Proyecto CONSTRUCCIÓN DE PISTAS Y VEREDAS DE LAS CALLES TEODORO NORIEGA CUADRA 2, JÚPITER CUADRA 2, Y AV. EL EJERCITO CUADRA 2, EN EL CENTRO POBLADO
PARATUSHIALI, DISTRITO DE SATIPO - PROVINCIA DE SATIPO - JUNÍN
Item Descripción Und. CANT. VECES LARGO ANCHO ALTO PARCIAL TOTAL
01 TRABAJOS PROVISIONALES
01.01 ALQUILER DE ALMACEN DE OBRA Y OFICINA TECNICA mes 3.00
3.00 3.00
01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40M X 3.60M. GIGANTOGRAFIA (SUMINI und 1.00
1.00 1.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00
1.00 1.00
02 OBRAS PRELIMINARES
02.01 LIMPIEZA DE TERRENO MANUAL m2 2784.92
CALLE TEODORO NORIEGA 1.00 area= 1,004.89 1004.89
CALLE JUPITER 1.00 area= 1,046.58 1046.58
AV. EL EJERCITO 1.00 area= 733.46 733.46
CALLE JUPITER
CP3 1.00 82.54 0.30 24.76
CP4 1.00 39.69 0.30 11.91
CP5 1.00 2.30 0.30 0.69
CP6 1.00 2.30 0.30 0.69
CP7 1.00 40.01 0.30 12.00
CP10 1.00 4.24 0.30 1.27
CP11 1.00 2.00 0.30 0.60
AV. EL EJERCITO
CP1 1.00 60.45 0.30 18.14
CP2 1.00 60.45 0.30 18.14
CONFORMACION Y COMPACTACION DE BADEN
CALLE TEODORO NORIEGA
BADEN 01 1.00 area= 12.91 12.91
BADEN 02 1.00 area= 6.41 6.41
CALLE JUPITER
BADEN 03 1.00 area= 5.55 5.55
CALLE JUPITER
CP3 1.00 82.54 0.30 24.76
CP4 1.00 39.69 0.30 11.907
CP5 1.00 2.30 0.30 0.69
CP6 1.00 2.30 0.30 0.69
CP7 1.00 40.01 0.30 12.00
CP10 1.00 4.24 0.30 1.27
CP11 1.00 2.00 0.30 0.60
AV. EL EJERCITO
CP1 1.00 60.45 0.30 18.14
CP2 1.00 60.45 0.30 18.14
BASE GRANULAR PARA BADENES
CALLE TEODORO NORIEGA
BADEN 01 1.00 area= 12.91 12.91
BADEN 02 1.00 area= 6.41 6.41
CALLE JUPITER
BADEN 03 1.00 area= 5.55 5.55
AV. EL EJERCITO
CP1 1.00 60.45 0.30 0.10 1.81
CP2 1.00 60.45 0.30 0.10 1.81
04.03 CALZADA
04.03.01 ENCOFRADO Y DESENCOFRADO EN PAVIMENTO m2 242.12
CALLE TEODORO NORIEGA
JUNTA LONGITUDINAL CENTRAL 1" 1.00 94.65 0.20 18.93
JUNTA LONGITUDINAL LATERAL 1" (perimetro) 1.00 217.68 0.20 43.54
JUNTA TRANSVERSAL 1" 21.00 8.80 0.20 36.96
CALLE JUPITER
JUNTA LONGITUDINAL CENTRAL 1" 1.00 96.50 0.20 19.30
JUNTA LONGITUDINAL LATERAL 1" (perimetro) 1.00 215.02 0.20 43.00
JUNTA TRANSVERSAL 1" 12.00 7.00 0.20 16.80
JUNTA TRANSVERSAL 1" 1.00 40.58 0.20 8.12
AV. EL EJERCITO
JUNTA LONGITUDINAL CENTRAL 1" 1.00 60.45 0.20 12.09
JUNTA LONGITUDINAL LATERAL 1" (perimetro) 1.00 132.90 0.20 26.58
JUNTA TRANSVERSAL 1" 14.00 6.00 0.20 16.80
04.03.02 CONEXIÓN ENTRE PAVIMENTOS RÍGIDOS CON FIERRO LISO Ø= 5/8" @0.50M, L=0.70M, und 1293.00
CALLE TEODORO NORIEGA
JUNTA LONGITUDINAL CENTRAL 1" 1.00 182.00 182.00
JUNTA TRANSVERSAL 1" 21.00 18.00 378.00
CALLE JUPITER
JUNTA LONGITUDINAL CENTRAL 1" 1.00 165.00 165.00
JUNTA TRANSVERSAL 1" 21.00 14.00 294.00
AV. EL EJERCITO
JUNTA LONGITUDINAL CENTRAL 1" 1.00 106.00 106.00
JUNTA TRANSVERSAL 1" 14.00 12.00 168.00
CALLE JUPITER
CP3 20.00 area= 0.06 1.20
CP4 9.00 area= 0.06 0.54
CP5 1.00 area= 0.06 0.06
CP6 1.00 area= 0.06 0.06
CP7 9.00 area= 0.06 0.54
CP10 1.00 area= 0.06 0.06
CP11 1.00 area= 0.06 0.06
AV. EL EJERCITO
CP1 15.00 area= 0.06 0.90
CP2 15.00 area= 0.06 0.90
CALLE JUPITER
CP3 1.00 82.54 area= 0.06 4.95
CP4 1.00 39.69 area= 0.06 2.38
CP5 1.00 2.30 area= 0.06 0.14
CP6 1.00 2.30 area= 0.06 0.14
CP7 1.00 40.01 area= 0.06 2.40
CP10 1.00 4.24 area= 0.06 0.25
CP11 1.00 2.00 area= 0.06 0.12
AV. EL EJERCITO
CP1 1.00 60.45 area= 0.06 3.63
CP2 1.00 60.45 area= 0.06 3.63
CALLE JUPITER
CP3 1.00 82.54 0.36 29.71
CP4 1.00 39.69 0.36 14.29
CP5 1.00 2.30 0.36 0.83
CP6 1.00 2.30 0.36 0.83
CP7 1.00 40.01 0.36 14.40
CP10 1.00 4.24 0.36 1.53
CP11 1.00 2.00 0.36 0.72
AV. EL EJERCITO
CP1 1.00 60.45 0.36 21.76
CP2 1.00 60.45 0.36 21.76
CALLE JUPITER
CP3 20.00 0.36 7.20
CP4 9.00 0.36 3.24
CP5 1.00 0.36 0.36
CP6 1.00 0.36 0.36
CP7 9.00 0.36 3.24
CP10 1.00 0.36 0.36
CP11 1.00 0.36 0.36
AV. EL EJERCITO
CP1 15.00 0.36 5.40
CP2 15.00 0.36 5.40
04.05 JARDINERIA
04.05.01 ENCOFRADO Y DESENCOFRADO EN SARDINELES m2 134.47
AV. EL EJERCITO
SP1 1.00 perimetro= 112.06 0.60 67.24
SP2 1.00 perimetro= 112.06 0.60 67.24
04.06 BADENES
04.06.01 ENCOFRADO Y DESENCOFRADO EN BADEN m2 1.89
BADEN PROYECTADO 01 3.00 area= 0.21 0.63
BADEN PROYECTADO 02 3.00 area= 0.21 0.63
BADEN PROYECTADO 03 3.00 area= 0.21 0.63
05 VEREDAS
05.01 MOVIMIENTO DE TIERRAS
05.01.01 CORTE SUPERFICIAL MANUAL DELTERRENO HASTA 0.20 m m2 412.71
AV. EL EJERCITO
VEREDA PROYECTADA 01 1.00 area= 71.63 71.63
VEREDA PROYECTADA 02 1.00 area= 71.63 71.63
CALLE JUPITER
VEREDA PROYECTADA 03 1.00 area= 90.04 90.04
VEREDA PROYECTADA 04 1.00 area= 37.20 37.20
VEREDA PROYECTADA 05 1.00 area= 37.24 37.24
CALLE TEODORO NORIEGA
VEREDA PROYECTADA 06 1.00 area= 104.99 104.99
05.01.02 BASE GRANULAR PARA VEREDAS E=0.10 M C/EQUIPO m2 412.71
AV. EL EJERCITO
VEREDA PROYECTADA 01 1.00 area= 71.63 71.63
VEREDA PROYECTADA 02 1.00 area= 71.63 71.63
CALLE JUPITER
VEREDA PROYECTADA 03 1.00 area= 90.04 90.04
VEREDA PROYECTADA 04 1.00 area= 37.20 37.20
VEREDA PROYECTADA 05 1.00 area= 37.24 37.24
CALLE TEODORO NORIEGA
VEREDA PROYECTADA 06 1.00 area= 104.99 104.99
ELIMINACION DE MATERIAL PRODUCTO DE LA EXCAVACION DE UÑAS DE VEREDAS Longitud = 672.58 area= 0.05 35.31
05.02.03 UÑAS DE VEREDAS CONCRETO F'C=175 KG/CM2 Hsumerg.=0.30m, A1=0.25m, A2=0.10m m 672.58
AV. EL EJERCITO
VEREDA PROYECTADA 01 2.00 55.88 111.76
VEREDA PROYECTADA 02 2.00 55.88 111.76
CALLE JUPITER
VEREDA PROYECTADA 03 2.00 75.00 150.00
VEREDA PROYECTADA 04 2.00 31.00 62.00
VEREDA PROYECTADA 05 2.00 31.03 62.06
CALLE TEODORO NORIEGA
VEREDA PROYECTADA 06 2.00 87.50 175.00
05.03.03 RAMPAS
05.03.03.01 RAMPA TIPO 1 und 10.00
AV. EL EJERCITO 8.00 8.00
CALLE JUPITER 2.00 2.00
06 PRUEBAS DE CALIDAD
06.01 ENSAYOS DE COMPRESION DE PROBETAS und 30.00
30.00 30.00
06.02 ENSAYOS DE DENSIDAD DE CAMPO und 20.00
20.00 20.00
06.03 DISEÑO DE MEZCLAS und 2.00
2.00 2.00
07 FLETE
07.01 FLETE TERRESTRE GLB 1.00
1.00 1.00
08 VARIOS
08.01 PLACA RECORDATORIA DE MARMOL INC/PEDESTAL E INSTALACION und 1.00
1.00 1.00
08.02 SUMINISTRO Y INSTALACION DE GRIFO CONTRA INCENDIO TIPO POSTE 2 BOCAS und 3.00
3.00 3.00
09 MITIGACION AMBIENTAL
09.01 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL GLB 1.00
1.00 1.00
09.02 PROGRAMA DE SEÑALIZACION AMBIENTAL und 1.00
1.00 1.00
09.03 MONITOREO AMBIENTAL
09.03.01 CALIDAD DEL AGUA GLB 1.00
1.00 1.00
09.03.02 CALIDAD DEL AIRE GLB 1.00
1.00 1.00
09.03.03 CALIDAD DEL SUELO GLB 1.00
1.00 1.00
09.03.04 RUIDO AMBIENTAL GLB 1.00
1.00 1.00
RESUMEN DE METRADOS
Proyecto CONSTRUCCIÓN DE PISTAS Y VEREDAS DE LAS CALLES TEODORO NORIEGA CUADRA 2, JÚPITER
CUADRA 2, Y AV. EL EJERCITO CUADRA 2, EN EL CENTRO POBLADO PARATUSHIALI, DISTRITO DE
SATIPO - PROVINCIA DE SATIPO - JUNÍN
BADEN PROYECTADO 03
ACERO LONGITUDINAL 4 1/2" 1 4 10.69 42.76
ESTRIBOS 4 1/2" 1 42 2.74 115.08
Peso en Kilogramos por metro lineal 0.25 0.56 1.02 1.60 2.26 4.04
Longitud total en metros lineales 0.00 0.00 317.85 0.00 0.00 0.00
Total en Kilogramos por F 0.00 0.00 324.21 0.00 0.00 0.00
TOTAL 324.21
Peso en Kilogramos por metro lineal 0.25 0.56 1.02 1.60 2.26 4.04
Longitud total en metros lineales 0.00 93.29 128.08 0.00 0.00 0.00
Total en Kilogramos por F 0.00 52.29 130.64 0.00 0.00 0.00
TOTAL 182.93