REGISTRO TIEMPOS Y MOVIMIENTOS Mar-12

Operación COMARSA Camión Fábrica B8A-855


HORARIO DE
TRABAJO x DIA KILOMETRAJE HOROMETRO

Kms
Fecha INICIO FIN INICIAL FINAL recorridos x INICIAL FINAL
Día

3/1/2012 6:30 18:30 10,293 10,307 14 2,219.5 2,224.6


3/2/2012 6:30 18:30 10,307 10,327 20 2,224.6 2,231.4
3/3/2012 6:30 18:30 10,327 10,356 29 2,231.4 2,240.8
3/4/2012 6:30 18:30 10,356 10,367 11 2,240.8 2,248.0
3/5/2012 6:30 18:30 10,367 10,379 12 2,248.0 2,254.0
3/6/2012 6:30 18:30 10,379 10,392 13 2,254.0 2,259.6
3/7/2012 6:30 18:30 10,392 10,413 21 2,259.6 2,266.9
3/8/2012 6:30 18:30 10,413 10,433 20 2,266.9 2,272.6
3/9/2012 6:30 18:30 10,433 10,452 19 2,272.6 2,279.6
3/10/2012 6:30 18:30 10,452 10,465 13 2,279.6 2,284.0
3/11/2012 6:30 18:30 10,465 10,505 40 2,284.0 2,293.9
3/12/2012 6:30 18:30 10,505 10,519 14 2,293.9 2,300.0
3/13/2012 6:30 18:30 10,519 10,544 25 2,300.0 2,307.1
3/14/2012 6:30 18:30 10,544 10,562 18 2,307.1 2,312.1
3/15/2012 6:30 18:30 10,562 10,569 7 2,312.1 2,315.2
3/16/2012 6:30 18:30 10,569 10,569 0 2,315.2 2,315.2
3/17/2012 6:30 18:30 10,569 10,581 12 2,315.2 2,318.2
3/18/2012 6:30 18:30 10,581 10,595 14 2,318.2 2,321.3
3/19/2012 6:30 18:30 10,595 10,608 13 2,321.3 2,324.9
3/20/2012 6:30 18:30 10,608 10,608 0 2,324.9 2,325.1
3/21/2012 6:30 18:30 10,608 10,608 0 2,325.1 2,325.3
3/22/2012 6:30 18:30 10,608 10,635 27 2,325.3 2,334.4
3/23/2012 6:30 18:30 10,635 10,661 26 2,334.4 2,342.1
3/24/2012 6:30 18:30 10,661 10,680 19 2,342.1 2,347.2
3/25/2012 6:30 18:30 10,680 10,696 16 2,347.2 2,350.5
3/26/2012 6:30 18:30 10,696 10,718 22 2,350.5 2,356.7
3/27/2012 6:30 18:30 10,718 10,735 17 2,356.7 2,362.9
3/28/2012 6:30 18:30 10,735 10,757 22 2,362.9 2,369.7
3/29/2012 6:30 18:30 10,757 10,775 18 2,369.7 2,375.7
3/30/2012 6:30 18:30 10,775 10,796 21 2,375.7 2,383.8
3/31/2012 6:30 18:30 10,757 0 2,383.8

TOTALES ACUMULADOS A LA FECHA (TAF) 503.00 Kms TAF

PROMEDIOS POR DIA (PPD) 18.63 Kms/día PPD

CONVERISON A FORMATO hh:mm


HNP HT HT
OROMETRO ANA POP POP

o
po
de

ivo nt

nt
lis e
Horas

os ie

0 ie
ui

k od
s
Supervisor

pl im

- 2 im
Eq
ad ne
x Operador

gu ecc /

ec ad
t
Se sp rlas

ex tec

N te c
trabajadas

rid io
FAMESA

ch len

Día

de bas

de bas
In ha

is

L
C

ev

A
R
5.1 E.Santander A. Solís 45 15 15 15
6.8 E.Santander A. Solís 45 15 15 30
9.4 E.Santander A. Solís 45 15 15 30
7.2 E.Santander A. Solís 60 15 15 15
6.0 E.Santander A. Solís 60 15 15 30
5.6 E.Santander A. Solís 30 15 15 15
7.3 E.Santander A. Solís 45 15 15 45
5.7 E.Santander A. Solís 45 15 15 45
7.0 E.Santander A. Solís 45 15 15 60
4.4 E.Santander A. Solís 45 15 15 30
9.9 E.Santander A. Solís 15 15 15 30
6.1 E.Santander A. Solís 45 15 15 60
7.1 R.rosales C.Francia 45 15 15 60
5.0 R.rosales C.Francia 45 15 15
3.1 R.rosales C.Francia 45 15 15 30
0.0 E.Santander C.Francia 15 15 30
3.0 E.Santander C.Francia 15 15 30
3.1 E.Santander C.Francia 60 15 15
3.6 E.Santander C.Francia 60 15 15 15
0.2 E.Santander C.Francia 45 15 15
0.2 E.Santander C.Francia
9.1 E.Santander C.Francia 15 15 15 60
7.7 E.Santander C.Francia 15 15 15 45
5.1 E.Santander C.Francia 30 15 15
3.3 E.Santander C.Francia 30 15 15 30
6.2 E.Santander C.Francia 30 15 15 15
6.2 E.Santander C.Francia 30 15 15 30
6.8 E.Santander C.Francia 30 15 15 30
6.0 E.Santander C.Francia 30 30 30 15
8.1 R. Rosales C.Francia 45 15 15 30
0.0

164.30 horas 1,080.00 450.00 450.00 825.00


5.67 horas 36 15 15 27.5
5:40 hh:mm
HEC HEC HEC HNT HNT HNT HT HT
HET HET HET POM POM POM POP POP
o

ío ra
ec a o

du rio o
nt

nt

o al o

gu ot

os de
oy so nd

la s o n d

to a

ci o
oy on nd
de
0 ie

ie

ra s

ra nd
ec o

ón
C oa
Pr ce ra

Vo ce ra
- 2 im

ua im

dr o
a p rs ra

oy lad

rfo ra
la uí
Ac spe

Ac spe
N te c

Ag tec

Pe spe

ea lad
to

Pe spe
Ta arg
Pr ras

ar
de bas

de bas

Ar ras
E

E
A

T
15 15 15 225
30 15 30 180
30 15 15 30 390
15 15 30 150
30 15 180
15 30 180
30 60 195
15 30 45 180
15 30 15 180
30 15 45 150
45 60 315
30 45 180
15 30 195
15 60 210
15 135
30 30 45
15 30 45
15 120
15 15 105

60 15 30 15 270
45 60 270
30 45 195
30 15 15 150
15 15 15 15 180
30 15 15 15 180
30 15 15 30 240
15 15 15 15 180
30 30 30 270

420.00 30.00 0.00 15.00 240.00 705.00 480.00 5,295.00


14 1 0 0.5 8 23.5 16 176.5
HEC HNT HT HNT HT HND HND HND
HET POM POP POM POP HM HM HM

le to
ra gía

o to
s
ib n

ic ió n

ca ión
ad n
ta
a a
ci o

o
st ie
du Vi

m ie
ra nd

nt
an

ni o
rg o
ón

bu ecim

án ac

tri ac
r a im
te n d
ca lad

la e

ie
rf o r a

a
Ll
Vo o d

ec r

éc ar
og ten
m
an ra

M epa
Pe spe

Re ras

El ep
om t

M spe
de poy

bi
C bas

Pr an
T

R
E

am

M
E
A

C
30 60 150
15 15 45 135
30 45
15 15 45 15 90
15 45
30 15 60
30 45 15
45 30
45 30
90 30 45
30 45 15
30 30
30 45 15
30 30 45 15
15 30
15
15
75 60
60 60
15 90 240

15 60 60
30 45 60
60 195
15 15 60
30 60
45 30 45 15
30 45 75
30 30
30 15 45 60

510.00 720.00 1,230.00 150.00 0.00 90.00 240.00 570.00


17 24 41 5 0 3 8 19
HND HND HND HND HEC HNT HNP HNT
HM HM HM HM POP POM ANA POM

C
ca ión

a
PL

m in
a

o)
ic
ic

ad os
a ió n

ra s

rs
a ión
tri ac

br
br

rz

in
ón

o g ra

a ist
ve
em ac


éc r

ue
em c

m
pr pe
El epa

ci

lim ev
st ra
st ar

ra

m
Es
Si alib

(c pr

l)
Si ep

Al

ta
R

pa

Im

(to
S
R

C
Re
60 60 720
90 60 720
60 720
150 60 705
255 60 720
255 60 720
165 60 720
195 60 720
210 60 720
150 60 720
75 60 720
210 60 720
195 60 720
195 45 720
360 60 720
465 60 705
465 60 690
300 60 720
300 60 720
240 60 720
720 720
30 60 720
60 60 720
75 60 720
270 60 720
135 60 600
150 60 690
150 720
240 60 705
45 60 720
0
0
0.00 0.00 0.00 0.00 6,210.00 1,665.00 0.00 21,375.00
0 0 0 0 207 55.5 0 712.5
Días completados de trabajo >> 30
RESUMEN CALCULOS TIEMPOS Y MOVIMIENTOS RESUME
TIEMPO EFECTIVO DE TRABAJO HTPD

ACTIVIDADES
HET PERDIDAS PERDIDAS HM TIEMPO Horas Totales
HET CARGUIO NO
RECARGA OPERATIVAS OPERATIVAS MANTENIMIEN Programadas
(min) ASIGNABLES
(min) PROPIAS (min) MINA (min) TO (min) en el Día
(min)

225 30 75 135 150 105 12.00


180 60 75 165 135 105 12.00
390 75 90 60 0 105 12.00
150 30 90 225 90 120 12.00
180 60 60 300 0 120 12.00
180 30 75 345 0 90 12.00
195 45 165 210 0 105 12.00
180 45 150 240 0 105 12.00
180 60 120 255 0 105 12.00
150 30 120 315 0 105 12.00
315 30 180 120 0 75 12.00
180 60 135 240 0 105 12.00
195 60 120 240 0 105 12.00
210 0 150 270 0 90 12.00
135 30 60 390 0 105 12.00
45 60 75 465 0 60 12.00
45 45 75 465 0 60 12.00
120 0 45 435 0 120 12.00
105 30 45 420 0 120 12.00
0 0 45 240 330 105 12.00
0 0 0 720 0 0 12.00
270 135 135 105 0 75 12.00
270 90 135 150 0 75 12.00
195 0 75 165 195 90 12.00
150 60 60 360 0 90 12.00
180 30 90 210 0 90 12.00
180 60 105 255 0 90 12.00
240 60 120 270 0 30 12.00
180 30 120 90
270 165 105
0 0 0 0 0 0 12.00
0
5,295 1,245 2,955 7,770 900 2,745 TAF 348.00
176.50 42.50 98.50 273.50 30.00 91.50 PPD 11.88
11:53
RESUMEN CALCULO DISPONIBILIDAD MECANICA
HNP HND HT HEC HNT DOCF DM

Horas Horas No Disponibilidad


Horas No Horas No Horas Efectivas Disponibilidad
Trabajadas en Trabajadas con Operativa Camión
Programables Disponibles Carguío Mecánica
el día Disponibilidad Fabrica

1.75 2.50 1.25 4.25 2.25 51.22% 43.75%


1.75 2.25 1.25 4.00 2.75 56.10% 47.92%
1.75 0.00 1.50 7.75 1.00 100.00% 85.42%
2.00 1.50 1.50 3.00 3.75 67.50% 56.25%
2.00 0.00 1.00 4.00 5.00 100.00% 83.33%
1.50 0.00 1.25 3.50 5.75 100.00% 87.50%
1.75 0.00 2.75 4.00 3.50 100.00% 85.42%
1.75 0.00 2.50 3.75 4.00 100.00% 85.42%
1.75 0.00 2.00 4.00 4.25 100.00% 85.42%
1.75 0.00 2.00 3.00 5.25 100.00% 85.42%
1.25 0.00 3.00 5.75 2.00 100.00% 89.58%
1.75 0.00 2.25 4.00 4.00 100.00% 85.42%
1.75 0.00 2.00 4.25 4.00 100.00% 85.42%
1.50 0.00 2.50 3.50 4.50 100.00% 87.50%
1.75 0.00 1.00 2.75 6.50 100.00% 85.42%
1.00 0.00 1.25 1.75 7.75 97.73% 89.58%
1.00 0.00 1.25 1.50 7.75 95.45% 87.50%
2.00 0.00 0.75 2.00 7.25 100.00% 83.33%
2.00 0.00 0.75 2.25 7.00 100.00% 83.33%
1.75 5.50 0.75 0.00 4.00 -7.32% -6.25%
0.00 0.00 0.00 0.00 12.00 100.00% 100.00%
1.25 0.00 2.25 6.75 1.75 100.00% 89.58%
1.25 0.00 2.25 6.00 2.50 100.00% 89.58%
1.50 3.25 1.25 3.25 2.75 38.10% 33.33%
1.50 0.00 1.00 3.50 6.00 100.00% 87.50%
1.50 0.00 1.50 3.50 3.50 80.95% 70.83%
1.50 0.00 1.75 4.00 4.25 95.24% 83.33%
0.50 0.00 2.00 5.00 4.50 100.00% 95.83%
1.50 2.00 3.50
1.75 2.75
0.00 0.00 0.00 0.00 0.00 0.00% 0.00%
0.00
45.75 15.00 49.25 104.50 129.50 88.75% 77.08%
1.53 0.50 1.64 3.65 4.56 90.34% 78.74%
1:32 0:30 1:39 3:39 4:34 <<< hh:mm
OBSERVACIONES

Operador no trabajo tubo descanso medico

OBSERVACIONES DEL MES


FALLAS O AVERIAS
SISTEMA INTEGRADO DE GESTION CODIGO: FR-SV.006
FORMATO: VERSION Nº: 01
REPORTE "D I A R I O" DISPONIBILIDAD MECANICA - FECHA: 20.07.10
TIEMPOS Y MOVIMIENTOS -- CAMION FÁBRICA Página 1 de 1

FECHA 1/4/2012 CAMION FABRICA B8A-855 SUPERVISOR FAMESA #N/A


OPERADOR FAMESA #N/A CLIENTE / OPERACIÓN COMARSA
KILOMETRAJE HOROMETRO Disponibilidad Operativa
Camión Fabrica (DOCF) #N/A
Recorrido Hrs trabaj. en
INICIAL FINAL INICIAL FINAL
en el día el día
Disponibilidad Mecánica (DM) #N/A
#N/A #N/A #N/A #N/A #N/A #N/A

Horas Totales Programadas en el Día HTPD #N/A


Horas No Programables HNP #N/A DOCF = [(HT + HEC + HNT) - HND] x
100 [HTPD - HNP]
Horas No Disponibles HND #N/A
Horas Trabajadas en el día HT #N/A
Horas Efectivas Carguío HEC #N/A DM =[(HT
HND]
+ HEC + HNT) - x 100
Horas No Trabajadas con Disponibilidad HNT #N/A
HTPD

Distribución Tiempos y Movimientos diario


Camión Fábrica

Tiempo Efectivo Trabajo Pérdidas Operativas Tiempo en Actividades No


Minutos x Carguío Recarga Propias Mina mantenimiento Asignables
día
#N/A #N/A #N/A #N/A #N/A #N/A
DESCRIPCIÓN DE LA "FALLA" O AVERÍA, EN CASO ÉSTA SE HUBIERA PRODUCIDO
#N/A

OBSERVACIONES
#N/A

PROCESO: SERVICIO DE VOLADURA ISO 9001 / ISO14001 / OHSAS 18001 / BASC


#N/A

SISTEMA INTEGRADO DE GESTION CODIGO: FR-SV.006


FORMATO: VERSION Nº: 01
REPORTE DIARIO DISPONIBILIDAD MECANICA CAMION FECHA: 20.07.10
FÁBRICA sin número
página de referencia/consulta, No imprimir

LEYENDA ACTIVIDADES PARA LA DISTRIBUCION DE TIEMPOS Y MOVIMIENTOS

Carguío
Carguío de Taladros TET
Recarga
Abastecimiento de Agua TET
Abastecimiento de explosivo TET
Abastecimiento de N - 20 TET
Pérdidas Operativas propias
Abastecimiento Combustible POP
Calibración Sistema Fábrica POP
Llenado de check list POP
Revisión Equipo POP
Traslado a otra Area Carguío POP
Traslado a Proyecto POP
Traslado a Recarga POP
Pérdidas Operativas Mina
Apoyo de Vigía de Voladura POM
Espera sin programa POM
Esperando Acceso a Proyecto POM
Esperando Accesorios Voladura POM
Esperando Perforación POM
Esperando Personal de apoyo POM
Imprevistos (clima adverso) POM
Tiempo en mantenimiento (HND)
Cambio Llantas HM
Esperando Mantenimiento HM
Mantenimiento Programado HM
Reparación Eléctrica HM
Reparación Mecánica HM
Reparación PLC HM
Reparación Sistema fábrica HM
Actividades No Asignables
Almuerzo ANA
Charlas/Inspecciones de Seguridad ANA

PROCESO: SERVICIO DE VOLADURA ISO 9001 / ISO14001 / OHSAS 18001 / BASC


SISTEMA INTEGRADO DE GESTION CODIGO: FR-SV.007
FORMATO: VERSION Nº: 01
REPORTE M E N S U A L DISPONIBILIDAD MECANICA - FECHA: 01.11.10
TIEMPOS Y MOVIMIENTOS -- CAMION FÁBRICA Página 1 de 1

MES 3/1/2012 CAMION FABRICA B8A-855 CLIENTE / OPERACIÓN COMARSA


Acum. Fecha Promedio/día
Horas Totales Programadas en el Día HTPD 348.00 11 horas 53 minutos
Kilometraje recorrido (Km) 503.00 18.6 Kms/día
Horometro (hrs) 164.30 5 horas 40 minutos
Horas No Programables HNP 45.75 1 horas 32 minutos
Horas No Disponibles HND 15.00 0 horas 30 minutos
Horas Trabajadas en el día HT 49.25 1 horas 39 minutos
Horas Efectivas Carguío HEC 104.50 3 horas 39 minutos
Horas No Trabajadas con Disponibilidad HNT 129.50 4 horas 34 minutos
Disponibilidad Operativa Camión Fabrica (DOCF) 88.75% Disponibilidad Mecánica (DM) 77.08%

45Kms Registro mensual de Kilometraje y horas - Camión Fábrica horas


14.0
40
12.0
35
10.0
30
25 8.0

20 6.0
15
4.0
10
2.0
5
0 0.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Kilometraje
Distribución Tiempos y Movimientos HTPD
promedio/día a la fecha Tiempo Efectivo Trabajo Horometro
Recarga
6%
Tiempo Efectivo Trabajo
Carguío
25% Pérdidas Operativas Propias
14%

Actividades No Asignables
13%

Tiempo en mantenimiento
4%
Pérdidas Operativas Mina
38%

Tiempo Efectivo Trabajo Pérdidas Operativas Tiempo en Actividades No


Minutos x Carguío Recarga Propias Mina mantenimiento Asignables
día
176.5 42.5 98.5 273.5 30.0 91.5
OBSERVACIONES
0
0
Camiones Operadores Supervisor
Kenworth WGC-026 Paul Tello
Kenworth WGC-047 Luis Rodriguez Aldo Solís
Peterbilt XI-3654 R. Rosales
Peterbilt XO-3975 G. Zamudio
Peterbilt XO-5705 E.Santander
B8A-855
Peterbilt XO-6681
Volkswagen WGB-608