
368.93 207.97
MURO DE CONTENCION 06
324.32 192.60
MURO DE CONTENCION 07
502.35 291.32 225.75