Está en la página 1de 1

¡Doble Aquí! > < Fold Here!

K J H G F E D C B A

D-HZNU-A00-AGA-LO-278-0

S
DRAWING NUMBER
CA
LLE
LA
S
TO
RR
7 ES 7

ATOTO

90

90
90
90
90
S
0.4071

N DRE
22

23

24

25

26
27

21

1 20

2 19

3 18

4 17

5 16

6 15

7 14

8 13

9 12

10 11

25

24

23

22

21

20

19

18

17

1 16

2 15

3 14

4 13

5 12

AN A
6 11

7 10

8 9

30284 30284

AV. S

CALLE ESFUERZO
UP TO VE-02 IN SECOND FLOOR
SUBE A VE-02 EN SEGUNDO NIVEL
1,095 CFM EA

180°

135°
130°

917
820

1322
1220
6 UP TO VE-03 IN ROOF CALLE ATLACOMU
LCO 6
SUBE A VE-03 EN AZOTEA
1,060 CFM EA
UP TO DC-02 IN ROOF
SUBE A DC-02 EN AZOTEA DOWN TO GROUND FLOOR
FD-07 4,400 CFM DC BAJA A PLANTA BAJA
DOWN TO GROUND FLOOR
BAJA HACIA PLANTA BAJA 10"x10"
FD-18 UP TO AHU-01 IN SECOND F LOOR
12"x14" 12"x12"
TECH CHASE TECH CHASE FD-03 FD-13 SUBE A AHU-01 EN SEGUNDO PISO

8"x8"
EG-01 FD-03 BOD = 4.25
132 133 BOD = 4.58 BOD = 4.10 12"x8"

10"ø
265/415 CFM
10"ø FD-01 14"x12"
TYP. FOR 3
SD-05
SOLUTION PREP. 14"x8" EG-03

6"ø
SOLUTION PREP. BOD = 5.76
PAL FCV-105 116 52"x20"
107 530 CFM BOP = 3.74 175 CFM
105 10"x8" 6" CONNECTION TYP. FOR 3
FCV-107 TO ARM FD-13
5 EG-01 CLEAN BIN STORAGE 5
650 CFM SG-01 DIRTY BIN STAGING
8"x6"

12"x6"
180 CFM 12"ø 460 CFM 117 12"x10"
SD-05 14"x6" 121
TYP. FOR 02 BOD = 5.11 TYP. FOR 3 CONNECTION WASH AREA
TYP.
MAL FOR 2 TO ARM 16"ø FCV-117 120
14"ø SD-05 1,280 CFM FD-12

18"x14"
106 8"ø FCV-106 FLUID BED DRYER 640 CFM
SD-04
325/450 CFM 900 CFM 16"x10" 115 TYP. FOR 2
8"x6"

12"x4"
FD-05 8"ø
TYP. FOR 8 FCV-115 60"x24"
FCV-116 EG-02
1,000 CFM 1,380 CFM MAL
12"x10" MAL 10"x6" 175 CFM
DUCTWORK 113 22,710 CFM SA TYP. FOR 3
FOR COATER 102 FCV-102 26"x14" 10"x8"
SYSTEM 900 CFM FCV-113
UTILITY
14"ø 12"x10" 1,085 CFM UP TO AHU-02 IN SECOND F LOOR
16"x12"

EG-01 FD-05 SD-05 CONTROL ROOM 039


BOD = 5.11 16"x14" 16"x10" SUBE A AHU-02 EN SEGUNDO PISO STAIRS
690 CFM 10"x8" 540/640 CFM 118

60"x22"
TYP. 12"ø TYP. FOR 3 20"x14" 040
32"x14" 20"x14" 22"x16"
FOR 02 COATING FCV-104
4 104 660 CFM 18"x14" 24"x12" CHARGING STATIONS FCV-130 4
PAL PAL
103 BOD = 4.22 119 2,850 CFM

28"x16"
10"x8" 114
FCV-114

20"x10"
12"x10" FCV-103
BOD = 3.86 BOD = 5.05 SD-05 640 CFM
FD-18 530 CFM 24"x14" AIRLOCK ANTEROOM
12 BOD = 4.12 BOD = 4.70 SD-05 FREIGHT ELEVATOR
EG-05 "x8 710 CFM 130
" BOD = 4.12
12"x8" 12"x6" TYP. FOR 4
FCV-128 FCV-127
VE-05 16"x12" 034
PRODUCTION 40"x22" 48"x22" 900 CFM 530 CFM
450 CFM EG-02 ELECTRICAL ROOM ELEVATOR
225 CFM SD-05
16"x14" TYP. FOR 02 131 011 4P OPEN 450 CFM
BOD = 4.58 SG-01 WORKSTATIONS BOD = 3.89 ANTEROOM
DOWN TO GROUND FLOOR TYP. FOR 2
STAGING 135
450 CFM 125
BAJA A PLANTA BAJA FCV-129 126
FCV-122 TYP. FOR 2 PARTS STORAGE
BOD = 3.80 2,000 CFM
< Fold Here!

< Fold Here!


900 CFM
FD-18 139
26"x16" 32"x24" 12"x10" 10"x8" 24"x12" MAL SD-05 PAL
BOD = 4.21 12"x12" PRODUCTION 128
BOD = 3.88 PAL 12"x10" 127 FIRE RISER
18"x12" 3,215 CFM EA STAIRS CORRIDOR
3 004 123 BOD = 4.19 SG-01 136 3
BOD = 4.50 STAGING 101 355 CFM CHEMICAL STORAGE

14"x12"
12"x10"
¡Doble Aquí! >

¡Doble Aquí! >


10"x8" MAL SD-05 TYP. FOR 3 TYP. FOR 3 137
111 16"x10" TECH CHASE IDF
FCV-123 FCV-124 122
530 CFM 134 138
6" CONNECTION TO ARM EG-02 2,145 CFM
SD-04 SD-04
1,415 CFM 450 CFM FCV-108 28"x20" PUNCHES EG-01 BLENDING
710 CFM 470 CFM

14"x18"
SD-02 TYP. FOR 2 900 CFM 112 TYP. FOR 2 129
MAL SG-02 COMPRESSION TYP. FOR 3
190 CFM 14"ø 12"x10"
108 536 CFM 124
TYP. FOR 4
SD-05 TYP. FOR 4 EG-01
12"ø 12"x8" 420 CFM
BOD = 5.11 360 CFM
FCV-110 TYP. FOR 2 BOD = 5.14 BOD = 4.15
FD-01 14"x16" TYP. FOR 2
760 CFM
10"x8" FCV-109
PAL 840 CFM 16"x20" 14"x10"
HIGH SHEAR MIXER 109 10"x10" TYP. FOR 2
FCV-109 10"ø
110 10"x16" 22"x18"
530 CFM FD-01 10"ø
SD-05 10"x10" EG-01 4"x12" SUBE A VE-02 EN SEGUNDO NIVEL
FD-04 UP TO VE-02 IN SECOND FLOOR
155 CFM
2 TYP. FOR 2 2
6"x12" 10"x8" UP TO DC-03 IN ROOFTOP 3,155 CFM EA
SUBE A DC-03 EN AZOTEA

FIRST FLOOR - CLEAN AIR


PRIMER NIVEL - PLANO DE AIRE LIMPIO
SCALE: 1 : 100 / ESCALA: 1 : 100

1 1

RESPONSABLES REVISIONES FECHA CIVIL ELEC. INSTRU. MEC. PROC. TUBER. NUM. DIBUJOS DE REFERENCIA APROBACIONES DEL CLIENTE DIBU. POR-NOM-FECHA ESTE DIBUJO IMPRESO ES PRESTADO PARA SU ASISTENCIA MUTUA Y ESTÁ SUJETO A RECUPERARSE EN CUALQUIER MOMENTO. LA
REV. DESCRIPCIÓN FECHA POR Vo Bo 02/JUN/2021 Ñ Ñ Ñ Ñ Ñ Ñ PV-2002653-R03 HVAC - PRIMER NIVEL - DISTRIBUCION DE AIRE LIMPIO J.C. PEREZ - 02/JUN/2021 INFORMACIÓN CONTENIDA AQUÍ NO DEBE REVELARSE O REPRODUCIRSE DE NINGUNA MANERA PARA BENEFICIO DE OTRAS PARTES COMO
RESP. SANIT.
DIBUJÓ: J.C. PEREZ SUBCONTRATISTAS Y PROVEEDORES QUE NO CUENTEN CON UN CONSENTIMIENTO EXPRESADO POR ESCRITO DE PROCTER & GAMBLE.
0 APROBADO PARA CONSTRUCCIÓN (IFC 100%) 02/JUN/2021 G.CANO J. JAIMES
OPERACIÓN REV. POR-NOM-FECHA NIVEL TECH. PLANTA NAUCALPAN NAUCALPAN DE JUAREZ NUMERO DE DIBUJO:
DISEÑÓ: R. GARCIA INGENIERÍA J. JAIMES - 02/JUN/2021
AGAVE - HVAC
LINEA No. PRESENTACIÓN
REVISÓ: B. RECKER VALIDACIONES
MATERIAL EQUIP No. PLANTA TABLETAS - PRIMER NIVEL D-HZNU-A00-AGA-LO-278-0
AUTORIZÓ: J. CHEMA CALIDAD
N/A DIBUJO LIST PROD. ÁREA REEMPLAZA A:
HS&E DISTRIBUCION DE AIRE LIMPIO PV-2002653-R03
APROBÓ: A. JARA ESCALA SUB-ENSAMBLE No. DESCRIPT.

PLANO: D-HZNU-A00-AGA-LO-278-0 INDICADA CANTIDAD EDIFICIO No. PROCTER & GAMBLE MANUFACTURING MEXICO S. DE R.L. DE C.V.
K J H G F E D C B A
¡Doble Aquí! > < Fold Here!

También podría gustarte