CAO AVANCE REAL

MENSUAL ACUMULADO MENSUAL


1 S/ 100,000.00 S/ 100,000.00 S/ 105,000.00
2 S/ 150,000.00 S/ 250,000.00 S/ 150,000.00
3 S/ 200,000.00 S/ 450,000.00 S/ 150,000.00
4 S/ 250,000.00 S/ 700,000.00 S/ 300,000.00
5 S/ 250,000.00 S/ 950,000.00 S/ 290,000.00
6 S/ 50,000.00 S/ 1,000,000.00 S/ 5,000.00

S/ 1,000,000.00 S/ 1,000,000.00

R= S/ 20,000.00

R = Vx K-1

CAO AVANCE REAL


MENSUAL ACUMULADO MENSUAL
1 S/ 100,000.00 S/ 100,000.00 S/ 105,000.00
2 S/ 150,000.00 S/ 250,000.00 S/ 150,000.00
3 S/ 200,000.00 S/ 450,000.00 S/ 200,000.00
4 S/ 250,000.00 S/ 700,000.00 S/ 300,000.00
5 S/ 250,000.00 S/ 950,000.00 S/ 245,000.00
6 S/ 50,000.00 S/ 1,000,000.00 S/ -

S/ 1,000,000.00 S/ 1,000,000.00
AVANCE REAL
ACUMULAD
S/ 105,000.00
S/ 255,000.00
S/ 405,000.00
S/ 705,000.00
S/ 995,000.00
S/ 1,000,000.00

AVANCE REAL
ACUMULAD
S/ 105,000.00
S/ 255,000.00
S/ 455,000.00
S/ 755,000.00
S/ 1,000,000.00
S/ 1,000,000.00
PROCESO :
ENTIDAD :
UBICACIÓN : DEPARTAMENTO : LIMA
PROVINCIA : LIMA
DISTRITO : CARABAYLLO
AREA GEOGRAFICA : 02
CONTRATISTA :
RESIDENTE DE OBRA :
SUPERVISOR :
OBRA :

CONTRATO No. Y FECHA :


SISTEMA DE CONTRATACION : CONTRATO A SUMA ALZADA
PRESUPUESTO REFERENCIAL Y FECHA : c/IGV S/. 144,514.20
s/IGV S/. 122,469.66
MONTO DEL CONTRATO EJECUCION DE OBR: c/IGV S/. 130,062.78
s/IGV S/. 110,222.69
PLAZO DE EJECUCION SEGÚN BASES LICIT. : 60 Días Calendarios
PLAZO DE EJECUCION SEGÚN CONTRATO : 60 Días Calendarios
AMPLIACIONES DE PLAZO : 0 Días Calendarios
ADICIONALES DE OBRA : c/IGV S/. 0.00
s/IGV S/. 0.00
DEDUCTIVOS VINCULANTE DE OBRA : c/IGV S/. 0.00
s/IGV S/. 0.00
REDUCCION DE PRESTACIONES : c/IGV S/. 0.00
s/IGV S/. 0.00
MAYORES GASTOS GENERALES : c/IGV S/. 0.00
s/IGV S/. 0.00
COSTOS ADICIONALES : c/IGV S/. 0.00
s/IGV S/. 0.00
MONTO CONTRATO VIGENTE : c/IGV S/. 130,062.78
s/IGV S/. 110,222.69
FECHA SOLICITUD ADELANTO EN EFECTIVO : 4-Oct-17
ADELANTO EN DIRECTO Y FECHA DE PAGO : c/IGV S/. 0.00
s/IGV S/. 0.00
ADELANTO MATERIALES Y FECHA DE PAGO : c/IGV S/. 21,486.41
s/IGV S/. 18,208.82
FECHA DE ENTREGA DEL TERRENO : 18-oct-19
FECHA DE INICIO OFICIAL DE OBRA : 11-nov-21
FECHA DE TERMINO ORIGINAL PROGRAMADO : 9-Jan-22
FECHA DE TERMINO VIGENTE DE OBRA : 9-Jan-22
FECHA DE TERMINO REAL DE OBRA, S/SUPERV. : 9-Jan-22
FECHA DE PLIEGO DE OBSERVACIONES DE OBSER:
FECHA DE LEVANTAMIENTO DE OBSERVACIONES : 10-Jan-00 Asiento Nº 201 Y 202 folio 12 del C.O. N
FECHA DE ACTA DE RECEPCION DE OBRA : _
INTERESES POR MORAS : c/IGV S/. 0.00
PENALIDAD : c/IGV S/. 0.00
GARANTIA POR FIEL CUMPLIMIENTO : c/IGV S/. 0.00
OTRAS PENALIDADES : s/IGV S/. 0.00
MAYORES PRESTACION DE SERVICIO DE LA SUPER: -
04-Oct-2021

30-Apr-2020

10-Nov-2021

20-Nov-2021
siento Nº 201 Y 202 folio 12 del C.O. N° 02
PRESUPUESTO CONTRACTUAL
ITEM DESCRIPCION
UND CANT./ MTS

1 ESTRUCTURAS
1.01 OBRAS PRELIMINARES
01.01.01 ALMACEN Y GUARDIANIA glb 1.00
01.01.02 PANEL DE OBRA 3.60x7.20M UNA CARA. u 1.00
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUI glb 1.00
1.02 OBRAS PRELIMINARES
01.02.01 DESMONTAJE DE COBERTURA LIVIANA INC. TIJERALES m2 37.51
01.02.02 DESMONTAJE DE CASA PREFABRICADA glb 1.00
01.02.03 DEMOLICION DE MURO DE LADRILLO m2 20.63
01.02.04 DEMOLICION DE PISO DE CONCRETO INCLUYE FALSO PISO m2 37.51
01.02.05 ELIMINACIÓN DE MATERIAL EXCEDENTE C/EQUIPO m3 17.54
01.02.06 LIMPIEZA DE TERRENO MANUAL m2 50.38
01.02.07 TRAZO Y REPLANTEO DE OBRA S/EQUIPO m2 50.38
1.03 SEGURIDAD Y SALUD EN EL TRABAJO
01.03.01 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00
01.03.02 RECURSOS PARA RESPUESTA ANTE EMERGENCIA EN SEGU glb 1.00
01.03.03 EQUIPO DE PROTECCION INDIVIDUAL glb 1.00
01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00
1.04 MITIGACION AMBIENTAL
01.04.01 HUMEDECIMIENTO DE AREA DE TRABAJO glb 1.00
01.04.02 CONTROL DE RUIDOS MOLESTOS glb 1.00
1.05 MOVIMIENTO DE TIERRAS
01.05.01 CORTE MANUAL EN TERRENO NATURAL m3 12.00
01.05.02 EXCAVACION DE ZANJAS Y/O CIMIENTOS HMAX <=2.00 m. m3 15.00
01.05.03 EXCAVACION DE ZANJAS Y/O CIMIENTOS EN ROCA m3 20.00
01.05.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 15.00
01.05.05 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 50.00
01.05.06 ELIMINACIÓN DE MATERIAL EXCEDENTE C/EQUIPO m3 73.35
1.06 OBRAS DE CONCRETO SIMPLE
01.06.01 CONCRETO CICLOPEO (C:H 1:10 +30% P.G.) P/CIMIENTOS m3 17.50
01.06.02 CONCRETO SOBRECIMIENTO MEZCLA 1:8+25% PG MAX. 2" m3 6.00
01.06.03 ENCOFRADO Y DESENCOFRADO NORMAL P/SOBRECIMIEN m2 55.00
01.06.04 FALSO PISO E=4" CON MEZCLA C:H 1:8, CEMENTO TIPO V m2 15.00
01.06.05 VEREDAS
01.06.05.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS h=0.10 m. m2 15.00
01.06.05.02 CONCRETO VEREDAS f'c= 175 kg/cm2 A=1.20m. INCLUYE B m2 15.00
01.06.05.03 JUNTA ASFALTICA E=1" m 4.00
1.07 CONCRETO ARMADO
01.07.01 COLUMNAS
01.07.01.01 CONCRETO f'c 210 kg/cm2 P/COLUMNAS CEMENTO TIPO V m3 25.00
01.07.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 55.00
01.07.01.03 ACERO fy=4200 kg/cm2 P/COLUMNAS kg 300.00
01.07.02 VIGAS
01.07.02.01 CONCRETO f'c=210 kg/cm2 P/VIGAS m3 15.00
01.07.02.02 ENCOFRADO Y DESENCOFRADO NORMAL P/VIGAS m2 23.00
01.07.02.03 ACERO fy=4200 kg/cm2 P/VIGAS kg 300.00
2 ARQUITECTURA
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO LADRILLO K.K. 18 HUECOS DE SOGA MEZCLA C:A 1:4 m2 78.00
2.02 REVOQUES Y ENLUCIDOS
02.02.01 TARRAJEO RAYADO O PRIMARIO C/MEZCLA C:A 1:4 E=1.5 c m2 25.00
02.02.02 TARRAJEO FROTACHADO EN MUROS INTERIORES C/MEZCLA m2 50.00
02.02.03 TARRAJEO FROTACHADO EN MUROS EXTERIORES C/MEZCLA m2 20.00
02.02.04 VESTIDURA DE DERRAMES A=VARIABLE C/MEZCLA C:A 1:5 m 54.10
2.03 PISOS Y PAVIMENTOS
02.03.01 CONTRAPISO C/MEZCLA C:A 1:4 E=4 cm m2 37.65
02.03.02 PISO CEMENTO PULIDO MEZCLA 1:4 E=3cm PASTA 1:2 E=1 m2 2.08
02.03.03 PISO DE PORCELANATO PULIDO 60x60 cm m2 33.00
02.03.04 PISO DE CEMENTO PULIDO BRUÑADO E=5cm MEZCLA 1:4 E= m2 22.72
2.04 CONTRAZOCALOS
02.04.01 CONTRAZOCALO PORCELANATO H=0.10 m 34.63
2.05 ZOCALOS
02.05.01 ENCHAPE DE PORCELANATO 60x60cm (PARA COCINA Y BA m2 2.30
2.06 COBERTURAS
02.06.01 VIGAS DE MADERA 6"x6" S/MODELO p2 14.10
02.06.02 CORREAS DE MADERA S/MODELO DE 2" x 4" glb 1.00
02.06.03 COBERTURA DE ONDUCOBER O SIMILAR m2 58.81
2.07 CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA 45 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO
02.07.01 m2 3.36
2"x3"
2.08 CARPINTERIA METALICA
02.08.01 PUERTA METALICA P-01 (2.10x4.00 mt) u 1.00
02.08.02 PUERTA METALICA P-03 (0.70x2.10 mt) u 1.00
02.08.03 PROTECTOR DE VENTANA TIPO SOL NACIENTE m2 12.87
2.09 VIDRIOS
02.09.01 VENTANA C/PERFILES DE ALUMINIO - CRISTAL TEMPLADO m2 8.00
2.1 CERRAJERIA
02.10.01 BISAGRA CAPUCHINAS ALUMINIZADAS DE 3 1/2" x 3 1/2" pza 5.00
02.10.02 CERRADURA TIPO POMO O REJILLA INCLUYE COLOCACION pza 3.00
02.10.03 CERRADURA PARA PUERTA PRINCIPAL pza 1.00
2.11 PINTURA
02.11.01 PINTURA EN MUROS INTERIORES LATEX 2 MANOS m2 60.00
02.11.02 PINTURA EN MUROS EXTERIORES LATEX 2 MANOS m2 41.81
PINTURA C/BASE ZINCROMATO Y ESMALTE EPOXICO EN CARPINTERIA METALICA
02.11.03 m2 20.00
- 2 MANOS
2.13 VARIOS
02.13.01 PLACA RECORDATORIA u 1.00
3 INSTALACIONES SANITARIAS
3.01 DESAGUE Y VENTILACION
03.01.01 EXCAVACION MANUAL DE ZANJA PARA TENDIDO DE TUBERI m3 2.00
03.01.02 SALIDA DE DESAGUE DE PVC-SAL 2" pto 2.00
03.01.03 SALIDA DE DESAGUE DE PVC-SAL 4" pto 2.00
03.01.04 SALIDA VENTILACION DE 2" pto 2.00
03.01.05 TUBERIA PVC SAL CON P/DESAGUE D=2" m 3.00
03.01.06 TUBERIA PVC SAL CON P/DESAGUE D=4" m 2.00
03.01.07 CODO PVC-SAL 2"x90° pza 3.00
03.01.08 CODO SANITARIO PVC SAL 4" pza 1.00
03.01.09 YEE PVC-SAL CON REDUCCION DE 4" A 2" pza 2.00
03.01.10 YEE PVC SAL 2" pza 2.00
03.01.11 REGISTROS DE BRONCE CROMADO 4" pza 1.00
03.01.12 SOMBRERO VENTILACION 2" PVC pza 2.00
03.01.13 SUMIDERO DE BRONCE CROMADO DE 2" (INC. TRAMPA TIPO pza 1.00
03.01.14 CAJA DE REGISTRO DE ALBAÑILERIA PREFABRICADA 12" X pza 1.00
03.01.15 CANALETAS DE DRENAJE 4" m 6.00
3.02 SISTEMA DE AGUA FRIA
03.02.01 SALIDA DE AGUA FRIA C/TUBERIA PVC C-10 1/2" pto 6.00
03.02.02 SALIDA DE AGUA FRIA C/TUBERIA PVC C-10 3/4" pto 3.00
03.02.03 TUBERIA PVC CLASE 10 SP P/AGUA FRIA D=1/2" m 20.00
03.02.04 TUBERIA PVC CLASE 10 SP P/AGUA FRIA D=3/4" m 10.00
03.02.05 TEE PVC AGUA C-10 P/AGUA FRIA D=1/2" pza 8.00
03.02.06 TEE PVC AGUA C-10 3/4" CON REDUCCION DE 3/4"-1/2" pza 10.00
03.02.07 CODO PVC AGUA C-10 1/2" pza 8.00
03.02.08 CODO PVC AGUA C-10 3/4" pza 2.00
03.02.09 VALVULA DE COMPUERTA DE 3/4" pza 1.00
03.02.10 CAJA DE CONTROL PARA RIEGO PREFABRICADA 50 X 50 C u 1.00
3.03 APARATOS Y ACCESORIOS SANITARIOS
03.03.01 INODORO NACIONAL SIFON JET BLANCO O SIMILAR pza 3.00
02.03.02 LAVATORIO NACIONAL FONTANA BLANCO O SIMILAR pza 1.00
03.03.02 LAVADERO DE GRANITO pza 1.00
02.03.03 COLOCACION DE APARATOS SANITARIOS pza 5.00
4 INSTALACIONES ELECTRICAS
4.01 SALIDA PARA ELECTRIFICACION
04.01.01 SALIDA PARA CENTROS DE LUZ pto 4.00
04.01.02 SALIDA PARA BRAQUETE pto 2.00
04.01.03 SALIDA DE TOMACORRIENTE DOBLE C/PUESTA A TIERRA pto 4.00
04.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 3.00
04.01.05 SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE pto 1.00
4.02 TUBERIAS
04.02.01 TUBERIA PVC SEL ELECTRICA DE 15 mm m 15.00
04.02.02 TUBERIA PVC SEL ELECTRICA DE 20 mm m 15.00
04.02.03 TUBERIA PVC SAP ELECTRICA DE 20 mm m 5.53
4.03 CONDUCTORES Y/O CABLES
04.03.01 CABLE THW CABLEADO 2.5 mm2 m 30.00
04.03.02 CABLE TW CABLEADO 2.5 mm2 m 10.00
04.03.03 CABLE THW CABLEADO 4 mm2 m 20.00
04.03.04 CABLE TW CABLEADO 4 mm2 m 5.53
4.04 TABLEROS ELECTRICOS
04.04.01 TABLERO DE DISTRIB. CAJA METALICA CON 8 POLOS (INC. u 1.00
4.05 DISPOSITIVOS DE MANIOBRA Y PROTECCION
04.05.01 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2 X 15A pza 1.00
04.05.02 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X20A pza 1.00
04.05.03 INTERRUPTOR DIFERENCIAL MONOFASICO 2X20A pza 1.00
4.06 ARTEFACTOS DE ILUMINACION
04.06.01 ARTEFACTO AHORRADOR ESPIRAL SIMPLE 20W pza 10.00
4.07 VARIOS
04.07.01 POZO DE TIERRA u 1.00
04.07.02 PRUEBAS ELECTRICAS glb 1.00
NICHO DE CONCRETO ARMADO P/LLAVE DE FUERZA
04.07.03 u 1.00
GENERAL Y TABLERO ELECTRICO

TOTAL COSTO DIRECTO


GASTOS GENERALES 20%
UTILIDAD 10%
SUBTOTAL

IGV 18%
TOTAL PRESUPUESTO

AVANCE REAL DE OBRA (%)


AVANCE PROGRAMADO DE OBRA (%)
SUPUESTO CONTRACTUAL

PRECIO PRECIO
UNITARIO PARCIAL

3,000.00 3,000.00
2,400.00 2,400.00
1,658.28 1,658.28

10.00 375.10
273.60 273.60
11.78 243.02
28.29 1,061.16
27.60 484.10
1.50 75.57
2.35 118.55

400.00 400.00
449.90 449.90
813.45 813.45
250.00 250.00

263.42 263.42
300.00 300.00

39.09 469.08
54.72 820.80
64.89 1,297.80
31.97 479.55
5.09 254.50
27.60 2,024.54

188.99 3,307.29
242.10 1,452.58
48.67 2,676.93
28.84 432.58

33.74 506.03
136.86 2,052.83
5.46 21.84

487.06 12,176.50
51.40 2,826.89
4.38 1,314.00

420.78 6,311.64
54.58 1,255.24
4.38 1,314.00

56.00 4,368.38

18.38 459.50
18.66 933.00
26.39 527.80
11.35 614.04

26.33 991.32
28.23 58.72
46.00 1,518.00
28.17 640.02

21.47 743.51

99.56 228.99

14.64 206.42
1,200.00 1,200.00
72.31 4,252.79

198.87 668.20

800.00 800.00
308.70 308.70
60.00 772.20

150.00 1,200.00

19.73 98.65
44.39 133.17
125.00 125.00

8.82 529.20
9.47 395.94
15.00 300.00

1,120.76 1,120.76
68.40 136.80
87.71 175.42
98.42 196.84
76.74 153.48
18.08 54.24
19.95 39.90
2.89 8.67
6.45 6.45
5.50 11.00
4.19 8.38
46.78 46.78
18.88 37.76
28.50 28.50
70.00 70.00
23.70 142.20

79.65 477.90
107.35 322.05
14.22 284.40
18.88 188.80
3.05 24.40
2.79 27.90
3.84 30.72
4.12 8.24
130.00 130.00
227.40 227.40

250.00 750.00
300.00 300.00
140.50 140.50
50.00 250.00

43.50 174.00
47.86 95.72
61.46 245.84
58.06 174.18
58.45 58.45

7.66 114.90
9.14 137.10
8.86 49.00
1.46 43.80
2.16 21.60
1.94 38.80
2.58 14.27

103.04 103.04

61.13 61.13
65.08 65.08
83.93 83.93

143.27 1,432.70

949.98 949.98
189.35 189.35
100.00 100.00

84,786.68
16,957.34
8,478.67
110,222.68

19,840.08
130,062.76

100.00%
100.00%
PRESUPUESTO CONTRATO PRINCIPAL
MONTO TOTAL
I.G.V.
No. DESCRIPCION (s/IGV) (c/IGV)

01 ESTRUCTURAS 69,109.01 12,439.63 81,548.64


02 ARQUITECTURA 30,152.60 5,427.47 35,580.07
03 INSTALACIONES SANITARIAS 5,562.35 1,001.22 6,563.57
04 INSTALACIONES ELECTRICAS 5,398.75 971.77 6,370.52

TOTAL 110,222.69 19,840.09 130,062.8

MM= SALDO POR VALOR X Coef. Monomio x Ima


ESTRUCTURAS

K = 0.366*(MOr / MOo) + 0.143*(Cr / Co) + 0.052*(AGr / AGo) + 0.126*(ACCr / ACCo) + 0.064*(MNr / MNo) + 0.069*

30-Apr-2020

SIMBOLO IU ELEMENTOS INCIDENCIA COEFICIENTES Imo


%
MO 47 MANO DE OBRA INC. LEYES SOCIALE 100.000% 0.366
C 21 CEMENTO PORTLAND TIPO I 100.000% 0.143 423.68
AG 5 AGREGADO GRUESO 100.000% 0.052 216.00
ACC 3 ACERO DE CONSTRUCCION CORRUG 100.000% 0.126 544.66
MN 43 MADERA IMPORTADA PARA ENCOFRA 100.000% 0.064 713.29
ME 48 MAQUINA Y EQUIPO NACIONAL 100.000% 0.069
GGU 39 INDICE GENERAL DE PRECIOS AL C 100.000% 0.180

ARQUITECTURA
K = 0.413*(MOr / MOo) + 0.170*(Cr / Co) + 0.052*(BLr / BLo) + 0.090*(PAr / PAo) + 0.054*(MNr / MNo) + 0.053*
30-Apr-2020

SIMBOLO IU ELEMENTOS INCIDENCIA COEFICIENTES Imo


%
MO 47 MANO DE OBRA INC. LEYES SOCIALE 100.000% 0.413
C 21 CEMENTO PORTLAND TIPO I 100.000% 0.170 423.68
BL 17 BLOQUE Y LADRILLO 100.000% 0.052 680.84
PA 43 MADERA IMPORTADA PARA ENCOFRA 100.000% 0.054
MN 56 PLANCHA DE ACERO LAC 100.000% 0.090 577.91
D 30 DÓLAR 100.000% 0.053
GGU 39 INDICE GENERAL DE PRECIOS AL C 100.000% 0.168

1.000

INSTALACIONES SANITARIAS
K = 0.343*(MOr / MOo) + 0.065*(Cr / Co) + 0.244*(ASr / ASo) + 0.056*(TFFr / TFFo) + 0.125*(TPAr / TPAo
30-Apr-2020

SIMBOLO IU ELEMENTOS INCIDENCIA COEFICIENTES Imo


%
MO 47 MANO DE OBRA INC. LEYES SOCIALE 100.000% 0.343
C 21 CEMENTO PORTLAND TIPO I 100.000% 0.065
TPA 72 TUBERIA PVC PARA AGUA 100.000% 0.125
TFF 71 TUBERIA DE ACERO NEGRO Y/O GA 100.000% 0.056
AS 10 APARATO SANITARIO CON GRIFERIA 100.000% 0.244 434.73
GGU 39 INDICE GENERAL DE PRECIOS AL C 100.000% 0.167

INSTALACIONES ELECTRICAS
K = 0.310*(MOr / MOo) + 0.113*(AGr / AGo) + 0.142*(ACTr / ACTo) + 0.194*(AAOr / AAOo) + 0.073*(TPEr / T
30-Apr-2020

SIMBOLO IU ELEMENTOS INCIDENCIA COEFICIENTES Imo


%
MO 47 MANO DE OBRA INC. LEYES SOCIALE 100.000% 0.310
AG 5 AGREGADO GRUESO 100.000% 0.113
ACT 7 ALAMBRE Y CABLE TIPO TW Y THW 100.000% 0.142
AAO 12 ARTEFACTO DE ALUMBRADO INTERI 100.000% 0.194 319.40
TPE 72 TUBERIA PVC PARA AGUA 100.000% 0.073
GGU 39 INDICE GENERAL DE PRECIOS AL C 100.000% 0.168
ADELANTO DIRECTO ADELANTO MATERIALES

10% S/ 6,910.90 20% S/ 13,821.80


10% S/ 3,015.26 20% S/ 6,030.52
10% S/ 556.23 20% S/ 1,112.47
10% S/ 539.87 20% S/ 1,079.75

S/ 11,022.27 S/ 22,044.54

CALENDARIO DE MATERIALES

LOR X Coef. Monomio x Ima /Imo

Co) + 0.064*(MNr / MNo) + 0.069*(MEr / MEo) + 0.180*(GGUr /GGUo)


Oct-21
01-Nov-2021

SALDO POR MONTO A


Ima Ima/Imo VALORIZAR MM SOLICITAR

445.24 1.0509 69,109.01 S/ 10,385.49 S/ 5,000.00


244.75 1.1331 69,109.01 S/ 4,071.99 S/ 2,000.00
798.59 1.4662 69,109.01 S/ 12,767.43 S/ 6,821.80
959.24 1.3448 69,109.01 S/ 5,948.07 S/ -

S/ 33,172.98 S/ 13,821.80 S/ 13,821.80

Ao) + 0.054*(MNr / MNo) + 0.053*(Dr / Do) + 0.168*(GGUr/GGUo)


01-Nov-2021

SALDO POR MONTO A


Ima Ima/Imo VALORIZAR MM SOLICITAR
445.24 1.0509 30,152.60 S/ 5,386.79 S/ 3,500.00
1037.21 1.5234 30,152.60 S/ 2,388.63 S/ 1,000.00
S/ -
1158.53 2.0047 30,152.60 S/ 5,440.19 S/ 1,530.52

S/ 13,215.61 S/ 6,030.52 S/ 6,030.52

TFFr / TFFo) + 0.125*(TPAr / TPAo) + 0.167*(GGUr /GGUo)


01-Nov-2021

SALDO POR MONTO A


Ima Ima/Imo MM
VALORIZAR SOLICITAR

562.46 1.2938 5,562.35 S/ 1,755.98 S/ 1,112.47

S/ 1,112.47 S/ 1,112.47

*(AAOr / AAOo) + 0.073*(TPEr / TPEo) + 0.168*(GGUr / GGUo)


01-Nov-2021

SALDO POR MONTO A


Ima Ima/Imo MM
VALORIZAR SOLICITAR

346.74 1.0856 5,398.75 S/ 1,137.01 S/ 1,079.75

S/ 1,079.75 S/ 1,079.75
CRONOGRAMA VALORIZADO ACTUALIZADO - PROGRAMADO
CONTRATO PRINCIPAL

PROCESO : 0
OBRA 0

CONTRATISTA : 0

MONTO CONT. (s/IGV) : 110,222.69

MONTO POR FORMULA DEL CONTRATO (s/IGV) PLAZO DE EJECUCION (Días Calendarios):
ESTRUCTURAS : S/. 69,109.01 AMPLIACION DE PLAZO (Días Calendarios):
ARQUITECTURA : S/. 30,152.60 FECHA DE INICIO
INSTALACIONES SANITARIAS : S/. 5,562.35 FECHA TERMINO CONTRACTUAL
INSTALACIONES ELECTRICAS : S/. 5,398.75 FECHA TERMINO VIGENTE
TOTAL : S/. 110,222.69 100.00%

CRONOGRAMA VALORIZADO ACTUALIZADO - PROGRAMADO


VAL 1 VAL 2
COD. FORMULA MONTO 11-Nov-21 1-Dec-21
30-Nov-21 31-Dec-21

01 ESTRUCTURAS 69,109.01 26,650.00 26,300.00


02 ARQUITECTURA 30,152.60 0.00 12,820.00
03 INSTALACIONES SANITARIAS 5,562.35 0.00 1,600.00
04 INSTALACIONES ELECTRICAS 5,398.75 0.00 5,300.00

MONTO CONTRATO (s/IGV) 110,222.69 26,650.00 46,020.00


I.G.V. 19,840.08 4,797.00 8,283.60
MONTO CONTRATO (c/IGV) 130,062.78 31,447.00 54,303.60

AVANCE MENSUAL 100.00% 24.18% 41.75%


AVANCE ACUMULADO 24.18% 65.93%
ías Calendarios): 60
(Días Calendarios): 0
: 11-Nov-21
: 10-Jan-22
: 10-Jan-22

O
VAL 3
1-Jan-19
10-Jan-22

16,159.01 ###
17,332.60 ###
3,962.35 ###
98.75 ###
###
###
37,552.69 ###
6,759.48 ###
44,312.18 ###

34.07%
100.00%
VALORIZACION 01
PRESUPUESTO CONTRACTUAL
ITEM DESCRIPCION
UND CANT./ MTS

1 ESTRUCTURAS
1.01 OBRAS PRELIMINARES
01.01.01 ALMACEN Y GUARDIANIA glb 1.00
01.01.02 PANEL DE OBRA 3.60x7.20M UNA CARA. u 1.00
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUI glb 1.00
1.02 OBRAS PRELIMINARES
01.02.01 DESMONTAJE DE COBERTURA LIVIANA INC. TIJERALES m2 37.51
01.02.02 DESMONTAJE DE CASA PREFABRICADA glb 1.00
01.02.03 DEMOLICION DE MURO DE LADRILLO m2 20.63
01.02.04 DEMOLICION DE PISO DE CONCRETO INCLUYE FALSO PISO m2 37.51
01.02.05 ELIMINACIÓN DE MATERIAL EXCEDENTE C/EQUIPO m3 17.54
01.02.06 LIMPIEZA DE TERRENO MANUAL m2 50.38
01.02.07 TRAZO Y REPLANTEO DE OBRA S/EQUIPO m2 50.38
1.03 SEGURIDAD Y SALUD EN EL TRABAJO
01.03.01 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00
01.03.02 RECURSOS PARA RESPUESTA ANTE EMERGENCIA EN SEGU glb 1.00
01.03.03 EQUIPO DE PROTECCION INDIVIDUAL glb 1.00
01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00
1.04 MITIGACION AMBIENTAL
01.04.01 HUMEDECIMIENTO DE AREA DE TRABAJO glb 1.00
01.04.02 CONTROL DE RUIDOS MOLESTOS glb 1.00
1.05 MOVIMIENTO DE TIERRAS
01.05.01 CORTE MANUAL EN TERRENO NATURAL m3 12.00
01.05.02 EXCAVACION DE ZANJAS Y/O CIMIENTOS HMAX <=2.00 m. m3 15.00
01.05.03 EXCAVACION DE ZANJAS Y/O CIMIENTOS EN ROCA m3 20.00
01.05.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 15.00
01.05.05 REFINE, NIVELACION Y COMPACTACION DEL TERRENO m2 50.00
01.05.06 ELIMINACIÓN DE MATERIAL EXCEDENTE C/EQUIPO m3 73.35
1.06 OBRAS DE CONCRETO SIMPLE
01.06.01 CONCRETO CICLOPEO (C:H 1:10 +30% P.G.) P/CIMIENTOS m3 17.50
01.06.02 CONCRETO SOBRECIMIENTO MEZCLA 1:8+25% PG MAX. 2" m3 6.00
01.06.03 ENCOFRADO Y DESENCOFRADO NORMAL P/SOBRECIMIEN m2 55.00
01.06.04 FALSO PISO E=4" CON MEZCLA C:H 1:8, CEMENTO TIPO V m2 15.00
01.06.05 VEREDAS
01.06.05.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS h=0.10 m. m2 15.00
01.06.05.02 CONCRETO VEREDAS f'c= 175 kg/cm2 A=1.20m. INCLUYE B m2 15.00
01.06.05.03 JUNTA ASFALTICA E=1" m 4.00
1.07 CONCRETO ARMADO
01.07.01 COLUMNAS
01.07.01.01 CONCRETO f'c 210 kg/cm2 P/COLUMNAS CEMENTO TIPO V m3 25.00
01.07.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 55.00
01.07.01.03 ACERO fy=4200 kg/cm2 P/COLUMNAS kg 300.00
01.07.02 VIGAS
01.07.02.01 CONCRETO f'c=210 kg/cm2 P/VIGAS m3 15.00
01.07.02.02 ENCOFRADO Y DESENCOFRADO NORMAL P/VIGAS m2 23.00
01.07.02.03 ACERO fy=4200 kg/cm2 P/VIGAS kg 300.00
2 ARQUITECTURA
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO LADRILLO K.K. 18 HUECOS DE SOGA MEZCLA C:A 1:4 m2 78.00
2.02 REVOQUES Y ENLUCIDOS
02.02.01 TARRAJEO RAYADO O PRIMARIO C/MEZCLA C:A 1:4 E=1.5 c m2 25.00
02.02.02 TARRAJEO FROTACHADO EN MUROS INTERIORES C/MEZCLA m2 50.00
02.02.03 TARRAJEO FROTACHADO EN MUROS EXTERIORES C/MEZCLA m2 20.00
02.02.04 VESTIDURA DE DERRAMES A=VARIABLE C/MEZCLA C:A 1:5 m 54.10
2.03 PISOS Y PAVIMENTOS
02.03.01 CONTRAPISO C/MEZCLA C:A 1:4 E=4 cm m2 37.65
02.03.02 PISO CEMENTO PULIDO MEZCLA 1:4 E=3cm PASTA 1:2 E=1 m2 2.08
02.03.03 PISO DE PORCELANATO PULIDO 60x60 cm m2 33.00
02.03.04 PISO DE CEMENTO PULIDO BRUÑADO E=5cm MEZCLA 1:4 E= m2 22.72
2.04 CONTRAZOCALOS
02.04.01 CONTRAZOCALO PORCELANATO H=0.10 m 34.63
2.05 ZOCALOS
02.05.01 ENCHAPE DE PORCELANATO 60x60cm (PARA COCINA Y BA m2 2.30
2.06 COBERTURAS
02.06.01 VIGAS DE MADERA 6"x6" S/MODELO p2 14.10
02.06.02 CORREAS DE MADERA S/MODELO DE 2" x 4" glb 1.00
02.06.03 COBERTURA DE ONDUCOBER O SIMILAR m2 58.81
2.07 CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA 45 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO
02.07.01 m2 3.36
2"x3"
2.08 CARPINTERIA METALICA
02.08.01 PUERTA METALICA P-01 (2.10x4.00 mt) u 1.00
02.08.02 PUERTA METALICA P-03 (0.70x2.10 mt) u 1.00
02.08.03 PROTECTOR DE VENTANA TIPO SOL NACIENTE m2 12.87
2.09 VIDRIOS
02.09.01 VENTANA C/PERFILES DE ALUMINIO - CRISTAL TEMPLADO m2 8.00
2.1 CERRAJERIA
02.10.01 BISAGRA CAPUCHINAS ALUMINIZADAS DE 3 1/2" x 3 1/2" pza 5.00
02.10.02 CERRADURA TIPO POMO O REJILLA INCLUYE COLOCACION pza 3.00
02.10.03 CERRADURA PARA PUERTA PRINCIPAL pza 1.00
2.11 PINTURA
02.11.01 PINTURA EN MUROS INTERIORES LATEX 2 MANOS m2 60.00
02.11.02 PINTURA EN MUROS EXTERIORES LATEX 2 MANOS m2 41.81
PINTURA C/BASE ZINCROMATO Y ESMALTE EPOXICO EN CARPINTERIA METALICA
02.11.03 m2 20.00
- 2 MANOS
2.13 VARIOS
02.13.01 PLACA RECORDATORIA u 1.00
3 INSTALACIONES SANITARIAS
3.01 DESAGUE Y VENTILACION
03.01.01 EXCAVACION MANUAL DE ZANJA PARA TENDIDO DE TUBERI m3 2.00
03.01.02 SALIDA DE DESAGUE DE PVC-SAL 2" pto 2.00
03.01.03 SALIDA DE DESAGUE DE PVC-SAL 4" pto 2.00
03.01.04 SALIDA VENTILACION DE 2" pto 2.00
03.01.05 TUBERIA PVC SAL CON P/DESAGUE D=2" m 3.00
03.01.06 TUBERIA PVC SAL CON P/DESAGUE D=4" m 2.00
03.01.07 CODO PVC-SAL 2"x90° pza 3.00
03.01.08 CODO SANITARIO PVC SAL 4" pza 1.00
03.01.09 YEE PVC-SAL CON REDUCCION DE 4" A 2" pza 2.00
03.01.10 YEE PVC SAL 2" pza 2.00
03.01.11 REGISTROS DE BRONCE CROMADO 4" pza 1.00
03.01.12 SOMBRERO VENTILACION 2" PVC pza 2.00
03.01.13 SUMIDERO DE BRONCE CROMADO DE 2" (INC. TRAMPA TIPO pza 1.00
03.01.14 CAJA DE REGISTRO DE ALBAÑILERIA PREFABRICADA 12" X pza 1.00
03.01.15 CANALETAS DE DRENAJE 4" m 6.00
3.02 SISTEMA DE AGUA FRIA
03.02.01 SALIDA DE AGUA FRIA C/TUBERIA PVC C-10 1/2" pto 6.00
03.02.02 SALIDA DE AGUA FRIA C/TUBERIA PVC C-10 3/4" pto 3.00
03.02.03 TUBERIA PVC CLASE 10 SP P/AGUA FRIA D=1/2" m 20.00
03.02.04 TUBERIA PVC CLASE 10 SP P/AGUA FRIA D=3/4" m 10.00
03.02.05 TEE PVC AGUA C-10 P/AGUA FRIA D=1/2" pza 8.00
03.02.06 TEE PVC AGUA C-10 3/4" CON REDUCCION DE 3/4"-1/2" pza 10.00
03.02.07 CODO PVC AGUA C-10 1/2" pza 8.00
03.02.08 CODO PVC AGUA C-10 3/4" pza 2.00
03.02.09 VALVULA DE COMPUERTA DE 3/4" pza 1.00
03.02.10 CAJA DE CONTROL PARA RIEGO PREFABRICADA 50 X 50 C u 1.00
3.03 APARATOS Y ACCESORIOS SANITARIOS
03.03.01 INODORO NACIONAL SIFON JET BLANCO O SIMILAR pza 3.00
02.03.02 LAVATORIO NACIONAL FONTANA BLANCO O SIMILAR pza 1.00
03.03.02 LAVADERO DE GRANITO pza 1.00
02.03.03 COLOCACION DE APARATOS SANITARIOS pza 5.00
4 INSTALACIONES ELECTRICAS
4.01 SALIDA PARA ELECTRIFICACION
04.01.01 SALIDA PARA CENTROS DE LUZ pto 4.00
04.01.02 SALIDA PARA BRAQUETE pto 2.00
04.01.03 SALIDA DE TOMACORRIENTE DOBLE C/PUESTA A TIERRA pto 4.00
04.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 3.00
04.01.05 SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE pto 1.00
4.02 TUBERIAS
04.02.01 TUBERIA PVC SEL ELECTRICA DE 15 mm m 15.00
04.02.02 TUBERIA PVC SEL ELECTRICA DE 20 mm m 15.00
04.02.03 TUBERIA PVC SAP ELECTRICA DE 20 mm m 5.53
4.03 CONDUCTORES Y/O CABLES
04.03.01 CABLE THW CABLEADO 2.5 mm2 m 30.00
04.03.02 CABLE TW CABLEADO 2.5 mm2 m 10.00
04.03.03 CABLE THW CABLEADO 4 mm2 m 20.00
04.03.04 CABLE TW CABLEADO 4 mm2 m 5.53
4.04 TABLEROS ELECTRICOS
04.04.01 TABLERO DE DISTRIB. CAJA METALICA CON 8 POLOS (INC. u 1.00
4.05 DISPOSITIVOS DE MANIOBRA Y PROTECCION
04.05.01 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2 X 15A pza 1.00
04.05.02 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X20A pza 1.00
04.05.03 INTERRUPTOR DIFERENCIAL MONOFASICO 2X20A pza 1.00
4.06 ARTEFACTOS DE ILUMINACION
04.06.01 ARTEFACTO AHORRADOR ESPIRAL SIMPLE 20W pza 10.00
4.07 VARIOS
04.07.01 POZO DE TIERRA u 1.00
04.07.02 PRUEBAS ELECTRICAS glb 1.00
NICHO DE CONCRETO ARMADO P/LLAVE DE FUERZA
04.07.03 u 1.00
GENERAL Y TABLERO ELECTRICO

TOTAL COSTO DIRECTO


GASTOS GENERALES 20%
UTILIDAD 10%
SUBTOTAL

IGV 18%
TOTAL PRESUPUESTO

AVANCE REAL DE OBRA (%)


AVANCE PROGRAMADO DE OBRA (%)

ESTRUCTURAS

TOTAL COSTO DIRECTO


GASTOS GENERALES 20%
UTILIDAD 10%
SUBTOTAL

IGV 18%
TOTAL PRESUPUESTO

AVANCE REAL DE OBRA (%)


AVANCE PROGRAMADO DE OBRA (%)
ARQUITECTURA

TOTAL COSTO DIRECTO


GASTOS GENERALES 20%
UTILIDAD 10%
SUBTOTAL

IGV 18%
TOTAL PRESUPUESTO

AVANCE REAL DE OBRA (%)


AVANCE PROGRAMADO DE OBRA (%)

INSTALACIONES SANITARIAS

TOTAL COSTO DIRECTO


GASTOS GENERALES 20%
UTILIDAD 10%
SUBTOTAL

IGV 18%
TOTAL PRESUPUESTO

AVANCE REAL DE OBRA (%)


AVANCE PROGRAMADO DE OBRA (%)

INSTALACIONES ELECTRICAS

TOTAL COSTO DIRECTO


GASTOS GENERALES 20%
UTILIDAD 10%
SUBTOTAL

IGV 18%
TOTAL PRESUPUESTO

AVANCE REAL DE OBRA (%)


AVANCE PROGRAMADO DE OBRA (%)
RIZACION 01
SUPUESTO CONTRACTUAL ACUMULADO MES ANTERIOR PRESENTE VALORIZACION

PRECIO PRECIO
UNITARIO PARCIAL METRADO S/. % METRADO S/. %

3,000.00 3,000.00 1.00 3,000.00 100.00%


2,400.00 2,400.00 1.00 2,400.00 100.00%
1,658.28 1,658.28 0.50 829.14 50.00%
0.00
10.00 375.10 37.51 375.10 100.00%
273.60 273.60 1.00 273.60 100.00%
11.78 243.02 20.63 243.02 100.00%
28.29 1,061.16 37.51 1,061.16 100.00%
27.60 484.10 17.54 484.10 100.00%
1.50 75.57 50.38 75.57 100.00%
2.35 118.55 50.38 118.55 100.00%

400.00 400.00 0.70 280.00 70.00%


449.90 449.90 0.70 314.93 70.00%
813.45 813.45 1.00 813.45 100.00%
250.00 250.00 1.00 250.00 100.00%

263.42 263.42 1.00 263.42 100.00%


300.00 300.00 1.00 300.00 100.00%

39.09 469.08 12.00 469.08 100.00%


54.72 820.80 15.00 820.80 100.00%
64.89 1,297.80 20.00 1,297.80 100.00%
31.97 479.55 15.00 479.55 100.00%
5.09 254.50 50.00 254.50 100.00%
27.60 2,024.54 30.72 848.01 41.89%

188.99 3,307.29 17.50 3,307.29 100.00%


242.10 1,452.58 6.00 1,452.58 100.00%
48.67 2,676.93 55.00 2,676.93 100.00%
28.84 432.58 0.00 0.00%

33.74 506.03 0.00 0.00%


136.86 2,052.83 0.00 0.00%
5.46 21.84 0.00 0.00%
487.06 12,176.50 10.00 4,870.60 40.00%
51.40 2,826.89 25.00 1,284.95 45.45%
4.38 1,314.00 300.00 1,314.00 100.00%

420.78 6,311.64 0.00 0.00%


54.58 1,255.24 0.00 0.00%
4.38 1,314.00 0.00 0.00%

56.00 4,368.38 20.00 1,120.10 25.64%

18.38 459.50 0.00 0.00%


18.66 933.00 0.00 0.00%
26.39 527.80 0.00 0.00%
11.35 614.04 0.00 0.00%

26.33 991.32 0.00 0.00%


28.23 58.72 0.00 0.00%
46.00 1,518.00 0.00 0.00%
28.17 640.02 0.00 0.00%

21.47 743.51 0.00 0.00%

99.56 228.99 0.00 0.00%

14.64 206.42 0.00 0.00%


1,200.00 1,200.00 0.00 0.00%
72.31 4,252.79 0.00 0.00%

198.87 668.20 0.00 0.00%

800.00 800.00 0.00 0.00%


308.70 308.70 0.00 0.00%
60.00 772.20 0.00 0.00%

150.00 1,200.00 0.00 0.00%

19.73 98.65 0.00 0.00%


44.39 133.17 0.00 0.00%
125.00 125.00 0.00 0.00%

8.82 529.20 0.00 0.00%


9.47 395.94 0.00 0.00%
15.00 300.00 0.00 0.00%
1,120.76 1,120.76 0.00 0.00%

68.40 136.80 1.00 68.40 50.00%


87.71 175.42 1.00 87.71 50.00%
98.42 196.84 1.00 98.42 50.00%
76.74 153.48 1.00 76.74 50.00%
18.08 54.24 2.00 36.16 66.67%
19.95 39.90 1.00 19.95 50.00%
2.89 8.67 1.00 2.89 33.33%
6.45 6.45 1.00 6.45 100.00%
5.50 11.00 1.00 5.50 50.00%
4.19 8.38 1.00 4.19 50.00%
46.78 46.78 0.00 0.00%
18.88 37.76 0.00 0.00%
28.50 28.50 0.00 0.00%
70.00 70.00 0.00 0.00%
23.70 142.20 0.00 0.00%

79.65 477.90 3.00 238.95 50.00%


107.35 322.05 1.00 107.35 33.33%
14.22 284.40 11.00 156.42 55.00%
18.88 188.80 4.96 93.64 49.60%
3.05 24.40 1.00 3.05 12.50%
2.79 27.90 2.00 5.58 20.00%
3.84 30.72 4.00 15.36 50.00%
4.12 8.24 1.00 4.12 50.00%
130.00 130.00 0.00 0.00%
227.40 227.40 0.00 0.00%

250.00 750.00 0.00 0.00%


300.00 300.00 0.00 0.00%
140.50 140.50 0.00 0.00%
50.00 250.00 0.00 0.00%

43.50 174.00 0.00 0.00%


47.86 95.72 0.00 0.00%
61.46 245.84 0.00 0.00%
58.06 174.18 0.00 0.00%
58.45 58.45 0.00 0.00%

7.66 114.90 0.00 0.00%


9.14 137.10 0.00 0.00%
8.86 49.00 0.00 0.00%
1.46 43.80 0.00 0.00%
2.16 21.60 0.00 0.00%
1.94 38.80 0.00 0.00%
2.58 14.27 0.00 0.00%

103.04 103.04 0.00 0.00%

61.13 61.13 0.00 0.00%


65.08 65.08 0.00 0.00%
83.93 83.93 0.00 0.00%

143.27 1,432.70 0.00 0.00%

949.98 949.98 0.00 0.00%


189.35 189.35 0.00 0.00%
100.00 100.00 0.00 0.00%

84,786.68 32,309.11
16,957.34 6,461.82
8,478.67 3,230.91
110,222.68 42,001.84

19,840.08 7,560.33
130,062.76 49,562.17

100.00% 38.11%
100.00% 38.11%

53,160.77 30,158.13
- 6,031.63
- 3,015.81
53,160.77 39,205.56

9,568.94 7,057.00
62,729.71 46,262.56

100.00% 73.75%
100.00% 73.75%
23,194.31 1,120.10
- 224.02
- 112.01
23,194.31 1,456.13

4,174.98 262.10
27,369.29 1,718.23

100.00% 6.28%
100.00% 6.28%

4,278.73 1,030.88
- 206.18
- 103.09
4,278.73 1,340.15

770.17 241.23
5,048.90 1,581.38

100.00% 31.32%
100.00% 31.32%

4,152.86 -
- -
- -
4,152.86 -

747.52 -
4,900.38 -

100.00% 0.00%
100.00% 0.00%

84,786.68
ACUMULADO MES ACTUAL SALDO POR VALORIZAR

METRADO S/. % METRADO S/. %

1.00 3,000.00 100.00% 0.00 0.00 0.00%


1.00 2,400.00 100.00% 0.00 0.00 0.00%
0.50 829.14 50.00% 0.50 829.14 50.00%

37.51 375.10 100.00% 0.00 0.00 0.00%


1.00 273.60 100.00% 0.00 0.00 0.00%
20.63 243.02 100.00% 0.00 0.00 0.00%
37.51 1,061.16 100.00% 0.00 0.00 0.00%
17.54 484.10 100.00% 0.00 0.00 0.00%
50.38 75.57 100.00% 0.00 0.00 0.00%
50.38 118.55 100.00% 0.00 0.00 0.00%

0.70 280.00 70.00% 0.30 120.00 30.00%


0.70 314.93 70.00% 0.30 134.97 30.00%
1.00 813.45 100.00% 0.00 0.00 0.00%
1.00 250.00 100.00% 0.00 0.00 0.00%

1.00 263.42 100.00% 0.00 0.00 0.00%


1.00 300.00 100.00% 0.00 0.00 0.00%

12.00 469.08 100.00% 0.00 0.00 0.00%


15.00 820.80 100.00% 0.00 0.00 0.00%
20.00 1,297.80 100.00% 0.00 0.00 0.00%
15.00 479.55 100.00% 0.00 0.00 0.00%
50.00 254.50 100.00% 0.00 0.00 0.00%
30.72 848.01 41.89% 42.63 1,176.53 58.11%

17.50 3,307.29 100.00% 0.00 0.00 0.00%


6.00 1,452.58 100.00% 0.00 0.00 0.00%
55.00 2,676.93 100.00% 0.00 0.00 0.00%
0.00 0.00 0.00% 15.00 432.58 100.00%

0.00 0.00 0.00% 15.00 506.03 100.00%


0.00 0.00 0.00% 15.00 2,052.83 100.00%
0.00 0.00 0.00% 4.00 21.84 100.00%
10.00 4,870.60 40.00% 15.00 7,305.90 60.00%
25.00 1,284.95 45.45% 30.00 1,541.94 54.55%
300.00 1,314.00 100.00% 0.00 0.00 0.00%

0.00 0.00 0.00% 15.00 6,311.64 100.00%


0.00 0.00 0.00% 23.00 1,255.24 100.00%
0.00 0.00 0.00% 300.00 1,314.00 100.00%

20.00 1,120.10 25.64% 58.00 3,248.28 74.36%

0.00 0.00 0.00% 25.00 459.50 100.00%


0.00 0.00 0.00% 50.00 933.00 100.00%
0.00 0.00 0.00% 20.00 527.80 100.00%
0.00 0.00 0.00% 54.10 614.04 100.00%

0.00 0.00 0.00% 37.65 991.32 100.00%


0.00 0.00 0.00% 2.08 58.72 100.00%
0.00 0.00 0.00% 33.00 1,518.00 100.00%
0.00 0.00 0.00% 22.72 640.02 100.00%

0.00 0.00 0.00% 34.63 743.51 100.00%

0.00 0.00 0.00% 2.30 228.99 100.00%

0.00 0.00 0.00% 14.10 206.42 100.00%


0.00 0.00 0.00% 1.00 1,200.00 100.00%
0.00 0.00 0.00% 58.81 4,252.79 100.00%

0.00 0.00 0.00% 3.36 668.20 100.00%

0.00 0.00 0.00% 1.00 800.00 100.00%


0.00 0.00 0.00% 1.00 308.70 100.00%
0.00 0.00 0.00% 12.87 772.20 100.00%

0.00 0.00 0.00% 8.00 1,200.00 100.00%

0.00 0.00 0.00% 5.00 98.65 100.00%


0.00 0.00 0.00% 3.00 133.17 100.00%
0.00 0.00 0.00% 1.00 125.00 100.00%

0.00 0.00 0.00% 60.00 529.20 100.00%


0.00 0.00 0.00% 41.81 395.94 100.00%
0.00 0.00 0.00% 20.00 300.00 100.00%
0.00 0.00 0.00% 1.00 1,120.76 100.00%

1.00 68.40 50.00% 1.00 68.40 50.00%


1.00 87.71 50.00% 1.00 87.71 50.00%
1.00 98.42 50.00% 1.00 98.42 50.00%
1.00 76.74 50.00% 1.00 76.74 50.00%
2.00 36.16 66.67% 1.00 18.08 33.33%
1.00 19.95 50.00% 1.00 19.95 50.00%
1.00 2.89 33.33% 2.00 5.78 66.67%
1.00 6.45 100.00% 0.00 0.00 0.00%
1.00 5.50 50.00% 1.00 5.50 50.00%
1.00 4.19 50.00% 1.00 4.19 50.00%
0.00 0.00 0.00% 1.00 46.78 100.00%
0.00 0.00 0.00% 2.00 37.76 100.00%
0.00 0.00 0.00% 1.00 28.50 100.00%
0.00 0.00 0.00% 1.00 70.00 100.00%
0.00 0.00 0.00% 6.00 142.20 100.00%

3.00 238.95 50.00% 3.00 238.95 50.00%


1.00 107.35 33.33% 2.00 214.70 66.67%
11.00 156.42 55.00% 9.00 127.98 45.00%
4.96 93.64 49.60% 5.04 95.16 50.40%
1.00 3.05 12.50% 7.00 21.35 87.50%
2.00 5.58 20.00% 8.00 22.32 80.00%
4.00 15.36 50.00% 4.00 15.36 50.00%
1.00 4.12 50.00% 1.00 4.12 50.00%
0.00 0.00 0.00% 1.00 130.00 100.00%
0.00 0.00 0.00% 1.00 227.40 100.00%

0.00 0.00 0.00% 3.00 750.00 100.00%


0.00 0.00 0.00% 1.00 300.00 100.00%
0.00 0.00 0.00% 1.00 140.50 100.00%
0.00 0.00 0.00% 5.00 250.00 100.00%

0.00 0.00 0.00% 4.00 174.00 100.00%


0.00 0.00 0.00% 2.00 95.72 100.00%
0.00 0.00 0.00% 4.00 245.84 100.00%
0.00 0.00 0.00% 3.00 174.18 100.00%
0.00 0.00 0.00% 1.00 58.45 100.00%

0.00 0.00 0.00% 15.00 114.90 100.00%


0.00 0.00 0.00% 15.00 137.10 100.00%
0.00 0.00 0.00% 5.53 49.00 100.00%
0.00 0.00 0.00% 30.00 43.80 100.00%
0.00 0.00 0.00% 10.00 21.60 100.00%
0.00 0.00 0.00% 20.00 38.80 100.00%
0.00 0.00 0.00% 5.53 14.27 100.00%

0.00 0.00 0.00% 1.00 103.04 100.00%

0.00 0.00 0.00% 1.00 61.13 100.00%


0.00 0.00 0.00% 1.00 65.08 100.00%
0.00 0.00 0.00% 1.00 83.93 100.00%

0.00 0.00 0.00% 10.00 1,432.70 100.00%

0.00 0.00 0.00% 1.00 949.98 100.00%


0.00 0.00 0.00% 1.00 189.35 100.00%
0.00 0.00 0.00% 1.00 100.00 100.00%

32,309.11 52,477.57
6,461.82 10,495.51
3,230.91 5,247.76
42,001.84 68,220.84

7,560.33 12,279.75
49,562.17 80,500.59

38.11% 61.89%
38.11% 61.89%

30,158.13 23,002.65
6,031.63 4,600.53
3,015.81 2,300.26
39,205.56 29,903.44

7,057.00 5,382.62
46,262.56 35,286.06

73.75% 56.25%
73.75% 56.25%
1,120.10 22,074.21
224.02 4,414.84
112.01 2,207.42
1,456.13 28,696.48

262.10 5,165.37
1,718.23 33,861.84

6.28% 123.72%
6.28% 123.72%

1,030.88 3,247.85
206.18 649.57
103.09 324.78
1,340.15 4,222.20

241.23 760.00
1,581.38 4,982.19

31.32% 98.68%
31.32% 98.68%

- 4,152.86
- 830.57
- 415.29
- 5,398.72

- 971.77
- 6,370.49

0.00% 130.00%
0.00% 130.00%
ESTRUCTURAS

K = 0.366*(MOr / MOo) + 0.143*(Cr / Co) + 0.052*(AGr / AGo) + 0.126*(ACCr / ACCo) + 0.064*(MNr / MNo) + 0.069*(M

SIMBOLO IU ELEMENTOS INCIDENCIA COEFICIENTES


%
MO 47 MANO DE OBRA INC. LEYES SOCIALES 100.000% 0.366
C 21 CEMENTO PORTLAND TIPO I 100.000% 0.143
AG 5 AGREGADO GRUESO 100.000% 0.052
ACC 3 ACERO DE CONSTRUCCION CORRUGADO 100.000% 0.126
MN 43 MADERA IMPORTADA PARA ENCOFRADO Y CA 100.000% 0.064
ME 48 MAQUINA Y EQUIPO NACIONAL 100.000% 0.069
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMID 100.000% 0.180

ARQUITECTURA
K = 0.413*(MOr / MOo) + 0.170*(Cr / Co) + 0.052*(BLr / BLo) + 0.090*(PAr / PAo) + 0.054*(MNr / MNo) + 0.053*(D

SIMBOLO IU ELEMENTOS INCIDENCIA COEFICIENTES


%
MO 47 MANO DE OBRA INC. LEYES SOCIALES 100.000% 0.413
C 21 CEMENTO PORTLAND TIPO I 100.000% 0.170
BL 17 BLOQUE Y LADRILLO 100.000% 0.052
PA 43 MADERA IMPORTADA PARA ENCOFRADO Y CA 100.000% 0.054
MN 56 PLANCHA DE ACERO LAC 100.000% 0.090
D 30 DÓLAR 100.000% 0.053
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMID 100.000% 0.168

INSTALACIONES SANITARIAS
K = 0.343*(MOr / MOo) + 0.065*(Cr / Co) + 0.244*(ASr / ASo) + 0.056*(TFFr / TFFo) + 0.125*(TPAr / TPAo)

SIMBOLO IU ELEMENTOS INCIDENCIA COEFICIENTES


%
MO 47 MANO DE OBRA INC. LEYES SOCIALES 100.000% 0.343
C 21 CEMENTO PORTLAND TIPO I 100.000% 0.065
TPA 72 TUBERIA PVC PARA AGUA 100.000% 0.125
TFF 71 TUBERIA DE ACERO NEGRO Y/O GALVANIZAD 100.000% 0.056
AS 10 APARATO SANITARIO CON GRIFERIA 100.000% 0.244
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMID 100.000% 0.167

1.000

INSTALACIONES ELECTRICAS
K = 0.310*(MOr / MOo) + 0.113*(AGr / AGo) + 0.142*(ACTr / ACTo) + 0.194*(AAOr / AAOo) + 0.073*(TPEr / TP

SIMBOLO IU ELEMENTOS INCIDENCIA COEFICIENTES


%
MO 47 MANO DE OBRA INC. LEYES SOCIALES 100.000% 0.310
AG 5 AGREGADO GRUESO 100.000% 0.113
ACT 7 ALAMBRE Y CABLE TIPO TW Y THW 100.000% 0.142
AAO 12 ARTEFACTO DE ALUMBRADO INTERIOR 100.000% 0.194
TPE 72 TUBERIA PVC PARA AGUA 100.000% 0.073
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMID 100.000% 0.168

1.000
/ ACCo) + 0.064*(MNr / MNo) + 0.069*(MEr / MEo) + 0.180*(GGUr /GGUo)
Oct-21

Io Ir K

Apr-20 Nov-21
619.99 653.54 0.3858
423.68 445.24 0.1503
216.00 244.75 0.0589
544.66 798.59 0.1847
713.29 959.24 0.0861
375.26 396.27 0.0729
464.96 494.23 0.1913

K= 1.130
Ka = 1.130

Ar / PAo) + 0.054*(MNr / MNo) + 0.053*(Dr / Do) + 0.168*(GGUr/GGUo)

Io Ir K

Apr-20 Nov-21
619.99 653.54 0.4353
423.68 445.24 0.1787
680.84 1037.21 0.0792
713.29 959.24 0.0726
577.91 1158.53 0.1804
511.28 642.27 0.0666
464.96 494.23 0.1786

K= 1.191
Ka = 1.191

056*(TFFr / TFFo) + 0.125*(TPAr / TPAo) + 0.167*(GGUr /GGUo)

Io Ir K

Apr-20 Nov-21
619.99 653.54 0.3616
423.68 445.24 0.0683
445.46 600.88 0.1686
660.29 660.29 0.0560
434.73 562.46 0.3157
464.96 494.23 0.1775
K= 1.148

0.194*(AAOr / AAOo) + 0.073*(TPEr / TPEo) + 0.168*(GGUr / GGUo)

Io Ir K

Apr-20 Nov-21
619.99 653.54 0.3268
216.00 244.75 0.1280
688.72 1050.75 0.2166
319.40 346.74 0.2106
445.46 600.88 0.0985
464.96 464.96 0.1680

K= 1.149
REINTE

CONTARISTA
MONTO CONTRACTUAL

CRONOGRAMA VALORIZADO
N° VALORIZACION VALORIZACION PRINCIPAL EJECUTADO
PROGRAMADO

MES ACUMULADO MES

ESTRUCTURAS

1 Nov-21 S/ 26,650.00 S/ 26,650.00 S/ 39,205.56

ARQUITECTURA

1 Nov-21 S/ - S/ - 1456.127

INST SANITARIAS

1 Nov-21 S/ - S/ - 1340.150

INST ELECTRICAS

1 Nov-21 S/ - S/ - 0.000

S/ 26,650.00
REINTEGRO POR REAJUSTE

R= Vx K-1
PAGO PROGRAMADO MES DE PAGO REAL REINTEGRO
IZACION PRINCIPAL EJECUTADO
K-1 MES K-1 MES PROGRAMADO EJECUTADO

ACUMULADO

S/ 39,205.56 0.130 0.130 S/ 3,464.76 S/ 5,097.10

1456.127 0.191 0.191 S/ - S/ 278.72

1340.150 0.148 0.148 S/ - S/ 197.92

0.000 0.149 S/ 0.15 S/ - S/ -

S/ 42,001.84
REINTEGRO DEDUCCION
BRUTO REINTEGRO
AUTORIZAD DIRECTO MATERIALES NETO
O AUTORIZADO

S/ 5,097.10 S/ 5,097.10

S/ 278.72 S/ 278.72

S/ 197.92 S/ 197.92

S/ - S/ -

S/ 5,573.74
DEDUCCION DEL REAJUSTES QUE NO CORRESPONDEN
POR EL ADELANTO EN DIRECTO

C A.D Ka
MONTO
ADELANTO DIRECTO nov
DESCRIPCION (s/IGV)

ESTRUCTURAS S/ 69,109.01 S/ 6,910.90 1.1300


ARQUITECTURA S/ 30,152.60 S/ 3,015.26 1.1914
INSTALACIONES SANITARIAS S/ 5,562.35 S/ 556.23 1.1477
INSTALACIONES ELECTRICAS S/ 5,398.75 S/ 539.87 1.1485
S/ 110,222.69 S/ 11,022.27

N° MES MONTO DE VAL REAJUSTE Nov-21


V K Ka

ESTRUCTURAS
1 Nov-21 S/ 39,205.56 1.1300 1.1300

ARQUITECTURA
1 Nov-21 S/ 1,456.13 1.1914 1.1914

INST SANITARIAS
1 Nov-21 S/ 1,340.15 1.1477 1.1477

INST ELECTRICAS
1 Nov-21 S/ - 1.1485 1.1485
CORRESPONDEN
ECTO

Donde:
D = Deducción del Reajuste que no corresponde
A.D. = Adelanto Directo Otorgado sin IGV
C = Monto del contrato principal si IGV.
V = Valorización Ejecutada.
K = Coeficiente de reajuste de la valorización (fecha del pago
Ka = Coeficiente del reajuste del mes en que se otorgó el adela

DEDUCCION
S/ -

S/ -

S/ -

S/ -

S/ -
ste que no corresponde
orgado sin IGV
principal si IGV.

te de la valorización (fecha del pago de la valoriz)


ste del mes en que se otorgó el adelanto
A= Coef. x V, no puede superar Mont. Adelanto deflactado

MONTO DE
N° MES IU MATERIAL
VALORIZACION

ESTRUCTURAS
1 Nov-21 21 CEMENTO PORTLAND TIPO I S/ 39,205.56
5 AGREGADO GRUESO S/ 39,205.56
3 ACERO DE CONSTRUCCION CORRUGADO S/ 39,205.56

ARQUITECTURA
1 Nov-21 21 CEMENTO PORTLAND TIPO I S/ 1,456.13
17 BLOQUE Y LADRILLO S/ 1,456.13
donde:
D= Es la deducción en cada valorización bruta reajustada
Imo = es el índice a la fecha del presupuesto base, del elemento representativo dentro del que se encu
Ima = Es el índice del mismo elemento a la fecha efectiva del adelanto
Imr = Es el Índice del mismo elemento a la fecha del reajuste

MONTO COEF INC. % ADELANTO


OTORGADO Ima Imo Imr DEDUCCION
MONOMIO MONOMIO UTILIZADO
A.M
A Nov-21 Apr-20 C % Cx%Xv
Nov-21 A

S/ 5,000.00 445.24 423.68 445.24 0.143 100% S/ 4,757.88 S/ -


S/ 2,000.00 244.75 216.00 244.75 0.052 100% S/ 1,765.07 S/ -
S/ 6,821.80 798.59 544.66 798.59 0.126 100% S/ 4,652.65 S/ -

S/ -

S/ 3,500.00 445.24 423.68 445.24 0.17 100% S/ 247.54 S/ -


S/ 1,000.00 1037.21 680.84 1037.21 0.052 100% S/ 75.72 S/ -

S/ -
dentro del que se encuentra el material o materiales para los cuales se otorgo el adelanto.

DEFLACTADO

A(Imo/Ima)

S/ 4,757.88 S/ 5,606.40
S/ 1,765.07
S/ 4,652.65

S/ 3,330.52
S/ 656.41
AMORTIZACIÓN DE ADELANTO PARA MATERIALES
𝑨= 𝑴𝒂𝒕𝒆𝒓𝒊𝒂𝒍 𝒖𝒕𝒊𝒍𝒊𝒛𝒂𝒅𝒐 𝒙 𝒑𝒓𝒆𝒄𝒊𝒐 𝒖𝒏𝒊𝒕𝒂𝒓𝒊𝒐 𝒙 𝑰𝒎𝒂/𝑰𝒎𝒐
A: Amortización
Precios unitario: precio del elemento representativo sin IGV
Imo: es elíndiceelefechadelPresupuestoBase,delelementorepresentativodentrodelqueseencuentraelmaterialoma
Ima:eselíndicedelmismoelementorepresentativoalafechaefectivadeladelanto.

FORMULA ESTRUCTURAS

N° MES VAL. IU COEFICIENTE %


ELEMENTO
FACTOR INCIDENCIA

ESTRUCTURAS
1 Nov-21 21 CEMENTO PORTLAND TI 0.143 100%
5 AGREGADO GRUESO 0.052 100%
3 ACERO DE CONSTRUC 0.126 100%

ARQUITECTURA
1 NOV 21 CEMENTO PORTLAND TI 0.17 100%
17 BLOQUE Y LADRILLO 0.052 100%
ES

eseencuentraelmaterialomaterialesparaloscualesseotorgóeladelanto.

MULA ESTRUCTURAS

MONTO
INDICE MONTO AMORTIZAR ADELANTO SALDO A
UTILIZADO OTORGADO MORTIZAR
Ima Imo 𝑨= 𝑴𝒂𝒕𝒆𝒓𝒊𝒂𝒍 𝒖𝒕𝒊𝒍𝒊𝒛𝒂𝒅𝒐
𝒙 𝒑𝒓𝒆𝒄𝒊𝒐 𝒖𝒏𝒊𝒕𝒂𝒓𝒊𝒐 𝒙
𝑰𝒎𝒂/𝑰𝒎𝒐

445.24 423.68 S/ 4,757.88 S/ 5,000.00 S/ 5,000.00 S/ -


244.75 216.00 S/ 1,765.07 S/ 2,000.00 S/ 2,000.00 S/ -
798.59 544.66 S/ 4,652.65 S/ 6,821.80 S/ 6,821.80 S/ -

S/ 13,821.80 S/ 13,821.80

445.24 423.68 S/ 247.54 S/ 260.14 S/ 3,500.00 S/ 3,239.86


1037.21 680.84 S/ 75.72 S/ 115.35 S/ 1,000.00 S/ 884.65

S/ 375.49 S/ 4,124.51
RESUMEN DE VALORIZAC
NOV 2021
OBRA:

CONTRATISTA:
SUPERVISOR:

PRESUPUESTO REFERENCIAL (sin IGV) S/. 122,469.66


PRESUPUESTO CONTRATADO (sin IGV) S/. 110,222.69

MONTO
DESCRIPCIÓN CONTRATADO
SIN IGV (S/.)

VALORIZACIÓN (V) 110,222.69

TOTAL CONTRACTUAL (Avances en porcentaje)

REAJUSTES (R)

DEDUCCIONES (D)
POR ADELANTO EN EFECTIVO
Estructuras
Arquitectura
Instalaciones Sanitarias
Instalaciones electricas
POR ADELANTO PARA MATERIALES
Estructuras
Arquitectura
Instalaciones Sanitarias
Instalaciones electricas

VALORIZACIÓN BRUTA (VB = V + R - D)

AMORTIZACIONES (A)
AMORTIZACION DEL ADELANTO EN EFECTIVO 11,022.27
AMORTIZACION DEL ADELANTO PARA MATERIALES 22,044.54
TOTAL AMORTIZACIONES (A)

VALORIZACIÓN NETA (VN = VB - A)

RETENCIONES ( C )
FONDOS DE GARANTIA (5% X VB)

TOTAL

MONTO A PAGAR AL CONTRATISTA


EN EFECTIVO (VN-C)
MONTO POR I.G.V. (VN x 0,18)
MONTO TOTAL CON I.G.V.

TOTAL COMPROMISO DE PAGO>>>>>>>>>>>>>>>>


ESUMEN DE VALORIZACION N°01
NOV 2021

VALORIZACION
% DE AVANCE SALDO POR
ANTERIOR ACTUAL ACUMULADO ACUMULADO VALORIZAR (S/.)
(S/.) (S/.) (S/.)

0.00 42,001.84 42,001.84 38.11% 68,220.85

0.00% 38.11% 38.11% 61.89%

5,573.74

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00 47,575.58 47,575.58

0.00 4,200.18 4,200.18 6,822.09


0.00 14,197.29 14,197.29 7,847.25
0.00 18,397.48 18,397.48

0.00 29,178.11 29,178.11

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00

0.00 29,178.11
5,252.06
34,430.17

S/. 34,430.17
S/ 10,507.25
RESOLUCIÓN JEFATURAL N° 113-2020-INEI

ÍNDICES UNIFICADOS DE PRECIOS DEL MES DE ABRIL DEL 2020


ÁREAS GEOGRÁFICAS
(Base : Julio 1992 = 100,0)

Cod. 1 2 3 4 5 6 Cod. 1
01 975.34 975.34 975.34 975.34 975.34 975.34 02 566.04
03 544.66 544.66 544.66 544.66 544.66 544.66 04 567.91
05 450.29 216.00 433.03 608.98 (*) 621.70 06 925.63
07 688.72 688.72 688.72 688.72 688.72 688.72 08 855.53
09 285.52 285.52 285.52 285.52 285.52 285.52 10 434.73
11 256.20 256.20 256.20 256.20 256.20 256.20 12 319.40
13 1655.16 1655.16 1655.16 1655.16 1655.16 1655.16 14 263.67
17 634.50 680.84 709.18 851.07 737.27 893.70 16 354.83
19 760.21 760.21 760.21 760.21 760.21 760.21 18 305.60
21 471.42 423.68 449.56 452.97 449.56 419.52 20 1971.36
23 439.25 439.25 439.25 439.25 439.25 439.25 22 (*)
27 482.43 482.43 482.43 482.43 482.43 482.43 24 234.40
31 386.37 386.37 386.37 386.37 386.37 386.37 26 387.24
33 875.01 875.01 875.01 875.01 875.01 875.01 28 598.89
37 310.05 310.05 310.05 310.05 310.05 310.05 30 511.28
39 464.96 464.96 464.96 464.96 464.96 464.96 32 479.79
41 437.48 437.48 437.48 437.48 437.48 437.48 34 504.39
43 751.86 713.29 947.39 680.31 1119.62 948.06 38 439.66
45 330.25 330.25 330.25 330.25 330.25 330.25 40 402.43
47 619.99 619.99 619.99 619.99 619.99 619.99 42 308.80
49 322.09 322.09 322.09 322.09 322.09 322.09 44 392.64
51 308.26 308.26 308.26 308.26 308.26 308.26 46 454.47
53 830.52 830.52 830.52 830.52 830.52 830.52 48 375.26
55 518.83 518.83 518.83 518.83 518.83 518.83 50 670.94
57 416.22 416.22 416.22 416.22 416.22 416.22 52 323.75
59 212.21 212.21 212.21 212.21 212.21 212.21 54 453.72
61 243.51 243.51 243.51 243.51 243.51 243.51 56 577.91
65 253.54 253.54 253.54 253.54 253.54 253.54 60 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 474.28
71 660.29 660.29 660.29 660.29 660.29 660.29 64 348.21
73 560.90 560.90 560.90 560.90 560.90 560.90 66 729.58
77 340.23 340.23 340.23 340.23 340.23 340.23 68 266.84
70 218.25
72 445.46
78 514.87
80 109.66
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 106-2020-INEI.
MES DE ABRIL DEL 2020
FICAS
00,0)

2 3 4 5 6
566.04 566.04 566.04 566.04 566.04
955.99 1057.30 595.44 374.92 753.89
925.63 925.63 925.63 925.63 925.63
855.53 855.53 855.53 855.53 855.53
434.73 434.73 434.73 434.73 434.73
319.40 319.40 319.40 319.40 319.40
263.67 263.67 263.67 263.67 263.67
354.83 354.83 354.83 354.83 354.83
305.60 305.60 305.60 305.60 305.60
1971.36 1971.36 1971.36 1971.36 1971.36
(*) (*) (*) (*) (*)
234.40 234.40 234.40 234.40 234.40
387.24 387.24 387.24 387.24 387.24
598.89 598.89 584.97 598.89 598.89
511.28 511.28 511.28 511.28 511.28
479.79 479.79 479.79 479.79 479.79
504.39 504.39 504.39 504.39 504.39
964.80 892.68 569.81 (*) 634.56
469.93 443.25 350.10 272.89 331.41
308.80 308.80 308.80 308.80 308.80
392.64 392.64 392.64 392.64 392.64
454.47 454.47 454.47 454.47 454.47
375.26 375.26 375.26 375.26 375.26
670.94 670.94 670.94 670.94 670.94
323.75 323.75 323.75 323.75 323.75
453.72 453.72 453.72 453.72 453.72
577.91 577.91 577.91 577.91 577.91
295.99 295.99 295.99 295.99 295.99
474.28 474.28 474.28 474.28 474.28
348.21 348.21 348.21 348.21 348.21
729.58 729.58 729.58 729.58 729.58
266.84 266.84 266.84 266.84 266.84
218.25 218.25 218.25 218.25 218.25
445.46 445.46 445.46 445.46 445.46
514.87 514.87 514.87 514.87 514.87
109.66 109.66 109.66 109.66 109.66

e fueron aprobados mediante


RESOLUCIÓN JEFATURAL N° 265-2021-INEI

ÍNDICES UNIFICADOS DE PRECIOS DEL MES DE OCTUBRE DEL 2021


ÁREAS GEOGRÁFICAS
(Base : Julio 1992 = 100,0)

Cod. 1 2 3 4 5 6 Cod. 1
01 1211.24 1211.24 1211.24 1211.24 1211.24 1211.24 02 802.66
03 798.59 798.59 798.59 798.59 798.59 798.59 04 641.95
05 491.74 244.75 460.18 601.28 (*) 679.50 06 1545.91
07 1050.75 1050.75 1050.75 1050.75 1050.75 1050.75 08 1304.42
09 426.33 426.33 426.33 426.33 426.33 426.33 10 562.46
11 280.48 280.48 280.48 280.48 280.48 280.48 12 346.74
13 2484.47 2484.47 2484.47 2484.47 2484.47 2484.47 14 312.00
17 808.12 1037.21 922.34 941.73 894.09 994.46 16 371.78
19 1226.95 1226.95 1226.95 1226.95 1226.95 1226.95 18 517.48
21 487.39 445.24 472.84 452.97 472.84 442.59 20 3048.53
23 461.83 461.83 461.83 461.83 461.83 461.83 22 (*)
27 570.25 570.25 570.25 570.25 570.25 570.25 24 278.85
31 392.71 392.71 392.71 392.71 392.71 392.71 26 409.93
33 990.58 990.58 990.58 990.58 990.58 990.58 28 707.92
37 382.56 382.56 382.56 382.56 382.56 382.56 30 642.27
39 494.23 494.23 494.23 494.23 494.23 494.23 32 507.42
41 638.30 638.30 638.30 638.30 638.30 638.30 34 665.62
43 899.6 959.24 1172.22 836.14 1317.24 1204.83 38 491.72
45 399.47 399.47 399.47 399.47 399.47 399.47 40 405.49
47 653.54 653.54 653.54 653.54 653.54 653.54 42 449.25
49 400.19 400.19 400.19 400.19 400.19 400.19 44 473.46
51 465.17 465.17 465.17 465.17 465.17 465.17 46 602.29
53 1066.96 1066.96 1066.96 1066.96 1066.96 1066.96 48 396.27
55 640.22 640.22 640.22 640.22 640.22 640.22 50 793.09
57 777.68 777.68 777.68 777.68 777.68 777.68 52 394.63
59 234.50 234.50 234.50 234.50 234.50 234.50 54 453.97
61 373.27 373.27 373.27 373.27 373.27 373.27 56 1158.53
65 324.54 324.54 324.54 324.54 324.54 324.54 60 385.02
69 390.93 327.82 428.87 488.52 269.39 451.51 62 521.59
71 660.29 660.29 660.29 660.29 660.29 660.29 64 364.45
73 885.84 885.84 885.84 885.84 885.84 885.84 66 1125.07
77 402.19 402.19 402.19 402.19 402.19 402.19 68 487.60
70 218.25
72 600.88
78 584.70
80 110.75
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N°252-2021-INEI.
MES DE OCTUBRE DEL 2021
FICAS
00,0)

2 3 4 5 6
802.66 802.66 802.66 802.66 802.66
1067.86 1194.49 610.17 358.11 816.96
1545.91 1545.91 1545.91 1545.91 1545.91
1304.42 1304.42 1304.42 1304.42 1304.42
562.46 562.46 562.46 562.46 562.46
346.74 346.74 346.74 346.74 346.74
312.00 312.00 312.00 312.00 312.00
371.78 371.78 371.78 371.78 371.78
517.48 517.48 517.48 517.48 517.48
3048.53 3048.53 3048.53 3048.53 3048.53
(*) (*) (*) (*) (*)
278.85 278.85 278.85 278.85 278.85
409.93 409.93 409.93 409.93 409.93
707.92 707.92 663.15 707.92 707.92
642.27 642.27 642.27 642.27 642.27
507.42 507.42 507.42 507.42 507.42
665.62 665.62 665.62 665.62 665.62
1133.76 1011.88 570.66 (*) 698.28
504.21 455.36 360.31 272.89 331.41
449.25 449.25 449.25 449.25 449.25
473.46 473.46 473.46 473.46 473.46
602.29 602.29 602.29 602.29 602.29
396.27 396.27 396.27 396.27 396.27
793.09 793.09 793.09 793.09 793.09
394.63 394.63 394.63 394.63 394.63
453.97 453.97 453.97 453.97 453.97
1158.53 1158.53 1158.53 1158.53 1158.53
385.02 385.02 385.02 385.02 385.02
521.59 521.59 521.59 521.59 521.59
364.45 364.45 364.45 364.45 364.45
1125.07 1125.07 1125.07 1125.07 1125.07
487.60 487.60 487.60 487.60 487.60
218.25 218.25 218.25 218.25 218.25
600.88 600.88 600.88 600.88 600.88
584.70 584.70 584.70 584.70 584.70
110.75 110.75 110.75 110.75 110.75