CALCULO DE

METROS DE AVANCE 600 AVANCE PROMEDIO POR DISPARO


70 % HUMEDO 420 DISPAROS TOPE HUMEDO
3O% SECO 180 DISPAROS TOPE SECO
TOTAL DE DISPAROS

NONELES TOPE HUMEDO


NONELES POR NONELES POR M. PIEZAS POR PIEZAS POR METROS
NUMEROS MATERIAL
TOPE ESTIMADOS TOPE ESTIMADOS

1 1 150.0 MF 1.5*39 96 10080


2 1 150.0 EM 1*39 63 6615
3 1 150.0 CORDON 20 2100
4 1 150.0 CAÑUELAS 2 210
5 2 300.0
6 2 300.0
7 4 600.0
8 4 600.0
9 5 750.0
10 2 300.0
11 0 0.0
12 0 0.0
13 0 0.0
14 5 750.0
15 22 3300.0
TOTAL 50 7500

METROS DE AVANCE 300 AVANCE PROMEDIO POR DISPARO


70 % HUMEDO 210 DISPAROS TOPE HUMEDO
3O% SECO 90 DISPAROS TOPE SECO
TOTAL DE DISPAROS

NONELES TOPE HUMEDO


NONELES POR NONELES POR M.
NUMEROS TOPE ESTIMADOS PIEZAS POR PIEZAS POR METROS
MATERIAL TOPE ESTIMADOS
1 1 150.0 MF 1.5*39 52 5460
2 1 150.0 EM 1*39 14 1470
3 1 150.0 CORDON 10 1050
4 1 150.0 CAÑUELAS 2 210
5 2 300.0
6 2 300.0
7 2 300.0
8 2 300.0
9 4 600.0
10 5 750.0
11 2 300.0
12 0 0.0
13 5 750.0
14 0 0.0
15 5 750.0
TOTAL 33 4950.0
CALCULO DE EXPLOSIVO POR METROS DE AVANCE

JUMBO

4
105
45
150.0

TOPE HUMEDO
PESO POR PESO POR PIEZAS POR
METROS TONELADAS MATERIAL
BOMBILLO ESTIMADOS TOPE
1 10080 KG 10.1 MF 1.5*39 6
0.463 3062.745 KG 3.1 EM 1*39 63
1 2100 M MF 1X8 23
1 210 PZAS ANFO 4
CORDON 20
CAÑUELAS 2

MAQUINA DE PIERNA

2
105
45
150.0

TOPE HUMEDO

PESO POR PESO POR METROS TONELADAS PIEZAS POR


BOMBILLO ESTIMADOS MATERIAL TOPE
1 5460 KG 5.46 MF 1.5*39 10
0.463 680.61 KG 0.68061 EM 1*39 14
1 1050 M MF 1X8 21
1 210 PZAS ANFO 2
CORDON 10
CAÑUELAS 2
TOPE SECO
PIEZAS POR METROS PESO POR PESO POR METROS TONELADAS
ESTIMADOS BOMBILLO ESTIMADOS

270.0 1 270.0 KG 0.3


2835.0 0.463 1312.6 KG 1.3
1035.0 0.1 103.5 KG 0.1
180.0 25 4500.0 KG 4.5
900.0 1 900.0 M
90.0 1 90.0 PZAS

TOPE SECO

PIEZAS POR METROS PESO POR PESO POR METROS TONELADAS


ESTIMADOS BOMBILLO ESTIMADOS
450 1 450 KG 0.45
630 0.463 291.69 KG 0.29169
945 0.1 94.5 KG 0.0945
90 25 2250 KG 2.25
450 1 450 M
90 1 90 PZAS